NRC 2004-0074, June 2004 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 2

From kanterella
(Redirected from NRC 2004-0074)
Jump to navigation Jump to search
June 2004 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 2
ML042100045
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/14/2004
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2004-0074
Download: ML042100045 (6)


Text

NuE e Committed to Nuclear xeln Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC July 14, 2004 NRC 2004-0074 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Monthly Operating Report In accordance with Technical Specification 5.6.3, Enclosure 1 contains the Monthly Operating Report for June 2004 for the Point Beach Nuclear Plant, Units I and 2.

This letter contains no new commitments and no revisions to existing commitments.

Dennis L. Koehl Site Vice-President, Poi t Beach Nuclear Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region ll, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW INPO Records Center 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321 N

ENCLOSURE I MONTHLY OPERATING REPORT 4 pages follow

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 07/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: June 2004 (Month/Year)

TYPE METHOD O3F CAUSE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOU) DOWN (2) COMMENTS 01 04/03/04 S 1597.3 C 4 U1R28 (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 1 average daily power for the month of June was 341.1 MWe.

There was one LER issued in June for unit 1: LER 266/2004-001-00, Reactor Pressure Vessel Upper Head Penetration 26 Flaw Indication.

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 07/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 573.2 2,807.2 242,953.1
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 536.2 2,769.7 239,366.4
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 245,574.5 1,374,061.5 111,268,373.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 07/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: June 2004 (Month/Year)

TYPE METHOD O3F, CA USE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOURS) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of June was 520.2 MWe.

There were no LERs issued in June for unit 2.

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 07/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,291.9 237,639.6
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 720.0 4,256.9 234,493.7
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 374,549.5 2,208,744.5 110,709,826.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LElTER 97-02 DATED MAY 15, 1997 A