IR 05000302/2007301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:November 29, 2007 Mr. Richard Hons Training Manager Crystal River Nuclear Plant 8200 West Venable Street Crystal River, FL 34429 SUBJECT:EXAMINATION RESULTS SUMMARY - CRYSTAL RIVER NUCLEAR PLANT EXAMINATION REPORT NO. 05000302/2007301
{{#Wiki_filter:ber 29, 2007
 
==SUBJECT:==
EXAMINATION RESULTS SUMMARY - CRYSTAL RIVER NUCLEAR PLANT EXAMINATION REPORT NO. 05000302/2007301


==Dear Mr. Hons:==
==Dear Mr. Hons:==
This is to inform you of the individual examination results of the applicants that participatedin the initial examination conducted at your facility during the week of October 22, 2007. This complies with the intent of ES-501, Section E.1.a., NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9. Enclosure 1 is a copy of the Power Plant Examination Results Summary, Form ES-501-2,Rev. 9. Copies of the licenses for the individuals who passed the examination are includedas Enclosure 2. Included as Enclosure 3 are copies of the individual Operator LicensingExamination Report (Form ES-303-1) packages. This will enable you to evaluate the individual weaknesses and provide appropriate remedial training for those operators as necessary. It takes approximately 90 days to generate and process the operator license certificates. Region II encourages licensees to plan certificate presentation ceremonies for licensedoperators. Regional management will be available to participate in such ceremonies, if possible. Please call me at (404) 562-4550 to discuss your plans.
This is to inform you of the individual examination results of the applicants that participated in the initial examination conducted at your facility during the week of October 22, 2007. This complies with the intent of ES-501, Section E.1.a., NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.
 
Enclosure 1 is a copy of the Power Plant Examination Results Summary, Form ES-501-2, Rev. 9. Copies of the licenses for the individuals who passed the examination are included as Enclosure 2. Included as Enclosure 3 are copies of the individual Operator Licensing Examination Report (Form ES-303-1) packages. This will enable you to evaluate the individual weaknesses and provide appropriate remedial training for those operators as necessary.
 
It takes approximately 90 days to generate and process the operator license certificates.
 
Region II encourages licensees to plan certificate presentation ceremonies for licensed operators. Regional management will be available to participate in such ceremonies, if possible. Please call me at (404) 562-4550 to discuss your plans.


Sincerely,
Sincerely,
/ RA / Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket No.: 50-302License No.: DPR-72 Enclosures: 1. Examination Results Summary (ES-501-2) 2. Copies of Licenses 3. Individual Examination Packages (ES-303-1)  
/ RA /
Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72 Enclosures: 1. Examination Results Summary (ES-501-2)
2. Copies of Licenses 3. Individual Examination Packages (ES-303-1)


_______________________ OFFICERII:DRS RII:DRS SIGNATURERARANAMEMBATES:BTMWIDMANN DATE12/ /200712/ /2007 E-MAIL COPY? NO NO
_______________________
OFFICE  RII:DRS RII:DRS SIGNATURE  RA  RA NAME  MBATES:BTM WIDMANN DATE  12/ /2007 12/ /2007 E-MAIL COPY? NO NO
}}
}}

Latest revision as of 23:57, 22 November 2019

Oct 2007 Exam Summary Sheet Letter, IR 05000302-07-301
ML073460301
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/29/2007
From: Widmann M
Division of Reactor Safety II
To: Hons R
Florida Power Corp
References
IR-07-301
Download: ML073460301 (2)


Text

ber 29, 2007

SUBJECT:

EXAMINATION RESULTS SUMMARY - CRYSTAL RIVER NUCLEAR PLANT EXAMINATION REPORT NO. 05000302/2007301

Dear Mr. Hons:

This is to inform you of the individual examination results of the applicants that participated in the initial examination conducted at your facility during the week of October 22, 2007. This complies with the intent of ES-501, Section E.1.a., NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.

Enclosure 1 is a copy of the Power Plant Examination Results Summary, Form ES-501-2, Rev. 9. Copies of the licenses for the individuals who passed the examination are included as Enclosure 2. Included as Enclosure 3 are copies of the individual Operator Licensing Examination Report (Form ES-303-1) packages. This will enable you to evaluate the individual weaknesses and provide appropriate remedial training for those operators as necessary.

It takes approximately 90 days to generate and process the operator license certificates.

Region II encourages licensees to plan certificate presentation ceremonies for licensed operators. Regional management will be available to participate in such ceremonies, if possible. Please call me at (404) 562-4550 to discuss your plans.

Sincerely,

/ RA /

Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72 Enclosures: 1. Examination Results Summary (ES-501-2)

2. Copies of Licenses 3. Individual Examination Packages (ES-303-1)

_______________________

OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME MBATES:BTM WIDMANN DATE 12/ /2007 12/ /2007 E-MAIL COPY? NO NO