{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001     
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001     


June 28, 2016   
June 28, 2016   
Line 51: Line 51:


The SRP-LR allows an applicant's LRA to reference its AMPs as being consistent with the AMPs described in the GALL Report. By referencing the GALL Report AMPs in this manner, the applicant is concluding that its AMPs correspond to those AMPs and that no further staff review should be required. If an applicant credits an AMP for being consistent with a GALL Report program, it is incumbent on the applicant to ensure that the plant program contains all of the elements of the referenced GALL Report program. The applicant's determination shall be documented and maintained in an auditable, retrievable form.
The SRP-LR allows an applicant's LRA to reference its AMPs as being consistent with the AMPs described in the GALL Report. By referencing the GALL Report AMPs in this manner, the applicant is concluding that its AMPs correspond to those AMPs and that no further staff review should be required. If an applicant credits an AMP for being consistent with a GALL Report program, it is incumbent on the applicant to ensure that the plant program contains all of the elements of the referenced GALL Report program. The applicant's determination shall be documented and maintained in an auditable, retrievable form.
During this audit, the staff will audit program elements 1 - 6 (scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria), and program element 10 (operating experience), of the applicant's AMPs claimed to be consistent with the GALL Report against the equivalent elements of the associated AMP described in the GALL Report, unless otherwise indicated. Program elements 7 - 9 (corrective actions, confirmation process, and administrative controls) are audited by another NRC project team during the scoping and screening methodology audit, and are evaluated separately. In addition, the staff will verify that the conditions at the plant are bounded by the conditions for which the GALL Report program was evaluated. The staff will also examine the applicant's program bases documents and related references for these AMPs, perform selected in-plant walkdowns, and interview applicant representatives to obtain additional clarification related to the AMPs.
During this audit, the staff will audit program elements 1 - 6 (scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria), and program element 10 (operating experience), of the applicant's AMPs claimed to be consistent with the GALL Report against the equivalent elements of the associated AMP described in the GALL Report, unless otherwise indicated. Program elements 7 - 9 (corrective actions, confirmation process, and administrative controls) are audited by another NRC project team during the scoping and screening methodology audit, and are evaluated separately. In addition, the staff will verify that the conditions at the plant are bounded by the conditions for which the GALL Report program was evaluated. The staff will also examine the applicant's program bases documents and related references for these AMPs, perform selected in-plant walkdowns, and interview applicant representatives to obtain additional clarification related to the AMPs.  
4. Information and Other Material Necessary for the Regulatory Audit  The project team will review the LRA, the AMP basis documents and other applicant supporting documents as appropriate.
: 4. Information and Other Material Necessary for the Regulatory Audit  The project team will review the LRA, the AMP basis documents and other applicant supporting documents as appropriate.
The project team would like for at least one hard-copy set of AMPs, AMP basis documents, and all other relevant documentation to be available in the team's work room.
The project team would like for at least one hard-copy set of AMPs, AMP basis documents, and all other relevant documentation to be available in the team's work room.
Work space and team support logistics: One general team work area with seating and laptop space for 18 people.
Work space and team support logistics: One general team work area with seating and laptop space for 18 people.
Three break-out rooms for question/answer/small group sessions and meetings, so that work in the main room will not be disrupted.
Three break-out rooms for question/answer/small group sessions and meetings, so that work in the main room will not be disrupted.
Telephone access for in-plant and/or outside business-related calls. The break-out rooms should also have speaker phone capability for conference calls. Access to printers for printing out drafts, draft requests for additional information, review comments, schedules, and so on.
Telephone access for in-plant and/or outside business-related calls. The break-out rooms should also have speaker phone capability for conference calls. Access to printers for printing out drafts, draft requests for additional information, review comments, schedules, and so on.
Access to a copier for making duplicates for team use, meeting agendas and so on.
Access to a copier for making duplicates for team use, meeting agendas and so on.  
5. Team Assignments  NRC staff participation is projected as follows (some deletions, additions or substitutions may occur on an as-needed basis):  
: 5. Team Assignments  NRC staff participation is projected as follows (some deletions, additions or substitutions may occur on an as-needed basis):  


Week of July 11, 2016:  Assigned Auditor Area of Review  Phyllis Clark Project Manager  Benjamin (Ben) Beasley Acting Deputy Director  Brian Wittick Branch Chief Samuel Cuadrado De Jesus Structural Juan Lopez Structural  Angela R. Buford Structural George Thomas Structural Andrew Prinaris Structural Bryce Lehman Structural Assigned Auditor Area of Review  Cliff K. Doutt Electrical Mohammad Saddollah Electrical William (Tony) A. Gardner Mechanical and Materials Aaron Mink Mechanical and Materials Huda Akhavannik Electrical Albert Wong Mechanical and Materials Alan Huynh Materials and Chemical Donald M. Brittner Operating Experience  Week of July 25, 2016:
Week of July 11, 2016:  Assigned Auditor Area of Review  Phyllis Clark Project Manager  Benjamin (Ben) Beasley Acting Deputy Director  Brian Wittick Branch Chief Samuel Cuadrado De Jesus Structural Juan Lopez Structural  Angela R. Buford Structural George Thomas Structural Andrew Prinaris Structural Bryce Lehman Structural Assigned Auditor Area of Review  Cliff K. Doutt Electrical Mohammad Saddollah Electrical William (Tony) A. Gardner Mechanical and Materials Aaron Mink Mechanical and Materials Huda Akhavannik Electrical Albert Wong Mechanical and Materials Alan Huynh Materials and Chemical Donald M. Brittner Operating Experience  Week of July 25, 2016:
Assigned Auditor Area of Review Phyllis Clark Project Manager Dennis C. Morey Branch Chief Bart Fu Mechanical and Materials William (Bill) C. Holston  Mechanical and Materials James Medoff Mechanical and Materials James A. Gavula Mechanical and Materials Seung Min Mechanical and Materials Sarah Obadina Mechanical and Materials Brian Allik Mechanical and Materials Mark Yoo Mechanical and Materials Donald M. Brittner Operating Experience  6. Logistics  The audit will be conducted on-site during the weeks of July 11 - 15, 2016 and July 25 - 29, 2016. Entrance and exit briefings will be held at the beginning and end of this audit, respectively. Each week's activities will begin on Monday morning and are normally planned to extend through part of the day Friday. Normally a status briefing should be held at the close of a day's activities to highlight progress and any special issues identified, and to review and/or adjust the schedule for the next day's work. 7. Special Requests The staff requests the applicant to make available the license renewal application program basis documentation and license renewal drawings (hard copy), and their condition report database (electronic version access) for independent searches by the regulatory audit team. Electronic copies of the Key-word Search Results should be made available for the staff's use while on-site. Applicant personnel responsible for or involved with the various programs should also be available. 8. Deliverables  An audit summary report should be issued to the applicant, normally within 90 days from the end of the audit.
Assigned Auditor Area of Review Phyllis Clark Project Manager Dennis C. Morey Branch Chief Bart Fu Mechanical and Materials William (Bill) C. Holston  Mechanical and Materials James Medoff Mechanical and Materials James A. Gavula Mechanical and Materials Seung Min Mechanical and Materials Sarah Obadina Mechanical and Materials Brian Allik Mechanical and Materials Mark Yoo Mechanical and Materials Donald M. Brittner Operating Experience  6. Logistics  The audit will be conducted on-site during the weeks of July 11 - 15, 2016 and July 25 - 29, 2016. Entrance and exit briefings will be held at the beginning and end of this audit, respectively. Each week's activities will begin on Monday morning and are normally planned to extend through part of the day Friday. Normally a status briefing should be held at the close of a day's activities to highlight progress and any special issues identified, and to review and/or adjust the schedule for the next day's work. 7. Special Requests The staff requests the applicant to make available the license renewal application program basis documentation and license renewal drawings (hard copy), and their condition report database (electronic version access) for independent searches by the regulatory audit team. Electronic copies of the Key-word Search Results should be made available for the staff's use while on-site. Applicant personnel responsible for or involved with the various programs should also be available. 8. Deliverables  An audit summary report should be issued to the applicant, normally within 90 days from the end of the audit.}}
 
}}

Revision as of 07:47, 19 May 2018

Plan for the Aging Management Program Regulatory Audits Regarding the Waterford Steam Electric Station, Unit 3 License Renewal Application Review
ML16168A359
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/28/2016
From: Phyllis Clark
License Renewal Projects Branch 1
To: Chisum M R
Entergy Operations
Clark P, NRR/DLR, 415-6447
References
DLR-16-0147
Download: ML16168A359 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

June 28, 2016

Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc. Waterford 3 17265 River Road Killona, LA 70057-3093

SUBJECT:

PLAN FOR THE AGING MANAGEMENT PROGRAM REGULATORY AUDITS REGARDING THE WATERFORD STEAM ELECTRIC STATION, UNIT 3 LICENSE RENEWAL APPLICATION REVIEW

Dear Mr. Chisum:

By letter dated March 23, 2016, Entergy Operations, Inc. submitted an application for renewal of operating licenses NPF-38 for Waterford Steam Electric Station, Unit 3. The staff of the U.S.

Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants."

The staff plans to conduct aging management program regulatory audits during the weeks of July 11 - 15, 2016, and July 25 - 29, 2016, in accordance with the enclosed regulatory audit plan. If you have any questions, please contact me by telephone at (301) 415-6447 or by e-mail at Phyllis.Clark@nrc.gov. Sincerely,

/RA/

Phyllis Clark, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosure:

As stated cc w/encl: Listserv

ML16168A259 *concurrence via email OFFICE LA: DLR PM: DLR/RPB1 BC: DLR/RPB1 BC:RARB:DLR BC: DLR/RASB PM: DLR/RPB1NAME *IBetts *PClark YDiaz-SanabriaDMorey BWittick PClark DATE 6/ 22 /16 6/ 22 /16 6/22 /16 6/24 /16 6/ 24/16 6/28 /16 Letter to M. Chisum from P. Clark date June 28, 2016

SUBJECT:

PLAN FOR THE AGING MANAGEMENT PROGRAM REGULATORY AUDITS REGARDING THE WATERFORD STEAM ELECTRIC STATION, UNIT 3 LICENSE RENEWAL APPLICATION REVIEW

DISTRIBUTION: HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlrRpb1 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMWaterford Resource RidsRgn4MailCenter@nrc.gov --------------- P. Clark J. Danna B. Wittick A. Buford S. CuadradoDeJesus J. Lopez B. Lehman G. Thomas A. Prinaris A. Mink W. Gardner C. Doutt H. Akhavannik M. Sadollah A. Wong D. Brittner A. Huynh D. Morey B. Allik B. Fu J. Gavula W. Holston J. Medoff S. Min Y. Lindell, OGC S. Obadina M. Yoo A. Pulvirenti D. McIntyre, OPA S. Burnell, OPA A. Moreno, OCA F. Ramirez, RIV C. Speer, RIV M. Dapas, RIV J. Jarrell, RIV A. Thomas, RIV J. Rodriguez, RIV L. Murray, RIV G. Young, RIV D. Lach, RIV A. Taylor, RIV

Audit Plan Aging Management Program Review for the Waterford Steam Electric Station, Unit 3 License Renewal Application

Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission License Renewal Aging Management Program Audit Plan Waterford Steam Electric Station, Unit 3 1. Background By letter dated March 23, 2016, Entergy Operations, Inc. (the applicant), submitted to the U.S. Nuclear Regulatory Commission (NRC or the staff) its application for renewal of operating license no. NPF-38 for the Waterford Steam Electric Station, Unit 3 (Waterford 3). Waterford 3 requested a renewal of the operating license for an additional 20 years beyond the 40-year current license term, which expires midnight on December 18, 2024. The staff from the Division of License Renewal will lead a regulatory audit to gain a better understanding of the applicant's aging management programs (AMPs), aging management reviews, and associated bases and documentation as applicable. 2. Regulatory Audit Bases License renewal requirements are specified in Title 10 of the Code of Federal Regulations (CFR) Part 54 (10 CFR Part 54), "Requirements for Renewal of Operating Licenses for Nuclear Power Plants." Guidance is provided in NUREG-1800, Rev. 2, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants" (SRP-LR), dated December 2010, and NUREG-1801, Rev. 2, "Generic Aging Lessons Learned (GALL) Report," dated December 2010. 3. Regulatory Audit Scope The scope of this regulatory audit is to: (a) examine the applicant's AMPs for Waterford 3; and (b) verify the applicant's claims of consistency with the corresponding GALL Report AMPs. Enhancements to AMPs will be evaluated on a case-by-case basis. Exceptions to the GALL Report AMP elements will be evaluated separately as part of the NRC staff's review of the license renewal application (LRA), and will be documented in the staff's safety evaluation report.

The SRP-LR allows an applicant's LRA to reference its AMPs as being consistent with the AMPs described in the GALL Report. By referencing the GALL Report AMPs in this manner, the applicant is concluding that its AMPs correspond to those AMPs and that no further staff review should be required. If an applicant credits an AMP for being consistent with a GALL Report program, it is incumbent on the applicant to ensure that the plant program contains all of the elements of the referenced GALL Report program. The applicant's determination shall be documented and maintained in an auditable, retrievable form.

During this audit, the staff will audit program elements 1 - 6 (scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria), and program element 10 (operating experience), of the applicant's AMPs claimed to be consistent with the GALL Report against the equivalent elements of the associated AMP described in the GALL Report, unless otherwise indicated. Program elements 7 - 9 (corrective actions, confirmation process, and administrative controls) are audited by another NRC project team during the scoping and screening methodology audit, and are evaluated separately. In addition, the staff will verify that the conditions at the plant are bounded by the conditions for which the GALL Report program was evaluated. The staff will also examine the applicant's program bases documents and related references for these AMPs, perform selected in-plant walkdowns, and interview applicant representatives to obtain additional clarification related to the AMPs.

4. Information and Other Material Necessary for the Regulatory Audit The project team will review the LRA, the AMP basis documents and other applicant supporting documents as appropriate.

The project team would like for at least one hard-copy set of AMPs, AMP basis documents, and all other relevant documentation to be available in the team's work room.

Work space and team support logistics: One general team work area with seating and laptop space for 18 people.

Three break-out rooms for question/answer/small group sessions and meetings, so that work in the main room will not be disrupted.

Telephone access for in-plant and/or outside business-related calls. The break-out rooms should also have speaker phone capability for conference calls. Access to printers for printing out drafts, draft requests for additional information, review comments, schedules, and so on.

Access to a copier for making duplicates for team use, meeting agendas and so on.

5. Team Assignments NRC staff participation is projected as follows (some deletions, additions or substitutions may occur on an as-needed basis):

Week of July 11, 2016: Assigned Auditor Area of Review Phyllis Clark Project Manager Benjamin (Ben) Beasley Acting Deputy Director Brian Wittick Branch Chief Samuel Cuadrado De Jesus Structural Juan Lopez Structural Angela R. Buford Structural George Thomas Structural Andrew Prinaris Structural Bryce Lehman Structural Assigned Auditor Area of Review Cliff K. Doutt Electrical Mohammad Saddollah Electrical William (Tony) A. Gardner Mechanical and Materials Aaron Mink Mechanical and Materials Huda Akhavannik Electrical Albert Wong Mechanical and Materials Alan Huynh Materials and Chemical Donald M. Brittner Operating Experience Week of July 25, 2016:

Assigned Auditor Area of Review Phyllis Clark Project Manager Dennis C. Morey Branch Chief Bart Fu Mechanical and Materials William (Bill) C. Holston Mechanical and Materials James Medoff Mechanical and Materials James A. Gavula Mechanical and Materials Seung Min Mechanical and Materials Sarah Obadina Mechanical and Materials Brian Allik Mechanical and Materials Mark Yoo Mechanical and Materials Donald M. Brittner Operating Experience 6. Logistics The audit will be conducted on-site during the weeks of July 11 - 15, 2016 and July 25 - 29, 2016. Entrance and exit briefings will be held at the beginning and end of this audit, respectively. Each week's activities will begin on Monday morning and are normally planned to extend through part of the day Friday. Normally a status briefing should be held at the close of a day's activities to highlight progress and any special issues identified, and to review and/or adjust the schedule for the next day's work. 7. Special Requests The staff requests the applicant to make available the license renewal application program basis documentation and license renewal drawings (hard copy), and their condition report database (electronic version access) for independent searches by the regulatory audit team. Electronic copies of the Key-word Search Results should be made available for the staff's use while on-site. Applicant personnel responsible for or involved with the various programs should also be available. 8. Deliverables An audit summary report should be issued to the applicant, normally within 90 days from the end of the audit.