ML17286A766

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Dec 1990 for WNP-2
ML17286A766
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1990
From: Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17286A764 List:
References
NUDOCS 9105210377
Download: ML17286A766 (1)


Text

OPERATXNG DATA REPORT WNP-2 01-Apr-91

1. DOCKET: 50-397
2. REPORTING PERIOD: Dec-90 OUTAGE + ON-LXNE HOURS 744
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATXNG (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATXNG (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

- 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

11 REASONS FOR RESTRICTIONS I IF ANY MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 744 8760 53024.2
13. HOURS REACTOR CRITICAL 677.2 5908.9 38984.2
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LXNE 664.3 5755.2 37602.8
16. UNIT RESERVE SHUTDOWN HOURS 0
17. GROSS THERMAL ENERGY (MWH) 2118026 18004585 106349025
18. GROSS ELECTRICAL ENERGY (MWH) 1164 997 90 01
19. NET ELECTRICAL ENERGY (MWH) 685490 5742027 34028170
20. UNIT SERVXCE FACTOR 89. 3~o 65.7c 70.9~o
21. UNIT AVAXLABILITYFACTOR 89. 3~o 65 '~o 71 6+o
22. UNIT CAPACITY FACTOR (MDC NET) 84.14 59.9>o 58.6~o
23. UNIT CAPACITY FACTOR (DER NET) 83. 8~o 59.64 58.34
24. UNIT FORCED OUTAGE RATE 10.7% 6. 6~o 8. 3%
25. FORCED OUTAGE HOURS 79.7 405.1 3401.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE I DURATION)
27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

9105210377 910501 PDR ADOCK 05000397 R PDR