MONTHYEARML17188A2652016-12-31031 December 2016 Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi Project stage: Other ML17188A2672017-03-31031 March 2017 Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) Project stage: Other ML17188A2602017-07-0707 July 2017 License Amendment Request for Measurement Uncertainty Recapture (MUR) Power Uprate Project stage: Request LR-N17-0044, Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings2017-07-0707 July 2017 Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings Project stage: Other 05000354/LER-1917-001, Regarding Secondary Containment Door Not Latched in Closed Position2017-07-0707 July 2017 Regarding Secondary Containment Door Not Latched in Closed Position Project stage: Request ML17222A1182017-08-16016 August 2017 Acceptance of Requested Licensing Action License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review ML17235B1202017-08-28028 August 2017 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N17-0141, Transmittal of 2017 Annual 10 CFR 50.46 Report2017-09-27027 September 2017 Transmittal of 2017 Annual 10 CFR 50.46 Report Project stage: Request ML17290B0132017-10-17017 October 2017 NRR E-mail Capture - Hope Creek MUR Request for Additional Information for Apla and Snpb Project stage: RAI LR-N17-0161, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-11-0101 November 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML17324A0522017-11-0909 November 2017 NRR E-mail Capture - Draft Request for Additional Information - Hope Creek MUR Chemical, Corrosion, and Steam Generator Project stage: Draft RAI ML17324A2602017-11-17017 November 2017 NRR E-mail Capture - Final Request for Additional Information - Hope Creek MUR Electrical Instrumentation and Controls Project stage: RAI LR-N17-0170, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-11-27027 November 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0176, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate2017-12-14014 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate Project stage: Response to RAI NMP1L3142, License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-12-15015 December 2017 License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 Project stage: Request LR-N17-0187, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0181, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0186, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0175, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0189, Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-22022 December 2017 Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI HCH-2017-049, Discharge Monitoring Report for November 20172017-12-22022 December 2017 Discharge Monitoring Report for November 2017 Project stage: Request ML18011A0352018-01-11011 January 2018 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station (CAC No. MF9930; EPID L-2017-LLA-0426) Project stage: Withholding Request Acceptance LR-N18-0009, Supplemental Information for the Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2018-01-22022 January 2018 Supplemental Information for the Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Supplement ML18096A5422018-04-24024 April 2018 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002) Project stage: Approval ML18205A3922018-07-24024 July 2018 Request for Additional Information Regarding Reactor Pressure Vessel Water Inventory Control License Amendment Request (L-2017-LLA-0426) Project stage: RAI ML18228A6932018-08-15015 August 2018 Request for Additional Information Regarding Reactor Pressure Vessel Water Inventory Control License Amendment Request (L-2017-LLA-0426) Project stage: RAI ML18222A2852018-09-0404 September 2018 Summary of Telephone Conf. with Exelon Generation Company, LLC Regarding a Request to Revise Nine Mile Point Nuclear Station, Unit 1 Technical Specifications with New Requirements on Reactor Pressure Vessel Water Inventory Control Project stage: Other NMP1L3238, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, .2018-10-0101 October 2018 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, . Project stage: Response to RAI ML18283B7992018-10-15015 October 2018 Summary of Telephone Conference with Exelon Generation Company, LLC, Request to Revise Nine Mile Point Nuclear Station, Unit 1, Technical Specifications with New Requirements on Reactor Pressure Vessel Water Inventory Control Project stage: Other NMP1L3248, Supplement to the Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, Revision 2, Reactor Pre2018-11-0202 November 2018 Supplement to the Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, Revision 2, Reactor Pres Project stage: Supplement ML19008A4542019-01-22022 January 2019 Issuance of Amendment No. 236 Revising Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control Project stage: Approval 2017-08-16
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Peter P. Sena, Ill President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 January 11, 2018
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (CAC NO. MF9930; EPID L-2017-LLA-0426)
Dear Mr. Sena:
By letter dated July 7, 2017 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17188A260), as supplemented by letters dated November 27, 2017 (ADAMS Accession No. ML17333A853); December 14, 2017 (ADAMS Accession No. ML17348B289);
December 19, 2017 (two letters) (ADAMS Accession Nos. ML17353A831 and ML17353A926);
and December 22, 2017 (ADAMS Accession No. ML17356A139), PSEG Nuclear LLC submitted a license amendment request for a measurement uncertainty recapture power uprate. The supplemental letters dated November 27, 2017; December 19, 2017; and December 22, 2017, contained enclosures that PSEG Nuclear LLC requested be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390.
The following table provides information on the affidavits, including the date and executor's name, title, and company. The location of the non-proprietary version of each document available in ADAMS for the public to view is also listed.
Affidavit ADAMS Date Executor, Title, Company Title of Document Accession No. of Public Version Lisa K. Schichlein, Senior Project Manager, Response to SNPB Request for NPP/Services Licensing, Regulatory Affairs Additional Information Regarding MUR 11/17/2017 GE-Hitachi Nuclear Energy Americas LLC Power Uprate (GEH Proprietary ML17333A853 Information) (GEH Reference (GEH)
DOC-0006-0106-086, Attachment 1 )
Lisa K. Schichlein, Senior Project Response to EICB Request for Manager, NPP/Services Licensing, Additional Information Regarding MUR 12/6/2017 Regulatory Affairs, GE-Hitachi Nuclear Power Uprate (GEH Proprietary ML17353A831 Information) (GEH Reference Energy Americas LLC DOC-0006-0106-087, Attachment 1)
Alan J. Bilanin, President and Senior COi Technical Note No. 16-23, "Stress 12/13/2017 Associate of Continuum Dynamics, Inc.
Evaluation of Hope Creek Unit 1 Steam ML17353A926 (CDI)
Dryer at MUR Conditions Using Perforated Plate Damping," Revision 0 GEH Responses to NRG TPO SRXB Lisa K. Schichlein, Senior Project RAls 9b, 11, and 12 (GEH Proprietary 12/19/2017 Manager, NPP/Services Licensing, Information); and Hope Creek ML17356A139 Regulatory Affairs, GE-Hitachi Nuclear Generating Station GNF2 ECCS-LOCA Energy Americas LLC Evaluation," 002N5176-RO-P, Revision 0 (GEH Proprietary Information)
P. Sena, Ill The affidavits for GE-Hitachi Nuclear Energy Americas LLC stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
Affidavit of Lisa K. Schlichlein:
(4) a.
Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies;
- b.
Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
The affidavit for Continuum Dynamics, Inc. stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
Affidavit of Alan J. Bilanin:
- 3.
(a) a process or method, including supporting data and analysis, where prevention of its use by COi's competitors without license from COi constitutes a competitive advantage over other companies; (b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; (c) Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b )(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
P. Sena, Ill If you have any questions regarding this matter, I may be reached at 301-415-1906 or Lisa.Regner@nrc.gov.
Docket No. 50-354 cc:
Mr. Alan J. Bilanin President Continuum Dynamics, Inc.
34 Lexington Avenue Ewing, NJ 08618-2302 Ms. Lisa K. Schichlein Senior Project Manager NPP/Services Licensing Regulatory Affairs Sine ely, I
/lV~'t.... *****
, _ _JI \\ r-Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation GE-Hitachi Nuclear Energy America LLS 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv
ML18011A035 RidsACRS_MailCTR Resource RidsNrrDorlLp11 Resource RidsNrrLALRonewicz Resource OFFICE NRR/D0RL/LPL4/PM NRR/DORL/LPL 1/LA NRR/DORL/LPL 1/BC N RR/D0RL/LPL4/PM NAME LRegner LRonewicz JDanna LRegner DATE 1/11/2018 1/11/2018 1/11/2018 1/11/2018