ML16118A408: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16118A408 | | number = ML16118A408 | ||
| issue date = 05/18/2016 | | issue date = 05/18/2016 | ||
| title = | | title = License Renewal Application Online Reference Portal | ||
| author name = Diaz-Sanabria Y | | author name = Diaz-Sanabria Y | ||
| author affiliation = NRC/NRR/DLR/RAPB | | author affiliation = NRC/NRR/DLR/RAPB | ||
| addressee name = Chisum M | | addressee name = Chisum M | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000382 | | docket = 05000382 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 18, 2016 Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc. | ||
Waterford 3 17265 River Road Killona, LA 70057-3093 | |||
May 18, 2016 | |||
Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc. | |||
Waterford 3 17265 River Road Killona, LA | |||
==SUBJECT:== | ==SUBJECT:== | ||
WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL | WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL | ||
==Dear Mr. Chisum:== | ==Dear Mr. Chisum:== | ||
By letter dated March 23, 2016, Entergy Operations, Inc (Entergy), submitted an application for renewal of facility operating license no. NPF-38 for Waterford Steam Electric Station, Unit 3. The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing this license renewal application (LRA) in accordance with the guidance in NUREG-1800, Rev. 2, | By letter dated March 23, 2016, Entergy Operations, Inc (Entergy), submitted an application for renewal of facility operating license no. NPF-38 for Waterford Steam Electric Station, Unit 3. | ||
The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing this license renewal application (LRA) in accordance with the guidance in NUREG-1800, Rev. 2, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants. | |||
In order to improve the efficiency of the NRC | In order to improve the efficiency of the NRC staffs environmental and safety reviews of the LRA, Entergy and the NRC staff have discussed the use of an online reference portal that would allow the NRC staff and associated contractors limited, read-only access to the basis documents and other reference materials cited in the LRA. The online reference portal would allow the NRC staff to audit basis documents to determine whether the information contained in the documents supports the LRA. In cases where the NRC staff identifies documents as necessary for its analysis of the LRA to document its determination in the safety evaluation report, or its development of the Environmental Impact Statement, the NRC staff will formally request those documents to be submitted on the docket. | ||
allow the NRC staff to audit basis documents to determine whether the information contained in | |||
the documents supports the LRA. In cases where the NRC staff identifies documents as necessary for its analysis of the LRA to document its determination in the safety evaluation report, or its development of the Environmental Impact Statement, the NRC staff will formally request those documents to be submitted on the docket. | |||
The use of the online reference portal will be in accordance with the following restrictions: | The use of the online reference portal will be in accordance with the following restrictions: | ||
* The online reference portal will be password-protected, and passwords will be distributed to NRC staff members and contractors directly involved in the Waterford Steam Electric Station, Unit 3, LRA review on a need-to-know basis. | * The online reference portal will be password-protected, and passwords will be distributed to NRC staff members and contractors directly involved in the Waterford Steam Electric Station, Unit 3, LRA review on a need-to-know basis. | ||
* The online reference portal will not support any printing, saving, or downloading functions. | * The online reference portal will not support any printing, saving, or downloading functions. | ||
* NRC staff members and contractors given password access to the online reference portal will be informed of the conditions of use of the online reference portal by NRC project managers. | * NRC staff members and contractors given password access to the online reference portal will be informed of the conditions of use of the online reference portal by NRC project managers. | ||
M. Chisum | |||
* The conditions associated with the online reference portal will be maintained throughout its use during the Waterford Steam Electric Station, Unit 3, LRA review process. | * The conditions associated with the online reference portal will be maintained throughout its use during the Waterford Steam Electric Station, Unit 3, LRA review process. | ||
* Documents posted to the online reference portal will be limited to basis and other reference material cited in the LRA, unless otherwise agreed upon by Entergy and NRC management. Should you have any questions, please contact Ms. | * Documents posted to the online reference portal will be limited to basis and other reference material cited in the LRA, unless otherwise agreed upon by Entergy and NRC management. | ||
Phyllis Clark, Project Manager for the safety review of the Waterford Steam Electric Station, Unit 3, LRA at 301-415-6447 or by e-mail at Phyllis.Clark@nrc.gov | Should you have any questions, please contact Ms. Phyllis Clark, Project Manager for the safety review of the Waterford Steam Electric Station, Unit 3, LRA at 301-415-6447 or by e-mail at Phyllis.Clark@nrc.gov. | ||
Sincerely, | |||
/RA/ | |||
Yoira K. Diaz-Sanabria, Chief Projects Branch 1 | Yoira K. Diaz-Sanabria, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-382 cc: Listserv | ||
ML16118A408 Concurred via email OFFICE LA:DLR PM:RPB1:DLR PM:RPB1:DLR OGC - NLO NAME IBetts PClark JMitchell JLindell DATE 5/ 2 /16 5/ 3 /16 5/ 4 /16 5/10/16 OFFICE BC:RASB:DLR BC:RARB:DLR BC:RERP:DLR BC:RPB1:DLR NAME BWittick DMorey JDanna YDiazSanabria DATE 5/11/16 5/11/16 5/11/16 5/18/16 | |||
Letter to Michael Chisum from Yoira K. Diaz-Sanabria dated May 18, 2016 | |||
==SUBJECT:== | ==SUBJECT:== | ||
WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL | WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL DISTRIBUTION: | ||
HARD COPY: | |||
DLR RF E-MAIL: | |||
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMWaterford Resource RidsRgn4MailCenter@nrc.gov | |||
--------------- | |||
P. Clark E. Keegan D. Drucker J. Danna E. Gettys E. Sayoc E. Stahl A. Pulvirenti Y. Lindell, OGC D. McIntyre, OPA S. Burnell, OPA A. Moreno, OCA F. Ramirez, RIV C. Speer, RIV M. Dapas, RIV J. Jarrell, RIV A. Thomas, RIV J. Rodriguez, RIV L. Murray, RIV G. Young, RIV D. Lach, RIV A. Taylor, RIV | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 18, 2016 Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc. | |||
Waterford 3 17265 River Road Killona, LA 70057-3093 | |||
May 18, 2016 | |||
Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc. | |||
Waterford 3 17265 River Road Killona, LA | |||
==SUBJECT:== | ==SUBJECT:== | ||
WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL | WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL | ||
==Dear Mr. Chisum:== | ==Dear Mr. Chisum:== | ||
By letter dated March 23, 2016, Entergy Operations, Inc (Entergy), submitted an application for renewal of facility operating license no. NPF-38 for Waterford Steam Electric Station, Unit 3. The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing this license renewal application (LRA) in accordance with the guidance in NUREG-1800, Rev. 2, | By letter dated March 23, 2016, Entergy Operations, Inc (Entergy), submitted an application for renewal of facility operating license no. NPF-38 for Waterford Steam Electric Station, Unit 3. | ||
The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing this license renewal application (LRA) in accordance with the guidance in NUREG-1800, Rev. 2, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants. | |||
In order to improve the efficiency of the NRC | In order to improve the efficiency of the NRC staffs environmental and safety reviews of the LRA, Entergy and the NRC staff have discussed the use of an online reference portal that would allow the NRC staff and associated contractors limited, read-only access to the basis documents and other reference materials cited in the LRA. The online reference portal would allow the NRC staff to audit basis documents to determine whether the information contained in the documents supports the LRA. In cases where the NRC staff identifies documents as necessary for its analysis of the LRA to document its determination in the safety evaluation report, or its development of the Environmental Impact Statement, the NRC staff will formally request those documents to be submitted on the docket. | ||
allow the NRC staff to audit basis documents to determine whether the information contained in | |||
the documents supports the LRA. In cases where the NRC staff identifies documents as necessary for its analysis of the LRA to document its determination in the safety evaluation report, or its development of the Environmental Impact Statement, the NRC staff will formally request those documents to be submitted on the docket. | |||
The use of the online reference portal will be in accordance with the following restrictions: | The use of the online reference portal will be in accordance with the following restrictions: | ||
* The online reference portal will be password-protected, and passwords will be distributed to NRC staff members and contractors directly involved in the Waterford Steam Electric Station, Unit 3, LRA review on a need-to-know basis. | * The online reference portal will be password-protected, and passwords will be distributed to NRC staff members and contractors directly involved in the Waterford Steam Electric Station, Unit 3, LRA review on a need-to-know basis. | ||
* The online reference portal will not support any printing, saving, or downloading functions. | * The online reference portal will not support any printing, saving, or downloading functions. | ||
* NRC staff members and contractors given password access to the online reference portal will be informed of the conditions of use of the online reference portal by NRC project managers. | * NRC staff members and contractors given password access to the online reference portal will be informed of the conditions of use of the online reference portal by NRC project managers. | ||
M. Chisum | |||
* The conditions associated with the online reference portal will be maintained throughout its use during the Waterford Steam Electric Station, Unit 3, LRA review process. | * The conditions associated with the online reference portal will be maintained throughout its use during the Waterford Steam Electric Station, Unit 3, LRA review process. | ||
* Documents posted to the online reference portal will be limited to basis and other reference material cited in the LRA, unless otherwise agreed upon by Entergy and NRC management. Should you have any questions, please contact Ms. | * Documents posted to the online reference portal will be limited to basis and other reference material cited in the LRA, unless otherwise agreed upon by Entergy and NRC management. | ||
Phyllis Clark, Project Manager for the safety review of the Waterford Steam Electric Station, Unit 3, LRA at 301-415-6447 or by e-mail at Phyllis.Clark@nrc.gov | Should you have any questions, please contact Ms. Phyllis Clark, Project Manager for the safety review of the Waterford Steam Electric Station, Unit 3, LRA at 301-415-6447 or by e-mail at Phyllis.Clark@nrc.gov. | ||
Sincerely, | |||
/RA/ | |||
Yoira K. Diaz-Sanabria, Chief Projects Branch 1 | Yoira K. Diaz-Sanabria, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-382 cc: Listserv | ||
ML16118A408 Concurred via email OFFICE LA:DLR PM:RPB1:DLR PM:RPB1:DLR OGC - NLO NAME IBetts PClark JMitchell JLindell DATE 5/ 2 /16 5/ 3 /16 5/ 4 /16 5/10/16 OFFICE BC:RASB:DLR BC:RARB:DLR BC:RERP:DLR BC:RPB1:DLR NAME BWittick DMorey JDanna YDiazSanabria DATE 5/11/16 5/11/16 5/11/16 5/18/16 | |||
Letter to Michael Chisum from Yoira K. Diaz-Sanabria dated May 18, 2016 | |||
==SUBJECT:== | ==SUBJECT:== | ||
WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL | WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL DISTRIBUTION: | ||
HARD COPY: | |||
DISTRIBUTION | DLR RF E-MAIL: | ||
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMWaterford Resource RidsRgn4MailCenter@nrc.gov | |||
--------------- | |||
RidsNrrDlrRpb1 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource | P. Clark E. Keegan D. Drucker J. Danna E. Gettys E. Sayoc E. Stahl A. Pulvirenti Y. Lindell, OGC D. McIntyre, OPA S. Burnell, OPA A. Moreno, OCA F. Ramirez, RIV C. Speer, RIV M. Dapas, RIV J. Jarrell, RIV A. Thomas, RIV J. Rodriguez, RIV L. Murray, RIV G. Young, RIV D. Lach, RIV A. Taylor, RIV}} | ||
RidsNrrDlrRsrg Resource RidsNrrPMWaterford Resource RidsRgn4MailCenter@nrc.gov | |||
P. Clark | |||
E. Keegan | |||
D. Drucker | |||
J. Danna E. Gettys E. Sayoc | |||
E. Stahl | |||
A. Pulvirenti | |||
Y. Lindell, OGC D. McIntyre, OPA S. Burnell, OPA A. Moreno, OCA F. Ramirez, RIV C. Speer, RIV | |||
M. Dapas, RIV J. Jarrell, RIV A. Thomas, RIV J. Rodriguez, RIV | |||
L. Murray, RIV | |||
G. Young, RIV D. Lach, RIV A. Taylor, RIV}} |
Latest revision as of 21:10, 30 October 2019
ML16118A408 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 05/18/2016 |
From: | Yoira Diaz-Sanabria NRC/NRR/DLR/RAPB |
To: | Chisum M Entergy Operations |
Clark P, NRR/DLR, 415-6447 | |
References | |
DLR-16-0095 | |
Download: ML16118A408 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 18, 2016 Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc.
Waterford 3 17265 River Road Killona, LA 70057-3093
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL
Dear Mr. Chisum:
By letter dated March 23, 2016, Entergy Operations, Inc (Entergy), submitted an application for renewal of facility operating license no. NPF-38 for Waterford Steam Electric Station, Unit 3.
The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing this license renewal application (LRA) in accordance with the guidance in NUREG-1800, Rev. 2, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants.
In order to improve the efficiency of the NRC staffs environmental and safety reviews of the LRA, Entergy and the NRC staff have discussed the use of an online reference portal that would allow the NRC staff and associated contractors limited, read-only access to the basis documents and other reference materials cited in the LRA. The online reference portal would allow the NRC staff to audit basis documents to determine whether the information contained in the documents supports the LRA. In cases where the NRC staff identifies documents as necessary for its analysis of the LRA to document its determination in the safety evaluation report, or its development of the Environmental Impact Statement, the NRC staff will formally request those documents to be submitted on the docket.
The use of the online reference portal will be in accordance with the following restrictions:
- The online reference portal will be password-protected, and passwords will be distributed to NRC staff members and contractors directly involved in the Waterford Steam Electric Station, Unit 3, LRA review on a need-to-know basis.
- The online reference portal will not support any printing, saving, or downloading functions.
- NRC staff members and contractors given password access to the online reference portal will be informed of the conditions of use of the online reference portal by NRC project managers.
M. Chisum
- The conditions associated with the online reference portal will be maintained throughout its use during the Waterford Steam Electric Station, Unit 3, LRA review process.
- Documents posted to the online reference portal will be limited to basis and other reference material cited in the LRA, unless otherwise agreed upon by Entergy and NRC management.
Should you have any questions, please contact Ms. Phyllis Clark, Project Manager for the safety review of the Waterford Steam Electric Station, Unit 3, LRA at 301-415-6447 or by e-mail at Phyllis.Clark@nrc.gov.
Sincerely,
/RA/
Yoira K. Diaz-Sanabria, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-382 cc: Listserv
ML16118A408 Concurred via email OFFICE LA:DLR PM:RPB1:DLR PM:RPB1:DLR OGC - NLO NAME IBetts PClark JMitchell JLindell DATE 5/ 2 /16 5/ 3 /16 5/ 4 /16 5/10/16 OFFICE BC:RASB:DLR BC:RARB:DLR BC:RERP:DLR BC:RPB1:DLR NAME BWittick DMorey JDanna YDiazSanabria DATE 5/11/16 5/11/16 5/11/16 5/18/16
Letter to Michael Chisum from Yoira K. Diaz-Sanabria dated May 18, 2016
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMWaterford Resource RidsRgn4MailCenter@nrc.gov
P. Clark E. Keegan D. Drucker J. Danna E. Gettys E. Sayoc E. Stahl A. Pulvirenti Y. Lindell, OGC D. McIntyre, OPA S. Burnell, OPA A. Moreno, OCA F. Ramirez, RIV C. Speer, RIV M. Dapas, RIV J. Jarrell, RIV A. Thomas, RIV J. Rodriguez, RIV L. Murray, RIV G. Young, RIV D. Lach, RIV A. Taylor, RIV
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 18, 2016 Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc.
Waterford 3 17265 River Road Killona, LA 70057-3093
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL
Dear Mr. Chisum:
By letter dated March 23, 2016, Entergy Operations, Inc (Entergy), submitted an application for renewal of facility operating license no. NPF-38 for Waterford Steam Electric Station, Unit 3.
The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing this license renewal application (LRA) in accordance with the guidance in NUREG-1800, Rev. 2, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants.
In order to improve the efficiency of the NRC staffs environmental and safety reviews of the LRA, Entergy and the NRC staff have discussed the use of an online reference portal that would allow the NRC staff and associated contractors limited, read-only access to the basis documents and other reference materials cited in the LRA. The online reference portal would allow the NRC staff to audit basis documents to determine whether the information contained in the documents supports the LRA. In cases where the NRC staff identifies documents as necessary for its analysis of the LRA to document its determination in the safety evaluation report, or its development of the Environmental Impact Statement, the NRC staff will formally request those documents to be submitted on the docket.
The use of the online reference portal will be in accordance with the following restrictions:
- The online reference portal will be password-protected, and passwords will be distributed to NRC staff members and contractors directly involved in the Waterford Steam Electric Station, Unit 3, LRA review on a need-to-know basis.
- The online reference portal will not support any printing, saving, or downloading functions.
- NRC staff members and contractors given password access to the online reference portal will be informed of the conditions of use of the online reference portal by NRC project managers.
M. Chisum
- The conditions associated with the online reference portal will be maintained throughout its use during the Waterford Steam Electric Station, Unit 3, LRA review process.
- Documents posted to the online reference portal will be limited to basis and other reference material cited in the LRA, unless otherwise agreed upon by Entergy and NRC management.
Should you have any questions, please contact Ms. Phyllis Clark, Project Manager for the safety review of the Waterford Steam Electric Station, Unit 3, LRA at 301-415-6447 or by e-mail at Phyllis.Clark@nrc.gov.
Sincerely,
/RA/
Yoira K. Diaz-Sanabria, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-382 cc: Listserv
ML16118A408 Concurred via email OFFICE LA:DLR PM:RPB1:DLR PM:RPB1:DLR OGC - NLO NAME IBetts PClark JMitchell JLindell DATE 5/ 2 /16 5/ 3 /16 5/ 4 /16 5/10/16 OFFICE BC:RASB:DLR BC:RARB:DLR BC:RERP:DLR BC:RPB1:DLR NAME BWittick DMorey JDanna YDiazSanabria DATE 5/11/16 5/11/16 5/11/16 5/18/16
Letter to Michael Chisum from Yoira K. Diaz-Sanabria dated May 18, 2016
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMWaterford Resource RidsRgn4MailCenter@nrc.gov
P. Clark E. Keegan D. Drucker J. Danna E. Gettys E. Sayoc E. Stahl A. Pulvirenti Y. Lindell, OGC D. McIntyre, OPA S. Burnell, OPA A. Moreno, OCA F. Ramirez, RIV C. Speer, RIV M. Dapas, RIV J. Jarrell, RIV A. Thomas, RIV J. Rodriguez, RIV L. Murray, RIV G. Young, RIV D. Lach, RIV A. Taylor, RIV