{{#Wiki_filter:OFFICIAL USE ONLY  
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
- SECURITY-RELATED INFORMATION
                                          UNITED STATES
  "Enclosure transmitted herewith contains SUNSI.  When separated from Attachment 1 to
                          NUCLEAR REGULATORY COMMISSION
the Enclosure, this transmittal document is decontrolled."
                                              REGION IV
OFFICIAL USE ONLY
                                          1600 E LAMAR BLVD
- SECURITY-RELATED INFORMATION
                                      ARLINGTON, TX 76011-4511
  January 30, 2015  
                                        January 30, 2015
 
Mr. Dennis L. Koehl
   President and CEO/CNO
Mr. Dennis L. Koehl  
STP Nuclear Operating Company
   President and CEO/CNO  
PO Box 289
STP Nuclear Operating Company PO Box 289 Wadsworth, TX 77483-0289   
Wadsworth, TX 77483-0289
SUBJECT:        SOUTH TEXAS PROJECT, UNITS 1 and 2 - NRC PROBLEM IDENTIFICATION
                AND RESOLUTION INSPECTION REPORT 05000498/2014010;
                05000499/2014010
Dear Mr. Koehl:
On December 4, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite
portion of the problem identification and resolution biennial inspection at the South Texas
Project. On that day, the NRC inspection team discussed the results of this inspection with
Mr. D. Rencurrel, Senior Vice President Operations, and other members of your staff. This
discussion included a finding for which the NRC had not yet reached a significance
determination. On December 18, 2014, the inspection team had completed its review and
provided Mr. D. Rencurrel, and other members of your staff, the results of a detailed risk
evaluation telephonically. The inspection team documented the results of this inspection in the
enclosed inspection report.
Based on the inspection sample, the inspection team determined that South Texas Projects
corrective action program, and your staffs implementation of it were adequate to support
nuclear safety.
In reviewing your corrective action program, the team assessed how well your staff identified
problems at a low threshold, your staffs implementation of the stations process for prioritizing
and evaluating these problems, and the effectiveness of corrective actions taken by the station
to resolve these problems. The team also evaluated other processes your staff used to identify
issues for resolution. These included your use of audits and self-assessments to identify latent
problems and your incorporation of lessons learned from industry operating experience into
station programs, processes, and procedures. The team determined that your stations
performance in each of these areas supported nuclear safety.
  Enclosure transmitted herewith contains SUNSI. When separated from Attachment 1 to
                  the Enclosure, this transmittal document is decontrolled.
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 and 2 - NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000498/2014010;
D. Koehl                                          -2-
05000499/2014010
Finally, the team determined that your stations management maintained a safety-conscious
Dear Mr. Koehl:   On December 4, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite portion of the problem identification and resolution biennial inspection at the South Texas
work environment in which your employees were willing to raise nuclear safety concerns
through at least one of the several means available.
Nuclear Regulatory Commission inspectors documented one security finding of very low
security significance (Green) in Attachment 1 to the enclosed report. This finding involved a
violation of Nuclear Regulatory Commission requirements. The Nuclear Regulatory
Commission is treating this violation as a non-cited violation consistent with Section 2.3.2.a of
the Enforcement Policy. The deficiency was promptly addressed and the plant complied with
applicable physical protection and security prior to the inspectors leaving the site. The finding
has a cross-cutting aspect in the human performance area associated with complacency in that
security force personnel did not implement appropriate error reduction tools due to the repetitive
nature of the activities and the expectation of successful outcomes (H.12).
Further, the inspectors also documented one licensee-identified violation determined to be of
very low safety significance in this report. The NRC is also treating this violation as a non-cited
violation consistent with Section 2.3.2.a of the NRC Enforcement Policy.
If you contest the violations or their significance, you should provide a response within 30 days
of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with
copies to the Regional Administrator, Region IV; the Director, Office of Enforcement,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident
inspector at the South Texas Project Electric Generating Station, Units 1 and 2, facility.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a
response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the Regional Administrator, Region IV; and to the NRC resident inspector at
the South Texas Project Electric Generating Station, Units 1 and 2, facility.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, a copy of this letter, and its enclosure (with
the exception stated below) will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Some of the material contained in the enclosed report therein contains Security-Related
Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized
individuals could present a security vulnerability. Therefore, the material in Attachment 1 to the
enclosure will not be made available electronically for public inspection in the NRC Public
Document Room or from the PARS component of NRC's ADAMS.
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


Project.  On that day, the NRC inspection team di
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
scussed the results of this inspection with Mr. D. Rencurrel, Senior Vice President Operations, and other members of your staff. This
D. Koehl                                        -3-
discussion included a finding for which the NRC had not yet reached a significance
If you choose to provide a response and Security-Related Information is necessary to provide
determination. On December 18, 2014, the inspection team had completed its review and provided Mr. D. Rencurrel, and other members of your staff, the results of a detailed risk
an acceptable response, please mark your entire response Security-Related Information -
evaluation telephonically. The inspection team documented the results of this inspection in the
Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)
enclosed inspection report.  
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with
10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
                                                  Sincerely,
                                                  /RA/
                                                  Geoffrey B. Miller, Chief
                                                  Technical Support Branch
                                                  Division of Reactor Safety
Docket Nos. 50-498, 50-499
License Nos. NPF-76, NPF-80
Nonpublic Enclosure:
Inspection Report 05000498/2014010; 05000499/2014010
  w/Attachments:
1. Security-Related Supplement
2. Supplemental Information
3. Information Request
cc w/Enclosure:
Mr. John Milliff
Manager, Security
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483
Distribution for South Texas Project Electric Generating Station
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


Based on the inspection sample, the inspection team determined that South Texas Project's corrective action program, and your staff's implementation of it were adequate to support nuclear safety.  
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
                                SUPPLEMENTAL INFORMATION
                                  KEY POINTS OF CONTACT
Licensee Personnel
D. Abell, Performance Improvement Specialist
R. Aguilera, Manager, Health Physics
J. Atkins, Manager, Systems Engineering
R. Barr, Supervisor, Corrective Action Program
M. Berg, Manager, Design Engineering/Test & Programs
C. T. Bowman, General Manager, Nuclear Oversight
D. Caraballo, System Engineer
J. Crain, Manager, Emergency Response Plant Protection Department Support
M. Crutcher, System Engineer
R. Dunn Jr, Manager, Nuclear Fuel & Analysis
M. Farmer, Security System Engineer
T. Frawley, Manager, Plant Protection/Emergency Response
C. Gann, Manager, Employee Concerns Program
M. Gandt, Engineer, Nuclear Steam Supply Systems
R. Gubbs, Manager, Operations Division-Production Support
A. Hasan, System Engineer
J. Heil, Program Engineer
L. Huerta, Supervisor, Security Training
G. Hildebrandt, Manager, Operations
B. Jenewein, Manager, Performance Improvement
L. Knox, Security Compliance Specialist
R. Lonazo, System Engineer
L. Meier, Project Manager, Regulated Security Solutions
A. McGalliard, Manager, Corporate Staff Support & Owner Liaison
J. Milliff, Manager, Security
M. Murray, Manager, Regulatory Affairs/Licensing
G. Powell, Site Vice President
D. Rencurrel, Senior Vice President Operations
P. Rodgers, System Engineer
R. Savage, Licensing Engineering Specialist
R. Scarborough, Manager, Quality Assurance
M. Schaefer, Plant General Manager
R. Stastny, Manager, Maintenance
L. Sterling, Supervisor, Licensing
T. Upton, Technical Supervisor, Maintenance
M. Uribe, Manager, Work Control
T. Vajdos, System Engineer
D. Whiddon, Supervisor, Quality
J. Winters, Lead Investigator
D. Zink, Supervisor, Engineering Specialist
NRC Personnel
N. Hernandez, Resident Inspector
G. Miller, Chief, Technical Support Branch
G. Replogle, Senior Reactor Analyst
                                              A2-1                        Attachment 2
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
In reviewing your corrective action program, t
                    LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
he team assessed how well your staff identified problems at a low threshold, your staff's implementation of the station's process for prioritizing and evaluating these problems, and the effectiveness of corrective actions taken by the station to resolve these problems.  The team also evaluated other processes your staff used to identify issues for resolution.  These included your use of audits and self-assessments to identify latent
Opened and Closed
problems and your incorporation of lessons learned from industry operating experience into station programs, processes, and procedures.  The team determined that your station's performance in each of these areas supported nuclear safety.
05000498/2014010-01        NCV Failure to Follow Security Procedure
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 
05000499/2014010-01
OFFICIAL USE ONLY
Closed
- SECURITY-RELATED INFORMATION
05000499/2014-001-00 LER Standby Diesel Generator 23 Essential Cooling Water Leak
  D. Koehl - 2 -
                                Through the Wall of Aluminum-Bronze Pipe Nipple
  OFFICIAL USE ONLY
                              LIST OF DOCUMENTS REVIEWED
- SECURITY-RELATED INFORMATION
Condition Reports
Finally, the team determined that your stat
08-16140            09-387                09-1736          09-4465          09-5524
ion's management maintained a safety-conscious
09-6591            09-6949              09-8195          09-9594          09-9986
work environment in which your employees were willing to raise nuclear safety concerns through at least one of the several means available. 
09-11422            09-13142              09-14961        09-16144        09-16155
09-16366            09-18746              09-20129        09-21177        10-227
Nuclear Regulatory Commission inspectors documented one security
10-302              10-321                10-543          10-4928          10-6359
finding of very low security significance (Green) in Attachment 1 to the enclosed report.  This finding involved a
10-10425            10-25855              11-483          11-771          11-3584
violation of Nuclear Regulatory Commission requirements.  The Nuclear Regulatory Commission is treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.  The deficiency was promptly addressed and the plant complied with
11-3756            11-3908              11-4895          11-12020        11-15707
applicable physical protection and security prior to the inspectors leaving the site.  The finding
11-19073            11-21271              11-21275        11-26455        11-27182
has a cross-cutting aspect in the human performance area associated with complacency in that
12-483              12-13560              12-14431        12-22937        12-23535
security force personnel did not implement appropriate error reduction tools due to the repetitive nature of the activities and the expectation of successful outcomes (H.12). 
12-24501            12-26558              12-27023        12-27493        12-27569
Further, the inspectors also documented
12-27648            12-28135              12-28186        12-28283        12-28600
one licensee-identified violation determined to be of very low safety significance in this report.  The NRC is also treating this violation as a non-cited violation consistent with Section 2.3.2.a of the NRC Enforcement Policy. 
12-28689            12-28901              12-29159        12-29161        12-31703
13-102              13-103                13-285          13-317          13-325
13-568              13-2311              13-2551          13-2611          13-3161
13-4566            13-5188              13-6031          13-6145          13-6543
13-7209            13-8786              13-8855          13-8957          13-9440
13-9648            13-9844              13-9932          13-10831        13-10896
13-10898            13-10902              13-10949        13-11358        13-11380
13-11528            13-11729              13-13857        13-15806        13-15904
14-22808*          14-23546*            14-25242*        14-62            14-298
14-514              14-518                14-747          14-1374          14-1712
14-2040            14-3306              14-3686          14-4235          14-4488
14-4501            14-4517              14-4650          14-4762          14-4895
14-5066            14-5383              14-6318          14-7054          14-7985
14-8012            14-8022              14-8213          14-9152          14-9634
14-9637            14-9939              14-11207        14-11266        14-13030
14-13247            14-13252              14-13314        14-13674        14-13925
14-17123            14-17723              14-18263        14-19793        14-20710
14-22328            14-22507              14-22532        14-22639        14-22811
14-22901            14-22976              14-24843        14-25164        14-72222
*Issued as a result of inspection activities.
                                                A2-2
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


If you contest the violations or their significance, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear  
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Regulatory Commission, ATTN: Document Control Desk, Washington,  DC 20555-0001; with
Drawings
copies to the Regional Administrator, Region IV; the Director, Office of Enforcement,
Number          Title                                                Revision
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident
00009E0DJAB,     Single Line Diagram, 125V DC Class 1E Distribution  22
inspector at the South Texas Project Electric Generating Station, Units 1 and 2, facility.  
Sheet 1          Switchboard, E1D11 (Channel II)
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your
Miscellaneous Documents
Number    Title                                                      Revision/
                                                                      Date
          Life Cycle Management Plan: Rod Control System
          Life Cycle Management Plan: Nuclear Instrumentation System
          Life Cycle management Plan: Qualified Display Processing
          System
          Solid State Protection System Health Report                September 30,
                                                                      2014
          Nuclear Instrumentation System Health Report                September 30,
                                                                      2014
          7300 Processor Support System Health Report                September 30,
                                                                      2014
          Qualified Display Processing System Health Report          September 30,
                                                                      2014
          STP Security System Health Report                          September 25,
                                                                      2014
          Executive Oversight Board                                  March 2013
                                                                      June 2103
                                                                      November
                                                                      2013
                                                                      January 2014
                                                                      May 2014
                                                                      October 2014
          STP Reporting Manual                                        11
          Requal Qualification Checkout Card (RQCC) No. 2164: Conduct
          Personnel Search
                                            A2-3
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


disagreement, to the Regional Administrator, Region IV; and to the NRC resident inspector at the South Texas Project Electric Generating Station, Units 1 and 2, facility.  
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," a copy of this letter, and its enclosure (with
Miscellaneous Documents
the exception stated below) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at
Number    Title                                                            Revision/
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
                                                                          Date
Reading Room).   
          Requal Qualification Checkout Card (RQCC) No. 2165: Perform
          Material Search
          Plan of Action: Increased Trend of NRC Performance Indicator    March 24,
                                                                          2014
          Physical Security Quality Audit Reports                          October 10,
                                                                          2012
                                                                          September 18,
                                                                          2013
                                                                          September 11,
                                                                          2014
          Safeguards Event Log
          Conduct of Operations for Radiation Protection - Chapter 9,     15
          Radiation Protection Condition Reporting Guideline
          Conduct of Operations for Radiation Protection - Chapter 22, RP
          Observations Program
          High and Low Head Safety Injection Pumps In-Service Testing      July 2009
          Trend for Units 1 and 2                                          through
                                                                          September
                                                                          2014
13-01    Emergency Preparedness Quality Audit Report                      March 11,
                                                                          2013
13-04    Corrective Action Program Supplemental Quality Audit Report      July 9, 2013
13-05    Maintenance Quality Control Audit Report                        August 7,
                                                                          2013
14-01    Emergency Preparedness Quality Audit Report                      March 12,
                                                                          2014
14-02    Radiological Controls Quality Audit Report                      March 31,
                                                                          2014
14-03    Testing and Programs Quality Audit Report                        June 4, 2014
                                            A2-4
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Some of the material contained in the enclosed report therein contains Security-Related
Miscellaneous Documents
Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.  Therefore, the material in Attachment 1 to the
Number    Title                                                                Revision/
enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS.   
                                                                                Date
MN-14-    Quality Monitoring Report                                            November 13,
9-                                                                              2014
103668
Preventive Maintenance Tasks
PM 1336                      PM 1337                  PM 1341                PM1342
Procedure
Number      Title                                                                Revision
0PGP03-      Fluid Leak Management Program                                        3
ZA-0133
0PGP03-      RCS Pressure Boundary Inspection for Boric Acid Leaks                9
ZE-0033
0PGP03-      Boric Acid Corrosion Program                                          8
ZE-0133
0PGP03-      Installed Plant Instrumentation Calibration Verification Program      25
ZM-0016
0PGP03-      Operational Decision-Making                                          4
ZO-0054
0PGP03-      Operability Determination and Functionality Assessments Program      6
ZO-9900
0PGP03-      Operability Determinations and Functionality Assessments Program      6
ZO-9900
0PGP03-      Operability Determinations and Functionality Assessments              4
ZO-900A
0PGP03-      Condition Reporting Process                                          50
ZX-0002
0PGP03-      CAQ Resolution Process                                                4
ZX-002A
0PGP03-      Station Cause Analysis Program                                        5
ZX-002B
                                              A2-5
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


 
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY  
Procedure
- SECURITY-RELATED INFORMATION
Number      Title                                                      Revision
  D. Koehl - 3 - OFFICIAL USE ONLY
0PGP03-     Conditions Not Adverse to Quality (CNAQ) Resolution Process
- SECURITY-RELATED INFORMATION
ZX-0008
If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).  In accordance with
0PGP05-     NRC Inspection / Interface Activities
ZN-0009
0POP01-    Operability, Functionality, and Reportaility Guidance      9
ZO-0011
0POP01-     Operability, Functionality, and Reportability Guidance      9
ZO-0011
0PSP03-     Auxiliary Feedwater Pump 11(21) Inservice Test              35
AF-0001
0PSP03-    Auxiliary Feedwater Pump 14(24) Inservice Test              44
AF-0007
Security    Security Incidents                                          6
Instruction
1005
Security    Access Control                                              22
Instruction
2101
SEG-0008    Printed Circuit Board Maintenance and Replacement Guideline
SG-005      Performing and Documenting Evaluations
WCG-003    Planners Guide                                            36
                                              A2-6
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


10 CFR 2.390(b)(1)(ii), the NRC is waiving the
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
affidavit requirements for your response.
Work Orders
Sincerely,  /RA/
32580862        32848449      33587688      33781745
32592449        32857451      33587766      33784486
32592456        32874207      33603766      33806141
Geoffrey B. Miller, Chief
32622205        32874237      33616204      33810329
Technical Support Branch
32657597        32906926      33617639      33816256
Division of Reactor Safety
32657618        32951496      33639146      33836230
32683168        32954403      33639164      33842544
Docket Nos.  50-498, 50-499
32746542        33028547      33639483      33851931
32747151        33196159      33659703      33878328
32748096        33211839      33659705      33898174
32762817        33254140      33663496      33910719
32764187        33329299      33689554      33913974
32789036        33389559      33689584      33950398
32819905        33525272      33697080      33959688
32819981        33559632      33724501      33959970
32823335        33559717      33724526      484418
32848427        33570188      33759248
                            A2-7
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


License NosNPF-76, NPF-80
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
                                        Information Request
                                            June 26, 2014
                  Biennial Problem Identification and Resolution Inspection -
                                November 17 - December 5, 2014
                                        South Texas Project
                Inspection Report Number 05000498/2014010, 050499/2014010
This inspection will cover the period from October 7, 2012, through the end of the inspection on
December 5, 2014. All requested information should be limited to this period or to the date of
the request unless otherwise specified. To the extent possible, provide the requested
information electronically in Adobe PDF (preferred) or Microsoft Office format. Provide paper
copies of any sensitive information during the teams first week on site; do not provide sensitive
or proprietary information electronically.
Lists of documents (summary lists) should be provided in Microsoft Excel or a similar sortable
format. Please provide the information on a compact disc (one for each team member), if
possible. This information may also be uploaded on the Certrec IMS website if so desired.
Please provide the following no later than October 10, 2014:
1. Document Lists
    Note: For these summary lists, please include the document/reference number, the
    document title or description of the issue, the priority, initiation date, status, and long text
    descriptions of the issues.
    a. Summary list of all corrective action documents related to significant conditions adverse
        to quality that were opened, closed, or evaluated during the period
    b. Summary list of all corrective action documents related to conditions adverse to quality
        that were opened or closed during the period
    c. Summary lists of all corrective action documents which were upgraded or downgraded in
        priority/significance during the period
    d. Summary list of all corrective action documents that subsume or roll up one or more
        smaller issues for the period
    e. Summary lists of operator workarounds, engineering review requests and/or operability
        evaluations, temporary modifications, and control room and safety system deficiencies
        opened, closed, or evaluated during the period
    fSummary list of plant safety issues raised or addressed by the Employee Concerns
        Program (or equivalent)
    g. Summary list of all Apparent Cause Evaluations completed during the period
    h. Summary list of all Root Cause Evaluations planned or in progress, but not complete at
        the end of the period
                                                A3-1                                      Attachment 3
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


Nonpublic Enclosure:  Inspection Report 05000498/2014010; 05000499/2014010 
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
  w/Attachments:   
2. Full Documents with Attachments
1. Security-Related Supplement
  a. Root Cause Evaluations completed during the period
2. Supplemental Information  
  b. Quality assurance audits performed during the period
3. Information Request
  c. All audits/surveillances performed during the period of the Corrective Action Program, of
 
      individual corrective actions, and of cause evaluations
  d. Corrective action activity reports, functional area self-assessments, and non-NRC third
cc w/Enclosure:   
      party assessments completed during the period (do not include INPO assessments)
Mr. John Milliff
  e. Corrective action documents generated during the period for the following:
Manager, Security STP Nuclear Operating Company
      i.   All Cited and Non-Cited Violations Issued to South Texas Project
P.O. Box 289
      ii. All Licensee Event Reports Issued by South Texas Project
Wadsworth, TX  77483
  f. Corrective action documents generated for the following, if they were determined to be
      applicable to South Texas Project (for those that were evaluated but determined not to
      be applicable, provide a summary list):
      i.   NRC Information Notices, Bulletins, and Generic Letters issued or evaluated during
            the period
      ii. Part 21 reports issued or evaluated during the period
      iii. Vendor safety information letters (or equivalent) issued or evaluated during the
            period
      iv. Other external events and/or Operating Experience evaluated for applicability during
            the period
  g. Corrective action documents generated for the following:
      i.   Emergency planning drills and tabletop exercises performed during the period
      ii. Maintenance preventable functional failures which occurred or were evaluated during
            the period
      iii. Adverse trends in equipment, processes, procedures, or programs which were
            evaluated during the period
      iv. Action items generated or addressed by plant safety review committees during the
            period
                                                A3-2
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


Distribution for South Texas Project Electric Generating Station 
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
3. Logs and Reports
 
  a. Corrective action performance trending/tracking information generated during the period
OFFICIAL USE ONLY  
      and broken down by functional organization
- SECURITY-RELATED INFORMATION
  b. Corrective action effectiveness review reports generated during the period
    A2-1 Attachment 2
  c. Current system health reports or similar information
  d. Radiation protection event logs during the period
  e. Security event logs and security incidents during the period (sensitive information can be
      provided by hard copy during first week on site)
  f. Employee Concern Program (or equivalent) logs (sensitive information can be provided
      by hard copy during first week on site)
  g. List of Training deficiencies, requests for training improvements, and simulator
      deficiencies for the period
4. Procedures
  a. Corrective action program procedures (initiation, evaluation, classification, and
      disposition of conditions adverse to quality). Include operability determination
      procedures, root and apparent cause evaluation procedures and any other procedures
      that implement the corrective action program
  b. Maintenance rule program and implementing procedures
  c. Operating experience program
  d. Employee concerns program
  e. Self-assessment program
  f. Degraded/non-conforming condition process (e.g., RIS 2005-20)
  g. System Health process or equivalent equipment reliability improvement programs
  h. Operational Decision Making (ODMI) process
5. Other Items
  a. Scheduled date/time/location of all meetings associated with implementation of the
      corrective action program, such as screening meetings, corrective action review board
      meetings, etc.
                                              A3-3
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


OFFICIAL USE ONLY  
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
- SECURITY-RELATED INFORMATION
     b. A list of condition reports generated as a result of identified trends. The list should
SUPPLEMENTAL INFORMATION
        be sorted by priority and have the following information: number, title/description,
  KEY POINTS OF CONTACT
        date initiated, status, and initiating department.
  Licensee Personnel      
    c. A list of outstanding corrective actions, sorted by priority, with the following information:
D. Abell, Performance Improvement Specialist
        number; priority; system/component affected, initiating date and due date. Please also
R. Aguilera, Manager, Health Physics
        identify and list any associated due date extensions.
J. Atkins, Manager, Systems Engineering R. Barr, Supervisor, Corrective Action Program M. Berg, Manager, Design Engineering/Test & Programs
    d. A chronological list of all nuclear Quality Assurance/Nuclear Oversight audits and
C. T. Bowman, General Manager, Nuclear Oversight  
        department/station self-assessments including their reference number.
D. Caraballo, System Engineer
    e. A list of all system health reports.
J. Crain, Manager, Emergency Response Plant Protection Department Support M. Crutcher, System Engineer R. Dunn Jr, Manager, Nuclear Fuel & Analysis
    f.  All copy of assessments or evaluations (internal or external) regarding station or
M. Farmer, Security System Engineer
        department safety-culture.
T. Frawley, Manager, Plant Protection/Emergency Response
    g. A list of all operability determinations and ODMIs performed with the following
C. Gann, Manager, Employee Concerns Program M. Gandt, Engineer, Nuclear Steam Supply Systems R. Gubbs, Manager, Operations Division-Production Support
        information: date initiated, initiating CR and status (open or closed).
A. Hasan, System Engineer
    h. A list of maintenance preventable functional failures (MPFFs) of risk-significant systems
J. Heil, Program Engineer
        (include actions completed and current status). A list of current Maintenance Rule a(1)
        systems and a list of those systems that entered a(1) within the last two years, but which
        were returned to a(2) status. Include a copy of the current system health report for those
        systems now in a(1).
    i.  Copy of the latest corrective action program statistics such as the number initiated by
        department, human performance errors by department, backlog, corrective action
        timeliness and others as may be available.
    j.  List of industry operating experience evaluated by the site and associated condition
        report number if applicable. Additionally, list of all NRC generic communications
        (information notices, generic letters, etc.) evaluated by the site for applicability to the
        station regardless of the determination of applicability.
    k. A chronological list of all Licensee Event Reports, with a brief description of the affected
        components or systems.
    l. A listing of the top 10 risk-significant systems, components, and/or operator manual
        actions as appropriate.
Please provided on CDs and/or DVDs sent via overnight carrier to:
U.S. NRC Region IV
1600 E. Lamar Blvd.
Arlington, TX 76011-4511
Attention: Harry Freeman
Please note that the NRC is not currently able to accept electronic documents on thumb drives
or other similar digital media.
                                                  A3-4
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


L. Huerta, Supervisor, Security Training
G. Hildebrandt, Manager, Operations B. Jenewein, Manager, Performance Improvement L. Knox, Security Compliance Specialist
R. Lonazo, System Engineer


L. Meier, Project Manager, Regulated Security Solutions
  ML15030A494
A. McGalliard, Manager, Corporate Staff Support & Owner Liaison J. Milliff, Manager, Security M. Murray, Manager, Regulatory Affairs/Licensing
Entire Report           ADAMS:             Publicly Available             Non-Sensitive Keyword
G. Powell, Site Vice President
  SUNSI Review           Yes No         Non-Publicly Available         Sensitive     MD 3.4 Non-Public A.3
D. Rencurrel, Senior Vice President Operations
By: HAF
P. Rodgers, System Engineer
Cover Letter             ADAMS:             Publicly Available             Non-Sensitive Keyword
R. Savage, Licensing Engineering Specialist R. Scarborough, Manager, Quality Assurance M. Schaefer, Plant General Manager
  SUNSI Review           Yes No         Non-Publicly Available         Sensitive     RGN-002
R. Stastny, Manager, Maintenance
By: HAF
L. Sterling, Supervisor, Licensing
OFFICE           SRI:TSB         RI:EB2             HP:TSB             SRI:DRP                       C:TSB
T. Upton, Technical Supervisor, Maintenance M. Uribe, Manager, Work Control T. Vajdos, System Engineer
NAME             HFreeman       SAlferink           BBaca             ASanchez                       GMiller/DAllen
D. Whiddon, Supervisor, Quality
SIGNATURE         /RA/           /RA/               /RA/               /RA/                           /RA/
J. Winters, Lead Investigator
DATE             1/28/15         1/29/15             1/28/15           1/29/15                       1/30/15
D. Zink, Supervisor, Engineering Specialist
                                             
 
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
NRC Personnel
Letter to Dennis L. Koehl from Geoffrey B. Miller, dated January 30, 2015
 
SUBJECT:       SOUTH TEXAS PROJECT, UNITS 1 & 2 - NRC PROBLEM IDENTIFICATION
N. Hernandez, Resident Inspector
                AND RESOLUTION INSPECTION REPORT 05000498/2014010;
G. Miller, Chief, Technical Support Branch
                05000499/2014010
G. Replogle, Senior Reactor Analyst 
Distribution by RIV w/Nonpublic Enclosure:
OFFICIAL USE ONLY
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
- SECURITY-RELATED INFORMATION
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
    A2-2 
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
OFFICIAL USE ONLY
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
- SECURITY-RELATED INFORMATION
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
  Opened and Closed
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)
05000498/2014010-01
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
05000499/2014010-01 NCV Failure to Follow Security Procedure 
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Closed 05000499/2014-001-00 LER Standby Diesel Generator 23 Essential Cooling Water Leak Through the Wall of Aluminum-Bronze Pipe Nipple
Distribution by RIV w/Public Enclosure:
  LIST OF DOCUMENTS REVIEWED
Regional Administrator (Marc.Dapas@nrc.gov)
  Condition Reports
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
08-16140 09-387 09-1736 09-4465 09-5524 09-6591 09-6949 09-8195 09-9594 09-9986
Acting DRP Director (Troy.Pruett@nrc.gov)
09-11422 09-13142 09-14961 09-16144 09-16155 09-16366 09-18746 09-20129 09-21177 10-227 10-302 10-321 10-543 10-4928 10-6359
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
10-10425 10-25855 11-483 11-771 11-3584
DRS Director (Anton.Vegel@nrc.gov)
11-3756 11-3908 11-4895 11-12020 11-15707
DRS Deputy Director (Jeff.Clark@nrc.gov)
11-19073 11-21271 11-21275 11-26455 11-27182 12-483 12-13560 12-14431 12-22937 12-23535 12-24501 12-26558 12-27023 12-27493 12-27569
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
12-27648 12-28135 12-28186 12-28283 12-28600
Resident Inspector (Nicholas.Hernandez@nrc.gov)
12-28689 12-28901 12-29159 12-29161 12-31703
Branch Chief, DRP (Neil.OKeefe@nrc.gov)
13-102 13-103 13-285 13-317 13-325 13-568 13-2311 13-2551 13-2611 13-3161 13-4566 13-5188 13-6031 13-6145 13-6543
Senior Project Engineer, DRP (David.Proulx@nrc.gov)
13-7209 13-8786 13-8855 13-8957 13-9440
Project Engineer, DRP (Fabian.Thomas@nrc.gov)
13-9648 13-9844 13-9932 13-10831 13-10896
Administrative Assistant (Lynn.Wright@nrc.gov)
13-10898 13-10902 13-10949 13-11358 13-11380 13-11528 13-11729 13-13857 13-15806 13-15904 14-22808* 14-23546* 14-25242* 14-62 14-298
Public Affairs Officer (Victor.Dricks@nrc.gov)
14-514 14-518 14-747 14-1374 14-1712
Public Affairs Officer (Lara.Uselding@nrc.gov)
14-2040 14-3306 14-3686 14-4235 14-4488
Project Manager (Balwant.Singal@nrc.gov)
14-4501 14-4517 14-4650 14-4762 14-4895 14-5066 14-5383 14-6318 14-7054 14-7985 14-8012 14-8022 14-8213 14-9152 14-9634
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
14-9637 14-9939 14-11207 14-11266 14-13030
RITS Coordinator (Marisa.Herrera@nrc.gov)
14-13247 14-13252 14-13314 14-13674 14-13925
ACES (R4Enforcement.Resource@nrc.gov)
14-17123 14-17723 14-18263 14-19793 14-20710 14-22328 14-22507 14-22532 14-22639 14-22811 14-22901 14-22976 14-24843 14-25164 14-72222 *Issued as a result of inspection activities.       
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
 
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OFFICIAL USE ONLY
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
- SECURITY-RELATED INFORMATION
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
    A2-3 
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
Drawings  Number Title Revision 00009E0DJAB, Sheet 1 Single Line Diagram, 125V DC Class 1E Distribution Switchboard, E1D11 (Channel II)
22  Miscellaneous Documents
  Number Title Revision/
Date  Life Cycle Management Plan:  Rod Control System 
Life Cycle Management Plan:  Nuclear Instrumentation System 
Life Cycle management Plan:  Qualified Display Processing
System  Solid State Protection System Health Report                                September 30, 2014  Nuclear Instrumentation System Health Report September 30, 2014  7300 Processor Support System Health Report September 30, 2014  Qualified Display Processing System Health Report September 30, 2014  STP Security System Health Report September 25, 2014  Executive Oversight Board  March 2013 June 2103 November 2013 January 2014
May 2014
October 2014  STP Reporting Manual 11  Requal Qualification Checkout Card (RQCC) No. 2164: Conduct
Personnel Search
 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
    A2-4 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
Miscellaneous Documents
  Number Title Revision/
Date  Requal Qualification Checkout Card (RQCC) No. 2165: Perform
Material Search
  Plan of Action:  Increased Trend of NRC Performance Indicator March 24, 2014  Physical Security Quality Audit Reports October 10, 2012 September 18, 2013 September 11, 2014  Safeguards Event Log  Conduct of Operations for Radiation Protection - Chapter 9, "Radiation Protection Condition Reporting Guideline"
15  Conduct of Operations for Radiation Protection - Chapter 22, "RP
Observations Program"
  High and Low Head Safety Injection Pumps In-Service Testing Trend for Units 1 and 2
July 2009
through September
 
2014 13-01 Emergency Preparedness Quality Audit Report March 11, 2013 13-04 Corrective Action Program Supplemental Quality Audit Report July 9, 2013 13-05 Maintenance Quality Control Audit Report August 7, 2013 14-01 Emergency Preparedness Quality Audit Report March 12, 2014 14-02 Radiological Controls Quality Audit Report March 31, 2014 14-03 Testing and Programs Quality Audit Report June 4, 2014 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
    A2-5 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
Miscellaneous Documents
  Number Title Revision/
Date MN-14-9-
103668 Quality Monitoring Report November 13, 2014  Preventive Maintenance Tasks
PM 1336  PM 1337 PM 1341 PM1342
Procedure Number Title Revision 0PGP03-ZA-0133 Fluid Leak Management Program 3
0PGP03-ZE-0033 RCS Pressure Boundary Inspection for Boric Acid Leaks 9
0PGP03-ZE-0133 Boric Acid Corrosion Program 8
0PGP03-ZM-0016 Installed Plant Instrumentation Calibration Verification Program 25
0PGP03-ZO-0054 Operational Decision-Making 4
0PGP03-ZO-9900 Operability Determination and Functionality Assessments Program 6
0PGP03-ZO-9900 Operability Determinations and Functionality Assessments Program 6
0PGP03-ZO-900A Operability Determinations and Functionality Assessments 4
0PGP03-ZX-0002 Condition Reporting Process 50
0PGP03-ZX-002A CAQ Resolution Process 4
0PGP03-ZX-002B Station Cause Analysis Program 5 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
    A2-6 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
Procedure Number Title Revision 0PGP03-ZX-0008 Conditions Not Adverse to Quality (CNAQ) Resolution Process 
0PGP05-ZN-0009 NRC Inspection / Interface Activities 
0POP01-ZO-0011 Operability, Functionality, and Reportaility Guidance 9
0POP01-ZO-0011 Operability, Functionality, and Reportability Guidance 9
0PSP03-AF-0001 Auxiliary Feedwater Pump 11(21) Inservice Test 35
0PSP03-AF-0007 Auxiliary Feedwater Pump 14(24) Inservice Test 44
Security Instruction
 
1005 Security Incidents 6
Security Instruction
 
2101 Access Control 22 SEG-0008 Printed Circuit Board Maintenance and Replacement Guideline  SG-005 Performing and Documenting Evaluations  WCG-003 Planner's Guide 36
   
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
    A2-7 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
Work Orders     
32580862 32592449 32592456 32622205
32657597
32657618
32683168
32746542 32747151 32748096
32762817
32764187
32789036 32819905 32819981
32823335
32848427 32848449 32857451 32874207 32874237
32906926
32951496
32954403
33028547 33196159 33211839
33254140
33329299
33389559 33525272 33559632
33559717
33570188 33587688 33587766 33603766 33616204
33617639
33639146
33639164
33639483 33659703 33659705
33663496
33689554
33689584 33697080 33724501
33724526
33759248 33781745 33784486 33806141 33810329
33816256
33836230
33842544
33851931 33878328 33898174
33910719
33913974
33950398 33959688 33959970
484418 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
    A3-1 Attachment 3
 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
Information Request
June 26, 2014
Biennial Problem Identification and Resolution Inspection - November 17 - December 5, 2014
South Texas Project Inspection Report Number 05000498/2014010, 050499/2014010
  This inspection will cover the period from October 7, 2012, through the end of the inspection on December 5, 2014.  All requested information should be limited to this period or to the date of the request unless otherwise specified.  To the extent possible, provide the requested information electronically in Adobe PDF (preferred) or Microsoft Office format.  Provide paper copies of any sensitive information during the team's first week on site; do not provide sensitive
or proprietary information electronically.
 
Lists of documents (summary lists) should be provided in Microsoft Excel or a similar sortable format.  Please provide the information on a compact disc (one for each team member), if
possible.  This information may also be uploaded on the Certrec IMS website if so desired.
 
Please provide the following no later than October 10, 2014:
1. Document Lists
 
Note:  For these summary lists, please include the document/reference number, the
document title or description of the issue, the priority, initiation date, status, and long text
descriptions of the issues.
a. Summary list of all corrective action documents related to significant conditions adverse to quality that were opened, closed, or evaluated during the period
 
b. Summary list of all corrective action documents related to conditions adverse to quality that were opened or closed during the period
c. Summary lists of all corrective action documents which were upgraded or downgraded in priority/significance during the period
d. Summary list of all corrective action documents that subsume or "roll up" one or more smaller issues for the period
e. Summary lists of operator workarounds, engineering review requests and/or operability evaluations, temporary modifications, and control room and safety system deficiencies opened, closed, or evaluated during the period
f. Summary list of plant safety issues raised or addressed by the Employee Concerns
Program (or equivalent)
 
g. Summary list of all Apparent Cause Evaluations completed during the period
h. Summary list of all Root Cause Evaluations planned or in progress, but not complete at the end of the period 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
  A3-2  OFFICIAL USE ONLY
- SECURI TY-RELATED INFORMATION
2. Full Documents with Attachments
  a. Root Cause Evaluations completed during the period
b. Quality assurance audits performed during the period
c. All audits/surveillances performed during the period of the Corrective Action Program, of individual corrective actions, and of cause evaluations
 
d. Corrective action activity reports, functional area self-assessments, and non-NRC third party assessments completed during the period (do not include INPO assessments)
e. Corrective action documents generated during the period for the following:
i. All Cited and Non-Cited Violations Issued to South Texas Project
ii. All Licensee Event Reports Issued by South Texas Project
f. Corrective action documents generated for the following, if they were determined to be applicable to South Texas Project (for those that were evaluated but determined not to be applicable, provide a summary list):
 
i. NRC Information Notices, Bulletins, and
Generic Letters issued or evaluated during the period
 
ii. Part 21 reports issued or evaluated during the period
iii. Vendor safety information letters (or equivalent) issued or evaluated during the
period  iv. Other external events and/or Operating Experience evaluated for applicability during the period
 
g. Corrective action documents generated for the following:
i. Emergency planning drills and tabletop exercises performed during the period
ii. Maintenance preventable functional failures which occurred or were evaluated during the period
 
iii. Adverse trends in equipment, processes, procedures, or programs which were evaluated during the period
iv. Action items generated or addressed by plant safety review committees during the
period 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
  A3-3  OFFICIAL USE ONLY
- SECURI TY-RELATED INFORMATION
3. Logs and Reports
  a. Corrective action performance trending/tracking information generated during the period and broken down by functional organization
b. Corrective action effectiveness review reports generated during the period
c. Current system health reports or similar information
d. Radiation protection event logs during the period
e. Security event logs and security incidents during the period (sensitive information can be provided by hard copy during first week on site)
 
f. Employee Concern Program (or equivalent) logs (sensitive information can be provided by hard copy during first week on site)
 
g. List of Training deficiencies, requests for training improvements, and simulator deficiencies for the period
4. Procedures
  a. Corrective action program procedures (initiation, evaluation, classification, and disposition of conditions adverse to quality).  Include operability determination
procedures, root and apparent cause evaluation procedures and any other procedures that implement the corrective action program
b. Maintenance rule program and implementing procedures
c. Operating experience program
d. Employee concerns program
  e. Self-assessment program
f. Degraded/non-conforming condition process (e.g., RIS 2005-20)
g. System Health process or equivalent equipment reliability improvement programs
h. Operational Decision Making (ODMI) process
5. Other Items
  a. Scheduled date/time/location of all meetings associated with implementation of the corrective action program, such as screening meetings, corrective action review board
 
meetings, etc.
 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
  A3-4  OFFICIAL USE ONLY
- SECURI TY-RELATED INFORMATION
b. A list of condition reports generated as a result of identified trends.  The list should
be sorted by priority and have the following
information: number, title/description, date initiated, status, and initiating department.
c. A list of outstanding corrective actions, sorted by priority, with the following information: number; priority; system/component affected, initiating date and due date.  Please also
identify and list any associated due date extensions.
d. A chronological list of all nuclear Quality Assurance/Nuclear Oversight audits and department/station self-assessments including their reference number.
e. A list of all system health reports.
f. All copy of assessments or evaluations (internal or external) regarding station or department safety-culture.
g. A list of all operability determinations and ODMIs performed with the following information: date initiated, initiating CR and status (open or closed).
h. A list of maintenance preventable functional failures (MPFFs) of risk-significant systems (include actions completed and current status). A list of current Maintenance Rule a(1)
systems and a list of those systems that entered a(1) within the last two years, but which were returned to a(2) status.  Include a copy of the current system health report for those
 
systems now in a(1).
i. Copy of the latest corrective action program statistics such as the number initiated by
department, human performance errors by department, backlog, corrective action timeliness and others as may be available.
j. List of industry operating experience evaluated by the site and associated condition
report number if applicable.  Additionally, list of all NRC generic communications (information notices, generic letters, etc.) evaluated by the site for applicability to the
station regardless of the determination of applicability.
k. A chronological list of all Licensee Event Reports, with a brief description of the affected
components or systems. 
l. A listing of the top 10 risk-significant systems, components, and/or operator manual actions as appropriate. 
 
Please provided on CDs and/or DVDs sent via overnight carrier to:
U.S. NRC Region IV
1600 E. Lamar Blvd.
Arlington, TX  76011-4511 Attention:  Harry Freeman
Please note that the NRC is not currently able to
accept electronic documents on thumb drives or other similar digital media.     
 
  ML15030A494
Entire Report ADAMS: Publicly Available Non-Sensitive Keyword  SUNSI Review By:  HAF Yes    No Non-Publicly Available Sensitive MD 3.4 Non-Public A.3 Cover Letter ADAMS: Publicly Available Non-Sensitive Keyword  SUNSI Review By: HAF  Yes    No Non-Publicly Available Sensitive RGN-002 OFFICE SRI:TSB RI:EB2 HP:TSB SRI:DRP C:TSB NAME HFreeman SAlferink BBaca ASanchez GMiller/DAllen SIGNATURE /RA/ /RA/ /RA/
/RA/ /RA/ DATE 1/28/15 1/29/15 1/28/15 1/29/15 1/30/15
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
  OFFICIAL USE ONLY  
- SECURITY-RELATED INFORMATION
  Letter to Dennis L. Koehl from Geoffrey B. Miller, dated January 30, 2015  
SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 & 2 - NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000498/2014010;  
05000499/2014010  
  Distribution by RIV w/Nonpublic Enclosure:   Security Specialist/NSIR (Eric.Wharton@nrc.gov) Security Specialist/NSIR (Niry.Simonian@nrc.gov)  
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
 
Security Specialist/NSI
R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)  
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov) Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov) Senior Resident Inspector (Alfred.Sanchez@nrc.gov)  
STP Administrative Assistant (Lynn.Wright@nrc.gov)  
 
Distribution by RIV w/Public Enclosure
Regional Administrator (Marc.Dapas@nrc.gov)  
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)  
Acting DRP Director (Troy.Pruett@nrc.gov)  
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Alfred.Sanchez@nrc.gov)  
Resident Inspector (Nicholas.Hernandez@nrc.gov)  
Branch Chief, DRP (Neil.OKeefe@nrc.gov)  
Senior Project Engineer, DRP (David.Proulx@nrc.gov) Project Engineer, DRP (Fabian.Thomas@nrc.gov) Administrative Assistant (Lynn.Wright@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Project Manager (Balwant.Singal@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)  
 
ACES (R4Enforcement.Resource@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov)
}}
}}

Latest revision as of 17:20, 31 October 2019

NRC Problem Identification and Resolution Inspection Report 05000498/2014010; 05000499/2014010
ML15030A494
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/30/2015
From: Geoffrey Miller
Division of Reactor Safety IV
To: Koehl D
South Texas
H. Freeman
References
IR 2014010
Download: ML15030A494 (16)


See also: IR 05000498/2014010

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

January 30, 2015

Mr. Dennis L. Koehl

President and CEO/CNO

STP Nuclear Operating Company

PO Box 289

Wadsworth, TX 77483-0289

SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 and 2 - NRC PROBLEM IDENTIFICATION

AND RESOLUTION INSPECTION REPORT 05000498/2014010;

05000499/2014010

Dear Mr. Koehl:

On December 4, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite

portion of the problem identification and resolution biennial inspection at the South Texas

Project. On that day, the NRC inspection team discussed the results of this inspection with

Mr. D. Rencurrel, Senior Vice President Operations, and other members of your staff. This

discussion included a finding for which the NRC had not yet reached a significance

determination. On December 18, 2014, the inspection team had completed its review and

provided Mr. D. Rencurrel, and other members of your staff, the results of a detailed risk

evaluation telephonically. The inspection team documented the results of this inspection in the

enclosed inspection report.

Based on the inspection sample, the inspection team determined that South Texas Projects

corrective action program, and your staffs implementation of it were adequate to support

nuclear safety.

In reviewing your corrective action program, the team assessed how well your staff identified

problems at a low threshold, your staffs implementation of the stations process for prioritizing

and evaluating these problems, and the effectiveness of corrective actions taken by the station

to resolve these problems. The team also evaluated other processes your staff used to identify

issues for resolution. These included your use of audits and self-assessments to identify latent

problems and your incorporation of lessons learned from industry operating experience into

station programs, processes, and procedures. The team determined that your stations

performance in each of these areas supported nuclear safety.

Enclosure transmitted herewith contains SUNSI. When separated from Attachment 1 to

the Enclosure, this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

D. Koehl -2-

Finally, the team determined that your stations management maintained a safety-conscious

work environment in which your employees were willing to raise nuclear safety concerns

through at least one of the several means available.

Nuclear Regulatory Commission inspectors documented one security finding of very low

security significance (Green) in Attachment 1 to the enclosed report. This finding involved a

violation of Nuclear Regulatory Commission requirements. The Nuclear Regulatory

Commission is treating this violation as a non-cited violation consistent with Section 2.3.2.a of

the Enforcement Policy. The deficiency was promptly addressed and the plant complied with

applicable physical protection and security prior to the inspectors leaving the site. The finding

has a cross-cutting aspect in the human performance area associated with complacency in that

security force personnel did not implement appropriate error reduction tools due to the repetitive

nature of the activities and the expectation of successful outcomes (H.12).

Further, the inspectors also documented one licensee-identified violation determined to be of

very low safety significance in this report. The NRC is also treating this violation as a non-cited

violation consistent with Section 2.3.2.a of the NRC Enforcement Policy.

If you contest the violations or their significance, you should provide a response within 30 days

of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with

copies to the Regional Administrator, Region IV; the Director, Office of Enforcement,

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident

inspector at the South Texas Project Electric Generating Station, Units 1 and 2, facility.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the Regional Administrator, Region IV; and to the NRC resident inspector at

the South Texas Project Electric Generating Station, Units 1 and 2, facility.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, a copy of this letter, and its enclosure (with

the exception stated below) will be available electronically for public inspection in the NRCs

Public Document Room or from the Publicly Available Records (PARS) component of the NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Some of the material contained in the enclosed report therein contains Security-Related

Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized

individuals could present a security vulnerability. Therefore, the material in Attachment 1 to the

enclosure will not be made available electronically for public inspection in the NRC Public

Document Room or from the PARS component of NRC's ADAMS.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

D. Koehl -3-

If you choose to provide a response and Security-Related Information is necessary to provide

an acceptable response, please mark your entire response Security-Related Information -

Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with

10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Geoffrey B. Miller, Chief

Technical Support Branch

Division of Reactor Safety

Docket Nos. 50-498, 50-499

License Nos. NPF-76, NPF-80

Nonpublic Enclosure:

Inspection Report 05000498/2014010; 05000499/2014010

w/Attachments:

1. Security-Related Supplement

2. Supplemental Information

3. Information Request

cc w/Enclosure:

Mr. John Milliff

Manager, Security

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

Distribution for South Texas Project Electric Generating Station

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

D. Abell, Performance Improvement Specialist

R. Aguilera, Manager, Health Physics

J. Atkins, Manager, Systems Engineering

R. Barr, Supervisor, Corrective Action Program

M. Berg, Manager, Design Engineering/Test & Programs

C. T. Bowman, General Manager, Nuclear Oversight

D. Caraballo, System Engineer

J. Crain, Manager, Emergency Response Plant Protection Department Support

M. Crutcher, System Engineer

R. Dunn Jr, Manager, Nuclear Fuel & Analysis

M. Farmer, Security System Engineer

T. Frawley, Manager, Plant Protection/Emergency Response

C. Gann, Manager, Employee Concerns Program

M. Gandt, Engineer, Nuclear Steam Supply Systems

R. Gubbs, Manager, Operations Division-Production Support

A. Hasan, System Engineer

J. Heil, Program Engineer

L. Huerta, Supervisor, Security Training

G. Hildebrandt, Manager, Operations

B. Jenewein, Manager, Performance Improvement

L. Knox, Security Compliance Specialist

R. Lonazo, System Engineer

L. Meier, Project Manager, Regulated Security Solutions

A. McGalliard, Manager, Corporate Staff Support & Owner Liaison

J. Milliff, Manager, Security

M. Murray, Manager, Regulatory Affairs/Licensing

G. Powell, Site Vice President

D. Rencurrel, Senior Vice President Operations

P. Rodgers, System Engineer

R. Savage, Licensing Engineering Specialist

R. Scarborough, Manager, Quality Assurance

M. Schaefer, Plant General Manager

R. Stastny, Manager, Maintenance

L. Sterling, Supervisor, Licensing

T. Upton, Technical Supervisor, Maintenance

M. Uribe, Manager, Work Control

T. Vajdos, System Engineer

D. Whiddon, Supervisor, Quality

J. Winters, Lead Investigator

D. Zink, Supervisor, Engineering Specialist

NRC Personnel

N. Hernandez, Resident Inspector

G. Miller, Chief, Technical Support Branch

G. Replogle, Senior Reactor Analyst

A2-1 Attachment 2

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened and Closed

05000498/2014010-01 NCV Failure to Follow Security Procedure

05000499/2014010-01

Closed

05000499/2014-001-00 LER Standby Diesel Generator 23 Essential Cooling Water Leak

Through the Wall of Aluminum-Bronze Pipe Nipple

LIST OF DOCUMENTS REVIEWED

Condition Reports

08-16140 09-387 09-1736 09-4465 09-5524

09-6591 09-6949 09-8195 09-9594 09-9986

09-11422 09-13142 09-14961 09-16144 09-16155

09-16366 09-18746 09-20129 09-21177 10-227

10-302 10-321 10-543 10-4928 10-6359

10-10425 10-25855 11-483 11-771 11-3584

11-3756 11-3908 11-4895 11-12020 11-15707

11-19073 11-21271 11-21275 11-26455 11-27182

12-483 12-13560 12-14431 12-22937 12-23535

12-24501 12-26558 12-27023 12-27493 12-27569

12-27648 12-28135 12-28186 12-28283 12-28600

12-28689 12-28901 12-29159 12-29161 12-31703

13-102 13-103 13-285 13-317 13-325

13-568 13-2311 13-2551 13-2611 13-3161

13-4566 13-5188 13-6031 13-6145 13-6543

13-7209 13-8786 13-8855 13-8957 13-9440

13-9648 13-9844 13-9932 13-10831 13-10896

13-10898 13-10902 13-10949 13-11358 13-11380

13-11528 13-11729 13-13857 13-15806 13-15904

14-22808* 14-23546* 14-25242* 14-62 14-298

14-514 14-518 14-747 14-1374 14-1712

14-2040 14-3306 14-3686 14-4235 14-4488

14-4501 14-4517 14-4650 14-4762 14-4895

14-5066 14-5383 14-6318 14-7054 14-7985

14-8012 14-8022 14-8213 14-9152 14-9634

14-9637 14-9939 14-11207 14-11266 14-13030

14-13247 14-13252 14-13314 14-13674 14-13925

14-17123 14-17723 14-18263 14-19793 14-20710

14-22328 14-22507 14-22532 14-22639 14-22811

14-22901 14-22976 14-24843 14-25164 14-72222

  • Issued as a result of inspection activities.

A2-2

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Drawings

Number Title Revision

00009E0DJAB, Single Line Diagram, 125V DC Class 1E Distribution 22

Sheet 1 Switchboard, E1D11 (Channel II)

Miscellaneous Documents

Number Title Revision/

Date

Life Cycle Management Plan: Rod Control System

Life Cycle Management Plan: Nuclear Instrumentation System

Life Cycle management Plan: Qualified Display Processing

System

Solid State Protection System Health Report September 30,

2014

Nuclear Instrumentation System Health Report September 30,

2014

7300 Processor Support System Health Report September 30,

2014

Qualified Display Processing System Health Report September 30,

2014

STP Security System Health Report September 25,

2014

Executive Oversight Board March 2013

June 2103

November

2013

January 2014

May 2014

October 2014

STP Reporting Manual 11

Requal Qualification Checkout Card (RQCC) No. 2164: Conduct

Personnel Search

A2-3

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Miscellaneous Documents

Number Title Revision/

Date

Requal Qualification Checkout Card (RQCC) No. 2165: Perform

Material Search

Plan of Action: Increased Trend of NRC Performance Indicator March 24,

2014

Physical Security Quality Audit Reports October 10,

2012

September 18,

2013

September 11,

2014

Safeguards Event Log

Conduct of Operations for Radiation Protection - Chapter 9, 15

Radiation Protection Condition Reporting Guideline

Conduct of Operations for Radiation Protection - Chapter 22, RP

Observations Program

High and Low Head Safety Injection Pumps In-Service Testing July 2009

Trend for Units 1 and 2 through

September

2014

13-01 Emergency Preparedness Quality Audit Report March 11,

2013

13-04 Corrective Action Program Supplemental Quality Audit Report July 9, 2013

13-05 Maintenance Quality Control Audit Report August 7,

2013

14-01 Emergency Preparedness Quality Audit Report March 12,

2014

14-02 Radiological Controls Quality Audit Report March 31,

2014

14-03 Testing and Programs Quality Audit Report June 4, 2014

A2-4

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Miscellaneous Documents

Number Title Revision/

Date

MN-14- Quality Monitoring Report November 13,

9- 2014

103668

Preventive Maintenance Tasks

PM 1336 PM 1337 PM 1341 PM1342

Procedure

Number Title Revision

0PGP03- Fluid Leak Management Program 3

ZA-0133

0PGP03- RCS Pressure Boundary Inspection for Boric Acid Leaks 9

ZE-0033

0PGP03- Boric Acid Corrosion Program 8

ZE-0133

0PGP03- Installed Plant Instrumentation Calibration Verification Program 25

ZM-0016

0PGP03- Operational Decision-Making 4

ZO-0054

0PGP03- Operability Determination and Functionality Assessments Program 6

ZO-9900

0PGP03- Operability Determinations and Functionality Assessments Program 6

ZO-9900

0PGP03- Operability Determinations and Functionality Assessments 4

ZO-900A

0PGP03- Condition Reporting Process 50

ZX-0002

0PGP03- CAQ Resolution Process 4

ZX-002A

0PGP03- Station Cause Analysis Program 5

ZX-002B

A2-5

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Procedure

Number Title Revision

0PGP03- Conditions Not Adverse to Quality (CNAQ) Resolution Process

ZX-0008

0PGP05- NRC Inspection / Interface Activities

ZN-0009

0POP01- Operability, Functionality, and Reportaility Guidance 9

ZO-0011

0POP01- Operability, Functionality, and Reportability Guidance 9

ZO-0011

0PSP03- Auxiliary Feedwater Pump 11(21) Inservice Test 35

AF-0001

0PSP03- Auxiliary Feedwater Pump 14(24) Inservice Test 44

AF-0007

Security Security Incidents 6

Instruction

1005

Security Access Control 22

Instruction

2101

SEG-0008 Printed Circuit Board Maintenance and Replacement Guideline

SG-005 Performing and Documenting Evaluations

WCG-003 Planners Guide 36

A2-6

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Work Orders

32580862 32848449 33587688 33781745

32592449 32857451 33587766 33784486

32592456 32874207 33603766 33806141

32622205 32874237 33616204 33810329

32657597 32906926 33617639 33816256

32657618 32951496 33639146 33836230

32683168 32954403 33639164 33842544

32746542 33028547 33639483 33851931

32747151 33196159 33659703 33878328

32748096 33211839 33659705 33898174

32762817 33254140 33663496 33910719

32764187 33329299 33689554 33913974

32789036 33389559 33689584 33950398

32819905 33525272 33697080 33959688

32819981 33559632 33724501 33959970

32823335 33559717 33724526 484418

32848427 33570188 33759248

A2-7

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Information Request

June 26, 2014

Biennial Problem Identification and Resolution Inspection -

November 17 - December 5, 2014

South Texas Project

Inspection Report Number 05000498/2014010, 050499/2014010

This inspection will cover the period from October 7, 2012, through the end of the inspection on

December 5, 2014. All requested information should be limited to this period or to the date of

the request unless otherwise specified. To the extent possible, provide the requested

information electronically in Adobe PDF (preferred) or Microsoft Office format. Provide paper

copies of any sensitive information during the teams first week on site; do not provide sensitive

or proprietary information electronically.

Lists of documents (summary lists) should be provided in Microsoft Excel or a similar sortable

format. Please provide the information on a compact disc (one for each team member), if

possible. This information may also be uploaded on the Certrec IMS website if so desired.

Please provide the following no later than October 10, 2014:

1. Document Lists

Note: For these summary lists, please include the document/reference number, the

document title or description of the issue, the priority, initiation date, status, and long text

descriptions of the issues.

a. Summary list of all corrective action documents related to significant conditions adverse

to quality that were opened, closed, or evaluated during the period

b. Summary list of all corrective action documents related to conditions adverse to quality

that were opened or closed during the period

c. Summary lists of all corrective action documents which were upgraded or downgraded in

priority/significance during the period

d. Summary list of all corrective action documents that subsume or roll up one or more

smaller issues for the period

e. Summary lists of operator workarounds, engineering review requests and/or operability

evaluations, temporary modifications, and control room and safety system deficiencies

opened, closed, or evaluated during the period

f. Summary list of plant safety issues raised or addressed by the Employee Concerns

Program (or equivalent)

g. Summary list of all Apparent Cause Evaluations completed during the period

h. Summary list of all Root Cause Evaluations planned or in progress, but not complete at

the end of the period

A3-1 Attachment 3

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

2. Full Documents with Attachments

a. Root Cause Evaluations completed during the period

b. Quality assurance audits performed during the period

c. All audits/surveillances performed during the period of the Corrective Action Program, of

individual corrective actions, and of cause evaluations

d. Corrective action activity reports, functional area self-assessments, and non-NRC third

party assessments completed during the period (do not include INPO assessments)

e. Corrective action documents generated during the period for the following:

i. All Cited and Non-Cited Violations Issued to South Texas Project

ii. All Licensee Event Reports Issued by South Texas Project

f. Corrective action documents generated for the following, if they were determined to be

applicable to South Texas Project (for those that were evaluated but determined not to

be applicable, provide a summary list):

i. NRC Information Notices, Bulletins, and Generic Letters issued or evaluated during

the period

ii. Part 21 reports issued or evaluated during the period

iii. Vendor safety information letters (or equivalent) issued or evaluated during the

period

iv. Other external events and/or Operating Experience evaluated for applicability during

the period

g. Corrective action documents generated for the following:

i. Emergency planning drills and tabletop exercises performed during the period

ii. Maintenance preventable functional failures which occurred or were evaluated during

the period

iii. Adverse trends in equipment, processes, procedures, or programs which were

evaluated during the period

iv. Action items generated or addressed by plant safety review committees during the

period

A3-2

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

3. Logs and Reports

a. Corrective action performance trending/tracking information generated during the period

and broken down by functional organization

b. Corrective action effectiveness review reports generated during the period

c. Current system health reports or similar information

d. Radiation protection event logs during the period

e. Security event logs and security incidents during the period (sensitive information can be

provided by hard copy during first week on site)

f. Employee Concern Program (or equivalent) logs (sensitive information can be provided

by hard copy during first week on site)

g. List of Training deficiencies, requests for training improvements, and simulator

deficiencies for the period

4. Procedures

a. Corrective action program procedures (initiation, evaluation, classification, and

disposition of conditions adverse to quality). Include operability determination

procedures, root and apparent cause evaluation procedures and any other procedures

that implement the corrective action program

b. Maintenance rule program and implementing procedures

c. Operating experience program

d. Employee concerns program

e. Self-assessment program

f. Degraded/non-conforming condition process (e.g., RIS 2005-20)

g. System Health process or equivalent equipment reliability improvement programs

h. Operational Decision Making (ODMI) process

5. Other Items

a. Scheduled date/time/location of all meetings associated with implementation of the

corrective action program, such as screening meetings, corrective action review board

meetings, etc.

A3-3

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

b. A list of condition reports generated as a result of identified trends. The list should

be sorted by priority and have the following information: number, title/description,

date initiated, status, and initiating department.

c. A list of outstanding corrective actions, sorted by priority, with the following information:

number; priority; system/component affected, initiating date and due date. Please also

identify and list any associated due date extensions.

d. A chronological list of all nuclear Quality Assurance/Nuclear Oversight audits and

department/station self-assessments including their reference number.

e. A list of all system health reports.

f. All copy of assessments or evaluations (internal or external) regarding station or

department safety-culture.

g. A list of all operability determinations and ODMIs performed with the following

information: date initiated, initiating CR and status (open or closed).

h. A list of maintenance preventable functional failures (MPFFs) of risk-significant systems

(include actions completed and current status). A list of current Maintenance Rule a(1)

systems and a list of those systems that entered a(1) within the last two years, but which

were returned to a(2) status. Include a copy of the current system health report for those

systems now in a(1).

i. Copy of the latest corrective action program statistics such as the number initiated by

department, human performance errors by department, backlog, corrective action

timeliness and others as may be available.

j. List of industry operating experience evaluated by the site and associated condition

report number if applicable. Additionally, list of all NRC generic communications

(information notices, generic letters, etc.) evaluated by the site for applicability to the

station regardless of the determination of applicability.

k. A chronological list of all Licensee Event Reports, with a brief description of the affected

components or systems.

l. A listing of the top 10 risk-significant systems, components, and/or operator manual

actions as appropriate.

Please provided on CDs and/or DVDs sent via overnight carrier to:

U.S. NRC Region IV

1600 E. Lamar Blvd.

Arlington, TX 76011-4511

Attention: Harry Freeman

Please note that the NRC is not currently able to accept electronic documents on thumb drives

or other similar digital media.

A3-4

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

ML15030A494

Entire Report ADAMS: Publicly Available Non-Sensitive Keyword

SUNSI Review Yes No Non-Publicly Available Sensitive MD 3.4 Non-Public A.3

By: HAF

Cover Letter ADAMS: Publicly Available Non-Sensitive Keyword

SUNSI Review Yes No Non-Publicly Available Sensitive RGN-002

By: HAF

OFFICE SRI:TSB RI:EB2 HP:TSB SRI:DRP C:TSB

NAME HFreeman SAlferink BBaca ASanchez GMiller/DAllen

SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/

DATE 1/28/15 1/29/15 1/28/15 1/29/15 1/30/15

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Letter to Dennis L. Koehl from Geoffrey B. Miller, dated January 30, 2015

SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 & 2 - NRC PROBLEM IDENTIFICATION

AND RESOLUTION INSPECTION REPORT 05000498/2014010;

05000499/2014010

Distribution by RIV w/Nonpublic Enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Distribution by RIV w/Public Enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Nicholas.Hernandez@nrc.gov)

Branch Chief, DRP (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP (David.Proulx@nrc.gov)

Project Engineer, DRP (Fabian.Thomas@nrc.gov)

Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION