Letter from M. Shannon, Chief, Plant Support Branch-1, Division of Reactor Safety, USNRC to M. Reddemann, Chief Executive Officer, Energy Northwest; Subject: Columbia Generating Station - NRC Security Inspection Report 05000397/2010403
ML12188A632
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/02/2010
From: Shannon M
Plant Support Branch-1
To: Reddemann M
Energy Northwest
References
FOIA/PA-2012-0152 IR-10-403
Download: ML12188A632 (4)


Text

I. ,

I.

A- r- r- I10 1A I 1 I 9%r- Af r% 1--fI r% r I AI '9r r% r-ll A'%r%..R1Al A PI0%I I~

O.d UNITED STATES

0 NUCLEAR REGULATORY COMMISSION

REGION IV

6; 612 EASTLAMAR BLVD, SUITE 400 4* ,ARLINGTON, TEXAS 76011-4125 September 2, 2010 Mr. Mark Chief, Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968 SUBJECT: COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2010403

Dear Mr. Reddemann:

On August 5, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Columbia Generating Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 5, 2010, with Mr. S. Oxenford, Vice President, Nuclear Generation/Chief Nuclear Officer, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified. However, a licensee-identified violation which was determined to be of very low security significance is listed in this report. The NRC is treating this violation as a noncited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of the violation and because it is entered into your corrective action program. If you contest this noncited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington D.C. 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Senior Resident Inspector at the Columbia Generating Station.

QIIQaLsmor UQE U inLsE SIT W!,ATE II

011;OWA" "'.B U3E 31L.-U-- -AThE IFORNJATI AFIELWW I.

Energy Northwest -2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-397 License No.: NPF-21 Nonpublic Enclosure: Inspection Report 05000397/2010403 w/Attachment: Supplemental Information cc w/o enclosure:

Douglas W. Coleman Manager, Regulatory Programs Energy Northwest P.O. Box 968, Mail Drop PE20 Richland, WA 99352-0968 V g ....... zrri~2IL WV m 3~L~ U~t ra~nrn:nrLA V .... -

V m .................... IFct

~ 3kAT~~

.o or..

AZI[TlAIll II "E 19l" 1' - BEOUI LA *PI* lpIAiliNFORMAIOil Energy Northwest - 3-Distribution w/enclosure:

Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyri Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov)

Branch Chief, RII DRS/PSB2 (Michael. Ernstes@nrc.gov)

Branch Chief, Rill DRS/PSB (Eric.Duncan*,nrc.qov)

Senior Resident Inspector (Ronald. Cohenanrc..ov)

Distribution w/o enclosure:

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck. Casto@nrc.gov)

DRP Acting Director (Tony.Vegel@nrc.gov)

DRP Acting Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Acting Deputy Director (Jeff.Clark@nrc.gov)

Resident Inspector (Mahdi.Hayes@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (David. Proulx@nrc.gov)

Project Engineer, DRP/A (Nick. Hernandez@nrc.gov)

Project Engineer, DRP/A (Laura.Micewski@nrc.gov)

Columbia Administrative Assistant (Crystal.Myers@nrc.gov)

Public Affairs Officer (Victor. Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Branch Chief, DRS/TSB (Michael. Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource OEDO RIV Coordinator (Margie. Kotzalas@nrc.gov)

API AI3IA UQAM A' 'I-- OUMT IlNl'. M ELATE i I Ti m aiiial" i

v. L Energy Northwest -4-Report:

SUNSI Review Completed: ETB ADAMS: E Yes 0 No Initials: ETB 0 Publicly Available N Non-Publicly Available U Sensitive Ul Non-Sensitive Letter Only:

SUNSI Review Completed: ETB ADAMS: 0 Yes Initials: ETB E Publicly Available 0 Non-Sensitive ML102450717 BSI:BSB' * :SPSB! *-RBC:AP!SB.:i C AC"'PSB1.3. "

ETByre MBrooks MPShannon WWalker MPShannon IRA/ IRA/ /RA/ IRA/ IRA/

08/12/10 8/20/10 8/20/10 8/20/10 9/2/10 Iylr< 2J T=Telephone E=E-Mail F=FAX OFFlPICIPlA I vm ~~ I 10

~-

~ ll 0%C21I*T

~*~6 ~~ ~

uvv n.,INFuOR FM .

RELA*Tn

-. ;F ur--]'

It6lIEl'ili

.;.",-..

lATIP

'rIlIlkli

.