(8 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML14111A083 | | | number = ML14111A083 |
| | issue date = 04/29/2014 | | | issue date = 04/29/2014 |
| | title = Columbia Generating Station - Request for Additional Information, License Amendment Request to Modify Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows (TAC MF | | | title = Request for Additional Information, License Amendment Request to Modify Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows |
| | author name = Lyon C F | | | author name = Lyon C |
| | author affiliation = NRC/NRR/DORL/LPLIV-1 | | | author affiliation = NRC/NRR/DORL/LPLIV-1 |
| | addressee name = Reddemann M E | | | addressee name = Reddemann M |
| | addressee affiliation = Energy Northwest | | | addressee affiliation = Energy Northwest |
| | docket = 05000397 | | | docket = 05000397 |
| | license number = NPF-021 | | | license number = NPF-021 |
| | contact person = Lyon C F | | | contact person = Lyon C |
| | case reference number = TAC MF3055 | | | case reference number = TAC MF3055 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1 023) Richland, WA 99352-0968 April 29, 2014 SUBJECT: COLUMBIA GENERATING STATION -REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST FOR CHANGE TO EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (TAC NO. MF3055) Dear Mr. Reddemann: By application dated October 31, 2013, to the U.S. Nuclear Regulatory Commission (NRC) (Agencywide Documents Access and Management System Accession No. ML 13316A009), Energy Northwest submitted a license amendment request to revise Columbia Generating Station Technical Specification Surveillance Requirements 3.5.1.4 and 3.5.2.5 for the low pressure core spray and residual heat removal/low pressure coolant injection pump flows. The NRC staff has reviewed the information provided in your application and determined that additional information is required in order to complete its review. The enclosed questions were provided to L. Williams of your staff on April 18, 2014. Please provide a response to the questions within 30 days of the date of this letter. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2296 or by e-mail at fred.lyon@nrc.gov. Docket No. 50-397 Enclosure: Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION CHANGE TO EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397 By application dated October 31, 2013, to the U.S. Nuclear Regulatory Commission (NRC) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13316A009), Energy Northwest submitted a license amendment request to revise Columbia Generating Station Technical Specification (TS) Surveillance Requirements (SRs) 3.5.1.4 and 3.5.2.5 for the low pressure core spray (LPCS) and residual heat removal/low pressure coolant injection (RHR/LPCI) pump flows. The proposed amendment would modify SRs 3.5.1.4 and 5.2.5 to decrease flow rates at the same specified differential pressure between the reactor pressure vessel and suppression pool (129 pounds per square inch differential (psid) for LPCS and 26 psid for RHR/LPCI). LPCS will have its flow rate decreased from 6,350 gallons per minute (gpm) to 6,200 gpm and the RHR/LPCI flow rate will be decreased from 7,450 gpm to 7,200 gpm. Based on its review, the NRC staff requests the following additional information to complete its safety evaluation of the application. SRXB-RAI-1 NED0-33813, Revision 2, "Technical Specification Change Support for RHR/LPCI and LPCS Flow Rate Long-Term LOCA [Loss-of-Coolant Accident] Containment Response and ECCS [Emergency Core Cooling System]/Non-LOCA Evaluations," September 2013 (ADAMS Accession No. ML 13316A010), Section 4.1.7, Refueling Operations and Spent Fuel Pool Cooling Assessment, states that refueling operations and spent fuel pool cooling may be affected if there is a reduction in the RHR heat exchanger heat removal capacity as a result of RHR/LPCI and LPCS flow rate reduction. NED0-33813, Revision 2 also indicates that these evaluations were not included with the report, and that the assessments would be made by Energy Northwest outside of this report. Please provide the assessments for refueling operations and spent fuel pool cooling to determine acceptability. Enclosure Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1 023) Richland, WA 99352-0968 April 29, 2014 SUBJECT: COLUMBIA GENERATING STATION-REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST FOR CHANGE TO EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (TAC NO. MF3055) Dear Mr. Reddemann: By application dated October 31, 2013, to the U.S. Nuclear Regulatory Commission (NRC) (Agencywide Documents Access and Management System Accession No. ML 13316A009), Energy Northwest submitted a license amendment request to revise Columbia Generating Station Technical Specification Surveillance Requirements 3.5.1.4 and 3.5.2.5 for the low pressure core spray and residual heat removal/low pressure coolant injection pump flows. The NRC staff has reviewed the information provided in your application and determined that additional information is required in order to complete its review. The enclosed questions were provided to L. Williams of your staff on April18, 2014. Please provide a response to the questions within 30 days of the date of this letter. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2296 or by e-mail at fred.lyon@nrc.gov. Docket No. 50-397 Enclosure: Sincerely, IRA/ Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC LPL4-1 Reading RidsAcrsAcnw_MaiiCTR Resource RidsNrrDoriLpl4-1 Resource RidsNrrDssSrxb Resource RidsNrrLAJBurkhardt Resource ADAMS Accession No.* ML 14111A083 OFFICE NRRIDORULPL4-1 /PM N RRIDORULPL4-1 /LA NRR/DSS/SRXB/BC* NAME FLyon JBurkhardt CJackson DATE 4/28/14 4/28/14 4/8/14 OFFICIAL RECORD COPY RidsNrrPMColumbia Resource RidsRgn4Mai1Center Resource MHardgrove, NRRIDSS/SRXB *email N RR/DORULPL4-1 /BC NRRIDORULPL4-1 /PM MMarkley FLyon 4/29/14 4/29/14 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 29, 2014 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) |
| }} | | Richland, WA 99352-0968 |
| | |
| | ==SUBJECT:== |
| | COLUMBIA GENERATING STATION - REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST FOR CHANGE TO EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (TAC NO. MF3055) |
| | |
| | ==Dear Mr. Reddemann:== |
| | |
| | By application dated October 31, 2013, to the U.S. Nuclear Regulatory Commission (NRC) |
| | (Agencywide Documents Access and Management System Accession No. ML13316A009), |
| | Energy Northwest submitted a license amendment request to revise Columbia Generating Station Technical Specification Surveillance Requirements 3.5.1.4 and 3.5.2.5 for the low pressure core spray and residual heat removal/low pressure coolant injection pump flows. |
| | The NRC staff has reviewed the information provided in your application and determined that additional information is required in order to complete its review. The enclosed questions were provided to L. Williams of your staff on April 18, 2014. Please provide a response to the questions within 30 days of the date of this letter. |
| | If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2296 or by e-mail at fred.lyon@nrc.gov. |
| | Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397 |
| | |
| | ==Enclosure:== |
| | |
| | Request for Additional Information cc w/encl: Distribution via Listserv |
| | |
| | REQUEST FOR ADDITIONAL INFORMATION CHANGE TO EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397 By application dated October 31, 2013, to the U.S. Nuclear Regulatory Commission (NRC) |
| | (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13316A009), Energy Northwest submitted a license amendment request to revise Columbia Generating Station Technical Specification (TS) Surveillance Requirements (SRs) 3.5.1.4 and 3.5.2.5 for the low pressure core spray (LPCS) and residual heat removal/low pressure coolant injection (RHR/LPCI) pump flows. The proposed amendment would modify SRs 3.5.1.4 and 5.2.5 to decrease flow rates at the same specified differential pressure between the reactor pressure vessel and suppression pool (129 pounds per square inch differential (psid) for LPCS and 26 psid for RHR/LPCI). LPCS will have its flow rate decreased from 6,350 gallons per minute (gpm) to 6,200 gpm and the RHR/LPCI flow rate will be decreased from 7,450 gpm to 7,200 gpm. |
| | Based on its review, the NRC staff requests the following additional information to complete its safety evaluation of the application. |
| | SRXB-RAI-1 NED0-33813, Revision 2, "Technical Specification Change Support for RHR/LPCI and LPCS Flow Rate Long-Term LOCA [Loss-of-Coolant Accident] Containment Response and ECCS |
| | [Emergency Core Cooling System]/Non-LOCA Evaluations," September 2013 (ADAMS Accession No. ML13316A010), Section 4.1.7, Refueling Operations and Spent Fuel Pool Cooling Assessment, states that refueling operations and spent fuel pool cooling may be affected if there is a reduction in the RHR heat exchanger heat removal capacity as a result of RHR/LPCI and LPCS flow rate reduction. NED0-33813, Revision 2 also indicates that these evaluations were not included with the report, and that the assessments would be made by Energy Northwest outside of this report. |
| | Please provide the assessments for refueling operations and spent fuel pool cooling to determine acceptability. |
| | Enclosure |
| | * ML14111A083 *email OFFICE NRRIDORULPL4-1 /PM N RRIDORULPL4-1 /LA NRR/DSS/SRXB/BC* N RR/DORULPL4-1 /BC NRRIDORULPL4-1 /PM NAME FLyon JBurkhardt CJackson MMarkley FLyon DATE 4/28/14 4/28/14 4/8/14 4/29/14 4/29/14}} |
Letter Sequence RAI |
---|
|
|
MONTHYEARGO2-13-151, NEDO-33813, Rev. 2, Technical Specification Change Support for Rhr/Lpci and LPCS Flow Rate. Long-Term LOCA Containment Response and ECCS/Non-LOCA Evaluations.2013-09-30030 September 2013 NEDO-33813, Rev. 2, Technical Specification Change Support for Rhr/Lpci and LPCS Flow Rate. Long-Term LOCA Containment Response and ECCS/Non-LOCA Evaluations. Project stage: Other ML13316A0092013-10-31031 October 2013 License Amendment Request for Change to Emergency Core Cooling Systems Surveillance Requirements Project stage: Request ML14038A0262014-02-0707 February 2014 NRR E-mail Capture - Acceptance Review Project stage: Acceptance Review ML14056A1202014-03-0505 March 2014 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML14111A0832014-04-29029 April 2014 Request for Additional Information, License Amendment Request to Modify Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows Project stage: RAI ML14163A4822014-05-29029 May 2014 Response to Request for Additional Information Regarding License Amendment Request to Change Emergency Core Cooling Systems Surveillance Requirements Project stage: Response to RAI ML14192B0312014-08-13013 August 2014 Redacted, Request for Additional Information, Nrr/Dss/Scvb, Request to Modify Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows Project stage: RAI ML14335A1892015-01-0707 January 2015 Redacted, Issuance of Amendment No. 229, Revise Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows Project stage: Approval 2014-03-05
[Table View] |
|
---|
Category:Letter
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 ML23206A2442023-07-25025 July 2023 Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance ML23163A2502023-06-12012 June 2023 Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report ML23157A2702023-06-0101 June 2023 4-2022-011 -022 Letter - OI Closure to Licensee IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 2024-01-08
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22242A1082022-08-30030 August 2022 Information Request, Information Request, Security IR 2022404 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information ML22145A4462022-06-0606 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000397/2022401 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22041A4572022-02-10010 February 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000397/2022010) and Request for Information ML21277A3572021-10-12012 October 2021 CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 ML20034E6082020-02-0303 February 2020 NRR E-mail Capture - RAI Formal Release Columbia TSTF 563 LAR, 30 Day Response Period Due March 3, 2020 ML20028E1512020-01-27027 January 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000397/2020002) and Request for Information ML19267A1842019-09-24024 September 2019 Request for Information for Upcoming Open Phase Condition Inspection at Columbia Generating Station ML19232A2282019-08-20020 August 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia Exigent Amendment - One Electrical RAI, ML19183A4752019-07-0202 July 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia HVAC LAR L-2019-LLA-0034 ML18088A0152018-03-29029 March 2018 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000397/2018010) and Request for ML17341B0272017-12-0707 December 2017 NRR E-mail Capture - RAI Associated with Columbia Amendment Request Revise Tech Spec 5.5.12 for Permanent Extension of Type a and Type C Containment Testing Frequencies for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - New RAI Response Da ML17292A0572017-10-18018 October 2017 NRR E-mail Capture - New RWCU RAI Due Date Now November 24, 2017 ML17249A6882017-09-0606 September 2017 NRR E-mail Capture - RAIs for Columbia Relief Request RAI (MF8925), 3ISI-19 ML17205A3152017-07-20020 July 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000397/2017004) and Request for Information ML17193A2192017-07-12012 July 2017 NRR E-mail Capture - Columbia RWCU LAR MF8318, Formal Release of RAIs ML17144A1702017-05-24024 May 2017 NRR E-mail Capture - NRC RAIs for Columbia Relief Request MF8922, 3ISI-16 ML17047A7492017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais ML17006A0922017-01-0404 January 2017 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML17006A0902017-01-0404 January 2017 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16356A1382016-12-21021 December 2016 NRR E-mail Capture - Columbia Mur LAR Evib RAIs Non - Proprietary Version - Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate ML16342C4322016-12-0707 December 2016 NRR E-mail Capture - Columbia Measurement Uncertainty Recapture Power Uprate LAR Rais: Human Performance: MF8060, Formal Release for Response on Monday January 9, 2017 ML16327A1842016-11-22022 November 2016 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16323A1192016-11-16016 November 2016 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16218A3902016-08-0808 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Request for Measurement Uncertainty Recapture (Mur) Power Uprate (from 3486 Mwt to 3544 Mwt) ML16194A3702016-07-11011 July 2016 Notification of NRC Triennial Heat Sink Performance Inspection 05000397/2016003 and Request for Information ML16069A3592016-03-0909 March 2016 NRR E-mail Capture - Second Round Rais: Columbia MF6042 LAR TSTF-425 ML16061A5542016-03-0101 March 2016 Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information ML16061A5662016-03-0101 March 2016 Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information ML15254A2572015-09-16016 September 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1 Seismic Reevaluations ML15215A0432015-08-18018 August 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations ML14262A3412014-09-24024 September 2014 Request for Additional Information, Round 2, License Amendment Request to Revise TS Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High ML14192B0312014-08-13013 August 2014 Redacted, Request for Additional Information, Nrr/Dss/Scvb, Request to Modify Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows ML14206A0112014-07-31031 July 2014 Request for Additional Information, License Amendment Request to Revise TS Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High 2024-01-10
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 29, 2014 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
COLUMBIA GENERATING STATION - REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST FOR CHANGE TO EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (TAC NO. MF3055)
Dear Mr. Reddemann:
By application dated October 31, 2013, to the U.S. Nuclear Regulatory Commission (NRC)
(Agencywide Documents Access and Management System Accession No. ML13316A009),
Energy Northwest submitted a license amendment request to revise Columbia Generating Station Technical Specification Surveillance Requirements 3.5.1.4 and 3.5.2.5 for the low pressure core spray and residual heat removal/low pressure coolant injection pump flows.
The NRC staff has reviewed the information provided in your application and determined that additional information is required in order to complete its review. The enclosed questions were provided to L. Williams of your staff on April 18, 2014. Please provide a response to the questions within 30 days of the date of this letter.
If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2296 or by e-mail at fred.lyon@nrc.gov.
Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION CHANGE TO EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397 By application dated October 31, 2013, to the U.S. Nuclear Regulatory Commission (NRC)
(Agencywide Documents Access and Management System (ADAMS) Accession No. ML13316A009), Energy Northwest submitted a license amendment request to revise Columbia Generating Station Technical Specification (TS) Surveillance Requirements (SRs) 3.5.1.4 and 3.5.2.5 for the low pressure core spray (LPCS) and residual heat removal/low pressure coolant injection (RHR/LPCI) pump flows. The proposed amendment would modify SRs 3.5.1.4 and 5.2.5 to decrease flow rates at the same specified differential pressure between the reactor pressure vessel and suppression pool (129 pounds per square inch differential (psid) for LPCS and 26 psid for RHR/LPCI). LPCS will have its flow rate decreased from 6,350 gallons per minute (gpm) to 6,200 gpm and the RHR/LPCI flow rate will be decreased from 7,450 gpm to 7,200 gpm.
Based on its review, the NRC staff requests the following additional information to complete its safety evaluation of the application.
SRXB-RAI-1 NED0-33813, Revision 2, "Technical Specification Change Support for RHR/LPCI and LPCS Flow Rate Long-Term LOCA [Loss-of-Coolant Accident] Containment Response and ECCS
[Emergency Core Cooling System]/Non-LOCA Evaluations," September 2013 (ADAMS Accession No. ML13316A010), Section 4.1.7, Refueling Operations and Spent Fuel Pool Cooling Assessment, states that refueling operations and spent fuel pool cooling may be affected if there is a reduction in the RHR heat exchanger heat removal capacity as a result of RHR/LPCI and LPCS flow rate reduction. NED0-33813, Revision 2 also indicates that these evaluations were not included with the report, and that the assessments would be made by Energy Northwest outside of this report.
Please provide the assessments for refueling operations and spent fuel pool cooling to determine acceptability.
Enclosure
- ML14111A083 *email OFFICE NRRIDORULPL4-1 /PM N RRIDORULPL4-1 /LA NRR/DSS/SRXB/BC* N RR/DORULPL4-1 /BC NRRIDORULPL4-1 /PM NAME FLyon JBurkhardt CJackson MMarkley FLyon DATE 4/28/14 4/28/14 4/8/14 4/29/14 4/29/14