Other: ML13317A969, ML15141A468, ML15272A398, W3F1-2012-0092, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), W3F1-2012-0093, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049), W3F1-2013-0006, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, Order Number EA-12-051, W3F1-2013-0010, (Waterford 3), Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3, W3F1-2013-0049, First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, W3F1-2013-0050, First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, W3F1-2014-0014, Second Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, W3F1-2014-0015, Second Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, W3F1-2014-0049, Third Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, W3F1-2014-0050, Third Six-Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Waterford Steam Electric Station, Un, W3F1-2015-0003, Fourth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, W3F1-2015-0004, Fourth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, W3F1-2015-0068, Fifth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation
|
MONTHYEARW3F1-2012-0042, Entergy'S 90-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments2012-06-0707 June 2012 Entergy'S 90-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments Project stage: Request W3F1-2012-0092, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2012-10-26026 October 2012 Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other W3F1-2012-0093, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2012-10-26026 October 2012 Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) Project stage: Other W3F1-2013-0010, (Waterford 3), Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.32013-02-21021 February 2013 (Waterford 3), Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 Project stage: Other W3F1-2013-0006, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, Order Number EA-12-0512013-02-28028 February 2013 Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, Order Number EA-12-051 Project stage: Other W3F1-2013-0017, (Waterford 3), Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-02-28028 February 2013 (Waterford 3), Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ML13246A3182013-08-28028 August 2013 Request for Additional Information E-mail, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: RAI W3F1-2013-0049, First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2013-08-28028 August 2013 First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other W3F1-2013-0050, First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-28028 August 2013 First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other W3F1-2013-0055, Response to Request for Additional Information (RAI) for the Overall Integrated Plan (OIP) in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool (SFP) Instrumentation2013-09-26026 September 2013 Response to Request for Additional Information (RAI) for the Overall Integrated Plan (OIP) in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool (SFP) Instrumentation Project stage: Response to RAI ML13317A9692013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Waterford Steam Electric Generating Station, Unit 3, TAC No.: MF0977 Project stage: Other ML13220A4022013-11-22022 November 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies Project stage: Acceptance Review ML13312A7872013-11-25025 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: RAI W3F1-2014-0015, Second Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2014-02-28028 February 2014 Second Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other W3F1-2014-0014, Second Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-28028 February 2014 Second Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other W3F1-2014-0050, Third Six-Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Waterford Steam Electric Station, Un2014-08-28028 August 2014 Third Six-Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Waterford Steam Electric Station, Unit 3 Project stage: Other W3F1-2014-0049, Third Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2014-08-28028 August 2014 Third Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other W3F1-2015-0003, Fourth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-02-26026 February 2015 Fourth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other W3F1-2015-0004, Fourth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2015-02-26026 February 2015 Fourth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other ML15141A4682015-05-27027 May 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other W3F1-2015-0068, Fifth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2015-08-27027 August 2015 Fifth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other W3F1-2015-0073, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2015-08-31031 August 2015 Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. Project stage: Request ML15245A3442015-10-0404 October 2015 Relaxation of the Schedule Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Approval ML15272A3982015-10-0606 October 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other 2013-09-26
[Table View] |
|
---|
Category:Audit Plan
MONTHYEARML21099A0022021-04-14014 April 2021 Regulatory Audit in Support of Review of Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors EPID L-2020-LLA-0279 ML20268B3242020-10-0101 October 2020 Regulatory Audit in Support of Review of Digital Upgrade License Amendment Request ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML16172A0082016-07-0808 July 2016 Environmental Site Audit Plan Regarding Waterford Steam Electric Station, Unit 3 ML16168A3592016-06-28028 June 2016 Plan for the Aging Management Program Regulatory Audits Regarding the Waterford Steam Electric Station, Unit 3 License Renewal Application Review ML16152A5952016-06-0606 June 2016 License Renewal Scoping and Screening Methodology Audit Documentation List 6/13/16 - 6/16/16 ML16152A0092016-06-0606 June 2016 License Renewal Scoping and Screening Methodology Audit Plan 6/13/16 6/16/16 ML15231A3542015-08-25025 August 2015 Nuclear Regulatory Commission Plan for Audit on Entergy Operations Inc'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1 Flooding for Waterford Steam Electric Station ML15141A4682015-05-27027 May 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14350A2122014-12-22022 December 2014 Regulatory Audit Plan; January 12-14, 2015 Audit in Support of the Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition ML14083A6202014-03-26026 March 2014 Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051 2021-04-14
[Table view] Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 27, 2015 Vice President, Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - PLAN FOR THE ONSITE AUDIT REGARDING IMPLEMENTATION OF MITIGATING STRATEGIES AND RELIABLE SPENT FUEL POOL INSTRUMENTATION RELATED TO ORDERS EA-12-049 AND EA-12-051 (TAC NOS. MF0977 AND MF0946)
Dear Sir/Madam:
On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events" and Order EA-12-051, "Order to Modify Licenses With Regard To Reliable Spent Fuel Pool Instrumentation," (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML12054A736 and ML12054A679, respectively). The orders require holders of operating reactor licenses and construction permits issued under Title 1O of the Code of Federal Regulations Part 50 to submit for review, Overall Integrated Plans (OIPs) including descriptions of how compliance with the requirements of of each order will be achieved.
By letter dated February 28, 2013 (ADAMS Accession No. ML13063A266), Entergy Operations, Inc. (Entergy, the licensee), submitted its OIP for Waterford Steam Electric Station, Unit 3 (Waterford), in response to Order EA-12-049. By letters dated August 28, 2013, February 28, 2014, August 28, 2014, and February 26, 2015 (ADAMS Accession Nos.
ML13241A281, ML14059A085, ML14241A270, and ML15057A548, respectively), Entergy submitted its first four successive six-month updates to the OIP. By letter dated August 28, 2013 (ADAMS Accession No. ML13234A503), the NRC notified all licensees and construction permit holders that the staff is conducting audits of their responses to Order EA-12-049 in accordance with NRC Office of Nuclear Reactor Regulation (NRR) Office Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195). This audit process led to the issuance of the Waterford interim staff evaluation (ISE) dated November 22, 2013 (ADAMS Accession No. ML13220A402), and continues with in-office and onsite portions of this audit.
By letter dated February 28, 2013 (ADAMS Accession No. ML13063A263), the licensee submitted its OIP for Waterford, in response to Order EA-12-051. By e-mail dated August 28, 2013 (ADAMS Accession No. ML13246A318), the NRC staff sent a request for additional information (RAI) to the licensee. By letters dated August 28, 2013, September 26, 2013, February 28, 2014, August 28, 2014, and February 26, 2015 (ADAMS Accession Nos.
ML13241A280, ML13273A013, ML14059A087, ML14247A294, and ML15057A555, respectively), the licensee submitted its RAI responses and first four successive six-month updates to the OIP. The NRC staff's review to date led to the issuance of the Waterford ISE
and RAI dated November 25, 2013 (ADAMS Accession No. ML13312A787). By letter dated March 26, 2014 (ADAMS Accession No. ML14083A620), the NRC notified all licensees and construction permit holders that the staff is conducting in-office and onsite audits of their responses to Order EA-12-051 in accordance with NRC NRR Office Instruction LIC-111, as discussed above.
The ongoing audit process, to include the in-office and onsite portions, allows the staff to assess whether it has enough information to make a safety evaluation of the Integrated Plans. The audit allows the staff to review open and confirmatory items from the mitigation strategies ISE, RAI responses from the spent fuel pool instrumentation ISE, the licensee's integrated plans, and other audit questions. Additionally, the staff gains a better understanding of submitted information, identifies additional information necessary for the licensee to supplement its plan, and identifies any staff potential concerns. The audit's onsite portion will occur prior to declarations of compliance for the first unit at each site.
This document outlines the on-site audit process that occurs after ISE issuance as licensees provide new or updated information via periodic updates, update audit information on e-portals, provide preliminary Overall Program Documents/Final Integrated Plans, and continue in-office audit communications with staff while proceeding towards compliance with the orders.
The staff plans to conduct an onsite audit at Waterford in accordance with the enclosed audit plan from July 13 - 16, 2015.
If you have any questions, please contact me at 301-415-2833 or by e-mail at Peter.Bamford@nrc.gov.
Sincerely, Peter Bamford, Senior Project Manager Orders Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosure:
Audit plan cc w/encl: Distribution via Listserv
Audit Plan Waterford Steam Electric Station, Unit 3 BACKGROUND AND AUDIT BASIS On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events" and Order EA-12-051, "Order to Modify Licenses With Regard To Reliable Spent Fuel Pool Instrumentation," (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML12054A736 and ML12054A679, respectively). Order EA-12-049 directs licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool (SFP) cooling capabilities in the event of a beyond-design-basis external event (BDBEE). Order EA-12-051 requires, in part, that all operating reactor sites have a reliable means of remotely monitoring wide-range SFP levels to support effective prioritization of event mitigation and recovery actions in the event of a BDBEE. The orders require holders of operating reactor licenses and construction permits issued under Title 1O of the Code of Federal Regulations Part 50 to submit for review, Overall Integrated Plans (OIPs) including descriptions of how compliance with the requirements of Attachment 2 of each order will be achieved.
By letter dated February 28, 2013 (ADAMS Accession No. ML13063A266), Entergy Operations, Inc. (Entergy, the licensee), submitted its OIP for Waterford Steam Electric Station, Unit 3 (Waterford), in response to Order EA-12-049. By letters dated August 28, 2013, February 28, 2014, August 28, 2014, and February 26, 2015 (ADAMS Accession Nos. ML13241A281, ML14059A085, ML14241A270, and ML15057A548, respectively), Entergy submitted its first four successive six-month updates to the OIP. By letter dated August 28, 2013 (ADAMS Accession No. ML13234A503), the NRC notified all licensees and construction permit holders that the staff is conducting audits of their responses to Order EA 12 049 in accordance with NRC Office of Nuclear Reactor Regulation (NRR) Office Instruction UC 111, "Regulatory Audits" (ADAMS Accession No. ML082900195). This audit process led to the issuance of the Waterford interim staff evaluation (ISE) dated November 22, 2013 (ADAMS Accession No. ML13220A402), and continues with in-office and onsite portions of this audit.
By letter dated February 28, 2013 (ADAMS Accession No. ML13063A263), the licensee submitted its OIP for Waterford, in response to Order EA-12-051. By e-mail dated August 28, 2013 (ADAMS Accession No. ML13246A318), the NRC staff sent a request for additional information (RAI) to the licensee. By letters dated August 28, 2013, September 26, 2013, February 28, 2014, August 28, 2014, and February 26, 2015 (ADAMS Accession Nos.
ML13241A280, ML13273A013, ML14059A087, ML14247A294, and ML15057A555, respectively), the licensee submitted its RAI responses and first four successive six-month updates to the OIP. The NRC staff's review to date led to the issuance of the Waterford ISE and RAI dated November 25, 2013 (ADAMS Accession No. ML13312A787). By letter dated March 26, 2014 (ADAMS Accession No. ML14083A620), the NRC notified all licensees and construction permit holders that the staff is conducting in-office and onsite audits of their responses to Order EA 12 051 in accordance with NRC NRR Office Instruction LIC-111, as discussed above.
Enclosure
The ongoing audit process, to include the in-office and onsite portions, allows the staff to assess whether it has enough information to make a safety evaluation of the Integrated Plans. The audit allows the staff to review open and confirmatory items from the mitigation strategies ISE, RAI responses from the spent fuel pool instrumentation (SFPI) ISE, the licensee's integrated plans, and other audit questions. Additionally, the staff gains a better understanding of submitted information, identifies additional information necessary for the licensee to supplement its plan, and identifies any staff potential concerns. The audit's onsite portion will occur prior to declarations of compliance for the first unit at each site.
This document outlines the onsite audit process that occurs after ISE issuance as licensees provide new or updated information via periodic updates, update audit information on e-portals, provide preliminary Overall Program Documents (OPDs)/Final Integrated Plans (FIPs), and continue in-office audit communications with staff while proceeding towards compliance with the orders.
Following the licensee's declarations of order compliance, the NRC staff will evaluate the OIPs, as supplemented, the resulting site-specific OPDs/FIPs, and, as appropriate, other licensee submittals based on the requirements in the orders. For Order EA-12-049, the staff will make a safety determination regarding order compliance using the Nuclear Energy Institute (NEI) guidance document NEI 12-06, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide" issued in August, 2012 (ADAMS Accession No. ML12242A378), as endorsed, by NRC Japan Lessons-Learned Directorate (JLD) interim staff guidance (ISG) JLD-ISG-2012-01 "Compliance with Order EA-12-049, 'Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events"' (ADAMS Accession No. ML12229A174) as providing one acceptable means of meeting the order requirements. For Order EA-12-051, the staff will make a safety determination regarding order compliance using the NEI guidance document NEI 12-02, "Industry Guidance for Compliance with NRC Order EA-12-051, 'To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation"' (ADAMS Accession No. ML12240A307), as endorsed, with exceptions and clarifications, by NRC ISG JLD-ISG-2012-03 "Compliance with Order EA-12-051, 'Reliable Spent Fuel Pool Instrumentation'" (ADAMS Accession No. ML12221A339), as providing one acceptable means of meeting the order requirements. Should the licensee propose an alternative strategy or other method deviating from the guidance, additional staff review will be required to evaluate if the alternative strategy complies with the applicable order.
AUDIT SCOPE As discussed, onsite audits will be performed per NRR Office Instruction LIC-111, to support the development of the safety evaluations.
The purpose of the audits is to (1) obtain and review information responsive to the Waterford OIPs, as supplemented, (2) review open and confirmatory items from the mitigation strategies ISE, (3) review RAI responses from the SFPI ISE, and (4) to observe and gain a better understanding of the basis for the site's overall programs to ensure the licensee is on the correct path for compliance with the Mitigation Strategies and SFPI orders. These may include, but are not limited to:
- Onsite review and discussion for the basis and approach for detailed analysis and calculations (Orders EA-12-049, EA-12-051);
- Walk-throughs of strategies and laydown of equipment to assess feasibility, timing, and effectiveness of a given mitigating strategy or integration of several strategies (Order EA-12-049);
- Storage, protection, access, and deployment feasibility and practicality for onsite portable equipment (Order EA-12-049);
- Evaluation of staging, access, and deployment of offsite resources to include National SAFER Response Center (NSRC) provided equipment (Order EA-12-049); and
- Review dimensions and sizing of the SFP area, placement of the SFP level instrumentation, and applicable mounting methods and design criteria (Order EA 051 ).
NRC AUDIT TEAM Title Team Member Team Lead and Project Manager Peter Bamford Technical Support Joshua Miller Technical Support KhoiNguyen Technical Support Kevin Roche Technical Support Matthew McConnell LOGISTICS The audit will be conducted onsite at Waterford on July 13-16, 2015. Entrance and exit briefings will be held with the licensee at the beginning and end of the audit, respectively, as well as daily briefings of team activities. Additional details will be addressed over the phone prior to the onsite audit. A more detailed schedule is provided below.
A private conference room is requested for NRC audit team use with access to audit documentation upon arrival and as needed.
DELIVERABLES An audit report/summary will be issued to the licensee within 90 days from the end of the audit.
INFORMATION NEEDS
- Materials/documentation provided in responses to open or confirmatory items and RAls in the ISEs;
- OPD/FIP (current version), operator procedures, FLEX Support Guidelines (FSGs),
operator training plans, NSRC (SAFER) Waterford Response Plan; and
- Materials/documentation for staff audit questions To provide supplemental input to the ongoing audit of documents submitted to the NRC and made available via e-portal, the onsite audit will have three components: 1) a review of the overall mitigating strategies for the site, including, if needed, walk-throughs of strategies and equipment laydown of select portions; 2) a review of material relating to open or confirmatory items and RAls from the ISEs, and staff audit questions; and 3) additional specific issues requested by NRC technical reviewers related to preparation of a safety evaluation. Each part is described in more detail below:
Part 1 - Overall Mitigating Strategies and Program Review:
During the onsite audit, please be prepared to conduct a tabletop discussion of the site's integrated mitigating strategies and SFPI compliance program. This discussion should address the individual components of the plans, as well as the integrated implementation of the strategies, including a timeline. The licensee team presenting this information should include necessary representatives from site management, engineering, training, and operations that were responsible for program development, and will be responsible for training and execution.
Following the tabletop discussion, please be prepared to conduct walk-throughs of procedures and demonstrations of equipment as deemed necessary by NRC audit team members. Include representatives from engineering and operations that will be responsible for training and execution. At this time we expect, at a minimum, to walk-through the items below. Based on the tabletop presentations and audit activities, this list may change.
WALK-THROUGH LIST:
- 1. Walk-through a sample of strategies that will be delineated by specific NRC technical staff audit team members.
- 2. Walk-through of portable (FLEX) diesel generator (DG) procedures, to include power supply pathways, areas where manual actions are required, and electrical isolation.
- 3. Walk-through of building access procedures, to include any unique access control devices.
- 4. Strategy walk-through of transfer routes from staging and storage areas to deployment locations for both onsite and offsite equipment.
- 5. Strategy walk-through for core cooling and reactor coolant system (RCS) inventory, to include portable pumping equipment, flow paths, and water storage locations and the related reactor systems analysis and calculations.
- 6. Walk-through of communications enhancements.
- 7. Walk-through of SFP area, SFPI locations, main control room (MCR), and related equipment mounting areas.
Part 2 - Specific Technical Review Items:
During the visit, audit items will be addressed from the licensee's ISE open items, confirmatory items, and SFPI RAls; audit question list; licensee OIP, as supplemented, open items; and draft safety evaluation additional questions. Please provide documents or demonstrations as needed to respond to each item.
Part 3 - Specific Topics for Discussion:
- 1. Draft of Waterford OPD/FIP
- 2. Training
- 3. Portable (FLEX) equipment maintenance and testing
- 4. SAFER Response Plan for Waterford
Proposed Schedule Onsite Day 1, Monday, July 13, 2015 0800 Check in at site, badging 1100 Entrance meeting 1130 Lunch 1300 Licensee presentation of strategies (tentative) 1500 NRC Audit Team Activities:
- Technical area break-out discussions between NRC and licensee staff in the areas of reactor systems, electrical, balance-of-plant/structures, SFPI, and others
- Review documents relating to open or confirmatory items, RAls, codes, analyses, etc.
1630 NRC Audit Team meeting 1700 Team lead daily debrref/next day planning with licensee Onsite Day 2, Tuesday, July 14, 2015 0800 NRC Audit Team Activities 1200 Lunch 1300 NRC Audit Team Activities 1630 NRC Audit Team meeting 1700 Team lead daily debrief/next day planning with licensee Onsite Day 3, Wednesday, July 15, 2015 0800 Continue NRC Audit Team Activities - Mitigating Strategies/SFPI walk-throughs with licensee (tentative) 1200 Lunch 1300 Continue NRC Audit Team Activities 1630 NRC Audit Team meeting 1700 Team lead daily debrief/next day planning with licensee
Onsite Day 4, Thursday, July 16, 2015 0800 Continue NRC Audit Team Activities 1200 Lunch 1300 Continue NRC Audit Team Activities 1400 NRC Audit Team meeting 1500 Pre-exit meeting (tentative) 1600 NRG/Licensee exit meeting 1700 Audit closeout/departure
ML13312A787). By letter dated March 26, 2014 (ADAMS Accession No. ML14083A620), the NRC notified all licensees and construction permit holders that the staff is conducting in-office and onsite audits of their responses to Order EA-12-051 in accordance with NRC NRR Office Instruction LIC-111, as discussed above.
The ongoing audit process, to include the in-office and onsite portions, allows the staff to assess whether it has enough information to make a safety evaluation of the Integrated Plans. The audit allows the staff to review open and confirmatory items from the mitigation strategies ISE, RAI responses from the spent fuel pool instrumentation ISE, the licensee's integrated plans, and other audit questions. Additionally, the staff gains a better understanding of submitted information, identifies additional information necessary for the licensee to supplement its plan, and identifies any staff potential concerns. The audit's onsite portion will occur prior to declarations of compliance for the first unit at each site.
This document outlines the on-site audit process that occurs after ISE issuance as licensees provide new or updated information via periodic updates, update audit information on e-portals, provide preliminary Overall Program Documents/Final Integrated Plans, and continue in-office audit communications with staff while proceeding towards compliance with the orders.
The staff plans to conduct an onsite audit at Waterford in accordance with the enclosed audit plan from July 13 - 16, 2015.
If you have any questions, please contact me at 301-415-2833 or by e-mail at Peter.Bamford@nrc.gov.
Sincerely, IRA!
Peter Bamford, Senior Project Manager Orders Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosure:
Audit plan cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorllpl 4-2 Resource JLD R/F RidsRgn4MailCenter Resource RidsAcrsAcnw_MailCTR Resource MHalter, NRR/JLD RidsNrrLASLent Resource PBamford, NRR/JLD RidsNrrPMWaterford Resource ADAMS Accession No. ML15141A468 OFFICE NRR/JLD/JOMB/PM NRR/JLD/LA NRR/JLD/JOMB/BC(A) NRR/JLD/JOMB/PM NAME PBamford Slent MHalter PBamford DATE 05/21/15 05/21/15 05/27/15 05/27/15