Category:Inspection Plan
MONTHYEARML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 IR 05000482/20220062023-03-0101 March 2023 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2022006) ML22321A2662022-11-16016 November 2022 January 2023 Emergency Preparedness Program Inspection - Request for Information IR 05000482/20220052022-08-23023 August 2022 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2022005) ML22215A2742022-08-0202 August 2022 Inservice Inspection Request for Information ML22249A2552022-06-29029 June 2022 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000482/2022012 ML22130A7662022-05-10010 May 2022 Notification of Inspection (NRC Inspection Report 05000482/2022003) and Request for Information ML22123A2702022-05-0303 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000482/2022401 IR 05000482/20224012022-05-0303 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000482/2022401 IR 05000482/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000482/2021006) ML22025A3612022-01-21021 January 2022 PI&R RFI Final ML22019A0932022-01-19019 January 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection (05000482/2022002) and Request for Information ML21322A2952021-11-19019 November 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000482/2022001 and Request for Information ML21237A5212021-09-0101 September 2021 Wc Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21132A1032021-05-12012 May 2021 Document Request List, Paperwork Reduction Act Statement ML21123A0412021-05-0505 May 2021 Notification of NRC Design Bases Assurance Inspection (Teams) (05000482/2021010) and Initial Request for Information IR 05000482/20190062021-03-0303 March 2021 Annual Assessment Letter (Report 05000482/2019006) ML21061A3412021-02-25025 February 2021 Request for Information: Wolf Creek Nuclear Station, Dated February 11, 2021, Inspection Report 05000482/2021002 Occupational Radiation Safety Inspection-1, 2, PI ML21026A1982021-01-26026 January 2021 Inservice Inspection Request for Information ML20104C1472020-04-13013 April 2020 Notification of Inspection (NRC Inspection Report 05000482/2020003) and Request for Information ML20099G9422020-04-0808 April 2020 Notification of NRC Biennial Problem Identification and Resolution Inspection (05000482/2020010) and Initial Request for Information ML20055E1132020-03-0303 March 2020 WC2019006 Annual Assessment Letter ML20024D7072020-01-24024 January 2020 Notification of NRC Design Bases Assurance Inspection (Programs) (05000482/2020011) and Initial Request for Information IR 05000482/20190052019-08-30030 August 2019 Updated Inspection Plan for Wolf Creek Generating Station, Report 05000482/2019005 ML19158A0782019-06-0505 June 2019 Notification of NRC Triennial Heat Sink Performance Inspection (05000482/2019003) and Request for Information IR 05000482/20180062019-03-0404 March 2019 Annual Assessment Letter for Wolf Creek Report 05000482/2018006) ML19043A9462019-02-12012 February 2019 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000482/2019002) and Request for Information IR 05000482/20180052018-08-31031 August 2018 Updated Inspection Plan for Wolf Creek Generating Station, Unit 1, (Inspection Report 05000482/2018005) IR 05000482/20170062018-03-0101 March 2018 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2017006) ML17311A5182017-11-0101 November 2017 Notification of NRC Inspection of Implementation of Mitigation Strategies Assessment Plans (05000482/2018008) and Request for Information IR 05000482/20170052017-08-28028 August 2017 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2017005) IR 05000482/20160062017-03-0101 March 2017 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016006) IR 05000482/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005) ML16237A0732016-08-31031 August 2016 Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005) IR 05000482/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Wolf Creek Generating Station (NRC Physical Security Inspection Reports Number 05000482/2016401) ML16085A0532016-03-25025 March 2016 Operating Corp - Notification of NRC Triennial Heat Sink Performance Inspection (05000482/2016002) and Request for Information IR 05000482/20150062016-03-0202 March 2016 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2015006) IR 05000482/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2015005) ML15015A1712015-01-0808 January 2015 Focused Baseline Inspection at the Wolf Creek Site for a Major Essential Service Water Modification IR 05000482/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Wolf Creek Generating Station (NRC Physical Security Inspection Report Number 05000482/2014402) IR 05000482/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2014006) ML14231A0682014-08-19019 August 2014 Notification of Inspection (NRC Inspection Report 05000482-14-005) and Request for Information ML14063A6282014-03-0404 March 2014 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2013001) ML13246A2992013-09-0303 September 2013 Midcycle Assessment Letter 2013 IR 05000482/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - Wolf Creek Generating Station (05000482/2012006) IR 05000482/20120012012-03-0505 March 2012 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482-12-001) ML1124403182011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Wolf Creek Generating Station ML1106300832011-03-0404 March 2011 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482-11-001) ML1024403512010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Wolf Creek Generating Station 2024-01-18
[Table view] Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] |
See also: IR 05000482/2020010
Text
April 8, 2020
Mr. Cleve Reasoner, Chief Executive Officer
and Chief Nuclear Officer
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK GENERATING STATION - NOTIFICATION OF NRC BIENNIAL
PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION
(05000482/2020010) AND INITIAL REQUEST FOR INFORMATION
Dear Mr. Reasoner:
On June 8, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin an onsite
inspection at the Wolf Creek Generating Station. A four-person team will perform this inspection
using NRC Inspection Procedure 71152, Problem Identification and Resolution. The inspection
will include 2 weeks of onsite inspection by the team. The inspection period will cover the time
between the end of the last Problem Identification and Resolution Inspection through the last
onsite day of this inspection (June 28, 2018 - June 26, 2020).
Onsite Weeks: June 8-12 and June 22-26
In order to minimize the inspection impact on the site and to ensure a productive inspection, we
have enclosed a request for information needed for the inspection. This information should be
made available to the lead inspector by May 25, 2020.
The lead inspector for this inspection is Peter Jayroe. We understand that our licensing contact
for this inspection is Ms. Lucille Stone. If there are any questions about the inspection or the
requested materials, please contact the lead inspector by telephone at 817-200-1174 or by
e-mail at peter.jayroe@nrc.gov.
Paperwork Reduction Act Statement
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office
of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
C. Reasoner 2
The burden to the public for these voluntary information collections is estimated to average
2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination including the time for reviewing instructions, searching existing
data sources, gathering and maintaining the data needed, and completing and reviewing the
information collection. You may submit comments on any aspect of the information collection,
including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
electronic mail to INFOCOLLECTS.RESOURCE@NRC.GOV; and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and
Budget, Washington, DC 20503.
Public Protection Notification
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
This letter will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Peter Jayroe, Senior Reactor Inspector
Inspection Programs and Assessment Team
Division of Reactor Safety
Docket No. 50-482
License No. NPF-42
Enclosure:
Biennial Problem Identification and Evaluation
Initial Request for Information
cc w/ encl: Distribution via LISTSERV
ML20099G942
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: PAJ Yes No Publicly Available Sensitive NRC-002
OFFICE SRI:IPAT
NAME PJayroe
SIGNATURE /RA/
DATE 04/08/2020
Initial Request for Information
Biennial Problem Identification and Resolution Inspection
WOLF CREEK GENERATING STATION
Inspection Report: 05000482/2020010
Inspection Dates: June 8-12, 2020, and June 22-26, 2020
Inspection Procedure: IP 71152 Problem Identification and Resolution
Lead Inspector: Peter Jayroe, Senior Reactor Inspector
Please provide the following information as they become available, but no later than
May 25, 2020:
1. Document List
Note: For these summary lists, please include the document/reference number, the
document title, initiation date, status, and long-text description of the issue.
a. Summary list of all corrective action documents related to significant conditions
adverse to quality that were opened, closed, or evaluated during the period.
b. Summary list of all apparent cause evaluations (adverse condition assessment)
performed during the period
c. Summary list of all corrective action documents related to conditions adverse to quality
that were opened, closed, or evaluated during the period
d. Summary list of all currently open corrective action documents associated with
conditions adverse to quality first identified any time prior to the beginning of this
assessment period
e. Summary lists of all corrective action documents that were upgraded or downgraded in
priority/significance during the period (these may be limited to those downgraded from,
or upgraded to, apparent-cause level or higher)
f. Summary list of all corrective action documents initiated during the period that identify an
adverse or potentially adverse trend in safety-related or risk-significant equipment
performance or in any aspect of the station's safety culture
g. Summary lists of operator workarounds, operator burdens, temporary modifications, and
control room deficiencies (1) currently open and (2) that were evaluated and/or closed
during the period; this list should include the date that each item was opened and/or
closed
h. Summary list of all prompt operability determinations or other engineering evaluations
performed to provide reasonable assurance of operability
Enclosure
i. Summary list of plant safety issues raised or addressed by the Employee Concerns
Program (or equivalent) (sensitive information should be made available during the
team's first week on site-do not provide electronically)
2. Full Documents with Attachments
a. Root cause evaluations (latest revision) completed during the period; include a list of any
planned or in progress
b. Apparent cause evaluations or adverse condition assessments (latest revision)
completed during the period (if less than 30)
c. Quality Assurance audits performed during the period
d. Audits/surveillances performed during the period on the Corrective Action Program, of
individual corrective actions, or of cause evaluations
e. Functional area self-assessments and non-NRC third-party assessments (e.g., peer
assessments performed as part of routine or focused station self- and independent
assessment activities; do not include INPO assessments) that were performed or
completed during the period; include a list of those that are currently in progress
f. Assessments of the safety-conscious work environment including any safety culture
survey results; if none performed during the inspection period, provide the most recent
g. Corrective action documents generated during the period associated with the following:
i. NRC findings and/or violations
ii. Licensee Event Reports issued
h. Corrective action documents generated for the following, if they were determined to
be applicable to the site (for those that were evaluated but determined not to be
applicable, provide a summary list):
i. NRC Information Notices, Bulletins, and Generic Letters issued or evaluated
during the period
ii. Part 21 reports issued or evaluated during the period
iii. Vendor safety information letters (or equivalent) issued or evaluated during the
period
iv. Other external events and/or Operating Experience evaluated for applicability
during the period
i. Corrective action documents generated for the following:
i. Maintenance-preventable functional failures that occurred or were evaluated
during the period
ii. Action items generated or addressed by offsite review committees during the
period
2
j. Comments, observations, or minor performance deficiencies documented in the
2018 NRC Pl&R (2018007) inspection report or generated due to inspector
comments during the inspection (include any initiated prior to the period)
3. Logs and Reports
a. Corrective action performance trending/tracking information generated during the
period and broken down by functional organization (if this information is fully
included in item 3.b, it need not be provided separately)
b. Current system health reports, Management Review Meeting package, or similar
information; provide past reports as necessary to include 12 months of
metric/trending data
c. Radiation protection event logs during the period
d. Security event logs and security incidents during the period (sensitive information
should be made available during the team's first week on site-do not provide
electronically)
e. List of training deficiencies, requests for training improvements, and simulator
deficiencies for the period
Note: For items 3.c and 3.d, if there is no log or report maintained separate from the
corrective action program, please provide a summary list of corrective action program
items for the category described.
4. Procedures
Note: For these procedures, please include all revisions that were in effect at any time
during the period.
a. Corrective action program procedures, to include initiation and evaluation
procedures, operability determination procedures, cause evaluation procedures, and
any other procedures that implement the corrective action program
b. Quality Assurance program procedures (exclude specific audit procedures)
c. Employee Concerns Program (or equivalent) procedures
d. Procedures that implement/maintain a Safety Conscious Work
Environment
e. Conduct of Operations procedure (or equivalent) and any other
procedures or policies governing control room conduct, operator burdens
and workarounds, etc.
f. Operating Experience (OE) program procedures and any other procedures or
guidance documents that describe the sites use of OE information
3
5. Other
a. List of risk-significant components and systems, ranked by risk worth;
b. List of component/system noun names by system designators
c. List of structures, systems, and components and/or functions that were in
maintenance rule (a)(1) status or evaluated for (a)(1) status at any time during
the inspection period; including dates and results of expert panel reviews and
dates of status changes
d. Organization charts (searchable) for plant staff and long-term/permanent
contractors
e. Electronic copies of the UFSAR (or equivalent), technical specifications, and
technical specification bases, if available
f. Table showing the number of corrective action documents (or equivalent)
initiated during each month of the inspection period, by screened significance
g. For each day the team is on site,
i. Planned work/maintenance schedule for the station
ii. Schedule of management or corrective action review meetings (e.g.
operations focus meetings, condition report screening meetings, CARBs,
CRGs, MRMs, challenge meetings for cause evaluations, etc.)
iii. Agendas for these meetings
Note: The items listed in 5.g may be provided on a weekly or daily basis after the team
arrives on site.
All requested documents may be provided electronically to an internet-based file library.
4