ML18033A230: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DI'4iQBUTION DEMONSTRPIION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8805200212 DOC.DATE: 88/05/13 NOTARIZED:
{{#Wiki_filter:ACCELERATED           DI'4iQBUTION       DEMONSTRPIION             SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry.Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION BROOKS,R.H.
ACCESSION NBR:8805200212       DOC.DATE: 88/05/13   NOTARIZED: NO         DOCKET g FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee         05000259 50-260 Browns Ferry .Nuclear Power Station, Unit 2, Tennessee       05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH. NAME         AUTHOR AFFILIATION BROOKS,R.H.         Tennessee Valley Authority RECIP.NAME         RECIPIENT AFFILIATION                                 05000296'UBJECT:
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Alabama, State of DOCKET g 05000259 05000260 05000296'UBJECT:
Alabama, State of R
Followup to NPDES noncompliance notification sedimentation pond.DISTRIBUTION CODE: C001D COPIES RECEIVED:LTR ENCL TITLE: Licensing Submittal:
Followup to NPDES noncompliance     notification re repair of sedimentation pond.                                                                 I DISTRIBUTION CODE: C001D     COPIES RECEIVED:LTR     ENCL     SIZE:
Environmental Rept Amdt&R re repair of I SIZE: Related Correspondence D NOTES:G.Zech 3 B.D.Liaw, G.Zech 3 B.D.Liaw, G.Zech 3 B.D.Liaw, cy.1 cy.'ea to: K.Barr, OI.cy.1 cy.ea to: K.Barr, OI.cy.1 cy.ea to: K.Barr, OI.Ebneter,Axelrad,S.Richardson Ebneter,Axelrad,S.Richardson, Ebneter,Axelrad,S.Richardson,'05000259 8 05000260/05000296A RECIPIENT ID CODE/NAME JAMERSON,C MORAN,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DEST/ADE 8H NRR/DREP/RPB 10 OGC 15-B-18 EXTERNAL: LPDR NSIC NOTES: COPIES LTTR ENCL 9 RECIPIENT ID CODE/NAME PD GEARS;G AEOD/DOA ARM/DAF/LFMB NRR/DEST/SGB 8D-ABSTRACT LE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 8 D TOTAL NUMBER OF COPIES REQUIRED: LTTR 34 ENCL  
TITLE: Licensing Submittal: Environmental Rept Amdt       & Related Correspondence D NOTES:G.Zech 3 cy. 1 cy. 'ea to: Ebneter,Axelrad,S.Richardson            '05000259 8 B.D.Liaw, K.Barr, OI.
'~It t',I TENNESSEE VALLEY AUTHORITY NAY)3888 Mr.Charles Horn, Director Mater Division Alabama Department of Environmental Management 1751 Federal Drive Montgomery, Alabama 36130 Attention:
G.Zech 3 cy. 1 cy. ea to: Ebneter,Axelrad,S.Richardson,               05000260/
Ms.Treena Piznar
B.D.Liaw, K.Barr, OI.
G.Zech 3 cy. 1 cy. ea to: Ebneter,Axelrad,S.Richardson,               05000296A B.D.Liaw, K.Barr, OI.
RECIPIENT        COPIES          RECIPIENT          COPIES ID  CODE/NAME      LTTR ENCL      ID CODE/NAME       LTTR ENCL JAMERSON,C                       PD MORAN,D                           GEARS;G INTERNAL: ACRS                               AEOD/DOA                1 AEOD/DSP/TPAB                     ARM/DAF/LFMB            1 NRR/DEST/ADE 8H                   NRR/DEST/SGB 8D        1 NRR/DREP/RPB 10                         -ABSTRACT        1 OGC 15-B-18                             LE      01      1 EXTERNAL: LPDR                               NRC PDR NSIC NOTES:                           9 8
D TOTAL NUMBER OF COPIES REQUIRED: LTTR       34   ENCL


==Dear Mr.Horn:==
        ' ~
BROWNS FERRY NUCLEAR PLANT (BFN)-NPDES PERMIT NO.AL0022080 SEDIMENTATION POND-DISCHARGE SERIAL NO.102 This is a follow up to my February 24 and March 25 letters to you regarding the repair of the sedimentation pond at BFN.This is our report on how the sedimentation pond was originally constructed.
It t',I
the extent of the repairs, and the results of the testing to determine the success of the repairs.The pond was constructed around 1970, as part of a two pond system for treating metal cleaning wastes.Concentrated wastes were initially pumped to a lined pond, and then subsequently pumped to the sedimentation pond where they were diluted with river water prior to discharge.
 
After BFN went into operation in 1974, wastewaters from the water treatment plant were also routed to the sedimentation pond.These wastes originated from the regeneration of the resin beds and filter backwash.The pond received this type of waste until March 1987, when the water treatment facility was removed from service.Since that time, a mobile water treatment facility (Ecolochem Inc.)has been providing demineralized water for BFN.The waste from this facility consists of filter backwash which contains alum, and is currently being routed to the lined pond while the sedimentation pond is out of'ervice.
TENNESSEE VALLEY AUTHORITY NAY    )3888 Mr. Charles Horn, Director Mater Division Alabama Department of Environmental Management 1751 Federal      Drive Montgomery, Alabama        36130 Attention:      Ms. Treena    Piznar
The sedimentation pond was built as a nonpermanent facility with a clay layer approximately two feet thick.The quality of the construction material was poor.The current repair work started on December 21, and concluded on February 10, During the excavation, it became apparent that the material used to originally construct the dike was not properly engineered after numerous stumps, rocks, and pipes were discovered in the dike.An area was excavated approximately 12 feet wide and 8 to 10 feet.8805200212 8805i3.'DR...ADGCK,05000259
 
'"8'CD d An Equal Opportunity Employer C I Mr.Charles Horn g<V 1~below the bottom of the pond.At this depth, we were able to identify suitable material to serve as a base for the fill that was placed in the excavated area.In addition, the new repair was tied into the area repaired in 1985.The 1985 repair work to the dike was done in a manner similar to the most recent work.The excavated area was backfilled with clay having a compaction of greater than 98 percent of the maximum Proctor density.In an effort to ensure integrity of the latest construction repair, on March 18 the pond was filled to a depth of 12 inches with river water.On March 21, seepage was observed in the switchyard drainage ditch on the southwest side of the sedimentation pond.Therefore, the pond has not been placed back into service, and will not be used until further repairs can be undertaken.
==Dear Mr. Horn:==
Because of the problems experienced with this pond, BFN intends to install a synthetic liner.We have initiated the design process, and plan to submit an engineering report to your office by July 29 for your review and approval.Until the pond is retested, it will remain out of service.Wastewater will continue to be routed to the lined pond and not discharged.
 
If you or your staff have any questions on this matter, please have them contact Madonna E.Hartin at (615)632-6695 in Knoxville.
BROWNS     FERRY   NUCLEAR PLANT (BFN)             NPDES     PERMIT   NO. AL0022080 SEDIMENTATION POND       - DISCHARGE SERIAL NO. 102 This is     a   follow up to my February 24               and March 25 letters     to you regarding     the   repair of the sedimentation             pond at BFN.     This is our report on how the sedimentation pond was originally constructed. the extent of the repairs, and the results of the testing to determine the success of the repairs.
Sincerely, ORIGINAL SIGNED BY.RALPH K BROOKS Ralph H.Brooks, Director Environmental Quality cc: Mr, K.P.Barr, Acting Assistant Director for Inspection Programs TVA Projects Division U.S.Nuclear Regulatory Commission Region XI 101 Marietta Street, NW., Suite 2900 Atlanta, Georgia 30323 Mr.Bruce R.Barrett, Director Water Management Division U.S.Environmental Protection Agency, Region XV 345 Courtland Street, NE.Atlanta, Georgia 30365 Continued on page 3 Mr.Charles Horn-3-NAY 33$988 U.S.Nuclear Re u Attention:
The pond was       constructed around 1970, as part of a two pond system for treating     metal cleaning wastes.             Concentrated wastes were initially pumped to a lined pond, and then subsequently pumped to the sedimentation pond where they were diluted with river water prior to discharge.                     After BFN went into operation in 1974, wastewaters                   from the water treatment plant were also routed to the sedimentation pond.                             These wastes originated from the regeneration of the resin beds and filter backwash.
Document Control Desk Washington, D.C.20555 Mr, G.G.Zech, Assistant Director for Projects TVA Projects Division U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 S T}}
The pond received this type of waste until March 1987, when the water treatment facility was removed from service. Since that time, a mobile water     treatment       facility (Ecolochem Inc.) has been providing demineralized water for BFN. The waste from this facility consists of filter backwash which contains alum, and is currently being routed to the lined pond while the sedimentation pond is out of'ervice.
The sedimentation       pond was built as a nonpermanent             facility with a clay layer approximately         two feet thick.         The quality     of the construction material was poor.         The current repair work started           on December 21, and concluded on February 10, During the excavation,                   it became apparent that the material used to originally construct the dike was not properly engineered after numerous stumps, rocks, and pipes were discovered in the dike. An area was excavated approximately 12 feet wide and 8 to 10 feet
.
  '"8 'CD
.8805200212       8805i3
    'DR ...ADGCK,05000259 d
An Equal Opportunity Employer
 
C I
 
Mr. Charles Horn                                                 g<V 1~
below the bottom of the pond. At this depth, we were able to identify suitable material to serve as a base for the excavated area.
fill that was placed in the In addition, the new repair was tied into the area repaired in 1985. The 1985 repair work to the dike was done in a manner similar to the most recent work. The excavated area was backfilled with clay having a compaction of greater than 98 percent of the maximum Proctor density.
In an effort to   ensure   integrity of   the latest construction repair,   on March 18 the pond was       filled   to a depth of 12 inches with river water.
On March   21, seepage was   observed in the switchyard drainage ditch on the southwest side of the sedimentation pond.           Therefore, the pond has not been placed back into service, and will not be used until further repairs can be undertaken.
Because   of the problems experienced with this pond, BFN intends to install   a   synthetic liner. We have initiated the design process, and plan to submit an engineering report to your office by July 29 for your review and approval. Until the pond is retested, it will remain out of service. Wastewater will continue to be routed to the lined pond and not discharged.
If you   or your   staff have any questions on this matter, please     have them contact Madonna E. Hartin at (615) 632-6695 in Knoxville.
Sincerely, ORIGINAL SIGNED BY.
RALPH   K BROOKS Ralph H. Brooks,   Director Environmental Quality cc:   Mr, K. P. Barr, Acting Assistant     Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region XI 101 Marietta Street, NW., Suite     2900 Atlanta, Georgia 30323 Mr. Bruce R. Barrett, Director Water Management Division U.S. Environmental Protection Agency, Region XV 345 Courtland Street, NE.
Atlanta, Georgia 30365 Continued on page   3
 
Mr. Charles Horn                         NAY 33 $ 988 U.S. Nuclear Re u Attention:   Document Control Desk Washington, D.C. 20555 Mr, G. G. Zech,   Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland   20852
 
S T}}

Revision as of 00:57, 22 October 2019

Followup to NPDES Noncompliance Notification Re Repair of Sedimentation Pond.Repair Started 871221 & Concluded on 880210.Seepage Observed on 880321 So Pond Not Placed Back in Svc Until Further Repairs Undertaken
ML18033A230
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 05/13/1988
From: Brooks R
TENNESSEE VALLEY AUTHORITY
To: Horn C
ALABAMA, STATE OF
References
NUDOCS 8805200212
Download: ML18033A230 (7)


Text

ACCELERATED DI'4iQBUTION DEMONSTRPIION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8805200212 DOC.DATE: 88/05/13 NOTARIZED: NO DOCKET g FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry .Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH. NAME AUTHOR AFFILIATION BROOKS,R.H. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION 05000296'UBJECT:

Alabama, State of R

Followup to NPDES noncompliance notification re repair of sedimentation pond. I DISTRIBUTION CODE: C001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Licensing Submittal: Environmental Rept Amdt & Related Correspondence D NOTES:G.Zech 3 cy. 1 cy. 'ea to: Ebneter,Axelrad,S.Richardson '05000259 8 B.D.Liaw, K.Barr, OI.

G.Zech 3 cy. 1 cy. ea to: Ebneter,Axelrad,S.Richardson, 05000260/

B.D.Liaw, K.Barr, OI.

G.Zech 3 cy. 1 cy. ea to: Ebneter,Axelrad,S.Richardson, 05000296A B.D.Liaw, K.Barr, OI.

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL JAMERSON,C PD MORAN,D GEARS;G INTERNAL: ACRS AEOD/DOA 1 AEOD/DSP/TPAB ARM/DAF/LFMB 1 NRR/DEST/ADE 8H NRR/DEST/SGB 8D 1 NRR/DREP/RPB 10 -ABSTRACT 1 OGC 15-B-18 LE 01 1 EXTERNAL: LPDR NRC PDR NSIC NOTES: 9 8

D TOTAL NUMBER OF COPIES REQUIRED: LTTR 34 ENCL

' ~

It t',I

TENNESSEE VALLEY AUTHORITY NAY )3888 Mr. Charles Horn, Director Mater Division Alabama Department of Environmental Management 1751 Federal Drive Montgomery, Alabama 36130 Attention: Ms. Treena Piznar

Dear Mr. Horn:

BROWNS FERRY NUCLEAR PLANT (BFN) NPDES PERMIT NO. AL0022080 SEDIMENTATION POND - DISCHARGE SERIAL NO. 102 This is a follow up to my February 24 and March 25 letters to you regarding the repair of the sedimentation pond at BFN. This is our report on how the sedimentation pond was originally constructed. the extent of the repairs, and the results of the testing to determine the success of the repairs.

The pond was constructed around 1970, as part of a two pond system for treating metal cleaning wastes. Concentrated wastes were initially pumped to a lined pond, and then subsequently pumped to the sedimentation pond where they were diluted with river water prior to discharge. After BFN went into operation in 1974, wastewaters from the water treatment plant were also routed to the sedimentation pond. These wastes originated from the regeneration of the resin beds and filter backwash.

The pond received this type of waste until March 1987, when the water treatment facility was removed from service. Since that time, a mobile water treatment facility (Ecolochem Inc.) has been providing demineralized water for BFN. The waste from this facility consists of filter backwash which contains alum, and is currently being routed to the lined pond while the sedimentation pond is out of'ervice.

The sedimentation pond was built as a nonpermanent facility with a clay layer approximately two feet thick. The quality of the construction material was poor. The current repair work started on December 21, and concluded on February 10, During the excavation, it became apparent that the material used to originally construct the dike was not properly engineered after numerous stumps, rocks, and pipes were discovered in the dike. An area was excavated approximately 12 feet wide and 8 to 10 feet

.

'"8 'CD

.8805200212 8805i3

'DR ...ADGCK,05000259 d

An Equal Opportunity Employer

C I

Mr. Charles Horn g<V 1~

below the bottom of the pond. At this depth, we were able to identify suitable material to serve as a base for the excavated area.

fill that was placed in the In addition, the new repair was tied into the area repaired in 1985. The 1985 repair work to the dike was done in a manner similar to the most recent work. The excavated area was backfilled with clay having a compaction of greater than 98 percent of the maximum Proctor density.

In an effort to ensure integrity of the latest construction repair, on March 18 the pond was filled to a depth of 12 inches with river water.

On March 21, seepage was observed in the switchyard drainage ditch on the southwest side of the sedimentation pond. Therefore, the pond has not been placed back into service, and will not be used until further repairs can be undertaken.

Because of the problems experienced with this pond, BFN intends to install a synthetic liner. We have initiated the design process, and plan to submit an engineering report to your office by July 29 for your review and approval. Until the pond is retested, it will remain out of service. Wastewater will continue to be routed to the lined pond and not discharged.

If you or your staff have any questions on this matter, please have them contact Madonna E. Hartin at (615) 632-6695 in Knoxville.

Sincerely, ORIGINAL SIGNED BY.

RALPH K BROOKS Ralph H. Brooks, Director Environmental Quality cc: Mr, K. P. Barr, Acting Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region XI 101 Marietta Street, NW., Suite 2900 Atlanta, Georgia 30323 Mr. Bruce R. Barrett, Director Water Management Division U.S. Environmental Protection Agency, Region XV 345 Courtland Street, NE.

Atlanta, Georgia 30365 Continued on page 3

Mr. Charles Horn NAY 33 $ 988 U.S. Nuclear Re u Attention: Document Control Desk Washington, D.C. 20555 Mr, G. G. Zech, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

S T