| {{#Wiki_filter:September 8, 2006Mr. Christopher M. CranePresident and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555SUBJECT:BYRON STATION, UNITS 1 AND 2NRC PHYSICAL SECURITY BASELINE INSPECTION REPORTNO. 05000454/2006007(DRS); 05000455/2006007(DRS) | | {{#Wiki_filter:ber 8, 2006 |
| | |
| | ==SUBJECT:== |
| | BYRON STATION, UNITS 1 AND 2 NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000454/2006007(DRS); 05000455/2006007(DRS) |
|
| |
|
| ==Dear Mr. Crane:== | | ==Dear Mr. Crane:== |
| On August 18, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a baselinesecurity inspection of your Byron Station and Exelon Nuclear Corporate. The enclosed report documents the results of this inspection, which were discussed on February 2, 2006, with Mr. D. Evans, on August 18, 2006, with Ms. Snow, and on August 30, 2006, with Mr. D. Hoots and other members of your staff.This inspection examined activities conducted under your license as they relate to public healthand safety, the common defense and security, and to compliance with the Commission's rules and regulations, orders, and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.EXEMPT FROM PUBLIC DISCLOSUREMay be exempt from public release under the Freedom ofInformation Act (5 U.S.C. 552)Exemption number: 5 Nuclear Regulatory Commission review required before publicrelease.K.Brooks, RIII/DRS/PSB Name and organization of person making determination. | | On August 18, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a baseline security inspection of your Byron Station and Exelon Nuclear Corporate. The enclosed report documents the results of this inspection, which were discussed on February 2, 2006, with Mr. D. Evans, on August 18, 2006, with Ms. Snow, and on August 30, 2006, with Mr. D. Hoots and other members of your staff. |
| | |
| | This inspection examined activities conducted under your license as they relate to public health and safety, the common defense and security, and to compliance with the Commissions rules and regulations, orders, and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel. |
| | |
| | EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552) |
| | Exemption number: 5 Nuclear Regulatory Commission review required before public Enclosure Contains . |
| | release. Upon separation, this page is Decontrolled. |
| | |
| | K.Brooks, RIII/DRS/PSB Name and organization of person making determination. |
| | |
| | Date of determination: 08/22/06 This report documents three findings of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. |
| | |
| | Nuclear Regulatory Commission is treating these violations as Non-Cited Violations (NCVs) |
| | consistent with Section VI.A.1of the NRC Enforcement Policy because of the very low security significance of these violations, and because they are entered into your corrective action program. If you contest this Non-Cited Violation, you should provide a response within 30 days of the date fo this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region III, the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Byron Station. |
| | |
| | The findings were both NRC-identified and Licensee-identified. |
| | |
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. |
|
| |
|
| Date of determination: 08/22/06 Enclosure Contains . Upon separation, this page is Decontrolled. C. Crane-2-This report documents three findings of very low security significance (i.e., Green as determinedby the Physical Protection Significance Determination Process). The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site.Nuclear Regulatory Commission is treating these violations as Non-Cited Violations (NCVs)consistent with Section VI.A.1of the NRC Enforcement Policy because of the very low security significance of these violations, and because they are entered into your corrective action program. If you contest this Non-Cited Violation, you should provide a response within 30 days of the date fo this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region III, the Director, Office of Enforcement, U.S. Nuclear RegulatoryCommission, Washington, DC 20555-0001; and the NRC Resident Inspector at the ByronStation.The findings were both NRC-identified and Licensee-identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessiblefrom the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public ElectronicReading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not beavailable for public inspection.In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for yourresponse, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public document room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.21. Otherwise, markyour entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390Enclosure Contains . Upon separation, this page is Decontrolled. C. Crane-3-Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.
| | In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public document room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 Enclosure Contains . |
| | Upon separation, this page is Decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you. |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/Kenneth Riemer, ChiefPlant Support Branch Division of Reactor SafetyDocket Nos. 50-454; 50-455License Nos. NPF-37; NPF-66Enclosure: Inspection Report 05000454/2006007(DRS);05000455/2006007(DRS)w/Attachment: Supplemental Information ( )cc w/encl ( ) | | /RA/ |
| : B. Westriech, NSIR/DNS Licensing Assistant, NSIR/DNS/RSS D. Combs, Byron Site Security Manager State Liaison OfficerEnclosure Contains . Upon separation, this page is Decontrolled.
| | Kenneth Riemer, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Enclosure: Inspection Report 05000454/2006007(DRS); |
| | 05000455/2006007(DRS) |
| | w/Attachment: Supplemental Information ( ) |
| | cc w/encl ( ): |
| | B. Westriech, NSIR/DNS Licensing Assistant, NSIR/DNS/RSS D. Combs, Byron Site Security Manager State Liaison Officer Enclosure Contains . |
| | Upon separation, this page is Decontrolled. |
| }} | | }} |
Similar Documents at Byron |
---|
Category:Letter
MONTHYEARIR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23313A0852023-11-0909 November 2023 Submittal of 2023-301 Byron Initial License Examination Post-Examination Comments RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23242A3282023-09-0101 September 2023 Amendment No. 233 Correction IR 05000454/20235012023-08-31031 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 ML23209A7242023-07-31031 July 2023 Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 ML23192A0362023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23122A3022023-07-20020 July 2023 Issuance of Amendments Technical Specifications 2.1.1 and 4.2.1 to Allow a Previously Irradiated Accident Tolerant Fuel Lead Test Assembly to Be Further Irradiated in Unit No. 2 IR 05000454/20234022023-07-18018 July 2023 Baseline Security Inspection Document; 05000454/2023402; 05000455/2023402 ML23198A0372023-07-17017 July 2023 Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23172A1172023-06-22022 June 2023 Notification of NRC Fire Protection Team Inspection Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23159A1302023-06-0808 June 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B1R25) ML23159A1542023-06-0808 June 2023 2022 Regulatory Commitment Change Summary Report RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process ML23157A2832023-06-0606 June 2023 Notification of NRC Baseline Inspection and Request for Information BYRON 2023-0029, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements2023-06-0101 June 2023 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23003A7882023-05-11011 May 2023 Report for December 12-16, 2022, Regulatory Audit Regarding Reinsertion of a High Burnup Accident Tolerant Fuel Lead Test Assembly 2024-02-02
[Table view] Category:Inspection Report
MONTHYEARIR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements IR 05000454/20235012023-08-31031 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 IR 05000454/20234022023-07-18018 July 2023 Baseline Security Inspection Document; 05000454/2023402; 05000455/2023402 IR 05000454/20230012023-05-0505 May 2023 Integrated Inspection Report 05000454/2023001 and 05000455/2023001 IR 05000454/20230102023-04-19019 April 2023 License Phase 1 Report 05000454/2023010 IR 05000454/20234012023-03-30030 March 2023 Baseline Security Inspection 05000454/2023401; and 05000455/2023401 IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 IR 05000454/20220062023-03-0101 March 2023 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2022006 and 05000454/2022006) IR 05000454/20220042023-02-0101 February 2023 Integrated Inspection Report 05000454/2022004 and 05000455/2022004 IR 05000454/20220102023-01-17017 January 2023 Design Basis Assurance Inspection (Programs) Inspection Report Report 05000454/2022010 and 05000455/2022010 IR 05000454/20224032022-12-28028 December 2022 Cyber Security Inspection Report 05000454/2022403 and 05000455/2022403 IR 05000454/20224052022-12-0909 December 2022 Material Control and Accounting Program Inspection Report 05000454/2022405 and 05000455/2022405 IR 05000454/20220032022-11-0707 November 2022 Integrated Inspection Report 05000454/2022003 and 05000455/2022003 BYRON 2022-0072, Steam Generator Tube Inspection Report for Refueling Outage 232022-10-27027 October 2022 Steam Generator Tube Inspection Report for Refueling Outage 23 IR 05000454/20220052022-08-24024 August 2022 Updated Inspection Plan for Byron Station Units 1 and 2 (Report 05000454/2022005; 05000455/2022005) IR 05000454/20224022022-08-0909 August 2022 Security Baseline Inspection Report 05000454/2022402 and 05000455/2022402 IR 05000454/20220022022-08-0808 August 2022 Integrated Inspection Report 05000454/2022002 and 05000455/2022002 IR 05000454/20220012022-05-0303 May 2022 Integrated Inspection Report 05000454/2022001 and 05000455/2022001 IR 05000454/20224012022-04-0404 April 2022 Security Baseline Inspection Report 05000454/2022401 and 05000455/2022401 IR 05000454/20210062022-03-0202 March 2022 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2021006 and 05000455/2021006) IR 05000454/20210042022-02-11011 February 2022 Integrated Inspection Report 05000454/2021004 and 05000455/2021004 IR 05000454/20210122022-01-0606 January 2022 Biennial Problem Identification and Resolution Inpsection Report 05000454/2021012 and 05000455/2021012 IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 IR 05000454/20214032021-11-22022 November 2021 Security Baseline Inspection Report 05000454/2021403 and 05000455/2021403 IR 05000454/20210032021-10-29029 October 2021 Integrated Inspection Report 05000454/2021003 and 05000455/2021003 and Exercise of Enforcement Discretion IR 05000454/20214022021-09-28028 September 2021 Security Baseline Inspection Report 05000454/2021402 and 05000455/2021402 IR 05000454/20210052021-09-0101 September 2021 Updated Inspection Plan for Byron Station Units 1 and 2 (05000454/2021005 and 05000455/2021005) IR 05000454/20210022021-08-0404 August 2021 Integrated Inspection Report 05000454/2021002; 05000455/2021002; and 07200068/2021001 IR 05000454/20210112021-05-14014 May 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000454/2021011 and 05000455/2021011 IR 05000454/20215012021-04-21021 April 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2021501 and 05000455/2021501 IR 05000454/20210012021-04-20020 April 2021 Integrated Inspection Report 05000454/2021001 and 05000455/2021001 IR 05000454/20214012021-03-24024 March 2021 Security Baseline Inspection Report 05000454/2021401 and 05000455/2021401 IR 05000454/20180102021-03-19019 March 2021 Closure of Auxiliary Feedwater System Unresolved Item 05000454/2018010-04 and 05000455/2018010-04 IR 05000454/20200062021-03-0404 March 2021 Annual Assessment Letter for Byron Station (Report 05000454/2020006 and 05000455/2020006) IR 05000454/20210102021-02-0909 February 2021 Triennial Fire Protection Inspection Report 05000454/2021010 and 05000455/2021010 IR 05000454/20200042021-01-27027 January 2021 Integrated Inspection Report 05000454/2020004 and 05000455/2020004 IR 05000454/20204032020-12-16016 December 2020 Security Baseline Inspection Report 05000454/2020403 and 05000455/2020403 IR 05000454/20200032020-11-10010 November 2020 Integrated Inspection Report 05000454/2020003 and 05000455/2020003 IR 05000454/20200112020-09-29029 September 2020 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000454/2020011 and 05000455/2020011 IR 05000454/20204022020-09-18018 September 2020 Security Baseline Inspection Report 05000454/2020402 and 05000455/2020402 IR 05000454/20200052020-09-0101 September 2020 Updated Inspection Plan for Byron Station Units 1 and 2 (Report 05000454/2020005 and 05000455/2020005) IR 05000454/20200022020-07-27027 July 2020 Integrated Inspection Report 05000454/2020002 and 05000455/2020002 IR 05000454/20200012020-04-24024 April 2020 Integrated Inspection Report 05000454/2020001 and 05000455/2020001 IR 05000454/20204012020-03-30030 March 2020 Security Baseline Inspection Report 05000454/2020401 and 05000455/2020401 IR 05000454/20190062020-03-0303 March 2020 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2019006 and 05000455/2019006) 2024-02-02
[Table view] |
Inspection Report - Byron - 2006007 |
---|
|
|
Text
ber 8, 2006
SUBJECT:
BYRON STATION, UNITS 1 AND 2 NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000454/2006007(DRS); 05000455/2006007(DRS)
Dear Mr. Crane:
On August 18, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a baseline security inspection of your Byron Station and Exelon Nuclear Corporate. The enclosed report documents the results of this inspection, which were discussed on February 2, 2006, with Mr. D. Evans, on August 18, 2006, with Ms. Snow, and on August 30, 2006, with Mr. D. Hoots and other members of your staff.
This inspection examined activities conducted under your license as they relate to public health and safety, the common defense and security, and to compliance with the Commissions rules and regulations, orders, and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.
EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)
Exemption number: 5 Nuclear Regulatory Commission review required before public Enclosure Contains .
release. Upon separation, this page is Decontrolled.
K.Brooks, RIII/DRS/PSB Name and organization of person making determination.
Date of determination: 08/22/06 This report documents three findings of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site.
Nuclear Regulatory Commission is treating these violations as Non-Cited Violations (NCVs)
consistent with Section VI.A.1of the NRC Enforcement Policy because of the very low security significance of these violations, and because they are entered into your corrective action program. If you contest this Non-Cited Violation, you should provide a response within 30 days of the date fo this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region III, the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Byron Station.
The findings were both NRC-identified and Licensee-identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public document room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 Enclosure Contains .
Upon separation, this page is Decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Kenneth Riemer, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Enclosure: Inspection Report 05000454/2006007(DRS);
05000455/2006007(DRS)
w/Attachment: Supplemental Information ( )
cc w/encl ( ):
B. Westriech, NSIR/DNS Licensing Assistant, NSIR/DNS/RSS D. Combs, Byron Site Security Manager State Liaison Officer Enclosure Contains .
Upon separation, this page is Decontrolled.