| number = ML17331A007
| number = ML17331A007
| issue date = 11/21/2017
| issue date = 11/21/2017
| title = E-mail Regarding Final Eicb Request for Additional Information - Hope Creek Power Uprate (EPID L-2017-LLS-0002)
| title = E-mail Regarding Final Eicb Request for Additional Information - Hope Creek Power Uprate
| author name = Regner L M
| author name = Regner L
| author affiliation = NRC/NRR/DORL/LPLI
| author affiliation = NRC/NRR/DORL/LPLI
| addressee name = Duke P R
| addressee name = Duke P
| addressee affiliation = PSEG Nuclear, LLC
| addressee affiliation = PSEG Nuclear, LLC
| docket = 05000354
| docket = 05000354
| license number = NPF-057
| license number = NPF-057
| contact person = Regner L M
| contact person = Regner L
| case reference number = EPID L-2017-LLS-0002
| case reference number = EPID L-2017-LLS-0002
| document type = E-Mail, Request for Additional Information (RAI)
| document type = E-Mail, Request for Additional Information (RAI)
| page count = 1
| page count = 1
| project = EPID:L-2017-LLS-0002
| project = EPID:L-2017-LLS-0002
| stage = RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:From:Regner, LisaTo:Paul.Duke@pseg.com; Thomas, Brian J.Cc:Regner, LisaSubject:FINAL EICB Request for Additional Informaiton - Hope Creek Power UprateDate:Tuesday, November 21, 2017 3:50:00 PM
{{#Wiki_filter:From:               Regner, Lisa To:                 Paul.Duke@pseg.com; Thomas, Brian J.
Cc:                 Regner, Lisa


===Attachments:===
==Subject:==
HCGS MUR draft EICB Request for Additional Information.msgFinal Request for Additional Information (L-2017-LLS-0002) On November 17, 2017, the U.S. Nuclear Regulatory Commission (NRC) staff sent PSEG(the licensee) a draft Request for Additional Information (RAI) as provided in the attacheddocumen These RAI questions relate to a license amendment request (LAR) thatproposes to increase the rated thermal power level from 3840 megawatts thermal to 3902megawatts thermal, and make technical specification changes as necessary to supportoperation at the uprated power leve This is referred to as a measurement uncertaintyrecapture (MUR) uprate. Subsequently. Mr. Brian Thomas of PSEG, informed the NRC staff that the questions wereunderstood and PSEG agreed to provide a response to this final RAI within 30 day IfPSEG does not respond by this date, the requested completion date for the MUR decisionmay not be met by the NR The NRC staff also informed the licensee that a publicly available version of this final RAIwould be placed in the NRC's Agencywide Documents Access and Management System(ADAMS). By letter dated July 7, 2017, (ADAMS package Accession No. ML17188A259), the licenseerequested an amendment to the Operating License for Hope Creek Generating Station. The proposed amendment requests a MUR uprate for Hope Cree The NRC staff requiresadditional information to complete its review of this request as detailed in the attacheddocument. Lisa M. RegnerSenior Project ManagerBranch 4, Division of Operating Reactor LicensingOffice of Nuclear Reactor RegulationU.S. Nuclear Regulatory Commission Lisa.Regner@NRC.gov 301-415-1906 OWFN 9D14}}
FINAL EICB Request for Additional Informaiton - Hope Creek Power Uprate Date:                Tuesday, November 21, 2017 3:50:00 PM Attachments:        HCGS MUR draft EICB Request for Additional Information.msg Final Request for Additional Information (L-2017-LLS-0002)
On November 17, 2017, the U.S. Nuclear Regulatory Commission (NRC) staff sent PSEG (the licensee) a draft Request for Additional Information (RAI) as provided in the attached document. These RAI questions relate to a license amendment request (LAR) that proposes to increase the rated thermal power level from 3840 megawatts thermal to 3902 megawatts thermal, and make technical specification changes as necessary to support operation at the uprated power level. This is referred to as a measurement uncertainty recapture (MUR) uprate.
Subsequently. Mr. Brian Thomas of PSEG, informed the NRC staff that the questions were understood and PSEG agreed to provide a response to this final RAI within 30 days. If PSEG does not respond by this date, the requested completion date for the MUR decision may not be met by the NRC.
The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRCs Agencywide Documents Access and Management System (ADAMS).
By letter dated July 7, 2017, (ADAMS package Accession No. ML17188A259), the licensee requested an amendment to the Operating License for Hope Creek Generating Station.
The proposed amendment requests a MUR uprate for Hope Creek. The NRC staff requires additional information to complete its review of this request as detailed in the attached document.
Lisa M. Regner Senior Project Manager Branch 4, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
* Lisa.Regner@NRC.gov
' 301-415-1906
: OWFN 9D14}}

Latest revision as of 04:47, 29 October 2019

E-mail Regarding Final Eicb Request for Additional Information - Hope Creek Power Uprate
ML17331A007
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/21/2017
From: Lisa Regner
Plant Licensing Branch 1
To: Duke P
Public Service Enterprise Group
Regner L
References
EPID L-2017-LLS-0002
Download: ML17331A007 (1)


Text

From: Regner, Lisa To: Paul.Duke@pseg.com; Thomas, Brian J.

Cc: Regner, Lisa

Subject:

FINAL EICB Request for Additional Informaiton - Hope Creek Power Uprate Date: Tuesday, November 21, 2017 3:50:00 PM Attachments: HCGS MUR draft EICB Request for Additional Information.msg Final Request for Additional Information (L-2017-LLS-0002)

On November 17, 2017, the U.S. Nuclear Regulatory Commission (NRC) staff sent PSEG (the licensee) a draft Request for Additional Information (RAI) as provided in the attached document. These RAI questions relate to a license amendment request (LAR) that proposes to increase the rated thermal power level from 3840 megawatts thermal to 3902 megawatts thermal, and make technical specification changes as necessary to support operation at the uprated power level. This is referred to as a measurement uncertainty recapture (MUR) uprate.

Subsequently. Mr. Brian Thomas of PSEG, informed the NRC staff that the questions were understood and PSEG agreed to provide a response to this final RAI within 30 days. If PSEG does not respond by this date, the requested completion date for the MUR decision may not be met by the NRC.

The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRCs Agencywide Documents Access and Management System (ADAMS).

By letter dated July 7, 2017, (ADAMS package Accession No. ML17188A259), the licensee requested an amendment to the Operating License for Hope Creek Generating Station.

The proposed amendment requests a MUR uprate for Hope Creek. The NRC staff requires additional information to complete its review of this request as detailed in the attached document.

Lisa M. Regner Senior Project Manager Branch 4, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission