IR 05000397/2010501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 01/10/2011
| issue date = 01/10/2011
| title = IR 05000397-10-501, on 12/31/2010, Columbia Generating Station - NRC Annual Emergency Preparedness
| title = IR 05000397-10-501, on 12/31/2010, Columbia Generating Station - NRC Annual Emergency Preparedness
| author name = Shannon M P
| author name = Shannon M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Reddemann M E
| addressee name = Reddemann M
| addressee affiliation = Energy Northwest
| addressee affiliation = Energy Northwest
| docket = 05000397
| docket = 05000397
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ary 10, 2011
[[Issue date::January 10, 2011]]


Mr. Mark Chief, Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
==SUBJECT:==
Richland, WA 99352-0968
COLUMBIA GENERATING STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000397/2010501
 
SUBJECT: COLUMBIA GENERATING STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000397/2010501


==Dear Mr. Reddemann:==
==Dear Mr. Reddemann:==
Line 33: Line 30:
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/
Sincerely,
/RA/
Michael P. Shannon, Chief Plant Support Branch 1 Division of Reactor Safety  
Michael P. Shannon, Chief Plant Support Branch 1 Division of Reactor Safety  


Line 39: Line 37:


cc:
cc:
Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172 Energy Northwest - 2 -  
Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172 UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Energy Northwest - 2 -  


Don Gregoire Acting Manager, Regulatory Programs Energy Northwest P.O. Box 968, Mail Drop PE20 Richland, WA 99352-0968  
Don Gregoire Acting Manager, Regulatory Programs Energy Northwest P.O. Box 968, Mail Drop PE20 Richland, WA 99352-0968  

Revision as of 00:44, 11 July 2019

IR 05000397-10-501, on 12/31/2010, Columbia Generating Station - NRC Annual Emergency Preparedness
ML110120561
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/10/2011
From: Shannon M
Plant Support Branch-1
To: Reddemann M
Energy Northwest
References
IR-10-501
Download: ML110120561 (3)


Text

ary 10, 2011

SUBJECT:

COLUMBIA GENERATING STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000397/2010501

Dear Mr. Reddemann:

On December 31, 2010, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Columbia Generating Station.

This inspection began on January 1, 2010. Issuance of this letter closes NRC Inspection Report 05000397/2010501. Observations and findings in these areas were provided in the quarterly integrated reports for your site.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Michael P. Shannon, Chief Plant Support Branch 1 Division of Reactor Safety

Dockets: 50-397 Licenses: NPF-21

cc:

Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172 UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Energy Northwest - 2 -

Don Gregoire Acting Manager, Regulatory Programs Energy Northwest P.O. Box 968, Mail Drop PE20 Richland, WA 99352-0968

Chairman Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190

Richard Cowley Washington State Department of Health 111 Israel Road, SE Tumwater, WA 98504-7827

William A. Horin, Esq Winston and Strawn 1700 K Street, NW Washington, DC 20006-3817

Lynn Albin Washington State Department of Health P.O. Box 7827 Olympia, WA 98504-7827

Ken Niles Assistant Director Nuclear Safety and Energy Siting Division Oregon Department of Energy 625 Marion Street NE Salem, OR 97301-3737

Special Hazards Program Manager Washington Emergency Management Division 127 W. Clark Street Pasco, WA 99301

Chief, Technological Hazards Branch FEMA Region X Federal Regional Center

130 228 th Street, SW Bothell, WA 98021-9796

Energy Northwest - 3 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Vacant)

Senior Resident Inspector (Ronald.Cohen@nrc.gov)

Resident Inspector (Mahdi.Hayes@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)

Project Engineer, DRP/A (Laura.Micewski@nrc.gov) CGS Administrative Assistant (Crystal.Myers@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource OEDO RIV Coordinator (Geoffrey.Miller@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

R:\ ADAMS: No x Yes x SUNSI Review Complete Reviewer Initials: MPS x Publicly Available x Non-Sensitive Non-publicly Available Sensitive C:PSB-1 MPShannon /RA/ 1/10/2011 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax