IR 05000305/2005017: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 02/03/2006
| issue date = 02/03/2006
| title = Ltr 02/03/06 Kewaunee Re Errata to NRC Integrated Inspection Report 05000305/2005017
| title = Ltr 02/03/06 Kewaunee Re Errata to NRC Integrated Inspection Report 05000305/2005017
| author name = Louden P L
| author name = Louden P
| author affiliation = NRC/RGN-III/DRP/RPB5
| author affiliation = NRC/RGN-III/DRP/RPB5
| addressee name = Christian D A
| addressee name = Christian D
| addressee affiliation = Dominion Energy Kewaunee, Inc
| addressee affiliation = Dominion Energy Kewaunee, Inc
| docket = 05000305
| docket = 05000305
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:February 3, 2006Mr. David A. ChristianSenior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711SUBJECT:ERRATA TO KEWAUNEE NUCLEAR POWER PLANTNRC INTEGRATED INSPECTION REPORT 05000305/2005017
[[Issue date::February 3, 2006]]
 
Mr. David A. ChristianSenior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
 
SUBJECT: ERRATA TO KEWAUNEE NUCLEAR POWER PLANTNRC INTEGRATED INSPECTION REPORT 05000305/2005017


==Dear Mr. Christian:==
==Dear Mr. Christian:==
Line 30: Line 25:
This mis-understanding of licensed operator requalification examination results has been corrected. The pass/fail results of the LORT program examination was evaluated as a green finding in the area of licensed operator requalification training. The enclosed errata contains the revised information and should be inserted where appropriate into Integrated Inspection Report 05000305/2005017.We apologize for any inconvenience to you and your staff.
This mis-understanding of licensed operator requalification examination results has been corrected. The pass/fail results of the LORT program examination was evaluated as a green finding in the area of licensed operator requalification training. The enclosed errata contains the revised information and should be inserted where appropriate into Integrated Inspection Report 05000305/2005017.We apologize for any inconvenience to you and your staff.


Sincerely,/RA/Patrick L. Louden, ChiefProjects Branch 5 Division of Reactor ProjectsDocket No. 50-305License No. DPR-43
Sincerely,
 
/RA/Patrick L. Louden, ChiefProjects Branch 5 Division of Reactor ProjectsDocket No. 50-305License No. DPR-43Enclosure:Errata to Inspection Report 05000305/2005017 See Attached Distribution Mr. David
===Enclosure:===
Errata to Inspection Report 05000305/2005017 See Attached Distribution Mr. David
}}
}}

Revision as of 00:52, 14 July 2019

Ltr 02/03/06 Kewaunee Re Errata to NRC Integrated Inspection Report 05000305/2005017
ML060370542
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/03/2006
From: Louden P
NRC/RGN-III/DRP/RPB5
To: Christian D
Dominion Energy Kewaunee
References
IR-05-017
Download: ML060370542 (6)


Text

February 3, 2006Mr. David A. ChristianSenior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711SUBJECT:ERRATA TO KEWAUNEE NUCLEAR POWER PLANTNRC INTEGRATED INSPECTION REPORT 05000305/2005017

Dear Mr. Christian:

On January 20, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued IntegratedInspection Report 05000305/2005017 (ML0602004410). Following additional discussions with the station's training staff, it was identified that an NRC inspector misunderstood the overallresults of the Licensed Operator Requalification Training (LORT) program annual examinations.

This mis-understanding of licensed operator requalification examination results has been corrected. The pass/fail results of the LORT program examination was evaluated as a green finding in the area of licensed operator requalification training. The enclosed errata contains the revised information and should be inserted where appropriate into Integrated Inspection Report 05000305/2005017.We apologize for any inconvenience to you and your staff.

Sincerely,

/RA/Patrick L. Louden, ChiefProjects Branch 5 Division of Reactor ProjectsDocket No. 50-305License No. DPR-43Enclosure:Errata to Inspection Report 05000305/2005017 See Attached Distribution Mr. David