ML11227A024: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11227A024
| number = ML11227A024
| issue date = 08/11/2011
| issue date = 08/11/2011
| title = Oconee, Units, 1, 2, & 3, McGuire, Units 1 & 2, Catawba, Units 1 & 2, Response to NRC Regulatory Issue Summary 2011-08, Preparation and Scheduling of Operator Licensing Examinations
| title = Units, 1, 2, & 3, McGuire, Units 1 & 2, Catawba, Units 1 & 2, Response to NRC Regulatory Issue Summary 2011-08, Preparation and Scheduling of Operator Licensing Examinations
| author name = Glover R M
| author name = Glover R
| author affiliation = Duke Energy Carolinas, LLC
| author affiliation = Duke Energy Carolinas, LLC
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::RIS 2011-08]]


=Text=
=Text=
{{#Wiki_filter:R. Michael GloverDuke General Manager, Nuclear Plant SupportEkEnergy Nuclear CorporateDuke Energy Corporation526 South Church StreetCharlotte, NC 28202Mailing Address:P. 0. Box 1006EC07HCharlotte, NC 28201-1006August 11,2011 704-382-6108Mike.Glover@duke-energy.comU. S. Nuclear Regulatory CommissionWashington, DC 20555-0001ATTENTION: Document Control DeskSubject: Duke Energy Carolinas, LLCOconee Nuclear Station, Units 1, 2, and 3Docket Nos. 50-269, 50-270, 50-287McGuire Nuclear Station, Units 1 and 2Docket Nos. 50-369, 50-370Catawba Nuclear Station, Units 1 and 2Docket Nos. 50-413, 50-414Response to NRC Regulatory Issue Summary 2011-08Preparation and Scheduling of Operator Licensing ExaminationsOn May 25, 2011, the NRC issued Regulatory Issue Summary (RIS) 2011-08, "Preparation andScheduling of Operator Licensing Examinations." The subject RIS requested an update to theNRC on projected schedules for site-specific operator licensing examinations, as well as theestimated numbers of applicants planning to take operator licensing examinations and theNRC's generic fundamentals examinations (GFEs).NRC Form 536, "Operator Licensing Examination Data" is attached as requested for Oconee,McGuire, and Catawba Nuclear Stations.Please direct any questions to L. B. Jones at (704) 382-4753'
{{#Wiki_filter:R. Michael Glover Duke                                                                General Manager, Nuclear Plant Support EkEnergy                                                              Nuclear Corporate Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 Mailing Address:
P. 0. Box 1006 EC07H Charlotte, NC 28201-1006 August 11,2011                                                       704-382-6108 Mike.Glover@duke-energy.com U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk


Sincerely,R. Michael GloverAttachmentspAc3owww. duke-energy. corn U. S. Nuclear Regulatory CommissionAugust 11, 2010Page 2xC:V. M. McCree, Region II AdministratorU.S. Nuclear Regulatory CommissionMarquis One Tower245 Peachtree Center Avenue NE, Suite 1200Atlanta, Georgia 30303-1257J. F. Stang, Jr., Senior Project Manager (ONS)U.S. Nuclear Regulatory Commission11555 Rockville PikeMail Stop 0-8 G9ARockville, MD 20852-2738J. H. Thompson, Project Manager (CNS & MNS)U. S. Nuclear Regulatory Commission11555 Rockville PikeMail Stop 0-8 G9ARockville, MD 20852-2738A. T. SabischNRC Senior Resident InspectorOconee Nuclear StationJ. ZeilerNRC Senior Resident InspectorMcGuire Nuclear StationA. Hutto, IIINRC Senior Resident InspectorCatawba Nuclear Station COPY OF U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011NRC FORM 536(10-2008) Estimated burden per response to comply with this voluntary informationcollection request: 1 hour. This information collection is used to plan budgetsand resources for operator examinations. Send comments regarding burdenestimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internetEXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Informationand Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management andBudget, Washington, DC 20503. If a means used to impose an informationcollection does not display a currently valid OMB control number, the NRC maynot conduct or sponsor, and a person is not required to respond to, theinformation collection.FACILITY NRC REGIONOconeeA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 13 CY 14 CY 15 CY 16ESTIMATED NUMBER OFLICENSEE-PREPARED 2 2 2 2EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED CY13 CY14 CY15 CY16NUMBERNUMBER OF REACTOR 5 4 5 4 5 4 5 4OPERATORSNUMBER OF SENIORREACTOR OPERATORS- 0 0 1 1 1 1 1 1INSTANTNUMBER OF SENIORREACTOR OPERATORS -4 5 3 4 3 4 3 4UPGRADENUMBER OF SENIORREACTOR OPERATORS -0 0 0 0 0 0 0 0LIMITEDPROPOSED DATESPRIMARY DATE 6-10-13 12-09-13 6-09-14 12-08-14 6-08-15 12-17-15 6-13-16 12-05-16ALTERNATE DATE 6-24-13 12-02-13 6-23-14 12-01-14 6-22-15 11-30-15 6-20-16 12-12-16C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)PROPOSED CY13 CY 14NUMBERMARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATEDNUMBER OF 9 11CANDIDATESCOPY OF NRC FORM 536 (10-2008)
==Subject:==
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011(10-2008) Estimated burden per response to comply with this voluntary informationcollection request: 1 hour. This information collection is used to plan budgetsand resources for operator examinations. Send comments regarding burdenestimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, orby internetEXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Informationand Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management andBudget, Washington, DC 20503. If a means used to impose an informationcollection does not display a currently valid OMB control number, the NRC maynot conduct or sponsor, and a person is not required to respond to, theinformation collection.FACILITY NRC REGIONMcGuire Nuclear StationIIA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 13 Cy 14 Cy 15 Cy 16ESTIMATED NUMBER OFLICENSEE-PREPARED 1 1 1 1EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 13 Cy 14 Cy 15 CY 16NUMBER OF REACTOR 8 9 9 8OPERATORSNUMBER OF SENIOR REACTOR 1 2 2OPERATORS -INSTANTNUMBER OF SENIOR REACTOROPERATORS -UPGRADENUMBER OF SENIOR REACTOR 0 0 0 0OPERATORS -LIMITEDPROPOSED DATESPRIMARY DATE 08/05/2013 08/04/2014 07/27/2015 07/25/2016ALTERNATE DATE 07/08/2013 08/11/2014 08/03/2015 08/01/2016C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE1*NRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER NRC'FORM 536110-2008)U.S. NUCLEAR REGULATORY COMMISSIONOPERATOR LICENSINGEXAMINATION DATAAPPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011Estimated burden per response to comply with this voluntary informationcollection request: 1 hour. This information collection is used to plan budgetsand resources for operator examinations. Send comments regarding burdenestimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internete-mail to infoc0llects@nrc.gov, and to the Desk Officer, Office of Informationand Regulatoiy Affairs, NEOB-10202. (3150-0131), Office of Management andBudget, Washington, DC 20503. If a means used to impose'an informationcollection does not display a currently valid OMB control number,,the NRC maynotcoriduct or sponsor, and a person is not required to respond to, theinformation collection.FACIUTYCatawba Nuclear StationA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 13 CY 14 CY 15 Cy 16ESTIMATED NUMBER OFLICENSEE-PREPARED I I 1EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 13 Cy 14 Cy 15 Cy 16NUMBER OF REACTOR 6 6 6 9OPERATORSNUMBER;OF SENIOR REACTOROPERATORS -INSTANTNUMBER OF SENIOR REACTOROPERATORS -UPGRADENUMBER OF SENIOR REACTOR 0 0 0 0OPERATORS -LIMITEDPROPOSED DATESPRIMARY DATE 06/24/2013 05/12/2014 03/30/2015 02/29/2016ALTERNATE DATE 07/08/2013 05/19/2014 04/06/2015 03/07/2016C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULEINRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER
Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 Response to NRC Regulatory Issue Summary 2011-08 Preparation and Scheduling of Operator Licensing Examinations On May 25, 2011, the NRC issued Regulatory Issue Summary (RIS) 2011-08, "Preparation and Scheduling of Operator Licensing Examinations." The subject RIS requested an update to the NRC on projected schedules for site-specific operator licensing examinations, as well as the estimated numbers of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs).
}}
NRC Form 536, "Operator Licensing Examination Data" is attached as requested for Oconee, McGuire, and Catawba Nuclear Stations.
Please direct any questions to L. B. Jones at (704) 382-4753' Sincerely, R. Michael Glover Attachments pAc3o www. duke-energy.corn
 
U. S. Nuclear Regulatory Commission August 11, 2010 Page 2 xC:
V. M. McCree, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 J. F. Stang, Jr., Senior Project Manager (ONS)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 J. H. Thompson, Project Manager (CNS & MNS)
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 A. T. Sabisch NRC Senior Resident Inspector Oconee Nuclear Station J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station A. Hutto, III NRC Senior Resident Inspector Catawba Nuclear Station
 
COPY OF         U.S. NUCLEAR REGULATORY COMMISSION               APPROVED BY OMB: NO. 3150-0131                 EXPIRES: 10/31/2011 NRC FORM 536 (10-2008)                                                       Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING                               Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA                             e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY                                                                                                           NRC REGION Oconee A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                         CY 13               CY 14                           CY 15                           CY 16 ESTIMATED NUMBER OF LICENSEE-PREPARED                     2                    2                                 2                               2 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                       0                   0                                 0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED                        CY13                   CY14                           CY15                           CY16 NUMBER NUMBER OF REACTOR                 5           4         5           4               5                 4               5             4 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-                 0           0         1           1               1                 1               1             1 INSTANT NUMBER OF SENIOR REACTOR OPERATORS -                 4           5         3           4               3                 4               3             4 UPGRADE NUMBER OF SENIOR REACTOR OPERATORS -                 0           0         0           0               0                 0               0             0 LIMITED PROPOSED DATES PRIMARY DATE             6-10-13     12-09-13   6-09-14     12-08-14         6-08-15         12-17-15         6-13-16       12-05-16 ALTERNATE DATE             6-24-13     12-02-13   6-23-14     12-01-14         6-22-15         11-30-15         6-20-16       12-12-16 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)
PROPOSED                                   CY13                                                         CY 14 NUMBER MARCH        JUNE     SEPTEMBER   DECEMBER         MARCH         JUNE         SEPTEMBER           DECEMBER ESTIMATED NUMBER OF               9                                                 11 CANDIDATES COPY OF NRC FORM 536 (10-2008)
 
NRC FORM 536               U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMB: NO. 3150-0131                           EXPIRES: 10/31/2011 (10-2008)                                                       Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING                         Nuclear Regulatory Commission, Washington, DC 20555-0001, orby internet EXAMINATION DATA                         e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY                                                                                                       NRC REGION McGuire Nuclear Station II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                     CY 13             Cy 14                           Cy 15                           Cy 16 ESTIMATED NUMBER OF LICENSEE-PREPARED                 1                          1                               1                               1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                   0                          0                               0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                     CY 13             Cy 14                           Cy 15                           CY       16 NUMBER OF REACTOR                       8                   9                                 9                               8 OPERATORS NUMBER OF SENIOR REACTOR                                           1                               2                              2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR                     0                    0                                 0                               0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE               08/05/2013         08/04/2014                     07/27/2015                       07/25/2016 ALTERNATE DATE               07/08/2013         08/11/2014                     08/03/2015                       08/01/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 1*
NRC FORM 536 (10-2008)                                                                                             PRINTED ON RECYCLED PAPER
 
NRC'FORM 536                U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150-0131                           EXPIRES: 10/31/2011 110-2008)                                                        Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING                        Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA                        e-mail to infoc0llects@nrc.gov, and to the Desk Officer, Office of Information and Regulatoiy Affairs, NEOB-10202. (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose'an information collection does not display a currently valid OMB control number,,the NRC may notcoriduct or sponsor, and a person is not required to respond to, the information collection.
FACIUTY Catawba Nuclear Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                       CY 13             CY 14                           CY 15                           Cy 16 ESTIMATED NUMBER OF LICENSEE-PREPARED                 I                           I                                                               1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                   0                          0                               0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                     CY 13               Cy 14                           Cy 15                           Cy     16 NUMBER OF REACTOR                       6                   6                                 6                             9 OPERATORS NUMBER;OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR                       0                    0                                 0                             0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE                 06/24/2013         05/12/2014                     03/30/2015                       02/29/2016 ALTERNATE DATE               07/08/2013         05/19/2014                     04/06/2015                       03/07/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I
NRC FORM 536 (10-2008)                                                                                             PRINTED ON RECYCLED PAPER}}

Latest revision as of 17:05, 12 November 2019

Units, 1, 2, & 3, McGuire, Units 1 & 2, Catawba, Units 1 & 2, Response to NRC Regulatory Issue Summary 2011-08, Preparation and Scheduling of Operator Licensing Examinations
ML11227A024
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 08/11/2011
From: Glover R
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-11-008
Download: ML11227A024 (5)


Text

R. Michael Glover Duke General Manager, Nuclear Plant Support EkEnergy Nuclear Corporate Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 Mailing Address:

P. 0. Box 1006 EC07H Charlotte, NC 28201-1006 August 11,2011 704-382-6108 Mike.Glover@duke-energy.com U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 Response to NRC Regulatory Issue Summary 2011-08 Preparation and Scheduling of Operator Licensing Examinations On May 25, 2011, the NRC issued Regulatory Issue Summary (RIS) 2011-08, "Preparation and Scheduling of Operator Licensing Examinations." The subject RIS requested an update to the NRC on projected schedules for site-specific operator licensing examinations, as well as the estimated numbers of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs).

NRC Form 536, "Operator Licensing Examination Data" is attached as requested for Oconee, McGuire, and Catawba Nuclear Stations.

Please direct any questions to L. B. Jones at (704) 382-4753' Sincerely, R. Michael Glover Attachments pAc3o www. duke-energy.corn

U. S. Nuclear Regulatory Commission August 11, 2010 Page 2 xC:

V. M. McCree, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 J. F. Stang, Jr., Senior Project Manager (ONS)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 J. H. Thompson, Project Manager (CNS & MNS)

U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 A. T. Sabisch NRC Senior Resident Inspector Oconee Nuclear Station J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station A. Hutto, III NRC Senior Resident Inspector Catawba Nuclear Station

COPY OF U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 NRC FORM 536 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Oconee A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 13 CY 14 CY 15 CY 16 ESTIMATED NUMBER OF LICENSEE-PREPARED 2 2 2 2 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED CY13 CY14 CY15 CY16 NUMBER NUMBER OF REACTOR 5 4 5 4 5 4 5 4 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS- 0 0 1 1 1 1 1 1 INSTANT NUMBER OF SENIOR REACTOR OPERATORS - 4 5 3 4 3 4 3 4 UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - 0 0 0 0 0 0 0 0 LIMITED PROPOSED DATES PRIMARY DATE 6-10-13 12-09-13 6-09-14 12-08-14 6-08-15 12-17-15 6-13-16 12-05-16 ALTERNATE DATE 6-24-13 12-02-13 6-23-14 12-01-14 6-22-15 11-30-15 6-20-16 12-12-16 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)

PROPOSED CY13 CY 14 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 9 11 CANDIDATES COPY OF NRC FORM 536 (10-2008)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, orby internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION McGuire Nuclear Station II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 13 Cy 14 Cy 15 Cy 16 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 13 Cy 14 Cy 15 CY 16 NUMBER OF REACTOR 8 9 9 8 OPERATORS NUMBER OF SENIOR REACTOR 1 2 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/05/2013 08/04/2014 07/27/2015 07/25/2016 ALTERNATE DATE 07/08/2013 08/11/2014 08/03/2015 08/01/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 1*

NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

NRC'FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 110-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infoc0llects@nrc.gov, and to the Desk Officer, Office of Information and Regulatoiy Affairs, NEOB-10202. (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose'an information collection does not display a currently valid OMB control number,,the NRC may notcoriduct or sponsor, and a person is not required to respond to, the information collection.

FACIUTY Catawba Nuclear Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 13 CY 14 CY 15 Cy 16 ESTIMATED NUMBER OF LICENSEE-PREPARED I I 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 13 Cy 14 Cy 15 Cy 16 NUMBER OF REACTOR 6 6 6 9 OPERATORS NUMBER;OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 06/24/2013 05/12/2014 03/30/2015 02/29/2016 ALTERNATE DATE 07/08/2013 05/19/2014 04/06/2015 03/07/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I

NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER