ML17311A944
| ML17311A944 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/08/1995 |
| From: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17311A945 | List: |
| References | |
| 182-06077-JML-J, 182-6077-JML-J, NUDOCS 9506160350 | |
| Download: ML17311A944 (4) | |
Text
PRI&RIWY' ACCELERATED RIDS Pl<OCESSliG, REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9506160350 DOC.DATE: 95/06/16 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 P
AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION R
Document Control Branch (Document Control Desk)
SUBJECT:
Forwards monthly operating for May 1995
& revised rept for April.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR g ENCL g SIZE: /2 TITLE: Monthly Operating Report (per Tech Specs)
NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
05000528 05000529 05000530 RECXPXENT ID CODE/NAME PD4-2 PD TRAN,L INTERNAL:
G
~
I LE CENTER 0
NRR/DO>S7OECB EXTERNAL LITCO BRYCE E J H
NRC PDR COPIES LTTR ENCL 1
1 1
1 10 10 1
1 1
1 1
1 1
1 RECXPIENT ID CODE/NAME HOLIAN, B THOMAS,C AEOD/SPD/RRAB NRR/DISP/PIPB RGN4 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 D
0 C
u N
Y'OTE TOALL"RIDS" RECIPIEYTS:
PLEASE HELP US TO REDUCE iVKSTE!COYTACTT!IE DOC!.'ifEYTCONTROL DESk, ROO) I P I.37 IEXT. 504-.083 ) TO EL IhfliATE YOUR i'AifL P ROif DIS'I'RI!IU'I'IOYLIS'I S I'OR DOC!.'4lEi'I'S YOU DOY"I'l.'I'.D!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 22
~
~
\\
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034
~
PHOENIX, ARIZONA85072-2034 JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 182-06077-JML/JLT/J DF June 8, 1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for May 1995 Enclosed are the Monthly Operating Reports for May 1995, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical. Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
Also enclosed is one revised page to the April 1995 report.
The revision on page 5 identifies the Shutdown for the Unit 1 fifth (5th) refueling outage that began on 04/01/95.
1 By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.
Ifyou have any questions, please contact Judy Fulton at (602) 393-5277.
Sincerely, JML/JLT/JDF/gez
Enclosures:
1 - May 1995 Monthly Operating Reports 2 - Revised page 5 to April 1995 Monthly Operating Report (all w/enclosures) cc:
L. J. Callan K. E. Perkins NRC Senior Resident Inspector INPO Records Center UtilityData Institute
'TI506160350
'II50531 PDR ADOCK 05000528 R
'I
~
]
J,