|
|
Line 39: |
Line 39: |
| Previous operating experience has shown that relays with no harmonic filters are susceptible to harmonics that could potentially offset the relay setpoints. The licensee stated that the new relays have harmonic filters, so there are no foreseeable issues. | | Previous operating experience has shown that relays with no harmonic filters are susceptible to harmonics that could potentially offset the relay setpoints. The licensee stated that the new relays have harmonic filters, so there are no foreseeable issues. |
| Because the relay alarm function is proposed to be removed from the HNP technical specifications in the upcoming outages, the NRC staff suggested that the licensee should document the regulatory history behind the original addition of the relay alarm function to the technical specifications. | | Because the relay alarm function is proposed to be removed from the HNP technical specifications in the upcoming outages, the NRC staff suggested that the licensee should document the regulatory history behind the original addition of the relay alarm function to the technical specifications. |
| The NRC staff discussed the use of guidance for developing the LAR. The NRC questioned portions of the current guidance in NEI 15-01, "An Analytical Approach for Establishing Degraded Voltage Relay (DVR) Settings," (ADAMS Package Accession No. ML15089A327) so its use would incur greater scrutiny than using the approved guidance of RIS 2011-12, Revision 1, "Adequacy of Station Electrical Distribution System Voltages," (ADAMS Accession No. | | The NRC staff discussed the use of guidance for developing the LAR. The NRC questioned portions of the current guidance in NEI 15-01, "An Analytical Approach for Establishing Degraded Voltage Relay (DVR) Settings," (ADAMS Package Accession No. ML15089A327) so its use would incur greater scrutiny than using the approved guidance of RIS 2011-12, Revision 1, "Adequacy of Station Electrical Distribution System Voltages," (ADAMS Accession No. ML113050583) and BTP 8-6, "Adequacy of Station Electrical Distribution System Voltages," |
| ML113050583) and BTP 8-6, "Adequacy of Station Electrical Distribution System Voltages," | |
| (ADAMS Accession No. ML070710478). | | (ADAMS Accession No. ML070710478). |
| The NRC staff stated that the Palo Verde Nuclear Generating Station degraded grid voltage LAR (ADAMS Accession No. ML16096A337) provided sufficient justification for their proposed change and could be used an example LAR. | | The NRC staff stated that the Palo Verde Nuclear Generating Station degraded grid voltage LAR (ADAMS Accession No. ML16096A337) provided sufficient justification for their proposed change and could be used an example LAR. |
Letter Sequence Meeting |
---|
|
|
MONTHYEARML17009A3832017-01-0909 January 2017 Degraded Voltage Pre-Submittal Public Meeting Slides Project stage: Meeting ML17030A4372017-02-15015 February 2017 Summary of Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Degraded Grid Voltage Proposed License Amendment Request Project stage: Meeting 2017-01-09
[Table View] |
Similar Documents at Hatch |
---|
Category:Meeting Summary
MONTHYEARML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24213A2462024-08-0505 August 2024 Summary of Closed Meeting SNC Fleet - Physical Barriers Exemption ML24156A1772024-06-11011 June 2024 Summary of June 6, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Physical Barrier Exemptions for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch Nuclear Plant, Units 1 and 2, and Vogtle ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML24019A1932024-01-30030 January 2024 Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2 ML24012A1592024-01-30030 January 2024 Summary of January 8, 2024, Meeting Held with Southern Nuclear Operating Company, Inc., to Discuss a RAI License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Head Bolts ML23356A0282023-12-27027 December 2023 December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam ML23338A2592023-12-0808 December 2023 Summary of Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Reactor Pressure Vessel Head Closure Bolts for Hatch, Units 1 & 2 (EPID No. L-2022-LLA- 0120) ML23311A1302023-11-17017 November 2023 Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 ML23244A0312023-09-18018 September 2023 MTS - Meeting Summary - Pre-Submittal Meeting on August 02, 2023 - RICT 45-day Extension for TS 3.7.1 & 3.7.2 ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML23088A3882023-04-0303 April 2023 Summary of March 28, 2023, Observation Public Meeting Held with SNC, Regarding a License Amendment Request Regarding the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plan, Units 1 and 2 ML23088A2362023-03-28028 March 2023 SNC Presentation - Public Meeting - 03-28-2023 - Page from ML22231B055 ML22243A1912022-09-0707 September 2022 Public Pre-Submittal Meeting on August 1, 2022 - Revise TS Table 1.1-1 Modes to Relax RPV Head Closure Studs ML22200A0432022-07-22022 July 2022 Summary of June 22, 2022, Pre-Submittal Meeting W/Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Re-Write TS 3.7.2, Plant Service Water and Ultimate Heat Sink for Edwin I. Hatch Nuclear ML22108A1382022-04-18018 April 2022 Annual Assessment Public Meeting Summary ML21278A5572021-10-25025 October 2021 Meeting Summary - Pre-Submittal Meeting on October 5, 2021 - Hatch NFPA 805 License Amendment Request ML21251A5372021-09-20020 September 2021 September 7, 2021, Summary of Follow-Up, Public, Pre-Licensing Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML21229A0072021-09-10010 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 ML21232A2622021-09-0101 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company Regarding Proposed LAR to Remove Function 1.f (Main Steam Line Isolation-Turbine Building Area Temperature-High) from TS Table 3.3.6.1A-7 for Hatch Units 1&2 (L-2021-LRM-0081 ML21124A1232021-05-0404 May 2021 April 27, 2021, Public Meeting Summary Joseph M. Farley Nuclear Plant Units 1 and 2, Edwin I. Hatch Nuclear Plant Units 1 and 2, Docket No. 50-348, 50-364, 50-321, 50-366, Meeting Number ML21117A030 ML21102A3112021-04-19019 April 2021 Corrected - 03/31/2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed Licensing Action Request to Change the Quality Assurance Topical Report ML21092A0082021-04-0808 April 2021 Summary of March 31, 2021, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed Licensing Action Request to Change the Technical Specification Related to Heat Flux Hot Channel Factor ML21028A0532021-02-0303 February 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Supplement National Fire Protection Association (NFPA)-805, Performance-Based Standard for Fire Protection for ML20318A0752020-11-16016 November 2020 Summary of November 12, 2020, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Emergency Plan ML20289A4242020-11-0404 November 2020 Summary of Public Meeting with Southern Nuclear Operating Company, Inc. Regarding Proposed License Amendment Request to Remove Function 1.f from Technical Specification Table 3.3.6.1A-7 for Hatch, Units 1 and 2 ML20217L3692020-08-13013 August 2020 Summary of Meeting Joseph M. Farley Nuclear Plant, Units 1 and 2; Edwin I. Hatch, Units 1 and 2; and Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 a LAR for the Emergency Plan (EPID Nos. L-2020-LLA0150 and L-2020-LLA-015 ML20162A1622020-06-16016 June 2020 June 10, 2020, Summary of Public Mtg with Southern Nuclear Operating Company, Inc., a Proposed License Amendment Request for a One-Time Completion Time for the Emergency Diesel Generator Using a Risk-Informed Approach ML20154K7242020-06-0202 June 2020 EOC Meeting Summary ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML19114A0062019-04-30030 April 2019 Summary of July 31, 2018, Pre-Application Meeting with Southern Nuclear to Discuss Proposed Changes to Secondary Containment Technical Specifications (EPID L-2018-LEM-0047 ML19038A3462019-02-15015 February 2019 Summary of Meeting with the Nuclear Regulatory Commission and Southern Nuclear Operating Company, Inc. Regarding Pre-Submittal of a License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18284A0222018-10-16016 October 2018 August 23, 2018, Summary of Pre-Application Meeting with Southern Nuclear Operating Company, Inc. to Discuss TSTF-51 and TSTF-471 ML18142B0452018-05-24024 May 2018 Summary of May 21, 2018, Pre-submittal Public Teleconference with Southern Nuclear Operating Company, Inc. to Discuss the Upcoming License Amendment Request to Remove the Dedicated Shift Technical Advisor ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML17131A1572017-05-11011 May 2017 Summary of Public Meeting Concerning Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML17093A9172017-04-21021 April 2017 Summary of 3/23/2017, Pre-Submittal Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Proposed License Amendment Requests Regarding TSTF-542, Reactor Pressure Vessel Water Inventory Controls, and SR3.3.1.3 (CAC Nos ML17030A4372017-02-15015 February 2017 Summary of Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Degraded Grid Voltage Proposed License Amendment Request ML16179A1862016-06-30030 June 2016 Summary of Public Meeting with Southern Nuclear Operating Company to Discuss Delay of Application Date for NFPA 805 License Amendment Request for Edwin I. Hatch Nuclear Plant, Units Nos. 1 and 2 ML16085A1762016-03-29029 March 2016 Summary of March 24, 2016, Meeting with Southern Nuclear Operating Company Regarding Planned Physical Protection Modifications ML15195A4812015-08-31031 August 2015 July 13, 2015, Summary of Meeting with SNC on High Density Polyethylene Piping for HNP-2 ML15125A0872015-05-26026 May 2015 May 12, 2015 Summary of Meeting with Southern Nuclear Operating Company to Discuss a Future Fleet Standard Emergency Plan Submittal ML15121A0342015-04-30030 April 2015 Summary of Public Meeting to Discuss the 2014 Annual Performance Assessment of the Edwin I. Hatch Nuclear Plant ML15103A0602015-04-30030 April 2015 April 22, 2015, Summary of Meeting with Southern Nuclear Operating Company to Discuss a Future Fleet Standard Emergency Plan Submittal ML14122A0372014-05-0808 May 2014 April 23, 2014 Summary of Meeting with Southern Nuclear Operating Company to Discuss Grid Design Criteria ML14115A4102014-04-25025 April 2014 Summary of Public Meeting to Discuss Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2, in Vidalia, Georgia ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors 2024-08-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 15, 2017 LICENSEE: Southern Nuclear Operating Company.
FACILITY: Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2
SUBJECT:
SUMMARY
OF JANUARY 18, 2017, PRE-SUBMITTAL PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY, INC. TO DISCUSS THE DEGRADED GRID VOLTAGE PROPOSED LICENSE AMENDMENT REQUEST (CAC NOS. MF9043 AND MF9044)
On January 18, 2017, a Category 1 pre-submittal public meeting was held between the U.S.
Nuclear Regulatory Commission (NRC) staff and representatives of Southern Nuclear Operating Company, Inc. (SNC, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss with the SNC staff its planned license amendment submittal regarding degraded grid voltage at the Edwin I.
Hatch Nuclear Plant (HNP), Unit Nos. 1 and 2.
The meeting notice and agenda, dated January 4, 2017, are located at Agencywide Documents Access and Management System (ADAMS) Accession No. ML17009A420. The licensee's presentation slides are available in ADAMS at Accession No. ML17009A383. A list of meeting attendees is provided in the enclosure to this meeting summary.
Meeting Summary After introductions, the licensee proceeded to the slide presentation, first providing an overview of the license amendment request (LAR). The NRC staff first inquired about which industrial standards and NRC branch technical position (BTP) that the licensee followed to determine specifications for its replacement transformer. The NRC staff suggested that in the planned LAR, the licensee state the current licensing basis and ( 1) if the plants are currently in compliance with both their licensing basis and Title 10 of the Code of Federal Regulations, Part 50, Appendix A, "General Design Criteria," and (2) which guidance they used to develop the LAR.
The NRC staff noted that the recent Joseph M. Farley Nuclear Plant (FNP) degraded grid voltage LAR would provide a useful model to follow when developing the same LAR for HNP.
SNC stated that they incorporated all of the lessons learned from the FNP LAR into the HNP LAR.
During the discussion of slide 3, the NRC staff suggested that the licensee clearly identify whether the stated voltage value used in the supporting calculations is the minimum expected voltage (MEV) or the minimum required voltage (MRV). Applications from other licensees in the past were sometimes not clear and resulted in additional requests for additional information to clarify.
The NRC staff questioned whether the size of the to-be-installed transformer and its electrical capacity is larger (i.e., not a replacement-in-kind) and suggested that the review may take
longer. The NRC staff suggested that the correct reviews and calculations be described in the submittal to account for this larger electrical capacity.
The NRC staff inquired if the new degraded voltage relays had harmonic filters installed.
Previous operating experience has shown that relays with no harmonic filters are susceptible to harmonics that could potentially offset the relay setpoints. The licensee stated that the new relays have harmonic filters, so there are no foreseeable issues.
Because the relay alarm function is proposed to be removed from the HNP technical specifications in the upcoming outages, the NRC staff suggested that the licensee should document the regulatory history behind the original addition of the relay alarm function to the technical specifications.
The NRC staff discussed the use of guidance for developing the LAR. The NRC questioned portions of the current guidance in NEI 15-01, "An Analytical Approach for Establishing Degraded Voltage Relay (DVR) Settings," (ADAMS Package Accession No. ML15089A327) so its use would incur greater scrutiny than using the approved guidance of RIS 2011-12, Revision 1, "Adequacy of Station Electrical Distribution System Voltages," (ADAMS Accession No. ML113050583) and BTP 8-6, "Adequacy of Station Electrical Distribution System Voltages,"
(ADAMS Accession No. ML070710478).
The NRC staff stated that the Palo Verde Nuclear Generating Station degraded grid voltage LAR (ADAMS Accession No. ML16096A337) provided sufficient justification for their proposed change and could be used an example LAR.
Finally, the licensee described a further upcoming LAR to increase the technical specification out of service completion times for a start up transformer or offsite power source. SNC is proposing to submit the LAR in the third quarter of 2017.
No members of the public were in attendance. No Public Meeting Feedback Forms were received.
Please direct any inquiries to me at 301-415-3229 or Michael.Orenak@nrc.gov.
~ ~ C1Ju Michael D Orenak, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366
Enclosure:
List of Attendees
LIST OF ATTENDEES JANUARY 18, 2017, PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY, INC.
REGARDING THE DEGRADED GRID VOLTAGE PROJECT EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 NAME ORGANIZATION Michael Orenak U.S. Nuclear Regulatory Commission (NRC)
Pete Snyder NRC Tania Martinez-Navedo NRC Roy Mathew NRC Ken McElroy Southern Nuclear Operating Company (SNC)
Pamela Burns SNC Brian McGregor SNC Nicole Jackson SNC Tim Piette SNC (telephone)
R.G. Reddy SNC (telephone)
Doug Parker SNC (telephone)
James Flowers SNC (telephone)
Jeff Wiebelt SNC (telephone)
John Minley SNC (telephone)
Haissam Awar Enercon (telephone)
Eric Praser Enercon (telephone)
Jason Bellamy Enercon (telephone)
Robin Smith Enercon (telephone)
Aaron Smith Enercon (telephone)
Chinmay Patel Enercon (telephone)
Nader Eldeiry Enercon (telephone)
Lexi Kacic Enercon (telephone)
Anthony Bressi EPM (telephone)
Jeff Quinn EPM (telephone)
Enclosure
ML17030A437 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DE/EEEB/BC NAME MOrenak KGoldstein JZimmerman DATE 02/13/17 02/09/17 02/14/17 OFFICE NRR/DORL/LPL2-1 /BC NRR/DORL/LPL2-1 /PM NAME MMarkley (SWllliams for) MOrenak DATE 02/15/17 02/15/17