IR 05000313/2007001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 7601 1-4005 March 2, 2007 Timothy Vice President Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 2, 2007


333 Russellville, AR 72802-0967 SUBJECT: ANNUAL ASSESSMENT LETTER - ARKANSAS NUCLEAR ONE (NRC INSPECTION REPORT 0500031 3/368-2007001)
==SUBJECT:==
ANNUAL ASSESSMENT LETTER - ARKANSAS NUCLEAR ONE (NRC INSPECTION REPORT 05000313/368-2007001)


==Dear Mr. Mitchell:==
==Dear Mr. Mitchell:==
On February 7, 2007, the NRC staff completed its performance review of Arkansas Nuclear One (ANO). Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31 , 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include physical protection information.
On February 7, 2007, the NRC staff completed its performance review of Arkansas Nuclear One (ANO). Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31 , 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.


A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the physical protection review and resultant inspection plan.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.


Overall, AN0 Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
Overall, AN0 Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.


The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice,"
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/reading-rm/adams.html (the Public Electronic Reading Room).
a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/reading-rm/adams.html (the Public Electronic Reading Room).


UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 7601 1-4005 March 2, 2007 Timothy Vice President Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R.
UNITED STATES NUCLEAR REGULATORY COMMISSION rch 2, 2007


333 Russellville, AR 72802-0967 SUBJECT: ANNUAL ASSESSMENT LETTER - ARKANSAS NUCLEAR ONE (NRC INSPECTION REPORT 0500031 3/368-2007001)
==SUBJECT:==
ANNUAL ASSESSMENT LETTER - ARKANSAS NUCLEAR ONE (NRC INSPECTION REPORT 05000313/368-2007001)


==Dear Mr. Mitchell:==
==Dear Mr. Mitchell:==
On February 7, 2007, the NRC staff completed its performance review of Arkansas Nuclear One (ANO). Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31 , 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include physical protection information.
On February 7, 2007, the NRC staff completed its performance review of Arkansas Nuclear One (ANO). Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31 , 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.


A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the physical protection review and resultant inspection plan.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.


Overall, AN0 Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
Overall, AN0 Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.


The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice,"
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/reading-rm/adams.html (the Public Electronic Reading Room).
a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/reading-rm/adams.html (the Public Electronic Reading Room).


Entergy Operations, Inc.
Entergy Operations, Inc. -5-Electronic distribution by RIV:
Regional Administrator (BSMI)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJCI)
Senior Resident Inspector (RWD)
Branch Chief, DRPIE (JAC)
Project Engineer, DRPIE (JCK3)
Team Leader, DRPITSS (RLNI)
RlTS Coordinator (MSH3)
V. Dricks, PA0 (VLD)
W. Maier, RSLO (WAM)
L. Owen, RA Secretary (LAO)
DRS Branch Chiefs (WBJ, ATG, LJS, MPSI)
C. Miller, Chief, TRPS, OED0 (CGM)
S. Richards, Deputy Director, DIRS, NRR (SAR)
J. Lubinski, Deputy Director, DORL, NRR (JWL)
C. Haney, Director, DORL, NRR (CXH)
D. Terao, Chief, PLB IV, DORL, NRR (DXT)
F. Saba, NRR Project Manager for A N 0 (FES)
RidsNrrDirslpab@,nrc.gov ROPrepor&s@nrc.gov SUNS1 Review Completed: -JAC- ADAMS: Byes 0 No Initials: -JAC Publicly Available 0 Non-Publicly Available 0 Sensitive ixj Non-Sensitive
/RA/  /RA/ AVegel for /RA/
2114/07  2114/07 2/25/07 3/2/07 OFFICIAL RECORD COPY  T=Tele phone E=E-mail F=Fax


-5- Electronic distribution by RIV: Regional Administrator (BSMI) DRP Director (ATH) DRS Director (DDC) DRS Deputy Director (RJCI) Senior Resident Inspector (RWD) Branch Chief, DRPIE (JAC) Project Engineer, DRPIE (JCK3) Team Leader, DRPITSS (RLNI) RlTS Coordinator (MSH3) V. Dricks, PA0 (VLD) W. Maier, RSLO (WAM) L. Owen, RA Secretary (LAO) DRS Branch Chiefs (WBJ, ATG, LJS, MPSI) C. Miller, Chief, TRPS, OED0 (CGM) S. Richards, Deputy Director, DIRS, NRR (SAR) J. Lubinski, Deputy Director, DORL, NRR (JWL) C. Haney, Director, DORL, NRR (CXH) D. Terao, Chief, PLB IV, DORL, NRR (DXT) F. Saba, NRR Project Manager for AN0 (FES) RidsNrrDirslpab@,nrc.gov ROPrepor&s@nrc.gov SUNS1 Review Completed: -JAC- ADAMS: Byes 0 No Initials: -JAC Publicly Available 0 Non-Publicly Available 0 Sensitive ixj Non-Sensitive  
Entergy Operations, Inc.  -5-Electronic distribution by RIV:
/RA/ /RA/ AVegel for /RA/ 211 4/07 211 4/07 2/25/07 3/2/07 OFFICIAL RECORD COPY T=Tele p hone E=E-mail F=Fax Entergy Operations, Inc.
Regional Administrator (BSMI)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJCI)
Senior Resident Inspector (RWD)
Branch Chief, DRPIE (JAC)
Project Engineer, DRPIE (JCK3)
Team Leader, DRPITSS (RLNI)
RlTS Coordinator (MSH3)
V. Dricks, PA0 (VLD)
W. Maier, RSLO (WAM)
L. Owen, RA Secretary (LAO)
DRS Branch Chiefs (WBJ, ATG, LJS, MPSI)
C. Miller, Chief, TRPS, OED0 (CGM)
S. Richards, Deputy Director, DIRS, NRR (SAR)
J. Lubinski, Deputy Director, DORL, NRR (JWL)
C. Haney, Director, DORL, NRR (CXH)
D. Terao, Chief, PLB IV, DORL, NRR (DXT)
F. Saba, NRR Project Manager for A N 0 (FES)
RidsNrrDirslpab@,nrc.gov ROPrepor&s@nrc.gov SUNS1 Review Completed: -JAC- ADAMS: Byes 0 No Initials: -JAC Publicly Available 0 Non-Publicly Available 0 Sensitive ixj Non-Sensitive
/RA/ /RA/ AVegel for /RA/
2114/07 2114/07 2/25/07 3/2/07 OFFICIAL RECORD COPY   T=Tele phone E=E-mail F=Fax


-5- Electronic distribution by RIV: Regional Administrator (BSMI) DRP Director (ATH) DRS Director (DDC) DRS Deputy Director (RJCI) Senior Resident Inspector (RWD) Branch Chief, DRPIE (JAC) Project Engineer, DRPIE (JCK3) Team Leader, DRPITSS (RLNI) RlTS Coordinator (MSH3) V. Dricks, PA0 (VLD) W. Maier, RSLO (WAM) L. Owen, RA Secretary (LAO) DRS Branch Chiefs (WBJ, ATG, LJS, MPSI) C. Miller, Chief, TRPS, OED0 (CGM) S. Richards, Deputy Director, DIRS, NRR (SAR) J. Lubinski, Deputy Director, DORL, NRR (JWL) C. Haney, Director, DORL, NRR (CXH) D. Terao, Chief, PLB IV, DORL, NRR (DXT) F. Saba, NRR Project Manager for AN0 (FES) RidsNrrDirslpab@,nrc.gov ROPrepor&s@nrc.gov SUNS1 Review Completed: -JAC- ADAMS: Byes 0 No Initials: -JAC Publicly Available 0 Non-Publicly Available 0 Sensitive ixj Non-Sensitive
Entergy Operations, Inc. -2-If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8147 with any questions you may have regarding this letter or the inspection plan.
/RA/ /RA/ AVegel for /RA/ 211 4/07 211 4/07 2/25/07 3/2/07 OFFICIAL RECORD COPY T=Tele p hone E=E-mail F=Fax Entergy Operations, Inc. -2- If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8147 with any questions you may have regarding this letter or the inspection plan.


Sincerely
Sincerely, V J e f f Clark, Chief Project Branch E Division of Reactor Projects Dockets: 50-313 50-368 Licenses: DPR-51 NPF-6 Enclosure:
, VJeff Clark, Chief Project Branch E Division of Reactor Projects Dockets: 50-31 3 Licenses: DPR-51 50-368 NPF-6 Enclosure: Arkansas Nuclear One Inspection/Activity Plan cc w/enclosure: Senior Vice President Entergy Operations, Inc.
Arkansas Nuclear One Inspection/Activity Plan cc w/enclosure:
Senior Vice President   Manager, Licensing
& Chief Operating Officer  Entergy Operations, Inc.


P.O. Box 31995 Jackson, MS 39286-1 995
Entergy Operations, Inc. Arkansas Nuclear One P.O. Box 31995   1448 S. R. 333 Jackson, MS 39286-1995  Russellville, AR 72802 Vice President   Director, Nuclear Safety & Licensing Operations Support   Entergy Operations, Inc.
& Chief Operating Officer Vice President Operations Support Entergy Operations, Inc.


P.O. Box 31995 Jackson, MS 39286-1 995 General Manager Plant Operations Entergy Operations, Inc. Arkansas Nuclear One 1448 S. R. 333 Russellville, AR 72802 Director, Nuclear Safety Assurance Entergy Operations, Inc. Arkansas Nuclear One 1448 S. R. 333 Russellville, AR 72802 Manager, Licensing Entergy Operations, Inc. Arkansas Nuclear One 1448 S. R. 333 Russellville, AR 72802 Director, Nuclear Safety & Licensing Entergy Operations, Inc.
Entergy Operations, Inc. 1340 Echelon Parkway P.O. Box 31995   Jackson, MS 39213-8298 Jackson, MS 39286-1995 Section Chief, Division of Health General Manager Plant Operations Radiation Control Section Entergy Operations, Inc. Arkansas Department of Health and Arkansas Nuclear One   Human Services 1448 S. R. 333   4815 West Markham Street, Slot 30 Russellville, AR 72802   Little Rock, AR 72205-3867 Director, Nuclear Safety Assurance Section Chief, Division of Health Entergy Operations, Inc. Emergency Management Section Arkansas Nuclear One   Arkansas Department of Health and 1448 S. R. 333   Human Services Russellville, AR 72802   4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867


1340 Echelon Parkway Jackson, MS 39213-8298 Section Chief, Division of Health Radiation Control Section Arkansas Department of Health and 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Human Services Section Chief, Division of Health Emergency Management Section Arkansas Department of Health and 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Human Services Entergy Operations, Inc.
Entergy Operations, Inc. -3-Manager, Washington Nuclear Operations Josh Johnston ABB Combustion Engineering Nuclear Emergency Service Coordinator Power  Johnson County Office of Emergency 12300 Twinbrook Parkway, Suite 330 Services Rockville, MD 20852  P.O. Box 546 Clarksville, AR 72830 James Mallay Director, Regulatory Affairs Don Fairbanks Framatome ANP  Emergency Service Coordinator 3815 Old Forest Road  Logan County Office of Emergency Lynchburg, VA 24501  Services Logan County Courthouse Chairperson  Paris, AR 72855 Denton Field Office Chemical and Nuclear Preparedness The Honorable Steve Pfeifer and Protection Division Mayor of Danville Office of Infrastructure Protection P.O. Box 69 Preparedness Directorate  Danville, AR 72833 Dept. of Homeland Security 800 North Loop 288  The Honorable Bill Elsken Federal Regional Center  Mayor of Paris Denton, TX 76201-3698  P.O. Box 271 Paris, AR 72855 David Maxwell Arkansas Department of The Honorable Billy Helms Emergency Management  Mayor of Clarksville P.O. Box 758  205 Walnut Street Conway, AR 72033  Clarksville, AR 72830-3005 David Freeman, Acting  The Honorable Carolyn McGee Emergency Service Coordinator Mayor of Dardanelle Pope County  P.O. Box 360 No. 4 Emergency Lane  Dardanelle, AR 72834 Russellville, AR 72801 The Honorable Allen Bradley Charlie Smith  Mayor of Dover Emergency Service Coordinator P.O. Box 258 Yell County Courthouse  Russellville, AR 7281 1 Union Street Dardanelle, AR 72834  The Honorable Jerry Don Barrett Mayor of Atkins P.O. Box 128 Atkins, AR 72823


-3- Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Power James Mallay Director, Regulatory Affairs Framatome ANP 3815 Old Forest Road Lynchburg, VA 24501 Chairperson Denton Field Office Chemical and Nuclear Preparedness and Protection Division Office of Infrastructure Protection Preparedness Directorate Dept. of Homeland Security 800 North Loop 288 Federal Regional Center Denton, TX 76201-3698 David Maxwell Arkansas Department of P.O. Box 758 Conway, AR 72033 Emergency Management David Freeman, Acting Emergency Service Coordinator Pope County No. 4 Emergency Lane Russellville, AR 72801 Charlie Smith Emergency Service Coordinator Yell County Courthouse Union Street Dardanelle, AR 72834 Josh Johnston Emergency Service Coordinator Johnson County Office of Emergency Services P.O. Box 546 Clarksville, AR 72830 Don Fairbanks Emergency Service Coordinator Logan County Office of Emergency Services Logan County Courthouse Paris, AR 72855 The Honorable Steve Pfeifer Mayor of Danville P.O. Box 69 Danville, AR 72833 The Honorable Bill Elsken Mayor of Paris P.O. Box 271 Paris, AR 72855 The Honorable Billy Helms Mayor of Clarksville 205 Walnut Street Clarksville, AR 72830-3005 The Honorable Carolyn McGee Mayor of Dardanelle P.O. Box 360 Dardanelle, AR 72834 The Honorable Allen Bradley Mayor of Dover P.O. Box 258 Russellville, AR 7281 1 The Honorable Jerry Don Barrett Mayor of Atkins P.O. Box 128 Atkins, AR 72823 Entergy Operations, Inc.
Entergy Operations, Inc. -4-The Honorable Tyrone Williamson Institute of Nuclear Power Operations (INPO)
Mayor of Russellville Records Center P.O. Box 428  700 Galleria Parkway SE, Suite 100 Russellville, AR 7281 1 Atlanta, GA 30339 The Honorable Edwin Price Mayor of London P.O. Box 130 London, AR 72847 The Honorable Bobby Kirby Mayor of Morrilton City Hall P.O. Box 583 Morrilton, AR 721 10 The Honorable Brad Wear Judge of Yell County Danville Courthouse P.O. Box 219 Danville, AR 72833 The Honorable Jimmy Hart Judge of Conway County 117 South Moose, Room 203 Morrilton, AR 721 10 The Honorable Mike Jacobs Judge of Johnson County P.O. Box 278 Clarksville, AR 72830 The Honorable Edgar Holt Judge of Logan County Room 22 Paris, AR 72855 Misty Sutton Emergency Service Coordinator P.O. Box 119 Morrilton, AR 721 10 The Honorable Jim Ed Gibson Judge of Pope County Courthouse 100 West Main Street Russellville, AR 72801


-4- The Honorable Tyrone Williamson Mayor of Russellville P.O. Box 428 Russellville, AR 7281 1 The Honorable Edwin Price Mayor of London P.O. Box 130 London, AR 72847 The Honorable Bobby Kirby Mayor of Morrilton City Hall P.O. Box 583 Morrilton, AR 721 10 The Honorable Brad Wear Judge of Yell County Danville Courthouse P.O. Box 219 Danville, AR 72833 The Honorable Jimmy Hart Judge of Conway County 117 South Moose, Room 203 Morrilton, AR 721 10 The Honorable Mike Jacobs Judge of Johnson County P.O. Box 278 Clarksville, AR 72830 The Honorable Edgar Holt Judge of Logan County Room 22 Paris, AR 72855 Misty Sutton Emergency Service Coordinator P.O. Box 119 Morrilton, AR 721 10 Institute of Nuclear Power Operations (INPO) Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339 The Honorable Jim Ed Gibson Judge of Pope County Courthouse 100 West Main Street Russellville, AR 72801 mmmmm CCCCC 00000 mcucuma, RRRRQ mmmmm KCCCC a,a,a,a,a, a,ara,a,a, mmmmm mmmmm .P .P .P .P .o ccccc ----- .E .E .E .E .e mmmmm ----- bbbbb 00000 00000 NNNNN aaaaa $$$$$ gg$?ss 00000 bbbbb 00000 00000 T-T--T-- $$s$; ooooi mu) CC 00 ma, an mm CK ma, .o .P cc -- .r .E ais - 33 mm bb 00 00 ??e 7- 2s 00 bb 00 00 2s s& 00 k3 0 co cum cu 7 2 0 0 N a: L W -I a: W Z W 0 0 n: a, or m Y 0 0 R (0 0 z zti G 7 d 0 0 N a: L Y 0 a W Z W 0 0 a: z m m 9 e C m 0 e .- a, ._ s 8 m C c 5 e 0 m a, a: C 0 a, CL m C .- e - C 0 m 0 c ._ c ._ & z > Y ._ 8 U C - .- c m 0 c a, > m 0 U C .- I z c ._ - c 0 c 0 c 0 C 0 I1 ._ C - z a, a: C 0 I1 0 m a, a: .- C - z e 0 m a, n: m a, m m C m or ._ n t e 2 U a, 3 m 0) .- I 2 a U C m U C m (D (D l- i= a 2 m 0 Z - I l- W I a, 0 C I 2 Y! a, a L C 0 .- c ._ 8 c C a, U c - C 0 m 0 c C a, ._ c .- e +! a, 0 C m E 'tr: a, a b P rn z a P U a, N 3 m m .- I F n c C C R k 0 l- 3 I P P W I I I W 'D (D W rD IC N 7 . 7 m N IC m N Ln i IC IC N T- a - 7 T- b a c adaa a a m W m W I m C 0 0 a, m f a, C a, m m .- +.a a - ._ - m I- O 0 N . c1 . m 0 I- 0 0 c! 9 . m 0 0) c 0 0 a, 0) C a, C a, 0) m ._ Y a - .- - m b 0 0 N . T- c! m 0 I- 0 0 b cu 0 c! . m mmmm CCCC 0000 mama, mmmm CCKC a,a,aa, a,ma,a, mmmm mmmm .P .P .P .o naan YYYY ---- .r .r .r .E mmmm mmmm yNNN m222 22&& ---- 0000 0000 cu"N 0000 mmmm 0000 0000 NNNN %-+a%- yNNN m&&2 0000 0 c 0 0 a, CL m C a, C a, 0) m ._ Y - .- - m W 0 0 N 0 Lo 0 . 7 . m c! 0 0 Lo 0 Lo 0 . mm cc 00 ala, mm CC mal ma, mm mm .P .P an CY -- .r .r -- mm mm 00 00 gg $$ $3 00 mm 00 00 77- 55 00 mmmm CCCC 0000 cucuma, mmmm CCKC ala,a,a, .P .P .P .o aaaa YYYC ---- .r - .E .r .c a555 mmmm mmmm mama mmmm CCCC 0000 mtucua, mmmm KCCC a,cua,a, a,a,a,a, mmmm mmmm .P .o .P .o aaaa YYYY ---- .r .r .r .G mmmm mmmcn a555 ---- 0000 0000 NNNN $?$?$?g ssss 0000 mmmm 0000 0000 NNNN 0000 ss&& mmmm 0000 0000 2222 mmmm 0000 0000 CUN" SSSS qooo I-SSS 0000 rb 7 0 m a, c a, > 0 .- e i 0 0 a, C a, > 0 a, z= W .- c h m 0 0 . 7 I K a, 3 E c 0 m 0 c .- Y .- G > L 0 - e 0 2 a e c 0 3 m 0 3 - e 0 $? a e C 0 3 m 0 Lz z v) W I- z W Z a 0 0 n II vi m a, C m 6 L 0 m C C a, .- .- L t b + m 0 TI) c .- - -1 4 t z -I 4 t z C 0 0 a, ._ Y 4- e a a, 0 C i.! t5 a 't a, - m K 0 .- Y 2 i; 3 0 k Z 3 0 z a $? ii -I 4 L I 6 W n W I I- .... 7 E 4 ?- Lo , 0 LT 8 I 0 a 9 T Lo ..-. I I I LL N z 7 (5) Lo m cu a l-- T 7 Lo I- a 0) ln r- 0 L" ?? T- 7 I- a - T 7 I- a 7 I-KZ aq 7 I- a - 7 I- a i; W liaa LT liaa a Entergy Operations, Inc.
m m m m m m u )
C C C C C C C
    .c P .P c
    .P c
    .P c
      .o c
      .o c
      .P c
0 0 0 0 0 0 0 m c u c u m a , m a ,
R R R R a n m m m m m m m-K - C - C - C - C -C -K a , a , a , a , a , m a ,
    -
    .E - .E
    .E - .E - .e a , a r a , a , a ,
      - .r .E
      -
ais m m m m m m m m m m m m m m m 3 3 m m b b b b b b b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 aN aN aN Na Na ??e 2 s 7 -
    $ $ $ $ $
0 0 0 0 0 0 0 b b b b b b b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 gg$?ss 2 s
    $T -
    $s$;
T -
o o o o i
    - T - -
k


-5- Electronic distribution by RIV: Regional Administrator (BSMI) DRP Director (ATH) DRS Director (DDC) DRS Deputy Director (RJCI) Senior Resident Inspector (RWD) Branch Chief, DRPIE (JAC) Project Engineer, DRPIE (JCK3) Team Leader, DRPITSS (RLNI) RlTS Coordinator (MSH3) V. Dricks, PA0 (VLD) W. Maier, RSLO (WAM) L. Owen, RA Secretary (LAO) DRS Branch Chiefs (WBJ, ATG, LJS, MPSI) C. Miller, Chief, TRPS, OED0 (CGM) S. Richards, Deputy Director, DIRS, NRR (SAR) J. Lubinski, Deputy Director, DORL, NRR (JWL) C. Haney, Director, DORL, NRR (CXH) D. Terao, Chief, PLB IV, DORL, NRR (DXT) F. Saba, NRR Project Manager for AN0 (FES) RidsNrrDirslpab@,nrc.gov ROPrepor&s@nrc.gov SUNS1 Review Completed: -JAC- ADAMS: Byes 0 No Initials: -JAC Publicly Available 0 Non-Publicly Available 0 Sensitive ixj Non-Sensitive  
0 s&
/RA/ /RA/ AVegel for /RA/ 211 4/07 211 4/07 2/25/07 3/2/07 OFFICIAL RECORD COPY T=Tele p hone E=E-mail F=Fax
0 0 co c u m cu  7
 
0
 
d
 
0  0 N  N a:  a:
L W-I L
Y 0  0 a:
W a
W Z  Z W  W 0  0 0  0 n:  a:
za, z
or Ym
 
0 m  zti m
 
e C
R G
  (0 m
.-0 e    a, C
s
    ._
m C
      .-
 
e
.-
c c c c
  ._
c 0 c C  a, CL m
.-0
 
C
 
C 0  m
 
  ._ 8  m-C c I a,
._
0 .-
-I1 -
C C 0 z e
c
  & e 5  m
> I1 0 > 0  a, c
z z a,
 
m a,
m a,
n: Y z m a,
a:  m m
._m 0 a: a: t 8
  ._  C U U U e    ._
or m
- C C m
C m 2 -
UC (D (D  n a, L C C  a, l-
 
C
 
b .-
c 0 ._
 
P ._ .-
c
 
m
 
U a,
  .-
 
C m
U i= .-Na, c
C C
E0 I  I I
rn c c 3  3 R
z c e m 0) Z a, a F m
k a - n Y! C C  'tr:
a, a, a, 2 a a -
U +! a    0 P  l-  2 3  I I  l-P m P W W I  I  I I m m N
IC
 
N L n W
  'D i
IC T-
    .
    (D W
 
rD
 
T-  IC  IC b  N  N a a d a a c
a m -
W a a  m W
I
 
m C c 0)  m m m m c 0 m m m m m m m m m m C C C C c c C C C C C C C C
.-0
+a.
 
._
Y
  .P .P .P .o Y Y Y Y
    ._
Y 0 .P .P C Y
    .P .P .P .o Y Y Y C
      .P .o .P .o Y Y Y Y 0 0  0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a, a,  m a m a , a, a l a , c u c u m a , m t u c u a ,
a a  n a a n CL a n a a a a  a a a a m  m m m m m m m m m m  m m m m
- f -C 0)
  -C - C - K - C -mC -C -C -
C - C - K - C -K - C - C - C a, a,  a , a , a a , a, m a l a l a , a , a , a,cua,a,
-
._C -C
.-  .r -
  - .r -
  .r - .E -C
    .- .r-m a.r
    -, -
    .r .E .r .c .r
      - .r -
      - .r .G-m a, a, 0)
a , m a , a ,
m m m m a,
0) m m a
m
 
m
 
m
 
m a , a , a , a ,
m m m m m m  m m m m m m m m a m a m m m m m m  m m m m m m m m m m m  m m m m I- b  m m m m W m m m m m m  m m m c n
.
O
 
.
N c1
.
 
0 N
T-
 
0 y
m N
 
0
 
c u " N
 
0 N
 
0
 
N 2 .
 
0
    .
N
 
0
 
g g
    $ $
 
0
 
0
 
0 2 2 2 2
 
0
 
0
 
0 N
 
0 N
a 5 5 5
      $?$?$?g
 
0 N
 
0 N
m c!
m  2 2 & &
 
Lo 0 0  0 0 0 0 0 0 0  0 0 0 0 I- I-  m m m m m m m m m m m  m m m m 0 0  0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  0 0 0 0 0 0
    $ 3 0 0 0 0 0 ssss 0 0 0 0
.
c! c!  N N N N c! CUN"
 
m
 
.
b cu m
 
  %-+a%- .
y N m & & 2 0 0 N
 
N
 
Lo
 
Lo
 
7 7 -
 
0 0
 
S q S o S o o I -0S 0S 0
 
S S
N ss&&
 
N
 
N
 
N
 
r b 7 m
0    0 a,    a, c    C
  .->
a, e
        >,
a
        .-
c
 
      .
h
 
m c  i I K
 
7 z=a, W
.-0  - a 3,
L 0  0 -
Y
.-m0  e e
c E    e e
c  0 C
 
G
> z  .-m 0    0 b v) C -1 2
 
vi a,
      -I $?
+  C
  .-a, 4 m  m  4  3 m
.-m0 n W L t 0 a
C m  t  0 a
TI)
- c I-t C
z 3  6  z  Lz a, z ._
0  L  -
0 Y  0  m W 0      K C
Z a,    k .-0
!.ti5 II a e
4-Z
 
Y
 
3
't a, a $?
 
z  0 a 0
 
ii-I a i; I
 
L 6  n W
I I-I I , .0... 7 W
I I  0 L L  LT E N a
0)
8 4 l-- ?-
Lo Lo z
 
      (5)
Lo m
9T
        ..-.
Lo L"      I - K Z cu a
T T- T ln  7 7 7 7  7 7
??  I- I- I-  I- I-r-
0  liaa a -
LT a i; W
a  a q l i a a a-a a
 
Entergy Operations, Inc.  -5-Electronic distribution by RIV:
Regional Administrator (BSMI)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJCI)
Senior Resident Inspector (RWD)
Branch Chief, DRPIE (JAC)
Project Engineer, DRPIE (JCK3)
Team Leader, DRPITSS (RLNI)
RlTS Coordinator (MSH3)
V. Dricks, PA0 (VLD)
W. Maier, RSLO (WAM)
L. Owen, RA Secretary (LAO)
DRS Branch Chiefs (WBJ, ATG, LJS, MPSI)
C. Miller, Chief, TRPS, OED0 (CGM)
S. Richards, Deputy Director, DIRS, NRR (SAR)
J. Lubinski, Deputy Director, DORL, NRR (JWL)
C. Haney, Director, DORL, NRR (CXH)
D. Terao, Chief, PLB IV, DORL, NRR (DXT)
F. Saba, NRR Project Manager for A N 0 (FES)
RidsNrrDirslpab@,nrc.gov ROPrepor&s@nrc.gov SUNS1 Review Completed: -JAC- ADAMS: Byes 0 No Initials: -JAC Publicly Available 0 Non-Publicly Available 0 Sensitive ixj Non-Sensitive
/RA/ /RA/ AVegel for /RA/
2114/07 2114/07 2/25/07 3/2/07 OFFICIAL RECORD COPY   T=Tele phone E=E-mail F=Fax
}}
}}

Latest revision as of 08:57, 23 November 2019

Annual Assessment Letter - Arkansas Nuclear One (NRC Inspection Report 05000313/2007001; 05000368/2007001)
ML070610584
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/02/2007
From: Clark J
NRC Region 4
To: Mitchell T
Entergy Operations
References
IR-07-001
Download: ML070610584 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 2, 2007

SUBJECT:

ANNUAL ASSESSMENT LETTER - ARKANSAS NUCLEAR ONE (NRC INSPECTION REPORT 05000313/368-2007001)

Dear Mr. Mitchell:

On February 7, 2007, the NRC staff completed its performance review of Arkansas Nuclear One (ANO). Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31 , 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.

Overall, AN0 Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/reading-rm/adams.html (the Public Electronic Reading Room).

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 2, 2007

SUBJECT:

ANNUAL ASSESSMENT LETTER - ARKANSAS NUCLEAR ONE (NRC INSPECTION REPORT 05000313/368-2007001)

Dear Mr. Mitchell:

On February 7, 2007, the NRC staff completed its performance review of Arkansas Nuclear One (ANO). Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31 , 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.

Overall, AN0 Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/reading-rm/adams.html (the Public Electronic Reading Room).

Entergy Operations, Inc. -5-Electronic distribution by RIV:

Regional Administrator (BSMI)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJCI)

Senior Resident Inspector (RWD)

Branch Chief, DRPIE (JAC)

Project Engineer, DRPIE (JCK3)

Team Leader, DRPITSS (RLNI)

RlTS Coordinator (MSH3)

V. Dricks, PA0 (VLD)

W. Maier, RSLO (WAM)

L. Owen, RA Secretary (LAO)

DRS Branch Chiefs (WBJ, ATG, LJS, MPSI)

C. Miller, Chief, TRPS, OED0 (CGM)

S. Richards, Deputy Director, DIRS, NRR (SAR)

J. Lubinski, Deputy Director, DORL, NRR (JWL)

C. Haney, Director, DORL, NRR (CXH)

D. Terao, Chief, PLB IV, DORL, NRR (DXT)

F. Saba, NRR Project Manager for A N 0 (FES)

RidsNrrDirslpab@,nrc.gov ROPrepor&s@nrc.gov SUNS1 Review Completed: -JAC- ADAMS: Byes 0 No Initials: -JAC Publicly Available 0 Non-Publicly Available 0 Sensitive ixj Non-Sensitive

/RA/ /RA/ AVegel for /RA/

2114/07 2114/07 2/25/07 3/2/07 OFFICIAL RECORD COPY T=Tele phone E=E-mail F=Fax

Entergy Operations, Inc. -5-Electronic distribution by RIV:

Regional Administrator (BSMI)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJCI)

Senior Resident Inspector (RWD)

Branch Chief, DRPIE (JAC)

Project Engineer, DRPIE (JCK3)

Team Leader, DRPITSS (RLNI)

RlTS Coordinator (MSH3)

V. Dricks, PA0 (VLD)

W. Maier, RSLO (WAM)

L. Owen, RA Secretary (LAO)

DRS Branch Chiefs (WBJ, ATG, LJS, MPSI)

C. Miller, Chief, TRPS, OED0 (CGM)

S. Richards, Deputy Director, DIRS, NRR (SAR)

J. Lubinski, Deputy Director, DORL, NRR (JWL)

C. Haney, Director, DORL, NRR (CXH)

D. Terao, Chief, PLB IV, DORL, NRR (DXT)

F. Saba, NRR Project Manager for A N 0 (FES)

RidsNrrDirslpab@,nrc.gov ROPrepor&s@nrc.gov SUNS1 Review Completed: -JAC- ADAMS: Byes 0 No Initials: -JAC Publicly Available 0 Non-Publicly Available 0 Sensitive ixj Non-Sensitive

/RA/ /RA/ AVegel for /RA/

2114/07 2114/07 2/25/07 3/2/07 OFFICIAL RECORD COPY T=Tele phone E=E-mail F=Fax

Entergy Operations, Inc. -2-If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8147 with any questions you may have regarding this letter or the inspection plan.

Sincerely, V J e f f Clark, Chief Project Branch E Division of Reactor Projects Dockets: 50-313 50-368 Licenses: DPR-51 NPF-6 Enclosure:

Arkansas Nuclear One Inspection/Activity Plan cc w/enclosure:

Senior Vice President Manager, Licensing

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc. Arkansas Nuclear One P.O. Box 31995 1448 S. R. 333 Jackson, MS 39286-1995 Russellville, AR 72802 Vice President Director, Nuclear Safety & Licensing Operations Support Entergy Operations, Inc.

Entergy Operations, Inc. 1340 Echelon Parkway P.O. Box 31995 Jackson, MS 39213-8298 Jackson, MS 39286-1995 Section Chief, Division of Health General Manager Plant Operations Radiation Control Section Entergy Operations, Inc. Arkansas Department of Health and Arkansas Nuclear One Human Services 1448 S. R. 333 4815 West Markham Street, Slot 30 Russellville, AR 72802 Little Rock, AR 72205-3867 Director, Nuclear Safety Assurance Section Chief, Division of Health Entergy Operations, Inc. Emergency Management Section Arkansas Nuclear One Arkansas Department of Health and 1448 S. R. 333 Human Services Russellville, AR 72802 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867

Entergy Operations, Inc. -3-Manager, Washington Nuclear Operations Josh Johnston ABB Combustion Engineering Nuclear Emergency Service Coordinator Power Johnson County Office of Emergency 12300 Twinbrook Parkway, Suite 330 Services Rockville, MD 20852 P.O. Box 546 Clarksville, AR 72830 James Mallay Director, Regulatory Affairs Don Fairbanks Framatome ANP Emergency Service Coordinator 3815 Old Forest Road Logan County Office of Emergency Lynchburg, VA 24501 Services Logan County Courthouse Chairperson Paris, AR 72855 Denton Field Office Chemical and Nuclear Preparedness The Honorable Steve Pfeifer and Protection Division Mayor of Danville Office of Infrastructure Protection P.O. Box 69 Preparedness Directorate Danville, AR 72833 Dept. of Homeland Security 800 North Loop 288 The Honorable Bill Elsken Federal Regional Center Mayor of Paris Denton, TX 76201-3698 P.O. Box 271 Paris, AR 72855 David Maxwell Arkansas Department of The Honorable Billy Helms Emergency Management Mayor of Clarksville P.O. Box 758 205 Walnut Street Conway, AR 72033 Clarksville, AR 72830-3005 David Freeman, Acting The Honorable Carolyn McGee Emergency Service Coordinator Mayor of Dardanelle Pope County P.O. Box 360 No. 4 Emergency Lane Dardanelle, AR 72834 Russellville, AR 72801 The Honorable Allen Bradley Charlie Smith Mayor of Dover Emergency Service Coordinator P.O. Box 258 Yell County Courthouse Russellville, AR 7281 1 Union Street Dardanelle, AR 72834 The Honorable Jerry Don Barrett Mayor of Atkins P.O. Box 128 Atkins, AR 72823

Entergy Operations, Inc. -4-The Honorable Tyrone Williamson Institute of Nuclear Power Operations (INPO)

Mayor of Russellville Records Center P.O. Box 428 700 Galleria Parkway SE, Suite 100 Russellville, AR 7281 1 Atlanta, GA 30339 The Honorable Edwin Price Mayor of London P.O. Box 130 London, AR 72847 The Honorable Bobby Kirby Mayor of Morrilton City Hall P.O. Box 583 Morrilton, AR 721 10 The Honorable Brad Wear Judge of Yell County Danville Courthouse P.O. Box 219 Danville, AR 72833 The Honorable Jimmy Hart Judge of Conway County 117 South Moose, Room 203 Morrilton, AR 721 10 The Honorable Mike Jacobs Judge of Johnson County P.O. Box 278 Clarksville, AR 72830 The Honorable Edgar Holt Judge of Logan County Room 22 Paris, AR 72855 Misty Sutton Emergency Service Coordinator P.O. Box 119 Morrilton, AR 721 10 The Honorable Jim Ed Gibson Judge of Pope County Courthouse 100 West Main Street Russellville, AR 72801

m m m m m m u )

C C C C C C C

.c P .P c

.P c

.P c

.o c

.o c

.P c

0 0 0 0 0 0 0 m c u c u m a , m a ,

R R R R Q a n m m m m m m m-K - C - C - C - C -C -K a , a , a , a , a , m a ,

-

.E - .E

.E - .E - .e a , a r a , a , a ,

- .r .E

-

ais m m m m m m m m m m m m m m m 3 3 m m b b b b b b b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 aN aN aN Na Na ??e 2 s 7 -

$ $ $ $ $

0 0 0 0 0 0 0 b b b b b b b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 gg$?ss 2 s

$T -

$s$;

T -

o o o o i

- T - -

k

0 s&

0 0 co c u m cu 7

0

d

0 0 N N a: a:

L W-I L

Y 0 0 a:

W a

W Z Z W W 0 0 0 0 n: a:

za, z

or Ym

0 m zti m

e C

R G

(0 m

.-0 e a, C

s

._

m C

.-

e

.-

c c c c

._

c 0 c C a, CL m

.-0

C

C 0 m

._ 8 m-C c I a,

._

0 .-

-I1 -

C C 0 z e

c

& e 5 m

> I1 0 > 0 a, c

z z a,

m a,

m a,

n: Y z m a,

a: m m

._m 0 a: a: t 8

._ C U U U e ._

or m

- C C m

C m 2 -

UC (D (D n a, L C C a, l-

C

b .-

c 0 ._

P ._ .-

c

m

U a,

.-

C m

U i= .-Na, c

C C

E0 I I I

rn c c 3 3 R

z c e m 0) Z a, a F m

k a - n Y! C C 'tr:

a, a, a, 2 a a -

U +! a 0 P l- 2 3 I I l-P m P W W I I I I m m N

IC

N L n W

'D i

IC T-

.

(D W

rD

T- IC IC b N N a a d a a c

a m -

W a a m W

I

m C c 0) m m m m c 0 m m m m m m m m m m C C C C c c C C C C C C C C

.-0

+a.

._

Y

.P .P .P .o Y Y Y Y

._

Y 0 .P .P C Y

.P .P .P .o Y Y Y C

.P .o .P .o Y Y Y Y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a, a, m a m a , a, a l a , c u c u m a , m t u c u a ,

a a n a a n CL a n a a a a a a a a m m m m m m m m m m m m m m m

- f -C 0)

-C - C - K - C -mC -C -C -

C - C - K - C -K - C - C - C a, a, a , a , a a , a, m a l a l a , a , a , a,cua,a,

-

._C -C

.- .r -

- .r -

.r - .E -C

.- .r-m a.r

-, -

.r .E .r .c .r

- .r -

- .r .G-m a, a, 0)

a , m a , a ,

m m m m a,

0) m m a

m

m

m

m a , a , a , a ,

m m m m m m m m m m m m m m a m a m m m m m m m m m m m m m m m m m m m m m I- b m m m m W m m m m m m m m m c n

.

O

.

N c1

.

0 N

T-

0 y

m N

0

c u " N

0 N

0

N 2 .

0

.

N

0

g g

$ $

0

0

0 2 2 2 2

0

0

0 N

0 N

a 5 5 5

$?$?$?g

0 N

0 N

m c!

m 2 2 & &

Lo 0 0 0 0 0 0 0 0 0 0 0 0 0 I- I- m m m m m m m m m m m m m m m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

$ 3 0 0 0 0 0 ssss 0 0 0 0

.

c! c! N N N N c! CUN"

m

.

b cu m

%-+a%- .

y N m & & 2 0 0 N

N

Lo

Lo

7 7 -

0 0

S q S o S o o I -0S 0S 0

S S

N ss&&

N

N

N

r b 7 m

0 0 a, a, c C

.->

a, e

>,

a

.-

c

.

h

m c i I K

7 z=a, W

.-0 - a 3,

L 0 0 -

Y

.-m0 e e

c E e e

c 0 C

G

> z .-m 0 0 b v) C -1 2

vi a,

-I $?

+ C

.-a, 4 m m 4 3 m

.-m0 n W L t 0 a

C m t 0 a

TI)

- c I-t C

z 3 6 z Lz a, z ._

0 L -

0 Y 0 m W 0 K C

Z a, k .-0

!.ti5 II a e

4-Z

Y

3

't a, a $?

z 0 a 0

ii-I a i; I

L 6 n W

I I-I I , .0... 7 W

I I 0 L L LT E N a

0)

8 4 l-- ?-

Lo Lo z

(5)

Lo m

9T

..-.

Lo L" I - K Z cu a

T T- T ln 7 7 7 7 7 7

?? I- I- I- I- I-r-

0 liaa a -

LT a i; W

a a q l i a a a-a a

Entergy Operations, Inc. -5-Electronic distribution by RIV:

Regional Administrator (BSMI)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJCI)

Senior Resident Inspector (RWD)

Branch Chief, DRPIE (JAC)

Project Engineer, DRPIE (JCK3)

Team Leader, DRPITSS (RLNI)

RlTS Coordinator (MSH3)

V. Dricks, PA0 (VLD)

W. Maier, RSLO (WAM)

L. Owen, RA Secretary (LAO)

DRS Branch Chiefs (WBJ, ATG, LJS, MPSI)

C. Miller, Chief, TRPS, OED0 (CGM)

S. Richards, Deputy Director, DIRS, NRR (SAR)

J. Lubinski, Deputy Director, DORL, NRR (JWL)

C. Haney, Director, DORL, NRR (CXH)

D. Terao, Chief, PLB IV, DORL, NRR (DXT)

F. Saba, NRR Project Manager for A N 0 (FES)

RidsNrrDirslpab@,nrc.gov ROPrepor&s@nrc.gov SUNS1 Review Completed: -JAC- ADAMS: Byes 0 No Initials: -JAC Publicly Available 0 Non-Publicly Available 0 Sensitive ixj Non-Sensitive

/RA/ /RA/ AVegel for /RA/

2114/07 2114/07 2/25/07 3/2/07 OFFICIAL RECORD COPY T=Tele phone E=E-mail F=Fax