MONTHYEARML17188A2652016-12-31031 December 2016 Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi Project stage: Request ML17188A2672017-03-31031 March 2017 Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) Project stage: Request ML17188A2602017-07-0707 July 2017 License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate Project stage: Request LR-N17-0044, Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings2017-07-0707 July 2017 Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings Project stage: Other ML17222A1182017-08-16016 August 2017 Acceptance of Requested Licensing Action License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review ML17235B1202017-08-28028 August 2017 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N17-0141, Transmittal of 2017 Annual 10 CFR 50.46 Report2017-09-27027 September 2017 Transmittal of 2017 Annual 10 CFR 50.46 Report Project stage: Request ML17290B0132017-10-17017 October 2017 NRR E-mail Capture - Hope Creek Mur Request for Additional Information for Apla and Snpb Project stage: RAI LR-N17-0161, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-11-0101 November 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML17324A0522017-11-0909 November 2017 NRR E-mail Capture - Draft Request for Additional Information - Hope Creek Mur Chemical, Corrosion, and Steam Generator Project stage: Draft RAI ML17324A2602017-11-17017 November 2017 NRR E-mail Capture - Final Request for Additional Information - Hope Creek Mur Electrical Instrumentation and Controls Project stage: RAI ML17331A0072017-11-21021 November 2017 E-mail Regarding Final Eicb Request for Additional Information - Hope Creek Power Uprate Project stage: RAI LR-N17-0170, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-11-27027 November 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0176, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate2017-12-14014 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate Project stage: Response to RAI LR-N17-0186, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0175, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0187, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0181, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0189, Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-22022 December 2017 Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML18011A0352018-01-11011 January 2018 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station (CAC No. MF9930; EPID L-2017-LLA-0426) Project stage: Withholding Request Acceptance LR-N18-0009, Supplemental Information for the Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2018-01-22022 January 2018 Supplemental Information for the Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Supplement ML18096A5422018-04-24024 April 2018 Hope Creek Generating Station - Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002) Project stage: Approval 2017-12-19
[Table View] |
|
---|
Category:Letter type:LR
MONTHYEARLR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0075, 2022 Annual 10 CFR 50.46 Report2022-09-30030 September 2022 2022 Annual 10 CFR 50.46 Report LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)2022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report (Rerr) LR-N22-0040, 2021 Annual Radiological Environmental Operating Report2022-04-28028 April 2022 2021 Annual Radiological Environmental Operating Report LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N22-0023, Guarantees of Payment of Deferred Premiums2022-03-21021 March 2022 Guarantees of Payment of Deferred Premiums LR-N22-0017, Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data2022-02-25025 February 2022 Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility LR-N22-0019, Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges2022-02-24024 February 2022 Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges LR-N22-0011, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink2022-02-0101 February 2022 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink LR-N22-0005, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-01-0707 January 2022 Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs LR-N22-0007, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2022-01-0505 January 2022 Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs LR-N21-0087, Corrected Hope Creek 10 CFR 50.46 Reports2021-12-0202 December 2021 Corrected Hope Creek 10 CFR 50.46 Reports LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0081, Submittal of Updated Final Safety Analysis Report, Revision 25, Summary of Revised Regulatory Commitments2021-11-15015 November 2021 Submittal of Updated Final Safety Analysis Report, Revision 25, Summary of Revised Regulatory Commitments LR-N21-0056, License Amendment Request to Amend the Technical Specifications to Revise Surveillance Requirements for Electric Power Monitor Channels for the Reactor Protection System (RPS) and Power Range Neutron Monitoring System2021-11-0303 November 2021 License Amendment Request to Amend the Technical Specifications to Revise Surveillance Requirements for Electric Power Monitor Channels for the Reactor Protection System (RPS) and Power Range Neutron Monitoring System LR-N21-0079, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2021-11-0303 November 2021 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N21-0071, 2021 Annual 10 CFR 50.46 Report2021-09-30030 September 2021 2021 Annual 10 CFR 50.46 Report LR-N21-0065, License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-09-29029 September 2021 License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0069, Emergency Plan Document Revisions Implemented August 10, 20212021-09-0909 September 2021 Emergency Plan Document Revisions Implemented August 10, 2021 LR-N21-0059, In-Service Inspection Activities - 90 Day Twenty-Third Refueling Outage2021-08-13013 August 2021 In-Service Inspection Activities - 90 Day Twenty-Third Refueling Outage LR-N21-0054, Correction to Prior Spent Fuel Cask Registration Letter2021-07-15015 July 2021 Correction to Prior Spent Fuel Cask Registration Letter LR-N21-0046, Submittal of Salem Generating Station Updated Final Safety Analysis Report, Revision 32, Summary of Revised Regulatory Commitments for Salem, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2021-06-17017 June 2021 Submittal of Salem Generating Station Updated Final Safety Analysis Report, Revision 32, Summary of Revised Regulatory Commitments for Salem, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N21-0040, Response to Request for Additional Information SNSB-RAI 1 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication2021-05-27027 May 2021 Response to Request for Additional Information SNSB-RAI 1 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication LR-N21-0042, Core Operating Limits Report, Reload 23, Cycle 24, Revision 212021-05-24024 May 2021 Core Operating Limits Report, Reload 23, Cycle 24, Revision 21 LR-N21-0025, License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink2021-05-0707 May 2021 License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink LR-N21-0039, Deviation from EPRI Document 33002012244 Inspection Requirements2021-04-30030 April 2021 Deviation from EPRI Document 33002012244 Inspection Requirements LR-N21-0018, Response to Requests for Additional Information SNSB-RAI 2 and SNSB-RAI 3 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication2021-04-29029 April 2021 Response to Requests for Additional Information SNSB-RAI 2 and SNSB-RAI 3 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication 2023-09-08
[Table view] |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 G
Nuclear LLC JAN 22 2018 10 CFR 50.90 LR-N18-0009 LAR H17-03 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354
Subject:
SUPPLEMENTAL INFORMATION FOR THE RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (CAC NO. MF9930)
References 1. PSEG letter to NRC, "License Amendment Request for Measurement Uncertainty Recapture (MUR) Power Uprate," dated July 7, 2017 (ADAMS Accession No. ML17188A260)
- 2. NRC e-mail to PSEG, " Final Reactor Systems Branch (SXRB) Request for Additional Information- HOPE CREEKMUR (CAC MF9930)," dated December 14, 2017 (ADAMS Accession No. ML17349A081)
- 3. PSEG letter to NRC, "Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate (CAC No. MF9930)," dated December 22, 2017 (ADAMS Accession No. ML17356A139)
- 4. PSEG letter to NRC, supplement to License Amendment Request for Extended Power Uprate," dated February 16, 2007 (ADAMS Accession No. ML070590182)
- 5. PSEG letter to NRC, "Response to Request for Additional Information Request for License Amendment- Extended Power Uprate," dated March 30, 2007 (ADAMS Accession No. ML071010243)
JAN>> 2018 Page2 10 CFR 50.90 LR-N18-0009
- 6. NRC letter to PSEG, "Hope Creek Generating Station- Issuance of Amendment Re: Extended Power Uprate (TAC No. MD3002)," dated May 14, 2008 (ADAMS Accession No. ML081230581 Cover Letter and ML081230640 Safety Evaluation Report)
In the Reference 1 letter, PSEG Nuclear LLC (PSEG) submitted a license amendment request for Hope Creek Generating Station (HCGS). The proposed amendment will increase the rated thermal power (RTP) level from 3840 megawatts thermal (MWt) to 3902 MWt, and make Technical Specification (TS) changes as necessary to support operation at the uprated power level.
In Reference 2, the U.S. Nuclear Regulatory Commission staff provided PSEG a Request for Additional Information (RAI) to support the NRC staff's detailed technical review of Reference. 1.
In Reference 3, PSEG provided the responses to the MUR RAI in Reference 2.
In the response to MUR RAI question SXRB-2 (Reference 3), PSEG stated that the Appendix R analysis for Hope Creek was performed at a power level of 3916.8 MWt (102% of 3840 MWt) which bounds the MUR power level of 3902 MWt. Following receipt of this information, the NRC requested that PSEG confirm the power level and peak suppression pool temperature values in Reference 3 since they conflicted with the information contained in the NRC Safety Evaluation Report for the Hope Creek Extended Power Uprate (EPU) (Reference 6).
The information contained in Section 2.6.5 of the NRC SER for EPU was the result of incorrect information provided to the NRC in an EPU RAI response dated March 30, 2007 (Reference 5).
In Reference 5, PSEG provided a response to EPU RAI Question 13.14 which stated that the Hope Creek Appendix R analysis was performed at 3840 MWt with a peak suppression pool temperature of 205.9°F.
In developing the response to MUR RAI question SXRB-2, PSEG performed a review of the EPU Appendix R evaluations and identified that the November 2006 Appendix R evaluation which supported the February 16, 2007 submittal (Reference 4) was the EPU Appendix R analysis of record. The review of the November 2006 Appendix R evaluation shows that the evaluation was performed at a power level of 3916. 8 MWt (102% of 3840 MWt) and resulted in a peak suppression pool temperature of 206.3°F. No changes were made since the November 2006 analysis described in Reference 4 was completed. Therefore the information contained in the EPU RAI Question 13.14 response (Reference 5) regarding the Appendix R event was in error.
PSEG has documented the above error in the corrective action program. As stated in the December 22, 2017 MUR RAI response, the Appendix R peak suppression pool temperature of 206.3°F was bounded and continues to be bounded by the ECCS net positive suction head (NPSH) evaluations which were performed at a 218°F suppression pool temperature.
PSEG has determined that the information provided in this submittal does not alter the conclusions reached in the 10 CFR 50.92 no significant hazards determination previously submitted. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
Page 3 10 CFR 50.90 LR-N18-0009 No new regulatory commitments are established by this submittal. If you have any questions or require additional information, please do not hesitate to contact Mr. Brian Thomas at (856) 339-2022.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on 1/:;J.-, ?
( ate)
Respect ____..
.c.::::--:-
Eric Carr Site Vice President Hope Creek Generating Station cc: Mr. D. Dorman, Administrator, Region I, NRC Ms. L. Regner, Project Manager, NRC NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Chief, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. T. MacEwen, Hope Creek Commitment Tracking Coordinator