ML19319C091: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 30: Line 30:
                                           "        '""'      U "' ' "  ~
                                           "        '""'      U "' ' "  ~
MAIL CONTROL FORM                      $5
MAIL CONTROL FORM                      $5
                        .
(
(
i 8001310                            0
i 8001310                            0


  .
                                                    -
                                                                                                    .
              .
                                                       ^^
                                                       ^^
r..a
r..a
                            ,                                  -
                         ..                                        n f-                                        C-        TOLEDO b ED! SON February 20, 1976                                                    LOWELL E. RCE v.ce % .as-t Facihties Cavatoorcent Docket No. 50-346 Dr. Donald F. Knuth, Director Office of Inspection and Enforcenent U. S. Nuclear Regulatory Co= mission Washington, D. C. 20555                                          .
                                                                                                          ,
    .    .
                         ..                                        n
* f-                                        C-        TOLEDO
                  <
b ED! SON February 20, 1976                                                    LOWELL E. RCE v.ce % .as-t Facihties Cavatoorcent
                                                                        ' ' * " " "
Docket No. 50-346 Dr. Donald F. Knuth, Director Office of Inspection and Enforcenent U. S. Nuclear Regulatory Co= mission Washington, D. C. 20555                                          .
                                                            ,


==Dear Dr. Knuth:==
==Dear Dr. Knuth:==
Line 58: Line 44:
Yours truly,
Yours truly,
                               .D          -
                               .D          -
                                                                      -
L. E. Roe
L. E. Roe
!  Vice President, Facilities Development
!  Vice President, Facilities Development l  LER/jy l  cc:  J. G. Kappler, Reg.'onal Director Office of Inspection and Enforcement Region III THE TCLEDO EDISON CCMPANY  ECISCN PLAZA  300 MACISCN AVENUE'  TOLEDO CHIO 43652
!
l  LER/jy l  cc:  J. G. Kappler, Reg.'onal Director Office of Inspection and Enforcement Region III
                                                                                                .
THE TCLEDO EDISON CCMPANY  ECISCN PLAZA  300 MACISCN AVENUE'  TOLEDO CHIO 43652
                                                                                                       . .}}
                                                                                                       . .}}

Latest revision as of 05:22, 1 February 2020

Interim Deficiency Rept Re Buckling of Stainless Steel Plate Areas in Top Third of Borated Water Storage Tank.Chicago Bridge & Iron to Repair Following Engineering Evaluation. Rept,Safety Analysis & Corrective Action to Be Submitted
ML19319C091
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/20/1976
From: Roe L
TOLEDO EDISON CO.
To:
References
NUDOCS 8001310458
Download: ML19319C091 (2)


Text

F 8 Ices DATE OF 00CuwfMT DATE KECEIVEO NO-m um m 2/20/76 2/ 27/76 60161 LYR UEMO KEFOve T OTMER Y

to DA 'O CC. OTHE9 ee

' l

' Y oa^"'**"*

. N I@ l' ACTION NECESSARY C CO C R ENCE O 1 NO AC? TON NECESSARY ] COwutNT ] gy CLAS3* F . . POST osF(E F8LE CODE ,

I MEG NO ogsCa,, vion ,%.....

g,g .E.Ea.Eo 10 oArt aECEivf o .. oArE CAVIS-MSSE BOCL7.1 PCE11 STATIM CE1Ts 1 IN Z1IN REPCET BEdAEDIEE TME 30CELIEG tr WARE 1CK R.A. IIARTFIELD

' STAmm STHL PLATE ARIAS OF STCRAGE

- tuur .

ENCLD50RES I

COPIES FCK Pgt, LOCAL PER, ESIC, ABB NIESSZK TO EEC10EAL rrranmTca ygg CIST11MTICE.

aEwAnas CCPT IINT TO EECICE 111 i I

" '""' U "' ' " ~

MAIL CONTROL FORM $5

(

i 8001310 0

^^

r..a

.. n f- C- TOLEDO b ED! SON February 20, 1976 LOWELL E. RCE v.ce % .as-t Facihties Cavatoorcent Docket No. 50-346 Dr. Donald F. Knuth, Director Office of Inspection and Enforcenent U. S. Nuclear Regulatory Co= mission Washington, D. C. 20555 .

Dear Dr. Knuth:

This letter is submitted as an interim report regarding the buckling of stainless steel plate areas in the top one third of the borated water storage tank at the Davis-Besse Nuclear Power Station, Unic #1. This was discussed by Mr. J. D. Lenardson, Quality Assurance Manager, with Mr. J. W. Sutton and Mr. D. W. Hayes, NRC Region III Office of Inspection and Enforcenent, on February 11, 1976. This condition is viewed as a significant deficiency pursuant to 10CFR50.55.

The borated water storage tank is utilized during construction to tenpor-arily store clean water for use in flushing and cleaning of coupleted portions of systems. Buckling occurred during flushing water draw down activities. Excess vacuum was created by an inoperative vacuum relief valve which had frozen in a partially open position. The necessary repairs will be accomplished by Chicago Bridge and Iron, following final engineering evaluation of the extent of danage and repair =ethod to be employed.

A definitive report of the deficiency, analysis cf the safety implications, and the corrective action taken, will be submitted to your office in accordance with 10CFR5050.55 upon co=pletion of our study of this problem.

Yours truly,

.D -

L. E. Roe

! Vice President, Facilities Development l LER/jy l cc: J. G. Kappler, Reg.'onal Director Office of Inspection and Enforcement Region III THE TCLEDO EDISON CCMPANY ECISCN PLAZA 300 MACISCN AVENUE' TOLEDO CHIO 43652

. .