  'Af Duquesne Lidit                                                                    ?"ftd*                                          ;
        ...,c.........,_                                                        1...,m::::t;:::                                      >
N.TO*l'isIOs'                                                            April 15, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Unites States Nuclear Regulatory Commission                                                                                        l Washington, DC 20555 ATTENTION:        Mr. Peter Tam, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulations l
 
==SUBJECT:==
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Bypass And Inoperable Status Panel
 
==REFERENCES:==
(a) 2NRC-4-165, dated October 11, 1984.
(b) 2NRC-4-079, dated June 13, 1984.
(c) NUREG-1057, Safety Evaluation Report related to the Opera-tion of Beaver Valley Power Station Unit 2, dated October 1985.
Gentlemen:
In Reference (a) Duquesne Light Company committed to make two changes to the Bypassed and        Inoperable Systems Indication logic. These new design changes have been included in Amendment 11 in January 1986 to the Beaver Valley Unit No. 2 Final Safety Analysis Report (FS AR).
The first change involved inoperability of the residual heat removal system when the primary component cooling water system is inoperable. This                                                      ;.
change is shown in FSAR Figure 7.5-6. The second change involved inoperability 4
of the primary component cooling water system, diesel generator and                      recircula-tion spray system when the service water system is inoperable. These changes are shown in FSAR Figures 7.5-16, 7.5-28, and 7.5-12 respectively.
In Reference (b) Duquesne Light Company committed to revise the FS AR
* to address Regulatory Guide 1.47. Amendment 7 to the FSAR in July 1984 revised Section 7.5.5 to address this issue.
I
        $$0TooN E
g                                                                                                                            :
el
                                                                                            '                                        a 0
fs Y
 
United States Nuclear Regulatory Commission Mr. Harold R. Denton, Director Bypass And Inoperable Status Panel Page 2 With the above modifications, Duquesne Light Company believes that all requests in Confirmatory Item No. 30 from Table 1.4 of the Safety Evalua-tion Report    (Reference b) have been completed and Confirmatory Item No. 30 can be closed.                                                                            I DUQUESNE LIGHT COMPANY I
By J. J. Tarey Vice President 1
il RWF/ sip cc: Mr. P. Tam, Project Manager l
Mr. L. Prividy, NRC Resident Inspector e
I
                                                                                          .I 2
E o
h' e
i e
E p
i
                                                                                                )
i i
4 5}}

Revision as of 02:21, 1 January 2021

Informs That Responses to Confirmatory Item 30 from Table 1.4 of SER Completed & Closed Due to Listed Changes to Bypassed & Inoperable Sys Indication Logic.Design Changes Included in Amend 11 to FSAR
ML20203C918
Person / Time
Site: Beaver Valley
Issue date: 04/15/1986
From: Carey J
DUQUESNE LIGHT CO.
To: Harold Denton, Tam P
Office of Nuclear Reactor Regulation
References
2NRC-6-038, 2NRC-6-38, TAC-62913, NUDOCS 8604210265
Download: ML20203C918 (2)


Text

- - - - - - _ - -

$VL

'Af Duquesne Lidit  ?"ftd*  ;

...,c.........,_ 1...,m::::t;::: >

N.TO*l'isIOs' April 15, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Unites States Nuclear Regulatory Commission l Washington, DC 20555 ATTENTION: Mr. Peter Tam, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulations l

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Bypass And Inoperable Status Panel

REFERENCES:

(a) 2NRC-4-165, dated October 11, 1984.

(b) 2NRC-4-079, dated June 13, 1984.

(c) NUREG-1057, Safety Evaluation Report related to the Opera-tion of Beaver Valley Power Station Unit 2, dated October 1985.

Gentlemen:

In Reference (a) Duquesne Light Company committed to make two changes to the Bypassed and Inoperable Systems Indication logic. These new design changes have been included in Amendment 11 in January 1986 to the Beaver Valley Unit No. 2 Final Safety Analysis Report (FS AR).

The first change involved inoperability of the residual heat removal system when the primary component cooling water system is inoperable. This  ;.

change is shown in FSAR Figure 7.5-6. The second change involved inoperability 4

of the primary component cooling water system, diesel generator and recircula-tion spray system when the service water system is inoperable. These changes are shown in FSAR Figures 7.5-16, 7.5-28, and 7.5-12 respectively.

In Reference (b) Duquesne Light Company committed to revise the FS AR

I

$$0TooN E

g  :

el

' a 0

fs Y

United States Nuclear Regulatory Commission Mr. Harold R. Denton, Director Bypass And Inoperable Status Panel Page 2 With the above modifications, Duquesne Light Company believes that all requests in Confirmatory Item No. 30 from Table 1.4 of the Safety Evalua-tion Report (Reference b) have been completed and Confirmatory Item No. 30 can be closed. I DUQUESNE LIGHT COMPANY I

By J. J. Tarey Vice President 1

il RWF/ sip cc: Mr. P. Tam, Project Manager l

Mr. L. Prividy, NRC Resident Inspector e