Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML17188A2652016-12-31031 December 2016 Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi Project stage: Request ML17188A2672017-03-31031 March 2017 Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) Project stage: Request ML17188A2602017-07-0707 July 2017 License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate Project stage: Request LR-N17-0044, Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings2017-07-0707 July 2017 Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings Project stage: Other ML17222A1182017-08-16016 August 2017 Acceptance of Requested Licensing Action License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review ML17235B1202017-08-28028 August 2017 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N17-0141, Transmittal of 2017 Annual 10 CFR 50.46 Report2017-09-27027 September 2017 Transmittal of 2017 Annual 10 CFR 50.46 Report Project stage: Request ML17290B0132017-10-17017 October 2017 NRR E-mail Capture - Hope Creek Mur Request for Additional Information for Apla and Snpb Project stage: RAI LR-N17-0161, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-11-0101 November 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML17324A0522017-11-0909 November 2017 NRR E-mail Capture - Draft Request for Additional Information - Hope Creek Mur Chemical, Corrosion, and Steam Generator Project stage: Draft RAI ML17324A2602017-11-17017 November 2017 NRR E-mail Capture - Final Request for Additional Information - Hope Creek Mur Electrical Instrumentation and Controls Project stage: RAI ML17331A0072017-11-21021 November 2017 E-mail Regarding Final Eicb Request for Additional Information - Hope Creek Power Uprate Project stage: RAI LR-N17-0170, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-11-27027 November 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0176, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate2017-12-14014 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate Project stage: Response to RAI NMP1L3142, License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-12-15015 December 2017 License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 Project stage: Request LR-N17-0175, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0187, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0181, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0186, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0189, Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-22022 December 2017 Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML18011A0352018-01-11011 January 2018 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station (CAC No. MF9930; EPID L-2017-LLA-0426) Project stage: Withholding Request Acceptance LR-N18-0009, Supplemental Information for the Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2018-01-22022 January 2018 Supplemental Information for the Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Supplement ML18096A5422018-04-24024 April 2018 Hope Creek Generating Station - Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002) Project stage: Approval ML18205A3922018-07-24024 July 2018 Request for Additional Information Regarding Reactor Pressure Vessel Water Inventory Control License Amendment Request (L-2017-LLA-0426) Project stage: RAI ML18228A6932018-08-15015 August 2018 Request for Additional Information Regarding Reactor Pressure Vessel Water Inventory Control License Amendment Request (L-2017-LLA-0426) Project stage: RAI ML18222A2852018-09-0404 September 2018 Summary of Telephone Conf. with Exelon Generation Company, LLC Regarding a Request to Revise Nine Mile Point Nuclear Station, Unit 1 Technical Specifications with New Requirements on Reactor Pressure Vessel Water Inventory Control Project stage: Other NMP1L3238, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, ...2018-10-0101 October 2018 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, ... Project stage: Response to RAI ML18283B7992018-10-15015 October 2018 Summary of Telephone Conference with Exelon Generation Company, LLC, Request to Revise Nine Mile Point Nuclear Station, Unit 1, Technical Specifications with New Requirements on Reactor Pressure Vessel Water Inventory Control Project stage: Other NMP1L3248, Supplement to the Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, Revision 2, Reactor Pre2018-11-0202 November 2018 Supplement to the Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, Revision 2, Reactor Pres Project stage: Supplement ML19008A4542019-01-22022 January 2019 Issuance of Amendment No. 236 Revising Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control Project stage: Approval 2017-07-07
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 IR 05000354/20220042023-01-24024 January 2023 Integrated Inspection Report 05000354/2022004 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments ML22335A0412022-12-0101 December 2022 Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information IR 05000354/20220032022-11-0303 November 2022 Integrated Inspection Report 05000354/2022003 2024-02-01
[Table view] Category:Proprietary Information Review
MONTHYEARML21153A1032021-06-0909 June 2021 Request for Withholding Information from Public Disclosure ML21124A1222021-05-13013 May 2021 Request for Withholding Information from Public Disclosure ML20310A1252020-11-19019 November 2020 Request for Withholding Information from Public Disclosure ML18038B1022018-02-21021 February 2018 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML18011A0352018-01-11011 January 2018 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station (CAC No. MF9930; EPID L-2017-LLA-0426) ML17321A0682017-11-28028 November 2017 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station (CAC No. MF9502; EPID L-2017-LLA-0204) ML17235B1202017-08-28028 August 2017 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML17201A0462017-07-24024 July 2017 Request for Withholding Information from Public Disclosure ML16200A2532016-08-0202 August 2016 08/02/2016 NRC Approval of Request for Withholding Information from Public Disclosure ML15112B1362015-05-26026 May 2015 Request for Withholding Information from Public Disclosure Hope Creek Generating Station ML15027A5922015-02-0202 February 2015 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML14126A8302014-06-0303 June 2014 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML14085A3252014-05-15015 May 2014 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML14073A0422014-03-28028 March 2014 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML1207405722012-03-29029 March 2012 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML1135003492012-01-11011 January 2012 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML1028505142010-10-19019 October 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML1023903432010-09-0909 September 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML1023903302010-09-0909 September 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML1018303302010-07-14014 July 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML1013303612010-06-0303 June 2010 Letter Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML1002607732010-02-0404 February 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0828105572008-10-10010 October 2008 Westinghouse Electric Co., Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0825506122008-09-18018 September 2008 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station (Hope Creek) Regarding Letter, Dated Sept. 2, 2008,License Condition 2.C.(22)2.b,for Hope Creek Extended Power Uprate (TAC No. MD ML0814200492008-05-22022 May 2008 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek, Generating Station Regarding Letter, Dated May 19, 2008, License Conditions 2.C.(21), 2.C.(22)2.g and 2.C.(22)3 ML0803104672008-03-0707 March 2008 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Regarding Letter Dated January 25, 2008, Responses to Requests for Additional Information Request for License Amendment - Extended Power Uprate. ML0803108582008-02-15015 February 2008 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Regarding Letter, Dated January 30, 2008, Responses to Requests for Additional Information Request for License Amendment--Extended Power Uprate ML0803108682008-02-15015 February 2008 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Regarding Letter, Dated 01/30/2008, Responses to Requests for Additional Information Request for License Amendment-Extended Power ML0802304872008-02-0101 February 2008 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Letter, Dated January 18, 2008, Responses to Requests for Additional Information Request for License Amendment - Extended Power U ML0801501272008-01-24024 January 2008 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Regarding Letter, Dated December 31, 2007, Subject: Continuum Dynamics, Incorporated Report No. 07-27P, Finite Element Modeling B ML0802304792008-01-0101 January 2008 Request for Withholding Information, Continuum Dynamics, Incorporated Report No. 07-17P, Stress Assessment of Hope Creek, Unit 1, Steam Dryer Based on Revision 4 Loads Model, Rev 3, Dated Jan 2008 ML0726301542007-10-0101 October 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Regarding Letter, Dated August 3, 2007, Subject: Response to Request for Additional Information Request for License Amendment - E ML0726101122007-09-24024 September 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Regarding Letter, Dated September 11, 2007, Subject: Revised CDI Report 07-17P, Stress Assessment of Hope Creek, Unit 1, Steam Dryer Based on Revisi ML0724308002007-09-24024 September 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Regarding Slides Presented at a Public Meeting, Dated August 17, 2007 (TAC No. MD3002.` ML0715604492007-07-0303 July 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0717904442007-07-0303 July 2007 PSEG Nuclear Request for Withholding Information from Public Disclosure for Hope Creek Generating Station (MD3002) ML0717004062007-07-0303 July 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0713502112007-07-0303 July 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0713006042007-06-0606 June 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0712404992007-06-0606 June 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0713006152007-06-0606 June 2007 Withholding from Public Disclosure, Transmittal - Proprietary Content of Hope Creek Letter, LCR H05-01, Rev. 1 - RAIs 11.1 and 3.5d, Enclosure 1 of the GE-HCGS-EPU-668 ML0712405102007-05-17017 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0712404612007-05-17017 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0628605302007-05-17017 May 2007 Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0712404872007-05-0909 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0628304532006-11-21021 November 2006 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0628304722006-11-0808 November 2006 PSEG Nuclear LLC, Withholding from Public Disclosure, NEDC-33076P, Revision 2, Safety Analysis Report for Hope Creek Constant Pressure Power Uprate, Class III, MD3002 ML0600400822006-01-10010 January 2006 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0600402222006-01-10010 January 2006 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station ML0600402082006-01-10010 January 2006 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure (Tac No. MC8839) 2021-06-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 11, 2018 Mr. Peter P. Sena, Ill President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (CAC NO. MF9930; EPID L-2017-LLA-0426)
Dear Mr. Sena:
By letter dated July 7, 2017 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17188A260), as supplemented by letters dated November 27, 2017 (ADAMS Accession No. ML17333A853); December 14, 2017 (ADAMS Accession No. ML17348B289);
December 19, 2017 (two letters) (ADAMS Accession Nos. ML17353A831 and ML17353A926);
and December 22, 2017 (ADAMS Accession No. ML17356A139), PSEG Nuclear LLC submitted a license amendment request for a measurement uncertainty recapture power uprate. The supplemental letters dated November 27, 2017; December 19, 2017; and December 22, 2017, contained enclosures that PSEG Nuclear LLC requested be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390.
The following table provides information on the affidavits, including the date and executor's name, title, and company. The location of the non-proprietary version of each document available in ADAMS for the public to view is also listed.
ADAMS Affidavit Executor, Title, Company Title of Document Accession No. of Date Public Version Response to SNPB Request for Lisa K. Schichlein, Senior Project Manager, Additional Information Regarding MUR NPP/Services Licensing, Regulatory Affairs 11/17/2017 Power Uprate (GEH Proprietary ML17333A853 GE-Hitachi Nuclear Energy Americas LLC Information) (GEH Reference (GEH)
DOC-0006-0106-086, Attachment 1 )
Response to EICB Request for Lisa K. Schichlein, Senior Project Additional Information Regarding MUR Manager, NPP/Services Licensing, 12/6/2017 Power Uprate (GEH Proprietary ML17353A831 Regulatory Affairs, GE-Hitachi Nuclear Information) (GEH Reference Energy Americas LLC DOC-0006-0106-087, Attachment 1)
COi Technical Note No. 16-23, "Stress Alan J. Bilanin, President and Senior Evaluation of Hope Creek Unit 1 Steam 12/13/2017 Associate of Continuum Dynamics, Inc. ML17353A926 Dryer at MUR Conditions Using (CDI)
Perforated Plate Damping," Revision 0 GEH Responses to NRG TPO SRXB Lisa K. Schichlein, Senior Project RAls 9b, 11, and 12 (GEH Proprietary Manager, NPP/Services Licensing, Information); and Hope Creek 12/19/2017 ML17356A139 Regulatory Affairs, GE-Hitachi Nuclear Generating Station GNF2 ECCS-LOCA Energy Americas LLC Evaluation," 002N5176-RO-P, Revision 0 (GEH Proprietary Information)
P. Sena, Ill The affidavits for GE-Hitachi Nuclear Energy Americas LLC stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
Affidavit of Lisa K. Schlichlein:
(4) a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies;
- b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
The affidavit for Continuum Dynamics, Inc. stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
Affidavit of Alan J. Bilanin:
- 3. (a) a process or method, including supporting data and analysis, where prevention of its use by COi's competitors without license from COi constitutes a competitive advantage over other companies; (b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; (c) Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b )(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
P. Sena, Ill If you have any questions regarding this matter, I may be reached at 301-415-1906 or Lisa.Regner@nrc.gov.
Sine ely, I
/lV~'t . . * * *
,__JI \ r-Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc: Mr. Alan J. Bilanin President Continuum Dynamics, Inc.
34 Lexington Avenue Ewing, NJ 08618-2302 Ms. Lisa K. Schichlein Senior Project Manager NPP/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy America LLS 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv
ML18011A035 OFFICE NRR/D0RL/LPL4/PM NRR/DORL/LPL 1/LA NRR/DORL/LPL 1/BC N RR/D0RL/LPL4/PM NAME LRegner LRonewicz JDanna LRegner DATE 1/11/2018 1/11/2018 1/11/2018 1/11/2018