o s MCBVED Arizona Public Service Company E                  TO P.o. BOX 21666 e PHOENIX, ARIZONA 85036 EM JA!! 12 Fit 1: 28 1
January 5,1984
                                                                            ~
ANPP-285. 9-BSK/NN    Y h.
U. S. Nuclear Regulatory Commission                                      hF Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
 
==Subject:==
Time Extension For Report - DER 83-40 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 1 LPSI And CS Pump Motors Have Defective Welds And Are Leaking 011.
File: 84-C19-026; D.4.33.2
 
==Reference:==
(A) Telephone conversation between A. D'Angelo and R. Tucker on June 29, 1983.
(B) ANPP-27396, dated Jtily 25,_1983(Interim Report)
(C) ANPP-27962, dated October 5, 1983 (Time Extension)
(D) ANPP-28363, dated December 6,1983 (Time Extension)
 
==Dear Sir:==
 
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and and Time Extensions were requested in References (C) and (D) At that time,-it was estimated that a Final Report would'be available by January 6, 1984.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by February 6,1984, at which time a complete report will be submitted .
There is no new information or change to the Interim Report at this time.
Very truly yours,
{
                                                                    .        OLLL    DqL E. E. Van Brunt , Jr.
APS Vice President Nuclear Projects Management ANPP Project Director EEVB/TRB:ru                                                                j-cc: See Page Two
                                    ~
8401260035 840105 PDR ADOCK 05000528 S                PDR                                                                      /O
 
              <L. *
            .s Mr. T. W.-Bishop                    .
,        .'              DER 83-4 0 '
Page Two 5
cc:          . Richard DeYoung; Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission-
                                      -Washington; D. C. 20555 T. G. Woods; Jr.                                                -
G. C. Andognini J.-A. Roedel D. B. Fasnacht
                                      .A. C. Rogers B. S. Kaplan W..E. Ide-J; Vorees J. R. Bynum D. D. Green P. P. Klute A. C..Gehr-W. J. Stubblefield
+                                      W. G. Bingham R. L. Patterson R. W. Welcher                                                  .
<-                                    H. Foster D. R. Hawkinson L. E. Vorderbrueggen
                                      - G. A. Fiorelli S. R. Frost
.                                    J. Self t                                    .D. Canady I
'                                      Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 f                                    -Atlanta, GA 30339 l
l l-t i
L Y
                                                                                            , _ . - -}}

Latest revision as of 06:12, 16 April 2020

Interim Part 21/deficiency Rept Re Low Pressure Safety Injection & CS Pump Motors W/Defective Welds & Oil Leaks. Initially Reported on 830629.Due to Extensive Investigation, Final Rept Will Not Be Submitted Until 840206
ML20086J939
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/05/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-84-340-000 ANPP-28559-BSK, DER-83-40, PT21-84-340, PT21-84-340-000, NUDOCS 8401260035
Download: ML20086J939 (2)


Text

<

o s MCBVED Arizona Public Service Company E TO P.o. BOX 21666 e PHOENIX, ARIZONA 85036 EM JA!! 12 Fit 1: 28 1

January 5,1984

~

ANPP-285. 9-BSK/NN Y h.

U. S. Nuclear Regulatory Commission hF Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-40 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 1 LPSI And CS Pump Motors Have Defective Welds And Are Leaking 011.

File: 84-C19-026; D.4.33.2

Reference:

(A) Telephone conversation between A. D'Angelo and R. Tucker on June 29, 1983.

(B) ANPP-27396, dated Jtily 25,_1983(Interim Report)

(C) ANPP-27962, dated October 5, 1983 (Time Extension)

(D) ANPP-28363, dated December 6,1983 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and and Time Extensions were requested in References (C) and (D) At that time,-it was estimated that a Final Report would'be available by January 6, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by February 6,1984, at which time a complete report will be submitted .

There is no new information or change to the Interim Report at this time.

Very truly yours,

{

. OLLL DqL E. E. Van Brunt , Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVB/TRB:ru j-cc: See Page Two

~

8401260035 840105 PDR ADOCK 05000528 S PDR /O

<L. *

.s Mr. T. W.-Bishop .

, .' DER 83-4 0 '

Page Two 5

cc: . Richard DeYoung; Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission-

-Washington; D. C. 20555 T. G. Woods; Jr. -

G. C. Andognini J.-A. Roedel D. B. Fasnacht

.A. C. Rogers B. S. Kaplan W..E. Ide-J; Vorees J. R. Bynum D. D. Green P. P. Klute A. C..Gehr-W. J. Stubblefield

+ W. G. Bingham R. L. Patterson R. W. Welcher .

<- H. Foster D. R. Hawkinson L. E. Vorderbrueggen

- G. A. Fiorelli S. R. Frost

. J. Self t .D. Canady I

' Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 f -Atlanta, GA 30339 l

l l-t i

L Y

, _ . - -