ML17286A346: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/31/1990
| issue date = 08/31/1990
| title = Revised Monthly Operating Rept for Aug 1990 for WNP-2
| title = Revised Monthly Operating Rept for Aug 1990 for WNP-2
| author name = HUTCHISON L B
| author name = Hutchison L
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REPCAT PERIOD Au9 19 90 mcnth, year LNIT SfUTDOl<NS
{{#Wiki_filter:DOCKET NO.
/REDUCTIONS DOCKET NO.UNIT NAME DATE COMPLETED BY TELE'ONE 50-397 WNP-2 9/1/90 LB Hutchison RL DDAD llPl'0IJRb REAsOH MMES IZW1D EP l~V I T E.%HAP8/14/90, S 0 HA PIPBX Reduced load to permit repair of a leaking malay cover on turbine crossunder steam piping.Uc Olg A+O~Qo Ow~<0 000~@co A~NOTE: THIS IS AN ADDENDUM TO THE AUGUST 1990 REPORT WHICH WAS PREVIOUSLY TRANSMITTED.
50-397 UNIT NAME          WNP-2 DATE        9/1/90 LNIT SfUTDOl<NS      /  REDUCTIONS                      COMPLETED BY          LB Hutchison REPCAT PERIOD      Au9      19 90                                                                                TELE'ONE mcnth,      year RL       DDAD   llPl'0IJRb       REAsOH     MMES IZW1D                     EP       l~V                             I                         T E
0 I l.SU>t iARY WNP-2 returned to service frcm refueling outage.Subsequently, a scheduled outage for testing and one peer reduction occurred.T'YPE F-Forced S-Sched REASON A-Equip Failure 0-Maint or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Admin G-Oper Error H-Other 1-Manual 2-Manual Scram 5-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT Exhibit F&H Instructions for Preparation Gf Data Entry Sheet Licensee Event Report (LER)File (NUREG-0161)
.%HAP8/14/90,     S       0                                             HA       PIPBX         Reduced load to permit repair of a leaking malay cover on turbine crossunder steam piping.
I~~v}}
Uc 0 I Olg A+               NOTE:   THIS IS   AN ADDENDUM TO THE AUGUST       1990 REPORT WHICH       WAS PREVIOUSLY TRANSMITTED.
O~
Qo Ow
  ~<0 000
  ~@co A~
: l.                 WNP-2 returned to service frcm refueling outage. Subsequently, a scheduled outage for testing and one peer reduction occurred.
SU>t iARY T'YPE           REASON                                                                    SYSTEM & COMPONENT F-Forced       A-Equip Failure                 F-Admin            1-Manual                Exhibit F & H S-Sched        0-Maint or Test                 G-Oper Error       2-Manual Scram           Instructions for C-Refueling                      H-Other            5-Auto Scram             Preparation Gf D-Regulatory Restriction                            4-Continued             Data Entry Sheet E-Operator Training                                  5-Reduced Load           Licensee Event Report
                    & License Examination                          9-Other                   (LER) File   (NUREG-0161)
 
I ~ ~ v}}

Latest revision as of 14:18, 29 October 2019

Revised Monthly Operating Rept for Aug 1990 for WNP-2
ML17286A346
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1990
From: Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17286A344 List:
References
NUDOCS 9010160287
Download: ML17286A346 (2)


Text

DOCKET NO.

50-397 UNIT NAME WNP-2 DATE 9/1/90 LNIT SfUTDOl<NS / REDUCTIONS COMPLETED BY LB Hutchison REPCAT PERIOD Au9 19 90 TELE'ONE mcnth, year RL DDAD llPl'0IJRb REAsOH MMES IZW1D EP l~V I T E

.%HAP8/14/90, S 0 HA PIPBX Reduced load to permit repair of a leaking malay cover on turbine crossunder steam piping.

Uc 0 I Olg A+ NOTE: THIS IS AN ADDENDUM TO THE AUGUST 1990 REPORT WHICH WAS PREVIOUSLY TRANSMITTED.

O~

Qo Ow

~<0 000

~@co A~

l. WNP-2 returned to service frcm refueling outage. Subsequently, a scheduled outage for testing and one peer reduction occurred.

SU>t iARY T'YPE REASON SYSTEM & COMPONENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched 0-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 5-Auto Scram Preparation Gf D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161)

I ~ ~ v