ML20083J190
| ML20083J190 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 12/23/1983 |
| From: | Bruch A TENNESSEE VALLEY AUTHORITY |
| To: | Marlar J ENVIRONMENTAL PROTECTION AGENCY |
| References | |
| NUDOCS 8401050157 | |
| Download: ML20083J190 (2) | |
Text
,-
TENNESSEE V ALL EY AUTHORITY KNOXVf LLE. TENNESSEE 37002 TVA Mailroom DEC 2 91983 Mr. John Marlar, Chief Facilities Performance Branch Water Management Division U.S. Environmental Protection Agency Region IV l
345 Courtland Street, NE.
Atlanta, Georgia 30365
Dear Mr. Marlar:
NOTIFICATION OF NONCOMPLIANCE WITH EFFLUENT LIMITATIONS - NPDES PERMIT N0. AL0022080 - BROWNS FERRY NUCLEAR PLANT Description of the discharge--Discharge No. 006 - Sewage treatment plant effluent. A grab sample collected on November 29 and reported from the laboratory on December 5 exceeded the maximum permit limitations as shown below.
Parameter Concentration Maximum Limitation B00 72 mg/L 45 mg/L 5
TSS 77 mg/L 45 mg/L Cause and period of the noncompliance--The daily total flow averaged 38,100 gpd for the four days preceding sample collection.
On the day of sample collection the daily total flow was 67,600 gpd. These high flows overloaded the treatment capacity of the system and contributed to the noncompliance.
Steps taken to reduce, eliminate, and prevent recurrence of the noncomplying discharge--A sewage lagoon has been designed to replace the sewage treatment plant.
The engineering report was submitted tn the Alabama Department of Environmental Management for approval on November 30.
Sincerely, Original signed by Dennis M. McCarthy Alvan Bruch, Ph.D.
(
Acting Director of f
Environmental Quality cc: See page 2 8401050157 831223 PDR ADOCK 05000259 R
PDR 1983-TVA 5OTH ANNIVERSARY An Equal Opportun ty Employer
e
_2 Mr. John Marlar DEC 2 31983 cc: Mr. Joe B. Broadwater, Director Alabama Department of Environmental Management State Capitol Montgomery, Alabama 36130 Director, Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 E