| issue date = 12/31/1990
| issue date = 12/31/1990
| title = Revised Monthly Operating Rept for Dec 1990 for WNP-2
| title = Revised Monthly Operating Rept for Dec 1990 for WNP-2
| author name = HUTCHISON L
| author name = Hutchison L
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OPERATXNG DATA REPORT WNP-2 01-Apr-91 1.DOCKET: 50-397 2.REPORTING PERIOD: Dec-90 3.UTILITY CONTACT: OUTAGE+ON-LXNE HOURS LEONARD HUTCHISON (509)377-2486 744 4.LICENSED THERMAL POWER (MWt): 5.NAMEPLATE RATXNG (GROSS MWe): 6.DESIGN ELECTRICAL RATXNG (NET MWe): 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXIMUM DEPENDABLE CAPACITY (NET MWe): 9.IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: 3323 1200.9 1100 1140 1095-10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): 1 1 REASONS FOR RESTRICTIONS I I F ANY 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LXNE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVXCE FACTOR 21.UNIT AVAXLABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 744 677.2 0.0 664.3 0 2118026 1164 685490 89.3~o 89.3~o 84.14 83.8~o 10.7%79.7 YEAR CUMULATIVE 8760 53024.2 5908.9 38984.2 0.0 340.4 5755.2 37602.8 18004585 106349025 997 90 01 5742027 34028170 65.7c 70.9~o 65'~o 71 6+o 59.9>o 58.6~o 59.64 58.34 6.6~o 8.3%405.1 3401.2 2 6 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE I DURATION)27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: 9105210377 910501 PDR ADOCK 05000397 R PDR}}
{{#Wiki_filter:OPERATXNG DATA REPORT WNP-2 01-Apr-91
: 1. DOCKET: 50-397
: 2. REPORTING PERIOD:     Dec-90             OUTAGE + ON-LXNE HOURS             744
: 3. UTILITY CONTACT:                  LEONARD HUTCHISON   (509) 377-2486
: 4. LICENSED THERMAL POWER (MWt):                                              3323
: 5. NAMEPLATE RATXNG (GROSS MWe):                                            1200.9
: 6. DESIGN ELECTRICAL RATXNG (NET MWe):                                        1100
: 7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):                                    1140
: 8. MAXIMUM DEPENDABLE CAPACITY (NET MWe):                                      1095
: 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT,   GIVE REASONS:
- 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11  REASONS FOR RESTRICTIONS I IF ANY MONTH        YEAR      CUMULATIVE
: 12. REPORT PERIOD HOURS                               744        8760      53024.2
: 13. HOURS REACTOR CRITICAL                         677.2      5908.9      38984.2
: 14. RX RESERVE SHTDWN HRS                             0.0          0.0        340.4
: 15. HRS GENERATOR ON LXNE                           664.3      5755.2      37602.8
: 16. UNIT RESERVE SHUTDOWN HOURS                       0
: 17. GROSS THERMAL ENERGY (MWH)                   2118026    18004585 106349025
: 18. GROSS ELECTRICAL ENERGY (MWH)                   1164        997 90        01
: 19. NET ELECTRICAL ENERGY (MWH)                   685490      5742027      34028170
: 20. UNIT SERVXCE FACTOR                             89. 3~o     65.7c        70.9~o
: 21. UNIT AVAXLABILITYFACTOR                          89. 3~o     65 '~o       71   6+o
: 22. UNIT CAPACITY FACTOR (MDC NET)                  84.14        59.9>o       58.6~o
: 23. UNIT CAPACITY FACTOR (DER NET)                  83. 8~o      59.64         58.34
: 24. UNIT FORCED OUTAGE RATE                          10.7%          6. 6~o       8. 3%
: 25. FORCED OUTAGE HOURS                              79.7        405.1       3401.2 26  SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE I DURATION)
: 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
9105210377 910501 PDR ADOCK 05000397 R               PDR}}

Latest revision as of 14:13, 29 October 2019

Revised Monthly Operating Rept for Dec 1990 for WNP-2
ML17286A766
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1990
From: Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17286A764 List:
References
NUDOCS 9105210377
Download: ML17286A766 (1)


Text

OPERATXNG DATA REPORT WNP-2 01-Apr-91

1. DOCKET: 50-397
2. REPORTING PERIOD: Dec-90 OUTAGE + ON-LXNE HOURS 744
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATXNG (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATXNG (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

- 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

11 REASONS FOR RESTRICTIONS I IF ANY MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 744 8760 53024.2
13. HOURS REACTOR CRITICAL 677.2 5908.9 38984.2
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LXNE 664.3 5755.2 37602.8
16. UNIT RESERVE SHUTDOWN HOURS 0
17. GROSS THERMAL ENERGY (MWH) 2118026 18004585 106349025
18. GROSS ELECTRICAL ENERGY (MWH) 1164 997 90 01
19. NET ELECTRICAL ENERGY (MWH) 685490 5742027 34028170
20. UNIT SERVXCE FACTOR 89. 3~o 65.7c 70.9~o
21. UNIT AVAXLABILITYFACTOR 89. 3~o 65 '~o 71 6+o
22. UNIT CAPACITY FACTOR (MDC NET) 84.14 59.9>o 58.6~o
23. UNIT CAPACITY FACTOR (DER NET) 83. 8~o 59.64 58.34
24. UNIT FORCED OUTAGE RATE 10.7% 6. 6~o 8. 3%
25. FORCED OUTAGE HOURS 79.7 405.1 3401.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE I DURATION)
27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

9105210377 910501 PDR ADOCK 05000397 R PDR