OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Enclosure transmitted herewith contains SUNSI. When separated from Attachment 1 to
the Enclosure, this transmittal document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
January 30, 2015
Mr. Dennis L. Koehl
President and CEO/CNO
STP Nuclear Operating Company
PO Box 289
Wadsworth, TX 77483-0289
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 and 2 - NRC PROBLEM IDENTIFICATION
AND RESOLUTION INSPECTION REPORT 05000498/2014010;
Dear Mr. Koehl:
On December 4, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite
portion of the problem identification and resolution biennial inspection at the South Texas
Project. On that day, the NRC inspection team discussed the results of this inspection with
Mr. D. Rencurrel, Senior Vice President Operations, and other members of your staff. This
discussion included a finding for which the NRC had not yet reached a significance
determination. On December 18, 2014, the inspection team had completed its review and
provided Mr. D. Rencurrel, and other members of your staff, the results of a detailed risk
evaluation telephonically. The inspection team documented the results of this inspection in the
enclosed inspection report.
Based on the inspection sample, the inspection team determined that South Texas Projects
corrective action program, and your staffs implementation of it were adequate to support
nuclear safety.
In reviewing your corrective action program, the team assessed how well your staff identified
problems at a low threshold, your staffs implementation of the stations process for prioritizing
and evaluating these problems, and the effectiveness of corrective actions taken by the station
to resolve these problems. The team also evaluated other processes your staff used to identify
issues for resolution. These included your use of audits and self-assessments to identify latent
problems and your incorporation of lessons learned from industry operating experience into
station programs, processes, and procedures. The team determined that your stations
performance in each of these areas supported nuclear safety.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
D. Koehl
- 2 -
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Finally, the team determined that your stations management maintained a safety-conscious
work environment in which your employees were willing to raise nuclear safety concerns
through at least one of the several means available.
Nuclear Regulatory Commission inspectors documented one security finding of very low
security significance (Green) in Attachment 1 to the enclosed report. This finding involved a
violation of Nuclear Regulatory Commission requirements. The Nuclear Regulatory
Commission is treating this violation as a non-cited violation consistent with Section 2.3.2.a of
the Enforcement Policy. The deficiency was promptly addressed and the plant complied with
applicable physical protection and security prior to the inspectors leaving the site. The finding
has a cross-cutting aspect in the human performance area associated with complacency in that
security force personnel did not implement appropriate error reduction tools due to the repetitive
nature of the activities and the expectation of successful outcomes (H.12).
Further, the inspectors also documented one licensee-identified violation determined to be of
very low safety significance in this report. The NRC is also treating this violation as a non-cited
violation consistent with Section 2.3.2.a of the NRC Enforcement Policy.
If you contest the violations or their significance, you should provide a response within 30 days
of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with
copies to the Regional Administrator, Region IV; the Director, Office of Enforcement,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident
inspector at the South Texas Project Electric Generating Station, Units 1 and 2, facility.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a
response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the Regional Administrator, Region IV; and to the NRC resident inspector at
the South Texas Project Electric Generating Station, Units 1 and 2, facility.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, a copy of this letter, and its enclosure (with
the exception stated below) will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Some of the material contained in the enclosed report therein contains Security-Related
Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized
individuals could present a security vulnerability. Therefore, the material in Attachment 1 to the
enclosure will not be made available electronically for public inspection in the NRC Public
Document Room or from the PARS component of NRC's ADAMS.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
D. Koehl
- 3 -
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
If you choose to provide a response and Security-Related Information is necessary to provide
an acceptable response, please mark your entire response Security-Related Information -
Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with
10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Geoffrey B. Miller, Chief
Technical Support Branch
Division of Reactor Safety
Docket Nos. 50-498, 50-499
Nonpublic Enclosure:
Inspection Report 05000498/2014010; 05000499/2014010
w/Attachments:
1. Security-Related Supplement
2. Supplemental Information
3. Information Request
cc w/Enclosure:
Mr. John Milliff
Manager, Security
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483
Distribution for South Texas Project Electric Generating Station
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A2-1
Attachment 2
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
D. Abell, Performance Improvement Specialist
R. Aguilera, Manager, Health Physics
J. Atkins, Manager, Systems Engineering
R. Barr, Supervisor, Corrective Action Program
M. Berg, Manager, Design Engineering/Test & Programs
C. T. Bowman, General Manager, Nuclear Oversight
D. Caraballo, System Engineer
J. Crain, Manager, Emergency Response Plant Protection Department Support
M. Crutcher, System Engineer
R. Dunn Jr, Manager, Nuclear Fuel & Analysis
M. Farmer, Security System Engineer
T. Frawley, Manager, Plant Protection/Emergency Response
C. Gann, Manager, Employee Concerns Program
M. Gandt, Engineer, Nuclear Steam Supply Systems
R. Gubbs, Manager, Operations Division-Production Support
A. Hasan, System Engineer
J. Heil, Program Engineer
L. Huerta, Supervisor, Security Training
G. Hildebrandt, Manager, Operations
B. Jenewein, Manager, Performance Improvement
L. Knox, Security Compliance Specialist
R. Lonazo, System Engineer
L. Meier, Project Manager, Regulated Security Solutions
A. McGalliard, Manager, Corporate Staff Support & Owner Liaison
J. Milliff, Manager, Security
M. Murray, Manager, Regulatory Affairs/Licensing
G. Powell, Site Vice President
D. Rencurrel, Senior Vice President Operations
P. Rodgers, System Engineer
R. Savage, Licensing Engineering Specialist
R. Scarborough, Manager, Quality Assurance
M. Schaefer, Plant General Manager
R. Stastny, Manager, Maintenance
L. Sterling, Supervisor, Licensing
T. Upton, Technical Supervisor, Maintenance
M. Uribe, Manager, Work Control
T. Vajdos, System Engineer
D. Whiddon, Supervisor, Quality
J. Winters, Lead Investigator
D. Zink, Supervisor, Engineering Specialist
NRC Personnel
N. Hernandez, Resident Inspector
G. Miller, Chief, Technical Support Branch
G. Replogle, Senior Reactor Analyst
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A2-2
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened and Closed 05000498/2014010-01
NCV Failure to Follow Security Procedure
Closed
05000499/2014-001-00 LER Standby Diesel Generator 23 Essential Cooling Water Leak
Through the Wall of Aluminum-Bronze Pipe Nipple
LIST OF DOCUMENTS REVIEWED
Condition Reports
08-16140 09-387
09-1736
09-4465
09-5524
09-6591
09-6949
09-8195
09-9594
09-9986
09-11422
09-13142
09-14961
09-16144
09-16155
09-16366
09-18746
09-20129
09-21177 10-227
10-302 10-321
10-543
10-4928
10-6359
10-10425
10-25855 11-483
11-771
11-3584
11-3756
11-3908
11-4895
11-12020
11-15707
11-19073
11-21271
11-21275
11-26455
11-27182 12-483
12-13560
12-14431
12-22937
12-23535
12-24501
12-26558
12-27023
12-27493
12-27569
12-27648
12-28135
12-28186
12-28283
12-28600
12-28689
12-28901
12-29159
12-29161
12-31703 13-102
13-103 13-285
13-317 13-325
13-568
13-2311
13-2551
13-2611
13-3161
13-4566
13-5188
13-6031
13-6145
13-6543
13-7209
13-8786
13-8855
13-8957
13-9440
13-9648
13-9844
13-9932
13-10831
13-10896
13-10898
13-10902
13-10949
13-11358
13-11380
13-11528
13-11729
13-13857
13-15806
13-15904
14-22808*
14-23546*
14-25242*
14-62 14-298
14-514 14-518
14-747
14-1374
14-1712
14-2040
14-3306
14-3686
14-4235
14-4488
14-4501
14-4517
14-4650
14-4762
14-4895
14-5066
14-5383
14-6318
14-7054
14-7985
14-8012
14-8022
14-8213
14-9152
14-9634
14-9637
14-9939
14-11207
14-11266
14-13030
14-13247
14-13252
14-13314
14-13674
14-13925
14-17123
14-17723
14-18263
14-19793
14-20710
14-22328
14-22507
14-22532
14-22639
14-22811
14-22901
14-22976
14-24843
14-25164
14-72222
- Issued as a result of inspection activities.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A2-3
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Drawings
Number
Title
Revision
00009E0DJAB,
Sheet 1
Single Line Diagram, 125V DC Class 1E Distribution
Switchboard, E1D11 (Channel II)
22
Miscellaneous Documents
Number
Title
Revision/
Date
Life Cycle Management Plan: Rod Control System
Life Cycle Management Plan: Nuclear Instrumentation System
Life Cycle management Plan: Qualified Display Processing
System
Solid State Protection System Health Report
September 30,
2014
Nuclear Instrumentation System Health Report
September 30,
2014
7300 Processor Support System Health Report
September 30,
2014
Qualified Display Processing System Health Report
September 30,
2014
STP Security System Health Report
September 25,
2014
Executive Oversight Board
March 2013
June 2103
November
2013
January 2014
May 2014
October 2014
STP Reporting Manual
11
Requal Qualification Checkout Card (RQCC) No. 2164: Conduct
Personnel Search
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A2-4
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Miscellaneous Documents
Number
Title
Revision/
Date
Requal Qualification Checkout Card (RQCC) No. 2165: Perform
Material Search
Plan of Action: Increased Trend of NRC Performance Indicator
March 24,
2014
Physical Security Quality Audit Reports
October 10,
2012
September 18,
2013
September 11,
2014
Safeguards Event Log
Conduct of Operations for Radiation Protection - Chapter 9,
Radiation Protection Condition Reporting Guideline
15
Conduct of Operations for Radiation Protection - Chapter 22, RP
Observations Program
High and Low Head Safety Injection Pumps In-Service Testing
Trend for Units 1 and 2
July 2009
through
September
2014
13-01
Emergency Preparedness Quality Audit Report
March 11,
2013
13-04
Corrective Action Program Supplemental Quality Audit Report
July 9, 2013
13-05
Maintenance Quality Control Audit Report
August 7,
2013
14-01
Emergency Preparedness Quality Audit Report
March 12,
2014
14-02
Radiological Controls Quality Audit Report
March 31,
2014
14-03
Testing and Programs Quality Audit Report
June 4, 2014
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A2-5
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Miscellaneous Documents
Number
Title
Revision/
Date
MN-14-
9-
103668
Quality Monitoring Report
November 13,
2014
Preventive Maintenance Tasks
PM1342
Procedure
Number
Title
Revision
0PGP03-
ZA-0133
Fluid Leak Management Program
3
0PGP03-
ZE-0033
RCS Pressure Boundary Inspection for Boric Acid Leaks
9
0PGP03-
ZE-0133
Boric Acid Corrosion Program
8
0PGP03-
ZM-0016
Installed Plant Instrumentation Calibration Verification Program
25
0PGP03-
ZO-0054
Operational Decision-Making
4
0PGP03-
ZO-9900
Operability Determination and Functionality Assessments Program
6
0PGP03-
ZO-9900
Operability Determinations and Functionality Assessments Program
6
0PGP03-
ZO-900A
Operability Determinations and Functionality Assessments
4
0PGP03-
ZX-0002
Condition Reporting Process
50
0PGP03-
ZX-002A
CAQ Resolution Process
4
0PGP03-
ZX-002B
Station Cause Analysis Program
5
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A2-6
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Procedure
Number
Title
Revision
0PGP03-
ZX-0008
Conditions Not Adverse to Quality (CNAQ) Resolution Process
0PGP05-
ZN-0009
NRC Inspection / Interface Activities
0POP01-
ZO-0011
Operability, Functionality, and Reportaility Guidance
9
0POP01-
ZO-0011
Operability, Functionality, and Reportability Guidance
9
0PSP03-
AF-0001
Auxiliary Feedwater Pump 11(21) Inservice Test
35
0PSP03-
AF-0007
Auxiliary Feedwater Pump 14(24) Inservice Test
44
Security
Instruction
1005
Security Incidents
6
Security
Instruction
2101
Access Control
22
SEG-0008
Printed Circuit Board Maintenance and Replacement Guideline
SG-005
Performing and Documenting Evaluations
WCG-003
Planners Guide
36
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A2-7
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Work Orders
32580862
32592449
32592456
32622205
32657597
32657618
32683168
32746542
32747151
32748096
32762817
32764187
32789036
32819905
32819981
32823335
32848427
32848449
32857451
32874207
32874237
32906926
32951496
32954403
33028547
33196159
33211839
33254140
33329299
33389559
33525272
33559632
33559717
33570188
33587688
33587766
33603766
33616204
33617639
33639146
33639164
33639483
33659703
33659705
33663496
33689554
33689584
33697080
33724501
33724526
33759248
33781745
33784486
33806141
33810329
33816256
33836230
33842544
33851931
33878328
33898174
33910719
33913974
33950398
33959688
33959970
484418
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A3-1
Attachment 3
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Information Request
June 26, 2014
Biennial Problem Identification and Resolution Inspection -
November 17 - December 5, 2014
South Texas Project
Inspection Report Number 05000498/2014010, 050499/2014010
This inspection will cover the period from October 7, 2012, through the end of the inspection on
December 5, 2014. All requested information should be limited to this period or to the date of
the request unless otherwise specified. To the extent possible, provide the requested
information electronically in Adobe PDF (preferred) or Microsoft Office format. Provide paper
copies of any sensitive information during the teams first week on site; do not provide sensitive
or proprietary information electronically.
Lists of documents (summary lists) should be provided in Microsoft Excel or a similar sortable
format. Please provide the information on a compact disc (one for each team member), if
possible. This information may also be uploaded on the Certrec IMS website if so desired.
Please provide the following no later than October 10, 2014:
1. Document Lists
Note: For these summary lists, please include the document/reference number, the
document title or description of the issue, the priority, initiation date, status, and long text
descriptions of the issues.
a. Summary list of all corrective action documents related to significant conditions adverse
to quality that were opened, closed, or evaluated during the period
b. Summary list of all corrective action documents related to conditions adverse to quality
that were opened or closed during the period
c. Summary lists of all corrective action documents which were upgraded or downgraded in
priority/significance during the period
d. Summary list of all corrective action documents that subsume or roll up one or more
smaller issues for the period
e. Summary lists of operator workarounds, engineering review requests and/or operability
evaluations, temporary modifications, and control room and safety system deficiencies
opened, closed, or evaluated during the period
f.
Summary list of plant safety issues raised or addressed by the Employee Concerns
Program (or equivalent)
g. Summary list of all Apparent Cause Evaluations completed during the period
h. Summary list of all Root Cause Evaluations planned or in progress, but not complete at
the end of the period
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A3-2
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
2. Full Documents with Attachments
a. Root Cause Evaluations completed during the period
b. Quality assurance audits performed during the period
c. All audits/surveillances performed during the period of the Corrective Action Program, of
individual corrective actions, and of cause evaluations
d. Corrective action activity reports, functional area self-assessments, and non-NRC third
party assessments completed during the period (do not include INPO assessments)
e. Corrective action documents generated during the period for the following:
i.
All Cited and Non-Cited Violations Issued to South Texas Project
ii. All Licensee Event Reports Issued by South Texas Project
f.
Corrective action documents generated for the following, if they were determined to be
applicable to South Texas Project (for those that were evaluated but determined not to
be applicable, provide a summary list):
i.
NRC Information Notices, Bulletins, and Generic Letters issued or evaluated during
the period
ii. Part 21 reports issued or evaluated during the period
iii. Vendor safety information letters (or equivalent) issued or evaluated during the
period
iv. Other external events and/or Operating Experience evaluated for applicability during
the period
g. Corrective action documents generated for the following:
i.
Emergency planning drills and tabletop exercises performed during the period
ii. Maintenance preventable functional failures which occurred or were evaluated during
the period
iii. Adverse trends in equipment, processes, procedures, or programs which were
evaluated during the period
iv. Action items generated or addressed by plant safety review committees during the
period
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A3-3
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
3. Logs and Reports
a. Corrective action performance trending/tracking information generated during the period
and broken down by functional organization
b. Corrective action effectiveness review reports generated during the period
c. Current system health reports or similar information
d. Radiation protection event logs during the period
e. Security event logs and security incidents during the period (sensitive information can be
provided by hard copy during first week on site)
f.
Employee Concern Program (or equivalent) logs (sensitive information can be provided
by hard copy during first week on site)
g. List of Training deficiencies, requests for training improvements, and simulator
deficiencies for the period
4. Procedures
a. Corrective action program procedures (initiation, evaluation, classification, and
disposition of conditions adverse to quality). Include operability determination
procedures, root and apparent cause evaluation procedures and any other procedures
that implement the corrective action program
b. Maintenance rule program and implementing procedures
c. Operating experience program
d. Employee concerns program
e. Self-assessment program
f.
Degraded/non-conforming condition process (e.g., RIS 2005-20)
g. System Health process or equivalent equipment reliability improvement programs
h. Operational Decision Making (ODMI) process
5. Other Items
a. Scheduled date/time/location of all meetings associated with implementation of the
corrective action program, such as screening meetings, corrective action review board
meetings, etc.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A3-4
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
b. A list of condition reports generated as a result of identified trends. The list should
be sorted by priority and have the following information: number, title/description,
date initiated, status, and initiating department.
c. A list of outstanding corrective actions, sorted by priority, with the following information:
number; priority; system/component affected, initiating date and due date. Please also
identify and list any associated due date extensions.
d. A chronological list of all nuclear Quality Assurance/Nuclear Oversight audits and
department/station self-assessments including their reference number.
e. A list of all system health reports.
f.
All copy of assessments or evaluations (internal or external) regarding station or
department safety-culture.
g. A list of all operability determinations and ODMIs performed with the following
information: date initiated, initiating CR and status (open or closed).
h. A list of maintenance preventable functional failures (MPFFs) of risk-significant systems
(include actions completed and current status). A list of current Maintenance Rule a(1)
systems and a list of those systems that entered a(1) within the last two years, but which
were returned to a(2) status. Include a copy of the current system health report for those
systems now in a(1).
i.
Copy of the latest corrective action program statistics such as the number initiated by
department, human performance errors by department, backlog, corrective action
timeliness and others as may be available.
j.
List of industry operating experience evaluated by the site and associated condition
report number if applicable. Additionally, list of all NRC generic communications
(information notices, generic letters, etc.) evaluated by the site for applicability to the
station regardless of the determination of applicability.
k. A chronological list of all Licensee Event Reports, with a brief description of the affected
components or systems.
l.
A listing of the top 10 risk-significant systems, components, and/or operator manual
actions as appropriate.
Please provided on CDs and/or DVDs sent via overnight carrier to:
U.S. NRC Region IV
1600 E. Lamar Blvd.
Arlington, TX 76011-4511
Attention: Harry Freeman
Please note that the NRC is not currently able to accept electronic documents on thumb drives
or other similar digital media.
Entire Report
ADAMS:
Publicly Available
Non-Sensitive
Keyword
SUNSI Review
By: HAF
Yes No
Non-Publicly Available
Sensitive
MD 3.4 Non-Public A.3
Cover Letter
ADAMS:
Publicly Available
Non-Sensitive
Keyword
SUNSI Review
By: HAF
Yes No
Non-Publicly Available
Sensitive
RGN-002
OFFICE
SRI:TSB
RI:EB2
HP:TSB
SRI:DRP
C:TSB
NAME
HFreeman
SAlferink
BBaca
ASanchez
GMiller/DAllen
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
1/28/15
1/29/15
1/28/15
1/29/15
1/30/15
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Letter to Dennis L. Koehl from Geoffrey B. Miller, dated January 30, 2015
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 & 2 - NRC PROBLEM IDENTIFICATION
AND RESOLUTION INSPECTION REPORT 05000498/2014010;
Distribution by RIV w/Nonpublic Enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Distribution by RIV w/Public Enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Nicholas.Hernandez@nrc.gov)
Branch Chief, DRP (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP (David.Proulx@nrc.gov)
Project Engineer, DRP (Fabian.Thomas@nrc.gov)
Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)