May 21, 2004

EA 04-101

Mr. J. V. Parrish

Chief Executive Officer

Energy Northwest

P.O. Box 968; MD 1023

Richland, Washington 99352-0968

SUBJECT: ONGOING REVIEW OF COLUMBIA GENERATING STATION - NRC

INTEGRATED INSPECTION REPORT 05000397/2003007 DENIED

NONCITED VIOLATION (50-397/03-07-01)

Dear Mr. Parrish:

Thank you for your letter dated April 16, 2004, in response to our January 30, 2004, letter and

integrated inspection report concerning use of nonsafety related instrument air during main

steam isolation valve local leak rate testing. A noncited violation (NCV 50-397/03-07-01) had

been identified for inadequate local leak rate testing due to the use of the nonsafety related

instrument air.

In response to Noncited Violation 50-397/03-07-01, Energy Northwest requested that the NRC

withdraw the noncited violation based on the belief that the applicable NRC regulations

(10 CFR Part 50 Appendix J, III.C.1) and other industry codes, that discuss closing valves for

local leak rate testing, are subject to interpretation with respect to the required qualification of

the motive source used to close the valves. We understand that although Energy Northwest

has denied the noncited violation, that Energy Northwest will perform the main steam isolation

valve local leak rate testing using the safety related air as a conservative method for ensuring

the main steam isolation valves are capable of performing their intended safety function.

The NRC is reviewing your response to Noncited Violation 50-397/03-07-01 and will inform you

by a separate letter in the future of the results of our review.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS

is accessible from the NRC Web site at

http://www.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

William B. Jones, Chief

Project Branch E

Division of Reactor Projects

Energy Northwest -2-

Docket: 50-397

License: NPF-21

cc:

Rodney Webring (Mail Drop PE04)

Vice President, Nuclear Generation

Energy Northwest

P.O. Box 968

Richland, WA 99352-0968

Albert E. Mouncer (Mail Drop PE01)

Vice President, Corporate Services/

General Counsel/CFO

Energy Northwest

P.O. Box 968

Richland, WA 99352-0968

Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, WA 98504-3172

Douglas W. Coleman (Mail Drop PE20)

Manager, Performance Assessment

and Regulatory Programs

Energy Northwest

P.O. Box 968

Richland, WA 99352-0968

Christina L. Perino (Mail Drop PE20)

Manager, Licensing

Energy Northwest

P.O. Box 968

Richland, WA 99352-0968

Max Benitz, Chairman

Benton County Board of Commissioners

P.O. Box 190

Prosser, WA 99350-0190

Dale K. Atkinson (Mail Drop PE08)

Vice President, Technical Services

Energy Northwest

P.O. Box 968

Richland, WA 99352-0968

Energy Northwest -3-

Thomas C. Poindexter, Esq.

Winston & Strawn

1400 L Street, N.W.

Washington, DC 20005-3502

Bob Nichols

Executive Policy Division

Office of the Governor

P.O. Box 43113

Olympia, WA 98504-3113

Lynn Albin, Radiation Physicist

Washington State Department of Health

P.O. Box 47827

Olympia, WA 98504-7827

Energy Northwest -4-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (GDR)

Branch Chief, DRP/E (WBJ)

Senior Project Engineer, DRP/E (VGG)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (KEG)

Rebecca Tadesse, OEDO RIV Coordinator (RXT)

Columbia Site Secretary (LEF1)

Dan Merzke, Pilot Plant Program (DXM2)

RidsNrrDipmLipb

OEMAIL

OEWEB

Gary Sanborn

Jennifer Dixon-Herrity, OE

Rani Franovich, NRR

Victor Dricks

Bill Maier

ADAMS: / Yes * No Initials: __WBJ__

/ Publicly Available * Non-Publicly Available * Sensitive / Non-Sensitive

R:\_COL\2004\EA04-101.wpd

RIV:C:DRP/E

WBJones

/RA/

05/21/04

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax