ML18036B364

From kanterella
Jump to navigation Jump to search
Adem Discharge Monitoring Rept for June 1993
ML18036B364
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/30/1993
From:
TENNESSEE VALLEY AUTHORITY
To:
References
NUDOCS 9308040317
Download: ML18036B364 (22)


Text

ACCELERATED DIIBUTION DEMONSTTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9308040317 DOC.DATE: 93/06/30 NOTARIZED:

NO DOCKET FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH.NAME AUTHOR AFFILIATION Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

"ADEM Discharge Monitoring Rept for June 1993."

DISTRIBUTION CODE:

IE48D COPIES RECEIVED:LTR + ENCL t

SIZE:

TITLE: 50.36a(a)(2)

Semiannual Effluent Release Reports NOTES:

D RECIPIENT ID CODE/NAME PD2-4 ROSS,T.

RGN2 FILE 02 EX)'.~RNAL: BNL TICHLER,J03 NRC PDR COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-4-PD WILLIAMS,J.

NRR/DRSS/PRPB1 1 RGN2 DRSS/RPB EGGG SIMPSON,F COPIES LTTR ENCL 1

1 1

1 2

2 2

2 2

2 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

A D

D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 17 ENCL 17

e CA

~

Page 1 of 9

Date of Report DISCHARGE MONXTORING REPORT NPDES NUMBER'L0022080 PERMITTEE INFORMATION:

NAME'ENNESSEE VALLEY AUTHORITY ADDRESS:

MT 8B-K FACIT.ITE NAME:

TVA-Browne Fer~rNucleac Plant FACILITy. CONTACT:

NAME:

Abraham Loudermilk PlfONE:

632-6656 REPORTXNG PERXOD:

.Tune 1993 I certi.fy under penalty of law that this di.scharge monitoring report, required by NPDES Permit Number AL0022080 for: the reporting period oF June T.

T.993 through

.Tune 3~0 1993 and consisting of pages numbered 1 through 9

and which are dated

.Tule 27 1993 was prepared under my direction or supervision in accordance with a system desi.gned to assure that qualified personnel properly gather:

and evaluate the information submitted.

Based on my inquiry of the person nr. persons who manage the system, or those persons directly responsible for. gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.

I am aware that there are si.gnifirant penalties for: submitting false information, includi.ng the possi.bi..lity of fine and impri.sonment for knowing violations.

SIGNATURE OF RESPONSIBLE INDIVXDUAL

~Ju.T.

2T 1993 DATE OF SIGNATURE 0056E 020048 9308040317 930630 PDR ADOCK 05000 9

R

)'

llj, 'V H

P

I

~

~

I I

~ ~

~

~

~

\\

~

~

I 'l I

II I

I I I

~ II I; ~ I I

I I

~ I I

I I I I

I I I I

I I I I I I I I I I

I I I I

I I I I

I I I I

I I I I

I I I I

I I I I

I I I I

I I I I

I I I I

I I Illl I III I III I III III I III I III III I III I III I III III I III I III I III I III I III I

~

~

~ ~

~

~

~

~

t ~

~ ~

~

~

~

~

~

0

\\

~

~

~

+ ~

~

~

0

\\

~

~

~

~

~

~ f

~

~

0

~ ~

~

0 t

~

,C I

II

~

I t

~

4

~ ~

~ t

~

~

~ '

t

~

~

~

~

j

~

~

~

~

~

~

~t

~

~

~

\\

~

~

\\

~ 't '

~

~

~

~

~

~

~

~

~ '

t

~

~

~

~

~

~

~

'I

(

~

gp I

~

II

~ '

~

~

~ I

~

~

~ ~

~ J

~ J

~

~

~

~ ~

~

~

~

~

J ~

~

~

~

~

~

\\

J

~

J

~ '

~

~

~

~

~

~

~

~ ~

J

~

J

~

~

~

~

~

~

~

~

~

~

C

~

J

~

J J

ADEH DISCHARGE MONITORING REPORT COMPANY:

TVA - Browns Ferry Nuclear Plant DSN00lc (Formerly 107)

(XI MONTHLY LOCATION :

G.S. Highway 72

Athens, Alabama 35611 MONTH:

JUNE, 1993 NPDES NO.

AL0022080 MAJOR EFFECTIVE : 10-15-89 PARAMiFlow 0 a G

i Tss AVG J

Hon 15.0

(

30 '

MAX

) Mon 20.0

( 100.0 FRE0 I

1 wk I 1/wk I 1/wk UNITS [

MGD

(

mg/1 ng/1 1I I

2 10.00 I

I 3

I I

I I

I I

I I

I 5

6 I

I I

9 I 000 I

10 12 13 14 15 16 I5.9E-4I<5.00 I 3.60 17 18 19 20 21 22 23 '4E-4I<5.00 2

/ 6.00 26 27 28 29 30 J 0.00 I

I H AVGi2.3E-4i<5.00 HAX ]5 ~9E-4[<5.00 f 4.80 f 6.00 I certify under penalty of law that this document and.all attachnents,wore prepared under.ny girection or supervision in accordance with a svstem designed to assure that qualxfxea personnel prgperly gather and evaluate tho infornatioD submitted.

Based on my inquxrv of the persqn or persons who nanage the system, or those persons directly respqnSxble for gathering the conformation, Qe xnformatxqn submatted is, to ghe best of ny knowledge and hei>of true, aqcurago, and complete.

I an aware that there aro sxgnxfxcant penalties for submitting false xnformatxon, Including the possibxlxty of fane and inprxsonnont for (mewling vxolatxons.

Signature of Responsible Official Date ADEM FORH 261 (B) 1/88

0 0

f I

lf N

OO

~

I

~

I I I '

~

~

I I

~

I I

I I

~

~

~

~

~

~

~

~

~

~

~ ~

~

\\ '

~

4

~

~

~ ~

~

~

C

~ ~

~

~

~

~

t 1

+

+

i '

~ 1

+

~

~

\\

~

~

~

~

~

~

~ ~

~"

~ 0 I' I

\\

~ ~

~ ~

~

~ '

~

~ ~

~ ~

~

~

\\

~

~ tl

~

\\

~ ~

\\

~

~

~ '

~

~ '

~ ~ i

~

~

~

~

~

~ <<

~

~

~

~

~

~

kc'

ADEM DISCHARGE MONITORING REPORT COMPANY :

TVA - Browns Ferry Nuclear Plant DSN005 PARAH(Flow Temp AVG

(

Mon Hon HAX ( Hon

( Mon FREQ

( 1/wk

( 1/wk DNITS(

HGD

( degrees F

(

NONE

(

2 I 6 48 I 78 '

3

(

NONE

(

4

(

NONE

(

5

(

NONE 6

(

NONE (X I HONTMLY LOCATION:

O.S.

Highway 72

Athens, Alabama 35611 MONTH:

GuNE, 1993 NPDES NO.

AL0022080 MAJOR EFFECTIVE : 10-15-89 IO

(

NONE

(

I 11

(

NONE

(

I 12

(

NONE

(

13

(

W>NE

(

14

(

NONE

(

15

(

NONE

(

16

(

NONE I

NONE 18

(

NONE 19

(

NONE 20

(

NONE 21

(

NONE 22

(

NONE

(

23 NoNE

(

I 24 ONE

(

25 NONE 26

( ONE

(

27

(

NONE

(

28

(

NONE

(

29

(

NONE

(

3o

(

NGNE

(

H AVG( 6.48-( 78.5 HAX I 6.48 I 78.5 I

I I

I I

I I

I I

I I

I I

I certify under penalty of law that this document and.all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualxfaed personnel prqperly gather and evaluate the information submitted.

Based on my inquiry of the persqn or persons who manage the system, or those persons directly rqspqnqible for gagerxng the jnfqrmatxon, the xnformauqn submitted xs, tq qhq best of my knowledge and belief true, accurate, and complete.

I am aware that there are sxgnxfxcant pena>tres for submxttxng false information, xncludxng the possxbxlxty of fane and imprasonment for /mowing violatxons.

Signature of Responsible Official Date ADEH FORM 261 (B) 1/88

~ i t'

~

/

~

I a<

~

I

~

I

~

~ tI ~

I I

~ I

~

~

~

~

~

~ ~

~ 'I

~

~

I

~ \\

~

~

~ ~

t t

~

~

~

~

0 0 ~

~

~

~

~

~

~

t I

~

~

~

0 h

3

c ~

~

~

V c

ALABAMADEP, ENT OF ENVIRONMENTALMANAGQhgFNT WA lVISION-lNDUSTRIALBRANCH NOh MKJANCENOTIFICATIONFORM PERMITTEE NAME: TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT PERMIT NUMBER:

AL0022080 FACILITYLOCATION: Limestone Count SW of Athens, Alabama DMR REPORTING PERIOD:

June 1

DESCRIPTIONOFDISCHARGE:

The discharge covered by this notification is DSN 011, Treated Domestic Wastewater Effluent to the Tennessee River NGNCOMPLIANiEPAIUQvtETER(S):

BOD-5 Daily Maximum 45mg/1.

A sample collected on June 15, 1993 had a value of 54mg/1.

CAUSE OF NONCOMPLIANCE: (Attach additional pages ifnecessary)

At the present time the cause of the non-compliance cannot be determined.

The history of the lagoon has shown problems in the past with algae blooms, but the physical characteristics that are normally associated with algae blooms were not observed in the June 15 sample.

Other possible causes are being investigated.

PERIOD OF NONCOMPLIANCE: (Include exact date(s) and time(s) or, ifnot conected, the anticipated timethenoncomplianceisexpectedtocontinue):

An informational sample collected June 8 from upstream of the discharge point showed a value of 22mg/1.

The results of the June 15 sample were received on June 22, therefore the maximum duration of the non-compliance would be 14 days (June 8 June 22, 1993).

DESCRIPTION OF STEPS TAKEN AND/OR BEING TAKEN TO REDUCE OR ELIMINATETHE NONCOMPLYING DISCHARGE AND TO PREVENT ITS RECURRENCE (attach additional pages if necessary):

1.

Upon receipt of the sample results showing a non-compliance, discharge from the lagoon was terminated.

2. Aeration equipment has been installed and is operating.
3. Monitoring of the lagoon conditions is continuing.

Releases from the lagoon will not resume until the BOD-5 stablizes and is in compliance.

4. Contacts with ADEM experts and others with experience in sewage lagoon operations have been initiated to receive assistance in troubleshooting the causes of the problems and developing solutions.

M. P.

Schmierbach, Mana er Environmental ualit NAMEANDTITLEOF REPONSIB LE OFFICIAL (type or print)

SIGNATURE OF RESPONSIBLE OFFICIAL

[t16i DATESIGNED

~

~

r

~

~