IR 05000305/201040218 March 2010IR 05000305-10-402, (Drs), on 02/08/2010 - 02/12/2010, Kewaunee Power Station, Routine Security Baseline Inspection - Cover LetterSignificance Determination Process
Affidavit
IR 05000305/20060048 November 2006IR 05000305-2006-004; 07/01/2006 - 09/30/2006; Kewaunee Power Station; Event FollowupSafe Shutdown
Boric Acid
High Radiation Area
Mission time
Tornado Missile
Time to boil
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Time Critical Operator Action
Preliminary White Finding
Fire Protection Program
Power change
Overexposure
IR 05000305/20060125 October 2006IR-05000305-06-012, on 08/31/06, Kewaunee Nuclear Power Station
IR 05000305/200601522 September 2006IR 05000305-06-015, on 08/14/2006 - 8/18/2006; Kewaunee Power Station. Supplemental Inspection 95002, Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance AreaProbabilistic Risk Assessment
Significance Determination Process
Operability Determination
IR 05000305/20050173 February 2006Re Errata to NRC Integrated Inspection Report 05000305/2005017
ML04231001917 August 2004Re Notification of Inspection and Request for InformationBoric Acid
Nondestructive Examination
VT-2
IR 05000305/200300929 December 2003IR 05000305-03-009(DRS); on 10/06/03 - 10/10/03; for Kewaunee Nuclear Power Plant; Ti 2515/148, Verification of Compliance with Interim Compensatory Measures Order, Revision 2