{{#Wiki_filter:JntaRowley V Vernon Ti e info Pag P>) -uz~From: "Hamer, Mike" <mhamer@entergy.com>
{{#Wiki_filter:JntaRowley V Vernon Ti e info                                                 Pag P>)   -uz~
To: "Jonathan Rowley" <JGR@nrc.gov>
From:             "Hamer, Mike" <mhamer@entergy.com>
Date: 06/07/2007 3:43:08 PM  
To:               "Jonathan Rowley" <JGR@nrc.gov>
Date:             06/07/2007 3:43:08 PM


==Subject:==
==Subject:==
Vernon Tie info Jonathan, *Attached is a previously docketed letter that provides our commitment for LCO actions/notifications upon loss of the Vernon Tie line. Also attached is the procedure that contains a protected step to ensure this commitment is properly administered  
Vernon Tie info Jonathan,
-see page 8.step 16.<<BVY 97-25 -Vernon Tie -Appendix R Compliance Letter.tif>>
* Attached is a previously docketed letter that provides our commitment for LCO actions/notifications upon loss of the Vernon Tie line. Also attached is the procedure that contains a protected step to ensure this commitment is properly administered - see page 8.step 16.
<<OP 2142 Vernon Tie Ico.pdf>>
      <<BVY 97 Vernon Tie - Appendix R Compliance Letter.tif>>
I c:\,temp\Gw}oooo4.TMP Pg i#aglei., Mail Envelope Properties (46685FBF.A66
      <<OP 2142 Vernon Tie Ico.pdf>>
: 11 : 19046)
 
Ic:\,temp\Gw}oooo4.TMP                                                                       i#aglei.,
Pg Mail Envelope Properties     (46685FBF.A66 : 11 : 19046)


==Subject:==
==Subject:==
Creation Date From: Created By: Vernon Tie info 06/07/2007 3:42:23 PM"Hamer, Mike" <mhamerdentergy.com>
Vernon Tie info Creation Date            06/07/2007 3:42:23 PM From:                    "Hamer, Mike" <mhamerdentergy.com>
mhamer(iDentergy.com Recipients nrc.gov TWGWPO03.HQGWDOOI JGR (Jonathan Rowley)Post Office TWGWPO03.HQGWDOO1 Route nrc.gov Files Size Date & Time MESSAGE 379 06/07/2007 3:42:23 PM TEXT.htm 2093 BVY 97-25 -Vernon Tie -Appendix R Compliance Letter.tif 95550 OP 2142 Vernon Tie lco.pdf 1691436 Mime.822 2451050 Options Expiration Date: Priority: ReplyRequested:
Created By:              mhamer(iDentergy.com Recipients nrc.gov TWGWPO03.HQGWDOOI JGR (Jonathan Rowley)
Return Notification:
Post Office                                                             Route TWGWPO03.HQGWDOO1                                                       nrc.gov Files                           Size               Date & Time MESSAGE                         379                 06/07/2007 3:42:23 PM TEXT.htm                       2093 BVY 97 Vernon Tie - Appendix R Compliance Letter.tif               95550 OP 2142 Vernon Tie lco.pdf     1691436 Mime.822                       2451050 Options Expiration Date:               None Priority:                       Standard ReplyRequested:                 No Return Notification:           None Concealed  
Concealed  


==Subject:==
==Subject:==
Security: None Standard No None No Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled Jonathan Rowley-BVY97-25
No Security:                       Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled
-Vernon Tie -Appendix R Compliance Lettertif Page 1 1 I T I i I e Rowley -BVY 97-25 -Vefnon Appendix R Compliance Letter.tif I VERMONT YANKEE NUCLEAR POWER CORPORATION RESPONSIBILITY NOPJ.J. DUFFY -Distribution LPAX 113-7 0v,,3,ed Ferry Road. Brattleboro.
 
VT 05301-7002 F1, 10 ENGINEERING OFFICE 580 MAIN STREET BOLTON, MA 0t740 (508) 779-6711 February 19, 1997 BVY 97-25 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555  
Compliance Lettertif                                       Page 1 1 Jonathan Rowley               -
Vefnon Tie
                - BVY 97 Vernon Rowley-BVY97-25                   T      Appendix R I IiIe -Appendix   R Compliance Letter.tif                                               I VERMONT YANKEE NUCLEAR POWER CORPORATION                                                       RESPONSIBILITY NOPJ.J.                                       DUFFY - Distribution LPAX 113-7 0v,,3,ed Ferry Road. Brattleboro. VT 05301-7002                                         F1, 10 ENGINEERING OFFICE 580 MAIN STREET BOLTON, MA 0t740 (508) 779-6711 February 19, 1997 BVY 97-25 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555


==References:==
==References:==
(a) License No. DPR-28 (Docket No. 50-271)(b) Letter, VYNPC to USNRC, BVY 96-43, dated April 4, 1996 (c) Telecon, USNRC to VYNPC, dated February 12, 1997  
(a) License No. DPR-28 (Docket No. 50-271)
(b) Letter, VYNPC to USNRC, BVY 96-43, dated April 4, 1996 (c) Telecon, USNRC to VYNPC, dated February 12, 1997


==Subject:==
==Subject:==
Clarification Regarding Use of Vernon Tie for Appendix R Compliance In Reference (b), Vermont Yankee requested an exemption from 1OCFR50, Appendix R, section l1I.L to allow use of the Vernon Tie as a source of ac power in alternative shutdown scenarios.
Clarification Regarding Use of Vernon Tie for Appendix R Compliance In Reference (b), Vermont Yankee requested an exemption from 10CFR50, Appendix R, section l1I.L to allow use of the Vernon Tie as a source of ac power in alternative shutdown scenarios. Vermont Yankee utilizes alternative shutdown capability in the event of a fire in the control room or cable spreading room. Currently, Vermont Yankee uses one of the two onsite emergency diesel generators in an alternate shutdown mode as a source of ac power when offsite power is not available in the event of a control room or cable spreading room fire.
Vermont Yankee utilizes alternative shutdown capability in the event of a fire in the control room or cable spreading room. Currently, Vermont Yankee uses one of the two onsite emergency diesel generators in an alternate shutdown mode as a source of ac power when offsite power is not available in the event of a control room or cable spreading room fire.This exemption was requested to facilitate the restoration of ac power to safe shutdown equipment and to reduce the operator timeline
This exemption was requested to facilitate the restoration of ac power to safe shutdown equipment and to reduce the operator timeline for initiating alternate shutdown systems. Use of the Vernon Tie has several significant advantages over use of an emergency diesel generator to meet alternate shutdown requirements. These advantages include: prompt restoration of power using simpler operator actions; continuous operation without dependence on support systems; and reliability of the Vernon Tie. As stated in Reference (b), the Vernon Tie is normally energized and the availability of Vernon Station has historically been well above 99%,
exceeding the required alternate ac source availability of 95%. However, in the event the Vernon Tie is unavailable, a diesel generator will be available to provide backup power.
In Reference (b) Vermont Yankee stated that it would institute the following administrative limit in the event of an unplanned unavailability of the Vernon Tie:
Power operationmay continue for no more than 15 days, unless the Vernon Tie is returned to
CAUTION To maintain seismic requirements, Bus 3 and 4 breakers must be removed from the cubicle after being racked down when the bus is required to be operable. (VYCES94120.01)
CAUTION To maintain seismic requirements, Bus 3 and 4 breakers must be removed from the cubicle after being racked down when the bus is required to be operable. (VYCES94120.01)
: 10. For buses 3 and 4, if the bus is required to be operable per Technical Specifications: (VYCES94120_01)
: 10.     For buses 3 and 4, if the bus is required to be operable per Technical Specifications: (VYCES94120_01)
: a. Remove the breaker from the cubicle.b. Check the breaker DISCHGD.NOTE It is preferable to secure the breaker by tying off to the breaker frame; do not tie off to operating components of the breaker. (INF97053 01)c. Secure the breaker with approved tie downs.NOTE VYOPF 2142.01 must be completed to satisfy the requirements to prepare for backfeeding the 4KV buses from the main/auxiliary transformer when the main generator/turbine is off-line.C. Transfer of Station Load from Startup Transformer to Auxiliary Transformer I. Check auxiliary transformer energized from main generator (which must be phased to the 345 KV system) or being backfed through main transformer from 345 KV system.2. Insert sync check handle in BKR 12 socket and turn sync switch on.OP 2142 Rev. 50 Page 20 of 31  
: a.     Remove the breaker from the cubicle.
&#xfd;qnaton _R6wlpy'--'O'P 2142 -Vernon Tie 11 Imp .df Jnta Ro eyO 212V ro Tic .p ....f ...... ... ........ .Page 21 I Verify bus I in phase with auxiliary transformer (synchroscope at 12 o'clock position).
: b.     Check the breaker DISCHGD.
CAUTION 5.6.7.8.9.Close BKR 12.Check that BKR 13 trips open when BKR 12 switch is released.Reset BKR 13 amber light.Turn sync check handle off and remove it.Insert sync check handle in BKR 22 socket and turn sync switch on.Verify bus 2 in phase with auxiliary transformer (synchroscope at 12 o'clock on Tie f '.pdf l&#xfd;9n&#xfd;&#xfd;&#xfd;anRow-ley--OP2142Ver-n..,, 9 3 Page2211d... .... .............
NOTE It is preferable to secure the breaker by tying off to the breaker frame; do not tie off to operating components of the breaker. (INF97053 01)
Row le. .......O P...2...42...V...r....n.  
: c.     Secure the breaker with approved tie downs.
..Tie.. ....... .. .......Page.....
NOTE VYOPF 2142.01 must be completed to satisfy the requirements to prepare for backfeeding the 4KV buses from the main/auxiliary transformer when the main generator/turbine is off-line.
22....I D. Transfer of Station Load from Auxiliary Transformer to Startup Transformer I. Verify that startup transformers are powered from 115 KV yard.a. If auto transformer is not supplying the 115 KV yard: 1) Notify system load dispatcher.
C. Transfer of Station Load from Startup Transformer to Auxiliary Transformer I.       Check auxiliary transformer energized from main generator (which must be phased to the 345 KV system) or being backfed through main transformer from 345 KV system.
: 2) Ensure K-186 line is capable of carrying the plant load.3) Request VELCO suspend 30 MVAR Cap Bank operations and notify VY of 15MVAR Cap Bank operation.
: 2.       Insert sync check handle in BKR 12 socket and turn sync switch on.
NOTE Steps 2 through 7 only apply if Bus I is available and is to be place in service.2. Insert sync check handle in BKR 13 socket and turn sync switch on.3. Verify bus I in phase with startup transformer (synchroscope at 12 o'clock position).
OP 2142 Rev. 50 Page 20 of 31
CAUTION If they are not In Phase, do not transfer.4. Close BKR 13.5. Check that BKR 12 trips open when BKR 13 switch is released.6. Reset BKR 12 amber light.7. Turn sync check handle to off and remove it from the socket.NOTE Steps 8 through 13 only apply if Bus 2 is available and is to be place in service.8. Insert sync check handle in BKR 23 socket and turn sync switch on.OP 2142 Rev. 50 Page 22 of 31 Joaha owley -OP 2142 Yernon' Tie" Ico.pd-f a*_ Pag ]9. Verify bus 2 in phase with startup transformer (synchroscope at 12 o'clock position).
 
CAUTION If they are not In Phase, do not transfer.10. Close BKR 23.*11. Check that BKR 22 trips open when BKR 23 switch is released.12. Reset BKR 22 amber light.13. Turn sync check handle off and remove it from the socket, a. Place sync check handle on CRP 9-8.14. If required, perform Section P to secure the 4KV bus backfeeding lineup from the main/auxiliary transformers.
&#xfd;qnaton _R6wlpy'--'O'P 2142-Vernon Tie11Imp .df Jnta
E. Manually Phasing Diesel Generators to Buses 3 or 4 1. Refer to OP 2126.F. Energizing of 4 KV Bus 3 from Vernon 4160 V Line 1. Open/check open BK.R 3V.2. Open/check olden BKR 4V.3. Close BKR 3V4.4. To energize 4 KV bus 3: a. Check open BKR 3TI.b. Check open BKR DG-B.c. Close BKR 3V.5. Check 3 phase voltage for bus 3 (3700 -4500 V).6. Check Vernon Tie ammeter.OP 2142 Rev. 50 Page 23 of 31 j6hathan'kowley OP 21 1 42 Ve .mon Tie Ico.pdf Jonathan.  
                                                  .... .. Ro. eyO... 212V
..Rowley -OP 2142 Vernon Tie Ico ii,, Pa~ge .24.i G. Energizing of 4 KV Bus 4 from Vernon 4160 V Line I. Open/check open BKR 3V.2. Open/check open BKR 4V.3. Close BKR 3V4.4. To energize 4KV bus 4: a. Check open BKR 4T2.b. Check open BKR DG-A.c. Close BKR 4V.5. Check 3 phase voltage for bus 4 (3700 -4500 V).6. Check Vernon Tie ammeter.H. Vernon Tie Supply OCB #10 Auto Trip at Vernon Hydro I. Initiate corrective action to recover the Vernon Tie Supply.Loss of DC Control Power to a 4 KV Bus NOTE Loss of DC control power could result from loss of DC-I or DC-2 or result from a problem in the switchgear.
                                                                        . ro.. Tic........
CAUTION When DC control power to 4 KV Buses I or 2 is switched to the alternate supply, the recirc pump will trip.1. If loss of DC control power is the result of the loss of DC-1 or DC-2, refer to ON 3159 or ON 3160.OP 2142 Rev. 50 Page 24 of 31 Jonatha.n ow'!ey -oP-2P142 Vernon TieiIco!.pdf 25 F2a gei i51!2. If reason for loss of DC control power cannot be determined:
                                                                                      .p      f      .Page         21 I Verify bus I in phase with auxiliary transformer (synchroscope at 12 o'clock position).
: a. Notify Electrical Maintenance Department immediately before switching to alternate supply.b. Monitor all running equipment for normal current and voltage.J. Local Operation of a 4 KV Bus 3 or 4 Breaker CAUTION Local manual operation of a 4 KV breaker will only be performed in an extreme emergency and then only with permission of the Shift Manager. Under no circumstances will the breakers be operated to closed if DC control power for the breaker is unavailable.
CAUTION Close BKR 12.
I. DC Control Power Available a. Obtain Shifi Manager's permission to perform local operation of the desired 4 KV breaker.b. If the 4 KV breaker to be operated is not an alternate shutdown equipped breaker, insert local ACB emergency breaker control key and operate key to desired position.c. If the 4 KV breaker to be operated is an alternate shutdown equipped breaker: I) Place alternate shutdown transfer switch to the emergency position.2) Place emergency breaker control switch to desired position.d. Verify that breaker changes position by observing local position lights and mechanical indicator.
: 5. Check that BKR 13 trips open when BKR 12 switch is released.
: e. Report breaker status to Control Room.OP 2142 Rev. 50 Page 25 of 31 14onathan Rowley -OP 2142 Vernon Tie lco.pdf JonahanRowey OP214 VenonTielcopdfPage-2-6 2. DC Control Power Unavailable NOTE The below listed steps are for tripping the breaker only.a. Obtain Shift Manager's permission to perform local tripping of the desired 4 KV breaker., CAUTION If the remote switch is left in an AUTO or ON position, the 4 KV breaker associated with that switch would close when DC control power is restored, therefore, it is essential that the remote switch remain in the PULL-TO-LOCK or OFF position.b. Check that remote switch for that breaker is positioned to PULL-TO-LOCK or OFF.c. Open door to the desired 4 KV breaker and depress local mechanical TRIP button.d. Verify that breaker has tripped by observing local mechanical position indicator.
: 6. Reset BKR 13 amber light.
: e. Report breaker status to Control Room.K. Local Operation of a 4 KV Bus I or 2 or 5 Breaker NOTE Breaker 55 can only be opened and closed locally CAUTION Local manual operation of a 4 KV breaker (except BKR 55) will only be performed in an extreme emergency and then only with permission of the Shift Manager. Under no circumstances will the breakers be operated to closed if DC control power for the breaker is unavailable.
: 7. Turn sync check handle off and remove it.
I. Obtain Shift Manager's permission to perform local operation of the desired 4 KV breaker.OP 2142 Rev. 50 Page 26 of 31 j, ona I th .an I'll Ro I wl e 1. y -OP :&#xfd;! 42 Verno'n Tie'11c", Jonathan............Rowley  
: 8. Insert sync check handle in BKR 22 socket and turn sync switch on.
-OP 2142 Vernon Tie
: 9. Verify bus 2 in phase with auxiliary transformer (synchroscope at 12 o'clock
_III...,, ........ .........  
 
..Pa.... geg For Breaker 55:* ,use control switch on front door (preferable), or* use trip/close pushbutton Except for Breaker 55, open door to the desired 4 KV breaker and depress local TRIP or CLOSE button, whichever position is desired.Verify that breaker changes position by observing local position lights and_ mechanical indicator.
3 l&#xfd;9n&#xfd;&#xfd;&#xfd;anRow-ley--OP2142Ver-n..,,on Tie
: 5. Report breaker status to Control Room.L. Loss of Fast Transfer Synch-Check Relays NOTE 25/1 and 25/2 computer inputs are:
                                      - f9-9'.pdf                                                                                              Page2211d
ion&#xfd;i"n koWey -OP 2142 Vernon Tie Ico.pdf Joata Rwey- P212Veno ieIo-- P age. a I .28 d N. Energizing of 4 KV Bus NOTE If energizing 4 KV Bus 3 or 4 from Vernon 4160 V Line refer to Section E orF.1. Insert sync check handle in appropriate breaker socket and turn sync switch on.2. If bus to be energized is not dead, verify incoming and running buses are in phase (synchroscope at 12 o'clock position).
                                                  ... .... .............     .......       Rowle.       ..           ....... .. Tie.........
: 3. If bus to be energized is dead, verify the synchroscope stayed as it was, and either the running or incoming source light will be lit with the other light out.4. Close appropriate breaker.5. Turn sync check handle off and remove it.a. Place sync check handle on CRP 9-8.0. Lining Up to Backfeed Through the Auxiliary Transformer (Opening the GD-I Disconnect)
O P...2...42...V...r....n.               Page.....22.... I D.       Transfer of Station Load from Auxiliary Transformer to Startup Transformer I.     Verify that startup transformers are powered from 115 KV yard.
I .Perform VYOPF 2142.01.P. Securing from Backfeeding Through the Auxiliary Transformer (Closing the GD- I Disconnect)
: a.     If auto transformer is not supplying the 115 KV yard:
: 1. Shift Manager permission obtained.2. Notify VELCO of the planned evolution.
: 1)       Notify system load dispatcher.
: 3. Transfer 4KV buses 1 and 2 to the Startup transformers per Section D.NOTE After re-closing the Generator No Load Disconnect (GD-1), the T-I MOD must remain open, until the order is given to connect the generator to the grid.4. Check open, rack down and Danger tag Breaker 12 (Unit Auxiliary Transf.T-2-1 A) per Section B.OP 2142 Rev. 50 Page 28 of 31 Jontha ORowle Iy:- OP 12142 -1VeIr InoIn -T Iie .Ic Io. pdf Pa Ig e 112, ol I Jonathan..  
: 2)       Ensure K-186 line is capable of carrying the plant load.
.. .... ..owley....  
: 3)       Request VELCO suspend 30 MVAR Cap Bank operations and notify VY of 15MVAR Cap Bank operation.
......OP...2142.....Vernon.......Tie.......o..........Page..  
NOTE Steps 2 through 7 only apply if Bus I is available and is to be place in service.
...30 J'onathanRowley  
: 2.     Insert sync check handle in BKR 13 socket and turn sync switch on.
-OP 2142 Vernon Tie Ico.pdf P&#xfd;!g&#xfd; 8-0" 1 14. For restoration of 4KV breakers 12 and 22: a. Remove Danger tags, b. Rack up breakers 12 and 22 per Section A of this procedure.
: 3.     Verify bus I in phase with startup transformer (synchroscope at 12 o'clock position).
NOTE The iso-phase bus cooling system and heaters should be maintained in operation to keep the duct pressurized and keep the system clean and dry.15. If available, check in operation/place in operation the iso-phase bus cooling system fan and heater per RP 2193.Q. Auxiliary Transformer Operation With Degraded Cooling System NOTE The Auxiliary Transformer coolers are operated with Group 1(2)selected for continuous operation and Group 2(1) selected for standby operation.
CAUTION If they are not In Phase, do not transfer.
A cooler consists of one oil pump and 3 fans. In this mode of operation, the cooling group selected for standby operation cycles on and off based upon temperature.
: 4.     Close BKR 13.
: 5.     Check that BKR 12 trips open when BKR 13 switch is released.
: 6.     Reset BKR 12 amber light.
: 7.     Turn sync check handle to off and remove it from the socket.
NOTE Steps 8 through 13 only apply if Bus 2 is available and is to be place in service.
: 8.     Insert sync check handle in BKR 23 socket and turn sync switch on.
OP 2142 Rev. 50 Page 22 of 31
 
Joaha owley -OP 2142 Yernon' Tie" Ico.pd-f                                                                         Pag a*_ ]
: 9.     Verify bus 2 in phase with startup transformer (synchroscope at 12 o'clock position).
CAUTION If they are not In Phase, do not transfer.
: 10. Close BKR 23.*
: 11. Check that BKR 22 trips open when BKR 23 switch is released.
: 12. Reset BKR 22 amber light.
: 13. Turn sync check handle off and remove it from the socket,
: a.     Place sync check handle on CRP 9-8.
: 14. If required, perform Section P to secure the 4KV bus backfeeding lineup from the main/auxiliary transformers.
E. Manually Phasing Diesel Generators to Buses 3 or 4
: 1.     Refer to OP 2126.
F. Energizing of 4 KV Bus 3 from Vernon 4160 V Line
: 1.     Open/check open BK.R 3V.
: 2.       Open/check olden BKR 4V.
: 3.       Close BKR 3V4.
: 4.       To energize 4 KV bus 3:
: a.     Check open BKR 3TI.
: b.     Check open BKR DG-B.
: c.     Close BKR 3V.
: 5.     Check 3 phase voltage for bus 3 (3700 - 4500 V).
: 6.     Check Vernon Tie ammeter.
OP 2142 Rev. 50 Page 23 of 31
 
j6hathan'kowley OP 21 142 Ve.mon Tie Ico.pdf Jonathan.             ..                     Rowley OP
                                                                                                -   2142 Vernon Tie Ico         Pa~ge .24.i ii,, 2*pdf G. Energizing of 4 KV Bus 4 from Vernon 4160 V Line I.     Open/check open BKR 3V.
: 2.     Open/check open BKR 4V.
: 3.     Close BKR 3V4.
: 4.     To energize 4KV bus 4:
: a.       Check open BKR 4T2.
: b.       Check open BKR DG-A.
: c.       Close BKR 4V.
: 5.     Check 3 phase voltage for bus 4 (3700 - 4500 V).
: 6.     Check Vernon Tie ammeter.
H. Vernon Tie Supply OCB #10 Auto Trip at Vernon Hydro I.     Initiate corrective action to recover the Vernon Tie Supply.
Loss of DC Control Power to a 4 KV Bus NOTE Loss of DC control power could result from loss of DC-I or DC-2 or result from a problem in the switchgear.
CAUTION When DC control power to 4 KV Buses I or 2 is switched to the alternate supply, the recirc pump will trip.
: 1.     If loss of DC control power is the result of the loss of DC-1 or DC-2, refer to ON 3159 or ON 3160.
OP 2142 Rev. 50 Page 24 of 31
 
Jonatha.n ow'!ey - oP-2P142 Vernon TieiIco!.pdf                                                                             F2a gei 25 i51!
: 2. If reason for loss of DC control power cannot be determined:
: a.     Notify Electrical Maintenance Department immediately before switching to alternate supply.
: b.     Monitor all running equipment for normal current and voltage.
J. Local Operation of a 4 KV Bus 3 or 4 Breaker CAUTION Local manual operation of a 4 KV breaker will only be performed in an extreme emergency and then only with permission of the Shift Manager. Under no circumstances will the breakers be operated to closed if DC control power for the breaker is unavailable.
I. DC Control Power Available
: a.     Obtain Shifi Manager's permission to perform local operation of the desired 4 KV breaker.
: b.     If the 4 KV breaker to be operated is not an alternate shutdown equipped breaker, insert local ACB emergency breaker control key and operate key to desired position.
: c.     If the 4 KV breaker to be operated is an alternate shutdown equipped breaker:
I)     Place alternate shutdown transfer switch to the emergency position.
: 2)       Place emergency breaker control switch to desired position.
: d.     Verify that breaker changes position by observing local position lights and mechanical indicator.
: e.     Report breaker status to Control Room.
OP 2142 Rev. 50 Page 25 of 31
 
14onathan Rowley - OP 2142 Vernon Tie lco.pdf JonahanRowey OP214                               VenonTielcopdfPage-       2-6
: 2.     DC Control Power Unavailable NOTE The below listed steps are for tripping the breaker only.
: a.     Obtain Shift Manager's permission to perform local tripping of the desired 4 KV breaker.,
CAUTION If the remote switch is left in an AUTO or ON position, the 4 KV breaker associated with that switch would close when DC control power is restored, therefore, it is essential that the remote switch remain in the PULL-TO-LOCK or OFF position.
: b.     Check that remote switch for that breaker is positioned to PULL-TO-LOCK or OFF.
: c.     Open door to the desired 4 KV breaker and depress local mechanical TRIP button.
: d.     Verify that breaker has tripped by observing local mechanical position indicator.
: e.       Report breaker status to Control Room.
K. Local Operation of a 4 KV Bus I or 2 or 5 Breaker NOTE Breaker 55 can only be opened and closed locally CAUTION Local manual operation of a 4 KV breaker (except BKR 55) will only be performed in an extreme emergency and then only with permission of the Shift Manager. Under no circumstances will the breakers be operated to closed if DC control power for the breaker is unavailable.
I.     Obtain Shift Manager's permission to perform local operation of the desired 4 KV breaker.
OP 2142 Rev. 50 Page 26 of 31
 
y - OP :&#xfd;! 42 Verno'n Tie'11c",
RoIwl e 1.
j,onaIth .an I'll                                        Jonathan............Rowley OP
                                                                                    - 2142 Vernon Tie Ico,.III*I*,,LL _III...,, ........ ......... .. Pa....
geg277*!
For Breaker 55:
                                                  * ,use     control switch on front door (preferable), or
* use trip/close pushbutton Except for Breaker 55, open door to the desired 4 KV breaker and depress local TRIP or CLOSE button, whichever position is desired.
Verify that breaker changes position by observing local position lights and
_    mechanical indicator.
: 5.     Report breaker status to Control Room.
L. Loss of Fast Transfer Synch-Check Relays NOTE 25/1 and 25/2 computer inputs are:
 
ion&#xfd;i"n koWey - OP 2142 Vernon Tie Ico.pdf Joata Rwey- P212Veno ieIo--                                   .28              Page.
aI  d N. Energizing of 4 KV Bus NOTE If energizing 4 KV Bus 3 or 4 from Vernon 4160 V Line refer to Section E orF.
: 1.     Insert sync check handle in appropriate breaker socket and turn sync switch on.
: 2.     If bus to be energized is not dead, verify incoming and running buses are in phase (synchroscope at 12 o'clock position).
: 3.     If bus to be energized is dead, verify the synchroscope stayed as it was, and either the running or incoming source light will be lit with the other light out.
: 4.     Close appropriate breaker.
: 5.     Turn sync check handle off and remove it.
: a.     Place sync check handle on CRP 9-8.
: 0. Lining Up to Backfeed Through the Auxiliary Transformer (Opening the GD-I Disconnect)
I.     Perform VYOPF 2142.01.
P. Securing from Backfeeding Through the Auxiliary Transformer (Closing the GD- I Disconnect)
: 1.     Shift Manager permission obtained.
: 2.     Notify VELCO of the planned evolution.
: 3.     Transfer 4KV buses 1 and 2 to the Startup transformers per Section D.
NOTE After re-closing the Generator No Load Disconnect (GD-1), the T-I MOD must remain open, until the order is given to connect the generator to the grid.
: 4.     Check open, rack down and Danger tag Breaker 12 (Unit Auxiliary Transf.
T-2-1 A) per Section B.
OP 2142 Rev. 50 Page 28 of 31
 
Jontha ORowle Iy:- OP12142 -1VeIrInoIn -TIie.IcIo.pdf PaIge112, ol I
 
Jonathan.. owley.... OP...2142.....Vernon.......Tie.......o..........Page..                           .. . ...     ..           ......         ...30 J'onathanRowley - OP 2142 Vernon Tie Ico.pdf                                                                                                 P&#xfd;!g&#xfd; 8-0"1
: 14.         For restoration of 4KV breakers 12 and 22:
: a.         Remove Danger tags,
: b.           Rack up breakers 12 and 22 per Section A of this procedure.
NOTE The iso-phase bus cooling system and heaters should be maintained in operation to keep the duct pressurized and keep the system clean and dry.
: 15.         If available, check in operation/place in operation the iso-phase bus cooling system fan and heater per RP 2193.
Q.     Auxiliary Transformer Operation With Degraded Cooling System NOTE The Auxiliary Transformer coolers are operated with Group 1(2) selected for continuous operation and Group 2(1) selected for standby operation. A cooler consists of one oil pump and 3 fans. In this mode of operation, the cooling group selected for standby operation cycles on and off based upon temperature.
Upon loss of or degraded cooling, reduce the Transformer output to within the limits below to clear any temperature alarms, or to be within the limits for planned maintenance on the fans/coolers.
Upon loss of or degraded cooling, reduce the Transformer output to within the limits below to clear any temperature alarms, or to be within the limits for planned maintenance on the fans/coolers.
: a. Allowed Auxiliary Transformer Continuous Load Under Degraded Cooling Conditions:
: a.         Allowed Auxiliary Transformer Continuous Load Under Degraded Cooling Conditions:
Coolers Operating Continuous Load (Meter Data Sheet or ERFIS C094)One cooler with 2 fans running.(One pump with 2 fans running on 15MW the same cooler. This corresponds to 33.3% of cooling capability.)
Coolers Operating                     Continuous Load (Meter Data Sheet or ERFIS C094)
One cooler with 2 fans running.
(One pump with 2 fans running on                     15MW the same cooler. This corresponds to 33.3% of cooling capability.)
One cooler in service, (One pump with 3 fans running on the same cooler. This corresponds to 50% of cooling capability.)
One cooler in service, (One pump with 3 fans running on the same cooler. This corresponds to 50% of cooling capability.)
Two coolers in service with 4 fans available. (This corresponds to 25MW 66.7% of cooling capability.)
Two coolers in service with 4 fans available. (This corresponds to                     25MW 66.7% of cooling capability.)
OP 2142 Rev. 50 Page 30 of 31 I -.IJonathan -UP' 2142 Vernon lie Ico.pdf Paae 31... ... ....b. Auxiliary Transformer Operational Limitations With Loss Of Cooling: Condition Cooling Previous Allowed Operating Time Equipment Out Transformer From Loss of Cooling of Service Condition Normal Operation at All Rated Load 1 Hour Rated Load Rated Voltage No All Rated Load 6 Hours Load Normal No Load Operation at All (At Ambient 2 Hours Rated Load Condition)
OP 2142 Rev. 50 Page 30 of 31
Rated Voltage No No Load Load All (At Ambient 12 Hours Condition)
 
I                                   -.
IJonathan I*owley - UP' 2142 Vernon
                                ......lie Ico.pdf
                                        ....                                                                           Paae 31
: b. Auxiliary Transformer Operational Limitations With Loss Of Cooling:
Condition           Cooling           Previous       Allowed Operating Time Equipment Out       Transformer       From Loss of Cooling of Service         Condition Normal Operation at                 All           Rated Load               1 Hour Rated Load Rated Voltage No             All           Rated Load               6 Hours Load Normal                                       No Load Operation at                 All           (At Ambient               2 Hours Rated Load                                 Condition)
Rated Voltage No                             No Load Load                         All           (At Ambient             12 Hours Condition)
: c. Notify System Engineering.
: c. Notify System Engineering.
: d. Initiate a Condition Report.FINAL CONDITIONS All appendices and forms completed and returned to Operations Office for filing per EN-AD-103, Document Control and Records Management Activities.
: d.     Initiate a Condition Report.
OP 2142 Rev, 50 Page 31 of 31 I Jonathan Rowley -OP 2142 Vernon Tie Ico.pdf Page 32 ,!FIGURE 1 MAGNE-BLAST CIRCUIT BREAKER PLUNGER -STATIONARY AUXILIARY SWITCH ADJUSTMENTS (ADAPTED FROM GE MVSD FIELD INSTALLATION DRAWING 0172C7558)(Not to Scale)
FINAL CONDITIONS All appendices and forms completed and returned to Operations Office for filing per EN-AD-103, Document Control and Records Management Activities.
Jonatha..........................Rowley  
OP 2142 Rev, 50 Page 31 of 31
......................  
 
........P......2142..............Vernon....................Tie........................................P......
I Jonathan Rowley - OP 2142 Vernon Tie Ico.pdf                                     Page 32 ,!
ge...............
FIGURE 1 MAGNE-BLAST CIRCUIT BREAKER PLUNGER - STATIONARY AUXILIARY SWITCH ADJUSTMENTS (ADAPTED FROM GE MVSD FIELD INSTALLATION DRAWING 0172C7558)
Jonathan Rowley -OP 2142 Vernon Tie lco.pdf Page,33 APPENDIX A 4 KV BREAKER LINEUP Description BUS I Breaker Number Position Initial 12 13 P-I-IA MG-I-IA P-I-1B P-2-1A P-5-1A 16 III BUS I Gnd Det Bkr Unit Auxiliary Transformer T-2-1 A Startup Transformer T IA Reactor Feedwater Pump IA Reactor Recirc MG Set IA Drive Motor Reactor Feedwater Pump I B Condensate Pump IA Circ Water Pump I A Station Service Transformer T-6-1 A/T- 12-1A Station Service Transformer T- II -IA BUS 1 Ground Detection Breaker (Note 2)RACKED UP RACKED UP RACKED UP RACKED UP RACKED UP RACKED UP RACKED UP RACKED UP RACKED UP CLOSED KIRK KEY INSTALLED BUS 2 99 I !,,it ~ Trr~,,~fnrmpr T..9..1 A R ACWIF) tip I'l-t A-ili TrasforeTT2-IARACK D U___________________1__
(Not to Scale)
!_____________
 
Breaker Numher_rintinna Position Initial BUS I w,,dtei,'
Jonatha..........................Rowley         P......2142..............Vernon....................Tie........................................P......
cr ru',ti-'t' 1 Pumi? IA'?-ar~rLt)'iX ervice Transformer T-6-1 AIT- 12-1 A prvit-rP Trnn-fnrmr T..I1 1.1 A RACKED UP ____R ArVRFif I I., I.I, 1 1. 1 p-?.Desc:k'Ua-drkCT rn'fh-e&-k 1F-t  2-1A Condensate 16 Station S.ill tAt1tfnn io'na'than kowl&#xfd;ey -OP 2-142 Vernon T'ie lco.p'd'f Jonathan Rowley -.OP.2142.Vernon Tie Pag e .4.APPENDIX A (Continued)
                                            ......................             ........                                                                                                                       ge...............
Description Position Initial BUS 3 P-7-1D P-46-1 B P-10-IC P-10-1D 38 P-8-1D 3T1 DG-I-IB P-8-1B l 4KVBus4 mon Hydro Transformer Service Water Pump ID Core Spray Pump I B RHR Pump IC RHR Pump ID Station Service Transformer T IA RHR Service Water Pump ID Tie from 4 KV Bus I Diesel Generator lB RHR Service Water Pump IB RACKED UP RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION RACKED UP RACKED UP RACKED UP RACKED UP RACKED UP RACKED UP RACKED UP RACKED UP RACKED UP--- I -
Jonathan Rowley - OP 2142 Vernon Tie lco.pdf                                                                                                                                                                   Page,33 APPENDIX A 4 KV BREAKER LINEUP Breaker Number                                           Description                                          Position                 Initial BUS I 12                     Unit Auxiliary Transformer T-2-1 A                                                  RACKED UP 13                    Startup Transformer T IA                                                        RACKED UP P-I-IA                 Reactor Feedwater Pump IA                                                          RACKED UP MG-I-IA               Reactor Recirc MG Set IA Drive Motor                                                RACKED UP P-I-1B                 Reactor Feedwater Pump IB                                                          RACKED UP P-2-1A                 Condensate Pump IA                                                                  RACKED UP P-5-1A                 Circ Water Pump I A                                                                RACKED UP 16                   Station Service Transformer T-6-1 A/T- 12-1A                                        RACKED UP III                  Station Service Transformer T- II - IA                                              RACKED UP BUS I Gnd              BUS 1 Ground Detection Breaker (Note 2)                                         CLOSED KIRK Det Bkr                                                                                              KEY INSTALLED BUS 2 99                     I !,,it       ~       Trr~,,~fnrmpr T..9..1 A                                     R ACWIF) tip TrasforeTT2-IARACK I'l-t       A-ili                                                       DU
[Jonathan RoWl'ey -OP 2142 -Ve-rnio-nlie'lco.p'difPge3, age -W APPENDIX A (Continued)
___________________1__                                                                                          !_____________
Breaker Number P-10-1A RHR Pump IA Description Position RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION Initial 10-IB RHR Pump IB P IC RHR Service Water Pump IC DG- I -IA Diesel Generator IA 4V Tie from 4 KV Bus 3 P-7-1A Service Water Pump IA P 1A RHR Service Water Pump IA RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION RACKED UP AND ALT SHTDN SWITCH [N NORMAL POSITION (NOTE 1)RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION (NOTE 1)RACKED UP AND ALT SHTDN SWITCH [N NORMAL POSITION Appendix A OP 2142 Rev. 50 Page 3 of 4 I- JonathanRlowley
Breaker rintinna                                                  Position                         Initial                             Numher_                              Desc:
-OP 2142 Vernon Tie Ico.pdf Page 36t1 Breaker Number 53 BUS 5A Gnd Det BKR APPENDIX A (Continued)
BUS I kit-t*.
Description BUS 5A Position Initial Startup Transformer T-3-1B BUS5A Ground Detection Breaker (Note 2)RACKED UP CLOSED KIRK KEY INSTALLED BUS 5B (Shed by East Cig Twr)55 Station Service Transformer T-5-B 1-1A and 1B RACKED UP P-6-1 A Circ Water Booster Pump I A RACKED UP P-6-1 B Circ Water Booster Pump I B RACKED UP P-6-IC Circ Water Booster Pump IC RACKED UP T-VERNON-HYDRO (Transformer by West Cig Twr)Disc. Sw. Transformer Supply Disconnect Switch CLOSED NOTE 1: There is only one Alternate Shutdown switch (SS-425) for both Breakers 4V and P-7-IA.NOTE 2: BUS 1, 2, and 5A Aux Comp PT Fuses are removed and installed by Maintenance, Kirk Keys operated and controlled by Maintenance.
k'Ua-drkCTrn'fh-e&
Remarks: Reviewed By_/Shift Manager (Print/Sign)
I I.,
Date Appendix A OP 2142 Rev. 50 Pige 4 of 4 Jonathan Rowley_-OP 2142 Vernon Tie Ico.pdfP I pia- -ge 8, APPENDIX B EQUIPMENT LOST DURING RESIDUAL VOLTAGE TRANSFER The following equipment will drop out during a residual voltage transfer and will not be picked up when voltage is restored.
                                                                                                                                                                                -k      &C-e,*cuti, 1F-t        *'ud w,,dtei,'  cr ru',ti-'t' 1                                                                                                       .I, p-Pumi? IA                                                                      RACKED UP                      ____            11.       ?. 2-1A          Condensate 1
Manual restart is required: Turbine Lube Oil Transfer Pumps P-43-1 A, P-43-I B Turning Gear Oil Pump P-73-1A Turbine Lube Oil Filter Pumps P-42-I A, P-42-1B Turbine Building Cooling Water Pumps P-58-IA, P-58-1B Cond. Demin. Body Feed Tank/Precoat Tank Agitator M-28, M-29 Condensate Transfer Pumps P-4-1 A, P-4-1 B Main Condenser Vacuum Pump P-53-1A Heater Drain Pumps P-3-IA, P-3-1B Station/Instrument Air Compressor C-I-I A, -IB, -I C, -ID Cleanup Recirculation Pump P-49-I A Cleanup Demineralizer Precoat Tank Agitator Waste Sample Pump P-21-1 A, lB Filter Decant Pump P-101-IA Floor Drain Sample Pump P-29-1A Condensate Backwash Transfer Pump P-30-1A Condensate Sludge Mixing Pump P-3 1 -1 A Condensate Decant Pump P-32-1A Cleanup Sludge Discharge Mixing Pump P-33-1A Cleanup Decant Pump P-34-IA Waste Sludge Discharge Mixing Pump P-35-IA Chemical Waste Pump P-36-1A Spent Resin Pump P-67-1A, Reactor Feed Pumps P- I-l A, l B, IC Appendix B OP 2142 Rev. 50 Page I of I Jonathan -koQe&#xfd; '01`52142 Vernon Tie'160'.pid Pq no Jo n ath... ... .. ..........R.. ..w... ...... .... ....O P......2142.......  
                                '?-ar~rLt)'iX ervice Transformer T-6-1 AIT- 12-1 A                                                                                                         16              Station S.
..Vernon........  
prvit-rP Trnn-fnrmr T..I1 1.1 A                                                    R ArVRFif I                                              ill                tAt1tfnn
.. ..Tie. .. ................  
 
...... .. ..... .. ...... 38...... , I APPENDIX C ENERGIZING 4KV BUSES 3 AND 4 FROM VERNON 4160 LINE A. ENERGIZING 4KV BUS 3 FROM VERNON 4160 V TIE LINE 1. Verify that power is available at 4KV VERNON TIE.2. OPEN/check open BKR NO. 3V.3. OPEN/check open BKR NO. 4V.4. CLOSE BKR NO. 3V4.5. OPEN/check open BKR NO. 3T1.6. OPEN/check open BKR NO. DG-B.7. CLOSE BKR NO. 3V.8. Check 3 phase voltage for 4KV BUS NO. 3 (3700 -4500 V).9. Check 4KV VERNON TIE ammeter.Initial B. ENERGIZING 4KV BUS 4 FROM VERNON 4160 V TIE LINE 1. Verify that power is available at 4KV VERNON TIE.2. OPEN/check.
io'na'than kowl&#xfd;ey - OP 2-142 Vernon T'ie lco.p'd'f Jonathan Rowley     -. OP.2142.Vernon Tie I.**c._p        .4. Pag e APPENDIX A (Continued)
open BKR NO. 3V.3. OPEN/check open BKR NO. 4V.4. CLOSE BKR NO. 3V4.5. OPEN/check open BKR NO. 4T2.6. OPEN/check open BKR NO. DG-A.7. CLOSE BKR NO. 4V.8. Check 3 phase voltage for 4KV BUS NO. 4 (3700 -4500 V).9. Check 4KV VERNON TIE ammeter./Completed by: Reviewed by:-(Print/Sign)
Description                       Position         Initial BUS 3 l 4KVBus4                                        RACKED UP mon Hydro Transformer                        RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION P-7-1D     Service Water Pump ID                                  RACKED UP P-46-1 B   Core Spray Pump IB                                    RACKED UP P-10-IC     RHR Pump IC                                            RACKED UP P-10-1D     RHR Pump ID                                            RACKED UP 38          Station Service Transformer T IA                    RACKED UP P-8-1D     RHR Service Water Pump ID                              RACKED UP 3T1         Tie from 4 KV Bus I                                    RACKED UP DG-I-IB     Diesel Generator lB                                    RACKED UP P-8-1B     RHR Service Water Pump IB                              RACKED UP
Date/(Print/Sign)
                                                                                          -        --
Date Appendix C OP 2142 Rev. 50 Page 1 of I Jo..n.o.y-O 1 2 e n n i c.p. .... ..... .......Page...........  
                                                                                              -,"*11~  I -
.. .39 I Jo nathan Rowley -OP 2142 Ver non Tie lco.pdf.Page. 3_9i APPENDIX D NORMAL TRANSFER OF STATION LOAD FROM AUXILIARY TRANSFORMER TO STARTUP TRANSFORMER I.2.3.Verify that startup transformers are powered from 115KV yard.Insert sync check handle in BKR NO. 13 socket and turn ON.Verify 4KV BUS NO. I is in phase with startup transformer.
 
CAUTION If bus and startup transformer are not In Phase, do not transfer.4.5.6.7.8.9.CLOSE BKR NO. 13.Check that BKR NO. 12 trips open when BKR NO. 13 switch is released.Reset BKR NO. 12 amber light.Turn sync check handle OFF and remove from socket.Insert sync check handle in BKR NO. 23 socket and turn ON.Verify 4KV BUS NO. 2 is in phase with startup transformer.
[Jonathan RoWl'ey - OP 2142 -Ve-rnio-nlie'lco.p'difPge3,                                                        age -W APPENDIX A (Continued)
CAUTION If bus and startup transformer are not In Phase, do not transfer.10. CLOSE BKR NO. 23.1I. Check that BKR NO. 22 trips open when BKR NO. 23 switch is released.12. Reset BKR NO. 22 amber light.13. Turn sync check handle OFF and remove from socket.a. Place sync check handle on CRP 9-8.Completed by: (Print/Sign)
Breaker Number                      Description                    Position            Initial P-10-1A    RHR Pump IA                                    RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION 10-IB    RHR Pump IB                                    RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION P IC    RHR Service Water Pump IC                      RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION DG- I - IA Diesel Generator IA                            RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION 4V        Tie from 4 KV Bus 3                            RACKED UP AND ALT SHTDN SWITCH [N NORMAL POSITION (NOTE 1)
Date (Print/Sign)
P-7-1A    Service Water Pump IA                          RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION (NOTE 1)
Date Reviewed by: Appendix D OP 2142 Rev. 50 Page I of 1 2 nonathnRowley-e ie ... .Page4 TO BACKFEED THROUGH THE AUXILIARY TRANSFORMER (OPENING THE GD-I DISCONNECT)
P 1A    RHR Service Water Pump IA                      RACKED UP AND ALT SHTDN SWITCH [N NORMAL POSITION Appendix A OP 2142 Rev. 50 Page 3 of 4
Jonathan, Ro&#xfd;4ey-- OP .2142 Vernon Tielco..Pdf JonaThan l~owIey -UP 2142 Vernon T~ e Ico.pdf Page 41 1 I LINING UP TO BACKFEED THROUGH THE AUXILIARY TRANSFORMER (OPENING THE GD-I DISCONNECT) (Continued)
 
NOTE The GD-I Disconnect takes approximately 25 turns of the hand crank to open.Perf.Init Ver.Init 9. Locally, unlock and open the GD-I Disconnect.
I-JonathanRlowley - OP 2142 Vernon Tie Ico.pdf                                                                              Page 36t1 APPENDIX A (Continued)
: 10. Locally, lock open the GD-I Disconnect manual operator.NOTE Additional lighting may be required to visually verify the GD-I Disconnect Contacts open.1I. Locally, visually verify the contacts are open on all three phases of the GD-I Disconnect.
Breaker Number                       Description                            Position                Initial BUS 5A 53          Startup Transformer T-3-1B                                  RACKED UP BUS 5A      BUS5A Ground Detection Breaker (Note 2)
: 12. Reset/verify reset the following primary and backup generator lockout relays:* 86/G-P* 86/G-B 13. With concurrence from VELCO, perform the following:
Gnd Det                                                          CLOSED KIRK KEY BKR                                                                      INSTALLED BUS 5B (Shed by East Cig Twr) 55          Station Service Transformer T-5-B 1-1A and 1B              RACKED UP P-6-1 A    Circ Water Booster Pump I A                                RACKED UP P-6-1 B    Circ Water Booster Pump IB                                  RACKED UP P-6-IC      Circ Water Booster Pump IC                                  RACKED UP T-VERNON-HYDRO (Transformer by West Cig Twr)
: a. Close the T-I MOD Motor Supply Switch b. On CRP 9-7, Close T-l MOD.c. Locally verify all three T-1 MOD blades closed.d. Restore the ring bus per VELCO specified sequence.
Disc. Sw. Transformer Supply Disconnect Switch                              CLOSED NOTE 1:      There is only one Alternate Shutdown switch (SS-425) for both Breakers 4V and P-7-IA.
The following is provided as a guide: I) Close 81 -IT ATB.2) Close IT ATB.3) Place the recloser switch for 81-IT to SYNC. CHECK.4) Place the recloser switch for IT to INST.14. When directed by the Shift Manager, energize Bus 1 (2) from the Auxiliary Transformer per OP 2142, Sect. C.i -VYOPF 2142.01 OP 2142 Rev. 50 Jonathan Rowley -OP 2142 Vernon Tie lco.pdf Page 4~1 Jonathan Rowley -OP 2142 Vernon Ti I e lco. I pdf Pa ge'-4_-2_11 LINING UP TO BACKFEED THROUGH THE AUXILIARY TRANSFORMER (OPENING THE GD-1 DISCONNECT) (Continued)
NOTE 2:      BUS 1, 2, and 5A Aux Comp PT Fuses are removed and installed by Maintenance, Kirk Keys operated and controlled by Maintenance.
: 15. If desired, Danger tag open the GD-I Disconnect switch.16. If available, check in operation/place in operation the iso-phase bus cooling system fan and heater per RP 2193.FINAL CONDITIONS I. Buses I and 2 are in service and being backfed from the main and auxiliary transformers with the generator no load disconnect switch, GD-I open.REMARKS: Performed by Operators (Print/Sign)
Remarks:
Date Reviewed by: Shift Manager (Print/Sign)
Reviewed By_                                                                          /
Date VYOPF 2142.01 OP 2142 Rev. 50 Page 3 of 3}}
Shift Manager (Print/Sign)                           Date Appendix A OP 2142 Rev. 50 Pige 4 of 4
 
pia-ge- 8, Jonathan Rowley_-OP 2142 Vernon Tie Ico.pdfP                                                                                          I APPENDIX B EQUIPMENT LOST DURING RESIDUAL VOLTAGE TRANSFER The following equipment will drop out during a residual voltage transfer and will not be picked up when voltage is restored. Manual restart is required:
Turbine Lube Oil Transfer Pumps P-43-1 A, P-43-I B Turning Gear Oil Pump P-73-1A Turbine Lube Oil Filter Pumps P-42-I A, P-42-1B Turbine Building Cooling Water Pumps P-58-IA, P-58-1B Cond. Demin. Body Feed Tank/Precoat Tank Agitator M-28, M-29 Condensate Transfer Pumps P-4-1 A, P-4-1 B Main Condenser Vacuum Pump P-53-1A Heater Drain Pumps P-3-IA, P-3-1B Station/Instrument Air Compressor C-I-I A, - IB, -I C, -ID Cleanup Recirculation Pump P-49-I A Cleanup Demineralizer Precoat Tank Agitator Waste Sample Pump P-21-1 A, lB Filter Decant Pump P-101-IA Floor Drain Sample Pump P-29-1A Condensate Backwash Transfer Pump P-30-1A Condensate Sludge Mixing Pump P-3 1-1A Condensate Decant Pump P-32-1A Cleanup Sludge Discharge Mixing Pump P-33-1A Cleanup Decant Pump P-34-IA Waste Sludge Discharge Mixing Pump P-35-IA Chemical Waste Pump P-36-1A Spent Resin Pump P-67-1A, Reactor Feed Pumps P- I-l A, l B, IC Appendix B OP 2142 Rev. 50 Page I of I
 
Jonathan -koQe&#xfd; '01`52142 Vernon Tie'160'.pid                                                                                                          Pq no
      ... .. R..
Jon ath...        w...
              . .........  ..          ......  . Tie.
Vernon........
OP......2142.......      ... . ...                ..             .. .. .. ................   ......   .. . . . .. .. . . . . .. 38......
                                                                                                                                                                , I APPENDIX C ENERGIZING 4KV BUSES 3 AND 4 FROM VERNON 4160 LINE Initial A.       ENERGIZING 4KV BUS 3 FROM VERNON 4160 V TIE LINE
: 1.     Verify that power is available at 4KV VERNON TIE.
: 2.     OPEN/check open BKR NO. 3V.
: 3.     OPEN/check open BKR NO. 4V.
: 4.     CLOSE BKR NO. 3V4.
: 5.     OPEN/check open BKR NO. 3T1.
: 6.     OPEN/check open BKR NO. DG-B.
: 7.     CLOSE BKR NO. 3V.
: 8.     Check 3 phase voltage for 4KV BUS NO. 3 (3700 - 4500 V).
: 9.     Check 4KV VERNON TIE ammeter.
B.       ENERGIZING 4KV BUS 4 FROM VERNON 4160 V TIE LINE
: 1.     Verify that power is available at 4KV VERNON TIE.
: 2.     OPEN/check. open BKR NO. 3V.
: 3.     OPEN/check open BKR NO. 4V.
: 4.     CLOSE BKR NO. 3V4.
: 5.     OPEN/check open BKR NO. 4T2.
: 6.     OPEN/check open BKR NO. DG-A.
: 7.     CLOSE BKR NO. 4V.
: 8.      Check 3 phase voltage for 4KV BUS NO. 4 (3700 - 4500 V).
: 9.     Check 4KV VERNON TIE ammeter.
Completed by:                                                                                      /
(Print/Sign)                                          Date Reviewed by:-                                                                                      /
(Print/Sign)                                          Date Appendix C OP 2142 Rev. 50 Page 1 of I
 
1 2 e n n i          c.p.                                 . .       ..    . ....   .......               39 . I
                                                                                                                          ..Page...........
Jo..n.o.y-O Jo nathan  Rowley - OP 2142 Ver non Tie lco.pdf                                                                          .Page.3_9i APPENDIX D NORMAL TRANSFER OF STATION LOAD FROM AUXILIARY TRANSFORMER TO STARTUP TRANSFORMER I. Verify that startup transformers are powered from 115KV yard.
: 2. Insert sync check handle in BKR NO. 13 socket and turn ON.
: 3. Verify 4KV BUS NO. I is in phase with startup transformer.
CAUTION If bus and startup transformer are not In Phase, do not transfer.
: 4. CLOSE BKR NO. 13.
: 5. Check that BKR NO. 12 trips open when BKR NO. 13 switch is released.
: 6. Reset BKR NO. 12 amber light.
: 7. Turn sync check handle OFF and remove from socket.
: 8. Insert sync check handle in BKR NO. 23 socket and turn ON.
: 9. Verify 4KV BUS NO. 2 is in phase with startup transformer.
CAUTION If bus and startup transformer are not In Phase, do not transfer.
: 10. CLOSE BKR NO. 23.
1I. Check that BKR NO. 22 trips open when BKR NO. 23 switch is released.
: 12. Reset BKR NO. 22 amber light.
: 13. Turn sync check handle OFF and remove from socket.
: a.       Place sync check handle on CRP 9-8.
Completed by:
(Print/Sign)                                    Date Reviewed by:
(Print/Sign)                                    Date Appendix D OP 2142 Rev. 50 Page I of 1
 
2 e nonathnRowley-ie      .     ..                                 . Page4 TO BACKFEED THROUGH THE AUXILIARY TRANSFORMER (OPENING THE GD-I DISCONNECT)
 
Jonathan, Ro&#xfd;4ey-- OP .2142 Vernon Tielco..Pdf                                                                                Page 41 1 Page41*il T~ e Ico.pdf                                                                                    I JonaThan l~owIey UP 2142 Vernon
                -
LINING UP TO BACKFEED THROUGH THE AUXILIARY TRANSFORMER (OPENING THE GD-I DISCONNECT) (Continued)
NOTE The GD-I Disconnect takes approximately 25 turns of the hand crank to open.
Perf. Ver.
Init    Init
: 9. Locally, unlock and open the GD-I Disconnect.
: 10. Locally, lock open the GD-I Disconnect manual operator.
NOTE Additional lighting may be required to visually verify the GD-I Disconnect Contacts open.
1I. Locally, visually verify the contacts are open on all three phases of the GD-I Disconnect.
: 12. Reset/verify reset the following primary and backup generator lockout relays:
* 86/G-P
* 86/G-B                                                                                i -
: 13. With concurrence from VELCO, perform the following:
: a. Close the T-I MOD Motor Supply Switch
: b. On CRP 9-7, Close T-l MOD.
: c. Locally verify all three T-1 MOD blades closed.
: d. Restore the ring bus per VELCO specified sequence. The following is provided as a guide:
I)       Close 81 -IT ATB.
: 2)       Close IT ATB.
: 3)      Place the recloser switch for 81-IT to SYNC. CHECK.
: 4)      Place the recloser switch for IT to INST.
: 14. When directed by the Shift Manager, energize Bus 1 (2) from the Auxiliary Transformer per OP 2142, Sect. C.
VYOPF 2142.01 OP 2142 Rev. 50
 
lco.pdf TieIe lco.                                                                       Page 4~1 Jonathan Rowley --OP OP 2142    Vernon Ti 2142 Vernon                Ipdf                                                                    Pa ge'-4_-2_11 LINING UP TO BACKFEED THROUGH THE AUXILIARY TRANSFORMER (OPENING THE GD-1 DISCONNECT) (Continued)
: 15. If desired, Danger tag open the GD-I Disconnect switch.
: 16. If available, check in operation/place in operation the iso-phase bus cooling system fan and heater per RP 2193.
FINAL CONDITIONS I. Buses I and 2 are in service and being backfed from the main and auxiliary transformers with the generator no load disconnect switch, GD-I open.
REMARKS:
Performed by Operators (Print/Sign)                                       Date Reviewed by:
Shift Manager (Print/Sign)                                   Date VYOPF 2142.01 OP 2142 Rev. 50 Page 3 of 3}}

Revision as of 05:52, 23 November 2019

(PA-LR) Vernon Tie Info
ML071840212
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/07/2007
From: Hamer M
Entergy Corp
To: Rowley J
NRC/NRR/ADRO/DLR
References
TAC MD2297
Download: ML071840212 (46)


Text

JntaRowley V Vernon Ti e info Pag P>) -uz~

From: "Hamer, Mike" <mhamer@entergy.com>

To: "Jonathan Rowley" <JGR@nrc.gov>

Date: 06/07/2007 3:43:08 PM

Subject:

Vernon Tie info Jonathan,

  • Attached is a previously docketed letter that provides our commitment for LCO actions/notifications upon loss of the Vernon Tie line. Also attached is the procedure that contains a protected step to ensure this commitment is properly administered - see page 8.step 16.

<<BVY 97 Vernon Tie - Appendix R Compliance Letter.tif>>

<<OP 2142 Vernon Tie Ico.pdf>>

Ic:\,temp\Gw}oooo4.TMP i#aglei.,

Pg Mail Envelope Properties (46685FBF.A66 : 11 : 19046)

Subject:

Vernon Tie info Creation Date 06/07/2007 3:42:23 PM From: "Hamer, Mike" <mhamerdentergy.com>

Created By: mhamer(iDentergy.com Recipients nrc.gov TWGWPO03.HQGWDOOI JGR (Jonathan Rowley)

Post Office Route TWGWPO03.HQGWDOO1 nrc.gov Files Size Date & Time MESSAGE 379 06/07/2007 3:42:23 PM TEXT.htm 2093 BVY 97 Vernon Tie - Appendix R Compliance Letter.tif 95550 OP 2142 Vernon Tie lco.pdf 1691436 Mime.822 2451050 Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled

Compliance Lettertif Page 1 1 Jonathan Rowley -

Vefnon Tie

- BVY 97 Vernon Rowley-BVY97-25 T Appendix R I IiIe -Appendix R Compliance Letter.tif I VERMONT YANKEE NUCLEAR POWER CORPORATION RESPONSIBILITY NOPJ.J. DUFFY - Distribution LPAX 113-7 0v,,3,ed Ferry Road. Brattleboro. VT 05301-7002 F1, 10 ENGINEERING OFFICE 580 MAIN STREET BOLTON, MA 0t740 (508) 779-6711 February 19, 1997 BVY 97-25 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

References:

(a) License No. DPR-28 (Docket No. 50-271)

(b) Letter, VYNPC to USNRC, BVY 96-43, dated April 4, 1996 (c) Telecon, USNRC to VYNPC, dated February 12, 1997

Subject:

Clarification Regarding Use of Vernon Tie for Appendix R Compliance In Reference (b), Vermont Yankee requested an exemption from 10CFR50, Appendix R, section l1I.L to allow use of the Vernon Tie as a source of ac power in alternative shutdown scenarios. Vermont Yankee utilizes alternative shutdown capability in the event of a fire in the control room or cable spreading room. Currently, Vermont Yankee uses one of the two onsite emergency diesel generators in an alternate shutdown mode as a source of ac power when offsite power is not available in the event of a control room or cable spreading room fire.

This exemption was requested to facilitate the restoration of ac power to safe shutdown equipment and to reduce the operator timeline for initiating alternate shutdown systems. Use of the Vernon Tie has several significant advantages over use of an emergency diesel generator to meet alternate shutdown requirements. These advantages include: prompt restoration of power using simpler operator actions; continuous operation without dependence on support systems; and reliability of the Vernon Tie. As stated in Reference (b), the Vernon Tie is normally energized and the availability of Vernon Station has historically been well above 99%,

exceeding the required alternate ac source availability of 95%. However, in the event the Vernon Tie is unavailable, a diesel generator will be available to provide backup power.

In Reference (b) Vermont Yankee stated that it would institute the following administrative limit in the event of an unplanned unavailability of the Vernon Tie:

Power operationmay continue for no more than 15 days, unless the Vernon Tie is returned to service or a Basis for Maintaining Operability(BMO) evaluation is written and approved.

In Reference (c), the NRC staff expressed concern that the Vernon Tie, if approved for use as Vermont Yankee's preferred source of power for alternative shutdown, may be out of service

Page 2 Rowley-- BVY Jonathan Rowley 1,,Jonathan - Vernon Tie 97 Vernon BVY 97-25 -

Appendix R Tie - Appendix CompI1iIance ILetter.tif R ICompliance Lett Ier.tif Page 2 ýJ VERMONT YANKEE NUCLEAR POWER CORPORATION United States Nuclear Regulatory Commission Febnrary 19, 1997 Page 2 of 2 indefinitely without NRC notification. In consideration of the NRC staffs concern, Vermont Yankee will revise, upon approval of the exemption requested in Reference (b), the administrative limit stated above to require that a special report be submitted to the NRC in the event of an unplanned unavailability of the Vernon Tie. The revised administrative limit will read:

Power operation may continue for no more than 15 days, unless the Vernon Tie is returned to service or a Basis for Maintaining Operability (BMO) evaluationis written and approvedby the Plant OperationsReview Committee.

If the Vernon Tie cannot be returnedto service within 15 days, submit a report to the Nuclear Regulatory Commission, in accordance with 10CFR50.4, within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> outlining the reason for the unavailability, corrective actions being taken to restore the Vernon Tie, compensatory actions in place to provide ac power for Appendix R alternative shutdown fire scenarios and the time required to make the Vernon Tie available, We trust that this submittal provides the requested information. However, should you have questions or require additional information, please contact this office.

Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION

Page 1 1

- OP ýi42 Jonathan Rowley op Vernon Tie 2142 Vernon Tie Ico.pdf 1co.pqj, P6ýý VERMONT YANKEE NUCLEAR POWER STATION I ,OPERATING PROCEDURE OP 2142 REVISION 50 4 KV ELECTRICAL SYSTEM USE CLASSIFICATION: REFERENCE RESPONSIBLE PROCEDURE OWNER: Manager, Operations REQUIRED REVIEWS Yes/No E-Plan IOCFR50.54(g) No Security IOCFR50.54(p) No Probable Risk Analysis (PRA) Yes Reactivity Management No LPC Effective Affected Pages No. Date Implementation Statement: N/A Effective Date: 05/26/2007 OP 2142 Rev. 50 Page 1 of3l

Jonathan Rowley- OP 2142 Vernon Tie Ico.pdf . Page 2 TABLE OF CONTENTS P U R P O SE.......................................................................................................................................................... 3 D ISCU SS ION .................................................................................................... .......................... ; .................... 3 A TT A C HM EN T S ............................................................................................................................................. 6 QA REQUIREMENTS CROSS REFERENCE .......................................................................................... 6 R E FE R EN C ES .................................................................................................................................................. 6 PRECAUTIONS/LIMITATIONS ........................... ......................................................................................... 7 P R E R E QU IS IT E S ..................................................................................... ............................................... 9 D E F IN ITION S ................................................................................................................................................. 10 P R OC E DU R E.................................................................................................................................................. II A. Racking Up a 4 KV Breaker to Its Bus ............................................................................... II B. Racking Down a 4 KV Breaker from Its Bus ................................................................... 17 C. Transfer of Station Load from Startup Transformer to Auxiliary Transformer ............... 20 D. Transfer of Station Load from Auxiliary Transformer to Startup Transformer ............... 22 E. Manually Phasing Diesel Generators to Buses 3 or 4 ....................................................... 23 F. Energizing of 4 KV Bus 3 from Vernon 4160 V Line ..................................................... 23 G. Energizing of 4 KV Bus 4 from Vernon 4160 V Line .................................................... 23 H. Vernon Tie Supply OCB #10 Auto Trip at Vernon Hydro .............................................. 24 I. Loss of DC Control Power to a 4 KV Bus ....................................................................... 24 J. Local Operation of a 4 KV Bus 3 or 4 Breaker ................................................................ 25 K. Local Operation of a 4 KV Bus I or 2 or 5 Breaker ........................................................ 26 L. Loss of Fast Transfer Synch-Check Relays ....................................................................... 27 M. RHR Alternate Shutdown NORMAIJEMERGENCY Transfer Switches on Bus 4 ............ 27 N. Energizing of 4 K V Bus .......... ........................................................................................ 28

0. Lining Up to Backfeed Through the Auxiliary Transformer (Opening the GD-1 Disco nn ect) ............................................................................................................................. 28 P. Securing from Backfeeding Through the Auxiliary Transformer (Closing the GD-I Disco nn e ct) ............................................................................................................................. 28 Q. Auxiliary Transformer Operation With Degraded Cooling System .................................. 30 F INAL C ON D ITION S .................................................................................................................................... 31 OP 2.142 Rev. 50 Page 2 of 31

In'Row/ ey 1P 2142 Vernon.Tie co.pdf Jon.ata* Page_3 rovide a procedure for Operations Department personnel to safely operate the 4 KV fystem.

buses I and 2 carry normal station service loads. Bus I is initially energized from former 3A through breaker 13 and bus 2 is initially energized from startup 3B through breaker 23. After the main generator has been phased to the system,

'plied to the buses from the auxiliary transformer through breaker 12 (bus 1) and breaker 22 (bus 2).

.I ý

-c-~-

JoniathanRowley - OP 21 42 VernonTTie co. pdfPage 4I The following breakers are interlocked as follows:

I. 3V4 cannot be closed unless breakers 3V and 4V are open.

2. 3V cannot be closed unless 3T1 and DG-I B are open or 4V closed and 3V4 open.
3. 4V cannot be closed unless 4T2 and DG-IA are open or 3V closed and 3V4 open.
4. 3TI cannot be closed unless 3V is open or racked down.
5. 4T2 cannot be closed unless 4V is open or racked down.
6. DG-IB can be closed manually through synchroswitch even if 3V or 3T1 are closed. When 3V or 3TI are closed DG-1B cannot be closed automatically.
7. DG-l A can be closed manually through synchroswitch even if 4V or 4T2 are closed. When 4V or 4T2 are closed DG-I A cannot be closed automatically.

All 4 KV breakers in the switchgear room can be operated manually from inside their respective cabinets. Additionally, the breakers on buses 3 and 4 can also be operated locally using the emergency breaker control switches (positions: TRIP/CLOSE) that are mounted on the front of their'cabinets. All of the emergency breaker control switches on bus 3, except for 3V4, and two of the switches on bus 4 are keylocked to prevent inadvertent local operation. The other emergency breaker control switches on bus 4 are associated with alternate shutdown and are not keylocked. These breakers are also provided with normal/emergency transfer switches which must be used in conjunction with the respective non-keylocked emergency breaker control switch to operate the breaker locally during alternate shutdown.

All 4 KV breakers in the switchgear room also contain breaker control switches (positions: TRIP/CLOSE) with L-shaped handles which are used by the Maintenance Department for breaker testing when the breaker is racked down. They are non-functional when the breaker is in the normal position.

All breakers on the 4 KV buses have red light supervision. The red indication light and the protective relay circuits are wired in series with the trip coil. Should the red light go out with the breaker closed, it may indicate an open trip coil or trip coil circuit. If the trip coil or circuit is open, the breaker will not trip even under fault conditions. If the TOC fails open, remote breaker control and indication is lost but the electrical protection will still operate for all breakers, except

'the diesel output breakers.

All 4 KV motors at Vermont Yankee are equipped with 50-51 relay protection (over current sensing and tripping) on each phase lead. The reactor feed pump and the recirc MG drive motors also have 87 relay protection (differential fault current tripping).

The 50-51 over current relay is a combination device. One part, the 50, functions instantaneously and is indicative of fault type currents. It has a separate indicating target on the right side of the relay marked INST.

OP 2142 Rev. 50 Page 4 of 31

Jona.than Rowley - OP 2142 Vernon Tie I.co. pd If Jonathan ... Rowley - OP 2142 Vernon Tie*Icod Pa!ge 5 Trips of this type should be subject to the same inspection as a differential trip and should not be restarted. The second part, the 51 portion, is a time delayed function of the relay and is indicative of over currents due to high starting torques, overloading the driven unit, mechanical problems, bearings, etc. Its target is on the left side of the relays marked TIME. If a breaker trips due to a time delayed overcurrent condition, reclosure of the breaker should not be attempted until cleared by the Maintenance Department, unless the equipment is urgently needed due to an.

emergency condition affecting plant safety. This applies only to the 51 portion.

The Vernon Tie consists of an underground cable which runs between the hydro station switchyard and a stepdown transformer (T-Vernon-Hydro) located at the north end of the west cooling tower. The low voltage side of the transformer (4KV) ties to the inhouse electric system via breaker 3V4. The connection at the 13KV hydro station switchyard which provides relay fault protection, is from Oil Circuit Breaker (OCB) #$10. This OCB will open on a system fault, and it remains open until the fault condition is cleared. At the transformer is a local fused disconnect switch on the high voltage side. The disconnect and transformer enclosure access door are key interlocked such that the disconnect must be open in order to remove the key. The key can then be used to unlock the access door.

When the main generator/turbine are off-line, the 4KV buses can be backfed through the main/auxiliary transformer if the startup transformers are not available, or are required to be removed from service for maintenance activities.

A generator "No Load" manual disconnect switch, GD-I, is installed in the 22KV isolated phase bus, inside the turbine building between the main step up transformer and the main generator, to isolate the main generator from the main transformer during 4KV bus backfeeding operations. The switch is operated via a simple hand crank. Position switches are wired into the existing primary and backup generator lockout trip circuits to automatically disable the anti-motoring protection and core spray initiation protection circuits when the disconnect is opened. The following lockouts are affected:

  • Anti-motoring trip of 86/G-P
  • Anti-motoring trip of 86/G-B
  • Core spray initiation (14A-KI IB,-K19B) trip of 86/G-B Appendix C, Energizing 4KV Buses 3 and 4 from Vernon 4160 Line is intended to be used as an operator aid at CRP 9-8 to provide a check for major actions to transfer power to the Vernon Tie. Appendix C only provides immediate actions, immediate verifications and required steps to safely perform this evolution. A review of all actions required by procedureSection F and G to validate all actions is required at the first available opportunity.

Appendix D, Normal Transfer of Station Load from Auxiliary Transformer to Startup Transformer, is intended to be used as an operator aid at CRP 9-8 to provide a check for major actions required to transfer loads from auxiliary transformer to startup transformer. Appendix D only provides immediate actions, immediate verifications and required steps to safely perform this evolution. A review of all actions required by Section D to validate all actions is required at the first available opportunity.

OP 2142 Rev. 50 Page 5 of 31

2 V e r non T ie Ic o.p d f

. ..

e

.- . 6..

t"I........ .......... R... w...

.......... 21. 4..2......

.. P.....

O .........

Ve ..

rno n....Tie. ..... ... .. ... . .. .. . .. . . . . ... . . ... . .. ... . .. ...... . ..... . . . I ATTACHMENTS

. Figure 1 Magne-Blast Circuit Breaker Plunger - Stationary Auxiliary Switch Adjustments

2. Appendix A 4 KV Breaker Lineup
3. Appendix B Equipment Lost During Residual Voltage Transfer
4. Appendix C Energizing 4KV Buses 3 and 4 From Vernon 4160 Line
5. Appendix D Normal Transfer of Station Load From Auxiliary Transformer to Startup Transformer
6. VYOPF 2142.01 Lining Up to Backfeed Through the Auxiliary Transformer (Opening the GD-I Disconnect)

QA REQUIREMENTS CROSS REFERENCE

1. None REFERENCES
1. Technical Specifications and Site Documents
a. Sections 3.10 and 4.10
2. Codes, Standards, and Regulations
a. Entergy Nuclear Vermont Yankee Safety Standard Manual Electrical Safety No. 302
3. Commitments
a. ER2001-1027, P-10-IC Breaker Failure to Close On Demand, Procedure Enhancement
b. INF93091OPI, "RE: Misadjustment Between General Electric 4.16 KV Circuit Breakers & Cubicles. Revise OP 2142 Per Rec. 2 of D. Hallonquist Memo"
c. INF97053_01, Circuit Breakers Left Racked Out In Non-Seismically Qualified Positions
d. VYCES94120_01, "RE: Seismic Evaluation of 480V and 4KV Switchgear, SR92-49 (vacate cubicles)"
e. VY Letter, BVY 96-43, "Request For Exemption From 10 CFR Part 50, Appendix R, Section IILL, Alternate and Dedicated Shutdown Capability", dated April 4, 1996
f. VY Letter, BVY 97-25, "Clarification Regarding Use of Vernon Tie for Appendix R Compliance", dated 2/19/97 OP 2142 Rev. 50 Page 6 of 31

Iýi o n a"tha'n Ro'wl-e'y 'P"-2-14-2"Ve'r no n T ie Ic o. pdf Jonathan............Rowley.............OP.....2142......Vernon..........Ti..e ........ Page.....Pge"1'

...........

I

4. Supplemental References
a. CWD Sheets 306 through 311, and 317 through 322
b. DWG G-191298, Main One Line Diagram
c. DWG G-191299, 4 KV One Line Diagram
d. ER 2004-1041, Installation of Remote Racking Modification
e. Memo, B. Mathis to J. Durborow, "Review of OP 2142, 4KV Electrical System",

dated November 7, 1990

f. Memo VYE 99/031, PRJ to RGJ, "Tap Change for Vernon Tie Line Transformers"
g. NRC Letter, NVY 83-81, "Adequacy of Station Electric Distribution System Voltages", dated April 13, 1983
h. SOER 82-16, De-energized Breaker Charging Spring Motor
i. VYC-1088 Rev. 1, VY Short Circuit/Voltage Study, dated 6/16/95
j. VYC-I 512 Rev. 2, Station Blackout Voltage Drop and Short Circuit Study
k. YAEC Report 1205, "Auxiliary Power System Voltage Study for VYNPS", dated March 17, 1980
1. EN-AD-103, Document Control and Records Management Activities
m. AP 0140, Vermont Yankee Local Control Switching Rules
n. AP 0155, Current System Valve and Breaker Lineup and Identification
o. OP 2124, Residual Heat Removal System
p. OP 2126, Diesel Generators
q. RP 2193, Isolated Phase Bus Cooling Operation
r. OP 3126, Shutdown Using Alternate Shutdown Methods
s. ON 3159, Loss of DC-1
t. ON 3160, Loss of DC-2 and DC-3
u. ON 3162, Loss of DC-1AS
v. ON 3163, Loss of DC-2AS
w. OP 5299, Installing 4 KV Breakers Into the Test Position PRECAUTIONS/LIMITATIONS I1. For the safety of personnel and equipment, observe rigid compliance with safety standards and tagging procedures.
2. Should the red "Closed Breaker" indicating light go out and the problem is not a burned out lamp, consider the breaker inoperable and that it may not trip either manually or automatically. Notify the Maintenance Department immediately.
3. If DC control power is switched from the normal to the alternate supply on 4 KV buses 1 and 2, the recirculation pumps will trip.
4. Prior to planned operation of the plant with only one startup transformer carrying all plant loads, the 115 KV tap must be changed to the 112 KV tap and the 4160/480 volt tap must be changed to 4060/480 volt tap (NRC Letter NVY 83-81).

OP 2142 Rev. 50 Page 7 of 31

1ý4 iýqoýýA&Me-y----OP 214 2 Ve mon Ti e Ico JonathanRowley OP

- 2142 Yemon Tie Ico.pdf Page 8 I b

8-1

5. Motors that trip due to operation of differential relays should never be restarted until a thorough electrical and mechanical inspection has been completed and the motor is released for restart by the Maintenance Department.
6. Exercise due caution when working near energized equipment to prevent contact with high voltage.
7. Ensure personnel protective equipment (e.g., eye protection, arc flash protection clothing, electrical safety gloves, etc.) is worn as required by Safety Standard 302 or EN-IS-123 as applicable when racking breakers (locally or remotely) in or out.
8. After operation of any breaker, observe indication lights to verify proper operation where possible.
9. Breaker 53 trips open upon loss of Bus 5 voltage. Ensure Breaker 53 is open prior to performing a planned de-energization of the startup transformers.
10. For the safety of personnel and equipment, perform local manual operation of the 4 KV breakers only in an extreme emergency. Under no circumstances are the breakers to be operated CLOSED if DC control power to the breaker is unavailable.
11. Only persons qualified under local switching and tagging rules are allowed to operate breakers.
12. The 3V or 4V breakers shall not be placed in the "Full Test Position" as defined in OP 5299, with the mechanical plunger extension arm installed and the elevating platform raised, unless the plant is shutdown because the auto closure of the DG-IA or DG-IB breakers would be defeated. The SW pump C or D breakers shall not be placed in the "Full Test Position", as defined in OP 5299, (with the mechanical plunger extension arm installed and the elevating platform raised), unless the plant is shutdown because the SW pump start on a diesel start would be defeated. If testing under these conditions should be necessary when the plant is in operation, a special procedure shall be written requiring operational monitoring during the test period and a minimum time of testing in the closed position. The Shift Manager must contact the Maintenance Supervisor to determine breaker test conditions prior to authorizing test performance.
13. To be considered operable, 4 KV bus voltage must be maintained as follows:

Buses 1/2/3/4/5 3700-4400 volts (YAEC Report 1205 and VYC-1088)

Vernon voltage 3900-4500 volts (all modes) (VYC-1512 Rev. 2 and Memo VYE 99/031)

14. If a breaker trips due to a fault type current (INST. indicating target), do not attempt to reclose it until cleared by Maintenance Department.

OP 2142 Rev. 50 Page 8 of 31

Jo w. y -. OP n thn.. Rowley .P 4.V

.. rnn.ie... .. . .. . . . . . . ....... ..... .... ......

Jonathan 2142 Vernon Tie Ico.pdf Page 9JI

15. If a breaker trips due to a delayed overcurrent condition (TIME indicating target), do not attempt to reclose it until cleared by Maintenance Department, unless the equipment is urgently needed due to an emergency condition affecting plant safety.
16. Because of its safety significance, following a loss of the Vernon Tie power supply, power operation may continue for no more than 15 days, unless the Vernon Tie is returned to service or a Basis for Maintaining Operability (BMO) evaluation is written and approved. (BVY96-43)

If the Vernon Tie cannot be returned to service within 15 days, submit a report to the Nuclear Regulatory Commission, in accordance with 10CFR50.4, within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> outlining the following:

  • reason for the unavailability,
  • corrective actions being taken to restore the Vernon Tie, compensatory actions in place to provide AC power for Appendix R alternative shutdown fire scenarios, and
  • the time required to make the Vernon Tie available. (BVY97-25)
17. Operability of 3V and 4V Breakers is verified by performing testing as specified in ER 2005-0798, Post Maintenance Testing for 4KV Breakers 3V and 4V.

PREREQUISITES I1. To energize the 4 KV buses through breakers (BKR) 13 and 23, the startup transformers must be energized.

2. To energize the 4 KV buses through breakers 12 and 22, the auxiliary transformer must be energized from the main generator which is phased to the 345 KV system or backfed through the main transformer during shutdowns while the main generator no load disconnect switch GD-I is open.
3. DC control power for the 4 KV buses must be available.

4 KV Swgr I normal FDR DC-1 Ckt 13 4 KV Swgr I emerg FDR DC-2 Ckt 15 4 KV Swgr 2 normal FDR DC-2 Ckt 16 4 KV Swgr 2 emerg FDR DC-I Ckt 14 4 KV Swgr 3 normal FDR (except for 3V4 bkr) DC-I Ckt 15 4 KV Swgr 3 emerg FDR (except for 3V4 bkr) DC-2 Ckt 17 4 KV Swgr 4 normal FDR DC-2 Ckt 18 4 KV Swgr 4 emerg FDR DC-2AS Ckt 7 4 KV Swgr 5A, 5B DC-2 Ckt 19 OP 2142 Rev. 50 Page 9 of 31

Jonathan. owley - OP 2142 Vernon Tie Ico.pdf .. Page 1

4. DC control power for the 3V4 breaker:

normal FDR DC-IAS Ckt 4 emerg FDR DC-I Ckt 15 backup FDR (to DC-I Ckt 15 emerg FDR) DC-2 Ckt 17

5. AC power for the 4 KV buses must be available.

4 KVSwgr I AC-DP-5, Ckt 13 4 KV Swgr 2 AC-DP-5, Ckt 14 4 KV Swgr 3 AC-DP-5, Ckt 15 4 KV Swgr 4 PP-6A, Ckt 31 4 KV Swgr 5A AC-DP-5, Ckt 17 4 KV Swgr 5B LP-IY, Ckt 20

6. To backfeed the 4KV buses from the main transformer, the generator must be off line.

DEFINITIONS ALTERNATE IMMEDIATE ACCESS SOURCE: 115 KV source (K-186 Line), via breaker K-1 86 and the startup transformer, capable of powering emergency buses 3 and 4 may be made available, dependent on its preloading, which must be limited by system dispatchers prior to it being declared an immediate access source. All breakers, transformers, switches, interrupting devices, cabling and controls required to transmit adequate power from the off site transmission network to the on site Emergency safeguard buses 3 and 4 must be operable.

2. QUALIFIED DELAYED ACCESS SOURCE: 345 KV source, via the main transformer and the auxiliary transformer, that is capable of powering emergency buses 3 and 4, along with all breakers, transformers, switches, interrupting devices, cabling and controls required to transmit adequate power from the off site transmission network to the on site Emergency safeguard buses 3 and 4. In this mode, the generator no load disconnect switch, GD-I, is open to isolate the main generator.
3. QUALIFIED IMMEDIATE ACCESS SOURCE: 345 KV source, via the auto transformer and the startup transformers that is capable of powering buses 3 and 4 along with all breakers, transformers, switches, interrupting devices, cabling and controls required to transmit adequate power from the off site transmission network to the on site Emergency safeguard buses 3 and 4. Either fast transfer or a residual bus transfer scheme qualifies as an immediate access source.
4. VERNON TIE: The Vernon tie is not a qualified immediate or delayed access power source. Analysis takes credit for the Vernon Tie as the power source for a station blackout analysis and Appendix R analysis.

OP 2142 Rev. 50 Page 10 of 31

Page 11 Jonathan Jonathan Rowley Rowley - OP

- OP 2142 Vernon Ico.pdf Vernon Tie Ico.pdf Pa ge , !1I, PROCEDURE A. Racking Up a 4 KV Breaker to Its Bus

1. Ensure Electrical Maintenance is available to check TOC switch operation when racking up 4KV breakers, if the breaker was removed from the cubical.

NOTE A check of the TOC switch operation is not required if the breaker was not removed from the cubical.

2. Check breaker open by observing green OPEN flag.
3. Request Electrical Maintenance to confirm there is no visible damage to the TOC switch before installation, if the breaker was removed from the cubical.

NOTE The Maintenance Department normally re-installs 4KV breakers, however it may be done by Operations personnel.

4. If the breaker was removed from the cubicle, request Maintenance to re-install the breaker into the cubicle and ensure it is fully inserted.
5. Check removed/remove breaker trip and close fuses.
6. If removed, install elevating fuses (Device UL - ELEV).

NOTES

" There are specific racking motors labeled for use on specific 4KV buses. Contact Electrical Maintenance before using a racking motor not specific to the bus, should a motor fail.

" The racking motors used for remotely racking up a breaker are larger than those used for locally racking up a breaker.

7. For locally racking up a breaker perform the following, if remotely racking up a breaker skip to Step 13.
8. Select the proper sized racking motor for the breaker.
a. Install the bus specific racking (elevating) motor.

OP 2142 Rev. 50 Page II of 31

I.Jonathan Rowley - OP 2142 Vernon TieIco.pdf Page 12 Place selector switch on motor in the RAISE position and check alignment of drive to clutch.

Pull clutch lever to eneace drive-and-automatically start motor of the elevating

J'onatha'n Rowley'- OP 2142 Vernon Tie Ico.pdfg F5a ge 13

j. Install the amphenal control cable into the receptacle on the cubicle door.
k. Install the pendant controller into the control box.

I. Verify that the circuit breaker on the control box is in the ON position.

1) Verify that the digi-tilt display illuminates and the top green LED on the cubicle receptacle.
m. From a suitable distance away hold the raise button on the pendant controller until limit switch opens the motor circuit as breaker reaches the fully elevated position.
n. Release raise button on the pendant.
o. Request Electrical Maintenance to confirm there is no visible damage to the TOC switch after racking up, if the breaker was removed from the cubicle.

CAUTION ruses must be firmly seated in the fuse block to ensure proper ct is made.

p. Install DC trip fuses.
q. If applicable, check installed/install Appendix R close fuse (RUC).,

NOTE If springs were previously discharged, the following step results in considerable noise as the springs charge.

r. Installation of DC close fuses.

I) Install DC close fuses.

2) If applicable, check installed/install Appendix R trip fuse (RUT).
3) Release the clutch lever by depressing the green illuminated button on the pendant controller.
4) Check that breaker springs are charged.
5) If breaker springs are not charged, breaker is inoperable.

OP 2142 Rev. 50 Page 13 of 3l

Jonathan..Rowley...OP"2142.Vernon.Tie.........Page.1..

Jonathan Rowley - OP 2142 Verno Tielco.pdf 'Pag~e 1!41

s. Remove the digi-tilt assembly or shorting plug.
t. Remove the amphenol connector from the cubicle door.
u. Remove elevating motor.
v. Proceed to procedure step 18.
14. Request Electrical Maintenance to confirm there is no visible damage to the TOC switch after racking up, if the breaker was removed from the cubical.

NOTE If motor or power for it is not available, breaker may be raised or lowered in an emergency by use of a hand crank placed in the clutch drive.

CAUTION The fuses must be firmly seated in the fuse block to ensure proper contact is made.

15. Install DC trip fuses.
16. If applicable, check installed/install Appendix R close fuse (RUC).

NOTE If springs were previously discharged, the following step results in considerable noise as the springs charge.

17. Installation of DC close fuses.
a. Pull and hold clutch lever engaged.
b. Install DC close fuses.
c. If applicable, check installed/install' Appendix R trip fuse (RUT).
d. Release clutch lever.
e. Check that breaker springs are charged.
f. If breaker springs are not charged, breaker is inoperable.

OP 2142 Rev. 50 Page 14 of 31

Jonat han Rowley - OP 21 4 2 Vernon Tie lco pdf JoahnRwe id P212Vro .i c...... i ii *i .... i2 2*21*~ 12 112 Pa...

ge 15 NOTES When the green indicator(s) is energized with normal brilliance it verifies that control power is on, breaker is open, and the cell switch is properly engaged.

A check of the TOC switch operation is not required if the breaker was not removed from the cubical.

18. Before closing the breaker, request Electrical Maintenance to confirm that the voltage measured across the TOC is less than 250 mV and that the Control Room green indicating light is bright, if the breaker was removed from the cubical.
19. If the green light is dim, or the voltage measured across the TOC is greater than 250 mV or the breaker closing springs are not charged:
a. Do not attempt to operate breaker.
b. Notify Electrical Maintenance Department.

NOTE The cubicle mounted stationary auxiliary switch is located inside, on the

Jonathan Rowley - OP 2142 Vernon TieIco.pdfPae6.

NOTE When the interlock cam roller is in the correct position, the interlock switch paddle on the left hand side of the breaker will connect with and close the interlock switch.

21. Verify the following:
a. The interlock cam roller on the right hand side of the breaker:
  • is in the "V" notch of the interlock cam, can spin freely and is not touching the cam, and
  • is approximately 1/16" to 1/8" above the interference block on the cam, and
  • the switch paddle on the left hand side is connected with and closing the interlock switch.
b. If the interlock cam roller can not spin freely due to contact with the cam or if the interlock switch paddle is not connecting with the interlock switch, notify Electrical Maintenance Department. (ER2001-1027)
22. If plant conditions support breaker closure, proceed as follows. Otherwise, proceed to Step 23:
a. Close the breaker.

NOTE A check of the TOC switch operation is not required if the breaker was not removed from the cubical or if the breaker does not have remote operation capability.

b. Request Electrical Maintenance to confirm that the voltage measured across the TOC is less than 250 mV and the Control Room red indicating light is bright, if the breaker was removed from the cubical.

C. If the red light is dim, or the voltage measured across the TOC is greater than 250 mV:

I) Do not attempt to operate the breaker.

2) Request Electrical Maintenance to determine and correct the cause of the problem.
3) Support Electrical Maintenance as necessary to determine and correct the cause of the problem.

OP 2142 Rev. 50 Page 16 of 31

1,Jonathan Rowley - OP 2142 Vernon Tie, Ico:pdf Jonathan~~~~~~~~ Roly-O 12 ennTeIo6d

~ 7 ae1

d. If the breaker operation is satisfactory, position the breaker open/closed as required for plant conditions.
23. If plant conditions do not support breaker closure, caution tag the equipment to require Electrical Maintenance perform OP 2142, Section A, Step 22 when the breaker is closed, if the breaker was removed from the cubical.
a. For breakers 3V or 4V, request Electrical Maintenance remove breaker front cover and perform resistance measurements across secondary disconnect pins 4, 9, and 10 in lieu of breaker cycling as follows:

I) Verify voltage drop from terminal #A16 to terminal #4 of 52 I/S switch is <250 mV for breaker secondary disconnect 4.

a) Check resistance is <1 ohm.

2) Verify voltage drop from terminal #AI 7 to terminal #2C of 52 AUX switch is <250 mV for breaker secondary disconnect 9.

a) Check resistance is <1 ohm.

3) Verify voltage drop from terminal #G6 to terminal #4C of 52 AUX switch is <250 mV for breaker secondary disconnect 10.

a) Check resistance is <21.5 ohm (reading includes trip coil resistance at 20.5 ohms).

B. Racking Down a 4 KV Breaker from Its Bus I1. Check breaker open:

a. Open indicating light (green) should be energized.
b. Mechanical indicator on breaker should read OPEN.
c. If either condition is not satisfied, notify Electrical Maintenance Department before continuing.
2. Remove fuses from the close and trip circuits.

OP 2142 Rev. 50 Page 17 of 31

[jonathan Rowley - OP 2142 Vernon Tie Ico0pdf Page 18,J

3. For locally racking down a breaker perform the following, if remotely racking down a breaker skip to Step 9.
4. Select the proper sized racking motor for the breaker.
a. Install the racking (elevating) motor and place selector switch in the LOWER position.
5. Align drive to the clutch.
6. Pull clutch lever to enape drive and hold until limit switch opens the motor

[Jonathan Rowley - OP 2142 Vernon Tie !co.pdf _Pagej_9. 1

e. If digi-tilt sensor is available, install digi-tilt sensor on breaker, otherwise proceed to 9.f.
f. Ifdigi-tilt sensor is not available, install a shorting plug.

NOTES

" Lights will not illuminate until all connections are made and the circuit breaker on the control box is in the ON position.

  • Digi-tilt sensor will also be powered up when all connections are made and the circuit breaker power on.
g. Verify that the upper light on the J-box is illuminated.
h. Close the cubicle door.
i. At the wall mounted control box install the amphenal extension cord into the control box.
j. Install the amphenal control cable into the receptacle on the cubicle door.
k. Install the pendant controller into the control box.

I. Verify that the circuit breaker on the control box is in the ON position.

1) Verify that the digi-tilt display illuminates and the bottom green LED on the cubicle receptacle illuminates.
m. From a suitable distance away hold the lower button on the pendant controller until limit switch opens the motor circuit as breaker reaches the fully lowered position.
n. Release lower button on the pendant.
o. Release the clutch lever by depressing the green illuminated button on the pendant controller.
p. Remove the digi-tilt assembly or shorting plug.
q. Remove racking motor plug from cubicle receptacle.
r. Remove remote racking (elevating) motor.

OP 2142 Rev. 50 Page 19 of 31

ion,a'thýýn -R'o-w'lev'- OP-2-1 4'2"'VernIon Tie lco-pdf Jonahan owly- O 214 Venon ie lo~pf Pae20 NOTES

" For bus I and 2 breakers, a racked down breaker may be left on the floor of the cubicle without any seismic concerns.

  • The Maintenance Department normally performs removal of 4KV breakers from the cubicle, however it may be done by Operations personnel.

CAUTION To maintain seismic requirements, Bus 3 and 4 breakers must be removed from the cubicle after being racked down when the bus is required to be operable. (VYCES94120.01)

10. For buses 3 and 4, if the bus is required to be operable per Technical Specifications: (VYCES94120_01)
a. Remove the breaker from the cubicle.
b. Check the breaker DISCHGD.

NOTE It is preferable to secure the breaker by tying off to the breaker frame; do not tie off to operating components of the breaker. (INF97053 01)

c. Secure the breaker with approved tie downs.

NOTE VYOPF 2142.01 must be completed to satisfy the requirements to prepare for backfeeding the 4KV buses from the main/auxiliary transformer when the main generator/turbine is off-line.

C. Transfer of Station Load from Startup Transformer to Auxiliary Transformer I. Check auxiliary transformer energized from main generator (which must be phased to the 345 KV system) or being backfed through main transformer from 345 KV system.

2. Insert sync check handle in BKR 12 socket and turn sync switch on.

OP 2142 Rev. 50 Page 20 of 31

ýqnaton _R6wlpy'--'O'P 2142-Vernon Tie11Imp .df Jnta

.... .. Ro. eyO... 212V

. ro.. Tic........

.p f .Page 21 I Verify bus I in phase with auxiliary transformer (synchroscope at 12 o'clock position).

CAUTION Close BKR 12.

5. Check that BKR 13 trips open when BKR 12 switch is released.
6. Reset BKR 13 amber light.
7. Turn sync check handle off and remove it.
8. Insert sync check handle in BKR 22 socket and turn sync switch on.
9. Verify bus 2 in phase with auxiliary transformer (synchroscope at 12 o'clock

3 lý9nýýýanRow-ley--OP2142Ver-n..,,on Tie

- f9-9'.pdf Page2211d

... .... ............. ....... Rowle. .. ....... .. Tie.........

O P...2...42...V...r....n. Page.....22.... I D. Transfer of Station Load from Auxiliary Transformer to Startup Transformer I. Verify that startup transformers are powered from 115 KV yard.

a. If auto transformer is not supplying the 115 KV yard:
1) Notify system load dispatcher.
2) Ensure K-186 line is capable of carrying the plant load.
3) Request VELCO suspend 30 MVAR Cap Bank operations and notify VY of 15MVAR Cap Bank operation.

NOTE Steps 2 through 7 only apply if Bus I is available and is to be place in service.

2. Insert sync check handle in BKR 13 socket and turn sync switch on.
3. Verify bus I in phase with startup transformer (synchroscope at 12 o'clock position).

CAUTION If they are not In Phase, do not transfer.

4. Close BKR 13.
5. Check that BKR 12 trips open when BKR 13 switch is released.
6. Reset BKR 12 amber light.
7. Turn sync check handle to off and remove it from the socket.

NOTE Steps 8 through 13 only apply if Bus 2 is available and is to be place in service.

8. Insert sync check handle in BKR 23 socket and turn sync switch on.

OP 2142 Rev. 50 Page 22 of 31

Joaha owley -OP 2142 Yernon' Tie" Ico.pd-f Pag a*_ ]

9. Verify bus 2 in phase with startup transformer (synchroscope at 12 o'clock position).

CAUTION If they are not In Phase, do not transfer.

10. Close BKR 23.*
11. Check that BKR 22 trips open when BKR 23 switch is released.
12. Reset BKR 22 amber light.
13. Turn sync check handle off and remove it from the socket,
a. Place sync check handle on CRP 9-8.
14. If required, perform Section P to secure the 4KV bus backfeeding lineup from the main/auxiliary transformers.

E. Manually Phasing Diesel Generators to Buses 3 or 4

1. Refer to OP 2126.

F. Energizing of 4 KV Bus 3 from Vernon 4160 V Line

1. Open/check open BK.R 3V.
2. Open/check olden BKR 4V.
3. Close BKR 3V4.
4. To energize 4 KV bus 3:
a. Check open BKR 3TI.
b. Check open BKR DG-B.
c. Close BKR 3V.
5. Check 3 phase voltage for bus 3 (3700 - 4500 V).
6. Check Vernon Tie ammeter.

OP 2142 Rev. 50 Page 23 of 31

j6hathan'kowley OP 21 142 Ve.mon Tie Ico.pdf Jonathan. .. Rowley OP

- 2142 Vernon Tie Ico Pa~ge .24.i ii,, 2*pdf G. Energizing of 4 KV Bus 4 from Vernon 4160 V Line I. Open/check open BKR 3V.

2. Open/check open BKR 4V.
3. Close BKR 3V4.
4. To energize 4KV bus 4:
a. Check open BKR 4T2.
b. Check open BKR DG-A.
c. Close BKR 4V.
5. Check 3 phase voltage for bus 4 (3700 - 4500 V).
6. Check Vernon Tie ammeter.

H. Vernon Tie Supply OCB #10 Auto Trip at Vernon Hydro I. Initiate corrective action to recover the Vernon Tie Supply.

Loss of DC Control Power to a 4 KV Bus NOTE Loss of DC control power could result from loss of DC-I or DC-2 or result from a problem in the switchgear.

CAUTION When DC control power to 4 KV Buses I or 2 is switched to the alternate supply, the recirc pump will trip.

1. If loss of DC control power is the result of the loss of DC-1 or DC-2, refer to ON 3159 or ON 3160.

OP 2142 Rev. 50 Page 24 of 31

Jonatha.n ow'!ey - oP-2P142 Vernon TieiIco!.pdf F2a gei 25 i51!

2. If reason for loss of DC control power cannot be determined:
a. Notify Electrical Maintenance Department immediately before switching to alternate supply.
b. Monitor all running equipment for normal current and voltage.

J. Local Operation of a 4 KV Bus 3 or 4 Breaker CAUTION Local manual operation of a 4 KV breaker will only be performed in an extreme emergency and then only with permission of the Shift Manager. Under no circumstances will the breakers be operated to closed if DC control power for the breaker is unavailable.

I. DC Control Power Available

a. Obtain Shifi Manager's permission to perform local operation of the desired 4 KV breaker.
b. If the 4 KV breaker to be operated is not an alternate shutdown equipped breaker, insert local ACB emergency breaker control key and operate key to desired position.
c. If the 4 KV breaker to be operated is an alternate shutdown equipped breaker:

I) Place alternate shutdown transfer switch to the emergency position.

2) Place emergency breaker control switch to desired position.
d. Verify that breaker changes position by observing local position lights and mechanical indicator.
e. Report breaker status to Control Room.

OP 2142 Rev. 50 Page 25 of 31

14onathan Rowley - OP 2142 Vernon Tie lco.pdf JonahanRowey OP214 VenonTielcopdfPage- 2-6

2. DC Control Power Unavailable NOTE The below listed steps are for tripping the breaker only.
a. Obtain Shift Manager's permission to perform local tripping of the desired 4 KV breaker.,

CAUTION If the remote switch is left in an AUTO or ON position, the 4 KV breaker associated with that switch would close when DC control power is restored, therefore, it is essential that the remote switch remain in the PULL-TO-LOCK or OFF position.

b. Check that remote switch for that breaker is positioned to PULL-TO-LOCK or OFF.
c. Open door to the desired 4 KV breaker and depress local mechanical TRIP button.
d. Verify that breaker has tripped by observing local mechanical position indicator.
e. Report breaker status to Control Room.

K. Local Operation of a 4 KV Bus I or 2 or 5 Breaker NOTE Breaker 55 can only be opened and closed locally CAUTION Local manual operation of a 4 KV breaker (except BKR 55) will only be performed in an extreme emergency and then only with permission of the Shift Manager. Under no circumstances will the breakers be operated to closed if DC control power for the breaker is unavailable.

I. Obtain Shift Manager's permission to perform local operation of the desired 4 KV breaker.

OP 2142 Rev. 50 Page 26 of 31

y - OP :ý! 42 Verno'n Tie'11c",

RoIwl e 1.

j,onaIth .an I'll Jonathan............Rowley OP

- 2142 Vernon Tie Ico,.III*I*,,LL _III...,, ........ ......... .. Pa....

geg277*!

For Breaker 55:

  • ,use control switch on front door (preferable), or
  • use trip/close pushbutton Except for Breaker 55, open door to the desired 4 KV breaker and depress local TRIP or CLOSE button, whichever position is desired.

Verify that breaker changes position by observing local position lights and

_ mechanical indicator.

5. Report breaker status to Control Room.

L. Loss of Fast Transfer Synch-Check Relays NOTE 25/1 and 25/2 computer inputs are:

ionýi"n koWey - OP 2142 Vernon Tie Ico.pdf Joata Rwey- P212Veno ieIo-- .28 Page.

aI d N. Energizing of 4 KV Bus NOTE If energizing 4 KV Bus 3 or 4 from Vernon 4160 V Line refer to Section E orF.

1. Insert sync check handle in appropriate breaker socket and turn sync switch on.
2. If bus to be energized is not dead, verify incoming and running buses are in phase (synchroscope at 12 o'clock position).
3. If bus to be energized is dead, verify the synchroscope stayed as it was, and either the running or incoming source light will be lit with the other light out.
4. Close appropriate breaker.
5. Turn sync check handle off and remove it.
a. Place sync check handle on CRP 9-8.
0. Lining Up to Backfeed Through the Auxiliary Transformer (Opening the GD-I Disconnect)

I. Perform VYOPF 2142.01.

P. Securing from Backfeeding Through the Auxiliary Transformer (Closing the GD- I Disconnect)

1. Shift Manager permission obtained.
2. Notify VELCO of the planned evolution.
3. Transfer 4KV buses 1 and 2 to the Startup transformers per Section D.

NOTE After re-closing the Generator No Load Disconnect (GD-1), the T-I MOD must remain open, until the order is given to connect the generator to the grid.

4. Check open, rack down and Danger tag Breaker 12 (Unit Auxiliary Transf.

T-2-1 A) per Section B.

OP 2142 Rev. 50 Page 28 of 31

Jontha ORowle Iy:- OP12142 -1VeIrInoIn -TIie.IcIo.pdf PaIge112, ol I

Jonathan.. owley.... OP...2142.....Vernon.......Tie.......o..........Page.. .. . ... .. ...... ...30 J'onathanRowley - OP 2142 Vernon Tie Ico.pdf Pý!gý 8-0"1

14. For restoration of 4KV breakers 12 and 22:
a. Remove Danger tags,
b. Rack up breakers 12 and 22 per Section A of this procedure.

NOTE The iso-phase bus cooling system and heaters should be maintained in operation to keep the duct pressurized and keep the system clean and dry.

15. If available, check in operation/place in operation the iso-phase bus cooling system fan and heater per RP 2193.

Q. Auxiliary Transformer Operation With Degraded Cooling System NOTE The Auxiliary Transformer coolers are operated with Group 1(2) selected for continuous operation and Group 2(1) selected for standby operation. A cooler consists of one oil pump and 3 fans. In this mode of operation, the cooling group selected for standby operation cycles on and off based upon temperature.

Upon loss of or degraded cooling, reduce the Transformer output to within the limits below to clear any temperature alarms, or to be within the limits for planned maintenance on the fans/coolers.

a. Allowed Auxiliary Transformer Continuous Load Under Degraded Cooling Conditions:

Coolers Operating Continuous Load (Meter Data Sheet or ERFIS C094)

One cooler with 2 fans running.

(One pump with 2 fans running on 15MW the same cooler. This corresponds to 33.3% of cooling capability.)

One cooler in service, (One pump with 3 fans running on the same cooler. This corresponds to 50% of cooling capability.)

Two coolers in service with 4 fans available. (This corresponds to 25MW 66.7% of cooling capability.)

OP 2142 Rev. 50 Page 30 of 31

I -.

IJonathan I*owley - UP' 2142 Vernon

......lie Ico.pdf

.... Paae 31

b. Auxiliary Transformer Operational Limitations With Loss Of Cooling:

Condition Cooling Previous Allowed Operating Time Equipment Out Transformer From Loss of Cooling of Service Condition Normal Operation at All Rated Load 1 Hour Rated Load Rated Voltage No All Rated Load 6 Hours Load Normal No Load Operation at All (At Ambient 2 Hours Rated Load Condition)

Rated Voltage No No Load Load All (At Ambient 12 Hours Condition)

c. Notify System Engineering.
d. Initiate a Condition Report.

FINAL CONDITIONS All appendices and forms completed and returned to Operations Office for filing per EN-AD-103, Document Control and Records Management Activities.

OP 2142 Rev, 50 Page 31 of 31

I Jonathan Rowley - OP 2142 Vernon Tie Ico.pdf Page 32 ,!

FIGURE 1 MAGNE-BLAST CIRCUIT BREAKER PLUNGER - STATIONARY AUXILIARY SWITCH ADJUSTMENTS (ADAPTED FROM GE MVSD FIELD INSTALLATION DRAWING 0172C7558)

(Not to Scale)

Jonatha..........................Rowley P......2142..............Vernon....................Tie........................................P......

...................... ........ ge...............

Jonathan Rowley - OP 2142 Vernon Tie lco.pdf Page,33 APPENDIX A 4 KV BREAKER LINEUP Breaker Number Description Position Initial BUS I 12 Unit Auxiliary Transformer T-2-1 A RACKED UP 13 Startup Transformer T IA RACKED UP P-I-IA Reactor Feedwater Pump IA RACKED UP MG-I-IA Reactor Recirc MG Set IA Drive Motor RACKED UP P-I-1B Reactor Feedwater Pump IB RACKED UP P-2-1A Condensate Pump IA RACKED UP P-5-1A Circ Water Pump I A RACKED UP 16 Station Service Transformer T-6-1 A/T- 12-1A RACKED UP III Station Service Transformer T- II - IA RACKED UP BUS I Gnd BUS 1 Ground Detection Breaker (Note 2) CLOSED KIRK Det Bkr KEY INSTALLED BUS 2 99 I !,,it ~ Trr~,,~fnrmpr T..9..1 A R ACWIF) tip TrasforeTT2-IARACK I'l-t A-ili DU

___________________1__ !_____________

Breaker rintinna Position Initial Numher_ Desc:

BUS I kit-t*.

k'Ua-drkCTrn'fh-e&

I I.,

-k &C-e,*cuti, 1F-t *'ud w,,dtei,' cr ru',ti-'t' 1 .I, p-Pumi? IA RACKED UP ____ 11.  ?. 2-1A Condensate 1

'?-ar~rLt)'iX ervice Transformer T-6-1 AIT- 12-1 A 16 Station S.

prvit-rP Trnn-fnrmr T..I1 1.1 A R ArVRFif I ill tAt1tfnn

io'na'than kowlýey - OP 2-142 Vernon T'ie lco.p'd'f Jonathan Rowley -. OP.2142.Vernon Tie I.**c._p .4. Pag e APPENDIX A (Continued)

Description Position Initial BUS 3 l 4KVBus4 RACKED UP mon Hydro Transformer RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION P-7-1D Service Water Pump ID RACKED UP P-46-1 B Core Spray Pump IB RACKED UP P-10-IC RHR Pump IC RACKED UP P-10-1D RHR Pump ID RACKED UP 38 Station Service Transformer T IA RACKED UP P-8-1D RHR Service Water Pump ID RACKED UP 3T1 Tie from 4 KV Bus I RACKED UP DG-I-IB Diesel Generator lB RACKED UP P-8-1B RHR Service Water Pump IB RACKED UP

- --

-,"*11~ I -

[Jonathan RoWl'ey - OP 2142 -Ve-rnio-nlie'lco.p'difPge3, age -W APPENDIX A (Continued)

Breaker Number Description Position Initial P-10-1A RHR Pump IA RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION 10-IB RHR Pump IB RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION P IC RHR Service Water Pump IC RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION DG- I - IA Diesel Generator IA RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION 4V Tie from 4 KV Bus 3 RACKED UP AND ALT SHTDN SWITCH [N NORMAL POSITION (NOTE 1)

P-7-1A Service Water Pump IA RACKED UP AND ALT SHTDN SWITCH IN NORMAL POSITION (NOTE 1)

P 1A RHR Service Water Pump IA RACKED UP AND ALT SHTDN SWITCH [N NORMAL POSITION Appendix A OP 2142 Rev. 50 Page 3 of 4

I-JonathanRlowley - OP 2142 Vernon Tie Ico.pdf Page 36t1 APPENDIX A (Continued)

Breaker Number Description Position Initial BUS 5A 53 Startup Transformer T-3-1B RACKED UP BUS 5A BUS5A Ground Detection Breaker (Note 2)

Gnd Det CLOSED KIRK KEY BKR INSTALLED BUS 5B (Shed by East Cig Twr) 55 Station Service Transformer T-5-B 1-1A and 1B RACKED UP P-6-1 A Circ Water Booster Pump I A RACKED UP P-6-1 B Circ Water Booster Pump IB RACKED UP P-6-IC Circ Water Booster Pump IC RACKED UP T-VERNON-HYDRO (Transformer by West Cig Twr)

Disc. Sw. Transformer Supply Disconnect Switch CLOSED NOTE 1: There is only one Alternate Shutdown switch (SS-425) for both Breakers 4V and P-7-IA.

NOTE 2: BUS 1, 2, and 5A Aux Comp PT Fuses are removed and installed by Maintenance, Kirk Keys operated and controlled by Maintenance.

Remarks:

Reviewed By_ /

Shift Manager (Print/Sign) Date Appendix A OP 2142 Rev. 50 Pige 4 of 4

pia-ge- 8, Jonathan Rowley_-OP 2142 Vernon Tie Ico.pdfP I APPENDIX B EQUIPMENT LOST DURING RESIDUAL VOLTAGE TRANSFER The following equipment will drop out during a residual voltage transfer and will not be picked up when voltage is restored. Manual restart is required:

Turbine Lube Oil Transfer Pumps P-43-1 A, P-43-I B Turning Gear Oil Pump P-73-1A Turbine Lube Oil Filter Pumps P-42-I A, P-42-1B Turbine Building Cooling Water Pumps P-58-IA, P-58-1B Cond. Demin. Body Feed Tank/Precoat Tank Agitator M-28, M-29 Condensate Transfer Pumps P-4-1 A, P-4-1 B Main Condenser Vacuum Pump P-53-1A Heater Drain Pumps P-3-IA, P-3-1B Station/Instrument Air Compressor C-I-I A, - IB, -I C, -ID Cleanup Recirculation Pump P-49-I A Cleanup Demineralizer Precoat Tank Agitator Waste Sample Pump P-21-1 A, lB Filter Decant Pump P-101-IA Floor Drain Sample Pump P-29-1A Condensate Backwash Transfer Pump P-30-1A Condensate Sludge Mixing Pump P-3 1-1A Condensate Decant Pump P-32-1A Cleanup Sludge Discharge Mixing Pump P-33-1A Cleanup Decant Pump P-34-IA Waste Sludge Discharge Mixing Pump P-35-IA Chemical Waste Pump P-36-1A Spent Resin Pump P-67-1A, Reactor Feed Pumps P- I-l A, l B, IC Appendix B OP 2142 Rev. 50 Page I of I

Jonathan -koQeý '01`52142 Vernon Tie'160'.pid Pq no

... .. R..

Jon ath... w...

. ......... .. ...... . Tie.

Vernon........

OP......2142....... ... . ... .. .. .. .. ................ ...... .. . . . .. .. . . . . .. 38......

, I APPENDIX C ENERGIZING 4KV BUSES 3 AND 4 FROM VERNON 4160 LINE Initial A. ENERGIZING 4KV BUS 3 FROM VERNON 4160 V TIE LINE

1. Verify that power is available at 4KV VERNON TIE.
2. OPEN/check open BKR NO. 3V.
3. OPEN/check open BKR NO. 4V.
4. CLOSE BKR NO. 3V4.
5. OPEN/check open BKR NO. 3T1.
6. OPEN/check open BKR NO. DG-B.
7. CLOSE BKR NO. 3V.
8. Check 3 phase voltage for 4KV BUS NO. 3 (3700 - 4500 V).
9. Check 4KV VERNON TIE ammeter.

B. ENERGIZING 4KV BUS 4 FROM VERNON 4160 V TIE LINE

1. Verify that power is available at 4KV VERNON TIE.
2. OPEN/check. open BKR NO. 3V.
3. OPEN/check open BKR NO. 4V.
4. CLOSE BKR NO. 3V4.
5. OPEN/check open BKR NO. 4T2.
6. OPEN/check open BKR NO. DG-A.
7. CLOSE BKR NO. 4V.
8. Check 3 phase voltage for 4KV BUS NO. 4 (3700 - 4500 V).
9. Check 4KV VERNON TIE ammeter.

Completed by: /

(Print/Sign) Date Reviewed by:- /

(Print/Sign) Date Appendix C OP 2142 Rev. 50 Page 1 of I

1 2 e n n i c.p. . . .. . .... ....... 39 . I

..Page...........

Jo..n.o.y-O Jo nathan Rowley - OP 2142 Ver non Tie lco.pdf .Page.3_9i APPENDIX D NORMAL TRANSFER OF STATION LOAD FROM AUXILIARY TRANSFORMER TO STARTUP TRANSFORMER I. Verify that startup transformers are powered from 115KV yard.

2. Insert sync check handle in BKR NO. 13 socket and turn ON.
3. Verify 4KV BUS NO. I is in phase with startup transformer.

CAUTION If bus and startup transformer are not In Phase, do not transfer.

4. CLOSE BKR NO. 13.
5. Check that BKR NO. 12 trips open when BKR NO. 13 switch is released.
6. Reset BKR NO. 12 amber light.
7. Turn sync check handle OFF and remove from socket.
8. Insert sync check handle in BKR NO. 23 socket and turn ON.
9. Verify 4KV BUS NO. 2 is in phase with startup transformer.

CAUTION If bus and startup transformer are not In Phase, do not transfer.

10. CLOSE BKR NO. 23.

1I. Check that BKR NO. 22 trips open when BKR NO. 23 switch is released.

12. Reset BKR NO. 22 amber light.
13. Turn sync check handle OFF and remove from socket.
a. Place sync check handle on CRP 9-8.

Completed by:

(Print/Sign) Date Reviewed by:

(Print/Sign) Date Appendix D OP 2142 Rev. 50 Page I of 1

2 e nonathnRowley-ie . .. . Page4 TO BACKFEED THROUGH THE AUXILIARY TRANSFORMER (OPENING THE GD-I DISCONNECT)

Jonathan, Roý4ey-- OP .2142 Vernon Tielco..Pdf Page 41 1 Page41*il T~ e Ico.pdf I JonaThan l~owIey UP 2142 Vernon

-

LINING UP TO BACKFEED THROUGH THE AUXILIARY TRANSFORMER (OPENING THE GD-I DISCONNECT) (Continued)

NOTE The GD-I Disconnect takes approximately 25 turns of the hand crank to open.

Perf. Ver.

Init Init

9. Locally, unlock and open the GD-I Disconnect.
10. Locally, lock open the GD-I Disconnect manual operator.

NOTE Additional lighting may be required to visually verify the GD-I Disconnect Contacts open.

1I. Locally, visually verify the contacts are open on all three phases of the GD-I Disconnect.

12. Reset/verify reset the following primary and backup generator lockout relays:
  • 86/G-P
  • 86/G-B i -
13. With concurrence from VELCO, perform the following:
a. Close the T-I MOD Motor Supply Switch
b. On CRP 9-7, Close T-l MOD.
c. Locally verify all three T-1 MOD blades closed.
d. Restore the ring bus per VELCO specified sequence. The following is provided as a guide:

I) Close 81 -IT ATB.

2) Close IT ATB.
3) Place the recloser switch for 81-IT to SYNC. CHECK.
4) Place the recloser switch for IT to INST.
14. When directed by the Shift Manager, energize Bus 1 (2) from the Auxiliary Transformer per OP 2142, Sect. C.

VYOPF 2142.01 OP 2142 Rev. 50

lco.pdf TieIe lco. Page 4~1 Jonathan Rowley --OP OP 2142 Vernon Ti 2142 Vernon Ipdf Pa ge'-4_-2_11 LINING UP TO BACKFEED THROUGH THE AUXILIARY TRANSFORMER (OPENING THE GD-1 DISCONNECT) (Continued)

15. If desired, Danger tag open the GD-I Disconnect switch.
16. If available, check in operation/place in operation the iso-phase bus cooling system fan and heater per RP 2193.

FINAL CONDITIONS I. Buses I and 2 are in service and being backfed from the main and auxiliary transformers with the generator no load disconnect switch, GD-I open.

REMARKS:

Performed by Operators (Print/Sign) Date Reviewed by:

Shift Manager (Print/Sign) Date VYOPF 2142.01 OP 2142 Rev. 50 Page 3 of 3