MONTHYEARML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination ML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1732021-10-28028 October 2021 Proposed Sim JPM BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1162021-10-28028 October 2021 ES-301-3 ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21361A1242021-10-28028 October 2021 ES-301-4 ML21361A1262021-10-28028 October 2021 ES-301-6 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21356B7242021-10-28028 October 2021 Ile Outline Review Comments Response ML21361A2732021-10-28028 October 2021 ES-201-2 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A3312021-10-28028 October 2021 SRO Admin JPM ML21361A2752021-10-28028 October 2021 ES-301-5 ML21361A3252021-10-28028 October 2021 Scenarios ML21361A3322021-10-28028 October 2021 Written Exam 2024-06-19
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A3322021-10-28028 October 2021 Written Exam ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1772021-10-28028 October 2021 Proposed SRO Admin JPM ML21361A1262021-10-28028 October 2021 ES-301-6 ML21356B7322021-10-28028 October 2021 ES-201-1 ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21356B7242021-10-28028 October 2021 Ile Outline Review Comments Response ML21361A3292021-10-28028 October 2021 Sim Job Performance Measure ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A3312021-10-28028 October 2021 SRO Admin JPM ML21361A1162021-10-28028 October 2021 ES-301-3 ML21356B7252021-10-28028 October 2021 ES-301-7 BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A2452021-10-28028 October 2021 ES-301-1 2024-06-19
[Table view] |
Text
ust 18, 2006
SUBJECT:
BYRON STATION, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000454/2006301(DRS);
05000455/2006301(DRS)
Dear Mr. Crane:
On June 30, 2006, the NRC completed initial operator licensing examinations at your Byron Station. The enclosed report documents the results of the examination, which were discussed on June 30 and July 24, 2006, with Mr. D. Hoots and Mr. S. Stimac respectively, and with other members of your staff.
NRC examiners administered the operating test during the weeks of June 19 and 26, 2006.
Members of the Byron Station Training Department staff administered the written examination on June 30, 2006. One Reactor Operator (RO) and five Senior Reactor Operator (SRO)
applicants were administered license examinations. The results of the examinations were finalized on July 24, 2006. All six applicants passed all sections of their examinations resulting in the issuance of one operator and three senior operator licenses.
During the NRCs review of initial license applications, two senior operator applicants were granted eligibility deferments so that the applicants could take the examination. These two applicants will need to complete a minimum of 6 months onsite responsible power plant experience before they will receive a license. The applicants will be granted a license only after you certify in writing to the NRC that the applicants have completed the eligibility requirement that was previously deferred.
In accordance with 10 CFR Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66
Enclosures:
1. Operator Licensing Examination Report 05000454/2006301(DRS);
05000455/2006301(DRS)
w/Attachment: Supplemental Information 2. Simulation Facility Report 3. Post Examination Comments and Resolutions 4. Written Examinations and Answer Keys (RO & SRO)
REGION III==
Docket Nos: 50-454; 50-455 License Nos: NPF-37; NPF-66 Report No: 05000454/2006301(DRS); 05000455/02006301(DRS)
Licensee: Exelon Generation Company, LLC Facility: Byron Station, Units 1 and 2 Location: Byron, Illinois Dates: June 21 through June 30, 2006 Examiners: M. Bielby, Senior Operations Engineer D. McNeil, Senior Operations Engineer B. Palagi, Senior Operations Engineer Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety
SUMMARY OF FINDINGS
ER 05000454/2006301(DRS), 05000455/2006301(DRS); 06/21/2006 - 06/30/2006;
Exelon Generation Company, LLC, Byron Station. Initial License Examination Report.
The announced operator licensing initial examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, Revision 9.
Examination Summary:
- All six applicants passed their examinations, four of these applicants were issued respective operator or senior operator licenses. Two senior operator applicants were granted eligibility determents so that the applicants could take the examination. These two applicants will need to complete a minimum of 6 months onsite responsible power plant experience before they will receive a license. (Section 4OA5.1)
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other
.1 Initial Licensing Examinations
a. Examination Scope
Byron Station's training staff prepared the examination outline and developed the written examination and operating test. The Nuclear Regulatory Commission (NRC) examiners validated the proposed examination during the week of May 22, 2006, and conducted the operator licensing initial examination during the weeks of June 19 and 26, 2006.
Byron Station training department staff members administered the written examination on June 30, 2006. In all cases, the training staff and the NRC examiners used the guidance established in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, to prepare, validate, revise, administer, and grade the examination. Five Senior Reactor Operator (SRO) and one Reactor Operator (RO)applicants were examined. Two of the five SRO applicants were granted eligibility deferments so they could take the examination.
b. Findings
Written Examination The licensee developed the written examination. During their internal review, the NRC examiners determined that the examination, as submitted, was within the range of acceptability expected for a proposed examination. Written examination comments developed during review by the NRC staff, and as a result of examination validation were incorporated into the written examination in accordance with the guidance contained in NUREG-1021.
One post-examination comment was submitted by the applicants and station training department personnel on July 10, 2006. The results of the NRCs review of the comment is documented in Enclosure 3, Post Examination Comments and Resolutions.
Operating Test The NRC examiners determined that the operating test, as originally submitted by the licensee, was within the range of acceptability expected for a proposed operating test.
Operating test changes made during the validation of the operating test were agreed upon between the NRC and the licensee.
Examination Results All six applicants passed their examinations, four of these applicants were issued respective operator or senior operator licenses. During the NRCs review of initial license applications, two senior operator applicants were granted eligibility deferments so that the applicants could take the examination. These two applicants will need to complete a minimum of 6 months onsite responsible power plant experience before they will receive a license. The applicants will be granted a license only after the NRC receives written certification from the station that the applicants have completed the eligibility requirement that was previously deferred.
.2 Examination Security
a. Scope
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination preparation and administration. The examiners used the guidelines provided in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.
b. Findings
No findings were noted in this area. The licensee staff was observed to be enforcing correct examination security procedures.
4OA6 Meetings
.1 Exit Meeting
The chief examiner presented the examination team's preliminary observations and findings on June 30, 2005, to Mr. D. Hoots and other members of the Operations and Training Department staff. A subsequent exit via teleconference was held on July 24, 2006 with Mr. S. Stimac following review of the site post examination comments. The licensee acknowledged the observations and findings presented. No proprietary information was identified by the stations staff during the exit meeting.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- D. Hoots, Site Vice President
- S. Stimac, Training Director
- L. Wehner, Operations Representative
- M. Jorgensen, Examination Author
- S. Deprest, Operation Training Program Specialist
NRC
- B. Bartlett, Senior Resident Inspector
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
LIST OF DOCUMENTS REVIEWED