ML19210C114: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
{{#Wiki_filter:, , , , , . _ _ _
{{#Wiki_filter:, , , , , . _ _ _
=      , s
=      , s
                  '
                                                                                                                     ;            p b _  . .
                                  -
Use UM gu, .s. cco                _. I SI                                                                        DUQUESNE LIGHT COMPAW                      -
                                                                                                                     ;            p
_
b _  . .
            ,
_
Use UM
_._...
gu, .s. cco                _. I
"
SI                                                                        DUQUESNE LIGHT COMPAW                      -
Beaver Valley Power Station              e
Beaver Valley Power Station              e
'                                                                                        Post Office Box 4                    '
'                                                                                        Post Office Box 4                    '
                                                                                                                                      -
E                                                                                        Shippingport, PA 15077      [
E                                                                                        Shippingport, PA 15077      [
L            .
L            .
November 5, 1979            !
November 5, 1979            !
                                                                                                                                  -
BVPS: JAW:732
BVPS: JAW:732
                                                                                                                                   .=
                                                                                                                                   .=
K-
K-Beaver Valley Power Station, Unit No. 1                                  > "
.,
Beaver Valley Power Station, Unit No. 1                                  > "
Docket No. 50-334, License No. DPR-66                                    ,
Docket No. 50-334, License No. DPR-66                                    ,
                                                                                                                                  -
LER 79-49/0lP Mr. B. H. Grier, Director of Regulation United States Nuclear Regulatory Commission                                                                        -
LER 79-49/0lP
                                                                                                                                  ,
Mr. B. H. Grier, Director of Regulation
-
United States Nuclear Regulatory Commission                                                                        -
Region 1 r-            631 Park Avenue                                                                                                    -
Region 1 r-            631 Park Avenue                                                                                                    -
.
King of Prussia, Pennsylvania 19406                                                                                -
King of Prussia, Pennsylvania 19406                                                                                -
_
=               
=               


==Dear Mr. Grier:==
==Dear Mr. Grier:==
                                                                                                    -
In accordance with Technical Specification 3.4.6.1, the following occurrence is reported. The report was discussed with resident inspector D. A. Beckman at                                      E approximately 0730 hours on November 5, 1979.                                                                      -
                                                                                                                      .
In accordance with Technical Specification 3.4.6.1, the following occurrence
-
is reported. The report was discussed with resident inspector D. A. Beckman at                                      E approximately 0730 hours on November 5, 1979.                                                                      -
                                                                                                                                  -
During routine review of operations logs with the station in Operational
During routine review of operations logs with the station in Operational
"              Mode 1 at approximately 36% full power, it was discovered that samples of the                                      y containment atmosphere required while the containment atmosphere particulate monitor is out of service were not being taken. Upon discovery, a sample was
"              Mode 1 at approximately 36% full power, it was discovered that samples of the                                      y containment atmosphere required while the containment atmosphere particulate monitor is out of service were not being taken. Upon discovery, a sample was immediately taken and analyzed.                  Since the containment atmosphere gaseous                '
-
immediately taken and analyzed.                  Since the containment atmosphere gaseous                '
monitor was in service, activity levels could still be monitored. The remaining reactor coolant leak detection monitoring instrumentation remained operable; therefore, no safety implications were involved.
monitor was in service, activity levels could still be monitored. The remaining reactor coolant leak detection monitoring instrumentation remained operable; therefore, no safety implications were involved.
Any additional information or corrective action will be included in the follow-up report.                                                                            -
Any additional information or corrective action will be included in the follow-up report.                                                                            -
                                                                                                                                 .f
                                                                                                                                 .f Very truly yours, w                                                                                    .
                                                                                                                        '
Very truly yours,
-
w                                                                                    .
                                                                                                                                  .
J. A. Werling /
J. A. Werling /
"
Superintendent y'
Superintendent y'
1320 134 Y'\
1320 134 Y'\
7.91123, 29g                ~
7.91123, 29g                ~
:
                                                                                                         .~      ,,
                                                                                                         .~      ,,
M P
M P
__-


  .
Mr. B. H. Grier                                            .
* Mr. B. H. Grier                                            .
November 5, 1979 BVPS: JAW:732 Page 2 cc: Director Of Management & Program Analysis er United States Nuclear Reg;1atory Commission Washington, D. C. 20555 D. L. Wigginton, BVPS Licensing Project Manager United States Nuclear Regulatory Commission Washington, D. C. 20555 D. A. Beckman, Nuclear Regulatory Commission, King of Prussia, PA G. A. Olson, Secretary, Prime Movers Committee - EEI O      f l
November 5, 1979 BVPS: JAW:732 Page 2 cc: Director Of Management & Program Analysis er United States Nuclear Reg;1atory Commission Washington, D. C. 20555 D. L. Wigginton, BVPS Licensing Project Manager United States Nuclear Regulatory Commission Washington, D. C. 20555 D. A. Beckman, Nuclear Regulatory Commission, King of Prussia, PA G. A. Olson, Secretary, Prime Movers Committee - EEI
    .
O      f
                                                                          .
                                                                              .
l
                                                                '%                  !
s y-}}
s y-}}

Latest revision as of 05:37, 2 February 2020

RO 79-49/01P:on 791105,during Routine Review of Operations, Samples of Containment Atmosphere Gaseous Monitor Could Not Be Taken.Activity Levels Could Still Be Monitored.Addl Info in Followup Rept
ML19210C114
Person / Time
Site: Beaver Valley
Issue date: 11/05/1979
From: Werling J
DUQUESNE LIGHT CO.
To:
References
NUDOCS 7911130290
Download: ML19210C114 (2)


Text

, , , , , . _ _ _

= , s

p b _ . .

Use UM gu, .s. cco _. I SI DUQUESNE LIGHT COMPAW -

Beaver Valley Power Station e

' Post Office Box 4 '

E Shippingport, PA 15077 [

L .

November 5, 1979  !

BVPS: JAW:732

.=

K-Beaver Valley Power Station, Unit No. 1 > "

Docket No. 50-334, License No. DPR-66 ,

LER 79-49/0lP Mr. B. H. Grier, Director of Regulation United States Nuclear Regulatory Commission -

Region 1 r- 631 Park Avenue -

King of Prussia, Pennsylvania 19406 -

=

Dear Mr. Grier:

In accordance with Technical Specification 3.4.6.1, the following occurrence is reported. The report was discussed with resident inspector D. A. Beckman at E approximately 0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br /> on November 5, 1979. -

During routine review of operations logs with the station in Operational

" Mode 1 at approximately 36% full power, it was discovered that samples of the y containment atmosphere required while the containment atmosphere particulate monitor is out of service were not being taken. Upon discovery, a sample was immediately taken and analyzed. Since the containment atmosphere gaseous '

monitor was in service, activity levels could still be monitored. The remaining reactor coolant leak detection monitoring instrumentation remained operable; therefore, no safety implications were involved.

Any additional information or corrective action will be included in the follow-up report. -

.f Very truly yours, w .

J. A. Werling /

Superintendent y'

1320 134 Y'\

7.91123, 29g ~

.~ ,,

M P

Mr. B. H. Grier .

November 5, 1979 BVPS: JAW:732 Page 2 cc: Director Of Management & Program Analysis er United States Nuclear Reg;1atory Commission Washington, D. C. 20555 D. L. Wigginton, BVPS Licensing Project Manager United States Nuclear Regulatory Commission Washington, D. C. 20555 D. A. Beckman, Nuclear Regulatory Commission, King of Prussia, PA G. A. Olson, Secretary, Prime Movers Committee - EEI O f l

s y-