{{#Wiki_filter:}} | {{#Wiki_filter:Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC September 15, 2004 NRC 2004-0095 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Monthly Operating Report and Revision to Unit 1 Operating Data Reports | ||
==References:== | |||
: 1) Letter from NMC to NRC dated May 11, 2004 (NRC 2004-0049) | |||
: 2) Letter from NMC to NRC dated June 4, 2004 (NRC 2004-0061) | |||
: 3) Letter from NMC to NRC dated July 14, 2004 (NRC 2004-0074) | |||
: 4) Letter from NMC to NRC dated August 12, 2004 (NRC 2004-0080) | |||
In accordance with Point Beach Nuclear Plant (PBNP) Technical Specifications 5.6.3, Enclosure 1 contains the Monthly Operating Report for August 2004 for PBNP, Units 1 and 2. | |||
In Reference 1, the number of reactor critical hours was incorrectly reported. This error was generated due to discrepancies in the definition of what constitutes the unit shutdown time for calculating the number of hours the reactor was critical. This discrepancy added 0.2 hours to the number of Unit 1 reactor critical hours for April 2004 and subsequent year to date reactor critical hours. | |||
Enclosure 2 contains the revised Operating Data Reports showing the correct number of hours the reactor was critical for the months of April through July. This error was discovered prior to generation of the August 2004 Monthly Operating Report. This error does not affect the Unit 2 Operating Data Reports. | |||
This letter contains no new commitments and no revisions to existing commitments. | |||
Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC 6590 Nuclear Road | |||
* Two Rivers, Wisconsin 54241 Telephone: 920.755.2321 ___1 | |||
Document Control Desk Page 2 Enclosures (2) cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW INPO Records Center | |||
ENCLOSURE I AUGUST MONTHLY OPERATING REPORT 4 pages follow | |||
OPERATING DATA REPORT DOCKET NO. 0 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 09/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD August - 2004 | |||
: 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0 | |||
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE | |||
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4,295.4 244,441.3 | |||
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 4,257.7 240,854;4' | |||
: 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9 | |||
: 6. NET ELECTRICAL ENERGY (MWH) 380,023.5 2,132,723.0 112,027,035.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997 | |||
UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 09/15/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Auaust 2004 (Month/Year) | |||
TYPE METH OF CAUSE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOU) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/AN/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain) | |||
F. Administrative G. Operational Error (Explain) | |||
H. Other (Explain) | |||
==SUMMARY== | |||
Unit 1 average daily power for the month of August was 510.8 MWe. | |||
There were no LERs issued in August for Unit 1. | |||
OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 09/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD August - 2004 | |||
: 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0 | |||
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE | |||
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,779.9 239,127.6 | |||
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 5,744.9 235,981.7 | |||
: 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2 | |||
: 6. NET ELECTRICAL ENERGY (MWH) 383,318.5 2,972,770.0 111,473,851.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997 | |||
UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 09/15/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Auzust 2004 (MonthiYear) | |||
TYPEMETHD OFCAUSE/CORRECTIVE NO. DATE F: FORCED DUT REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOURS) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) l. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain) | |||
F. Administrative G. Operational Error (Explain) | |||
H. Other (Explain) | |||
==SUMMARY== | |||
Unit 2 average daily power for the month of August was 515.2 MWe. | |||
There were no LERs issued in August for Unit 2. | |||
ENCLOSURE 2 REVISED UNIT 1 APRIL - JULY 2004 MONTHLY OPERATING REPORT 4 pages follow | |||
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 08/18/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD April - 2004 | |||
: 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0 | |||
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE | |||
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL 50.2 2,234.2 242,380.1 | |||
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 49.5 2,233.5 238,830.2 | |||
: 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9 | |||
: 6. NET ELECTRICAL ENERGY (MWH) 20,584.5 1,130,453.0 111,024,765.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997 | |||
V OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT I DATE 08/18/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD May - 2004 | |||
: 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0 | |||
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE | |||
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2,234.2 242,380.1 | |||
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 0.0 2,233.5 238,830.2 | |||
: 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9 | |||
: 6. NET ELECTRICAL ENERGY (MWH) 0.0 1,128,487.0 111,022,799.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997 | |||
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT I DATE 08/18/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2004 | |||
: 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0 | |||
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE | |||
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL 573.2 2,807.4 242,953.3 | |||
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 536.2 2,769.7 239,366.4 | |||
: 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9 | |||
: 6. NET ELECTRICAL ENERGY (MWH) 245,574.5 1,374,061.5 111,268,373.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997 | |||
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 08/18/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD July - 2004 | |||
: 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0 | |||
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE | |||
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,551.4 243,697.3 | |||
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 3,513.7 240,110.4 | |||
: 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9 | |||
: 6. NET ELECTRICAL ENERGY (MWH) 378,638.0 1,752,699.5 111,647,011.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997}} |
Latest revision as of 12:00, 24 March 2020
ML042660437 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 09/15/2004 |
From: | Koehl D Nuclear Management Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
NRC 2004-0095 | |
Download: ML042660437 (12) | |
Text
Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC September 15, 2004 NRC 2004-0095 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Monthly Operating Report and Revision to Unit 1 Operating Data Reports
References:
- 1) Letter from NMC to NRC dated May 11, 2004 (NRC 2004-0049)
- 2) Letter from NMC to NRC dated June 4, 2004 (NRC 2004-0061)
- 3) Letter from NMC to NRC dated July 14, 2004 (NRC 2004-0074)
- 4) Letter from NMC to NRC dated August 12, 2004 (NRC 2004-0080)
In accordance with Point Beach Nuclear Plant (PBNP) Technical Specifications 5.6.3, Enclosure 1 contains the Monthly Operating Report for August 2004 for PBNP, Units 1 and 2.
In Reference 1, the number of reactor critical hours was incorrectly reported. This error was generated due to discrepancies in the definition of what constitutes the unit shutdown time for calculating the number of hours the reactor was critical. This discrepancy added 0.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to the number of Unit 1 reactor critical hours for April 2004 and subsequent year to date reactor critical hours.
Enclosure 2 contains the revised Operating Data Reports showing the correct number of hours the reactor was critical for the months of April through July. This error was discovered prior to generation of the August 2004 Monthly Operating Report. This error does not affect the Unit 2 Operating Data Reports.
This letter contains no new commitments and no revisions to existing commitments.
Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC 6590 Nuclear Road
- Two Rivers, Wisconsin 54241 Telephone: 920.755.2321 ___1
Document Control Desk Page 2 Enclosures (2) cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW INPO Records Center
ENCLOSURE I AUGUST MONTHLY OPERATING REPORT 4 pages follow
OPERATING DATA REPORT DOCKET NO. 0 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 09/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD August - 2004
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4,295.4 244,441.3
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 4,257.7 240,854;4'
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
- 6. NET ELECTRICAL ENERGY (MWH) 380,023.5 2,132,723.0 112,027,035.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 09/15/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Auaust 2004 (Month/Year)
TYPE METH OF CAUSE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOU) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/AN/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)
F. Administrative G. Operational Error (Explain)
H. Other (Explain)
SUMMARY
Unit 1 average daily power for the month of August was 510.8 MWe.
There were no LERs issued in August for Unit 1.
OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 09/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD August - 2004
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,779.9 239,127.6
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 5,744.9 235,981.7
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
- 6. NET ELECTRICAL ENERGY (MWH) 383,318.5 2,972,770.0 111,473,851.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 09/15/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Auzust 2004 (MonthiYear)
TYPEMETHD OFCAUSE/CORRECTIVE NO. DATE F: FORCED DUT REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOURS) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) l. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)
F. Administrative G. Operational Error (Explain)
H. Other (Explain)
SUMMARY
Unit 2 average daily power for the month of August was 515.2 MWe.
There were no LERs issued in August for Unit 2.
ENCLOSURE 2 REVISED UNIT 1 APRIL - JULY 2004 MONTHLY OPERATING REPORT 4 pages follow
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 08/18/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD April - 2004
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 50.2 2,234.2 242,380.1
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 49.5 2,233.5 238,830.2
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
- 6. NET ELECTRICAL ENERGY (MWH) 20,584.5 1,130,453.0 111,024,765.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
V OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT I DATE 08/18/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD May - 2004
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2,234.2 242,380.1
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 0.0 2,233.5 238,830.2
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
- 6. NET ELECTRICAL ENERGY (MWH) 0.0 1,128,487.0 111,022,799.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT I DATE 08/18/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2004
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 573.2 2,807.4 242,953.3
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 536.2 2,769.7 239,366.4
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
- 6. NET ELECTRICAL ENERGY (MWH) 245,574.5 1,374,061.5 111,268,373.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 08/18/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD July - 2004
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,551.4 243,697.3
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 3,513.7 240,110.4
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
- 6. NET ELECTRICAL ENERGY (MWH) 378,638.0 1,752,699.5 111,647,011.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997