Letter Sequence Draft RAI |
|---|
|
|
MONTHYEARML17188A2652016-12-31031 December 2016 Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi Project stage: Other ML17188A2672017-03-31031 March 2017 Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) Project stage: Other ML17188A2602017-07-0707 July 2017 License Amendment Request for Measurement Uncertainty Recapture (MUR) Power Uprate Project stage: Request LR-N17-0044, Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings2017-07-0707 July 2017 Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings Project stage: Other 05000354/LER-1917-001, Regarding Secondary Containment Door Not Latched in Closed Position2017-07-0707 July 2017 Regarding Secondary Containment Door Not Latched in Closed Position Project stage: Request ML17222A1182017-08-16016 August 2017 Acceptance of Requested Licensing Action License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review ML17235B1202017-08-28028 August 2017 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N17-0141, Transmittal of 2017 Annual 10 CFR 50.46 Report2017-09-27027 September 2017 Transmittal of 2017 Annual 10 CFR 50.46 Report Project stage: Request ML17290B0132017-10-17017 October 2017 NRR E-mail Capture - Hope Creek MUR Request for Additional Information for Apla and Snpb Project stage: RAI LR-N17-0161, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-11-0101 November 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML17324A0522017-11-0909 November 2017 NRR E-mail Capture - Draft Request for Additional Information - Hope Creek MUR Chemical, Corrosion, and Steam Generator Project stage: Draft RAI ML17324A2602017-11-17017 November 2017 NRR E-mail Capture - Final Request for Additional Information - Hope Creek MUR Electrical Instrumentation and Controls Project stage: RAI LR-N17-0170, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-11-27027 November 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0176, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate2017-12-14014 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate Project stage: Response to RAI LR-N17-0186, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0181, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0187, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0175, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0189, Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-22022 December 2017 Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI HCH-2017-049, Discharge Monitoring Report for November 20172017-12-22022 December 2017 Discharge Monitoring Report for November 2017 Project stage: Request ML18011A0352018-01-11011 January 2018 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station (CAC No. MF9930; EPID L-2017-LLA-0426) Project stage: Withholding Request Acceptance LR-N18-0009, Supplemental Information for the Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2018-01-22022 January 2018 Supplemental Information for the Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Supplement ML18096A5422018-04-24024 April 2018 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002) Project stage: Approval 2017-12-22
[Table View] |
Text
1 NRR-PMDAPEm Resource From:
Regner, Lisa Sent:
Thursday, November 09, 2017 11:54 AM To:
Paul.Duke@pseg.com Cc:
Thomas, Brian J.
Subject:
Draft RAI for Hope Creek MUR Follow Up Flag:
Follow up Flag Status:
Completed
- Paul, Below are the 2 draft questions from the Chemical, Corrosion, and Steam Generator Branch (MCCB). Please let me know if youd like to have a clarification call next week.
- Thanks, Lisa DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE HOPE CREEK GENERATING STATION PSEG NUCLEAR, LLC.
DOCKET NO. 50-354 Protective Coatings in Containment:
Protective coating systems (paints) provide a means for protecting the surfaces of facilities and equipment from corrosion and contamination from radionuclides, and also provide wear protection during plant operation and maintenance activities. Coatings are also used due to their suitability for, and stability under, design basis LOCA accident conditions, considering radiation and chemical effects. The NRC's acceptance criteria for protective coating systems is based on: (1) 10 CFR Part 50, Appendix B, which states quality assurance requirements for the design, fabrication, and construction of safety-related structures, systems, and components (SSCs); and (2) Regulatory Guide (RG) 1.54, Revision 3, Service Level I, II, and Ill Protective Coatings Applied to Nuclear Power Plants. Specific review criteria are contained in SRP Section 6.1.2, Protective Coating Systems (Paints) - Organic Materials Review Responsibilities.
Consistent with the regulatory requirements stated above, the license amendment request (LAR) dated July 7, 2017 (Agencywide Documents Access Management System (ADAMS) Accession No. ML17188A260), TSAR Section 4.1.5, Containment Coatings stated that the service level 1 coatings in containment are qualified to 340 degrees Fahrenheit (F), 70 pounds per square inch (psig), and 1.1 x 106 absorbed radiation dose (rads).
MCCB 1:
In order for the NRC staff to determine whether the coatings will continue to perform their safety function and not be adversely impacted by the power uprate conditions, the staff requests the licensee confirm the qualification limit for radiological dose. The current radiological dose qualification appears to be low for service in containment compared to similar epoxy coatings at other plants. In addition, provide the maximum post-accident primary containment conditions for temperature, pressure, and radiation at the measurement uncertainty recapture (MUR) power uprate conditions.
Flow-Accelerated Corrosion (FAC):
2 FAC is a corrosion mechanism occurring in carbon steel components exposed to single-phase or two-phase water flow.
Components made from stainless steel are immune to FAC, and FAC is significantly reduced in components containing even small amounts of chromium or molybdenum. The rates of material loss due to FAC depend on the system flow velocity, component geometry, fluid temperature, steam quality, oxygen content, and pH. During plant operation, it is not normally possible to maintain all of these parameters in a regime that minimizes FAC; therefore, loss of material by FAC can occur and the rate of material loss needs to be predicted so that repair or replacement of damaged components could be made before reaching a critical thickness. The NRC's acceptance criteria are based on the structural evaluation of the minimum acceptable wall thickness for the components undergoing degradation by FAC.
MCCB 2:
The MUR power uprate will affect several process variables that influence FAC. The licensee states that for the TPO the evaluation of predicted wall thinning of the balance of plant piping will be minimal. However, the licensee also states that the TPO will change some parameters affecting FAC in systems associated with the turbine cycle and appropriate changes to piping inspection frequency will be made. Provide the areas where changes may be made to the piping inspection frequency and discuss the impacts of operating parameters (e.g. planned changes in water chemistry, power level, steam cycle data, etc.) that lead to the changes in inspection frequency.
Lisa Regner Sr. Project Manager NRR/DORL/LPL4 301-415-1906 O9D14
Hearing Identifier:
NRR_PMDA Email Number:
3840 Mail Envelope Properties (62740b7980b54466960fecc79a6322c5)
Subject:
Draft RAI for Hope Creek MUR Sent Date:
11/9/2017 11:53:35 AM Received Date:
11/9/2017 11:53:35 AM From:
Regner, Lisa Created By:
Lisa.Regner@nrc.gov Recipients:
"Thomas, Brian J." <Brian.Thomas@pseg.com>
Tracking Status: None "Paul.Duke@pseg.com" <Paul.Duke@pseg.com>
Tracking Status: None Post Office:
HQPWMSMRS01.nrc.gov Files Size Date & Time MESSAGE 4126 11/9/2017 11:53:35 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Follow up