{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED DISTMBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RXDS)CESSION NBR:9403140274 DOC.DATE: 94/03/07 NOTARIZED:
DISTMBUTION
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME'UTHOR AFFILIATXON ROBINSON,W.R.
DEMONSTRATION
Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000400  
SYSTEM REGULATORY
 
INFORMATION
==SUBJECT:==
DISTRXBUTION
Responds to NRC 940203 ltr re violations'oted in insp rept 50-400/93-25.Corrective actions:tie wraps will be installed on field cables in two dc distribution panels&PSU-111 connectors replaced.DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation R sponse D NOTES:Application for permit renewal filed.05000400 A RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DSP/ROAB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPB1 NUDOCS-ABSTRACT OGC/HDS1 RES/HFB EXTERNAL: EG&G/BRYCE,J.H.
SYSTEM (RXDS)CESSION NBR:9403140274
NSIC COPIES LTD ENCL 1 (1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/DE IB AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NRR/DRSS/PEPB NRR/PMAS/ILPB2 OEM%EG~02 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
DOC.DATE: 94/03/07 NOTARIZED:
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOiVI Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 D D J t  
NO FACIL:50-400
<jy CPA.L Carolina Power 8 Light Company PO Box 165 New Hill NC 27562 , MAR-"f lgg File: HO-.940507 William R.Robinson Vice President Harris Nuclear Plant Serial: HNP-94-018 10CFR2.201 United States Nuclear Regulatory Commission Attention:
Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME'UTHOR AFFILIATXON
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50400/LICENSE NO.NPF-63 REPLY TO A NOTICE OF VIOLATION Gentlemen:
ROBINSON,W.R.
Carolina Power&Light Co.RECIP.NAME
RECIPIENT AFFILIATION
Document Control Branch (Document Control Desk)DOCKET 05000400 SUBJECT: Responds to NRC 940203 ltr re violations'oted
in insp rept 50-400/93-25.Corrective
actions:tie
wraps will be installed on field cables in two dc distribution
panels&PSU-111 connectors
replaced.DISTRIBUTION
CODE: IE01D COPIES RECEIVED:LTR
ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
of Violation R sponse D NOTES:Application
for permit renewal filed.05000400 A RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DSP/ROAB
AEOD/TTC NRR/DORS/OEAB
NRR/DRIL/RPEB
NRR/PMAS/ILPB1
NUDOCS-ABSTRACT
OGC/HDS1 RES/HFB EXTERNAL: EG&G/BRYCE,J.H.
NSIC COPIES LTD ENCL 1 (1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/DE IB AEOD/DSP/TPAB
DEDRO NRR/DRCH/HHFB
NRR/DRSS/PEPB
NRR/PMAS/ILPB2
OEM%EG~02 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOiVI Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!TAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 D D  
J t  
<jy CPA.L Carolina Power 8 Light Company PO Box 165 New Hill NC 27562 , MAR-"f lgg File: HO-.940507
William R.Robinson Vice President Harris Nuclear Plant Serial: HNP-94-018
10CFR2.201
United States Nuclear Regulatory
Commission
Attention:
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50400/LICENSE
NO.NPF-63 REPLY TO A NOTICE OF VIOLATION Gentlemen:
In reference to your letter of February 3, 1994, referring to NRC Inspection
In reference to your letter of February 3, 1994, referring to NRC Inspection
~~~Report 50-400/93-25, the attached is Carolina Power Bc Light Company's reply to the violations
~~~Report 50-400/93-25, the attached is Carolina Power Bc Light Company's reply to the violations identified in Enclosure 1.II It is considered that the corrective actions taken/planned are satisfactory for resolution of the violations.
identified
Questions regarding this matter may be referred to Mr.D.C.McCarthy at (919)362-2100.Very truly yours, W.R.Robinson SDC:sdc Attachment c: Mr.S.D.Ebneter (NRC-RII)M.N.S.Z (NRR)Mr.J.E.Tedrow (NRC-SHNPP) 9403140274 940307 PDR ADOCK 05000400 9 PDR State Road1134 New Hill NC Tel 919362-2502 Fax 919362-6950 Attachment to HNP-94-018 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO.50400/93-25 Re orted Violation A: 10 CFR 50, Appendix B, Criterion XVI requires that measures shall be established to assure conditions adverse to quality, such as failures, malfunctions,'deficiencies, deviations, and non-confor'mance are properly identified and corrected.
in Enclosure 1.II It is considered
The licensee's Corporate Quality Assurance Manual, Section 12, requires that significant conditions adverse to quality be identified and that corrective actions be determined which-will preclude repetition of the condition.
that the corrective
Contrary to the above, following the failure of an auxiliary feedwater system valve in November 1992, the identification and determination of corrective actions for deficiencies noted in the motor control center wiring of auxiliary feedwater system motor operated valves was not sufficient to preclude the repetition of another auxiliary feedwater system valve failure on December 14, 1993.This is a Severity Level IV violation (Supplement g.Denial or Admission:
actions taken/planned
are satisfactory
for resolution
of the violations.
Questions regarding this matter may be referred to Mr.D.C.McCarthy at (919)362-2100.Very truly yours, W.R.Robinson SDC:sdc Attachment
c: Mr.S.D.Ebneter (NRC-RII)M.N.S.Z (NRR)Mr.J.E.Tedrow (NRC-SHNPP)
9403140274
940307 PDR ADOCK 05000400 9 PDR State Road1134 New Hill NC Tel 919362-2502
Fax 919362-6950  
Attachment
to HNP-94-018
REPLY TO A NOTICE OF VIOLATION NRC INSPECTION
REPORT NO.50400/93-25
Re orted Violation A: 10 CFR 50, Appendix B, Criterion XVI requires that measures shall be established
to assure conditions
adverse to quality, such as failures, malfunctions,'deficiencies, deviations, and non-confor'mance
are properly identified
and corrected.
The licensee's
Corporate Quality Assurance Manual, Section 12, requires that significant
conditions
adverse to quality be identified
and that corrective
actions be determined
which-will preclude repetition
of the condition.
Contrary to the above, following the failure of an auxiliary feedwater system valve in November 1992, the identification
and determination
of corrective
actions for deficiencies
noted in the motor control center wiring of auxiliary feedwater system motor operated valves was not sufficient
to preclude the repetition
of another auxiliary feedwater system valve failure on December 14, 1993.This is a Severity Level IV violation (Supplement
g.Denial or Admission:
The violation is admitted.Reason for the Violation:
The violation is admitted.Reason for the Violation:
Plant Change Request PCR-3551 was initiated for the DC electrical
Plant Change Request PCR-3551 was initiated for the DC electrical distribution system in August 1988 by the Technical Support Unit to disposition concerns of loose electrical connector strips found in DC distribution panels DP-1A2-SA and DP-1B2-SB'.
distribution
The connectors of concern were Connectron Model PSU-111, separable modular plugs.The PCR prompted an investigation to discern the scope of potential problem(s) with the connectors.
system in August 1988 by the Technical Support Unit to disposition
A review of records found no equipment failures resulting f'rom these connectors coming loose.It was believed that the PCR was initiated as a result of problems experienced f'rom movement of the cables associated with activities within the DC" distribution panels during construction of the facility.Given that no documented failures could be associated with these connectors after commencement of plant operations, PCR-3551 was canceled in August 1990.Meanwhile, on July 18, 1989, the Operations Unit issued a Standing Order and mounted placards on the access doors of the two DC distribution panels to heighten operations and maintenance personnel awareness of concerns associated with these connectors.
concerns of loose electrical
The There are a total of five valves routed through the distribution panels DP-1A24A and DP-1B2-SB.MEM/HO 940507/OS1 Attachment to HNP-94-018 4 tw Standing Order required verifying proper operation of each valve whose control circuitry is~~~~~~~~~~routed through a DC distribution panel in which work is done in the breaker cubicle or to the access doors.PCR-5511 was initiated in September 1990 by the Operations Vnit based on the same concerns that resulted in initiation of PCR-3551.Subsequently, a single failure attributable to a loose PSU-111 connector occurred on November 26, 1992 in the control circuit of valve 1MS-70'.The engineering review stemming from the failure'concluded that the design of the distribution panels, including the PSV-111 terminals, was sufficient if the cables are supported in accordance with design requirements., Further, the review stated that the terminal blocks unlatch due to forces on them f'rom supporting cable weight and pulling forces exerted by the moving of cables.The pull-apart terminal blocks used in the two DC.~'.".l~hu<3on.
connector strips found in DC distribution
g~a~ls have s>>fficient frictional force holding them together such that without the introduction of outside forces the terminal blocks would not pull apart.Investigation of PCR 5511 prompted another review to discern if there had been any changes since the previous PCR's review.This review identified the single failure on November 26, 1992 in the control circuit of valve 1MS-70 as the only failure.However, given the population of greater than 3500 PSU-111 terminal blocks in service for seven years of operation, a single failure attributable to a loose PSU-111 connection was not considered to be sufficient cause to warrant any design changes.Therefore, PCR-5511 was also canceled on November 12, 1993 and no additional actions were taken.On December 14, 1993, valve 1AF-137 failed.The root-cause investigation attributed the failure to a loose PSU-111 connector resulting from movement of the cables, possibly by settling, given that the cables had been recently disturbed and were not properly supported by tie-wraps.
panels DP-1A2-SA and DP-1B2-SB'.
The PSU-111 separable modular connectors are used in the two DC distribution panels as well as in other AC Motor Control Centers (MCC).Carolina Power&Light Company believes that the component inoperability concern is limited to the two DC distribution panels because 1)inspection of several AC MCCs confirmed that the cables were appropriately supported by tie-wraps, 2)the AC distribution panels are not entered for routine testing comparable to the two DC panels, and 3)there have been no documented problems with loose connectors within the AC MCCs.The combination of the cables being disturbed to acquire current test readings for DC motor driven MOVs and the lack of supporting tie-wraps has been determined as the probable cause of the two terminal block failures.Note: A second failure of 1MS-70, on March 8, 1993, referred to in the Inspection Report 93-25 Details Section Paragraph b.(2)was the result of a main contactor problem with the motor operator for valve iMS-70.It did not have any correlation to loose PSU-111 connectors.
The connectors
MEM/HO940507/osi Attachment to HNP-94-018 Corrective Ste s Taken and Results Achieved: Since the failure of 1MS-70, revision to the Root Cause Investigation Procedure (AP-605)requires a more rigorous root cause evaluation.
of concern were Connectron
Model PSU-111, separable modular plugs.The PCR prompted an investigation
to discern the scope of potential problem(s)
with the connectors.
A review of records found no equipment failures resulting f'rom these connectors
coming loose.It was believed that the PCR was initiated as a result of problems experienced
f'rom movement of the cables associated
with activities
within the DC" distribution
panels during construction
of the facility.Given that no documented
failures could be associated
with these connectors
after commencement
of plant operations, PCR-3551 was canceled in August 1990.Meanwhile, on July 18, 1989, the Operations
Unit issued a Standing Order and mounted placards on the access doors of the two DC distribution
panels to heighten operations
and maintenance
personnel awareness of concerns associated
with these connectors.
The There are a total of five valves routed through the distribution
panels DP-1A24A and DP-1B2-SB.MEM/HO 940507/OS1  
Attachment
to HNP-94-018
4 tw Standing Order required verifying proper operation of each valve whose control circuitry is~~~~~~~~~~routed through a DC distribution
panel in which work is done in the breaker cubicle or to the access doors.PCR-5511 was initiated in September 1990 by the Operations
Vnit based on the same concerns that resulted in initiation
of PCR-3551.Subsequently, a single failure attributable
to a loose PSU-111 connector occurred on November 26, 1992 in the control circuit of valve 1MS-70'.The engineering
review stemming from the failure'concluded
that the design of the distribution
panels, including the PSV-111 terminals, was sufficient
if the cables are supported in accordance
with design requirements., Further, the review stated that the terminal blocks unlatch due to forces on them f'rom supporting
cable weight and pulling forces exerted by the moving of cables.The pull-apart
terminal blocks used in the two DC.~'.".l~hu<3on.
g~a~ls have s>>fficient
frictional
force holding them together such that without the introduction
of outside forces the terminal blocks would not pull apart.Investigation
of PCR 5511 prompted another review to discern if there had been any changes since the previous PCR's review.This review identified
the single failure on November 26, 1992 in the control circuit of valve 1MS-70 as the only failure.However, given the population
of greater than 3500 PSU-111 terminal blocks in service for seven years of operation, a single failure attributable
to a loose PSU-111 connection
was not considered
to be sufficient
cause to warrant any design changes.Therefore, PCR-5511 was also canceled on November 12, 1993 and no additional
actions were taken.On December 14, 1993, valve 1AF-137 failed.The root-cause
investigation
attributed
the failure to a loose PSU-111 connector resulting from movement of the cables, possibly by settling, given that the cables had been recently disturbed and were not properly supported by tie-wraps.
The PSU-111 separable modular connectors
are used in the two DC distribution
panels as well as in other AC Motor Control Centers (MCC).Carolina Power&Light Company believes that the component inoperability
concern is limited to the two DC distribution
panels because 1)inspection
of several AC MCCs confirmed that the cables were appropriately
supported by tie-wraps, 2)the AC distribution
panels are not entered for routine testing comparable
to the two DC panels, and 3)there have been no documented
problems with loose connectors
within the AC MCCs.The combination
of the cables being disturbed to acquire current test readings for DC motor driven MOVs and the lack of supporting
tie-wraps has been determined
as the probable cause of the two terminal block failures.Note: A second failure of 1MS-70, on March 8, 1993, referred to in the Inspection
Report 93-25 Details Section Paragraph b.(2)was the result of a main contactor problem with the motor operator for valve iMS-70.It did not have any correlation
to loose PSU-111 connectors.
MEM/HO940507/osi  
Attachment
to HNP-94-018
Corrective
Ste s Taken and Results Achieved: Since the failure of 1MS-70, revision to the Root Cause Investigation
Procedure (AP-605)requires a more rigorous root cause evaluation.
That more rigorous process was followed for the 1AF-137 valve failure investigation.
That more rigorous process was followed for the 1AF-137 valve failure investigation.
As a result of the failure of 1AF-137 on December 14, 1993, Adverse Condition Report (ACR)93-594 was initiated.
As a result of the failure of 1AF-137 on December 14, 1993, Adverse Condition Report (ACR)93-594 was initiated.
Investigation
Investigation reconfirmed the findings of the engineering review performed in association with PCR-5511, i.e., that the design of the distribution panels was sufficient if the cables are tie-wrapped and not disturbed.
reconfirmed
To that end, the ACR requires the installation of tie-wraps on field cables in the two DC distribution panels.Corrective Ste s To Be Taken to Prevent Further Violations:
the findings of the engineering
As stated above, tie-wraps will be installed on the field cables in the two DC distribution panels.In addition, Carolina Power&Light Company will replace the PSU-111 connectors in the DC distribution panels DP-1A2-SA and DP-1B2-SB with a non separable connector.
review performed in association
Date When Full Com liance Will Be Achieved: Full compliance is expected upon completion of the corrective actions described above.The reinstallation of tie-wraps will be completed by March 25, 1994.The replacement of the DC panels PSU-111 connectors will be performed during the upcoming outage.This action will be completed by May 15, 1994.M EM/H 0940507/Osl Attachment to HNP-94-018 Re orted Violation B: Technical Specification 6.8.1(a)requires that written procedures be properly established and implemented covering procedures outlined in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.Regulatory Guide 1.33, Appendix A, paragraph 2.f requires procedures for changing turbine load, Operating Procedure OP-131.01, Main Turbine, Section 7.1 provides specific guidance for reducing turbine load., Ccr~avg to the above, on December 31, 1993, the directions provided in procedure OP-131.01 were determined to be inadequate and could not be performed in the sequerice specified to reduce the turbine load.This is a Severity Level V violation (Supplement I).Denial or Admission:
with PCR-5511, i.e., that the design of the distribution
panels was sufficient
if the cables are tie-wrapped
and not disturbed.
To that end, the ACR requires the installation
of tie-wraps on field cables in the two DC distribution
panels.Corrective
Ste s To Be Taken to Prevent Further Violations:
As stated above, tie-wraps will be installed on the field cables in the two DC distribution
panels.In addition, Carolina Power&Light Company will replace the PSU-111 connectors
in the DC distribution
panels DP-1A2-SA and DP-1B2-SB with a non separable connector.
Date When Full Com liance Will Be Achieved: Full compliance
is expected upon completion
of the corrective
actions described above.The reinstallation
of tie-wraps will be completed by March 25, 1994.The replacement
of the DC panels PSU-111 connectors
will be performed during the upcoming outage.This action will be completed by May 15, 1994.M EM/H 0940507/Osl  
Attachment
to HNP-94-018
Re orted Violation B: Technical Specification
6.8.1(a)requires that written procedures
be properly established
and implemented
covering procedures
outlined in Appendix A of Regulatory
Guide 1.33, Revision 2, February 1978.Regulatory
Guide 1.33, Appendix A, paragraph 2.f requires procedures
for changing turbine load, Operating Procedure OP-131.01, Main Turbine, Section 7.1 provides specific guidance for reducing turbine load., Ccr~avg to the above, on December 31, 1993, the directions
provided in procedure OP-131.01 were determined
to be inadequate
and could not be performed in the sequerice specified to reduce the turbine load.This is a Severity Level V violation (Supplement
I).Denial or Admission:
The violation is admitted.Reason for the Violation:
The violation is admitted.Reason for the Violation:
On December 31, 1993, the plant was to reduce power to perform required testing.In preparation
On December 31, 1993, the plant was to reduce power to perform required testing.In preparation to reduce load, the Control Operator added 50 gallons of boric acid (about an 8 ppm increase in the RCS boron concentration).
to reduce load, the Control Operator added 50 gallons of boric acid (about an 8 ppm increase in the RCS boron concentration).
When the boron took effect, approximately 10 minutes after injection, the turbine load reduction was to start per OP-131.01.
When the boron took effect, approximately
While preparing for the power down, the Balance of Plant (BOP)Operator saw that two procedure steps in OP 131.01 were out of sequence.OP-131.01 gives instructions for changing turbine load with the DEH control panel.Step 7.1.2.1.g should have directed the enabling of the Megawatt and Turbine Impulse'ressure feedback loops and then inputting the desired load change.However, the steps were reversed, which would result v the ioac coiiilnand oeing deleted upon activation of the feedback control.A check of the Operator Feedback Report (OFR)database showed that the problem was already identified.
10 minutes after injection, the turbine load reduction was to start per OP-131.01.
At the time the OFR was initiated, the time frame for revising the procedure was not considered to be critical given the operator knowledge of this evolution through training and experience, plus the fact that this evolution was correctly sequenced in General Operating Procedure GP-006.Hence, the information was in the procedure working file to be added to the procedure during the next revision.However, in October 1993, this work sequence was removed from GP-006 since it was believed to be redundant to OP-131.01.
While preparing for the power down, the Balance of Plant (BOP)Operator saw that two procedure steps in OP 131.01 were out of sequence.OP-131.01 gives instructions
Management in the Control Room directed the BOP Operator to reduce load based on his knowledge of how to reduce turbine load.The plant load reduction was subsequently completed, but no action was taken to immediately correct OP-131.01.
for changing turbine load with the DEH control panel.Step 7.1.2.1.g should have directed the enabling of the Megawatt and Turbine Impulse'ressure
Thus the violation M EM/HO 94507/os1 Attachment to HNP-94-018 C t occurred because the identified procedure defect was not corrected when first identified.
feedback loops and then inputting the desired load change.However, the steps were reversed, which would result v the ioac coiiilnand
'econdly, the rediscovery of the error was not appropriately addressed.
oeing deleted upon activation
Proper application of plant procedural use and adherence requirements (AP-100)allows achieving safe stable conditions.
of the feedback control.A check of the Operator Feedback Report (OFR)database showed that the problem was already identified.
In this event, performing a load decrease to maintain RCS average temperature at the program value would be acceptable.
At the time the OFR was initiated, the time frame for revising the procedure was not considered
However, this should have been immediately followed'with a temporary change to OP-131.01.
to be critical given the operator knowledge of this evolution through training and experience, plus the fact that this evolution was correctly sequenced in General Operating Procedure GP-006.Hence, the information
Corrective Ste s Taken and Results Achieved: Procedures have been revised to incorporate the correct sequence of steps for reducing turbine load.This was completed by January 20, 1994.~.b.~..~.>iv~~>.;,s, Yaken to Prevent Further Violations:
was in the procedure working file to be added to the procedure during the next revision.However, in October 1993, this work sequence was removed from GP-006 since it was believed to be redundant to OP-131.01.
The individuals involved were counseled on the proper response to the discovery of errors in procedures.
Management
A discussion of compliance with AP-100 was presented by the Manager-Operations in a Shift Supervisor
in the Control Room directed the BOP Operator to reduce load based on his knowledge of how to reduce turbine load.The plant load reduction was subsequently
-Nuclear meeting held on February 8, 1994.The Operations Unit procedure revision working files were reviewed and seven additional procedure revisions were identified.
completed, but no action was taken to immediately
The seven procedures were subsequently revised.Date When Full Com liance Will Be Achieved: Full compliance was achieved as described above by February 14, 1994.MEM/HO940507/osl 0}}
correct OP-131.01.
Thus the violation M EM/HO 94507/os1  
Attachment
to HNP-94-018
C t occurred because the identified
procedure defect was not corrected when first identified.
'econdly, the rediscovery
of the error was not appropriately
addressed.
Proper application
of plant procedural
use and adherence requirements (AP-100)allows achieving safe stable conditions.
In this event, performing
a load decrease to maintain RCS average temperature
at the program value would be acceptable.
However, this should have been immediately
followed'with
a temporary change to OP-131.01.
Corrective
Ste s Taken and Results Achieved: Procedures
have been revised to incorporate
the correct sequence of steps for reducing turbine load.This was completed by January 20, 1994.~.b.~..~.>iv~~>.;,s, Yaken to Prevent Further Violations:
The individuals
involved were counseled on the proper response to the discovery of errors in procedures.
A discussion
of compliance
with AP-100 was presented by the Manager-Operations
in a Shift Supervisor
-Nuclear meeting held on February 8, 1994.The Operations
Unit procedure revision working files were reviewed and seven additional
procedure revisions were identified.
The seven procedures
were subsequently
revised.Date When Full Com liance Will Be Achieved: Full compliance
was achieved as described above by February 14, 1994.MEM/HO940507/osl  
0
}}

Revision as of 04:59, 17 August 2019

Responds to NRC 940203 Ltr Re Violations Noted in Insp Rept 50-400/93-25.Corrective Actions:Tie Wraps Will Be Installed on Field Cables in Two Dc Distribution Panels & PSU-111 Connectors Replaced
ML18011A382
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/07/1994
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-94-018, HNP-94-18, HO-940507, NUDOCS 9403140274
Download: ML18011A382 (9)


Text

ACCELERATED DISTMBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RXDS)CESSION NBR:9403140274 DOC.DATE: 94/03/07 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME'UTHOR AFFILIATXON ROBINSON,W.R.

Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000400

SUBJECT:

Responds to NRC 940203 ltr re violations'oted in insp rept 50-400/93-25.Corrective actions:tie wraps will be installed on field cables in two dc distribution panels&PSU-111 connectors replaced.DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation R sponse D NOTES:Application for permit renewal filed.05000400 A RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DSP/ROAB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPB1 NUDOCS-ABSTRACT OGC/HDS1 RES/HFB EXTERNAL: EG&G/BRYCE,J.H.

NSIC COPIES LTD ENCL 1 (1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/DE IB AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NRR/DRSS/PEPB NRR/PMAS/ILPB2 OEM%EG~02 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOiVI Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 D D J t

<jy CPA.L Carolina Power 8 Light Company PO Box 165 New Hill NC 27562 , MAR-"f lgg File: HO-.940507 William R.Robinson Vice President Harris Nuclear Plant Serial: HNP-94-018 10CFR2.201 United States Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50400/LICENSE NO.NPF-63 REPLY TO A NOTICE OF VIOLATION Gentlemen:

In reference to your letter of February 3, 1994, referring to NRC Inspection

~~~Report 50-400/93-25, the attached is Carolina Power Bc Light Company's reply to the violations identified in Enclosure 1.II It is considered that the corrective actions taken/planned are satisfactory for resolution of the violations.

Questions regarding this matter may be referred to Mr.D.C.McCarthy at (919)362-2100.Very truly yours, W.R.Robinson SDC:sdc Attachment c: Mr.S.D.Ebneter (NRC-RII)M.N.S.Z (NRR)Mr.J.E.Tedrow (NRC-SHNPP) 9403140274 940307 PDR ADOCK 05000400 9 PDR State Road1134 New Hill NC Tel 919362-2502 Fax 919362-6950 Attachment to HNP-94-018 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO.50400/93-25 Re orted Violation A: 10 CFR 50, Appendix B, Criterion XVI requires that measures shall be established to assure conditions adverse to quality, such as failures, malfunctions,'deficiencies, deviations, and non-confor'mance are properly identified and corrected.

The licensee's Corporate Quality Assurance Manual, Section 12, requires that significant conditions adverse to quality be identified and that corrective actions be determined which-will preclude repetition of the condition.

Contrary to the above, following the failure of an auxiliary feedwater system valve in November 1992, the identification and determination of corrective actions for deficiencies noted in the motor control center wiring of auxiliary feedwater system motor operated valves was not sufficient to preclude the repetition of another auxiliary feedwater system valve failure on December 14, 1993.This is a Severity Level IV violation (Supplement g.Denial or Admission:

The violation is admitted.Reason for the Violation:

Plant Change Request PCR-3551 was initiated for the DC electrical distribution system in August 1988 by the Technical Support Unit to disposition concerns of loose electrical connector strips found in DC distribution panels DP-1A2-SA and DP-1B2-SB'.

The connectors of concern were Connectron Model PSU-111, separable modular plugs.The PCR prompted an investigation to discern the scope of potential problem(s) with the connectors.

A review of records found no equipment failures resulting f'rom these connectors coming loose.It was believed that the PCR was initiated as a result of problems experienced f'rom movement of the cables associated with activities within the DC" distribution panels during construction of the facility.Given that no documented failures could be associated with these connectors after commencement of plant operations, PCR-3551 was canceled in August 1990.Meanwhile, on July 18, 1989, the Operations Unit issued a Standing Order and mounted placards on the access doors of the two DC distribution panels to heighten operations and maintenance personnel awareness of concerns associated with these connectors.

The There are a total of five valves routed through the distribution panels DP-1A24A and DP-1B2-SB.MEM/HO 940507/OS1 Attachment to HNP-94-018 4 tw Standing Order required verifying proper operation of each valve whose control circuitry is~~~~~~~~~~routed through a DC distribution panel in which work is done in the breaker cubicle or to the access doors.PCR-5511 was initiated in September 1990 by the Operations Vnit based on the same concerns that resulted in initiation of PCR-3551.Subsequently, a single failure attributable to a loose PSU-111 connector occurred on November 26, 1992 in the control circuit of valve 1MS-70'.The engineering review stemming from the failure'concluded that the design of the distribution panels, including the PSV-111 terminals, was sufficient if the cables are supported in accordance with design requirements., Further, the review stated that the terminal blocks unlatch due to forces on them f'rom supporting cable weight and pulling forces exerted by the moving of cables.The pull-apart terminal blocks used in the two DC.~'.".l~hu<3on.

g~a~ls have s>>fficient frictional force holding them together such that without the introduction of outside forces the terminal blocks would not pull apart.Investigation of PCR 5511 prompted another review to discern if there had been any changes since the previous PCR's review.This review identified the single failure on November 26, 1992 in the control circuit of valve 1MS-70 as the only failure.However, given the population of greater than 3500 PSU-111 terminal blocks in service for seven years of operation, a single failure attributable to a loose PSU-111 connection was not considered to be sufficient cause to warrant any design changes.Therefore, PCR-5511 was also canceled on November 12, 1993 and no additional actions were taken.On December 14, 1993, valve 1AF-137 failed.The root-cause investigation attributed the failure to a loose PSU-111 connector resulting from movement of the cables, possibly by settling, given that the cables had been recently disturbed and were not properly supported by tie-wraps.

The PSU-111 separable modular connectors are used in the two DC distribution panels as well as in other AC Motor Control Centers (MCC).Carolina Power&Light Company believes that the component inoperability concern is limited to the two DC distribution panels because 1)inspection of several AC MCCs confirmed that the cables were appropriately supported by tie-wraps, 2)the AC distribution panels are not entered for routine testing comparable to the two DC panels, and 3)there have been no documented problems with loose connectors within the AC MCCs.The combination of the cables being disturbed to acquire current test readings for DC motor driven MOVs and the lack of supporting tie-wraps has been determined as the probable cause of the two terminal block failures.Note: A second failure of 1MS-70, on March 8, 1993, referred to in the Inspection Report 93-25 Details Section Paragraph b.(2)was the result of a main contactor problem with the motor operator for valve iMS-70.It did not have any correlation to loose PSU-111 connectors.

MEM/HO940507/osi Attachment to HNP-94-018 Corrective Ste s Taken and Results Achieved: Since the failure of 1MS-70, revision to the Root Cause Investigation Procedure (AP-605)requires a more rigorous root cause evaluation.

That more rigorous process was followed for the 1AF-137 valve failure investigation.

As a result of the failure of 1AF-137 on December 14, 1993, Adverse Condition Report (ACR)93-594 was initiated.

Investigation reconfirmed the findings of the engineering review performed in association with PCR-5511, i.e., that the design of the distribution panels was sufficient if the cables are tie-wrapped and not disturbed.

To that end, the ACR requires the installation of tie-wraps on field cables in the two DC distribution panels.Corrective Ste s To Be Taken to Prevent Further Violations:

As stated above, tie-wraps will be installed on the field cables in the two DC distribution panels.In addition, Carolina Power&Light Company will replace the PSU-111 connectors in the DC distribution panels DP-1A2-SA and DP-1B2-SB with a non separable connector.

Date When Full Com liance Will Be Achieved: Full compliance is expected upon completion of the corrective actions described above.The reinstallation of tie-wraps will be completed by March 25, 1994.The replacement of the DC panels PSU-111 connectors will be performed during the upcoming outage.This action will be completed by May 15, 1994.M EM/H 0940507/Osl Attachment to HNP-94-018 Re orted Violation B: Technical Specification 6.8.1(a)requires that written procedures be properly established and implemented covering procedures outlined in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.Regulatory Guide 1.33, Appendix A, paragraph 2.f requires procedures for changing turbine load, Operating Procedure OP-131.01, Main Turbine, Section 7.1 provides specific guidance for reducing turbine load., Ccr~avg to the above, on December 31, 1993, the directions provided in procedure OP-131.01 were determined to be inadequate and could not be performed in the sequerice specified to reduce the turbine load.This is a Severity Level V violation (Supplement I).Denial or Admission:

The violation is admitted.Reason for the Violation:

On December 31, 1993, the plant was to reduce power to perform required testing.In preparation to reduce load, the Control Operator added 50 gallons of boric acid (about an 8 ppm increase in the RCS boron concentration).

When the boron took effect, approximately 10 minutes after injection, the turbine load reduction was to start per OP-131.01.

While preparing for the power down, the Balance of Plant (BOP)Operator saw that two procedure steps in OP 131.01 were out of sequence.OP-131.01 gives instructions for changing turbine load with the DEH control panel.Step 7.1.2.1.g should have directed the enabling of the Megawatt and Turbine Impulse'ressure feedback loops and then inputting the desired load change.However, the steps were reversed, which would result v the ioac coiiilnand oeing deleted upon activation of the feedback control.A check of the Operator Feedback Report (OFR)database showed that the problem was already identified.

At the time the OFR was initiated, the time frame for revising the procedure was not considered to be critical given the operator knowledge of this evolution through training and experience, plus the fact that this evolution was correctly sequenced in General Operating Procedure GP-006.Hence, the information was in the procedure working file to be added to the procedure during the next revision.However, in October 1993, this work sequence was removed from GP-006 since it was believed to be redundant to OP-131.01.

Management in the Control Room directed the BOP Operator to reduce load based on his knowledge of how to reduce turbine load.The plant load reduction was subsequently completed, but no action was taken to immediately correct OP-131.01.

Thus the violation M EM/HO 94507/os1 Attachment to HNP-94-018 C t occurred because the identified procedure defect was not corrected when first identified.

'econdly, the rediscovery of the error was not appropriately addressed.

Proper application of plant procedural use and adherence requirements (AP-100)allows achieving safe stable conditions.

In this event, performing a load decrease to maintain RCS average temperature at the program value would be acceptable.

However, this should have been immediately followed'with a temporary change to OP-131.01.

Corrective Ste s Taken and Results Achieved: Procedures have been revised to incorporate the correct sequence of steps for reducing turbine load.This was completed by January 20, 1994.~.b.~..~.>iv~~>.;,s, Yaken to Prevent Further Violations:

The individuals involved were counseled on the proper response to the discovery of errors in procedures.

A discussion of compliance with AP-100 was presented by the Manager-Operations in a Shift Supervisor

-Nuclear meeting held on February 8, 1994.The Operations Unit procedure revision working files were reviewed and seven additional procedure revisions were identified.

The seven procedures were subsequently revised.Date When Full Com liance Will Be Achieved: Full compliance was achieved as described above by February 14, 1994.MEM/HO940507/osl 0