IR 05000305/2003009
ML033630723 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 12/29/2003 |
From: | Pederson C Division of Reactor Safety III |
To: | Coutu T Nuclear Management Co |
References | |
IR-03-009 | |
Download: ML033630723 (4) | |
Text
ber 29, 2003
SUBJECT:
KEWAUNEE NUCLEAR POWER PLANT NRC SAFEGUARDS INSPECTION OF COMPLIANCE WITH ORDER INSPECTION REPORT 05000305/2003009(DRS)
Dear Mr.Coutu:
On November 7, 2003, the NRC completed an inspection at your Kewaunee Nuclear Power Plant. The enclosed report documents the inspection findings which were discussed on November 7, 2003, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to public health and safety, the common defense and security, and to compliance with the Commissions regulations, orders, and the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be placed in the Public Document Room.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter, without enclosure, will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Enclosure Contains Upon Separation This Page is Decontrolled T. Coutu -2-Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Cynthia D. Pederson, Director Division of Reactor Safety Docket No. 50-305 License No. DPR-43 Enclosure: Inspection Report 05000305/2003009(DRS);
( )
cc w/encl ( ):
B. Westreich (NSIR/DNS)
E. McNeil (NSIR/DNS/RSS) (MS T4D8)
cc w/o ( ):
D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer Enclosure Contains Upon Separation This Page is Decontrolled T. Coutu -2-Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Cynthia D. Pederson, Director Division of Reactor Safety Docket No. 50-305 License No. DPR-43 Enclosure: Inspection Report 05000305/2003009(DRS);
( )
cc w/encl w/( ):
B. Westreich (NSIR/DNS)
E. McNeil (NSIR/DNS/RSS) (MS T4D8)
cc w/o ( ):
D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer ADAMS Distribution w/out ( ):
WDR DFT JGL1 RidsNrrDipmIipb GEG HBC JFL C. Ariano (hard copy)
C. Pederson, DRS (hard copy - IRs only)
DRPIII DRSIII PLB1 JRK1 Enclosure Contains Upon Separation This Page is Decontrolled DOCUMENT NAME: G:DRS\ML033630723.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NSIR RIII NAME JCreed:tr Sorth for PLouden BHughes via email CPederson KRiemer DATE 12/09/03 12/18/03 12/24/03 12/09/03 12/29/03 OFFICIAL RECORD COPY