NRC Problem Identification and Resolution Inspection Report 05000498/2014010; 05000499/2014010
ML15030A494
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/30/2015
From: Geoffrey Miller
Division of Reactor Safety IV
To: Koehl D
South Texas
H. Freeman
References
IR 2014010
Download: ML15030A494 (16)


See also: IR 05000498/2014010

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Enclosure transmitted herewith contains SUNSI. When separated from Attachment 1 to

the Enclosure, this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

January 30, 2015

Mr. Dennis L. Koehl

President and CEO/CNO

STP Nuclear Operating Company

PO Box 289

Wadsworth, TX 77483-0289

SUBJECT:

SOUTH TEXAS PROJECT, UNITS 1 and 2 - NRC PROBLEM IDENTIFICATION

AND RESOLUTION INSPECTION REPORT 05000498/2014010;

05000499/2014010

Dear Mr. Koehl:

On December 4, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite

portion of the problem identification and resolution biennial inspection at the South Texas

Project. On that day, the NRC inspection team discussed the results of this inspection with

Mr. D. Rencurrel, Senior Vice President Operations, and other members of your staff. This

discussion included a finding for which the NRC had not yet reached a significance

determination. On December 18, 2014, the inspection team had completed its review and

provided Mr. D. Rencurrel, and other members of your staff, the results of a detailed risk

evaluation telephonically. The inspection team documented the results of this inspection in the

enclosed inspection report.

Based on the inspection sample, the inspection team determined that South Texas Projects

corrective action program, and your staffs implementation of it were adequate to support

nuclear safety.

In reviewing your corrective action program, the team assessed how well your staff identified

problems at a low threshold, your staffs implementation of the stations process for prioritizing

and evaluating these problems, and the effectiveness of corrective actions taken by the station

to resolve these problems. The team also evaluated other processes your staff used to identify

issues for resolution. These included your use of audits and self-assessments to identify latent

problems and your incorporation of lessons learned from industry operating experience into

station programs, processes, and procedures. The team determined that your stations

performance in each of these areas supported nuclear safety.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

D. Koehl

- 2 -

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Finally, the team determined that your stations management maintained a safety-conscious

work environment in which your employees were willing to raise nuclear safety concerns

through at least one of the several means available.

Nuclear Regulatory Commission inspectors documented one security finding of very low

security significance (Green) in Attachment 1 to the enclosed report. This finding involved a

violation of Nuclear Regulatory Commission requirements. The Nuclear Regulatory

Commission is treating this violation as a non-cited violation consistent with Section 2.3.2.a of

the Enforcement Policy. The deficiency was promptly addressed and the plant complied with

applicable physical protection and security prior to the inspectors leaving the site. The finding

has a cross-cutting aspect in the human performance area associated with complacency in that

security force personnel did not implement appropriate error reduction tools due to the repetitive

nature of the activities and the expectation of successful outcomes (H.12).

Further, the inspectors also documented one licensee-identified violation determined to be of

very low safety significance in this report. The NRC is also treating this violation as a non-cited

violation consistent with Section 2.3.2.a of the NRC Enforcement Policy.

If you contest the violations or their significance, you should provide a response within 30 days

of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with

copies to the Regional Administrator, Region IV; the Director, Office of Enforcement,

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident

inspector at the South Texas Project Electric Generating Station, Units 1 and 2, facility.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the Regional Administrator, Region IV; and to the NRC resident inspector at

the South Texas Project Electric Generating Station, Units 1 and 2, facility.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, a copy of this letter, and its enclosure (with

the exception stated below) will be available electronically for public inspection in the NRCs

Public Document Room or from the Publicly Available Records (PARS) component of the NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Some of the material contained in the enclosed report therein contains Security-Related

Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized

individuals could present a security vulnerability. Therefore, the material in Attachment 1 to the

enclosure will not be made available electronically for public inspection in the NRC Public

Document Room or from the PARS component of NRC's ADAMS.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

D. Koehl

- 3 -

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

If you choose to provide a response and Security-Related Information is necessary to provide

an acceptable response, please mark your entire response Security-Related Information -

Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with

10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Geoffrey B. Miller, Chief

Technical Support Branch

Division of Reactor Safety

Docket Nos. 50-498, 50-499

License Nos. NPF-76, NPF-80

Nonpublic Enclosure:

Inspection Report 05000498/2014010; 05000499/2014010

w/Attachments:

1. Security-Related Supplement

2. Supplemental Information

3. Information Request

cc w/Enclosure:

Mr. John Milliff

Manager, Security

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

Distribution for South Texas Project Electric Generating Station

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

A2-1

Attachment 2

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

D. Abell, Performance Improvement Specialist

R. Aguilera, Manager, Health Physics

J. Atkins, Manager, Systems Engineering

R. Barr, Supervisor, Corrective Action Program

M. Berg, Manager, Design Engineering/Test & Programs

C. T. Bowman, General Manager, Nuclear Oversight

D. Caraballo, System Engineer

J. Crain, Manager, Emergency Response Plant Protection Department Support

M. Crutcher, System Engineer

R. Dunn Jr, Manager, Nuclear Fuel & Analysis

M. Farmer, Security System Engineer

T. Frawley, Manager, Plant Protection/Emergency Response

C. Gann, Manager, Employee Concerns Program

M. Gandt, Engineer, Nuclear Steam Supply Systems

R. Gubbs, Manager, Operations Division-Production Support

A. Hasan, System Engineer

J. Heil, Program Engineer

L. Huerta, Supervisor, Security Training

G. Hildebrandt, Manager, Operations

B. Jenewein, Manager, Performance Improvement

L. Knox, Security Compliance Specialist

R. Lonazo, System Engineer

L. Meier, Project Manager, Regulated Security Solutions

A. McGalliard, Manager, Corporate Staff Support & Owner Liaison

J. Milliff, Manager, Security

M. Murray, Manager, Regulatory Affairs/Licensing

G. Powell, Site Vice President

D. Rencurrel, Senior Vice President Operations

P. Rodgers, System Engineer

R. Savage, Licensing Engineering Specialist

R. Scarborough, Manager, Quality Assurance

M. Schaefer, Plant General Manager

R. Stastny, Manager, Maintenance

L. Sterling, Supervisor, Licensing

T. Upton, Technical Supervisor, Maintenance

M. Uribe, Manager, Work Control

T. Vajdos, System Engineer

D. Whiddon, Supervisor, Quality

J. Winters, Lead Investigator

D. Zink, Supervisor, Engineering Specialist

NRC Personnel

N. Hernandez, Resident Inspector

G. Miller, Chief, Technical Support Branch

G. Replogle, Senior Reactor Analyst

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

A2-2

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened and Closed 05000498/2014010-01

05000499/2014010-01

NCV Failure to Follow Security Procedure

Closed

05000499/2014-001-00 LER Standby Diesel Generator 23 Essential Cooling Water Leak

Through the Wall of Aluminum-Bronze Pipe Nipple

LIST OF DOCUMENTS REVIEWED

Condition Reports

08-16140 09-387

09-1736

09-4465

09-5524

09-6591

09-6949

09-8195

09-9594

09-9986

09-11422

09-13142

09-14961

09-16144

09-16155

09-16366

09-18746

09-20129

09-21177 10-227

10-302 10-321

10-543

10-4928

10-6359

10-10425

10-25855 11-483

11-771

11-3584

11-3756

11-3908

11-4895

11-12020

11-15707

11-19073

11-21271

11-21275

11-26455

11-27182 12-483

12-13560

12-14431

12-22937

12-23535

12-24501

12-26558

12-27023

12-27493

12-27569

12-27648

12-28135

12-28186

12-28283

12-28600

12-28689

12-28901

12-29159

12-29161

12-31703 13-102

13-103 13-285

13-317 13-325

13-568

13-2311

13-2551

13-2611

13-3161

13-4566

13-5188

13-6031

13-6145

13-6543

13-7209

13-8786

13-8855

13-8957

13-9440

13-9648

13-9844

13-9932

13-10831

13-10896

13-10898

13-10902

13-10949

13-11358

13-11380

13-11528

13-11729

13-13857

13-15806

13-15904

14-22808*

14-23546*

14-25242*

14-62 14-298

14-514 14-518

14-747

14-1374

14-1712

14-2040

14-3306

14-3686

14-4235

14-4488

14-4501

14-4517

14-4650

14-4762

14-4895

14-5066

14-5383

14-6318

14-7054

14-7985

14-8012

14-8022

14-8213

14-9152

14-9634

14-9637

14-9939

14-11207

14-11266

14-13030

14-13247

14-13252

14-13314

14-13674

14-13925

14-17123

14-17723

14-18263

14-19793

14-20710

14-22328

14-22507

14-22532

14-22639

14-22811

14-22901

14-22976

14-24843

14-25164

14-72222

  • Issued as a result of inspection activities.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

A2-3

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Drawings

Number

Title

Revision

00009E0DJAB,

Sheet 1

Single Line Diagram, 125V DC Class 1E Distribution

Switchboard, E1D11 (Channel II)

22

Miscellaneous Documents

Number

Title

Revision/

Date

Life Cycle Management Plan: Rod Control System

Life Cycle Management Plan: Nuclear Instrumentation System

Life Cycle management Plan: Qualified Display Processing

System

Solid State Protection System Health Report

September 30,

2014

Nuclear Instrumentation System Health Report

September 30,

2014

7300 Processor Support System Health Report

September 30,

2014

Qualified Display Processing System Health Report

September 30,

2014

STP Security System Health Report

September 25,

2014

Executive Oversight Board

March 2013

June 2103

November

2013

January 2014

May 2014

October 2014

STP Reporting Manual

11

Requal Qualification Checkout Card (RQCC) No. 2164: Conduct

Personnel Search

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

A2-4

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Miscellaneous Documents

Number

Title

Revision/

Date

Requal Qualification Checkout Card (RQCC) No. 2165: Perform

Material Search

Plan of Action: Increased Trend of NRC Performance Indicator

March 24,

2014

Physical Security Quality Audit Reports

October 10,

2012

September 18,

2013

September 11,

2014

Safeguards Event Log

Conduct of Operations for Radiation Protection - Chapter 9,

Radiation Protection Condition Reporting Guideline

15

Conduct of Operations for Radiation Protection - Chapter 22, RP

Observations Program

High and Low Head Safety Injection Pumps In-Service Testing

Trend for Units 1 and 2

July 2009

through

September

2014

13-01

Emergency Preparedness Quality Audit Report

March 11,

2013

13-04

Corrective Action Program Supplemental Quality Audit Report

July 9, 2013

13-05

Maintenance Quality Control Audit Report

August 7,

2013

14-01

Emergency Preparedness Quality Audit Report

March 12,

2014

14-02

Radiological Controls Quality Audit Report

March 31,

2014

14-03

Testing and Programs Quality Audit Report

June 4, 2014

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

A2-5

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Miscellaneous Documents

Number

Title

Revision/

Date

MN-14-

9-

103668

Quality Monitoring Report

November 13,

2014

Preventive Maintenance Tasks

PM 1336

PM 1337

PM 1341

PM1342

Procedure

Number

Title

Revision

0PGP03-

ZA-0133

Fluid Leak Management Program

3

0PGP03-

ZE-0033

RCS Pressure Boundary Inspection for Boric Acid Leaks

9

0PGP03-

ZE-0133

Boric Acid Corrosion Program

8

0PGP03-

ZM-0016

Installed Plant Instrumentation Calibration Verification Program

25

0PGP03-

ZO-0054

Operational Decision-Making

4

0PGP03-

ZO-9900

Operability Determination and Functionality Assessments Program

6

0PGP03-

ZO-9900

Operability Determinations and Functionality Assessments Program

6

0PGP03-

ZO-900A

Operability Determinations and Functionality Assessments

4

0PGP03-

ZX-0002

Condition Reporting Process

50

0PGP03-

ZX-002A

CAQ Resolution Process

4

0PGP03-

ZX-002B

Station Cause Analysis Program

5

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

A2-6

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Procedure

Number

Title

Revision

0PGP03-

ZX-0008

Conditions Not Adverse to Quality (CNAQ) Resolution Process

0PGP05-

ZN-0009

NRC Inspection / Interface Activities

0POP01-

ZO-0011

Operability, Functionality, and Reportaility Guidance

9

0POP01-

ZO-0011

Operability, Functionality, and Reportability Guidance

9

0PSP03-

AF-0001

Auxiliary Feedwater Pump 11(21) Inservice Test

35

0PSP03-

AF-0007

Auxiliary Feedwater Pump 14(24) Inservice Test

44

Security

Instruction

1005

Security Incidents

6

Security

Instruction

2101

Access Control

22

SEG-0008

Printed Circuit Board Maintenance and Replacement Guideline

SG-005

Performing and Documenting Evaluations

WCG-003

Planners Guide

36

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

A2-7

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Work Orders

32580862

32592449

32592456

32622205

32657597

32657618

32683168

32746542

32747151

32748096

32762817

32764187

32789036

32819905

32819981

32823335

32848427

32848449

32857451

32874207

32874237

32906926

32951496

32954403

33028547

33196159

33211839

33254140

33329299

33389559

33525272

33559632

33559717

33570188

33587688

33587766

33603766

33616204

33617639

33639146

33639164

33639483

33659703

33659705

33663496

33689554

33689584

33697080

33724501

33724526

33759248

33781745

33784486

33806141

33810329

33816256

33836230

33842544

33851931

33878328

33898174

33910719

33913974

33950398

33959688

33959970

484418

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

A3-1

Attachment 3

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Information Request

June 26, 2014

Biennial Problem Identification and Resolution Inspection -

November 17 - December 5, 2014

South Texas Project

Inspection Report Number 05000498/2014010, 050499/2014010

This inspection will cover the period from October 7, 2012, through the end of the inspection on

December 5, 2014. All requested information should be limited to this period or to the date of

the request unless otherwise specified. To the extent possible, provide the requested

information electronically in Adobe PDF (preferred) or Microsoft Office format. Provide paper

copies of any sensitive information during the teams first week on site; do not provide sensitive

or proprietary information electronically.

Lists of documents (summary lists) should be provided in Microsoft Excel or a similar sortable

format. Please provide the information on a compact disc (one for each team member), if

possible. This information may also be uploaded on the Certrec IMS website if so desired.

Please provide the following no later than October 10, 2014:

1. Document Lists

Note: For these summary lists, please include the document/reference number, the

document title or description of the issue, the priority, initiation date, status, and long text

descriptions of the issues.

a. Summary list of all corrective action documents related to significant conditions adverse

to quality that were opened, closed, or evaluated during the period

b. Summary list of all corrective action documents related to conditions adverse to quality

that were opened or closed during the period

c. Summary lists of all corrective action documents which were upgraded or downgraded in

priority/significance during the period

d. Summary list of all corrective action documents that subsume or roll up one or more

smaller issues for the period

e. Summary lists of operator workarounds, engineering review requests and/or operability

evaluations, temporary modifications, and control room and safety system deficiencies

opened, closed, or evaluated during the period

f.

Summary list of plant safety issues raised or addressed by the Employee Concerns

Program (or equivalent)

g. Summary list of all Apparent Cause Evaluations completed during the period

h. Summary list of all Root Cause Evaluations planned or in progress, but not complete at

the end of the period

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

A3-2

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

2. Full Documents with Attachments

a. Root Cause Evaluations completed during the period

b. Quality assurance audits performed during the period

c. All audits/surveillances performed during the period of the Corrective Action Program, of

individual corrective actions, and of cause evaluations

d. Corrective action activity reports, functional area self-assessments, and non-NRC third

party assessments completed during the period (do not include INPO assessments)

e. Corrective action documents generated during the period for the following:

i.

All Cited and Non-Cited Violations Issued to South Texas Project

ii. All Licensee Event Reports Issued by South Texas Project

f.

Corrective action documents generated for the following, if they were determined to be

applicable to South Texas Project (for those that were evaluated but determined not to

be applicable, provide a summary list):

i.

NRC Information Notices, Bulletins, and Generic Letters issued or evaluated during

the period

ii. Part 21 reports issued or evaluated during the period

iii. Vendor safety information letters (or equivalent) issued or evaluated during the

period

iv. Other external events and/or Operating Experience evaluated for applicability during

the period

g. Corrective action documents generated for the following:

i.

Emergency planning drills and tabletop exercises performed during the period

ii. Maintenance preventable functional failures which occurred or were evaluated during

the period

iii. Adverse trends in equipment, processes, procedures, or programs which were

evaluated during the period

iv. Action items generated or addressed by plant safety review committees during the

period

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

A3-3

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

3. Logs and Reports

a. Corrective action performance trending/tracking information generated during the period

and broken down by functional organization

b. Corrective action effectiveness review reports generated during the period

c. Current system health reports or similar information

d. Radiation protection event logs during the period

e. Security event logs and security incidents during the period (sensitive information can be

provided by hard copy during first week on site)

f.

Employee Concern Program (or equivalent) logs (sensitive information can be provided

by hard copy during first week on site)

g. List of Training deficiencies, requests for training improvements, and simulator

deficiencies for the period

4. Procedures

a. Corrective action program procedures (initiation, evaluation, classification, and

disposition of conditions adverse to quality). Include operability determination

procedures, root and apparent cause evaluation procedures and any other procedures

that implement the corrective action program

b. Maintenance rule program and implementing procedures

c. Operating experience program

d. Employee concerns program

e. Self-assessment program

f.

Degraded/non-conforming condition process (e.g., RIS 2005-20)

g. System Health process or equivalent equipment reliability improvement programs

h. Operational Decision Making (ODMI) process

5. Other Items

a. Scheduled date/time/location of all meetings associated with implementation of the

corrective action program, such as screening meetings, corrective action review board

meetings, etc.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

A3-4

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

b. A list of condition reports generated as a result of identified trends. The list should

be sorted by priority and have the following information: number, title/description,

date initiated, status, and initiating department.

c. A list of outstanding corrective actions, sorted by priority, with the following information:

number; priority; system/component affected, initiating date and due date. Please also

identify and list any associated due date extensions.

d. A chronological list of all nuclear Quality Assurance/Nuclear Oversight audits and

department/station self-assessments including their reference number.

e. A list of all system health reports.

f.

All copy of assessments or evaluations (internal or external) regarding station or

department safety-culture.

g. A list of all operability determinations and ODMIs performed with the following

information: date initiated, initiating CR and status (open or closed).

h. A list of maintenance preventable functional failures (MPFFs) of risk-significant systems

(include actions completed and current status). A list of current Maintenance Rule a(1)

systems and a list of those systems that entered a(1) within the last two years, but which

were returned to a(2) status. Include a copy of the current system health report for those

systems now in a(1).

i.

Copy of the latest corrective action program statistics such as the number initiated by

department, human performance errors by department, backlog, corrective action

timeliness and others as may be available.

j.

List of industry operating experience evaluated by the site and associated condition

report number if applicable. Additionally, list of all NRC generic communications

(information notices, generic letters, etc.) evaluated by the site for applicability to the

station regardless of the determination of applicability.

k. A chronological list of all Licensee Event Reports, with a brief description of the affected

components or systems.

l.

A listing of the top 10 risk-significant systems, components, and/or operator manual

actions as appropriate.

Please provided on CDs and/or DVDs sent via overnight carrier to:

U.S. NRC Region IV

1600 E. Lamar Blvd.

Arlington, TX 76011-4511

Attention: Harry Freeman

Please note that the NRC is not currently able to accept electronic documents on thumb drives

or other similar digital media.

ML15030A494

Entire Report

ADAMS:

Publicly Available

Non-Sensitive

Keyword

SUNSI Review

By: HAF

Yes No

Non-Publicly Available

Sensitive

MD 3.4 Non-Public A.3

Cover Letter

ADAMS:

Publicly Available

Non-Sensitive

Keyword

SUNSI Review

By: HAF

Yes No

Non-Publicly Available

Sensitive

RGN-002

OFFICE

SRI:TSB

RI:EB2

HP:TSB

SRI:DRP

C:TSB

NAME

HFreeman

SAlferink

BBaca

ASanchez

GMiller/DAllen

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

1/28/15

1/29/15

1/28/15

1/29/15

1/30/15

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Letter to Dennis L. Koehl from Geoffrey B. Miller, dated January 30, 2015

SUBJECT:

SOUTH TEXAS PROJECT, UNITS 1 & 2 - NRC PROBLEM IDENTIFICATION

AND RESOLUTION INSPECTION REPORT 05000498/2014010;

05000499/2014010

Distribution by RIV w/Nonpublic Enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Distribution by RIV w/Public Enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Nicholas.Hernandez@nrc.gov)

Branch Chief, DRP (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP (David.Proulx@nrc.gov)

Project Engineer, DRP (Fabian.Thomas@nrc.gov)

Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)