ML24197A102

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Lift Settings for Reactor Coolant System Safety Relief Valves
ML24197A102
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 07/15/2024
From: James Kim
NRC/NRR/DORL/LPL1
To: Jurek S
Public Service Enterprise Group
References
L-2024-LLA-0089
Download: ML24197A102 (2)


Text

From:

James Kim Sent:

Monday, July 15, 2024 8:57 AM To:

Jurek, Shane Cc:

Thomas, Brian J.; Wiwel, Michael; Hipo Gonzalez

Subject:

Acceptance Review - Hope Creek - Revise TS Lift Settings for Reactor Coolant System Safety Relief Valves (EPID: L-2024-LLA-0089)

Mr. Jurek, By letter dated June 28, 2024 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24180A126), Public Service Enterprise Group Nuclear LCC (PSEG, the licensee) submitted a license amendment for Hope Creek Generation Station Technical Specification (TS) 3/4.4.2.1, Safety/Relief Valves, to modify the code safety valve function lift settings to 1130 psig for all fourteen (14) valves.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

The NRC staff has estimated that this licensing request will take approximately 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> to complete. The NRC staff expect to complete this review by July 15, 2025, 12 months from the date of this acceptance. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any question, please contact me, James Kim, at James.Kim@nrc.gov or 301-415-4125.

James Kim, Project Manager Branch 1, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

Hearing Identifier:

NRR_DRMA Email Number:

2554 Mail Envelope Properties (DM6PR09MB47118253971B25E127AFE139E4A12)

Subject:

Acceptance Review - Hope Creek - Revise TS Lift Settings for Reactor Coolant System Safety Relief Valves (EPID L-2024-LLA-0089)

Sent Date:

7/15/2024 8:57:05 AM Received Date:

7/15/2024 8:57:00 AM From:

James Kim Created By:

James.Kim@nrc.gov Recipients:

"Thomas, Brian J." <Brian.Thomas@pseg.com>

Tracking Status: None "Wiwel, Michael" <Michael.Wiwel@pseg.com>

Tracking Status: None "Hipo Gonzalez" <Hipolito.Gonzalez@nrc.gov>

Tracking Status: None "Jurek, Shane" <Shane.Jurek@pseg.com>

Tracking Status: None Post Office:

DM6PR09MB4711.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2447 7/15/2024 8:57:00 AM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: