ML110310623: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:SOUTHERNCALIFOR N IA......EDISONA n EDI S O N INTER NATlONALCompa ny January 28, 2011Director,SpentFuel Project Office Office of Nuclear Material Safety and Safeguards U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Dougla s R.Bauder S ite VicePres id ent&S tation Manager S an Onofr e Nuclear Generating Stat ion10CFR 72.44(d)(3)
{{#Wiki_filter:SOUTHERN CA LIFO RNIA                                                        Douglas R. Bauder
...... EDISON                                                                            Site Vice President & Station Manager San Onofre Nuclear Generating Station An EDISON INT ERNATlONAL Compa ny 10 CFR 72.44(d)(3)
January 28, 2011 Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555


==Subject:==
==Subject:==
DocketNos.50-206,50-361,50
Docket Nos. 50-206, 50-361, 50-362, 72-41 Annual Radioactive Effluent Release Reportfor Independent Spent Fuel Storage Installation - 2010 San Onofre Nuclear Generation Station Units 1, 2 and 3
-362, 72-41 Annual Radioactive Effluent Release Reportfor Independent Spent Fuel Storage Installation-2010 San Onofre Nuclear Generation Station Units1,2and3


==DearSirorMadam:==
==Dear Sir or Madam:==


In accordancewith10CFR 72.44(d)(3) and Certificate of Compliance No.72-1029 , Amendments0and1 , Technical Specification Section 5.2.3(c), Southern Cal i fornia Edison(SCE)is providing the Annual Radioac tive Effluen t ReleaseReportfo rtheI ndependent Spent Fuel Storage Installation(ISFSI)atSan Onofre Nuclear Generating Station (SONGS).TheperiodofthereportisJa nuary1,2010 through December 31 , 2010.Thedry shielded canisters are double seal welded and designed to meetthecriteria of Interim Staff Guidance-18andthus prevent effluent releases.Inaddition
In accordance with 10 CFR 72.44(d)(3) and Certificate of Compliance No. 72-1029, Amendments 0 and 1, Technical Specification Section 5.2.3(c) , Southern California Edison (SCE) is providing the Annual Radioactive Effluen t Release Report for the Independent Spent Fuel Storage Installation (ISFSI) at San Onofre Nuclear Generating Station (SONGS).
,wehave completed in-process inspectionsandtestsduringthe fabrication a nd sealing o f the canisters in compliancewiththe amendments tothe Certificate of Compliance sta tedabove.Onthat basis , SCE i s reporting therewereno releases of principal radionuclides in liquidor gaseous effluentsfromthe SONGS ISFSI totheenv ironment i n 2010.Ifyourequire additional informa tion , please contactMr.RyanI.Treadway at (949)368-9985.cc:ElmoE.Collins ,NRCRegional Administrator
The period of the report is January 1, 2010 through December 31, 2010 .
,RegionIVJ.C.Shepherd , NRC Project Manager , SONGS Un it 1G.G.Warnick , NRC Senior Reside nt Inspector , SONGSUnits2and3 C.M.Staab, NRC Project Manager, SONGS ISFSI P.O.Box128 S an C lemente, CA 92672(949)368-9275PAX89275 Fax:(949)368-9881 Doug.Bauder@sce.com}}
The dry shielded canisters are double seal welded and designed to meet the criteria of Interim Staff Guidance-18 and thus prevent effluent releases . In addition , we have completed in-process inspections and tests during the fabrication and sealing of the canisters in compliance with the amendments to the Certificate of Compliance stated above. On that basis , SCE is reporting there were no releases of principal radionuclides in liquid or gaseous effluents from the SONGS ISFSI to the environment in 2010.
If you require additional information , please contact Mr. Ryan I. Treadway at (949) 368-9985.
cc:       Elmo E. Collins, NRC Regional Administrator, Region IV J. C. Shepherd, NRC Project Manager, SONGS Unit 1 G. G. Warnick, NRC Senior Reside nt Inspector, SONGS Units 2 and 3 C. M. Staab , NRC Project Manager, SONGS ISFSI P.O. Box 128 San Clemente, CA 92672 (949) 368-9275 PAX 89275 Fax: (949) 368-9881 Doug .Bauder@sce.com}}

Latest revision as of 04:04, 13 November 2019

Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2010
ML110310623
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/28/2011
From: Bauder D
Edison International Co, Southern California Edison Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
Download: ML110310623 (1)


Text

SOUTHERN CA LIFO RNIA Douglas R. Bauder

...... EDISON Site Vice President & Station Manager San Onofre Nuclear Generating Station An EDISON INT ERNATlONAL Compa ny 10 CFR 72.44(d)(3)

January 28, 2011 Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket Nos. 50-206, 50-361, 50-362, 72-41 Annual Radioactive Effluent Release Reportfor Independent Spent Fuel Storage Installation - 2010 San Onofre Nuclear Generation Station Units 1, 2 and 3

Dear Sir or Madam:

In accordance with 10 CFR 72.44(d)(3) and Certificate of Compliance No. 72-1029, Amendments 0 and 1, Technical Specification Section 5.2.3(c) , Southern California Edison (SCE) is providing the Annual Radioactive Effluen t Release Report for the Independent Spent Fuel Storage Installation (ISFSI) at San Onofre Nuclear Generating Station (SONGS).

The period of the report is January 1, 2010 through December 31, 2010 .

The dry shielded canisters are double seal welded and designed to meet the criteria of Interim Staff Guidance-18 and thus prevent effluent releases . In addition , we have completed in-process inspections and tests during the fabrication and sealing of the canisters in compliance with the amendments to the Certificate of Compliance stated above. On that basis , SCE is reporting there were no releases of principal radionuclides in liquid or gaseous effluents from the SONGS ISFSI to the environment in 2010.

If you require additional information , please contact Mr. Ryan I. Treadway at (949) 368-9985.

cc: Elmo E. Collins, NRC Regional Administrator, Region IV J. C. Shepherd, NRC Project Manager, SONGS Unit 1 G. G. Warnick, NRC Senior Reside nt Inspector, SONGS Units 2 and 3 C. M. Staab , NRC Project Manager, SONGS ISFSI P.O. Box 128 San Clemente, CA 92672 (949) 368-9275 PAX 89275 Fax: (949) 368-9881 Doug .Bauder@sce.com