ML17222A600: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(10 intermediate revisions by the same user not shown)
Line 14: Line 14:
| document type = PRESERVICE & INSERVICE INSPECTION & TEST REPTS, TEXT-SAFETY REPORT
| document type = PRESERVICE & INSERVICE INSPECTION & TEST REPTS, TEXT-SAFETY REPORT
| page count = 232
| page count = 232
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:Page 1  of 10 FORM  NIS-1  OWNERS'REPORT  FOR INSERVICE INSPECTIONS As  required by the provisions of the    ASME CODE RULES
: 1. Owner  Florida  Power  6 Li ht Co. P.O. Box 14000    Juno Beach  Fl. 33408
: 2. PLANT  St. Lucie Nuclear Power Plant      P.O.Box 128  Ft.Pierce Fl. 33454
: 3. Plant Unit    1
: 7. Components Inspected Manufacturer Component  or    Manufacturer      or Installer    State or        National Appurtenance      or Installer      Serial No.      Province No.      Board No REACTOR VESSEL      COMBUSTION ENG. CE-67109            N/A            N/A RPV CLOS. HEAD      COMBUSTION ENG. CE-67229            N/A            N/A STM GEN.1A        COMBUSTION ENG. CE-67508            N/A            N/A RESSURIZER        COMBUSTION ENG. CE-67604            N/A            N/A
  .C.PUMP 1A1      BYRON JACKSON      681-N-445          N/A            N/A REACTOR COOLANT EBASCO                Pg. 7 of 10        N/A            N/A SAFETY  INJ.CL.1  EBASCO            Pg. 7 of 10        N/A            N/A CHARGING            EBASCO            Pg. 7 of 10        N/A            N/A MAIN STEAM          EBASCO            Pg. 7 of 10        N/A            N/A FEEDWATER          EBASCO            Pg. 7 of 10        N/A            N/A 88i2080235 SSii30 PDR  ADOCK  05000335 O                  PDC ote: Suppl'cmental sheets    in form of lists, sketches, or drawings may be used, provided, (1) size      is 8 1/2 in. x 11 in.; (2) information in items 1  through  6  on this report is included on each sheet; and (3) each sheet is  numbered  and the number of sheets is recorded at the top of this form.
>p;
      ' C i4 g I
Page 2 of 10 NIS-1  REPORT  (Continued)
: 8. Examination Dates: 7-11-1988        to 9-1-1988
: 9. Inspection    Interval:    Second 10 Year 02-11-88    to 02-10-98 First  Period 02-11-88 to 02-10-91
: 10. Abstract of Examinations The Inservice Examination of selected Class I and II components and piping systems of Florida Power and Light Company's St.Lucie Plant, Unit 1, was performed during the refueling outage which began on July 11, 1988. This was the first outage in the first inspection period of the Second 10-year Interval (Program B).
The components    and    piping systems examined were selected per the Second Ten Year    Inspection Plan, which was prepared per the requirements of Section XI of the ASME Code, 1983 Edition, through Summer of 1983 addenda and Code Case N-408.
Manual Ultrasonic, Liquid Penetrant, Magnetic Particle, and
.Visual nondestructive techniques were used in the examination of the selected components, piping systems, and their supports.
See attached Summary Tables for complete examination results.
Eddy  Current examinations were conducted by Combustion Engineer-ing from July 20, 1988 through August 6, 1988 on lA and 1B Steam Generators. There were 8057 tubes examined in Steam Generator lA, and 8161 tubes were examined in Steam Generator 1B. See the attached NIS-BB report for the summary of examination results.
The augmented    Feedwater Nozzle follow up examination program continued this outage. One hundred percent of the area from the nozzle ramp out to a point of one pipe diameter on the elbow side was examined using ultrasonics.
Snubber  functional testing and visual examinations were conducted in accordance with St. Lucie Unit-1 Plant Technical Specifi-cation 4.7.10. Examination and testing services were supplied by Wyle  Laboratories.
System pressure    testing was conducted by the plant to applicable Plant Technical Specifications and Procedures.          The Instrumented Inspection Technique    . was  used  as  applicable. A  summary of the specific systems    tested    is  included  in  this report  on Page 6.
D ia (
Page 3 of 10 NIS-1  REPORT  (Continued) ll. Conditions Noted
: 12. Corrective Measures Recommended    and Taken CLASS  I REACTOR VESSEL A visual (VT-3) examination (B-N-1) was conducted on accessible areas of the vessel interior. Ultrasonic examinations were performed on 1/3 of the vessel to,flange weld and on 1/3 of the flange ligament area. No rejectable indications were noted. One third of the flange to head weld and one head meridional weld were examined using ultrasonic and magnetic particle techniques.
No rejectable indications were noted.
STEAM GENERATOR  lA (PRIMARY SIDE)
The  nozzle inner radius section on the two (2) reactor coolant outlet nozzles were volumetrically (UT) examined. No recordable indications were noted.
PRESSURIZER Volumetric (UT) examinations were conducted on the upper shell to head weld and the upper shell longitudinal weld. In addition, the support skirt to lower head weld was surface (MT) examined.
No recordable indications were noted.
REACTOR COOLANT PUMPS Surface (PT) examinations were performed on 1A1 reactor coolant pump support integral attachments.        No recordable indications were noted.
MAIN REACTOR COOLANT PIPING Surface (MT,PT), and volumetric (UT) examinations were conducted on eight (8) circumferential welds, ten (10) longitudinal welds, and three (3) branch connection welds. No rejectable indications were noted. This included two (2) welds on the surge line.
REACTOR COOLANT  PIPING Visual, surface,  and volumetric    examinations were conducted on selected piping welds, valves, and supports.          No rejectable indications were noted.
a Jj<a I-
Page 4 of  10 NIS-1  REPORT  (Continued)
: 11. Conditions Noted
: 12. Corrective measures Recommended    and Taken CLASS  I  (Cont.)
SAFETY INJECTION/CHARGING PIPING Visual, surface, and volumetric examinations were conducted on selected piping welds, valves, and supports. Visual examination revealed incomplete thread engagement on valve V-1405 (one stud/
nut) and flange FE-3321. Per Plant procedures, the bolting was adjusted to meet minimum thread engagement and re-examined.
Valves V-3227 and V-3124 were found to have boric acid buildup at bolted connections (Cover Plates). The affected areas were cleaned, bolting tightened, and re-inspected satisfactory.
Visual examination revealed support I SIH-199 had a loose nut on a U-bolt. This was evaluated as improper installation.          Six (6) other supports of the same type were inspected        showing no discrepant conditions per IWF-2430. The four (4) bolts which connect the spring can base plate to the pedestal on support CH-129-316, were identified as being inadequately engaged. The condition was evaluated acceptable as is.
CHEMICAL AND VOLUME CONTROL Visual, and surface examinations were conducted on selected piping welds, valves, and supports. No recordable indications were noted.
CLASS  IZ MAIN STEAM Visual(VT-3), surface (MT), and volumetric (UT) examinations were conducted as applicable on selected        piping welds, supports and integral attachments.      No rejectable indications were noted.
MAIN FEEDWATER Surface  (MT) and  volumetric (UT) examinations were conducted as applicable on seven (7) piping welds. Surface Examination revealed indications in the area of interest of two welds (BF-14-4-SW-1 & BF-51-FW-2B).        The indications were evaluated as tooling  marks  and  the area  of concern was subjected to additional surface prep, re-examined and found acceptable.
Augmented examinations were done on the feedwater nozzle for 1B steam generator. Several geometric indications were recorded and determined to be due to root geometry and nozzle transition.
~+t
~l E
        >dg i1 t
Page 5 of  10 NIS-1  REPORT  (Continued) ll. ConditionsRecommended
: 12. Corrective measures Noted and Taken SAFETY INJECTION/CONTAINMENT SPRAY PIPING Visual, volumetric, and surface examinations were conducted on selected piping welds, valves and supports. No rejectable indica-tions were noted.
SNUBBER EXAMINATION AND TESTING Visual examination was conducted on 1004 of the Plants'nubber population per the Plant Technical Specifications. A failure in the initial ten percent functional test sample and failures in the next two test samples resulted in a total of 132 snubbers being functionally tested. Complete examination and test results are on file at the Plant. A summary of the functional test results is included with this report.
SYSTEM LEAKAGE/PRESSURE TESTING The system leakage    tests and visual (VT-2) examinations of class I systems  were performed- by the Plant prior to plant startup.The system leakage test was conducted during Reactor Coolant (RCS) overpressure. The pressure testing documented on page 6 of this report includes all testing done from 4/16/87 up to 8/28/88.
The  Pressure  test requirements for the first Ten      Year Interval have been met. Documentation packages        for all the system leakage tests and pressure tests are'n      file at  the Plant Site.
All    the above conditions were dispositioned in accordance with Plant Procedures.
The Examination Summary Tables      included with this Report provide the results for the    non-destructive    examinations performed.
An explanation of the Summary Table format is also included.
N 4
~
  +
8 I.
Page 6    of  10 NIS-1 REPORT(Continued)
Pressure Testing Summary Report Test No. System Description          Method/Type          Results 1-IPT-07 RCS System Leakage          SYS. LEAK    Packing gland leakage four valves, test sat.
1-IPT-16 3"-CS-108 & 3"-CS-109      HYDROSTATIC  Satisfa'ctory 1-IPT-17 "A" Aux.feedwater pump                  Satisfactory discharge 1-IPT-18 "B",Aux.feedwater      pump              Satisfactory discharge 1-IPT-19 "C" Aux.feedwater      pump              Packing gland leakage discharge                              two valves,2-4 dpm one valve check body hinge plugs,3 dpm,Sat.
1-IPT-26 Containment spray NAOH  lines                            Satisfactory 1-IPT-27 Intake cooling water lube water  1A HYDROSTATIC  Satisfactory pump 1B                  Satisfactorv 1C                  5 dpm  leak  HCR  1-105 1-IPT-29 A  Charging pump disch.                  Satisfactory 1-IPT-33 B  Charging pump disch.                  Satisfactory 1-IPT-34 C  Charging pump disch.                  Satisfactory 1-IPT-36 A,B,&C  AFW  Suction                    Satisfactory 1-IPT-37 Atmospheric storage        Hydrostatic  Satisfactory CCW.Surgy tk RWST,CST, Boric Aczd mfcup Spent Fuel pool,diesel oil 1-IPT-38 Spenf Fuel pool, intake    Hydrostatic  Satisfactory cooling water dxsch.
1-IPT-40 NaOH  Tank                  Hydrostatic  Satisfactory 1-IPT-41 SI from    HCVs TO  check                Unsatisfactory valves    (4 LINES)                      seat  leakage:    3  valves 1-IPT-41 SI  retest between HCV anh check valves.
Satisfactory 1-IPT-42 1A,1B Diesel oil            Hydrostatic  Satisfactory transfer pump suction 1-IPT-43 Shutdown cooling tie        Hydrostatic  Satisfactory lines 1-IPT-44 LP  & HP  SI recirc.line Hydrostatic    Satisfactory 1-IPT-45 S.
1A2 I. Tanks 1B1, 1B2, 1A1  Hydrostatic  Satisfactory 1-IPT-46 1A  & 1B  Diesel Qil      Hydrostatic Unsatisfactory thru Transfer    pump dz.sch.                wall leakage zn two locations, repaired NCR-1-245        1-240 per
Page 7  of 10 NIS-1 REPORT    (Continued)
Line numbers for the Piping systems with items examined  (NDE) this outage.
CLASS  I REACTOR COOLANT      SAFETY INJECTION        CHARGING/LETDOWN I-42-RC-123            I-12-SI-148              I-2-CH-147 I-30-RC-112            I-6-SI-110              I-2-CH-148 I-30-RC-115            I-6-SI-112 I-12-RC-108            I-6-SI-113 I-12-RC-151            I-3-SI-140 I-3-RC-109 I-2.5-RC-157 I-2-RC-116 I-2-RC-125 I-2-RC-142 CLASS  IZ MAIN STEAM            MAIN FEEDWATER
  -I-35.5-MS-3            I-20-BF-14 I-34-MS-29              I-20-BF-55 I-34-MS-28              I-18-BF-51 I-18-BF-52
                                ~ ~
                                    ~ ~
lh P,,ii'4 Il I
1'"-
~P q fl!l 2y
Page 8  of 10 NIS-1 REPORT(Continued)
We certify that the statement made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code, Section XI.
Certificate of Authorization No.~N      A    Expiration Date    N A Date    I l Z I Q  Signed Florida Power  & Li ht Co. By Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the Mutual Insurance Com an w
National Board of Boiler and Pressure Vessel Inspectors and /
of Norwood Mass. have inspected the components described in this Owner's Data Report during the period 11 Jul 1988 to 1 Se tember 1988 and state that to the best of my knowledge and belief, the owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore,      neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Inspector's Signature Commissions    k'F National Board, State, Province, and Endorsements Date    I  2
A Pj;"
Page 9 of  10 NIS-1 REPORT
: l. Owner:  Florida Power and Liciht ~Co. 700 Universe Blvd.
Juno Bch. FL. 33408
: 2. Plant: St. Lucie Nuclear Power Plant P.O.Box ~128 Ft. Pierce FL. 33454 3.Plant Unit: 1            4.Owner Certificate of Authorization  ~N A 5.Commerical Service Date: 21 December 1976 6.Unit National Board No. A    ~N REPORT NUMBER          ORGANIZATION        DESCRIPTION OF SERVICES JNS-PSL-100-88                FPL              INSERVICE INSPECTION FINAL REPORT FPL          EDDY CURRENT EXAMINATION OF STEAM GENERATORS FINAL REPORT CE            EDDY CURRENT EXAMINATION OF STEAM GENERATORS FPL          SNUBBER VISUAL EXAMINATION AND FUNCTIONAL TESTING FINAL REPORT 1  IPT 07F 1 IPT  16F                    TEST DOCUMENTATION FOR 1-IPT-17,thru 1-IPT-19,                    INSERVICE PRESSURE TESTING 1  IPT 26F 1 IPT 27  F 1  IPT 29F 1 IPT 33F 1-IPT-34, 1-IPT-36 1-IPT-37,1-IPT-38 1  IPT 40 I THRU 1  IPT 46
II
] ~
Page 10  of  10 FORM  NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As required by the provisions of the ASME CODE RULES EDDY CURRENT EXAMINATION RESULTS PLANT:  St. Lucie Unit    5  1 EXAMINATION DATES: 20      July  1988  thru        6  August 1988 TOTAL                    TUBES      TUBES    TOTAL TOTAL          INDICATIONS                PLUGGED AS  PLUGGED  PLUGGED STEAM          TUBES                                      PREVENTIVE THIS        TUBES GENERATOR INSPECTED 204  394 40%                        MAINTENANCE OUTAGE    IN S/G 1004'13 8057          904
* 40  **      141        603 8161          522        62
* 42  ****    97***      455 LOCATION OF INDICATIONS (204  1004)
STEAM          U BENDS      EGGCRATES    DRILLED SUPPORTS            TOP OF TUBE SHEET GENERATOR                      1 TO 8                  9 TO 10        TO g 1 EGGCRATE DHB  to  DCB    H/L    C/L      H/L                C/L      H/L          C/L A            29        452      56      77                83        286        34 24        194      44      31                45        190        56 REMARKS '
S/G A: 113    Indications located in 101 tubes.
* S/Q B: 62      Indications located in 60 tubes, 5 of the 60 tubes are also ASR tubes.
  ** S/Q  A  39 = ASR, and 1 = TRS.
*** S/Q  B  Row 116  line 124,cold leg was inadvertently                left unplugged but  was reported during 2/87 outage; see LER g                335-88-006.
****$ /Q  B 41 = ASR and 1 TBP ( row 116  line 122)
ASR = Adjacent stay      rod tube TRS = Tube    restriction TBP = To be plugged CERTIFICATION OF RECORD We certify that the statements        in this report are correct and the tubes inspected were tested in accordance with the requirements of Section XI of the ASME Code.
Florida        Power  & Light  Co.
DATE                                                BY
pl FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.
JUNO BEACH, FLORIDA 33408 ST. LUCIE NUCLEAR PLANT P.O.BOX 128 FT.PIERCE, FLORIDA 33454 UNIT 1 STEAM GENERATOR 1A& 1B 1988 EDDY CURRENT RESULTS CUMULATIVE REPORT
T.
0>>,
Q3a g?;
p$ l j~v
CUMULA' VE R=PORT 87/88,          ST.      LUC 1 E S/G        A, UNIT STEAM G"NERATOR: A                                                                                                            PAGE:            1  OF        4 LOCATiON: ALL                                                                                                                DATE:            89/89/88 CRiTERiA: 48$ TO 188'A. ABR, TRS                                                                                              TIME:            89'~i' I        I      1        IEXTENT        I      I          I            I                          I              CURRENT                        I IROWILINIHEATIIILEGIREQITSTIRENIREELIPROSEI                                                  LOCATION            I VOLTS IMILIDEB I                %  I CHI I          I        I      I        I      I      I      I          I            I                          I            I        I      I      I        1 521 121888121              C    IF/LIF/LIRPII 27FI588SNI81H+                              8. 8      SB      I    le il            11881 521 11 21 181888121              C    IF/I IF/LIRPII 35F1588SNI81H"                            8. 4      PS      I    1.$      1        11811 521 11 361 181999991              C    IF/LIF/LIRPII 28FI588BNIVS2-                              1.4      PC      I    1.81              I 871      621    il 141      241888141        C    IF/LIF/LI RPI I 21F1588SNI81H+                            8.4      PB      I    8 71              11861 471 1 I 211        251888121        C    IF/LIF/I.I RPI I 21F1588SNI81H+                          8.5        SS      I    So71              I  971 551 11 141      261888221      C    IF/LIF/LI RPI I 22F 1588SNI$ 2H"                        8.5        PS      I    8.51              11131 4$ 1 I  1 211        271999991      C    I F/L F/L I RP I I 22F 15888M I 8 1 H+
I                                                Se8      PC      I    1  71            I 821      681 11 381        281888131      C    IF/LIF/LI RPI I 22F I 5888N ITSH+                        4.5        PB    I    8.51            11181 431 11 671        291888121      C    IF/LIF/LIRPII 38FISSSSNI82K+                            So  2      PS    I    2.41            11131 481 1 I 981        381888421      C    IF/L IF/I. RP I I 39F 15888N 181H+
I                                        8. 6      SS    I    Se51              I 991      531 11 I        I      I  C    IF/LIF/LIRPII 39FI5888NI85H+                            8. 8      SS    I    le41            I 731      751 11 431 311888781              C    IF/LI I                I          I            I                          I            I        I        IABRI I 451 311888781              C    IF/LI I                I          I            I                          I            I        I        IABRI I 461 321888781              C    IF/LI I                I          I            I                          I            I        I        IASRI I I        I      I  C    IF/LIF/Ll I 72F1548SMI                                                    I            I        I        IASRI I 171 331888421              C    IF/LIF/LIRPII 23FI588SMITSC+                            3.9        PS    I    8.41              11831 581 1 I 431 331888781              C    IF/LI I                I          I            I                          I                      I        IABRI          I I        I      I  C    IF/LIF/Ll              I  72FI548SNI                                      I            I        I        IASRI          I 45I 331000701              C    IF/LI I                I          I            I                          I            I        I        IASRI          I 121 341888121              C    IF/LIF/I.IRPII 23FI588SNISiH+                            8.5      PC    I    Sa91            I    781 711 11 321 361888131              C    IF/LIF/LIRPII 24FI588SMITSC+                              20 2      PS    I    1+21            11881 451 1 I 331 371888131              C    IF/LIF/LIRPII 24FI588SNISiH+                              8. 7      PS    I    8 41            I 871        631    il 931 371888121              C    IF/L IF/L I RPI I 41F I 5888N 1$ 1H+                      8.4      PS    I    111              11811 511 1 I 191 391888121              C    IF/L IF/L I RPI I 24F15888MI TSH+                        1.5      PB    I      So51            11821 581          il I        I      I    C    IF/LIF/L I RPI I 24F 1588SN I TSC+                        4e4      PB    I    8.61              11181 431 1 I 1831        391$ 8843I      C    IF/L IF/L I RPI I 41F15888NI89C+                          8.$      PB    I      1e51            11131 411 1 I 331      471888141        H    IF/LIF/LIRPII 1$ FI58$ 8NI83H-                          Ss  1    SC    I      1.61            11141 441 11 911        471888781        C    IF/LI I              I          I            I                          I            I        I        IASRI        I 931        471888781      C    IF/LI I              I          I            I                          I            I        I        IASRI        I 981        481888781      C    IF/LITECI            I          I            I                          I            I        I        IASRI I 941        481$ 88781      C    IF/LI          I      I          I            I                          I            I        I        IABRI I 211        491888121      H    IF/LIF/LIRPII iiFI58$8NITSH+ 4.5                                    PC  I      4e21            11121 411 11 931        491888781      C    IF/LI          I      I          I            I                        I            I        I        IABRI I 41      581888121      C    IF/LIF/LIRPII 37F1588SNITSH+ 8.7                                    SC    I      Se7I            I Sil 53IM11 I        I      I    C    IF/I. IF/I. I RPI  I 37F 15888MI 81H+                  8. 8      88    I      1.41            11891 441            ll 381 581888141              H I F/L IF/L I RPI        I    1 1F I 5888N I 81H+          8. 9            I      1.81            I 781 691 11 981 581888121              C    IF/LtF/LIRPII 44FI588SMITSH+ 2.4                                    PS    I      1.31            11181 43! 1 I 71      511888141      C    IF/LIF/LIRPII 37Ft5888NIVS2+ 8. 8                                  PS    I      8 61            I    741 731 1 I 281        521888121      H    IF/LIF/LIRPII liFI588SMI81H- So 5                                  PC  I      1.31            11121 411 1 I 211        531999991      H  If/LIF/LIRPII 11FI5888NI84H+ 8.2                                          I      8.51          11121 '411 1 I 381        581999991      H  ITSCITSCIGNSI 13FI5888MISiK- 8.2                                    PS  I      1  51        I 591          861 11 251        591888131      H  IF/LIF/LIRPII 13FI588BMI86H+ 8.5                                    PS  I      8 61          I 941          58 I 11 I  931        591999991      C  IF/LIF/LIRPII 51FI588SNI$ 9H+ 8. $                                  PB  I      2.21          I      981 531        il 61      681888211      C  IF/LIF/LIRPII 37FI58$ SMI81H+ 8. 6                                  PS  I      is81          11831 491 1 I 131        611999991      C  IF/LIF/LIAPII 48FI588BNI89H+ 8.8                                    SS  I      2.21          11821 581 1 I I        I      I        I      1      I      I          I            I                          I            I        I        I      I    I FLORIDA        POWER        4      LIGHT COMPANY
ff
  'I fg Ca
'/
.'c
+
C Qi k
I ff;,
        'I:J I
CUMULATIVE REPORT 87/88,        ST. LUCIE S/G A. UNIT      1 STEAln GENERATOR: A                                                                                                  PAGE:              "" OF 4
LOCATION: ALL                                                                                                        DATE:              89/89/88 CRITERIA:                48'A TO          188/,ASR, TRS                                                              TIME:              69 51 I          I        I        I        IEXTENT    I        I        I      I                      I              CURRENT                            I IROWILINIHEATIIILEGIREQITSTIREMIREELiPRQBEI                                        LOCATION              IVOLTSIMfLIDEGI 5 ICHI I          I          I        I        I      I    I        I        I      I                      I            I        I        I      I          I I    161        62 I 888411        H    IF/LIF/LI RPI I 14FI588SNI81H+ 8. 6                    PS      I  1.31              11881 541 1 I I  1141        641999991          C    IF/L IF/L I RPI 49FI588SNI89H+ 8. 8 I                                PC      I  1.11              I 991      541 1 I I    431        651888221          H    IF/LI        I        I        I      I                        I          I          I        IASRI I    451        651888211            H    IF/LI I              I        I      I                      I            I          I        IABRI I I  1811        651888121            C    IF/LIF/LIRPII 52F 1588SN 82H- 8,4      I              PS      I    2.2l              11851 471          il I    321        661888221          H    ITSCITSCIGNSI 14FI588BMITSH+ 2.6                      PS      I    8 81              11111 441 11 I    421        661888431          H    IF/LI I              I        I      I                      I            I        I        IASRI            I I    461        661888221          H    IF/LI I              I        I      I                      I            I        I        IASRI I I    431        671888211          H    IF/LI I              I        I        I                      I            I        I        IASRI I I    4SI        6? 1888211          H    IF/LI I              I        I        I                      I            I        I        IASRI            I I    471        691888211          H    IF/LIF/LIRPII f5FI588SNI83H" 8. 5                    PS      I  8.61              11131        411 1 I 11811            691999991          C    IF/LIF/LI RPI I 53F1588SMI89H+ 8.8                    PS      I  2 31              11811        521 11 I 321            781888211          H    IF/LIF/LIRPII 15F1588SNI82H+ 8.5                      SS      I  8.61              11821        511    ll 11861            721999991          C    IF/LIF/LI RPI I 54FI588BNI89H+ 8.8                    PS      I    8.81              I 961        551    il I 371 491 731888141 731888111 H    IF/LIF/LIRPII 15F1588SNI82H+ 8o4 IF/LIF/LIRPII 15FI5888NISBC- 8.4 SS      I    8.51              I 991        531    il I                                    H                                                          SB      I    8.71              11841        491 1 I I      631        731888121          H    IF/LIF/LIRPII 8?FI588SNITSC+ 4.8                      PS      I    8.71              11861        451 1 I I 981            761888131          C    IF/LIF/LIRPII 55F1588SMITSH+ 1.5                      PS      I    1.61              11131        421 1 I I      781        781999991          H    IF/I. IF/L I RPI I 88FI588SNI82H+          8e8        PB      I    8.81              11861        481 11 I      581        881888141          H    IF/LIF/LIRPII 89FI588SNI83H+                8e8        PS      I    8.81            11871        481 1 I I 461            821888881          H    IF/LIF/LIRPII 11FI588SNITSC+              So 8              I    1.61            I 891        681 11 I            I        I        I    H    IF/LIF/LIRPII 11FI588SMITSC+                So 5      PC    I    8.51            11881        471 1 I I      581        821999991          H    IF/I IF/L I RPI I 16FI588SMITSC+            6.4        PS    I    1.81            I 881        681 11 I    1281        821999991          H    IF/LIF/LIRPII 53FI588SMI89C+                8.8        PS    I    1.41            11881        531 1 I I      571        831888141          H    IF/LIF/LIRPII 89FI588SN182H+                8eB        PS    I    1.51            1    if 1 I  451      il I      911        831888781          H    IF/LI I            I        I      I                      I            I        I          IASRI          I I      931        831888781            H    IF/LI I            I        I      I                      I            I        I          IASRI          I I      951        831999991            C    IF/LIF/LI RPI I S?F 1588SN I 89H+                    PS    I    2.21            I      951 561        il I      981        841888781            H    IF/LI I            I        I      I                      I            I        I          IASRI          I I      941        841888781          H    IF/LI I            I        I      I                      I            I        I          IABRI          I I            I        I        I    C    IF/LIF/LI I 72F 154 8SN I                                    I            I                    IASRI          I I    1121        841999991          H    IF/LIF/LI RPI I 53FI588SMI89H+            8.8        PS    I      1.81            11151          481    1 I I 391              851888441          C    IF/L IF/I. I RPI I 18F1588SNITBH+          Be  2      PS    I    8.91            I  1 131      411    11 I 911              851888781          H    IF/LI I            I        I      I                      I            I        I        'ASRI            I I      931        851888781          H    IF/LI I            I        I      I                      I            I        I          IASRI          I I 961              861888121          C    IF/LIF/LIRPII 58F 1588SM I 81H-            8.5        PC I        2.11            11841 491              1 I 11881              861999991          C    I F/L IF/L I RP I I S?F 1588SN I 89H+      8.8        PS I        1.61            I 951          561    1 I I 921 I iei I 891888121 881999991          C    IF/LIF/LIRPII 58FI588SNI84H+                8o3        PS I        8.41            I 861 641              il C    IF/LIF/LIRPII 58F1588BMI89H+                8o 1      PC I        5.61            11111,421              11 11871 891888121                        C    IF/LIF/LI RPI I 58FI588BNI82H-              8.6        BS I        2.21            11881 451              fI I f281              981999991          H  IF/LIF/LIRPII 55F I 588SM I 81H+            8. 5      PB I        1.41          I      781 791        11 I 1241 981888131                        H  IF/LIF/LIRPII SSFIS88SMI83H+                8.3        PS I        8.61          11851 491              1 I I 421 941999991                          C  IF/LIF/LIRPII ifFI588BMITSH+                8.5        SB I        8.71          11841 481              1 I I 1281              961999991          H  IF/I IF/LIRPII 5?FI588SMI89C+                8.8            I      is BI          I      611 841        1 I I        4311 811888781                  H  IF/LI I            I        I      I                      I            I        I          I ABRI        I I            I        I        I          I      I    I    I        I      I                      I            I        I          I      I      I FLORIDA POWER 4 LIGHT COMPANY
p I
p4 V
Ig
'gf
~e F% t k:
CUNULATIVE REPORT 87/88,      ST. LUCIE S/G Aq UNIT                1 STEAN GENERATOR: A                                                                                              PAGE:              3 OF        4 LOCATION: ALL                                                                                                    DATE:              89/89/88 CRITERIA:          4$ %    TO 188%,ASR, TRB                                                                  TINE:              $ 9: Sl:25 I        I      I        I      I EXTENT    I    I      I      I                                I            CURRENT                      I I ROW    ILINIHEAT&#xb9; I LEGIREQITSTIRENIREELIPROHEI                                  LOCATION        IVOLTSIMILIDEGI % ICHI I        I      I        I      I      I    I      I      I      I                                I          i        I      I      I      I I  4511811888781            H  IF/LI      I      I      I      I                                I          I        I      IASRI        I I  4211821888781            H  IF/LI      I      I      I      I                                I          I        I      IASRI        I I  4611821888781            H  IF/LI I          I      I      I                                I          I        I      IASRI        I I  18611821999991            C  IF/LIF/LI RPI I 61FI58SSNI89M+                    8. 8      PS  I  Re  31            11881 441        11 I  4311831888781            H  IF/LI I          I      I      I                                I          I          I      IASRI        I I  4511831888781            H  IF/I  I    I    I      I      I                                I          I          I      IASRI        I I  11811841999991            H    IF/LIF/LIRPII 46F 1588SM I 89C+                    8. 8      PS  I  1. 61            11$ S I 491      11 I    2111871888131            C    IF/LIF/L RPI I 13F I 5888M 81M+
I                    1                S. 2      SS  I  1. 2 I            11871 461        11 I    5311871999991            C    IF/LIF/LI RPI 86F 158$ SN I SRM-I                                8. 5      SS  I  S. 61            11141 481          11 6111871999991            C    IF/LIF/LIRPII $ 6FI58SSNISRH-                      Se 2      SS    I  8. 61            11861 581          il I
1411881888121          C    IF/LIF/LIRPII 13FI58$ 8MI84H-                      Se 4      PS    I  8. 81            Iiiil      421    il I
I    7411881999991            C    IF/LIF/L RPI I $ 6F 15888M I TSH+
I                                      l. 1      PS    I  8. 61            I  ill  I 461    1 I I    9811881888121            C    IF/LIF/LI RPI I 63FI588SNITSH+                    1.4      PS    I  2. SI            11161 431          11 I    9911111888121            C    IF/LIF/LI RPI 63FI58SSNI89H+
I                                8. 8      PS    I  Re 41            11881 531          1 I I    2411121$ $ 8121          C    IF/LIF/LI RPI I 14F1588SMI83H+                    8. 1      PB    I  Se 81            11161 481        ll I    9611121999991            C    IF/LIF/LI RPI I 64FIS8$ SNI89H+                    8. 8      PS    I  i. 21            I 991      531    il I    7711131999991            C    I F/L IF/L I RPI I 87FIS8$ SNITSH+ 3.9                            I  S. 91            11181 431          1 I I        I      I        I  C    IF/LIF/LI RPI I 87F158SBMI 81H+ 8. S                        SS    I  8. 41            11811 511          1 I I    1711151888131            C    IF/LIF/LI RPI I 1SFI58$ 8NI$ 4H+ 8. 4                        PC    I  Re  31            11871 441          11 I 11311151888121              H    IF/LIF/LIRPII 48F 15888N I 89H+ Se 8                        PB    I  6. 31            I  991 521        1 I I 1411161888411              C  IF/LIF/LI RPI I 15F 15888M I SSH+ 8. 8                        SS    I  le 71          I 9SI      551    il I 2211161888421              C    IF/LIF/LI RPI 15F 15888M I 81H+ 8. 8 I                                          BS  I  Se  71          11811 581          il I    1511171888411            C  IF/LIF/LIRPII 15F158$ 8N I 84M+ 8. 1                          SB  I  Se  91          I 851      631    11 I    1411181888411            C  IF/LIF/LIRPII 15FI58$ 8NITSH+ 1.8                            PS  I  i. 2  I        I    611 831      il I 4211181888431                C  IF/LIF/LI RPI I 1SFI5888NI83H+ 8. 5                          PB  I  Se  41          I 821      661    11 I 351 1191888441              C  IF/LIF/LI RPI I 16F I 58$ 8N1$ 2H+ 8. 8                      SB  I  1. Sl          ,11841 471          il I 9111191888781                H  IF/LI I          I      I      I                              I          I        I        I ABRI      I I 11311191999991              H  I  F/LIF/LI RPI I 49FI588SMIS9C+ 8. 8                        PB  I  2. 11          I 951      571    il I 9811281888781                H  IF/LI I          I      I      I                                I          I        I        IASRI        I I    9411281888781            H  IF/LI I          I      I      I                                I          I        I        IASRI        I I 9111211888221                H  IF/LI I          I      I      I                              I          I        I        IABRI        I I 9311211888221                H  IF/LI I          I      I      I                              I          I        I        IASRI        I I    1411221999991            H  IF/LIF/LIRPII 16FI5888MITBM+ 8.8                              PS  I  2. 31            I    871    48IN11 I        I      I        I    H  IF/LIF/LI RPI I 16FI5888NITSH+ 1.2                            PS  I  2. SI          I    941    411Nl I I        I      I        I    H  IF/LIF/LIRPII 16F 15888M I TBM+ 2. 4                          PS  I    2. 11          I 821        53 Nll 1
I        I      I        I    H  IF/LIF/LIRPII 16F 158$ 8N I TSH+ Re 9                          PS  I    1. 91          I 911        44 I Ni I I          I I H      IF/LIF/LIRPII 16F 15888M (TSM+ 3. 3                            PB  I    1. 41          I 571        78 I Ni I I        I      I      I    M  IF/LIF/LIRPII 16F 15888M fbi H":S. 5                          SB  I    Se 91        . 11141        481    11 I        I      I      I    H  IF/LIF/LIRPII 16FI5888NISPH+ 8, 8                              PC.I    1. 81          I 991        511    1 I I      3411221888141            H  IF/LIF/LI RPI I 16F1588SMf8$ M+                                SS  I    Se 91          I    891'621        11 ll
                                                                            ...Seek>'9F I    9611221888121            H  IF/LIF/I.I RPI I          158$ 8N'181M+'" 8. 9                SS  I    Se 61          I    961 561 I    5811241999991            H  IF/LIF/LI RPI I 17FI58$ SNITBH+ 8. 6                          PS  I    1>>  61          11811 521          1 I I    2211381999991            H  IF/I IF/L I RPI I 18F 15888M I SRM- 8. 5                      PS  I    le 31          11131 411          1 I I    9611321888211            H  IF/LIF/LIRPII 42FI58$ 8NIS9C+ 8.8                              PB  I    ie 11          11831 511          1 I I    10211321888121            H  IF/LIF/LIRPII 42F 158$ 8MI$9H+ 8. 8                            PS  I    3. 31          11111 441          11 I        I      I      I        I      I    I    I      I      I                                I          I        I        I      I    I FLORIDA POWER 4 LIGHT COMPANY
,1j
'J it'
      ~ J
      ~4  Clog VI P
CUMULATIVE REPORT 87/88,      ST. i UCIE S/G A, UNIT        1 STEAN GENERATOR:~ A                                                                            PAGE:          4 OF        4 LOCATION: Ai L                                                                                  DATE:        89/89/88 CRITERIA:      48M TO 188'A, ASR.~ TRB                                                          TIME:          89:51:25 I    I      I    IEXTENT      I      I      I        I                      I          CURRENT                I ROWILINIHEATOILEGIREQITSTIREMIREELIPROBEI                            LOCATION        IVOLTSINILIDEGI 5 ICHI I    I      I    I      I      I      I      I        I                      I        I      I      I      I    I 1311331888131      H  I  F/L IF/L I RPI    I  19F 1588SM I TSH+      1.3      SS  I  8.81        I 931 47IN11 2111331888131      H  IF/L IF/L I RPI      I  19FI588SN ITSC+      2.8        SS  I  8e71        11151 421 11 7311331888121      H  IF/L IF/L I RPI      I 29F 1588SMI81H+        8o5      PS    I  8.51          I 851 661      il 1211341888131      H  I F/L IF/L I RPI      I 19F1588SNITSH+        8e5      PS    I  1.11        I 731    781 11 4311351999991      H  IF/LI        I      I        I        I                      I        I      I      IASRI      I I  I      I  H  I  F/L I 81C I      I  19FI588SMI                            I        I      I      IABRI I 4511351888131      H  I F/LI        I      I      I        I                      I        I      I      IABRI I I  I      I  H  IF/LIF/LI            I  19FI588SNI                            I        I      I      IASRI I 9711351888111      H  I  F/L IF/L I RPI I    42FI588SNI89H+                  SC  I    1.81          971 561      il 4211361888781      H  IF/L I        I      I      I        I                      I        I      I      IABRI I 4611361888781      H  I F/LI        I      I      I        I                      I        I. I      IASRI I 4311371888781      H  I F/LI        I      I      I        I                      I        I      I      IASRI I 4511371888131      H I F/LI        I      I      I        I                      I        I      I      IASRI I 3811381888121      H I F/L IF/L I RP I I 28F      1588SN 182H+      8.2      PS  I  8.81        11871 461        il 3211441888121      H I  F/LIF/L  I RPI I    21F 1588SM I TSH+      8. 1      PB  I  1.31        I 821    58IN11 9511451888111      H I F/L IF/L I RPI I      44FI588SMI82H"        8.5      PS  I  8 51        11121 431 11 2711471888121      H I F/L IF/L I RPI I      22FI588SNITSH+        8.8      PS  I    8.81        I 941      571    il 6911471999991      H IF/LIF/LIRPII 32F1588SNI85H+                    8.6          I    8.31        11841 511 11 1511511888441      H I F/L IF/L I RP I  I 23F 1588SN I TSH+          8.8      SS  I    2.31        I 961 44INil I  I      I  H IF/LIF/L      I RPI I    23FI588SNI81H+        8. 9      SC  I  18o31        11121 431 1 I 3211521999991      H IF/I IF/L I RPI I        23F 1588SNI82H+        8.4      SS  I    8.71        11861 481 1 I 7211541999991      H I F/L I F  /L I RP I I  34F 1588SMI84H+        8.2      SS  I    8.91        I 871      641 11 311591999991      H IF/L186HIRPII            67FI548SNI                          I        I            ITRSI      I I    I      I    I      I      I      I      I        I                      I        I      I      I      I    I NUMBER OF TUBES SELECTED FROM CURRENT OUTAGE:                            141 NO TREND      ANALYSIS REQUESTED FLORIDA      POWER  4    LIGHT COMPANY
P th
'k V
CUMULATIVE REPORT 87/88, ST. LUCIE S/G                    B. UNIT i TEAM GENERATOR: T        8                                                                                    PAG=:                1  QF LOCATION: ALL                                                                                                  DATE:              89/C9/68 CRITERIA:        4W    TO 188'A,      ASR,TBP                                                                TIME:                iS:19:36 I      I      I        IEX)ENT I                I          I    I                          I            CURRENT                        I IROWILINIHEATQILEGIREQiTSTIREMIREELIPROSEI                                      LOCATION            IVOLTSIMILIDEGI / ICtll I      I      I      I        !      I        I        I          I      I                          I          I        I        I      I      I I  441    181999991    C    I F/L I F /L I RP I I        iSFI588BNI82H+        8. 5      PS      I  8.51              11891      491    1 I I    31    251999991    C    I F/L IF/L I RPI I          35F 1588BD 181H"      8. 7        SS      I  8. 81              I  641      841    11 I    431    311888781    H    IF/LI I                  I          I      I                          I          I        I        IABRI          I I    451    311888781    M    IF/LI I                  I          I      I                        I          I          I        IABRI          I I    421    321888781    H    IF/LI          I        I          I      I                        I          I          I        IASRI          I I    461    321888781    H    IF/LI I                  I          I      I                        I          I          I        IASRI          I I    431    331888781    H    IF/LI I                  I          I      I                        I          I          I        IASRI          I 451    331888111    H    IF/LI I                                                                                              IASRI I
I  iiil    371888431    C    I F/L IF/L I RP I I I          I      I 44F 1588BN I 89C+    8. 8        PS I
I  1.21 I          I I  981      591    11 I
I    781    421999991    C    I F/L IF/L I RP I I          33F I 588SMI 8 iH+    8. 8        SS    I  8 91              11151      441    11 I    511    471888121    H    I F/L IF/L I RP I I          81F 1588SN184H+      8. 6        PB    I  Se81        -    11191      431    11 I    911    471888781    C    IF/LI IRITI                          I    I                          I          I          I        I ABRI        I I    931    471888781    H    IF/LI I                  I          I    I                          I          I          I        I ABRI        I I  981    481888781    H    IF/LI I                  I          I    I                          I          I        I        I ABRI        I I  941    481888781    H    IF/LI I                  I          I    I                          I          I        I        I ABRI        I I  911    491888211    H    IF/LI I                  I          I    I                          I          I        I        IASRI          I 931    491888781    H    IF/LI I                              I                                I          I        I        IASRI          I I                I Iiiil 8
I 1281    541999991    C    IF/L IF/L I RPI I            46F 1588BN I 81M+    8. 7        PS    I  8.41                          491    11
  ~,'      131    591888221    H    I F/L I F/I I RP I I          12F 15888M I 81H+    8. 4        PS    I    leSI              I  941 631          il 42I    681999991    H    IF/L IF/L I RPI I            13F 1588BM I TBC+    8e  1      PS    I    ie81              I  911 641 11 121    621888221    H    IF/LIF/LI RPI I 13F 1588BN I TSH+                  1. 1      PS    I  8 61              I 931        631    il 361    621999991      H    I TBCI TSC I GNB I            13F 1588SN I TSC+    4. 1      SS    I  8.91              I  891 55IMil I    311    651888121      H    ITBCITBCIGNSI 14F 1588SN I 81M-                    8. 5            I    2m 31            11141 441 11 I    431    651888221      H    181HI          I RI T I              I    I                        I          I                  I ABRI        I I 451      651888221      H    181HI          I RIT I              I      I                        I          I          I        I  ABRI        I I 221      661888221      H    I F/L IF/I. I RP I I          14F 1588SN I 81H+    8. 8      BS    I    Si91              11171 481          1 I I 481      661888221      H    IF/LIF/LI RPI I 14F1588SNI82H+                      8. 8      PB    I    8.81              11881 491          1 I I 421        661888221      H  181HI          IRITI                I      I                        I          I          I        IABRI          I I 461        661888221      H  181HI          IRITI                I      I                        I          I          I        IASRI          I I    431    671888121    H    IF/LI          I        I          I      I                        I          I        I        IASRI          I I    451    671888121    H    181HI          I  RIT I            I      I                        I          I                  IASRI          I I 471        671888221    H    I F/I. I F/L RP I I 14F1588SNITSC+
I                                  6o3        BS I      1.21            I    671 741        1 I I 441        681888211    H    IF/LIF/LIRPII 14F 1588BN I TSC+ 7. 5                            PS I      1  61            11861 Sil            il I 1221      781999991    C    I F/L I F/I. I RP I I 49F 588SM 189C+I              8. 8        PB I      8.81            I    871 671        il I    631    751999991    H    I F/L I F/L I RP I I 87F 158SSN I 8 iM+            8. 4        SB I      lo21            11841 531 11 I 1351        771999991    H  I F/L I F/L RP I I 51F I 58SSMI 89H+
I                                    8. 8        PS I      1.41            11881 491 1 I I 911        831888781    H  I        ITEH I RPI I                I      I                        I          I        I        IASRI          I I 931        831888781    H  I F/L I        I RI T I                                                                              IASRI I,
I      I                        I            I        I                      I I 981        841888781    H  IF/LI          I        I          I      I                        I          I          I        IASRI          I I 941        841888781    H  IF/LI          I                    I      I                                    I          I        IABRI          I I 911        851888781    M  181CI          I RIT I              I      I                        I          I          I        IASRI          I I        I. I      I  H  181C 181C I            I 56FI58SBNI                                I          I          I        IABRI          I
.        931 851888781 I      I 521 861888121 I      I I
I H
H C  I I
I  81CI 181C 181C I
I RIT I I
F/L I F /L I RP I I 82F I      I        I I
56FI58SSMI I
158SSN I TBC+
I      I
: 6. 7        PS I
I I
I 1.21 I
I I        I I
I 11861 IABRI IASRI I
521 i
il I
I I
FLORIDA            POWER AND      LIGHT COMPANY
f
'lid 4.
II
~i f
j"'-IA r
) ( ~ ~
              ~
CUMULATIVE REPORT 87/88,        ST. t.UCI E B/6 9, UNIT  l STEAM  E          GENERATOR:
G                    B                                                                                PAGE:                2 O"
            'CATION:
L                        ALL                                                                                            DATE:              89/89/88 CRITERIA:T      ~          48)! TO 188/, ASR, TBP
                                                            ~
                                                              ~                                                                    TIME:                  18: .'9:~e I            I        I                  I EXTENT        I    I          I      I                      I              CURRENT                            I I ROW        (LIMNIHEAT&#xb9; (          LEG(REQITST(REM(REEL(PROBE(                      LOCATION            (VOLTS( NIL IDEGI                      A  I CHI
(          (          I          I        I        I      I    I          I      I                    (              I          I        I      I        I I    481 92(888121                  C    IF/LIF/L RPI I 18F 158QSN I TSC+
I                          6. 5      PS    I    1.11                11171        42(    ll I  134 941999991 1                        H    IF/LIF/LIRPII SGF(58QBM(82H+                8.9        SS    I    8 81                11831        551 ll I    541 96(88812(                  C    IF/LIF/LI RPI I 84F (5888M(81H-              8. 4      SS    I    1. 1(                11141        461 il I    351 99(88812(                  C    IF/LIF/LI RPI 11F(58QBN(TSC+
I                      6.5      PS      I    8.91                1184(        531 ll I    43( 99(999991                  C    IF/L(F/L RPI I 11F (58QSN I TSC+
I                            6.8      PC      I    1.SI                I  971        441 Ml      I I    1351 991999991                  H    IF/LIF/LI RPI 44FI588SM(89H+
I                      Qe8      PS      I    2  il              11161        43( ll I    126(1881999991                  H    IF/LIF/LIRPII 45F(588SN(89C+                8. 8      PS      I    1  91                  981      591 ll I      4S(1811888121                  H    IF/I    I      I    I          I      I                    I              I          I        IASRI          I I            I        I          I  C    IF/LIF/LIRPII 11F 1588BNITSC+ 5.9                      SC    I    8.91                I  811      681 Nl I I      421182188812(                  H    IF/LI I              I          I      I                    k              I          I        I ABRI          I I      46li82188878(                  H    IF/LI I              I          I      I                    I              I    -
I        I ABRI
        ~  I      48(182(88812(                  C    IF/LIF/LI RPI I 11F (58QSM(81H+ 8.7                    SS    I    3.11                11131 461 1(
I      43(183(888121                  H    IF/L(          I    I          I      I                    I            I          I        I ABRI          I I            I          I        I    C    IF/LIF/LIRPII 12F 1588SM I TSC+ 9. 5                    PS    I    8.81                (1161 441            il I      45(1831888781                  H    IF/LI I              I          I      I                    I            I          I        IASRI          I I      17(185(88812(                  C    IF/LIF/LI RPI I 12F (58QSM I TSC+ 2.4                  PS    I    8.81                11891 58(            ll I      39118SI888411                  C    ITSHITSHIGNSI            12FI58QSNIQSH+    8. 1      SS    I    8.41                11121 471            il I      37(187(88814(                  C    ITSHITSHIGNBI            12F 1588SN I 81H+  8. 5      PS    I    1.21                11811 571            il I      43(1871888121                  C    IF/LIF/LI RPI I          12F 1588SN I 81H+  Qo5        PB    I    3.SI                1185( 54(            il I      47(189(88812(                  C    IF/LIF/LI RPI I          13F(58QBMIQiH-    8. 3      PS    I    2.31                11171          42(    il I        411181888141                  H    IF/LIF/LI RPI I          34F(588SNI82H+      8.3        PS    I    8.41              11811          551    11 I      69(113(88812(                  C    IF/LIF/LI RPI I          88F 1588SN I 81H+  8.8        PC    I    1  SI            I    95( 681          il I            I        I        I    C  IF/LIF/LI RPI I          QBF (58QSN I 81H+  8.5              I    1.8(              1189( 49(              il I      781116(99999(                  C  IF/LIF/LI RPI I          88F(588SM(TSC+      4.8        SS    I    8.91                (113( 451              11 I      9111191888411                  H  (81CI          I RITI            I    I                    I              I          I        I  ABRI        I I      93(119(88841(                  H    IF/LI          I    I            I    I                    I              I          I        I ABRI          I I            I          I        I    H    I  F/L.(F/L I RPI    I    38F (58QSM I TSH+  1.4      PS    I    1  41            (1881 581              il I        66(128(88812(                  C    IF/LIF/LI RPI I 89FI588SNITSC+              2o6        PC    I    2e  ll            (113( 45(              ll I        98(128(88841(                  H    IF/I    I      I    I          I      I                    I              I          I        IASRI          I I            I        I        I    H    IF/LIQ1C I          I    38F 1588SN(83H+    Qe4        PS    I    Q.SI                1119( 48(            11 I      94(128(88814(                  H    IF/LI          I    I          I      I                    I            I          I        IASRI          I I      911121(88841(                  H    (F/LI          I    I          I      I                    I              I          I        IASRI          I I            I 931121(888411 I        I    H    IF/LIF/LI            I    38F(58QSMITSH+      is 7      PC    I    6.1(              I 291          72(    il I                                        H  I        ITEHI RPI    I          I    I                    I              I          I        IASRI          I I        6611221999991                  H  IF/LIF/LI RPI        I    26F(58QSNITSC+    4.6        PS    I    8.61              (1141 431              11 I        98(122(88822(                  H  IF/LIF/LIRPI I            38F(588BNITSH+    8.2        PS    I    1    QI            I    791      731    ll I    116(122(888411                    H  IF/LI I RPI I                    I      I                    I I        ITBPI          I I        15(125(88812(                  H  IF/LIF/LI RPI I 17F 15888M I 81H+            Q. 1      PS  I      311                1119( 421              ll I        5811261999991                  H  IF/LIF/LIPIDI 26F 158QBN(81H+                8. QQ      SS  I      8.91              11181          47( 1(
I    18811261888121                    H  I F/L I F /L I RP I I 39F I SGQBN189H+        8.8        PS  I      7e81              11171          421    1(
I        98 I 128(88821(                H  IF/LIF/LIRPII 46F (588BN(81H+                  8. 3      PS  I      8.9(              11821          551    il I        94(138(88821(                  H  IF/L,IF/LIRPII 48F (588SN(81H+                8,4        SS  I      Qe61              1114(            441    ll I    188 (138 I 88821 I                  H  IF/LIF/LIRPII 46F(58QSM(89C+                  8.8        PS  I      1.7(              11181            41(    ll I    188 11321888211                    H  IF/LIF/LIRPII 41F (5888M(89H+                  8.8        PS  I      3.51              I      851      681    il I        72(134(999991 i          I H  IF/LIF/LI RPI I 28F 158QBN I TSH+              8.9        PS  I      8.71 I
11861            511    il
(                                  I        (        I      I                I      I                                              I        I              I FLORIDA POWER AND LIGHT COMPANY
f I
'p'y k4
    ~II ~
I ~
CUMULATIVE REPORT 87/88t    ST.    'CIE    S/G Bs UNIT  1 STEAN GENERATOR: 8                                                                          PAGE:        3 OF      3 LOCATION: ALL                                                                                DATE:        89/89/aa CRITERIA:          488    TO 188/.ASR, TBP                                                  TINE:        18'19 a6 I      I      I        I    IEXTENT    I      I    I        I                              CURRENT              I I ROMILINIHEAT&#xb9;liEGIREQiTSTIRENIREELIPRO&EI                          LOCATION        I VO'B I NIL I DEG I  5  ! CH I I    I      I        I      I    I    I      I    !        I                    I      I    I      I    i    I I  94  I 134 I 88813  I  H  IF/LIF/LI RPI    I 41F I S88SN I 89H+  8. 8      PS  I  2.8I      I 187  I S8I  1 I I  43  I 135 I 88878  I  H  I81CI    I  RITI        I        I                    I      I    I      IASRI    I I  45 I 135 I 88878  I  H  I 81CI    I  RIT I      I        I                    I        I    I      IASRI    I I  69  1135I99999I        H I  FILIF/L I RPI I 29F    I 588SN I TSK+  8.7        PS  I  8.81      I119I 42I      il I      I    I        I  H IF/LIF/LI RPI I      29F I 588SN I 85C+  8,4        PB  I  8.6I      I  114  I 46 I  1 I I    6 I 136 I 88812  I  H I F/L IF/L I RP I I  3SF I S88SN I VS2+  8,4        PS I  8.7I      I  119  I 41 I  1 I I  42I136I88878I          H I81CI      I  RITI      I        I                    I      I    I      IABRI    I I  46I1361888781          H IF/LI      I      I      I        I                    I      I    I  'ASRI        I I  43 I 137I 888781      H I81CI      IRITI        I        I                    I      I    I      IASRI    I I  45I137I88878I          H I      ITEHI RPI  I      I        I                    I      I    I      IASRI    I I  92I138I88811l          H IF/LIF/LIRPII 42FI588SNI89H+              8. 8      PB I  1.1I      I  189 I 49 I  1 I I  12 I 148I 88841    I  H IF/LIF/LIRPII 22F I 588BN I 81H"          8,5        SS I  8 9I      I  581  88I  1 I I  28 I 148 I 88813  I  H IF/LIF/LIRPII 22F I 588SN I TSH+          1.4        PS I  1(8I      I116I 43I      11 I    1 I 151 I 88812  I  H IF/LIF/LIRPII 36F I 588SD I81H+          8. 6      SS I  2.1I      I  114 I  44 I  1 I I  21 I 151 I 99999  I  H IF/LIF/LI RPI 23FIS88SNITSH+
I                      8.3        PS I  1.2I      I  185 I  52 I  1 I I  55 I 155 I 99999  I  H IF/L IF/L I RPI I 33FIS88SNI84H-          8,4        PS I  8.5I      l114I 46I      il I      I      I        I    I    I    I      I      I        I                    I      I                  I MUI(IBER OF  F T  TUBES SELECTED FRON CURRENT OUTAGE:                  97 NO TREND        ANALYSIS REQUESTED FLORIDA    POWER AND      LIGHT CONPANY
t V 1I
FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.
JUNO BEACH, FLORIDA 33408 ST. LUCIE NUCLEAR PLANT P.O.BOX 128 FT.PIERCE, FLORIDA 33454 UNIT 1 1988 OUTAGE SNUBBER FUNCTIONAL TESTING REPORT
J
  ~ 4
Tag  &#xb9;: 1-010 Lockup Velocity 1.340 PASS. 1.480 PASS.
Mfg/Cap.: ITT-200 Bleed Rate 0.015  PASS. 0.128 PASS.
Serial &#xb9;: 5571 Test Load 193          257 Mark&#xb9;: SS-21B Tag &#xb9;: 1-016 Lockup Velocity 1.480 PASS. 1.480 PASS.
Mfg/Cap.: ITT-200 Bleed Rate 0.036  PASS. 0.038 PASS.
Serial &#xb9;: 5573 Test Load 193          257 Mark&#xb9;: SS-8 1B Tag &#xb9;: 1-018 Lockup Velocity 3.140 PASS. 1.400 PASS.
Mfg/Cap.: ITT-50 Bleed Rate 0.067  PASS. 0.067 PASS.
Serial &#xb9;: 11180 Test Load 20          20 Mark&#xb9;: 1A2
gl let lg
        ~ ~
F, t n~ ~
Breakaway: 53.9      P.9%, PASS. 13.4        0.2%, PASS.
Initial Drag: 14.9  0.2%, PASS. 14.2        0.2%, PASS.
Tag &#xb9;: 1-022              Peak Drag: 25.0      0.4%, PASS. 29.7        P 5% PASS Mfg/Cap.: PSA-3        Activation (PSA): 0.009    PASS        0.006      PASS Serial &#xb9;: 101            Release (A/D)
Mark &#xb9;: RC-005-34B          Test Load: 4500    75 P%        4500        75 0'/
Final Drag: 15.0    0.3%, PASS. 10.9        0.2%, PASS.
Peak Drag: 25.2      P4% PASS    26.9        0.4%, PASS.
Breakaway: 39.0      0.7%, PASS. 20.0      0.3%, PASS.
Initial Drag: 26.1  P 4%i PASS. 12.4      0.2%, PASS.
Tag  &#xb9;: 1-027            Peak Drag: 45.1    0.8%, PASS. 27.6        P 5%i PASS.
Mfg/Cap.: PSA-3        Activation (PSA): 0.005    PASS        0.006      PASS Serial&#xb9;: 100            Release (A/D)
Mark &#xb9;: RC-005-55B        Test Load: 4634    77.2%        4407        73.4%
Final Drag: 19.5  0.3%, PASS. 18  ~ 1    0.3% PASS.
Peak Drag: 34.2      0.6%, PASS. 28.8        0 5%i PASS.
Breakaway: 19.8      0.3%, PASS. 12.2        0.2%, PASS.
Initial Drag: 19.0  0 3% PASS. 18.3        03% PASS.
Tag  &#xb9;: 1-029            Peak Drag: 33.9      0.6%, PASS. 31.2        0.5%, PASS.
Mfg/Cap.: PSA-3        Activation (PSA): 0.003    PASS        0.011      PASS Serial &#xb9;: 114            Release (A/D)
Mark &#xb9;: RC-005-62A          Test Load: 4590    76 5%        4957        82.6%
Final Drag: 29.8    P  5% PASS  12.2        0.2%, PASS.
Peak Drag: 42.9      P  7%, PASS. 25.1        P 4% PASS Breakaway: 27.8      P.5%, PASS. 3.7        0.1% PASS Initial Drag: 27.1  0.5%, PASS.        '6.4 P  4% PASS.
Tag  &#xb9;: 1-031            Peak Drag: 52.0      P.9%, PASS. 47.3        P.8% PASS.
Mfg/Cap.: PSA-3        Activation (PSA): 0.002    PASS        0.003      PASS Serial &#xb9;: 29505          Release (A/D)
Mark &#xb9;: RC-005-90          Test Load: 4326      72.1%        4458        74.3%
Final Drag: 32.7    05% PASS. 41.0        0.7%, PASS.
Peak Drag: 56.9      P  9% PASS  60.8        1.0% PASS.
Breakaway      25.6 0.4%, PASS. 25.6        0.4% PASS.
Initial Drag: 25.4  0.4%, PASS. 4.9        0.1%, PASS.
Tag  &#xb9;: 1-035            Peak Drag: 36.4      P.6% PASS. 15.4        0.3%, PASS.
Mfg/Cap.: PSA-3        Activation (PSA); 0.007    PASS        0.006      PASS Serial &#xb9;: 19348          Release (A/D)
Mark &#xb9;: MS-1076-3164      Test Load: 4648      77.5%        4656        77 6'/
Final Drag: 13.9    0.2%, PASS. 7.1        P.1% PASS.
Peak Drag: 32.2      05% PASS    22.4        04% PASS.
(if Kl Q&ll aM 47.
t4
n io    od                        0    0 Breakaway      133.0  0.3%, PASS.        145.2  0.3% PASS.
Initial Drag 141.5    0.3%, PASS.        205.0  0  4'/ PASS Tag  &#xb9;: 1-036          Peak Drag 240.3        05%, PASS.        311.1  0.6%, PASS.
Mfg/Cap.: PSA-35      Activation (PSA) 0.002        PASS              0.000  PASS Serial &#xb9;: 8452          Release (A/D)
Mark &#xb9;: MS-649-314        Test Load: 37576      75 2%              39577  79.2%
Final Drag: 162.3    0.3%, PASS.        248.9  P5% PASS.
Peak Drag: 279.4      0.6%, PASS.        328.2  07% PASS.
Breakaway      235.5  0.2%, PASS.        380.6  0.3%, PASS.
Initial Drag 324.5  0,3%, PASS.        377.0  03% PASS Tag  &#xb9;: 1-044            Peak Drag 908.9      0.8%, PASS.        1101.7 P  9%, PASS.
Mfg/Cap.: PSA-100    Activation (PSA) 0.004      PASS                0.01 0  PASS Serial &#xb9;: 1229          Release (A/D)
Mark &#xb9;: BF-549-8          Test Load: 89670      74  7'I          90182  75.2%
Final Drag: 269.6    0.2%, PASS.        683.2  P.6% PASS.
Peak Drag: 961.4      P.8% PASS.          1331.0 1.1%, PASS.
Breakaway      49.5    0.3%, PASS.        45.6    0.3%, PASS.
Initial Drag  65.4    0.4%, PASS.        40.5    P.3% PASS Tag &#xb9;: 1-045            Peak Drag 92.2        P.6%, PASS.        60.5    P4% PASS Mfg/Cap.: PSA-10      Activation (PSA) 0.038      0.018g over, FAILI 0.040  0.020g over, FAILI Serial &#xb9;: 164          Release (A/D)
Mark &#xb9;: BF-549-11        Test Load: 12054      80 4%              11053  73.7%
Final Drag: 79.1      05% PASS.          47.3    0.3%, PASS.
Peak Drag: 107.8      0.7%, PASS.        68.8    P5% PASS.
Breakaway      49.0    0.3%, PASS.        42.5    0.3%, PASS.
Initial Drag 44.2    0.3%, PASS.        32.0    0.2% PASS.
Tag &#xb9;: 1-046            Peak Drag 75.4        0 5'/ PASS        52.2    0.3%, PASS.
Mfg/Cap.: PSA-10      Activation (PSA) 0.010      PASS              0.013  PASS Serial &#xb9;: 171          Release (A/D)
Mark &#xb9;: BF-549-11        Test Load: 11895      79.3%              11407  76.P Final Drag: 48.6      0.3%, PASS.        52.2    03% PASS.
Peak Drag: 78.8        0 5'/ PASS        69.5    0.5%, PASS.
Breakaway      144.0  03% PASS.          263.5  P 5% PASS.
Initial Drag  120.8  0.2%, PASS.        274.5  05% PASS Tag  &#xb9;: 1-047          Peak Drag 402.6        0.8% PASS.        436.8  0.9%, PASS.
Mfg/Cap.: PSA-35      Activation (PSA) 0.001      PASS              0.001  PASS Serial &#xb9;: 8453          Release (A/D)
Mark &#xb9;: BF-661-4020      Test Load: 37527      75                38406  76.8%
Final Drag: 176.9        1'.4%,
PASS. 344.0  0.7%, PASS.
Peak Drag: 464.8      09% PASS.          483.1  1.P%, PASS.
    >pi l
1  'c1 l  II 4/
1 1~1
Breakaway      20.0  0.3%, PASS. 13.7    0.2%, PASS.
Initial Drag 14.9  0.2%, PASS. 5.1    0.1%, PASS.
Tag  &#xb9;: 1-054            Peak Drag 29.5      P 5% PASS.      21.2    0.4%, PASS.
Mfg/Cap.: PSA-3        Activation (PSA) 0.009      PASS            0.008  PASS Serial &#xb9;: 111            Release (A/D)
Mark &#xb9;: SI-968-565          Test Load: 3821    63.7%          3733    62.2%
Final Drag: 15.4    0.3%, PASS. 25.6    P 4% PASS.
Peak Drag; 28.8      0.5%, PASS. 41.5    07% PASS.
Breakaway      14.4  0.2%, PASS. 15.9    0.3%, PASS.
Initial Drag 26.1  P 4% PASS      23.9    0.4%, PASS.
Tag  &#xb9;: 1-055            Peak Drag 37.6      0.6%, PASS. 42.5    0.7%, PASS.
Mfg/Cap.: PSA-3        Activation (PSA) 0.010      PASS          0.009    PASS Serial &#xb9;: 119            Release (A/D)
Mark &#xb9;: Sl-968-1205        Test Load: 3792    63.2%          3975    66.2%
Final Drag: 21.5  P  4% PASS      8.8    0.1% PASS.
Peak Drag: 35.4    p.6% PASS.      3P P    P5% PASS.
Breakaway      42.9  0.3%, PASS. 30.3    0.2%, PASS.
Initial Drag 50.0  0.3%, PASS. 47.8    03% PASS.
Tag  &#xb9;: 1-057            Peak Drag 81.2      P  5% PASS. 102.7  0.7%, PASS.
Mfg/Cap.: PSA-10      Activation (PSA) 0.006    PASS            0.008  PASS Serial &#xb9;: 113            Release (A/D)
Mark &#xb9;: SI-969-1190        Test Load: 11797    78 6%          11  675 77.8%
Final Drag: 46.6  P3% PASS        46.1    03% PASS.
Peak Drag: 76.9      0  5'/ PASS    91.5    0.6%, PASS.
Breakaway 42.7      0.3%, PASS. 37.8    0.3% PASS.
Initial Drag 55.4  04% PASS.      62.7    0.4%, PASS.
Tag  &#xb9;: 1-063            Peak Drag 87.8      P.6% PASS.      75.9    P5% PASS.
Mfg/Cap.: PSA-10      Activation (PSA) 0.009    PASS            0.012  PASS Serial &#xb9;: 100            Release (A/D)
Mark &#xb9;: SI-969-6217        Test Load: 11200    74 7%          10724  71.5%
Final Drag: 27.3    0.2%, PASS. 42.P    0.3% PASS.
Peak Drag: 66.1      P 4% PASS.      58.3    0.4%, PASS.
Breakaway      31.0  0.2%, PASS. 28.8    0.2%, PASS.
Initial Drag 45.9  03% PASS.      42.7    P.3% PASS.
Tag &#xb9;: 1-064              Peak Drag 60.0      0.4%, PASS. 66.6    P4% PASS.
Mfg/Cap.: PSA-10      Activation (PSA) 0.01 1    PASS            0.011  PASS Serial &#xb9;: 112            Release (A/D)
Mark &#xb9;: Sl-969-6217        Test Load: 11712    78.1~4          11248  75 0%
Final Drag: 33.2    0.2% PASS.      42.2    0.3%, PASS.
Peak Drag: 49.3      0.3%; PASS.* .! 63.9    04% PASS.
lg EN
  ~
g4 V(
Il pl
s 0 19.0    0.3%, PASS. 20.4      0.3%, PASS.
Breakaway'nitial Drag: 44.9      P.7% PASS  24.9    P 4% PASS Tag &#xb9;: 1-066              Peak Drag: 67.3                  1.1% PASS. 50.5      0.8% PASS.
Mfg/Cap.: PSA-3        Activation (PSA): 0.004                PASS        0.004    PASS Serial &#xb9;: 19345          Release (A/D)
Mark &#xb9;: Sl-970-1248        Test Load: 4436                73 9%      4070      67.8%
Final Drag: 22.P                P 4% PASS. 31.7      P  5% PASS.
Peak Drag: 42.7                  P 7% PASS. 58.1      1.0%, PASS.
Breakaway: 44.9                  0.3%, PASS. 104.9    P.7% PASS.
Initial Drag: 88.6              0 6% PASS  89.3      0.6%, PASS.
Tag  &#xb9;: 1-069            Peak Drag: 108.1                P.7% PASS  259.1    1.7%, PASS.
Mfg/Cap.: PSA-10      Activation (PSA): 0.007                PASS        0.008    PASS Serial &#xb9;: 16611          Release (A/D)
Mark &#xb9;: SI-971-1229        Test Load:            1 1 749  78.3%        1 1 297  75.3%
Final Drag: 44 4                03% PASS. 79 5    P5% PASS.
Peak Drag: 66              1    0 4'/ PASS  219.4    1.5%, PASS.
Breakaway              46.6      0.8%, PASS. 38.1    0.6%, PASS.
Initial Drag: 48.6            0.8%, PASS. 43.9    0.7%, PASS.
Tag  &#xb9;: 1-070            Peak Drag: 137.6                2.3%, PASS. 83.2      1.4%, PASS.
Mfg/Cap.: PSA-3        Activation (PSA): 0.007                PASS        0.003    PASS Serial &#xb9;: 30535          Release (A/D)
Mark &#xb9;: SI-971-6229        Test Load: 5109                85.2%        5007    83 5%
Final Drag: 59.5              1.0%, PASS. 4P P    P  7% PASS.
Peak Drag: 153.0                2.5%, PASS. 65.9    1.1%, PASS.
Breakaway: 39.5                  0.7%, PASS. 37.8    0.6%, PASS.
Initial Drag: 39.8              0.7%, PASS. 39.3    07% PASS.
Tag  &#xb9;: 1-071            Peak Drag: 57.3                  1.0%, PASS. 56.9    P.9% PASS.
Mfg/Cap.: PSA-3        Activation (PSA): 0.009                PASS        0.011    PASS Serial &#xb9;: 112            Release (A/D)
Mark &#xb9;: SI-971-6236        Test Load: 4736                  78 9%        4831    80.5%
Final Drag: 26.8                0.4%, PASS. 48.6    0.8%, PASS.
Peak Drag: 45.1                  0.8% PASS. 62.2    1.0%, PASS.
Breakaway: 46.6                  0.3% PASS. 52.0    0.3%, PASS.
initial Drag: 43.7              03% PASS. 53.4    P4% PASS.
Tag  &#xb9;: 1-072            Peak Drag: 69.5                  0.5%, PASS. 75.6    P  5%i PASS.
Mfg/Cap.: PSA-10      Activation (PSA): 0.01              1 PASS        0.015    PASS Serial &#xb9;: 101            Release (A/D)
Mark &#xb9;: SI-972-1243        Test Load:            1 2200    81.3%        12151    81.0%
Final Drag: 25.1                0.2%, PASS. 66.4    0.4%, PASS.
Peak Drag:            544      P4% PASS. 88.8    0.6%, PASS.
C g
b
$~
4
+I g
k f
Vd I
Breakaway: 499.5      8.3%, 199&#xb9; over, FAIL!    499.7  8.3%, 199.7&#xb9; over, FAIL!
Initial Drag: 460.7  7.7%, 160.7&#xb9; over, FAIL!  491.7  8.2%, 191.7&#xb9; over, FAILI Tag  &#xb9;: 1-073              Peak Drag: 499.5      8.3%, 199&#xb9; over, FAIL!    499.7  8.3%, 200&#xb9; over, FAILI Mfg/Cap.: PSA-3        Activation (PSA): 0.000      PASS                      0.000  PASS Serial &#xb9;: 26881          Release (A/D)
Mark &#xb9;: Sl-972-6240        Test Load: 3287      54.8%                    341 8  57.0%
Final Drag: 478.7    8.0%, 178.7&#xb9; over, FAIL!  493.1  8.2%, 193.1&#xb9; over, FAILI Peak Drag: 499.5      8.3%, 199&#xb9; over, FAIL!    499.7  8.3%, 200&#xb9; over, FAILI Breakaway: 25.4        0.4%, PASS.              20.5  0.3%, PASS.
Initial Drag: 16.6  03% PASS.                13.2  0.2%, PASS.
Tag  &#xb9;: 1-076              Peak Drag: 28 1  ~    05% PASS.                24.4  0.4%, PASS.
Mfg/Cap.: PSA-3        Activation (PSA): 0.003      PASS                      0.004  PASS Serial &#xb9;: 29502          Release (A/D)
Mark &#xb9;: SI-973-6224        Test Load: 4041      67.3%                    4085  68.1%
Final Drag: 12.2    0.2%, PASS.              29.0  0 5% PASS.
Peak Drag: 27.1      0.5%, PASS.              43 9  07% PASS.
Breakaway: 28.3        05% PASS.                41.2  0.7%, PASS.
Initial Drag; 15.1    0.3%, PASS.              33.7  0.6% PASS.
Tag  &#xb9;: 1-079            Peak Drag; 32.2        05% PASS                  60.3  1.0% PASS.
Mfg/Cap.: PSA-3        Activation (PSA): 0.010      PASS                      0.027  0.007g over, FAILI Serial &#xb9;: 19349          Release (A/D)
Mark &#xb9;: Sl-868-163        Test Load: 7605        1 26.8%                  4890    81.5%
Final Drag: 58.8      1.0% PASS.              57.1    1.0%, PASS.
Peak Drag: 78.6        1.3% PASS.              75.9    1.3%, PASS.
Breakaway: 27.6        0.5%, PASS.              20.5  0.3%, PASS.
Initial Drag: 22.0  0.4% PASS.                16.4  0.3% PASS.
Tag &#xb9;: 1-080              Peak Drag: 39 3      0.7% PASS.                54.7  09% PASS.
Mfg/Cap.: PSA-3        Activation (PSA): 0.027      0.007g over, FAIL!        0.027  0.007g over, FAILI Serial &#xb9;: 19352          Release (A/D)
Mark &#xb9;: Sl-868-410          Test Load: 2350      39.2%                    695    11.6%
Final Drag: 49.0    0.8% PASS                15.4  0 3%, PASS.
Peak Drag: 75.9        1.3% PASS.                35.4  0.6%, PASS.
Breakaway. 19.8        0.3% PASS.                13.9  0.2%, PASS.
Initial Drag: 18.1    0.3%, PASS.              7.3-  01% PASS Tag &#xb9;: 1-081              Peak Drag: 26.4        04% PASS.                16.6  0.3%, PASS.
Mfg/Cap.: PSA-3        Activation (PSA): 0.005      PASS                      0.006  PASS Serial &#xb9;: 17189          Release (A/D)
Mark &#xb9;: SI-676-67          Test Load: 4743        79.0%                    4802  80.0%
Final Drag: 17.8      0.3% PASS.                9.8    0.2% PASS.
Peak Drag: 26.1        0.4%, PASS.              16.8  03% PASS.
l ll I
I" I
  ~
f 3O
ee                            re Breakaway: 32.0      0.2%, PASS. 37.8      0.3% PASS.
Initial Drag: 29.0  0.2%, PASS. 32.9      0.2%, PASS.
Tag &#xb9;: 1-085              Peak Drag: 44.4    0.3%, PASS. 48.8      P.3% PASS Mfg/Cap.: PSA-10      Activation (PSA): 0.013    PASS        0.013    PASS Serial &#xb9;: 115          Release (A/D)
Mark &#xb9;: Sl-676-127        Test Load: 12212    81.4%        11932    79.5%
Final Drag: 24.4  0.2%, PASS. 31.7      0.2%, PASS.
Peak Drag: 38.5      P.3% PASS. 47.8      0.3%, PASS.
Breakaway: 13.7      0.2%, PASS. 16.1      0.3%, PASS.
Initial Drag: 11.8  0.2%, PASS. 7.7      0.1% PASS.
Tag  &#xb9;: 1-087          Peak Drag: 28.4      0.5%, PASS. 36.3      0.6% PASS.
Mfg/Cap.: PSA-3      Activation (PSA): 0.006    PASS        0.003    PASS Serial &#xb9;: 18843        Release (A/D)
Mark &#xb9;: SI-676-250        Test Load: 4780      79.7%        4619      77 P%
Final Drag: 22.2    P 4% PASS. 27.3      P.5% PASS Peak Drag: 60.5      1.P% PASS. 114.2    1.9%, PASS.
Breakaway: 17.8      0.3%, PASS. 7.6      0.1% PASS.
Initial Drag: 9.6  0.2%, PASS. 10.0      0.2%, PASS.
Tag &#xb9;: 1-091            Peak Drag: 20.2      0.3%, PASS. 23.4      04% PASS.
Mfg/Cap.: PSA-3      Activation (PSA): 0.004    PASS        0.008    PASS Serial &#xb9;: 19353          Release (A/D)
Mark &#xb9;: SPS-417          Test Load: 4165      69 4%        4070      67.8%
Final Drag: 12.5  0.2%, PASS. 8.0      0.1%, PASS.
Peak Drag: 24.4    P  4% PASS. 21.4      0.4% PASS.
Breakaway: 11.5      0.2%, PASS. 6.6      0.1%, PASS.
Initial Drag: 17.8  0.3%, PASS. 7.3      0.1% PASS.
Tag  &#xb9;: 1-094            Peak Drag: 25.9    P.4% PASS    15.9    0.3%, PASS.
Mfg/Cap.: PSA-3      Activation (PSA); 0.009    PASS        0.010    PASS Serial &#xb9;: 102          Release (A/D)
Mark &#xb9;: CS-832-118        Test Load: 4487    74  8'/      4187      69.8%
Final Drag: 9.8    0.2%, PASS. 3.7      0.1%, PASS.
Peak Drag: 17.8      P.3% PASS    11.0      0.2%, PASS.
Breakaway; 12.9      0.2%, PASS. 19.5      0.3%, PASS.
Initial Drag: 23.4  P4% PASS. 11.0      P.2% PASS.
Tag  &#xb9;: 1-095          Peak Drag: 30.0      P 5% PASS. 21.7      P.4% PASS Mfg/Cap.: PSA-3      Activation (PSA): 0.011    PASS        0.011    PASS Serial &#xb9;: 110          Release (A/D)
Mark &#xb9;: CS-878-115        Test Load: 4560      76 0%        4282      71  4%
Final Drag: 10.7    0.2%, PASS. 11.2      0.2%, PASS.
Peak Drag: 18.1      03% PASS. 42.7      p.7% PASS
P P
P l~
r,~
P Breakaway      18.5    0.3%, PASS.              13.4  0.2%, PASS.
Initial Drag: 18.8    0.3%, PASS.              11.7  0.2%, PASS.
Tag  &#xb9;: 1-096          Peak Drag: 89.0        1.5% PASS.              29.5  P5%, PASS Mfg/Cap.: PSA-3      Activation (PSA): 0.004        PASS                    0.007  PASS Serial &#xb9;: 19360        Release (A/D)
Mark &#xb9;: CC-1865-9        Test Load: 4055        67 6%                    4041  67 3%
Final Drag: 18.3      0.3%, PASS.              14.4  0.2%, PASS.
Peak Drag: 36.1        0.6%, PASS.            35.9    P.6% PASS.
Breakaway. 48.1        0.3%, PASS.              9.0    0.1%, PASS.
Initial Drag: 72.7    0.5%, PASS.              22.9  0.2%, PASS.
Tag  &#xb9;: 1-101            Peak Drag:    'I 01.0 P  7% PASS.              74.4  P 5% PASS Mfg/Cap.: PSA-10      Activation (PSA): 0.025      0.005g over, FAILI      0.016  PASS Serial &#xb9;: 16443        Release (A/D)
Mark &#xb9;: CC-17-1          Test Load: 11000      73.3%                    11000 73.3%
Final Drag: 58.1      P.4%, PASS.              30.7  0.2%, PASS.
Peak Drag: 86.6        0.6%, PASS.              78.3  P5% PASS.
Breakaway: 63.7        0.4%, PASS.              60.5  0.4%, PASS.
Initial Drag: 58.1    0.4%, PASS.              57.6  0.4%, PASS.
Tag  &#xb9;: 1-102          Peak Drag: 88.8        0.6%, PASS.              94.7  0.6%, PASS.
Mfg/Cap.: PSA-10      Activation (PSA): 0.007      PASS                    0.010  PASS Serial &#xb9;: 14478        Release (A/D)
Mark &#xb9;: CC-14-2            Test Load: 11907      79 40/                  11736  78.2%
Final Drag: 56.9      04% PASS.                60.3  P.4% PASS.
Peak Drag: 89.5        0.6% PASS.              98.1  07% PASS Breakaway: 22.2        0.4%, PASS.              26.6  04% PASS Initial Drag: 23.4    P 4% PASS                32.9  P  5%i PASS.
Tag &#xb9;: 1-106            Peak Drag: 32.0        P5% PASS.                32.9  0.5%, PASS.
Mfg/Cap.: PSA-3      Activation (PSA): 0.009      PASS                    0.011  PASS Serial  &#xb9;: 19358        Release (A/D)
Mark &#xb9;: CH-64-40          Test Load: 4875        81.2%                    4963-  82.7%
Final Drag: 22.0      P.4% PASS                21.5  P  4% PASS.
Peak Drag: 32.7        0 5% PASS                31.2  P5% PASS.
Breakaway      61  9.8 10.3%, PASS.            129.3  2.2% PASS.
Initial Drag: 460.9    7.7%, 160.9&#xb9; over, FAILI 483.9  8.1%, 183.8&#xb9; over, FAILI Tag &#xb9;: 1-114            Peak Drag: 499.5        8.3%, 199&#xb9; over, FAILI  499.7  8.3%, 200&#xb9; over, FAILI Mfg/Cap.: PSA-3      Activation (PSA): 0.003      PASS                    0.001  PASS Serial  &#xb9;: 26882        Release (A/D)
Mark &#xb9;: Sl-972-6240      Test Load: 3733        62.2%                    3924  65  4'l Final Drag: 400.9      6.7%, 100.9&#xb9; over, FAILI 439.2  7.3%, 139.2&#xb9; over, FAILI Peak Drag: 499.5        8.3%, 199&#xb9; over, FAIL!  499.7  8.3%, 200&#xb9; over, 'FAlL!
yk~
ling~'
e  o    0 e Breakaway: 12.7        3.2%, PASS.              11.0    2.7% PASS.
initial Drag: 12.7    3.2%, PASS.              13.1    3.3%, PASS.
Tag  &#xb9;: 1-117          Peak Drag: 15.2        3.8%, PASS.              16.5    4.1%, PASS.
Mfg/Cap.: A/D-41    Activation (PSA):
Serial &#xb9;: 1297        Release (A/D) 54.500      PASS.                  54.100  PASS.
Mark &#xb9;: RC-1-221A        Test Load: 322        80.5%                  334      83 5%
Final Drag: 12.1    3.0%, PASS.              15.1  3.8% PASS.
Peak Drag: 14.4      3.6% PASS.              30.4    7.6%, 10&#xb9; over, FAILI Breakaway: 4.8          1.4% PASS              6.3      1.8%, PASS.
initial Drag: 33.8    9.7%, 16.3&#xb9; over, FAILI  19.9    5.7%, 2.4&#xb9; over, FAILI Tag  &#xb9;: 1-118          Peak Drag: 50.0        14.3%, 32&#xb9; over, FAILI  50.0    14.3%, 32&#xb9; over, FAILI Mfg/Cap.: PSA-1/4  Activation (PSA): 0.011      PASS                    0.010  PASS Serial &#xb9;: 29367      Release (A/D)
Mark &#xb9;: RC-1-124B        Test Load: 266          6 Oo/                  311    88 9%
Final Drag: 35.2      10.1%, 17.7&#xb9; over, FAILI 5.1    1.5%, PASS.
Peak Drag: 50.0        14.3%,  32&#xb9; over, FAILI  50.0    14.3%,  32&#xb9; over, FAILI Breakaway: 6.5        1.6%, PASS.              5.6    1.4%, PASS.
Initial Drag: 5.0    1.2%, PASS.              8.5    2.1%, PASS.
Tag &#xb9;: 1-120          Peak Drag: 9.8        2.4% PASS.              10.8    2.7%, PASS.
Mfg/Cap.: A/D-41    Activation (PSA):
Serial &#xb9;: 1287        Release (A/D) 5.200      FAIL.                    113.200 FAIL.
Mark &#xb9;: RC-1-192A      Test Load: 0          P  P%                    9      2.2%
Final Drag: 6.3      1  6'/ PASS              6.5    1.6% PASS.
Peak Drag: 8.9        2.2%, PASS.              7.6    1.9%, PASS.
Breakaway: 3.0        0.9%, PASS.              3.5    1.0%, PASS.
Initial Drag: 4.7    1.4% PASS.              4.7    1.3%, PASS.
Tag &#xb9;: 1-121          Peak Drag: 6.8        1.9%, PASS.              6.9    2.0%, PASS.
Mfg/Cap.: PSA-1/4  Activation (PSA): 0.011      PASS                    0.013  PASS Serial &#xb9;: 19778      Release (A/D)
Mark &#xb9;: RC-5-475        Test Load: 261        74  6'/                  253    72.3%
Final Drag: 2.9      0.8%, PASS.              4.8    1.4% PASS.
Peak Drag: 4.5        1.3%, PASS.              7.2    2.1%, PASS.
Breakaway 8.2          2.3%, PASS.              13.9    4 0%i PASS.
Initial Drag: 6.5    1.9'/, PASS.            9 9    2.8%, PASS.
Tag  &#xb9;: 1-122          Peak Drag: 16.4        4.7%, PASS.              12.8    3.7%, PASS.
Mfg/Cap.: PSA-1/4  Activation (PSA): 0.012      PASS                    0.007  PASS Serial &#xb9;: 4152        Release (A/D)
Mark &#xb9;: CH-129-99      Test Load: 296        84.6/o                  282    80 6%
Final Drag: 10.7      3.1%, PASS.              9.6. 2.8%, PASS.
Peak Drag: 15.7        4 5%,PASS.<<.:    "      12.1    3.4%, PASS.
"C ep,"
y4 pt
e  o Breakaway: 1.9        0.5%, PASS. 3.1    09%, PASS.
Initial Drag: 4.9    1.4%, PASS. 5.9    1.7% PASS.
Tag  &#xb9;: 1-123          Peak Drag: 6.9      2.0%, PASS. 8.0    2.3% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.008      PASS        0.009  PASS Serial &#xb9;: 11412        Release (A/D)
Mark &#xb9;: RC-217-5          Test Load: 271      77 4%        274    78.3%
Final Drag: 2.7      0.8%, PASS. 4.4    1.3%,
PASS.'.9%,
Peak Drag: 4.5        1.3% PASS. 6.5            PASS.
Breakaway: 3.4        1.0%, PASS. 2.5    07%, PASS.
Initial Drag: 2.7  0.8%, PASS. 3.2    0 9'i  PASS Tag  &#xb9;: 1-124          Peak Drag: 4.0        1.1%, PASS. 4.2    1.2%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.011    PASS        0.009  PASS Serial &#xb9;: 36531        Release (A/D)
Mark &#xb9;: CH-65-54C        Test Load: 280      80.0%        283    80.9%
Final Drag: 3.1    09% PASS    3.4    1.0%, PASS.
Peak Drag: 4.2      1.2%, PASS. 4.2    1.2% PASS.
Breakaway      7.7  2.2%, PASS. 9.8    2.8% PASS.
Initial Drag: 9.2    2.6%, PASS. 13.1  3.8% PASS.
Tag &#xb9;: 1-125            Peak Drag: 11.7      3.4%, PASS. 16.1  4.6% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.012    PASS        0.011  PASS Serial &#xb9;: 20283        Release (A/D)
Mark &#xb9;: CH-142-9          Test Load: 275      78.6%        267    76.3%
Final Drag: 9.9    2.8%, PASS. 16.0  4.6%, PASS.
Peak Drag: 14.2      4.0% PASS. 21.5  6.1% 4&#xb9; over, FAILI Breakaway      9.0  2.6%, PASS. 9.1    2.6%, PASS.
Initial Drag; 8.6    2.5%, PASS. 13.3  3.8%, PASS.
Tag  &#xb9;: 1-126          Peak Drag: 11.7      3.3%, PASS. 16.4  4.7%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.009    PASS        0.01 1 PASS Serial &#xb9;: 36814        Release (A/D)
Mark &#xb9;: CH-143-30C      Test Load: 248        70.9%        229    65 4'/
Final Drag: 8.8      2.5%, PASS. 11.7  3.4%, PASS.
Peak Drag: 12.0      34% PASS    14.7  4.2%, PASS.
Breakaway: 7.5        2.1%, PASS. 6.4    1.8%, PASS.
Initial Drag: 7.2    2.0% PASS. 7.4    2.1% PASS.
Tag  &#xb9;: 1-127          Peak Drag: 9.6        2.7%, PASS. 9.2    2.6% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.011    PASS        0.009  PASS Serial &#xb9;: 20210        Release (A/D)
Mark &#xb9;: RC-215-9A        Test Load: 264        75.4%        266    76  0'/
Final Drag: 3.7      1.0%, PASS. 7.4    2 1o/  PASS Peak Drag: 6.0        1.7% PASS. 10.1  2.9%,  PASS.
lg
."I gi
lo    od Breakaway: 2.1            0.6%, PASS. 6.1    1.7%, PASS.
Initial Drag: 3.2        P 9%, PASS. 7.0  2.0%, PASS.
Tag  &#xb9;: 1-128          Peak Drag: 5.4            1.5%, PASS. 9.4  2.7%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.009          PASS        0.009  PASS Serial &#xb9;: 29182        Release (A/D)
Mark &#xb9;: MSI-22-3A        Test Load: 246          70.3%        240    68.6%
Final Drag: 5.3          1.5% PASS. 7.3    2.1%, PASS.
Peak Drag: 7.6            2.2%, PASS. 10.4  3.0% PASS.
Breakaway. 4.7            1.4%, PASS. 4.8    1.4%, PASS.
Initial Drag: 4.8        1.4%, PASS. 5.6    1.6%, PASS.
Tag &#xb9;: 1-130            Peak Drag: 6.0            1.7%, PASS. 6.7    1.9% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.009          PASS        0.008  PASS Serial &#xb9;: 11850        Release (A/D)
Mark &#xb9;: MSI-20-3A        Test Load: 278          79 40/      262    74.9%
Final Drag: 3.6          1.0%, PASS. 5.1    1.5%, PASS.
Peak Drag: 5.0            1.4%, PASS. 6.2    1.8%, PASS.
Breakaway: 5.1            1.5%, PASS. 6.8    1.9%, PASS.
Initial Drag:  3.3      09% PASS. 6.8    1.9% PASS.
Tag  &#xb9;: 1-131          Peak Drag: 6.0            1.7%, PASS. 9.2    2.6%, PASS.
Mtg/Cap.: PSA-1/4    Activation (PSA): 0.009        PASS        0.009  PASS Serial &#xb9;: 20296        Release (A/D)
Mark &#xb9;: MSI-16-3A        Test Load:              68.3%        227    64.9%
239'.8 Final Drag;            1.1% PASS. 6.8    1.9%, PASS.
Peak Drag: 8.1            2.3% PASS. 9.P    2.6% PASS.
Breakaway: 4.2            1.2%, PASS. 5.5    1.6%, PASS.
Initial Drag: 2.8        0.8%, PASS. 7.4    2.1%, PASS.
Tag  &#xb9;: 1-132          Peak Drag: 5.4            1 5'/  PASS  10.8  3.1%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.009        PASS        0.009  PASS Serial &#xb9;: 29371        Release (A/D)
Mark &#xb9;: CH-125-356      Test Load: 273            78.0%        269    76.9%
Final Drag: 2.8          0.8%, PASS. 8.7    2.5%, PASS.
Peak Drag: 5.3            1 5% PASS    11.2  3.2%, PASS.
Breakaway: 4.2            1.2%, PASS. 3.8    1.1%, PASS.
Initial Drag: 4.6        1.3%, PASS. 5.1    1.5% PASS.
Tag &#xb9;: 1-133            Peak Drag: 5.7            1.6% PASS. 7.6    2.2%, PASS.
Mtg/Cap.: PSA-1/4    Activation (PSA): 0.007        PASS        0.010  PASS Serial &#xb9;: 11838        Release (A/D)
Mark &#xb9;: MSI-14-3A        Test Load: 277            79.1%        269    76.9%
Final Drag: 2.1          0.6% PASS. 4.7    1.3%, PASS.
Peak Drag: 4.4            1.3% PASS. 6.2    1.8%, PASS
Qy I f/'y
s 0 Breakaway: 3.2          P 9% PASS    6.8    1.9% PASS Initial Drag: 7.2      2.1% PASS. 4.7    1.4% PASS.
Tag  &#xb9;: 1-134            Peak Drag: 10.0        2.9%, PASS. 7.7    2.2%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.008        PASS        0.009  PASS Serial &#xb9;: 29193        Release (A/D)
Mark &#xb9;: CH-129-339        Test Load: 280          80.0%        277    79.1%
Final Drag: 2.5        0.7%, PASS. 4.0    1.1%, PASS.
Peak Drag: 5.6          1.6% PASS. 6.8    1.9% PASS.
Breakaway: 3.2            09% PASS. 3.1    09% PASS.
Initial Drag:  4.4      1.3%, PASS. 4.5    1.3% PASS.
Tag  &#xb9;: 1-135            Peak Drag: 5.9          1.7% PASS    6.9    2.p% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.009        PASS        0.008  PASS Serial &#xb9;: 19085        Release (A/D)
Mark &#xb9;: RC-220-105        Test Load: 257          73 4%        256    73. 1%
Final Drag: 4.0        1 to/o PASS  4.8    1.4% PASS.
Peak Drag: 5.2          1.5%, PASS. 5.8    1.7% PASS.
Breakaway        12.8    3.7%, PASS. 8.3    2.4%, PASS.
Initial Drag 10.7      30% PASS. 13.2  3.8% PASS.
Tag  &#xb9;: 1-136            Peak Drag; 13.9        4.0%, PASS. 16.7  4.8% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.009        PASS          0.007  PASS Serial &#xb9;: 11835          Release (A/D)
Mark &#xb9;: RC-217-5          Test Load: 271          77 40/        265  75 7%
Final Drag: 6.5        1.9% PASS    11.8  3.4%, PASS.
Peak Drag: 10.1        2.9% PASS. 15.4  4.4%, PASS.
Breakaway      9.5      2.7%, PASS. 9.2  2.6%, PASS.
Initial Drag: 12.3      3.5%, PASS.  ,11.9  34% PASS Tag  &#xb9;: 1-137          Peak Drag: 17.4          5p% PASS. 16.0  4.6%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.014        PASS          0.012 PASS Serial &#xb9;: 12898        Release (A/D)
Mark &#xb9;: CH-129-339        Test Load: 257          73.4%        255    72.9%
Final Drag: 4.3        1.2% PASS. 9.9    2.8%, PASS.
Peak Drag: 9.2          2.6% PASS. 14.4  4.1%, PASS.
Breakaway      2.3      0.7%, PASS. 3.2    0.9%, PASS.
Initial Drag: 4.4      1.3%, PASS. 7.6    2.2% PASS.
Tag &#xb9;: 1-138            Peak Drag: 6.9          2.0%, PASS. 9.8    2.8'/o PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.010        PASS        0.01 0 PASS Serial &#xb9;: 29197        Release (A/D)
Mark &#xb9;: RC-114-129        Test Load: 248          70.9%        244    69.7%
Final Drag: 3.4        1.0%, PASS. 4.5    1.3% PASS.
Peak Drag: 5.6          1.6% PASS. 6.7    1.9%, PASS.
I N
/
A~*
Tf Ow
Breakaway      2.4  0.7%, PASS.              3.9      1.1%, PASS.
Initial Drag 2.1  06% PASS                3.7      1.1%, PASS.
Tag  &#xb9;: 1-139            Peak Drag 4.1      1.2%, PASS.              5.0      1.4%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA) 0.013    PASS                    0.012    PASS Serial &#xb9;: 11428        Release (A/D)
Mark &#xb9;: RC-221-162        Test Load: 269    76  9'/                  247      7P 6'/
Final Drag; 2.6    P 7% PASS                3.7      1.1% PASS.
Peak Drag: 4.2      1.2'/o PASS.            4.9      1.4% PASS.
Breakaway      5.4  1.5%, PASS.              4.0      1.2%, PASS.
Initial Drag 4.8  1.4%, PASS.              6.4      1.8%, PASS.
Tag  &#xb9;: 1-140            Peak Drag 6.9      2.0%, PASS.              8.3      2.4%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA) 0.009    PASS                    0.012    PASS Serial &#xb9;: 20290        Release (A/D)
Mark &#xb9;: CH-187-38A        Test Load: 262    74.9%                    262      74.9%
Final Drag: 2.9  0.8%, PASS.              6.5      1.9%, PASS.
Peak Drag: 4.6      1.3%, PASS.              8.5    2.4%, PASS.
Breakaway      3.1  09%, PASS.                7.0    2.P% PASS.
Initial Drag 2.5  0.7%, PASS.              6.6      1.9%, PASS.
Tag &#xb9;: 1-141              Peak Drag 4.2      1 2o/  PASS            7.6    2.2%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA) 0.008    PASS                      0.008    PASS Serial &#xb9;: 20179          Release (A/D)
Mark &#xb9;: CH-143-26C        Test Load: 237    67  7'/                  228    65.1%
0                              Final Drag: 3.5  1.0% PASS.                7.1    2.0%, PASS.
Peak Drag: 4.7    1.3%, PASS.              8.3    2.4%, PASS.
Breakaway 6.1      1.7%, PASS.              5.9      1.7% PASS.
Initial Drag 6.7  1.9%, PASS.              9.7      2.8%, PASS.
Tag  &#xb9;: 1-142            Peak Drag 0.5      0.1%, PASS.              15.5    44% PASS Mfg/Cap.: PSA-1/4    Activation (PSA) 0.010    PASS                    0.009    PASS Serial &#xb9;: 29370        Release (A/D)
L Mark &#xb9;: CH-141-74          Test Load: 253    72 3%                    252      72.0%
Final Drag: 3.8    1.1%, PASS.              10.9    3.1%, PASS.
Peak Drag: 8.3      2.4%, PASS.              16.9    4.8% PASS.
Breakaway      50.0 14.3%, 32&#xb9; over, FAILI  50.0    14.3%, 32.5&#xb9; over, FAILI Initial Drag 47.2  13.5%, 29.7&#xb9; over, FAILI 48.8    13.9%, 31.3&#xb9; over, FAILI Tag &#xb9;: 1-144            Peak Drag 50.0      14.3%, 32&#xb9; over, FAILI  50.0    14.3%,  32&#xb9; over, FAILI Mfg/Cap.: PSA-1/4    Activation (PSA) 0.000    PASS                    0.000    PASS Serial &#xb9;: 19781        Release (A/D)
Mark &#xb9;: RC-128-99        Test Load: 268      76.6%                    265      75.7%
Final Drag: 44.8  12.8%, 27.3&#xb9; over, FAILI 48.8    13.9%, 31.3&#xb9; over, FAILI Peak Drag: 50.0    14.3%,  32&#xb9; over, FAILI 50.0    14.3%,  32&#xb9; over, FAILI
4 ~ 'l'! I  I ~
Q V
4
~j p
Breakaway        16.5  4.7%, PASS.          13.1  3.7%, PASS.
Initial Drag: 15.6  45% PASS              12.1  3.4%, PASS.
Tag  &#xb9;: 1-145          Peak Drag: 18.5      5.3%, 1&#xb9; over, FAIL!  19.0  5.4%, 1&#xb9; over, FAILI Mfg/Cap.: PSA-1/4    Activation (PSA): 0.015      PASS                0.01 0  PASS Serial &#xb9;: 20293        Release (A/D)
Mark &#xb9;: CH-143-34C        Test Load: 279        79.7%                281    80.3%
Final Drag: 15.3    4.4% PASS            12.0  34% PASS Peak Drag: 19.0      5.4%, 1&#xb9; over, FAIL!  17.4  50% PASS.
Breakaway      3.8    1.1%, PASS.          2.9    0.8%, PASS.
Initial Drag 3.3    0.9%, PASS.          3.8    1.1%, PASS.
Tag  &#xb9;: 1-147            Peak Drag 5.0        1.4% PASS.          5.6    1.6% PASS Mfg/Cap.: PSA-1/4    Activation (PSA) 0.014      PASS                  0.012  PASS Serial &#xb9;: 19101        Release (A/D)
Mark &#xb9;: CH-141-36C        Test Load: 264      75 40/                274    78.3%
Final Drag: 3.3      1.0%, PASS.          4.0    1.1%, PASS.
Peak Drag: 4.8        1.4% PASS.          6.0    1.7%, PASS.
Breakaway: 4.1        0.3%, PASS.          4.6    0.3%, PASS.
Initial Drag: 8.1    P5% PASS.            10.6  P.7% PASS.
Tag  &#xb9;: 1-148          Peak Drag: 2.0        P.1% PASS.            15.5    1.0%, PASS.
Mfg/Cap.: PSA-1      Activation (PSA): 0.014    PASS                  0.012  PASS Serial &#xb9;: 20184        Release (A/D)
Mark &#xb9;: RC-1-124A        Test Load: 274        18.3%                267    17.8%
Final Drag; 5.0    0.3%, PASS.          8.0    05% PASS.
Peak Drag; 7.8        0 5% PASS            12.1  0.8%, PASS.
Breakaway. 1.6        0.5%, PASS.          2.7    P.8%, PASS.
Initial Drag:  4.0    1 1'/  PASS        5.4    1.6%, PASS.
Tag  &#xb9;: 1-150          Peak Drag: 6.2        1.8% PASS.            7.0    2.0%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.014    PASS                  0.013  PASS Serial &#xb9;: 11427        Release (A/D)
Mark &#xb9;: MSI-8-3A          Test Load: 254      72.6%                267    76.3%
Final Drag: 2.7      0.8%, PASS.          5.2    1.5% PASS.
Peak Drag: 5.0        1.4% PASS.            7.0    2.0%, PASS.
Breakaway      5.8  1.7%, PASS.          4.4    1.3%, PASS.
Initial Drag: 7.0    2.0%, PASS.          7.5    2.1%, PASS.
Tag  &#xb9;: 1-151          Peak Drag: 9.8        2.8% PASS.            11.8  3.4%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.005    PASS                  0.004  PASS Serial &#xb9;: 11830        Release (A/D)
Mark &#xb9;: CH-142-17        Test Load: 283        80:9~/                282    80.6%
Final Drag: 4.1      1.2% P,ASS.          8.8    2.5'/, PASS.
Peak Drag: 7.0 4 t 2.0%, PASS~."
                                                                "    14.7  4.2%, PASS.
    "~i V
  'I 1((
4~
QP
Breakaway      3.1  0.9%, PASS.            6.6    1.9%, PASS.
Initial Drag: 13.1 3.8%, PASS.            29.7  8.5%, 12.2&#xb9; over, FAILI Tag  &#xb9;: 1-153          Peak Drag: 21.5      6.1%,  4&#xb9; over, FAILI  45.2  12.9%, 28&#xb9; over, FAILI Mfg/Cap.: PSA-1/4  Activation (PSA): 0.002    PASS                  0.002  PASS Serial &#xb9;: 19782        Release (A/D)
Mark &#xb9;: RC-165-11        Test Load: 251      71.7%                  262    74.9%
Final Drag: 7.7    2.2%, PASS.            12.5  3.6%, PASS.
Peak Drag: 12.0    34% PASS                17.5  5.0%,  0&#xb9; over, FAILI Breakaway: 1.9      0.5%, PASS.            3.1    09% PASS.
Initial Drag: 2.5  P  7% PASS            4.1    1.2%, PASS.
Tag  &#xb9;: 1-154          Peak Drag: 4.0      1.2% PASS.            5.8    1.7%, PASS.
Mfg/Cap.: PSA-1/4  Activation (PSA): 0.009    PASS                  0.008  PASS Serial &#xb9;: 20182      Release (A/D)
Mark &#xb9;: MSI-18-3A        Test Load: 277      79  1'I                281    80.3%
Final Drag; 2.0    P.6% PASS.            4.2    1.2% PASS.
Peak Drag: 3.6      1.0% PASS.            6.4    1.8%, PASS.
Breakaway      3.9  1.0%, PASS.            8.3    2.1%, PASS.
Initial Drag: 15.5  39% PASS              13.3  3.3% PASS Tag &#xb9;: 1-155          Peak Drag; 18.6      4.7%, PASS.            50.0  12.5%, 30&#xb9; over, FAILI Mfg/Cap.: A/D-41    Activation (PSA):,
Serial &#xb9;: 1302        Release (A/D) 47.200    PASS.                  45.200 PASS.
Mark &#xb9;: RC-128-99        Test Load: 324      81.0%                  319    79 8%
Final Drag: 6.9    1.7% PASS.            48.7  12.2%, 28.7&#xb9; over, FAIL!
Peak Drag: 10.0      2.5%, PASS.            48.7  12.2%,  29&#xb9; over, FAILI Breakaway 7.7        1.9%, PASS.            3.4    09% PASS Initial Drag: 7.1  1.8% PASS.            7.1    1.8% PASS.
Tag &#xb9;: 1-156          Peak Drag: 9.9      2.5%, PASS.            10.4  2.6%, PASS.
Mfg/Cap.: A/D-41    Activation (PSA):
Serial &#xb9;: 1293        Release (A/0) 56.500    PASS.                  52.100 PASS.
Mark &#xb9;: MSI-12-3A      Test Load: 342      85 5%                  326    81  5%
Final Drag: 6.7    1.7% PASS.            6.4    1.6% PASS.
Peak Drag: 8.8      2.2%, PASS.            10.2  2.5%, PASS.
Breakaway: 1.4      0.4%, PASS.            4.6    1.3%, PASS.
Initial Drag: 2.2  0.6%, PASS.            6.0    1.7% PASS.
Tag &#xb9;: 1-157          Peak Drag: 4.9      1.4%, PASS.            8.2    2.3% PASS.
Mfg/Cap.: PSA-1/4  Activation (PSA): 0.011    PASS                  0.013  PASS Serial &#xb9;: 19784      Release (A/D)
Mark &#xb9;: RC-219-6B      Test Load: 277      79.1%                  276    78 9%
Final Drag: 3.8    1.1% PASS.            5.4    1.5% PASS Peak Drag: 6.7      1.9%, PASS.            7.0    2.0% PASS.
    "4 l'>g
  /~
j
  ~f
~
I fc
Breakaway      5.7  1.6%, PASS. 3.2    0.9%, PASS.
Initial Drag 3.8  1.1%, PASS. 6.1    1.7% PASS.
Tag  &#xb9;: 1-158            Peak Drag 5.6      1.6%, PASS. 8.0    2.3%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA) 0.009    PASS          0.011  PASS Serial &#xb9;: 19021        Release (A/D)
Mark &#xb9;: CH-142-18        Test Load: 282    80. 6%        278    79 40/
Final Drag: 3.7    1  0% PASS    5.6    1.6%, PASS.
Peak Drag: 5.2      1.5%, PASS. 7.2    2.1%, PASS.
Breakaway      7.0  2.0% PASS. 10.8  3.1%, PASS.
Initial Drag 9.1  2.6% PASS. 9.6    2.7%, PASS.
Tag  &#xb9;: 1-160          Peak Drag 1 1.8    3.4% PASS. 14.3  4.1%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA) 0.008    PASS          0.010  PASS Serial &#xb9;: 36815        Release (A/D)
Mark &#xb9;: CH-142-18        Test Load: 302      86.3%        285    81 4%
Final Drag: 6.7    1.9%, PASS. 7.9    2.3%, PASS.
Peak Drag: 9.8    2.8%, PASS. 10.1  2.9% PASS.
Breakaway      10.2 0.7%, PASS. 19.3    1.3%, PASS.
Initial Drag 12.7  0.8% PASS. 16.6    1.1%, PASS.
Tag &#xb9;: 1-161            Peak Drag 27.3      1.8%, PASS. 27.1  1.8% PASS.
Mfg/Cap.: PSA-1      Activation (PSA) 0.007    PASS          0.012  PASS Serial &#xb9;: 12790        Release (A/D)
Mark &#xb9;: RC-165-11        Test Load: 1149    76.6%        1139  75 90/
0                              Final Drag: 11.0  0.7%, PASS. 19.3  1.3%,  PASS.
Peak Drag: 23.7    1.6%, PASS. 30.0  2.0%    PASS.
Breakaway      4.3  1.2%, PASS. 5.3    1.5%,  PASS.
Initial Drag  6.5  1.9% PASS. 7.6    2.2%,  PASS.
Tag &#xb9;: 1-162            Peak Drag 8.6      2.5%, PASS. 9.5    2.7%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA) 0.005    PASS          0.010  PASS Serial &#xb9;: 20255        Release (A/D)
Mark &#xb9;: RC-217-5        Test Load: 273      78.0%        276    78 9%
Final Drag: 2.8    0.8%, PASS. 7.7    2.2%, PASS.
Peak Drag: 5.7      1.6% PASS. 9.7    2.8%, PASS.
Breakaway      2.8  0.8%, PASS. 6.2    1.8%, PASS.
Initial Drag 2.2  0.6% PASS. 5.7    1.6% PASS.
Tag  &#xb9;: 1-163          Peak Drag 4.7      1.3%, PASS. 7.7    2.2%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA) 0.010    PASS          0.011  PASS Serial &#xb9;: 29187        Release (A/D)
Mark &#xb9;: SI.69-58        Test Load: 241      68 9%        244    69.7%
Final Drag: 4.2    1.2%, PASS. 6.5    1.9% PASS.
Peak Drag: 7.3      2.1%, PASS. 8.5    2.4% PASS.
prt c ~
wl (l
C t
Breakaway. 3.5        1.0% PASS. 4.3    1.2%, PASS.
Initial Drag: 4.6  1.3%, PASS. 5.8    1.7% PASS.
Tag  &#xb9;: 1-164          Peak Drag: 6.3      1.8%, PASS. 9.1    2.6% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.009    PASS        0.008  PASS Serial &#xb9;: 20294        Release (A/D)
Mark &#xb9;: Sl-39-6            Test Load: 276      78 9%        276    78 9%
Final Drag: 2.6    0.8%, PASS. 5.0    1.4%, PASS.
Peak Drag: 4.0      1.2%, PASS. 7.0    2.0%, PASS.
Breakaway      8.6  2.5%, PASS. 8.0    2.3%, PASS.
Initial Drag: 11.3  3.2%, PASS. 11.6  3.3%, PASS.
Tag  &#xb9;: 1-165            Peak Drag: 14.6      4.2% PASS. 15.2  4.3% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.009    PASS        0.010  PASS Serial &#xb9;: 19061          Release (A/D)
Mark &#xb9;: RC-221-148        Test Load: 237      67 7%      241    68.9%
Final Drag: 8.5    2.4%, PASS. 11.1  3.2%, PASS.
Peak Drag: 11.7    3.4%, PASS. 13.9  4.0% PASS.
Breakaway. 2.9      0.8%, PASS. 3.8    1.1%, PASS.
Initial Drag; 4.9  1.4%, PASS. 6.7    1.9%, PASS.
Tag &#xb9;: 1-167            Peak Drag; 10.8      3.1%, PASS. 11.8  34% PASS Mfg/Cap.: PSA-1/4    Activation (PSA): 0.009    PASS        0.008  PASS Serial &#xb9;: 29338        Release (A/D)
Mark &#xb9;: CH-67-81          Test Load: 271      77 40/      275    78.6%
Final Drag: 3.2    09% PASS    7.0    2.0%,    PASS.
Peak Drag: 8.6      2.5%,  PASS. 10.7  3.0%,    PASS.
Breakaway: 3.6      1.0%,  PASS. 4.1    1.2%,    PASS.
Initial Drag: 4.2  1.2%,  PASS. 6.3    1.8%    PASS.
Tag  &#xb9;: 1-168          Peak Drag: 5.7      1.6%  PASS. 8.6    2.5%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.010    PASS        0.008  PASS Serial &#xb9;: 20137        Release (A/D)
Mark &#xb9;: RC-114-129        Test Load: 270      77.1%        275    78  6'/
Final Drag: 7.8    2.2% PASS. 7.1    2.0% PASS.
Peak Drag: 9.4      2.7% PASS. 11.0  3.1%, PASS.
Breakaway      2.7  0.8%, PASS. 3.7    1.0% PASS Initial Drag: 3.7  1.1% PASS. 4.2    1.2% PASS.
Tag &#xb9;: 1-169            Peak Drag: 5.6      1.6% PASS. 6.2    1.8%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.012    PASS        0.011  PASS Serial &#xb9;: 20247        Release (A/D)
Mark &#xb9;: RC-44-26          Test Load: 250      71.4%        242    69 1o/
Final Drag: 2.4    0.7% PASS    4.7    1  3% PASS Peak Drag: 3.8      1.1%, PASS. 6.7    1.9% PASS.
L4
    'F I
V
0 Breakaway. 3.5          1.0%, PASS. 7.0    2.0%, PASS.
Initial Drag: 8.1      2.3%, PASS. 10.3  2.9%, PASS.
Tag  &#xb9;: 1-170            Peak Drag: 12.9        3.7%, PASS. 16.4  47% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.011        PASS        0.010  PASS Serial &#xb9;: 19106        Release (A/D)
Mark &#xb9;: RC-220-112        Test Load: 251          71.7%        252    72.0%
Final Drag: 3.8        1.1%, PASS. 12.9  3.7%, PASS.
Peak Drag: 10.9        3.1%, PASS. 20.7  5.9%, 3&#xb9; over, FAILI Breakaway        5.4      1.6% PASS. 4.6    1.3%, PASS.
Initial Drag: 5.2      1.5% PASS    5.7    1.6%, PASS.
Tag  &#xb9;: 1-171            Peak Drag: 7.8          2.2%, PASS. 8.4    2.4%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.014        PASS        0.012  PASS Serial &#xb9;: 20201        Release (A/D)
Mark &#xb9;: RC-218-26          Test Load: 259          74.0%        257    73.4%
Final Drag: 3.5        1.0%, PASS. 5.9    1.7%, PASS.
Peak Drag: 5.3          1.5%, PASS. 8.4    2.4%, PASS.
Breakaway      8.4      2.1%, PASS. 9.5    2.3%, PASS.
Initial Drag: 6.8      1.6% PASS. 12.8  3.1%, PASS.
Tag  &#xb9;: 1-172            Peak Drag: 10.0        2.4% PASS. 17.1  4.2% PASS.
Mfg/Cap.: A/D-41      Activation (PSA):
Serial &#xb9;: 1298          Release (A/D) 49.000        PASS.        53.000  PASS.
Mark &#xb9;: RC-44-11          Test Load: 323          78 8%        329    80.2%
Final Drag: 9.9        2.4%,  PASS. 9.3    2.3%,  PASS.
Peak Drag: 13.1          3.2%  PASS. 14.7  3.6%  PASS.
Breakaway. 5.0          1.4%,  PASS. 3.2    0.9%,  PASS.
Initial Drag:  4.2      1.2%,  PASS. 4.1    1.2%,  PASS.
Tag &#xb9;: 1-173            Peak Drag: 5.8          1.7%  PASS. 5.5    1.6%  PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.009        PASS        0.010  PASS Serial &#xb9;: 29183        Release (A/D)
Mark &#xb9;: CH-67-81          Test Load: 256          73.1%        255    72.9%
Final Drag: 2.9        0.8%, PASS. 3.6    1.0% PASS.
Peak Drag: 4.2          1.2%, PASS. 5.1    1.5%, PASS.
Breakaway      2.2      0.6%, PASS. 3.0    0.8%, PASS.
Initial Drag: 3 2  4  0.9%, PASS. 5.0    1.4% PASS.
Tag &#xb9;: 1-175            Peak Drag: 4.2          1.2%, PASS. 7.3    2.1% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.01      1 PASS        0.010  PASS Serial &#xb9;: 19075        Release (A/D)
Mark &#xb9;: RC-220-112        Test Load: 257          73.4%        249    71.1%
Final Drag; 3 3        09% PASS. 4.8    1.4%, PASS.
Peak Drag: 5.1          1.5%, PASS. 7.0    2.0%, PASS.
v 4 '
l-
  ~
(4
Breakaway        3.0  0.9% PASS.            4.5    1.3% PASS.
Initial Drag: 5.6  1.6%, PASS.          6.7    1 9% PASS Tag  &#xb9;: 1-176          Peak Drag: 7.8      2.2%, PASS.          9.1    2.6%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.013    PASS                  0.013  PASS Serial &#xb9;: 20194        Release (A/D)
Mark &#xb9;: MSI-2-H1          Test Load: 259      74 0%                261    74.6%
Final Drag: 4.2    1.2% PASS.            5.2    1.5% PASS.
Peak Drag: 5.9      1.7% PASS.            6.6    1.9%, PASS.
Breakaway: 7.5        2.1%, PASS.          5.8    1.7% PASS.
Initial Drag: 5.4  1.5%, PASS.          7.5    2.1% PASS.
Tag  &#xb9;: 1-177          Peak Drag: 10.8      3.1% PASS.            11.1  3.2% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.001    PASS                  0.003  PASS Serial &#xb9;: 20133        Release (A/D)
Mark &#xb9;: RC-222-43        Test Load: 264      75 4%                269    76.9%
Final Drag: 5.5    1.6% PASS            6.7    1.9%, PASS.
Peak Drag: 18.6      5.3%, 1&#xb9; over, FAIL!  10.0  2.8% PASS.
Breakaway      4.4  1.3% PASS.            4.6    1.3%, PASS.
Initial Drag: 6.0  1.7% PASS            6.6    1.9% PASS.
Tag &#xb9;: 1-178            Peak Drag: 8.2      2.3% PASS.            8.5    2.4%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA). 0.012    PASS                0.013  PASS Serial  &#xb9;: 11836        Release (A/D)
Mark &#xb9;:  MSI-4-H1        Test Load: 252      72.0%                254    72 6%
Final Drag; 2.3    0.6%, PASS.          4.6    1.3% PASS.
Peak Drag: 3.6      1.0%, PASS.          6.2    1.8% PASS.
Breakaway      3.4  0.2%, PASS.          7.4    05% PASS.
Initial Drag: 15.4  1.0%, PASS.          23.7    1.6% PASS.
Tag &#xb9;: 1-179            Peak Drag: 46.6      3.1%, 17&#xb9; over, FAIL! 42.2  2.8%, 12&#xb9; over, FAILI Mfg/Cap.: PSA-1      Activation (PSA): 0.010    PASS                  0.009  PASS Serial &#xb9;: 453          Release (A/D)
Mark &#xb9;: RC-216-15        Test Load: 659      43 9%                698    46.5%
Final Drag: 10.7    07% PASS.            16.1  1.1%,  PASS.
Peak Drag: 31.7      2.1%,  2&#xb9; over, FAILI 29.5  2.0%,  PASS.
Breakaway      4.3  1.2%, PASS.          5.1    1.5%  PASS.
Initial Drag: 5.1  1.5% PASS.            5.8    1.7%  PASS.
Tag  &#xb9;: 1-180          Peak Drag: 8.1      2.3%, PASS.          9.1    2.6%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.012    PASS                  0.011  PASS Serial &#xb9;: 19103        Release (A/D)
Mark &#xb9;: RC-220-114      Test Load: 264      75.4%o                268    76.6%
Final Drag; 3.5    1.0% P,ASS.          5.5    1.6%, PASS.
Peak Drag: 6.5      1.9%,,PASS: '        9.4    2.7%, PASS.
        ~
ft l, s
              ~
1+"
V I
f/~
1 jI,i
e  o    o Breakaway      3.0    0.9%, PASS.          4.7    1.4%, PASS.
Initial Drag: 4.0    1.1% PASS.            4.6    1.3%, PASS.
Tag  &#xb9;: 1-181          Peak Drag: 7.2        2.1%, PASS.          6.9    2.0%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.009      PASS                  0.005  PASS Serial &#xb9;: 19786        Release (A/D)
Mark &#xb9;: RC-215-9B        Test Load: 262        74.9%                268    76.6%
Final Drag: 3.6      1.0%, PASS.          4.8    1.4% PASS.
Peak Drag: 6.0        1.7%. PASS.          7.0    2.0%, PASS.
Breakaway      13.6    3.9%, PASS.          16.0  4.6% PASS.
Initial Drag: 15.4    44%, PASS.            21.2  6.1% 3.7&#xb9; over, FAIL!
Tag  &#xb9;: 1-183          Peak Drag: 26.7        7.6%, 9&#xb9; over, FAILI  27.8  7.9%, 10&#xb9; over, FAILI Mfg/Cap.: PSA-1/4    Activation (PSA): 0.007      PASS                  0.007  PASS Serial &#xb9;: 20189        Release (A/D)
Mark &#xb9;: MSI-3-H1        Test Load: 232        66.3%                230    65.7%
Final Drag: 12.9      3.7%, PASS.          16.3  4.7% PASS.
Peak Drag: 23.2        6.6%, 6&#xb9; over, FAILI  21.4  6.1%, 4&#xb9; over, FAILI Breakaway: 5.9          1.7%, PASS.          8.2    2.3% PASS.
Initial Drag: 7.7    2.2%, PASS.          7.6    2.2%, PASS.
Tag  &#xb9;: 1-184          Peak Drag: 9.6        2.7%, PASS.          9.3    2.7%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.011      PASS                0.009  PASS Serial &#xb9;: 20209        Release (A/D)
Mark &#xb9;: RC-218-26        Test Load: 269        76.9%                268    76.6%
Final Drag: 1.6      0.5%, PASS.          6.8    1.9%, PASS.
Peak Drag: 4.5        1.3%, PASS.          8.4    2.4%, PASS.
Breakaway 4.2          1.0%, PASS.          17.7  4 4% PASS Initial Drag: 12.4    3.1%, PASS.          14.0  3.5% PASS.
Tag &#xb9;: 1-185            Peak Drag: 14.9        37% PAS              19.9  5.0% PASS.
Mfg/Cap.: A/D-41    Activation (PSA):
Serial &#xb9;: 1290        Release (A/D) 54.700      PASS.                51.500 PASS.
Mark &#xb9;: CH-64-45A        Test Load: 331        82.8%                327    81.8%
Final Drag: 12.1      3.0%, PASS.          17.7  4.4%, PASS.
Peak Drag: 14.9        37% PASS              23.8  5.9%,  4&#xb9; over, FAILI Breakaway      7.6    2.2%, PASS.          7.6    2.2%, PASS.
Initial Drag: 5.2    1.5%, PASS.          6.6    1.9% PASS.
Tag  &#xb9;: 1-187          Peak Drag: 10.2        2.9%, PASS.          12.1  3.4%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.005      PASS                  0.003  PASS Serial &#xb9;: 19774        Release (A/D)
Mark &#xb9;: Sl-69-60        Test Load: 281        80.3%                277    79.1%
Final Drag: 6.3      1.8%, PASS.          6.8    1.9% PASS.
Peak Drag: 9.6        2.7%, PASS.          15.1  4.3%, PASS.
lpga b
Breakaway      1.5  04% PASS              4.2      1.2%, PASS.
Initial Drag  6.3  1.8%, PASS.          8.3    2.4%, PASS.
Tag &#xb9;: 1-188              Peak Drag 11.0    3.1%, PASS.          10.8    3.1%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA) 0.013    PASS                  0.003  PASS Serial &#xb9;: 19785        Release (A/D)
Mark &#xb9;: RC-150-H7          Test Load: 275    78.6%                278    79 4o/
Final Drag: 3.3    09%, PASS.            8.1    2.3%,  PASS.
Peak Drag: 5.4      1.6%, PASS.          9.7    2.8%,  PASS.
Breakaway 5.5        1.6%, PASS.          5.5    1.6%,  PASS.
Initial Drag 6.8  1.9% PASS.            6.7    1.9%  PASS.
Tag  &#xb9;: 1-189            Peak Drag 9.9      2.8%, PASS.          10.1    2.9%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA) 0.011    PASS                  0.010  PASS Serial &#xb9;: 19775        Release (A/D)
Mark &#xb9;: Sl-69-60          Test Load: 258      73 7%                261    74 6%
Final Drag: 3.3    0 9'/ PASS            9.2    2.6%, PASS.
Peak Drag: 5.0      1.4%, PASS.          11.4    3.2%, PASS.
Breakaway      3.1  P.9% PASS            1.8    0.5%, PASS.
Initial Drag 3.3    0 9'/ PASS            7.0    2.0% PASS Tag  &#xb9;: 1-192            Peak Drag 6.6      1.9% PASS.            11.9  34% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA) 0.013    PASS                  0.013  PASS Serial &#xb9;: 19789        Release (A/D)
Mark &#xb9;: B-3-795          Test Load: 330      94.3%                330      94.3%
Final Drag: 3.5    1.0% PASS.            4.9    1.4% PASS.
Peak Drag: 5.8      1.7% PASS.            9.7    2.8%, PASS.
Breakaway      18.0 4.5%, PASS.            6.2    1.6%, PASS.
Initial Drag: 10.1 2.5% PASS.            8.8    2.2%, PASS.
Tag &#xb9;: 1-194            Peak Drag: 22.6    5.6%, 3&#xb9; over, FAILI  14.5  3.6% PASS.
Mfg/Cap.: A/D-41      Activation (PSA):
Serial &#xb9;: 1294          Release (A/D) 53.500  PASS.                51.200  PASS.
Mark&#xb9;: MSH-7B              Test Load: 322    80;5%                320    80 p'/
Final Drag: 11.4  2.8%, PASS.          15.8    4.0% PASS.
Peak Drag: 22.4    5.6%,  2&#xb9; over, FAILI 23.8    6.0%,  4&#xb9; over, FAILI Breakaway      3.2  09% PASS              4.1    1.2%, PASS.
Initial Drag  2.7  P.8% PASS.            4.3    1.2%, PASS.
Tag &#xb9;: 1-195            Peak Drag 5.0      1.4% PASS.            6.0    1.7% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA) 0.011    PASS                  0.01  1 PASS Serial &#xb9;: 11388        Release (A/D)
Mark &#xb9;: MPR-200-250      Test Load: 284      81.1%                272    77 70/
Final Drag: 1.4    P.4% PASS            3.2    0.9% PASS.
Peak Drag: 2.9      0.8%, PASS.          5.2    1.5%, PASS.
Attb- < ~ ~ e ~
N ff
e  I Breakaway        8.3    2.1%, PASS.              6.7    1.7%, PASS.
Initial Drag: 2.4    0.6%, PASS.              4.4    1  1'/ PASS Tag&#xb9;: 1-196                Peak Drag: 6.8        1.7%, PASS.              9.2    2.3%, PASS.
Mfg/Cap.: A/D-41        Activation (PSA):
Serial &#xb9;: 1295          Release (A/D) 50.800      FAIL.                    48.900  FAIL.
Mark&#xb9;: MSH-7A              Test Load: 286        71.5o/o                  286    71 5o/
Final Drag: 0.0      0.0%, PASS.              0.0    P P%  PASS.
Peak Drag:
Breakaway        6.9    2.0%, PASS.              7.8    22% PASS Initial Drag  6.0    1.7%, PASS.              6.5    1.9% PASS.
Tag &#xb9;: 1-197              Peak Drag 7.8          2.2% PASS.                8.5    2.4%, PASS.
Mfg/Cap.: PSA-1/4      Activation (PSA) 0.010        PASS                    0.01 1  PASS Serial  &#xb9;: 12655          Release (A/D)
Mark &#xb9;: MPR-201-16          Test Load: 233        66 6%                    237    67.7%
Final Drag: 6.7        1.9% PASS.              7.2    2.1%, PASS.
Peak Drag: 8.5        2.4%, PASS.              9.2    2.6%, PASS.
Breakaway        5.6    1.6%, PASS.              4.0      1.1%, PASS.
Initial Drag 4.0      1.1%, PASS.              3.6      1.0%, PASS.
Tag &#xb9;: 1-198              Peak Drag 5.0          1.4%, PASS.              4.8      1.4% PASS.
Mfg/Cap.: PSA-1/4      Activation (PSA) 0.045        0.025g over, FAIL!      0.036  0.016g over, FAILI Serial &#xb9;: 20218          Release (A/D)
M  ik&#xb9;:  MPR 200 20        Test Load: 88          25.1%                    46      13.1%
Final Drag: 4.2      1.2%, PASS.              4.4    1.3%, PASS.
Peak Drag: 6.0          1.7%, PASS.              6.4    1.8%, PASS.
Breakaway 22.0          0.4%, PASS.              6.1    01% PASS Initial Drag    26.6  0.4%, PASS.              22.0    0 4O/ PASS Tag &#xb9;: 1-201              Peak Drag 38.8          0.6% PASS.              39.0    P  7%, PASS.
Mfg/Cap.: PSA-3        Activation (PSA) 0.002        PASS                    0.003  PASS Serial &#xb9;: 29628          Release (A/D)
Mark &#xb9;: CS-678-2135        Test Load: 4531        75 5%                    4377    72.9%
Final Drag: 20.7      0.3% PASS.              13.7    0.2%, PASS.
Peak Drag: 31.0        0.5%, PASS.              26.1    0.4% PASS.
Breakaway      50.0    14.3% 32&#xb9; over, FAILI    50.0    14.3%, 32.5&#xb9; over, FAIL!
Initial Drag 49.4      14.1%, 31.9&#xb9; over, FAILI 49.6    14.2%, 32.1&#xb9; over, FAILI Tag &#xb9;: 1-203              Peak Drag 50.0          14.3%, 32&#xb9; over, FAILI  50.0    14.3%, 32&#xb9; over, FAILI Mfg/Cap.: PSA-1/4      Activation (PSA) 0.000        PASS                    0.000  PASS Serial &#xb9;: 19107          Release (A/D)
Mark &#xb9;: CH-240-H10        Test Load: 269          76 9%                    255    72 9%
Final Drag: 48.8      13.9%, 31.3&#xb9; over, FAILI 49.5    14.1%, 32.0&#xb9; over, FAILI Peak Drag: 50.0        14.3%,  32&#xb9; over, FAILI 50.0    14.3%,  32&#xb9; over,'FAILI
V P
      ~ % I A ~
t ll.
g4
0    0 Breakaway      28.6  0.2%, PASS. 34.6  0.2%, PASS.
Initial Drag: 41.7  0.3%, PASS. 20.7  0.1% PASS.
Tag  &#xb9;: 1-206            Peak Drag: 63.2      0.4%, PASS. 38.8  0.3%, PASS.
Mfg/Cap.: PSA-10      Activation (PSA): 0.003    PASS        0.004  PASS Serial &#xb9;: 11392        Release (AG)
Mark &#xb9;: BF-659-32        Test Load: 11358    75.7%        12066  80  4'/
Final Drag: 28.3    0.2%, PASS. 22.9  0.2%, PASS.
Peak Drag: 50.5      0.3%, PASS. 42.0  0.3%, PASS.
Breakaway. 2.2        0.6%, PASS. 2.6    0.8%, PASS.
Initial Drag:  3.6  1.0%, PASS. 3.4    1.0%, PASS.
Tag  &#xb9;: 1-217          Peak Drag: 4.9        1.4%, PASS. 5.7    1.6% PASS.
Mtg/Cap.: PSA-1/4    Activation (PSA): 0.011      PASS        0.011  PASS Serial  &#xb9;: 19030        Release (A/D)
Mark &#xb9;: B-9-501          Test Load: 276      78  9'/      271  77.4%
Final Drag: 2.4    P.7% PASS    4.2    1.2%, PASS.
Peak Drag: 4.3        1.2%, PASS. 5.8    1.6% PASS.
Breakaway        2.4  0.7%, PASS. 2.8    0.8% PASS.
Initial Drag: 2.9  0.8%, PASS. 4.2    1.2%, PASS.
Tag &#xb9;: 1-219            Peak Drag: 4.2        1.2%, PASS. 5.6    1.6% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.012    PASS        0.013  PASS Serial &#xb9;: 11408        Release (A/D)
Mark &#xb9;: CH-235-H9        Test Load: 273      78 P%        268    76.6%
Final Drag: 3.0    0 9'/ PASS  5.0    1.4% PASS.
Peak Drag: 3.0        0.9%, PASS. 5.0    1.4%, PASS.
Breakaway: 12.3      1.9% PASS    9.3    1.4%, PASS.
Initial Drag:  5.7  0 9% PASS    8.8    1.4%, PASS.
Tag  &#xb9;: 1-220          Peak Drag: 11.6      1.8%, PASS. 11.8  1.8%, PASS.
Mfg/Cap.: PSA-1/2    Activation (PSA): 0.011    PASS        0.011  PASS Serial &#xb9;: 10720        Release (A/D)
Mark &#xb9;: CH-235-H10      Test Load: 505        77 7%        510    78 5%
Final Drag: 5.7      p 9% PASS    9.1    1.4% PASS Peak Drag: 11.3      1.7%, PASS. 13.8  2.1%,  PASS.
Breakaway      3.6  1.0% PASS. 5.7    1.6%,  PASS.
tnitial Drag: 5.1    1.5% PASS    5.4    1.5%    PASS.
Tag &#xb9;: 1-221            Peak Drag: 7.3        2.1%, PASS. 6.5    1.9%    PASS.
Mtg/Cap.: PSA-1/4    Activation (PSA): 0.011    PASS        0.010  PASS Serial &#xb9;: 19081        Release (A/D)
Mark &#xb9;: CH-235-H11      Test Load: 243        69 4%        246    70.3%
Final Drag: 3.0      09% PASS    5.3    1.5%, PASS.
Peak Drag: 4.7        1.4% PASS. 6.7    1.9% PASS.
g o    0                  o    e        0 Breakaway: 44.2        0.3%, PASS.        20.5    0.1%, PASS.
Initial Drag: 51.0    03% PASS.          23.7    0.2%, PASS.
Tag  &#xb9;: 1-222              Peak Drag: 71.5        0 5'I PASS          105.9    0.7%, PASS.
Mfg/Cap.: PSA-10        Activation (PSA): 0.026      0.005g over, FAILI  0.036    0.016g over, FAILI Serial &#xb9;: 8219          Release (A/D)
Mark &#xb9;: CS-678-1555        Test Load: 10016      66.8%              9601    64.0%
Final Drag: 24.6      0.2%, PASS.        20.5    0.1%, PASS.
Peak Drag: 40.3        0.3%, PASS.        123.2    0.8%, PASS.
Breakaway      3.3    0.5%, PASS.        8.9      1.4%, PASS.
Initial Drag: 7.0      1.1%, PASS.        3.4      0.5%, PASS.
Tag  &#xb9;: 1-223              Peak Drag: 9.7        1.5%, PASS.        7.0      1.1%, PASS.
Mfg/Cap.: PSA-1/2      Activation (PSA): 0.006        PASS                0.021    0.001g over, FAILI Serial &#xb9;: 16089          Release (A/D)
Mark &#xb9;: RC-164-H1          Test Load: 432        66.5%              456      70 2%
Final Drag: 7.2      1.1%, PASS.        18.9    2.9% PASS.
Peak Drag: 7.2          1.1%, PASS.        18.9    2.9%, PASS.
Breakaway        2.6    0.8%, PASS.        6.6      1.9%, PASS.
Initial Drag: 3.2    09% PASS.          6.3      1.8%, PASS.
Tag &#xb9;: 1-224              Peak Drag: 13.0        3.7% PASS          7.4      2.1%, PASS.
Mfg/Cap.: PSA-1/4      Activation (PSA): 0.011      PASS                0.008    PASS Serial &#xb9;: 19082          Release (A/D)
Mark &#xb9;: RC-244-H1          Test Load: 242        69.1%              255      72.9%
Final Drag: 2.4      0.7%, PASS.        6.8      2.0%, PASS.
Peak Drag: 8.2          2.3%, PASS.        8.2      2.3%, PASS.
Breakaway: 4.9          1.4% PASS.          6.3      1.8%, PASS.
Initial Drag: 4.9      1 4% PASS          6.3      1.8%, PASS.
Tag &#xb9;: 1-226              Peak Drag: 7.9          2.2%, PASS.        6.3      1.8%, PASS.
Mfg/Cap.: PSA-1/4      Activation (PSA): 0.013      PASS                0.010    PASS Serial &#xb9;: 19073          Release (A/D)
Mark &#xb9;: RC-246-H3          Test Load: 255          72.9%              260      74.3%
Final Drag; 3.2        0.9%, PASS.        4.6      1.3%, PASS.
Peak Drag: 6.2          1.8%, PASS.        5.7      1.6%, PASS.
Breakaway      9.7    2.8%, PASS.        9.8      2.8%, PASS.
Initial Drag: 12.3    3.5% PASS          17.0    4.9% PASS.
Tag &#xb9;: 1-228              Peak Drag: 12.3        3.5%, PASS.        17.0    49% PASS Mfg/Cap.: PSA-1/4      Activation (PSA): 0.005      PASS                0.001    PASS Serial &#xb9;: 20282          Release (A/D)
Mark &#xb9;: RC-247-H2          Test Load: 261          74:6'Yo            256      73 1%
Final Drag: 7.2        2.1%, PASS.        14.4    4.1%, PASS.
Peak Drag: 7.2          2.1%;  PASS.."    14.4    4.1%, PASS.
          '" ~
  ),  'h' a4
  'ty k'-
Sp
'P  ~>
                  'I g 1
A f'gy
Breakaway        28.5  7.1%, 8&#xb9; over, FAIL!    33.0    8.2%, 13.0&#xb9; ovel', FAILI Initial Drag: 30.3  7.6%, 10.3&#xb9; over, FAILI  28.1    7.0%, 8.1&#xb9; over, FAILI Tag  &#xb9;: 1-229            Peak Drag: 38.5      9.6%, 18&#xb9; over, FAIL!    34.7    8.7%, 15&#xb9; over, FAILI Mfg/Cap.: A/D-41      Activation (PSA):
Serial &#xb9;: 1304        Release (A/D) 52.700      PASS.                    53.100  PASS.
Mark &#xb9;: RC-247-H3        Test Load: 327        81.8%                    321    80.2%
Final Drag: 25.6    6.4%, 5.6&#xb9; over, FAIL!  30.5    7.6%, 10.5&#xb9; over, FAILI Peak Drag: 39.4      9.9%, 19&#xb9; over, FAILI    35.7    8.9%, 16&#xb9; over, FAILI Breakaway      3.0    0.9% PASS.              7.P    2.0%, PASS.
Initial Drag: 12.4    3.5% PASS.              30.9    8.8%, 13.4&#xb9; over, FAILI Tag  &#xb9;: 1-230            Peak Drag: 12.4      3.5%, PASS.              30.9    8.8%, 13&#xb9; over, FAILI Mfg/Cap.: PSA-1/4    Activation (PSA): 0.003      PASS                    0.005  PASS Serial &#xb9;: 20288        Release (A/D)
Mark &#xb9;: RC-247-HS        Test Load: 281        80.3%                    283    80 9%
Final Drag: 7.1      2.0%, PASS.              23.0    6.6%, 5.5&#xb9; over, FAILI Peak Drag: 7.1        2.0%, PASS.              23.0    6.6%, 5&#xb9; over; FAILI Breakaway. 4.2          1.2%, PASS.              2.2    P.6% PASS.
Initial Drag:  3.5    1.0%, PASS.              4.5    1.3%, PASS.
Tag  &#xb9;: 1-231          Peak Drag: 5.6        1.6% PASS.              6.2    1.8% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.013      PASS                    0.009  PASS Serial &#xb9;: 29178        Release (A/D)
Mark&#xb9;: RCGV-13          Test Load: 255        72.9%                  258      73.7%
Final Drag: 1.7      0.5%, PASS.              4.4      1.3%, PASS.
Peak Drag: 4.1        1.2%, PASS.            6.1      1.7% PASS.
Breakaway        4.0    1.2%, PASS.            5.7    1.6% PASS.
Initial Drag: 3.0    0.9%, PASS.              5.2    1.5% PASS.
Tag &#xb9;: 1-232            Peak Drag: 4.1        1.2%, PASS.              6.7    1.9% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.008      PASS                    0.005  PASS Serial &#xb9;: 15060        Release (A/D)
Mark&#xb9;: RCGV-14            Test Load: 279        79.7%                    280    80.0%
Final Drag: 2.1      0.6%, PASS.              5.2    1.5% PASS.
Peak Drag: 3.5        1.0%, PASS.              6.1    1.7%, PASS.
Breakaway      2.6    0.7%, PASS.              3.2    0.9% PASS.
Initial Drag: 3.8    1.1% PASS.              4.9    1 4o/  PASS Tag &#xb9;: 1-233            Peak Drag: 5.8        1.7% PASS.              6.6    1.9% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.009      PASS                    0.009  PASS Serial &#xb9;: 15062        Release (A/D)
Mark &#xb9;: RCGV-15          Test Load: 270        77.1%                    265    75.7%
Final Drag: 1.3      0.4%, PASS.              4.5    1.3%, PASS.
Peak Drag: 3.1        0.9%, PASS.              6.2    1.8%, PASS.
I A
  ,)~
~ 4'>
Pj lg
Breakaway. 2.1        0.6%, PASS. 2.1    0.6%, PASS.
Initial Drag: 3.0    0.8%, PASS. 3.4    1.0% PASS.
Tag &#xb9;: 1-234            Peak Drag: 3.8      1.1%, PASS. 4.8    1.4% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.01 0    PASS          0.009  PASS Serial &#xb9;: 15061      Release (A/D)
Mark &#xb9;: RCGV-22          Test Load: 264      75.4%        260    74.3%
Final Drag: 3.0      0.9%, PASS. 3.4      1.0%, PASS.
Peak Drag: 4.3        1.2%, PASS. 4.6      1.3%, PASS.
Breakaway. 6.4        1.8%, PASS. 6.7    1 9%, PASS.
Initial Drag: 2.6    0.7%, PASS. 7.9    2.2% PASS.
Tag  &#xb9;: 1-235          Peak Drag: 4.9        1.4%, PASS. 9.8      2.8% PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.010      PASS        0.007    PASS Serial &#xb9;: 20199        Release (A/D)
Mark &#xb9;: RCGV-26          Test Load: 248        70.9%        254    72.6%
Final Drag: 4.2      1.2%, PASS. 7.9    2.3%, PASS.
Peak Drag: 6.8        1.9%, PASS. 10.6    3.0%, PASS.
Breakaway: 6.8        1.9%, PASS. 5.7      1.6%, PASS.
Initial Drag: 4.3    1.2%, PASS. 7.3    2.1%, PASS.
Tag  &#xb9;: 1-236          Peak Drag: 8.0      2.3%, PASS. 11.4    3.3% PASS Mfg/Cap.: PSA-1/4    Activation (PSA): 0.003      PASS          0.004  PASS Serial &#xb9;: 19115        Release (A/D)
Mark &#xb9;: SI-101-6          Test Load: 257      73.4%        249    71.1%
Final Drag: 3.5      1.0%, PASS. 6.7    1.9% PASS.
Peak Drag: 6.1        1.7% PASS. 9.5    2.7%, PASS.
Breakaway: 6.7        1.9%, PASS. 7.9    2.3% PASS.
Initial Drag: 3.8    1.1%, PASS. 9.5    2.7% PASS.
Tag  &#xb9;: 1-237          Peak Drag: 6.8        2.0%, PASS. 12.4    3.5%, PASS.
Mfg/Cap.: PSA-1/4    Activation (PSA): 0.005      PASS          0.005  PASS Serial &#xb9;: 12653      Release (A/D)
Mark &#xb9;: Sl-101-13        Test Load: 255      72.9%        255    72.9%
Final Drag: 4.5      1.3%, PASS. 10.4    3.0%, PASS.
Peak Drag: 7.6        2.2%, PASS. 13.3    3.8%, PASS.
Breakaway      434.3 P.4% PASS. 203.7  0.2%, PASS.
Initial Drag: 223.3  P.2%, PASS. 294.0  0.2%, PASS.
Tag  &#xb9;: 1-238          Peak Drag: 1048.0    P.9%, PASS. 1071.2  0.9%, PASS.
Mfg/Cap.: PSA-100    Activation (PSA): 0.005    PASS          0.009  PASS Serial &#xb9;: 2126        Release (A/D)
Mark &#xb9;: MS-649-275      Test Load: 81179      67 6%        81 398  67.8%
Final Drag: 518.5    P 4% PASS    327.0  0.3%, PASS.
Peak Drag: 1238.3    1.0%, PASS. 1080.9  0.9%, PASS.
  ))'F, 4'
5.3  0.4%, PASS.      9.3    P.6% PASS.
Breakaway'nitial Drag: 7.9    05% PASS.        7.2    p 5%0 PASS.
Tag  &#xb9;: 1-239            Peak Drag: 59.0              3.9%, PASS.      12.7  0.8%, PASS.
Mfg/Cap.: PSA-1        Activation (PSA): 0.010            PASS            0.009  PASS Serial &#xb9;: 12755        Release (A/D)
Mark &#xb9;: SI-676-149        Test Load: 1222              81              1200    80.0%
5'/'.4%
Final Drag: 5.9                        PASS  10.3    0.7%, PASS.
Peak Drag: 11.9            0.8%, PASS.      16.4    1.1%, PASS.
Breakaway. 9.6                1.5%, PASS.      7.3    1.1%, PASS.
Initial Drag: 7.9            1.2%, PASS.      8.6    1.3% PASS.
Tag  &#xb9;: 1-240            Peak Drag: 10.3              1.6%, PASS.      10.8    1.7%, PASS.
Mfg/Cap.: PSA-1/2      Activation (PSA): 0.009            PASS              0.009  PASS Serial &#xb9;: 14569          Release (A/D)
Mark &#xb9;: SPS-467            Test Load: 512              78.8%            515    79.2%
Final Drag: 6.7            1.0% PASS.        6.8    1.0%, PASS.
Peak Drag; 9.2              1  4'/ PASS      8.2    1.3%, PASS.
Breakaway. 3.4                0.5%, PASS.      2.6    0.4%, PASS.
Initial Drag: 3.3          0.5% PASS.        4.0    P.6% PASS.
Tag &#xb9;: 1-241              Peak Drag: 5.1              0.8% PASS.        5.4    0.8%, PASS.
Mfg/Cap.: PSA-1/2      Activation (PSA): 0.014            PASS              0.015  PASS Serial  &#xb9;: 14572        Release (A/D)
Mark &#xb9;: SPS-467            Test Load: 493              75 8%            505    77.7%
Final Drag: 3.0            P  5% PASS.      5.2    0.8% PASS.
Peak Drag: 4.4              0.7%, PASS.      6.8    1.0%, PASS.
Breakaway              51.2  0.9%, PASS.      31.2    0.5% PASS.
Initial Drag: 32.5          0.5% PASS.      36.8    0.6%, PASS.
Tag  &#xb9;: 1-242            Peak Drag: 82.7              1.4% PASS.      77.3    1.3% PASS.
Mfg/Cap.: PSA-3        Activation (PSA): 0.002            PASS            0.004  PASS Serial &#xb9;: 30534        Release (A/D)
Mark &#xb9;: Sl-971-6229        Test Load: 4634              77 2%            4568  76.1%
Final Drag: 34.9            P.6%, PASS.      34.6  0.6% PASS.
Peak Drag: 72.5              1.2%, PASS.      67.1    1.1% PASS Breakaway              10.8  2.7%, PASS.      8.5    2.1%, PASS.
Initial Drag: 0.9          0.2%, PASS.      9.4    2.4%, PASS.
Tag  &#xb9;: 1-243            Peak Drag: 5.0              1.2%, PASS.      13.1  3.3%, PASS.
Mfg/Cap.: A/D-41      Activation (PSA):
Serial &#xb9;: 1335          Release (A/D) 40.200            PASS.            43.400 PASS.
Mark &#xb9;: RC-95-H3A          Test Load 319                79 8%            338    84 5%
Final Drag: 10.2            2.5% PASS.        6.6    1  7'/ PASS Peak Drag: 15.0              3.8%, PASS.      12.0  3.0% PASS.
Ql~k~
FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.
JUNO BEACH, FLORIDA 33408 ST. LUCIE NUCLEAR PLANT P.O.BOX 128 FT.PIERCE, FLORIDA 33454 UNIT 1 1988 OUTAGE INSERVICE INSPECTION
==SUMMARY==
TABLES
11 pt 8
II ~
t klW4 4,
k'g I
fQ    '1 J
f r,r
*(>>
I
Summary  Table Format Inservice Inspection    Summary Outage      (Year)        Period          Interval Class    Components SYSTEM      (l)
ZONE NUMBER'(J)
N  I  'GT 0
ASME                          0  N SEC. XI                      R  S  E H
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION CATGY    NDE                  E  I  0 E REMARKS ITEM NO METH    PROCEDURE    C  G  M R CAL BLOCK DWG. NO.(K)
(L)  (M)                  (p)      (R)      (S)                    (U)
(N)                  (Q)
(0)
(V)
(A) Denotes the date of the inspection plan table (B) Denotes the current revision number of the plan (C) Identifies the outage number within the period (D) Identifies the year of the outage (E) Identifies which period (First, Second, Third)
(F) Identifies which interval (First, Second, Third,      Fourth)
(G) Identifies the ASME Code Class (H) Identifies the page number of the table (I) Identifies the  System applicable to this table (J) Denotes the applicable Zone number    for this table (K) Identifies the applicable isometric drawing number for this table (L) Identifies the item number associated with the item (M) Denotes the component or weld identification number (N) Identifies the component or weld description (0) Denotes the elevation level (P) Denotes the ASME Code Category (Q) Denotes the ASME Code Item Number (R) Denotes the NDE Method to be used for the examination (S) Identifies which NDE procedure was used (T) Identifies the results of the NDE examinations (U) Denotes any remarks associated with the examination results (V) Identifies the ultrasonic calibration block to be used
~I
~g <
DATE:  11/14/88                                    ST ~ LUCIE NUCLEAR PLANT UNIT  1                                    PAGE:    1 VISION:      0                              IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1 (1988),  FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS REACTOR VESSEL N I  0 ZONE HUMBER: 001                        ASME                                  S  ONGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMIHAT I OH AREA              CATGY    EXAM                        A  E I 0 E  REMARKS NUMBER  IDENT I F ICATION                ITEM NO  METHOD      PROCEDURE      T  C G M R  **CALIBRATIONBLOCK**
REF. DWG. NO. 01-001-A 000200  7-203                            8-A      UT  1.5  DEG NDE 5.12 - 001  C  C        8-9-88 UT: EXAHINED FROM FLANGE(FROM UPPER SHELL TO FLANGE GIRTH      B1 ~ 30  UT  5.7  DEG NDE 5.12 - 001    C        STUD HOLES  1 TNRU 18 INCLUSIVE (1/3).
WELD                                      UT  12.5    NDE 5.12 . 001    C RCB
                                                                                            ~*UT-8**
REF. D'WG. NO. 01-001 000760  FL-01  THRU  54                B-G-1    UT 0 DEG ~  NDE 5.12 - 001  C  C        8-9-88 UT:  EXAMINED 1/3 OF FLANGE THREADS IH BASE MATERIAL        B6.40                                              LIGAMENT AREA. 1-18 STUDS INCLUSIVE.
(FLANGE)
RCB
                                                                                            **UT-8**
001010  AK-01                            B-N-1    VT-3        HDE 4.3 - 045  C  C        8-4-88 VT-3:  COMPLETE ALIGNMENT KEY 9 0 DEGREES        B13.10 RCB
                                                                                            **H/A**
001020  AK-02                            B-N.1    VT-3        HDE 4.3 - 045  C  C        8-4-88 VT-3:  COMPLETE ALIGNMENT KEY 9 90 DEGREES      813.10 RCB
                                                                                            **N/Ae>>
001030  AK.03                            B-H-1    VT-3        NDE 4.3 - 045  C  C        8.4-88 VT-3:  COMPLETE ALIGNMENT KEY    9 180  DEGREES B13.10 RCB
                                                                                            **N/A**
001040  AK-04                            B-H-1    VT-3        HDE 4.3 - 045  C  C        8.4-88 VT-3  COMPLETE ALIGHHENT KEY    9 270  DEGREES B13.10 RCB
                                                                                            **H/A**
    $ 4,I C
ki,
ST. LUCIE NUCLEAR PLANT UNIT 1                                    PAGE: 2 DATE:  11/14/88 VIS IOH:      0                            IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPOHENTS REACTOR VESSEL N I  0 ZONE HUMBER: 001                      ASME                                  S  ONGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMINATION AREA              CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENT I F ICATION            ITEM HO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK**
REF. DWG. NO. 01-001 001050  ON- IE-A                      B-H-1      VT-3      HDE 4.3 - 045  C    C      8-4-88 VT-3: COMPLETE, PITTIHG INTERGRAL EXT. MATING SURFACE B13.10 QOD RCB
                                                                                        **H/A~*
001060  OH-IE-B                      B-N-1      VT-3      HDE 4.3 - 045  C  C        8-4.88 VT-3: COMPLETE INTERGRAL EXT. MATING SURFACE B13.10                HDE 5.1 Q180D RCB
                                                                                        **H/A~>>
si
~ ssS t'l
DATE:  11/14/88                                      ST. LUCIE NUCLEAR PLANT UNIT  1                                    PAGE:    3 EVI SION:      0                                INSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988),  FIRST PERIOD, SECOND INTERVAL CLASS  'I COMPONENTS REACTOR PRESSURE    VESSEL CLOSURE HEAD N I  0 ZONE NUMBER:  002                        ASME                                    S  ONGT SEC ~ XI                                T  RSEH
==SUMMARY==
EXAMINATION AREA                  CATGY      EXAM                        A  E I 0 E  REMARKS NUMBER  IDEHT I F ICATION                ITEM HO    METHOD      PROCEDURE      T  C G M R  ~~CALIBRATION BLOCK**
REF. DHG. NO. 01-002 001080  209-03A                          8-A        UT 0 DEG. NDE  5.14 - 001 C  C        7-27.88  MT:COMPLETE,LOCATEO DIRECTLY PEEL SEGMENT WELD    9 60 DEGREES 81.22      UT 45 DEG. NDE  5.14 - 001    C        ABOVE STUD HOLE TEH RCB                                          UT 60 DEG ~ NDE  5.14 - 001    C        7-27-88 UT:PARTIAL DUE  TO SHROUD,134 OF RCB                                          MT          NDE  2.2 - 004    C        THE IIELD WAS EXAMINED.
001140  209-02                            B-A        MT          HDE  2.2 - 004  C  C        7-27-88 MT:  EXAM AREA INCLUSIVE OF AREA FLANGE FLEX AREA, (HEAD TO        81.40      UT 0 DEG. NDE  5.14 - 001    C        FROM STUD HOLE  OHE(1) TO EIGHTEEN(18)
FLANGE HELD)                                  UT 45 DEG. HDE  5.14 - 001    C        INCLUSIVE.            7-27-88 UT: 1/3 RCB                                          UT 60 DEG. HDE  5.14 - 001    C        DONE, OBSTRUCTIOH DUE TO SHROUD, PARTIAL COVERAGE.
                                                                                              **UT-3A**
i4 DATE:  11/14/88                                  ST ~ LUCIE NUCLEAR PLANT UNIT 1                              PAGE: 4 EVI SION:      0                            IHSERVICE IHSPECTIOH
==SUMMARY==
REPORT OUTAGE  1  (1988),  FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS STEAM GEHERATOR 1A PRIMARY N I  0 ZOHE NUMBER:  003                      ASHE                                  S  ON  6T SEC. XI                                T  RSEH
==SUMMARY==
EXAMIHAT ION AREA              CATGY      EXAM                        A  E I 0 E  REMARKS NUMBER  IDENT I F I CATION            ITEM HO    METHOD      PROCEDURE      T  C G M R  *~CALIBRATION BLOCK*>>
REF. DWG. NO.      01-003 001380  OH-IR.B                        8-D        UT 45 DEG. HDE 5  '3  - 001 C  C        8-5-88 UT: COMPLETE OUTLET NOZZLE(45      D) INNER 83.140    UT 60 DEG. HDE  5 '3  0 001    C RADIUS RCB
                                                                                          ~*UT-2, UT-4A**
001400  OH- IR-A                      B-D        UT 45 DEG. HDE  5.13 - 001  C  C        8-5-88 UT: COMPLETE OUTLET NOZZLE(315 D) INNER    83.140    UT 60 DEG. HDE  5.13 - 001    C RADIUS RCB
                                                                                          <<*UT-2, UT-4A**
li DATE:  11/14/88                                      ST. LUCIE NUCLEAR PLANT UNIT  1                            PAGE 5 eyISIPH                                          INSERVICE IHSPECTIOH
==SUMMARY==
REPORT OUTAGE  1  (1988),  FIRST PERIOD, SECOND INTERVAL CLASS  1 COMPONENTS PRESSURIZER N I  0 ZONE HUMBER:  005                        ASME                                  S  OHGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMINATION AREA                  CATGY      EXAM                        A  E I 0 E  REMARKS NUMBER    IDENTIFICATION                  ITEM HO    METHOD      PROCEDURE      T  C G M R  **CALIBRATIONBLOCK**
REF. DWG. NO. 01-005 001900  PRZ-8.411                        B-8        UT 0 DEG. NDE 5.1 - 001  C  C        8-4-88 UT: COMPLETE
* TOP HEAD TO UPPER SHELL  CIRC. B2.11      UT 45 DEG. HDE  5.1 - 001      C WELD                                        UT 60 DEG. NDE  5.1 - 001      C RCB
                                                                                              ~*UT-4A**
001910  PRZ-L1                          ~ B-B        UT 0 DEG. NDE 5.1 - 001  C  C        8-4-88 UT: COMPLETE UPPER SHELL LONGITUDINAL WELD    82.12      UT 45 DEG. NDE  5.1 - 001      C 9 0  DEG                                    UT 60 DEG. NDE  5.1 - 001      C RCB
                                                                                              **UT-4A**
930  PRZ-410-02                        B-H        MT          NDE 2.2 - 015  C  C        8-3-88 MT: COMPLETE SUPPORT  SKIRT TO LOWER HEAD    88.20
        'WELD RCB
                                                                                              ~*H/A**
l.(pl 1, Pl g I
DATE:  11/14/88                                    ST ~ LUCIE NUCLEAR PLANT UNIT 1                            PAGE: 7 VISION:      0                                IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE 1  (1988),  FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT    PIPING LOOP "A" PUMP 1A2 TO REACTO N I  0 ZONE NUMBER:  009                        ASME                                  S  OHGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMIHAT IOH AREA                CATGY    EXAM                        A  E I 0 E  REMARKS HUMBER  IDENT IF I CAT IOH                ITEM NO  METHOD      PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK*>>
REF. DUG. NO. 01-009 002440  RC-115-4-508                      B-J      UT 0 DEG. HDE 5.3 - 007  C  C        7-29-88 MT: COMPLETE BRANCH CONNECTION SAFETY    IHJ  89.31    UT 45 DEG. HDE  5.3 - 007      C        8-9-88 UT: COMPLETE 5.3 - 007 HOZ ~
RCB                                        Ml'DE UT 60 DEG. NDE 2.2 - 006 C
C
                                                                                            **UT 6**
d g}
I I
la
$h I'
DATE:  11/14/88                                    ST ~ LUCIE NUCLEAR PLANT UNIT 1                              PAGE 8 VISION:      0                                INSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST  PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT  PIPING LOOP "A" S G 1A TO PUMP 1A N I  0 ZONE NUMBER:  012                      ASME                                    S  ONGT SEC ~ XI                                T  RSEM
==SUMMARY==
EXAHINATION AREA                CATGY      EXAM                        A  E I 0 E  REHARKS NUMBER  IDENT IF ICATION                ITEH  NO    METHOD      PROCEDURE      T  C G H R  **CALIBRATIONBLOCK**
REF. ONG. NO. 01-012 002770  1A-'I-112-C                    8-J        UT 0 BEGS  NDE 5.3 - 005  C  C        7-23-88  MT: COMPLETE S/G NOZZLE TO EXTENSION PIECE  89.11      UT 45 DEG. NDE  5.3 - 005      C RCB                                        UT 60 OEG. NDE 5.3 - 005      C RCB                                        MT          NDE 2.2 - 002      C
                                                                                            >>>>UT-6>>>>
002790  RC-112-1-500L- LS-A            8-J        UT 45 DEG ~ NDE 5.3 - 006  C  C        7-23-88 HT:  COMPLETE ELBOII LONGITUDINAL SEAM        89.12      UT 60 DEG. NDE 5.3 - 006      C        8-9.88 UT:  COHPLETE RCB                                        MT          NDE 2.2 - 002      C
                                                                                            **UT 6>>>>
REF. DWG. NO. 1-012 800  RC-112-1-500L-LS-8              8-J        UT 45 DEG. NDE  5.3 - 006  C  C        7-23-88 MT: COHPLETE ELBOM LONGITUDINAL SEAM        89.12      UT 60 DEG. NDE 5.3 - 006      C        8-9-88 UT: COMPLETE RCB                                        MT          NDE 2.2 - 002      C
                                                                                            **UT.6**
002810  RC-112-3-503                    8-J        UT 0 DEG. NDE 5.3 - 006  C  C        7-23-88 MT: COMPLETE ELBOII TO PIPE                  89.11      UT 45 DEG. NDE  5.3 - 006      C        8-9-88 UT: COMPLETE RCB                                        UT 60 OEG. NDE 5.3 - 006      C RCB                                        MT          NDE 2.2 - 002      C
                                                                                            **UT-6>>>>
002820  RC-112-3-503-LS-A              8-J        UT 45 DEG. NDE  5.3 - 006  C  C        7-23-88 HT: COHPLETE PIPE LONGITUDIHAL SEAM          89.12      UT 60 DEG. NDE  5.3 - 006      C        8-9-88 UT: COMPLETE RCB                                        MT          NDE 2.2 - 001      C
                                                                                            *Ul'-6**
002830  RC.112-3-503.LS-B              8-J        UT 45 DEG. NDE  5.3 - 006  C  C        7-23-88 MT:  COMPLETE PIPE LONGITUDINAL SEAM          89.12      UT 60 DEG ~ NDE 5.3 - 006      C        8.9-88 UT:  COMPLETE RCB                                        MT          NDE 2.2 - 001      C
                                                                                            **Ul'-6*>>
4fgk A,
g1
/pe x>
DATE:  11/14/88                                    ST. LUCIE NUCLEAR PLANT UNIT  1                                      PAGE:      9 VISION:      0                              IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988),  FIRST PERIOD, SECOND INTERVAL CLASS  1 COMPONENTS REACTOR COOLANT  PIPING LOOP "A" S G 1A TO PUMP 1A H I  0 ZOHE NUMBER:  012                      ASME                                  S  ONGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMINATION AREA                CATGY      EXAM                        A  E I 0 E  REMARKS NUMBER  IDENTIFICATION                  ITEM NO    METHOD      PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK*>>
REF.. DMG. NO. 1-012 002920  RC-112-2-500M-LS-A              8-J        UT 45 DEG. NDE  5.3 - 006  C  C        7-23-88 MT: COMPLETE ELBOW LONGITUDINAL SEAM        89.12      UT 60 DEG. HDE  5.3 - 006      C        8-9-88 UT: COMPLETE RCB                                        MT          HDE 2.2 - 001      C 0*UT  P*
002930  RC-112-2-500M-LS-8              8-J        UT 45 DEG. NDE  5.3 - 006  C  C        7-23-88 MT : COMPLETE ELBSI LOHGITUDIHAL SEAM        89.12      UT 60 DEG. HDE 5.3 . 006      C        8-9-88 UT: COMPLETE RCB                                        MT          NDE 2.2 - 001      C A*UT  6**
002940  RC-112-5-503                    8-F        UT  0 DEG. NDE  5.3 - 002  C  C        7-23-88 PT:  COMPLETE, LIGHT PINK ELBSI  TO SAFE END              85.130    UT 45 DEG. HDE  5.3 - 002      C        INDICATIONS  FROM GRINDING MARKS, PRESENT RCB                                        UT 0 DEG. HDE 5.3 - 006      C        9 360 DEGREES INTERMITTENT. 8-5-88 UT:
RCB                                        UT 45 DEG. NDE  5.3 - 006      C        COMPLETE  (UT-59)
UT 60 DEG. NDE 5.3 - 006      C        8-9-88 UT: COMPLETE (UT-6)
PT          HDE 3.3 - 002      C        **UT-59,UT-6*"
002960  RC-112-FH-3-500G                8-J        UT 0 DEG. HDE 5.3 - 002  C  C        7-23-88 PT: LIGHT PINK INDICATIONS    FROM SAFE EHD TO PUMP 1A1            89.11      UT 45 DEG. HDE 5.3 - 002      C        GRINDING MARKS PRESENT(360 RCB                                        PT          HDE 3.3 - 001        C      DEGREES, INTERMITTENT)              8-5.88 RCB                                                                                UT: COMPLETE
                                                                                          *~UT-59**
002970  RC-112.16-507                  8-J        MT          HDE 2.2 - 001  C  C        7-23-88 MT:  COMPLETE BRANCH COHHECTION DRAIN NOZZLE  89.32 RCB
                                                                                          <<*H/A**
dg,'g h
p
DATE:  11/14/88                                      ST. LUCIE NUCLEAR PLANT UNIT  1 VISION:      0                                IHSERVICE INSPECTION SUHHARY REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT    PIPING LOOP "A" PUHP 1A1 TO REACTO N  I  0 ZONE NUHBER: 013                          ASHE                                  S  ONGT SEC. XI                                T  RSEN
==SUMMARY==
EXAHIHAT IOH AREA                CATGY      EXAH                        A  E  I 0 E REMARKS NUHBER  IDEHT IF I CATION                ITEH NO    HETKOO      PROCEDURE      T  C G H R  **CALIBRATIONBLOCK**
REF. DWG. HO. 1-013 002980  RC-112-FM-3-500H                  8-J        UT 0 OEG. NDE 5.3 0 003  C  C        7-27-88 PT: COHPLETE REACTOR COOLANT PUHP 1A1 TO      89.11      UT 45 DEG. NDE  5.3 - 003      C        8-5-88 Ul': COHPLETE SAFE EHD                                    PT          HDE 3.3 . 015      C RCB
                                                                                            **UT 59*>>
002990  RC-112-5-504                      8-F        UT  0 OEG. NDE 5.3 - 003  C  C        7-27-88 PT: COMPLETE SAFE EHD TO PIPE                  85.130    UT 45 DEG. NOE  5.3 - 003      C        8-5-88 UT: COMPLETE,UT-59 RCB                                          UT 0 DEG. HDE 5.3 - 004      C        8-9.88 UT: COHPLETE,UT-6 RCB                                          UT 45 DEG ~ HDE 5.3 - 004      C UT  60 DEG. HDE 5.3 - 004      C        **UT-59,UT-6**
PT          HDE 3.3 . 014      C 000  RC-112-5-504-LS-A                8-J        UT 45 DEG. HDE  5.3 - 004  C  C        7-28-88 HT: COMPLETE PIPE LONGITUDINAL IIELD          89.12    UT 60 DEG. HDE  5.3 004        C        8-9-88 UT: COHPLETE RCB                                        MT          HDE 2.2 - 008      C
                                                                                            **UT 6>>*
003010  RC-112-5.504-LS-B                8-J      UT 45 DEG. HDE  5.3 - 004  C  C        7-28-88 HT: COHPLETE PIPE LONGITUDINAL IIELD          89.12    UT  60 OEG. NDE 5.3 - 004      C        8-9-88 UT: COMPLETE RCB                                        HT          HDE 2.2 - 008      C
                                                                                            <<<<UT-6>>>>
    )g>
;ff
DATE:  11/14/88                        ST ~ LUCIE NUCLEAR PLANT UHIT 1                            PAGE: 11 VISION:      0                  IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST  PERIOD, SECOHO INTERVAL CLASS 1 COMPOHEHTS PRESSURIZER  SURGE  LINE N I  0 ZOHE NUMBER:  016          ASME                                  S  ONGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMINATION AREA    CATGY      EXAM                        A  E I 0 E  REMARKS NUMBER  IDENTIFICATION      ITEM HO    METHOD      PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK**
REF. DMG. NO. 1-016 003430  RC-2-505-C          8-J        UT 45 OEG. NDE  5.4 - 006  C  C        8-3-88 PT: COMPLETE PIPE- TO.P IPE      89.11      UT 60 DEG. NDE 5.4 - 006      C        8-3-88 UT: COMPLETE RCB                            PT          NDE 3.3 - 046      C INPUT 23*I 003440  RC-2-505-B          B-J        UI'5  DEG. NDE 5 ' - 006  C  C        8-3-88 PT: COMPLETE PIPE-TO.ELBON      89.11      Ur 60 DEG. HDE 5.4 - 006      C        8-3-88 UT: COMPLETE RCB                            PT          HDE 3.3 - 047      C
                                                                                **UT 23**
    )I >>
~ts<
A f
DATE:  11/14/88                        ST. LUCIE NUCLEAR PLANT UHIT 1                            PAGE: 12 VISIGH:      0                  INSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT PUMP 1A1 H I  0 ZONE NUMBER: 017            ASME                                  S  ONGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMINATION AREA    CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENTIFICATION      ITEM NO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK**
REF. DWG. NO. 1-017 003530  01-017.004          B-K-1      PT        HDE 3.3 - 033  C  C        8-1-88 PT: COMPLETE SUPPORT  LUG &#xb9;1    810.20 RCB
                                                                              **H/A*>>
003540  01-017-005          8-K-1      PT        HDE 3.3 - 034  C  C        8-1-88 PT: COMPLETE SUPPORT  LUG &#xb9;2    810.20 RCB
                                                                              **N/A**
003550  01-017.006          8-K-1      PT        HDE 3.3 - 035  C  C        8-1-88 PT: COMPLETE o        SUPPORT RCB LUG &#xb9;3    B10.20
                                                                              <<~H/A**
v t
,1
    + '1
DATE:  11/14/88                                        ST. LUCIE HUCLEAR PLANT UNIT  1                                              PAGE:  13 VISION:              0                        IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE    1  (1988),  FIRST PERIOD, SECOND INTERVAL CLASS  1 COMPONENTS LPSI 1A1 H I  0 ZONE NUMBER: 021                          ASME                                    S  OHGT SEC. XI                                  T  RSEH
==SUMMARY==
EXAMIHAT ION AREA                  CATGY        EXAM                        A  E I 0 E  REMARKS NUMBER  IDENT        IF ICATION          ITEM HO      METHOD      PROCEDURE      T  C G M R  **CALIBRATIONBLOCK**
REF. DWG. NO. 1-021 004090  SI-112-FW-7                                    UT 45 DEG. NOE  5.4 - 001  C  C        7-25-88 PT:        COMPLETE RCB  EL.34'-J PEHETRATIOH EL.34'CB
                              &#xb9;37-TO-PIPE 89.11        UT 60 DEG. HDE PT          HDE 5.4 - 002 3.3 . 011      C C    7-25-88 UT:        COMPLETE  , I.D.
GEOMETRY, REFLECTORS FROM THE ROOT OF THE WELD    (60    DEGREE)
                                                                                                **UT-38**
004100  SI-112.6-SW-3                                  UT 45 DEG. NDE  5.4 - 001  C  C        7-25-88 PT:        COMPLETE RCB  EL.34'-J PIPE-TO-ELBOW EL.34'CB 89.11        UT 60 DEG. HDE PT          HDE 5.4 - 002 3.3 - 010      C C    7-25-88 UT:        COMPLETE, I.DE GEOMETRY, REFLECTORS FROM THE ROOT OF THE WELD.(60 DEG.)
                                                                                                >>>>UT-38>>>>
110  SI-112-6-SW-2                    8-J          UT 45 DEG. HDE  5.4 - 001  C  C        7-25-88 PT:        COMPLETE ELBOW-TO-PIPE                    89.11        UT 60 OEG. NDE  5.4 - 002          C    7-25-88 UT:        COMPLETE(  I.DE RCB                                            PT          NDE 3.3 - 005      C        GEOMETRY, REFLECTORS FROM THE ROOT OF THE RCB                                                                                    WELD    (60 DEG.)
                                                                                                **UT-38**
004120  S1-112.6-SW-1                    8-J          UT 45 DEG. HDE  5.4 - 001  C  C        7-25-88 PT:        COMPLETE PIPE-TO-ELBOW                    B9.11        UT 60 DEG. NDE 5.4 -'02          C    7-25-88 UT:        COMPLETE,  I.O.
WELD' RCB                                            PT          NDE 3.3 - 009      C        GEOMETRY, REFLECTORS FROM THE ROOT OF THE RCB                                                                                    IIELD.(60 OEG.)
                                                                                                **UT-38**
004130  SI-112-FW-8                      8-J          UT 45 DEG. NOE  5.4 - 001  C  C        7-25-88 PT:        COMPLETE ELBOW-TO-PIPE                    89.11        UT 60 DEG ~ NDE 5.4 - 002          C    7-25-88 UT:        COMPLETE,  I.O.
RCB                                            PT          HDE 3.3 - 008      C        GEOMETRY, REFLECTORS FROM THE ROOT OF THE RCB                                                                                            (60 DEG.)
                                                                                                >>*UT-38**
004140  SI -112-7-SW-1                    B-J          UT 45 DEG. HDE  5.4 - 004  C  C        7-28-88 PT: COMPLETE PIPE-TO.ELBOW                    89.11        UT 60 DEG. HOE  5.4 - 004          C    8-2-88 UT: COMPLETE( 60          DEGREE ;ROOT RCB                                        ~  PT          HDE 3.3 - 032      C GEOMETRY'*UT-38**
i
  ~
    )
gP
DATE:  11/14/88                        ST. LUCIE NUCLEAR PLANT UNIT  1                                            PAGE:  14 VISIOH:        0                  INSERVICE INSPECTION SUHMARY REPORT OUTAGE  1  (1988),  FIRST PERIOD, SECOHD INTERVAL CLASS 1 COHPOHEHTS LPSI 1A1 H I  0 ZOHE NUHBER: 021            ASHE                                      OHGT SEC. XI                                  RSEH SUHHARY EXAHINATIOH AREA    CATGY      EXAH                          E I 0 E  REMARKS HUHBER  IDENTIFICATION      ITEM NO    HETHOD      PROCEDURE      T  C G H R  **CALIBRATIOHBLOCK**
REF. DWG. HO. 1-021 004150  SI-112-FW-9        8-J        UT 45 DEG. NDE  5.4 - 004  C  C        7-28-88 PT:        COHPLETE, LIGHT PINK ELBOW-TO-PIPE      89.11      UT 60 DEG. HDE 5.4 - 004          C    INDICATIOHS FROH GRINDING MARKS ~
RCB                            PT          HDE 3.3 - 031      C        8-2-88 UT:        COHPLETE, 60 DEGREE; ROOT RCB                                                                    GEOHETRY.
                                                                                **UT-38**
004160  SI-112.8.SW-1      B-J        UT 45 DEG. HDE  5.4 - 004  C  C        7-27-88 PT: COMPLETE P IPE- TO.PIPE      89.11      UT 60 DEG. NDE  5.4 - 004          C    8-2-88 UT: COMPLETE(60        DEGREE; ROOT RCB                            PT          HDE 3.3 - 017      C        GEOMETRY.
                                                                                **UT-38~*
4170  SI-112-FW-10        8-J        UT 45 DEG. HDE  5.4 - 004  C  C        7-27-88 PT: COMPLETE PIPE-TO-PIPE        89.11      UT 60 DEG. HDE  5.4 - 004          C    8-2-88 UT: COMPLETE,60        DEGREE; ROOT RCB                            PT          HDE 3.3 - 016      C GEOMETRY'~UT-38~~
004180  SI -112-9-SW-1      B-J        UT 45 DEG. NDE  5.4 . 015  C      C    8.4-88 PT: COHPLETE PIPE- TO.PIPE      89.11      UT 60 DEG. HDE  5.4 - 016              8-12-88 UT: COHPLETE, I.D.        GEOHETRY.
RCB                            PT'DE          3.3 - 048      C C
                                                                                **UT-38**
004190  SI -112- FW-11      8-J        Ul'5  DEG. HDE 5.4 - 015  C  C        8-10-88 PT:        COMPLEl'E PIPE-TO.PIPE        89.11      UT 60 DEG. NDE 5.4 - 016          C    8-12-88 UT:        COMPLE'tE,60 DEG ~ I.DE RCB                            PT          NDE 3.3 . 063      C        GEOHETRY.
                                                                                **UT-38**
004200  S I-112-10-SW-1    8-J        UT 45 DEG. NDE  5.4 - 010  C  C        7-25 88 PT:        COHPLETE PIPE-TO-PIPE        89.11      UT 60 DEG. HDE  5 ' - 011          C    8-3-88 UT:        COHPLETE, 60 DEG. I.D.
RCB                            PT          NDE 3.3 - 041      C        GEOHETRY.
                                                                                **Ut 38*i 004210  SI -112- FW-12      8- J      UT 45 DEG. NDE  5.4 - 010  C  C        7-25-88 PT: COHPLETE PIPE-TO PIPE        89.11    .UT 60 DEG. HDE  5.4 - 011          C    8-3-88 UT: COMPLETE,60 DEG.;I.D.
RCB                            PT          HDE 3.3 - 040      C        GEOMETRY.
                                                                                **UT-38**
;~
DATE:    11/14/88                        ST. LUCIE NUCLEAR PLANT UNIT    1                                          PAGE:  15 VISION:        0                  INSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988),  FIRST PERIOD, SECOND INTERVAL CLASS  1 COMPONENTS LPSI 1A1 N I  0 ZONE NUMBER: 021            ASHE                                      S  ONGT SEC. XI                                  T  RSEH
==SUMMARY==
EXAMINATION AREA    CATGY      EXAM                          A  E  I 0 E REMARKS NUMBER    IDENT  IF ICATION  ITEM NO    METHOD        PROCEDURE      T  C G M R  **CALIBRATION BLOCK**
REF. DWG. NO. 1-021 004220  SI-112-11-SW-1      8-J        UT 45 DEG ~ NDE    5.4 - 008  C      C  7-25-88 PT: COMPLETE PIPE-TO-PIPE        89.11      UT  60 DEG ~ NDE  5.4 - 009          C  8-2-88 UT: COMPLETE,I.D.        GEOMETRY RCB                            PT            NDE  3.3 - 044    C
                                                                                  **UT 38**
004230  S I -112- FW-13    8-J        UT 45 DEG ~ NDE    5.4 - 008  C  C        8-2-88 PT:        COMPLETE BEGS PIPE-TO-PIPE        89.11      UT  60 OEG. NDE  5.4 - 009          C  8-2-88 UT:        COMPLETE, 60 OEG.;I.D.
RCB                            PT            NDE  3.3 - 043    C        GEOMETRY.
                                                                                  **UT-38**
004240  SI -112-12-SW-1    8-J        UT 45 DEG. NDE    5.4 - 008  C  C        8-2-88 PT:        COMPLETE PIPE- TO-PIPE      89.11      UT 60 DEG. NDE    5.4 - 009          C  8-2-88 UT:        COHPLETE, 60      ; I.D.
RGB                            PT            NDE  3.3 - 042    C        GEOMETRY'*UT 38*4 004250  S I -112. FW-14    8-J        UT 45 BEGS NDE      5.4 - 008  C      C  7-25-88 PT: COMPLETE PIPE TO.PIPE        89. '11    UT  60 DEG. NDE  5.4 - 009          C  8-2-88 UT: COMPLETE, I.D.        GEOMETRY.
RCB                            PT            NDE  3.3 . 039    C
                                                                                  **UT 38**
004260  SI -112-13-SW-1    8-J        UT 45 DEG. NDE 5 4      - 010  C  C        7-25-88 PT: COMPLETE PIPE- TO.P IPE      89.1'I    UT  60 OEG. NDE  5.4 - 011          C  8-3-88 UT: COHPLETE,60 DEG.; 1.0.
RCB                            PT            NDE  3.3 - 038    C        GEOMETRY
                                                                                  **UT-38**
004270  S I -112- FW.15    8-J        UT 45 DEG. NDE      5.4 - 010  C      C  8-2-88 PT:        COHPLETE PIPE TO.PIPE        89.11      UT  60 DEG ~ NDE  5.4 - 0'11        C  8-3-88 Ul':      COMPLETE, I.D. GEOMETRY.
RCB                            PT            HDE  3.3 - 045    C.
                                                                                  **UT-38**
004280  S I -112-14-SW-1    8-J        UT 45 DEG. HDE      5.4 - 010  C  C        7-25-88 PT: COMPLETE PIPE-TO-PIPE        89.11      UT  60 DEG. NDE  5.4 - 011          C  8-3-88 UT: COMPLETE( 60        OEG. I.D.
RCB                            PT            NDE  3.3 - 037    C        GEOMETRY
                                                                                  **UT-38*+
a sL (1 'I) i'0
~f)
II Q
DATE:  11/14/88                        ST ~  LUCIE HUCLEAR PLANT UHIT 1                                    PAGE:    16 VISION:        0                IHSERVICE    INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988),  FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPOHEHTS LPSI 1A1 H I    0 ZONE NUMBER: 021            ASME                                    S  OHGT SEC. XI                                  T  RSEH
==SUMMARY==
EXAMIHATIOH AREA    CATGY      EXAM                        A  E  I 0 E REMARKS NUMBER  IDENT  IF ICATION  ITEM NO    METHOD      PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK>>>>
REF. DWG. HO. 1-021 004290  S I -112- FW-16    8-J        UT 45 DEG. NDE 5 '  - 015  C      C  8-12-88 PT: COMPLETE PIPE-TO-ELBN        89.11      UT  60  DEG. NDE 5.4 - 016          C  8-12-88 UT: COMPLETE, I.D. GEOMETRY,360 RCB                          'PT            HDE 3.3 - 065      C        DEG. INTERMITTENT.
                                                                                  **UT 38**
004300  S I -112- FW-17    8-J        UT 45 DEG ~ HDE  5.4 - 016  C  C        7-25-88 PT: COMPLETE ELBSI-TO-PIPE      89.11      UT  60 DEG. NDE 5.4 - 016          C  8-12-88 UT: COMPLETE, 60 DEG. I.D.
RCB                            PT          HDE 3.3 - 004      C        GEOMETRY.
                                                                                  **Ul'-38**
004310  S I-148-2-SW-2      8- J        UT 45 DEG. NDE  5.4 - 016  C  C        7-25-88 PT: COMPLETE PIPE-TO.ELBSI      89.11      UT 60 DEG. HDE 5.4 - 016          C  8.12-88 UT: COMPLETE, 60 DEG. I.D.
RCB                            PT          NDE 3.3 - 003      C        GEOMETRY.
                                                                                  **UT-38>>*
004320  SI-148.2-SH-3      B-J        UT 45 DEG. NDE  5.4 - 016  C  C        7-25-88 PT: COMPLETE ELBN-TO-PIPE        89.11      UI'0 DEG. HDE 5.4 - 016          C  8-12-88 UT: COMPLETE,60 DEG. I.D.
RCB                            PT          NDE 3.3 - 007      C        GEOMETRY.
                                                                                  **UT-38*>>
004330  S I -148-2-SM-4    8-J        UT 45 DEG. HDE 5 4  - 016  C  C        7-25-88 PT: COMPLETE PIPE-TO-TEE        89.11      UT 60 DEG. NDE  5.4 - 016          C  8-12-88 UT: COMPLETE, 60 DEG. I.D.
RCB                            PT          HDE 3.3 - 006      C        GEOMETRY.
                                                                                  >>>>UT-38>>*
004340  V-3624              B-0-2      VT-1        HDE 4.1 - 001  C  C        7-23-88 VT-1: COMPLETE BOLTING            87.70 RCB
                                                                                  **H/A>>*
004370  SI -148-1-Su-1      B-J        UT 45 DEG ~ NDE  5.4;  013  C      C  8-12-88 PT: COMPLETE PIPE-TO-ELBN        89. '11    UT 60 DEG. HDE  5.4 - 013      C        8-12-88 UT: COMPLETE( 45 DEG. ROOT RCB                            PT          NDE 3.3 - 066      C        GEOMETRY.SCAH LIMITATIONS.
                                                                                  **UT 35**
l'4
'+N  V
DATE:  11/14/88                                ST. LUCIE NUCLEAR PLANT UNIT  1                                      PAGE      17 VISION:        0                        INSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPOHENTS LPSI 1A1 N  I  0 ZONE NUMBER: 021                    ASME                                  S  OHGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMINATION AREA            CATGY      EXAM                        A  E  I 0 E REMARKS NUMBER  I DENT IF I CATION          ITEM NO    METHOD      PROCEDURE      T  C G M R  <<*CALIBRATIOH BLOCK*>>
REF. DUG. NO. 1-021 004380  Sl -148-1-SM-2              8-J        UT 45 DEG. NDE  5.4 - 007  C  C        7-26-88 PT: COMPLETE ELBOH-TO.PIPE              89.11      UT 60 DEG. HDE  5.4 . 007      C        8-2 88 UT: COMPLETE, 60 DEGREE,I.O.
RCB                                    PT          HDE 3.3 - 012      C        GEOMETRY LESS THAN  20X OAC
                                                                                        >>>>UT-35>>>>
004390  SI.148-FH-2                8-J        Ul'5  OEG. HDE 5.4 - 007  C  C        7-26-88 PT: COMPLETE PIPE-TO-TEE                89.11      UT 60 DEG. HDE  5.4 - 007      C        8-2-88 UT: COMPLETE,60  DEGREE(  I.O.
RCB                                    PT          HDE 3.3 - 013      C        GEOMETRY< 20K DAC.
                                                                                        **UT-35**
004400  SI -148-2-SN-5              8-J        UT 45 DEG. HDE  5.4 - 007  C  C        7-26-88 PT: COMPLETE, I.D. TAG  LIMITATION TEE-TO ELBCM                89.11      UT 60 DEG. NDE  5.4 - 007      C        8" TO 12" CCM FROM 0 REF.g    7  U.ST RCB                                    PT          HDE 3.3 - 018      C        FROM TOE OF  HELD. TAG IS 'WELDED  'TO RCB                                                                            PIPE. (LIMITATION BY  PROCEDURE OHLY) 8-2-88 UT:  COMPLETE,60 DEGREE,  I.O.
GEOMETRY <  20K DAC.
                                                                                        **UT 35**
004410  S I -148- FM.3              8-J        UT 45 DEG. NDE  5.4 - 007  C  C        8-2-88 PT:  COMPLETE ELBN-TO PIPE                89.11      UT 60 OEG. NDE  5.4 - 007      C        8-2 88 UT:  COMPLETE, 60 DEGREE;    I.D.
RCB                                    PT          HDE 3.3 - 036      C        GEOMETRY <  20K OAC.
                                                                                        *<<UT  35**
004450  SI-148.4-SW.1              8-J      UT 45 DEG. NDE  5.4 - 013  C        C  8.11-88 PT:  COMPLETE PIPE-TO-ELBN                89.11    UT 60 DEG. HOE  5.4 - 013      C        8 12-88 UT: COMPLETE, 45 DEG. ROOT RCB                                    PT          HDE 3.3 - 061      C        GEOMETRY.
                                                                                        *<<UT 35**
A 004460  SI-148-FW.5                8-J      UT 45 DEG ~ NDE 5 '  - 013  C  C        8-12-88 PT:  COMPLETE ELBOH-TO-VALVE    (V-3227) 89.11    UT  60 DEG. HDE 5.4 - 013      C        8-12-88 UT:  COMPLETE, SCAN LIMITATION RCB                                  PT          NDE 3.3 - 064      C
                                                                                        **UT-35**
tQ Ag
ST. LUCIE NUCLEAR PLANT UNIT                                      PAGE:    18 DATE:  11/14/88                                                        1 VISION:        0                    INSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPOHEHTS LPSI 1A1 N I  0 ZONE NUMBER: 021                ASME                                  S  ONGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMINATION AREA        CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENT I F ICATION      ITEM NO    METHOD    PROCEDURE      T  C G M R  ~*CALIBRATIOH BLOCK**
REF. DUG. NO. 1-021 004470  V-3227                B-G-2      VT-1      NDE 4.1 - 006  C        C  8-11-88 VT-1:HEAVY BORIC ACID RESIDUE BOLTING                87.70      VT-1      HDE 4.1 - 011      C        BUILDUP(CNF-88-1-016.FOLLN  UP EXAM RCB                                                                      REQUIRED'-23-88 RCB                                                                      VT-1:COMPLETE, CNF CLOSED PER PMO XA88081509-1203.
                                                                                  **H/A'0*
004490  RC-151- FW-1          8-J        UT 45 DEG. NDE 5.4 - 014  C  C        8-'11-88 PT: COMPLETE VALVE-TO.ELBN (V-3227) 89.11      UT 60 DEG. NDE 5.4 - 014      C        8.12-88 UT:  COMPLETE(
RCB                                PT        NDE 3.3 - 059      C
                                                                                  **UT-35+*
00  RC-151-1-Sll-1        B-J        UT 45 DEG. HDE 5.4 - 014  C      C    8-11-88 PT:  COMPLETE ELBSl-TO-ELBSI        B9.11      UT 60 DEG. NDE 5.4 - 014      C        8 12 88 UT: COMPLETE, 45 DEG. ROOT RCB                                PT        NDE 3.3 - 058      C        GEOMETRY.
                                                                                  **UT 35**
004510  RC-151- FW-2          8-J        UT 45 DEG. HDE 5.4 - 014  C  C        8-11-88 PT:  COMPLETE ELBOW-TO-SAFE EHD      89.11      UT 60 DEG. NDE 5.4 - 014      C        8-12-88 UT:  COMPLETE RCB                                PT        NDE 3.3 - 057      C 4+UT  35**
004520  RC-6-508A              B-F        PT        HDE 3.3 - 056  C  C        8-11-88 PT:  COMPLETE SAFE END-TO-SI NOZZLE  B5 ~ 130              NDE 5.11 RCB
                                                                                  **UT-23)UT-16*>>
w' DATE:  11/14/88                                      ST. LUCIE NUCLEAR PLANT UNIT 1                                        PAGE:      19 Vl SIGH:        0                                INSERVICE INSPECTION SUMHARY REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COHPOHENTS LOOP 1A1 SAFETY INJECTION    PIPING SUPPORTS H I  0 ZONE NUMBER: 021                          ASME                                  S  OHGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMINATION AREA                  CATGY      EXAH                      A  E I 0 E  REMARKS NUHBER  IDENTIFICATION                    ITEM HO    METHOD    PROCEDURE      T  C G H R  **CALIBRATIONBLOCK**
REF. DWG. NO. 1-021S 004610  S I H-200                        F-C        VT-3      NDE 4.3 - 009  C  C        7-21-88 VT-3:    COMPLETE, FOLLOW UP EXAM SLIDIHG BASE SUPPORT              F3.10                                              PER  IWF-2420,NRI,RESUME NORHAL SCHEDULE RCB t*N/A**
004630  S I -969-6199                    F-8        VT-3      NDE 4.3 - 043  C  C        8-2-88 VT.3:    COMPLETE RIGID STRUT                      F3.10 RCB
                                                                                              **N/A**
004640  S I H-199                        F-C        VT-3      NDE 4.3    005  C        C  7-21-88 VT-3:    LOOSE NUT ON LEFT SlOE OF SLIDIHG BASE SUPPORT              F3.10      VT-3      HDE 4.3 - 053      C        SUPPORT  CLAMP, LOOKING DOWNSTREAM, CNF RCB                                                                                  88-1-003.                8-23-88 VT-3:
RCB                                                                                  COMPLETE,CNF CLOSED PER NCR 1-209.REEXAMINE 2/1  ~
                                                                                              **N/A**
004650  Sl H-198                          F-C        VT-3      NDE 4.3 - 010  C  C        7-21-88 VT-3:    COMPLETE, FOLLOW UP EXAM SLIDING BASE SUPPORT              F3.10                                              PER  IWF-2420,NRI,RESUME    NORMAL SCHEDULE RCB
                                                                                              **N/Ak*
004680  S I H-197                        F-C        VT-3      NDE 4.3 - 011  C  C        7-21-88 VT-3:"COHPLETE,FOLLOW UP      EXAM SLIDING BASE  SUPPORT            F3.10                                              PER  IWF-2420,HRI,RESUME    NORMAL SCHEDULE RCB
                                                                                              *IN/A**
004690  SI-969-6197                      F-8        VT-3      HDE 4.3 - 044  C  C        8-2-88 VT-3:  COMPLETE RIGID  SWAY STRUT                F3.10 RCB
                                                                                              **N/A**
004700  S I H-196                        F-C        VT-3        HDE 4.3 - 012  C  C        7-21-88 VT-3:    COMPLETED, FOLLOW UP EXAH SLIDING BASE SUPPORT              F3.10                                              PER  IWF-2420,NRI,RESUME    NORMAL SCHEDULE RCB
                                                                                              **N/A*0
Q' I
  ,4 '1
DATE:  11/14/88                                    ST. LUCIE NUCLEAR PLANT UNIT 1                                      PAGE:    20 VISION:        0                              IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS LOOP 1A1 SAFETY INJECTION  PIPING SUPPORTS N I  0 ZONE NUMBER: 021                        ASME                                  S  ONGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMINATION AREA                CATGY      EXAM                      A  E I 0 E  REMARKS HUMBER  IDEHTIFICATION                  ITEM HO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK**
REF. DWG. NO. 1-021S 004720  SIH-195                        F-C        VT-3      HDE 4.3 - 007  C  C        7-21-88 VT-3:  COMPLETE,FOLLOWUP EXAM PER SLIDING BASE SUPPORT            F3.10                                              IWF-2420,HRI,RESUME NORMAL SCHEDULE RCB t*H/A*0 004750  SIN-194                        F-C        VT-3      HDE 4.3 - 014  C  C        7-21-88 VT-3:  COMPLETE, FOLLOW UP EXAM SLIDIHG BASE SUPPORT            F3 ~ 10                                            PER  IWF-2420,HRI RESUME NORMAL SCHEDULE RCB
                                                                                          **N/AA*
004760  SI-969-6194                    F B        VT-3      NDE 4.3 - 008  C  C        7-21-88 VT-3:COMPLETE RIGID  SWAY STRUT              F3.10 RCB 4*N/A**
004770  S I H-193                      F-C        VT-3      HDE 4.3 - 013  C  C        7-21-88 VT-3:  COMPLETE, FOLLOW UP EXAM SLIDING BASE SUPPORT            F3.10                                              PER IWF-2420,NRI,RESUME  NORMAL SCHEDULE RCB
                                                                                          **N/A%A
e fw
DATE:  11/14/88                                ST. LUCIE NUCLEAR PLANT UHIT  1                                          PAGE:              21 VISION:        0                          IHSERVICE IHSPECT ION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS LPSI 1B2 N  I  0 ZONE NUMBER:    024                  ASME                                  S  ONGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMINATION AREA              CATGY      EXAM                        A  E  I 0 E REMARKS NUMBER  IDENTIFICATION              ITEM HO    METHOD      PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK**
REF. DUG. HO. 1-024 005930  S I -110- FN-9A              B-J        UT 45 DEG. HDE  5.4 - 003  C  C        7-27-88 PT:      COMPLETE PEHETRAT ION    &#xb9;39- TO.PIPE 89.11      UT 60 DEG. HDE  5.4 - 003              7-28-88 UT:      COMPLETE,60 DEGREE: ROOT RCB                                    PT          HDE 3.3 - 029      C        GEOMETRY.
                                                                                          **UT-38*+
005940  SI-110.8-SW-5                B-J        UT 45 DEG. HDE  5.4 - 003  C  C        7-27-88 PT:      COMPLETE PIPE-TO.ELBSI                B9.11      UT  60 DEG. NDE 5.4 - 003          C  7-28-88 UT:      COMPLETE 60 DEGREE;ROOT RCB                                    PT          NDE 3.3 - 021      C        GEOMETRY.
                                                                                          **UT-38~*
005950  SI-110.8.S'N.4              B-J        UT 45 OEG. HDE  5.4 - 003  C  C        7-27-88 PT:      COMPLETE q                                                                5.4 - 003 ELBSI-TO PIPE                B9.11      UT  60 OEG. HDE                    C  7-28-88 UT:      COMPLETE,60 DEGREE;ROOT RCB                                    PT          HDE 3.3 - 020      C GEOMETRY'~UT-38*~
005960  SI-110.8.SW-3                8-J        UT 45 DEG. NDE  5.4 - 003  C  C        7-27-88 PT:      COMPLETE PIPE-TO.ELBOW                89.11      UT  60 DEG. HDE 5.4 - 003          C  7-28.88 UT:      COMPLETE,60 DEGREE; ROOT RCB                                    PT          HDE 3.3 - 022      C        GEOMETRY.
                                                                                          **UT-38**
005970  SI-110-8-S'N-2              B-J        UT 45 DEG ~ HDE 5.4 - 003  C  C        7-27-88 PT:      COMPLETE ELBN-TO.PIPE                89.11      UT  60 DEG. HDE 5.4 - 003          C  7-28-88 Ul':      COMPLETE( 60 DEGREE; 3.3 - 019 ROOI'EOMETRY.
RCB                                    PT          HDE                C
                                                                                          ~*UT-38**
005980  SI-110-8-SW-1                B-J        UT 45 DEG. HDE  5.4 - 012  C    C    7-27-88 PT: COMPLETE PIPE-TO.ELBSI                89.11      UT 60 DEG. NDE  5.4 - 012          C  8-4-88 UT: COMPLETE(45 DEGREE RCB                                    PT          HDE 3.3 - 027      C>>      IHSIGHI FICANT IND i 60 DEGREES GEOMETRY
                                                                                          **UT 38++
005990  S I -110- FM.10              B-J        UT 45 DEG. HDE  5.4 - 012  C    C    7-27-88 PT: COMPLETE ELBSI-TO PIPE                89.11      UT  60 DEG. HDE 5.4 - 012          C  8-4-88 UT: COMPLETE,45      DEG. INSIGNIFICANT RCB                                    PT          HDE 3.3 - 028      C        IHD.,60 DEG. GEOMETRY.
                                                                                          **UT-38**
g ~
(~f r
DATE:  11/14/88                        ST. LUCIE NUCLEAR PLANT UNIT 1                                            PAGE:    22 VISION:        0                IHSERVICE IHSPECTIOH
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS LPSI 1B2 N I  0 ZONE NUMBER:    024          ASME                                  S  ONGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMINATION AREA    CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENT  IF ICATION  ITEM HO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK**
REF. DWG. HO. 1-024 006000  S I -110-9-SM-'l    B-J        UT 45 DEG. HDE 5.4 . 003  C  C        7-27-88 PT:        COMPLETE PIPE-TO-ELBN        89.11      UT 60 DEG. NDE 5.4 - 003          C    7-28-88 Ul':        COMPLETE, 60 DEGREEl ROOT RCB                            PT        HDE 3.3 - 026      C        GEOMETRY.
                                                                              <<*UT-38*>>
006010  SI-110-FII-11      B-J        UT 45 DEG. HDE 5.4 - 003  C  C        7-27-88 PT:        COMPLETE ELBSI-TO-PIPE      B9.11      UT 60 DEG. HDE 5.4 - 003          C    7-28-88 UT:        COMPLETE, 60 DEGREE; ROOT RCB                            PT        HDE 3.3 - 023      C        GEOMETRY'*UT 38**
006020  SI -110-10-SN-2    B-J        UT 45 DEG. HDE 5.4 - 003  C  C        7-27-88 PT:        COMPLETE, LIGHT PINK PIPE-TO-ELBN        B9.11      UT 60 DEG. NDE 5.4 - 003          C    INDICATIONS        FROM GRINDING MARKS PRESENT RGB                            PT        HDE 3.3 - 024      C        360        DEGREES INTERMITTENT. 7-28-88 UT:
COMPLETE,60 DEGREE; ROOT GEOMETRY.
                                                                              **UT-38'*
006030  SI-110-10-SN-1      8-J        UI'5  DEBS NDE 5.4 - 003  C  C        7-27-88 PT:        COMPLETE LIGHT PINK ELBON-TO.PIPE      B9.11      UT 60 DEG. NDE 5.4 - 003          C    INDICATIOHS 360 DEGREES INT. GRIHDING RCB                            PT        HDE 3.3 - 025      C        MARKS                                7-28.88 RCB                                                                  UT: COMPLETE, 60 DEGREE;        ROOT GEOMETRY.
                                                                              **UT 38<<<<
006040  S I -110- FN-12    8-J        UT 45 DEG. HDE 5.4 - 005  C  C        7-28-88 PT: COMPLETE PIPE-TO-ELBN        89.11      UT 60 DEG. NDE 5.4 - 005          C    8-4-88 UT: COMPLETE,60        DEGREE) ROOT RCB                            PT        NDE 3.3 - 030      C        GEOMETRY.
                                                                              **UT-38**
4 4~
S
DATE:  11/14/88                                    ST. LUCIE HUCLEAR PLANT UNIT 1                                      PAGE:    23 EVISIOH:        0                              INSERVICE INSPECTIOH
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPOHENTS LOOP 1B2 SAFETY INJECTION  PIPING SUPPORTS H I  0 20HE NUMBER: 024                        ASME                                  S  OHGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMINATION AREA                CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENTIFICATION                  ITEM NO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK>>>>
REF. DWG. NO. 01-024S 006360  S I -971-235                    F.B        VI'-3      HDE 4.3 - 003  C        C  7-21-88 VT-3: CNF-88-'1-001,COTTER PIN  ON RIGID SHAY STRUT                F3.10      VT-3      HDE 4.3 - 051      C        LONER ASSEMBLY ARE HOT PROPERLY BEHT.
RCB                                                                                8-23-88 VT-3:  COMPLETE( CNF CLOSED PER RCB                                                                                NCR 1-209.REEXAMIHE 2/1  ~
                                                                                          **N/A>>>>
~ '
DATE:  11/14/88                              ST. LUCIE NUCLEAR PLAHT UNIT 1                            PAGE: 25 VISION'                                INSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS LOOP B HOT  LEG-S.I.S S.D COOLING N I  0 ZONE NUMBER:  028                ASME                                  S  ON  0T SEC. Xl                              T  RSEH
==SUMMARY==
EXAMIHATIOH AREA          CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENT IF I CATION        ITEM NO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK**
REF. DWG. NO. 1-028 007660  Sl-130-FW-2              8-J        PT        HDE 3.3 - 050  C  C        8 8-88 PT: COMPLETE VALVE (MV-3652) TO ELBOW  89.11                  NDE 5.4 RCB
                                                                                    **UT-37
* DATE:  11/14/88                        ST. LUCIE NUCLEAR PLANT UNIT 1                            PAGE: 26 VISION:      0                    INSERVICE INSPECTIOH
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS CHARGING LINE TO LOOP 1B1 N I  0 20HE NUMBER: 031            ASME                                  S  OHGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMINATION AREA    CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENI'IFICATION      ITEM HO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK*~
REF. DMG. NO. 01-031 008920  CH-148-SW-2          8-J        PT        NDE 3.3 - 049  C  C        8-9.88 PT: COMPLETE TEE TO PIPE          89.40 RCB
                                                                              **N/A*%
g
  'l giC
DATE:  11/14/88                              ST. LUCIE NUCLEAR PLANT UNIT 1                                    PAGE:    27 VISION:    0                          IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS CHARGING LINE TO LOOP 101 SUPPORTS H I  0 ZOHE NUMBER: 031                  ASME                                  S  OHGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMINATIOH AREA          CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDEHTIFICATIOH            ITEM HO    METHOD    PROCEDURE      T  C G M R  <<<<CALIBRATIOH BLOCK**
REF. DNG. HO. 01-031S 008990  CH-129-316                F-C        VT-3i4    NDE 4.3 - 004  C        C  7-27-88 VT-3)4:INADEQUATE THREAD VARIBLE SPRING SUPPORT    F3.50      VT-3,4    HDE 4.3 - 052      C        ENGAGEMENT OH THE SPRING CAH BASE RCB                                                                          PLATE,CNF-88-1-002                8.23-88 RCB                                                                          VT-3,4: COMPLETE,CHF CLOSED PER NCR 1-209. REEXAMINE 2/1.
                                                                                    **H/A**
I
    'ter Jg
DATE:  11/14/88                        ST. LUCIE NUCLEAR PLANT UNIT 1                              PAGE: 28 VISION:    0                    IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS CHARGIHG LINE TO LOOP 1A2 H I  0 ZONE NUMBER: 032            ASME                                  S  ONGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMINATION AREA    CATGY      EXAM                      A  E I 0 E  REHARKS NUMBER  IDENTIFICATION      ITEM NO    METHOD    PROCEDURE      T  C G M R  "*CALIBRATIOH BLOCK**
REF. DWG. NO. 01-032 009460  CH-147-SM-26A        8-J        PT        HDE 3.3  055  C  C        8-11-88 PT: COMPLETE PIPE TO COUPLING    89.40 RCB
                                                                              **H/A**
009580  CH-147-S'N-34        8-J        PT        NDE 3.3 - 054  C  C        8.11-88 PT: COMPLETE COUPLIHG TO PIPE    89.40 RCB
                                                                              **H/A**
DATE:  11/14/88                                        ST. LUCIE NUCLEAR PLANT UNIT 1                                PAGE: 29 VI SION:        0                                IHSERVICE IHSPECTIOH
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS LOOP 1A2 PRIMARY DRAIN H I  0 ZONE NUMBER:  034                          ASME                                  S  ONGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMIHATIOH AREA                    CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  I DENT I F I CAT I ON              ITEM NO    METHOD    PROCEDURE      T  C G M R  <<*CALIBRATIOH BLOCK"*
REF. DWG. NO. 1-034 010070  18-507-B                            B-F        PT        NDE 3.3 - 067  C  C        8-13-88 PT: COMPLETE NOZZLE TO SAFE END                  B5.140 RCB
                                                                                              **H/A**
010140                                      B-G-2      VT-1      HDE 4.1 - 007  C  C        8-13-88 VT-1: COMPLE'IE FLANGE BOLTIHG        (8 STUDS & 16 B7.50 HUTS)
RCB
                                                                                              **H/A**
DATE:  11/14/88                        ST. LUCIE NUCLEAR PLANT UNIT 1                              PAGE: 30 VISION:    0                    INSERVICE INSPECTION SUHHARY REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COHPONENTS LOOP 182 PRIMARY DRAIN N I  0 ZONE NUMBER: 035            ASHE                                  S  ONGT SEC. XI                              T  RSEN SUHHARY EXAHINATION AREA    CATGY      EXAH                      A  E I 0 E  REHARKS NUHBER  IDENTIFICATION      ITEH NO    HETNOO    PROCEDURE      T  C G H R  ~*CALIBRATION BLOCK"*
REF. DMG. NO. 1-035 010150  18-507-C            8-F        PT        NDE 3.3 - 069  C  C        8-13-88 PT: COHPLETE NOZZLE TO SAFE END  85. 140 RCB
                                                                              **N/A**
~a k
DATE:  11/14/88                        ST. LUCIE NUCLEAR PLANT UNIT 1                            PAGE: 31 VI SION:      0                  IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS LETDOWN  LINE FROM LOOP 1B1 H I  0 ZONE NUMBER:  037            ASME                                  S  ONGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMINATION AREA    CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENTIFICATION      ITEM HO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK*"
REF. DWG. NO. 1-037 010440  RC-142-FW.6        B-J        PT        NDE 3.3 - 068  C  C        8-13-88 PT: COMPLETE PIPE TO ELBOW      B9.40 RCB
                                                                              **H/A**
6' DATE:  11/14/88                        ST. LUCIE NUCLEAR PLANT UNIT 1                                      PAGE:    32 VISION:        0                  IHSERVICE IHSPECTIOH
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS PRESSURIZER  RELIEF LINE N I  0 ZONE HUMBER:  038            ASME                                  S  OHGT SEC. Xl                              T  RSEH
==SUMMARY==
EXAMIHAT ION AREA    CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENT I F ICATION  ITEM NO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK**
REF. DUG. HO. 1-038 011180  V-1405              B-G-2      VT-1      HDE 4.1 - 005  C        C  8-10-88 VT: INCOMPLETE THREAD VALVE BOLTING      87.70      VT-1      HDE 4.1 - 010      C        EHGAGEMEHT,CNF  88-1-014,FOLLOM  UP EXAM RCB                                                                    REQUIRED.                        8-19.88 RCB                                                                    VT: COMPLETE, CNF CLOSED PER PWO XA88081509-2947.
                                                                                **H/A**
011250  V-1404              8-G-2      VT-1      HDE 4.1 - 003  C  C        8-10-88 VT.1:  COMPLETE VALVE BOLTING      87.70 RCB
                                                                                **H/A**
~tP
'S
ATE:  11/14/88                                    ST ~ LUCIE NUCLEAR PLANT UNIT 1                              PAGE: 33 I SION:    0                                INSERVICE IHSPECTIOH SUHMARY REPORT OUTAGE 1 ( 1988) ~ FIRST PERIODS SECOHD INTERVAL CLASS 1 COHPONENTS PRESSURIZER RELIEF VALVE PIPING SUPPORTS H I  0 ZONE NUHBER:  038                      ASHE                                    S  OHGT SEC. XI                                T  RSEH SUHHARY EXAHIHATION AREA                CATGY      EXAH                        A  E I 0 E REMARKS NUMBER  IDENTIFICATION                ITEH  HO  METHOD      PROCEDURE      T  C G H R **CALIBRATIONBLOCK>>>>
REF. DWG. No. 01-038S 011310  RC-005-53A                    F-8        VT-3        HDE 4.3 - 047  C  C      .8-10-88 VT-3: COMPLETE RIGID STRUT ASSEMBLY          F3. 10 RCB
                                                                                          **N/A**
        \
gt' y v
ST. LUCIE NUCLEAR PLANT UNIT 1                                    PAGE:    34 DATE:  11/14/88 VISION:    0                      INSERVICE INSPECTIOH SUMHARY REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONEHTS SI 1A1 OUTSIDE CONTAINMENT N I  0 ZONE NUMBER: 039              ASME                                S  OHGT SEC. XI                              T  RSEH
==SUMMARY==
EXAHINATION AREA      CATGY    EXAH                      A  E I 0 E REMARKS NUMBER  IDENTIFICATION        ITEH NO  HETMOO    PROCEDURE      T  C G H R **CALIBRATIONBLOCK**
REF. DUG. NO. 1-039-B 011400                        B-G-2    VT-1      HDE 4.1 - 002  C        C 7-23-88 VT-1:  IHCOMPLETE THREAD FLANGE BOLTING        87.70    VT.1      HDE 4.1 - 008      C      ENGAGEMENT,CNF  88-1-012,FOLLSI UP EXAM RAB                                                                  HEEDED.                        8-23.88 RAB                                                                  VT-1: COMPLETE,CNF CLOSED PER PNO    &#xb9; XA88081509-3858.
                                                                              **N/A~~
011470  V-3124                B-G-2    VT-1      NDE 4.1 - 004  C        C 7-23-88 VT-1:  BORIC ACID RESIDUE AROUND BOLTING              87.70    VT-1      NDE 4.1 - 009      C      STUDS.CNF-88-1.013. FOLLOW UP EXAH RAB                                                                  REQUIRED.                  8-22-88 VT-1:
RAB                                                                  COMPLETE,CNF CLOSED PER PWO  &#xb9; XA88081509-4806,CLEANED,  NO DEGRADATION.
                                                                              ~*N/A**
1" ~
        ~ p c4 I  o<
  ,I
.J,  I,
'j 1
DATE:  11/14/88                                ST. LUCIE NUCLEAR PLANT UNIT 1                                      PAGE:    35 I SION:      0                          INSERVICE INSPECTION SUHMARY REPORT OUTAGE    1  (1988), FIRST PERIOD, SECOND IHTERVAL CLASS 1 COHPOHEHTS SI 1A1 OUTSIDE CONTAINHENT SUPPORTS N I  0 ZONE HUHBER:    039                ASHE                                    S  ONGT SEC. Xl                              T  RSEH
==SUMMARY==
EXAHIHATION AREA            CATGY        EXAM                      A  E I 0 E  REMARKS HUHBER    IDENT  IF ICAT ION        ITEH HO      HETHOO    PROCEDURE      T  C G H R  **CALIBRATIONBLOCK**
REF. DWG. NO. 01-039-BS 011980    SIH-171                  F-C          VT-3      NDE 4.3 - 002  C  C        7-23-88 VT-3(4:  COHPLETE SLIDIHG BASE SUPPORT      F3.10 5        RAB-44H/A**
012030    SIH-49                    F-C          VT-3      HDE 4.3 - 050  C  C        8-13-88 VT-3:  COHPLETE (AUGHEHTED)
HANGER                    F3.10 RAB
                                                                                        *IN/A**
012040    S I -868-1295            F-8          VT-3      HDE 4.3 - 015  C        C  7-23-88 VT 3: SHIH SLIPPIHG OUT(S.S.
BOX RESTRAINT            F3.10        VT-3      HDE 4.3 - 054      C        PIPE( C.S. SUPPORT.8-23-88 VT-3 0        RAB                                                                            COHPLETE,                        CHF RAB                                                                            CLOSED PER HCR  1-209. REEXAMINE 2/1.
                                                                                        **H/A**
012050    S I H-48                  F-C          VT-3      HDE 4.3 - 049  C  C        8-13-88 VT-3:  COHPLETE (AUGMENTED)
HANGER                    F3.10 RAB
                                                                                        **H/A%A 012060    S I -868.131              F-8          VT-3      HDE 4.3 - 006  C  C        7-23-88 VT-3:  COHPLETE RIGID SHAY STRUT          F3 '0 RAB
                                                                                        **H/A**
012110    S IH-45                  F-C          VT-3,4    NDE 4.3 - 001  C  C        7-23-88 VT: COHPLETE SPRING HAHGER            F3 F 50      VT-4 RAB
                                                                                        **M/A**
I
'Z
DATE:  11/14/88                                  ST. LUCIE NUCLEAR PLANT UNIT 1 .                                    PAGE:    36 VISION:      0                              INSERVICE IHSPECTIOH
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 2 COMPONEHTS STEAM GENERATOR 1A SECONDARY SIDE H  I  0 ZONE NUMBER: 041                      ASME                                  S  OHGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMINATION AREA              CATGY      EXAM                      A  E  I 0 E REMARKS NUMBER  IDEHTIFICATIOH                ITEM HO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIONBLOCK**
REF. DWG. NO. 01-041 013480  SG-1A-S1                      C-C        MT        HDE 2.2 - 010  C  C        7-28-88 MT: COMPLETE KEY BRACKET  9 0 DEGREES      C3.10 RCB
                                                                                          **H/A%A 013490  SG-1A-SS                      C-C        MT        HDE 2.2 - 011  C  C        7-30-88 MT: COMPLETE KEY BRACKET  9 180 DEGREES    C3.10 RCB
                                                                                          **H/A*4 013500  SG-1A-S2                      C-C        MT        HDE 2.2 - 010  C  P        7-28-28 MT: PARTIAL EXAM, IHSULATIOH CLEVIS BRACKET 9 45 DEGREES    C3.10                                              RING BLOCKING ONE SIDE, COMPLETE EXAM 3RD RCB                                                                              PERIOD WITH CONE TO    UPPER SHELL WELD.
                                                                                          **H/A*>>
013510  SG-1A-S3                      C-C        MT        NDE 2.2 - 010  C  P        7-28-88 MT: PARTIAL( INSULATIOH RING SUPPORT  BRACKET 9 90 DEGREES C3.10                                              BLOCKING ONE SIDE, COMPLETE 3RD PERIOD.
RCB
                                                                                          **N/A*A
DATE:  11/14/88                                  ST ~ LUCIE HUCLEAR PLANT UNIT 1                            PAGE: 37 VISION:      0                              IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988),  FIRST PERIOD, SECOHD INTERVAL CLASS 2 COMPONENTS MAIN STEAM LIHE 1A1 INSIDE CONTAINMENT H I  0 ZONE NUMBER: 063                      ASME                                  S  ONGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMIHAT IOH AREA              CATGY      EXAM                        A  E I 0 E  REMARKS NUMBER  IDENTIFICATION                ITEM NO    METHOD      PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK**
REF. DWG. HO. 01-063 020110  MSH-78                        C-C        MT          NDE 2.2 . 019  C  C        8-11-88 MT: COMPLETE TRUHHION  (T=3/4")            C3 ~ 20
                                                                                          **H/A%A 020390  MSH.81                        C-C        MT          HDE 2.2 - 019  C  C        8-11-88 MT: COMPLETE TRUNNION  (T=3/4")            C3.20
                                                                                          **H/A%*
  +II I
DATE:  11/14/88                                  ST. LUCIE NUCLEAR PLANT UNIT  1                            PAGE: 38 VISION:      0                              IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST  PERIOD, SECOHD INTERVAL CLASS 2 COMPONENl'S MAIN STEAM LINE 1B1 INSIDE CONTAIHMEHT N I  0 ZONE HUMBER:  064                      ASHE                                  S  ONGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMINATION AREA              CATGY      EXAM                        A  E I 0 E  REMARKS NUMBER  IDENTIFICATION                ITEM HO    METHOD    PROCEDURE        T  C G M R  **CALIBRATIOHBLOCK**
REF. DWG. NO. 01-064 020620  MS-53-FW.1                    C-F-2      MT        HDE  2.2 -  021  C  C        8-9.88 MT: COMPLETE S/G EXl'. PIECE-TO.ELBOH      C5.51                NDE 5 '
                                                                                          **UT.45**
020630  MS-53-FW-'I-LR                C-F-2      MT        NDE  2.2 -  021  C  C        8-9-88 MT: COMPLETE LOHG SEAM                    C5.52                HDE  5.2
                                                                                          **ur-45 020640  MS-53-FN-1-SR                C-F-2      MT        HDE  2.2 -  021  C  C        8-9-88  MT: COMPLETE LONG SEAM                    C5.52                HDE  5.2
                                                                                          **UT 45**
020680  MSH.74                        C-C        MT        HDE  2.2 - 017  C  C        8-6-88  MT: COMPLETE TRUNNIOH    (T=3/44)          C3.20
                                                                                          *IN/A*1 020840  MSH-75                        C-C        MT        NDE  2.2 - 022    C C        8-9-88  MT: COMPLETE UELDED LUGS    (4) (T=1 1/4") C3.20
                                                                                          **H/A**
020850  MS-649-314                    C-C        MT          NDE 2'  - 022  C C        8-9-88  MT: COMPLETE MELDED LUGS  (8) (T=1 1/2")  C3.20
                                                                                          *IN/A*I 021000  MSH-77                        C-C        MT          HDE 2.2 - 017    C C        8-6.88  MT: COMPLETE TRUNNION (T=  3/4")          C3.20
                                                                                          **N/A~*
g
'+
h
DATE:  11/14/88                                  ST. LUCIE HUCLEAR PLANT UHIT 1                                          PAGE: 39 VISION:      0                            IHSERVICE INSPECTION
==SUMMARY==
REPORT 0                                        OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 2 COMPONEHTS MAIN STEAM LINE 1B1 OUTSIDE CONTAINMENT N I  0 ZONE NUMBER:  066                      ASME                                S  OH  0T SEC. XI                              T  RSEH
==SUMMARY==
EXAMINATION AREA              CATGY    EXAM                      A  E I 0 E REMARKS NUMBER  IDENT I F I CAT ION            ITEM HO  METHOD      PROCEDURE      T  C G M R **CALIBRATIOHBLOCK**
REF. DMG. NO. 01-066 021850  MS-3-1-SM.S                    C-F-2    MT          HDE 2.2 - 016  C  C      7-27-88    MT: COLPLETE PIPE-TO RELIEF NOZZLE          C-5.81
                                                                                        **N/A**
021890  MS-3 SN-25                  C-F-2    UT 45 DEG. HDE  5.2 - 003  C  C      7-27-88 MT:    COMPLETE PIPE-TO-PIPE                  C5.51    UT 60 DEG. NDE 5.2 - 003    C      7-30-88 UT:    COMPLETE MT          HDE 2.2 - 016    C
                                                                                        +*UT  44**
021900  MS-3-1-SM-25-LS-A              C-F-2    Ul'5  DEG ~ HDE 5.2 - 004  C    C C  8-8-88 UT:    COMPLETE,45 DEG. GEOMETRIC PIPE LOHG SEAM                C5.52    UT 60 DEG. HDE  5.2 - 004    C      IHD I CAT IOHS, SLAG, INS IGNI F I CANT.
MT          HDE 2.2 - 020    C      8-8-88  MT: COMPLETE SAUT  44%i 021926  MS-3-1-FW-2-LS-A              C-F-2    UT 45 DEG. HDE  5.2 - 004  C    C    8-8-88 M'I:  COMPLETE PIPE  LONG SEAM                C5.52    UT 60 OEG. HDE  5.2 - 004    C      8-8.88 UT:    COMPLETE STM TRSL                                MT          HDE 2.2 - 020    C
                                                                                        **Ur-44.*
021935  MS-3-1-V1                      C-G      MT          HDE 2.2 - 016  C  C      7-27-88    MT: COMPLETE VALVE TO VALVE                C6.20 STM TRSL
                                                                                        **N/A**
  'k >
      ~
t
DATE:  11/14/88                                    ST. LUCIE NUCLEAR PLANT UNIT  1                                        PAGE:    40 VISION:      0                                INSERVICE INSPECTION SUHHARY REPORT 0                                        OUTAGE    1  (1988), FIRST  PERIOD, SECOND INTERVAL CLASS 2 COHPONEHTS MAIN FEEDWATER TO STEAM GENERATOR 1A1 INSIDE CONTA N I  0 ZONE NUMBER:  067                    ASHE                                      S  ONGT SEC. XI                                  T  RSEH
==SUMMARY==
EXAHIHAT ION AREA              CATGY        EXAH                        A  E I 0 E  REMARKS NUMBER  IDEN'llF ICATION              ITEH    HO    METHOD      PROCEDURE      T  C G H R  **CALIBRATIONBLOCK*>>
REF. DWG. NO. 01-067 022050  BF-14.4-SW-1                  C-F-2        UT 45 DEG ~ NDE 5.2 - 005  C  C        8-11-88 UT:    COMPLETE, ROOT GEOHETRY < 20X ELBSI-TO PIPE                C5 ~ 51      UT 60 DEG. HDE 5.2 - 005      C        DAC HT          HDE 2.2 . 023            C  8-11-88 HT:    LINEAR IHDICATIOHS, HT          HDE 2.2 - 025              CNF-88-1-015.FOLLSI    UP EXAM REQUIRED.
UT 0 DEG. HDE 5.18 - 002              8-16-88 HT:    COHPLETE,CHF CLOSED OUT.
                                                                                              >>>>UT-41>>>>
022090  BF-51-FW-3A                  C-F-2        UT 45 DEG. NDE  5.2 - 006    C    C    8-6-88 HT:  COHPLETE PIPE-TO-ELBOW                CS ~ 51      UT 60 DEG. HDE 5  '  - 006        C    8-9.88 UT:  COMPLETE( ROOT GEOHETRY.
MT          HDE 2 '  - 018    C
                                                                                              **UT-43*>>
100  BF-51.FW-28                  C-F-2        MT          HDE 2.2 - 012    C      C  8-1-88 HT:LINEAR IHDICATIOH,    CHF ELBSI-TO-PIPE                C5.51        MT          HDE 2.2 - 024      C        88-1-010.EVALUATION,COLD LAP.
RCB                                        UT 0 DEG. HDE 5.18 - 001    C        8-16-88  HT:COMPLETE (FOLLOWUP EXAH),UT 0 RCB                                                    HDE 5.2                    DEGREE OF AREA,CNF CLOSED PER NCR    1-228.
022110  BF-51-FW-1B                  C-F-2        UT 45 DEG. NDE  5.2 . 008    C C        8-1-88 HT:  COHPLETE ,NOH-RELEVANT PSIDER P IPE- TO.S/G EXTENSION      C5.51        UT 60 DEG. HDE  5.2 - 008    C        ACCUMULATIOH DUE TO PERHEABILITY.
MT          HDE  2.2 . 013    C        8-8-88 UT:    COHPLETE
                                                                                              **UT 43**
        "a gl.
~+  4
DATE:  11/14/88                                  ST. LUCIE NUCLEAR PLANT UNIT 1                                    PAGE:  41 VISION:,0                                  IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND IHTERVAL CLASS 2 COMPONENTS MAIN FEEDWATER TO STEAM GENERATOR 181 IHSIDE CONTA H I  0 ZONE NUMBER: 068                      ASME                                  S  ONGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMIHATIOH AREA              CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENTIFICATION                ITEM NO    METHOD    PROCEDURE      T  C G H R  **CALIBRATIONBLOCK**
REF. DUG. HO. 01-068 022340  BF-52-FH-2B                    C-F-2      UT 45 DEG. HDE 5.2 - 007  C      C    8-2-88 MT: COMPLETE ELBN-TO.PIPE                  C5.51      UT 60 DEG. HDE 5.2 - 007          C    8-8-88 UT: COMPLETE, ROOT GEOMETRY.
MT        HDE 2.2 . 014      C
                                                                                        **UT-43**
022350  BF-52-FW-2A                    C-F-1      UT 45 DEG. HDE 5.2 - 007  C  C        8-2-88 MT: COMPLETE PIPE-TO-S/G EXTENSION          C-5.51    UT 60 DEG. HDE 5.2 - 007      C        8-8-88 UT: COMPLETE MT        NDE 2.2 - 014      C
                                                                                        *IUT 43**
DATE:  11/14/88                                    ST. LUCIE NUCLEAR PLANT UNIT 1                                    PAGE:    42
  "-VISION:      0                                INSERVICE INSPECTION SUHHARY REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 2 COHPONENTS HAIN FEEDNATER TO    S G 1A1 OUTSIDE CONTAINMENT N I  0 ZONE NUHBER: 071                          ASME                                  S  ONGT SEC. XI                              T  RSEN SUHMARY EXAMINATION AREA                  CATGY      EXAH                      A  E I 0 E  REMARKS NUHBER  IDENT IF ICATION                ITEH NO    HETHOD    PROCEDURE      T  C G H R  **CALIBRATIONBLOCK**
REF. DUG. NO. 01-071 023380  BF-55-FIJ-1                      C-F-2      UT 45 DEG. NDE 5.2 - 001  C  C        7-27-88 HT: COHPLETE VALVE-TO-PIPE (V-9248)          C5.51      UT 60 DEG. NDE 5.2 - 001      C        7-30-88 UT: COHPLETE,ONE SIDED EXAM DUE HT        NDE 2.2 - 007      C        TO CONFIGURATION.
                                                                                            *~UT-42**
V
  ~i
DATE:  11/14/88                                    ST. LUCIE NUCLEAR PLANT UHIT 1                                    PAGE:  43 VISION:      0                                IHSERVICE INSPECTIOH
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 2 COMPOHEHTS MAIN FEEDHATER TO S  G 181 OUTSIDE COHTAINMEHT N I  0 ZONE NUMBER:  072                        ASME                                  S  OHGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMIHATION AREA                CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENT IF ICATION                ITEM HO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIONBLOCK**
REF. DUG. NO. 01-072 023490  BF-19-Fll-1                      C-F-2      UT 45 DEG. HDE 5.2 - 002  C  C        7-27-88 MT: COMPLETE VALVE-TO-PIPE (MV-09-8)          C5.51      UT 60 DEG. NDE 5.2 . 002      C        7-30-88 UT: COMPLETEtSCAH LIMITATION DUE MT        HDE 2.2 - 005      C        TO 1" DRAIN LINE.
I t>>
( 1
DATE:  11/14/88                                  ST ~ LUCIE NUCLEAR PLANT UNIT 1                                    PAGE:    44 VI SIOH:      0                            IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988),  FIRST PERIOD, SECOHD INTERVAL CLASS 3 COMPOHEHTS COMPONENT COOLING HEAT EXCHANGER A&B INLET HEADERS H I  0 ZONE NUMBER: 100                      ASME                                  S  ONGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMIHATION AREA              CATGY      EXAM                        A  E I 0 E  REMARKS NUMBER  IDENTIFICATION                ITEM NO    METHOD      PROCEDURE      T  C G M R  **CALIBRATIONBLOCK>>"
REF. DWG. HO. 01-100 031100  CC-998-11                    F-8        VT-3        HDE 4.3 - 028  C  C        7-29-88 VT-3:  COMPLETE RIGID SHAY STRUT              F3.10 031130  CC-998-65                    F-B        VT-3        NDE 4.3 - 027  C  C        7-27-88 VT-3:  COMPLE'TE RIGID STRUT                  F3.10 031190  YPH-1                        F-C        VT-3,4      HDE 4.3 - 023  C  C        7-29-88 VT-3,4:
VARIBLE SPRING HANGER        F3.50      VT-3,4      HDE 4.3 - 058      C        COMPLETE,CHF-88-1-008,PAINTED SCALE  ON SPRIHG CAN.
8-23-88 VT-3,4: COMPLETE,CNF CLOSED  PER HCR 1-209. NO REEXAM REQUIRED.
                                                                                          *>>H/A*>>
031220  YPH-4                        F-C        VT-3        HDE 4.3 - 040  C  C        7-29-88 VT-3;  COMPLETE ROO HANGER                    F3.10
                                                                                          **N/A**
031250  YPH-110                      F-C        VT-3        HDE 4.3 - 041  C  C        7.29-88 VT-3:  COMPLETE SLIDING BASE SUPPORT          F3.10
                                                                                          **N/A'>>>>
031290  YPH-176                      F-C        VT-3,4      HDE 4.3 - 022  C  C        7-29-88 VT-3 4:  COMPLETE, CHF-88-1.007 VARIABLE BASE SUPPORT        F3.10      VT-3,4      HDE 4.3 - 057      C        FOR SPRING CAH SCALE BEING PAINTED OVER ~
8-23.88 VT-3(4:  COMPLETE(CHF CLOSED PER NCR  1-209.HO REEXAM REQUIRED.
                                                                                          **H/A>>>>
I g;
k J
DATE:  11/'l4/88                                    ST. LUCIE HUCLEAR PLANT UHIT 1 VISION:      0                                IHSERVICE IHSPECTIOH
==SUMMARY==
REPORT OUI'AGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPONENTS COMPONENT COOLING PUMP    1A-1B-1C INLET SUPPORTS N I  0 ZONE,NUMBER: 105                        ASME                                  S  ONGT SEC. XI                                T  RSEH
==SUMMARY==
EXAMIHATIOH AREA                CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENT IF ICATION                ITEM HO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK**
REF. DWG. NO. 01-105 032720  CC-28-1                          F-8        VT.3      NDE 4.3 - 032  C  C        7-29-88 VT-3: COMPLETE RIGID TIE  BAR ASSEMBLY        F3.10 032750  CC-28-3                          F-B        VT.3      HDE 4.3 - 031  C  C        7-29-88 VT-3: COMPLETE BOX RESTRAINT                    F3.10 032800  CC-28-7A                        F-B        VT-3      NDE 4.3 - 037    C C        7-29-88 VT-3: COMPLETE RIGID  SWAY STRUT              F3.10 0  860  CC-28-11                        F-B        VT-3      NDE 4.3 - 029    C C        7-29.88 VT-3: COMPLETE RIGID  SWAY STRUT              F3.10
1 I
II C
    +1
        '1 0
DATE:  11/14/88                                  ST. LUCIE HUCLEAR PLANT UNIT 1                                      PAGE:    46 I SION:      0                            IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPOHEHTS CIRCULATING WATER HEAT EXCHANGER -ARB- DISCHARGE T N I  0 ZONE NUMBER:  107                      ASME                                    OHGT SEC. XI                                  RSEK
==SUMMARY==
EXAMINATION AREA                CATGY      EXAM                          E I 0 E  REMARKS NUMBER  IDENTIFICATION                ITEM HO    METHOD    PROCEDURE          C G M R  **CALIBRATIONBLOCK*~
REF. DWG. NO. 01-107 033280  CW-1000-9A                    F-B        VT-3      HDE 4.3 - 035  C  C        7-29.88 VT-3:  COMPLETE RIGID  S'WAY STRUT            F3.10 033330  CW-'1000-148                  F-B        VT-3      HDE 4.3 - 020    C      C  7-29-88 VT-3:  HEAVY RUST ON BOLTS AND BOX RESTRAINT                  F3.10      VT-3      NDE 4.3 - 055      C        HUTS AT BASE  8  TWO (2) NUTS ARE NOT COMPLETELY ENGAGED.
CHF-88-1-005(FOLLOW UP EXAM REQUIRED.8-23-88 VT-3:COMPLETE,CHF CLOSED PER NCR 1-209.REEXAMINE    2/'l.
350  O'W-1000-90                    F-C        VT-3I4    HDE 4.3 - 021    C      C  7-30.88 VT-3,4:  INCOMPLETE THREAD SPRING BASE RESTRAINT ASSEMBLY F3.10      VT-3,4    NDE 4.3 - 056      C        ENGAGEMENT)HEAVY  RUST,CNF-88-1-006.
8-23-88 VT-3(4:  COMPLETE, CNF CLOSED OUT PER HCR 1-209.REEXAMIHE  2/1.
                                                                                          **H/Ala 033410  CW-1001-14A                    F-B        VT-3      HDE 4.3 - 036    C C        7-29-88 VT-3:  COMPLETE RIGID  SWAY STRUT              F3.10 033470  YPH-105                        F-C        VT-3      NDE 4.3 - 034    C C        7-29.88 VT-3:  COMPLETE SLIDIHG BASE SUPPORT ASSEMBLY  F3.10
                                                                                          **H/At*
ls l,
0
DATE:  11/14/88                            ST. LUCIE NUCLEAR PLANT UNIT 1 I SION:      0                        IHSERVICE INSPECTIOH
==SUMMARY==
REPORT OUl'AGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPONENTS CIRCULATING WATER INLET SUPPORTS H I  0 ZONE NUMBER:  109              ASME                                  S  OHGT SEC. Xl                              T  RSEH
==SUMMARY==
EXAMINATION AREA        CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENTIFICATION          ITEM HO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK*~
REF. DWG. NO. 01-109 033930  CW.999-75A              F-B        VT-3      HDE 4.3 - 033  C  C        7.29-88 VT-3:  COMPLETE RIGID  SWAY STRUT      F3.10 033980  CW.999-225A            F-B        VT-3      HDE 4.3 - 039  C  C        7-29-88 VT-3:  COMPLETE RIGID STRUT            F3.10 033990  CW.999-235              F-B        VT-3      HDE 4.3 - 038  C  C        7-29.88 V'I-3: COMPLETE BOX RESTRAINT          F3.10
0 DATE:  11/'l4/88                                  ST. LUCIE NUCLEAR PLANT UNIT 1                              PAGE: 48 I SION:      0                              IHSERVICE INSPECTIOH SUHHARY REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPOHEHTS CIRCULATING WATER INLET SUCTION SUPPORTS N I  0 20NE NUMBER: 110                      ASME                                  S  OHGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMINATION AREA                CATGY      EXAM                      A  E I 0 E  REMARKS NUHBER  IDENTIFICATION                ITEM HO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK**
REF. DWG. NO. 01-110 034240  ISH-2                          F-8        VT-3      HDE  4.3 - 026  C  C        7-28-88 VT-3: COMPLETE BOX RESTRAINT                  F3 '0 034250  ISH-3                          F.B        VT-3      NDE  4.3 - 024  C  C        7-28-88 VT-3: COMPLETE SADDLE RESTRAINT              F3. 10 034260  ISH-4                          F-8        VT-3        HDE 4.3 - 025  C  C        7-28-88 VT 3: COMPLETE SADDLE RESTRAINT              F3.10 270  ISH-5                          F.B        VT-3        HDE 4.3 - 030  C C        7-28-88 VT-3: COMPLETE BOX RESTRAINT                  F3.10
P f'~
i
DATE:  11/14/88                                      ST. LUCIE NUCLEAR PLANT UHIT 1 VISION:      0                                  INSERVICE IHSPECTIOH
==SUMMARY==
REPORT OUTAGE    1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPONENTS AUXILIARY FEEDWATER  PUMP 1C TO MAIN FEED'WATER SUPP H I  0 ZONE HUMBER: 112                        ASME                                    S  ONGT SEC. Xi                              T  RSEH
==SUMMARY==
EXAMIHATION AREA                CATGY        EXAM                      A  E I 0 E  REMARKS NUHBER  IDENTIFICATION                  ITEM HO      METHOD    PROCEDURE      T  C G M R  **CALIBRATIOHBLOCK**
REF. DWG. NO. 01-112 034620  BF-3.6                          F-8          VT-3      NDE 4.3 - 018  C  C        7-28-88 VT-3: COMPLETE RIGID TIE  BAR ASSEMBLY        F3. '10 034680  BF-4-1                          F-C          VT-3      HDE 4.3 - 017  C  C        7-28-88 VT-3: COMPLETED RIGID RESI'RAINT                F3.10
                                                                                              **H/AA*
034740  BF-4-8                          F-B          VT-3      NDE 4.3 - 019  C  C        7-28-88 VT-3; COMPLETE RIGID  SWAY STRUT              F3.10 o
s
      'l V cry a>
DATE:  11/14/88                                    ST. LUCIE HUCLEAR PLANT UNIT 1 vISION:      0                              INSERVICE INSPECTION
==SUMMARY==
REPORT 0                                          OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPOHENTS AUXILIARY FEEDIJATER.CONDENSATE TANK TO AUXILIARY F N I  0 ZONE NUMBER: 114                        ASME                                  S  OHGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMIHATION AREA                CATGY      EXAM                      A  E I 0 E  REMARKS HUMBER  IDENTIFICATION                  ITEM NO    METHOD    PROCEDURE      T  C G M R  **CALIBRATIONBLOCK*>>
REF. DUG. NO. 01-114 035190  BF-3-H1                        F-C        VT-3      HDE 4.3 - 016  C  C        7-28-88 VT-3: COMPLETE RESTRAINT                      F3.10
                                                                                            **H/A**
P II I II g,'
DATE:  11/14/88                                  ST. LUCIE HUCLEAR PLAHI'NIT 1                                      PAGE:    51 VISION:      0                              IHSERVICE INSPECTION
==SUMMARY==
REPORT OUTAGE  1  (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPOHEHTS AUXILIARY FEEDWATER TO MAIN FEEDWATER SUPPORTS H I  0 20HE NUMBER: 115                      ASME                                  S  OHGT SEC. XI                              T  RSEH
==SUMMARY==
EXAMINATION AREA              CATGY      EXAM                      A  E I 0 E  REMARKS NUMBER  IDENTIFICATION                ITEM NO    METHOD    PROCEDURE      T  C G M R  *~CALIBRATION BLOCK**
REF. DWG. HO. 01-115 035200  BF-4-H1                        F-C        VT-3      HDE 4.3 - 042  C        C  8-1-88 VT-3:  HEAVY CORROSION OH U BOLT RESTRAINT                      F3 '0      VT-3      NDE 4.3 - 059      C        ,CHF-88-1-009,FOLLOW UP  EXAM REQUIRED.
8 24-88 VT-3: COMPLETE,CNF CLOSED PER NCR 1-209.REEXAMINE 2/1 (ENVIRONMENT)
                                                                                        **H/A**
rq
    'lv
  >)
i I
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS I ~ ~ IMtaOeeesrs        As required by the provisions of the ASME Code Section XI Page  1 of  0
: 1.      OWNER:                  FLORIDA POWER 4 LIGHT CO.                    DATE! October 26, 1988 P.O. Box 529100 Miami, Florida 33152
: 2.        PLANT:                  St. LUcie Unit I                            UNITt P.O. Box 128 Fort Pierce, Florida WORK                                                                  JOB NO. PC/M: 178-188 PERFORMED                FPL Plant Construction BY:                      P.O. Box 14000                              CWO NO.:        6652 Juno Beach, Florida IDENTIFICATION                                                        PROCESS SHEET NO.:
OF SYSTEM:              ICW Lube Water Flange                          6652-1264 Rev. 20 Replacements                            6652-1269 Rev. 6 Repair Organization POf/, 3OBO, etc.
P.O. 0 C43967-65676 Type Code Symbol Stamp      N A Authorization No.                N/A Expiration Date                N/A ANSI B31.7 (1969)
: a. Applicable Construction Code SECTION III            Edition                        Addenda
: b. Applicable Edition of Section XI utilized for repairs or replacements: 1983 Summer 83 Addenda
: 6.        Identification of components repaired or replaced and replacement components Name of            Name of      Mfg's.      Nat'l          Other    Year  Repaired  ASM E Code Component            Mfg.          S/N        Bd. 4        Identif-  Built  Replaced    Stamped Ication          /Replace-    (Yes/No) ment Line No.
F lange          N/A        N/A          N/A      1-3"-CW-)01 1979;    Replaced        N/A Line No.
Flange          N/A                      N/A      1-3"-CW-302 1979    Replaced        N/A Line No.
Flange          Hub        N/A          N/A      1-3"-CW-301 1988    Replacement      N/A Line No.
F lange          I lub      N/A                    1-3"-CW-302 1988    Re'placement    N/A
Is
  ~ w'i t i',,
v3 I
Page  2  of  0 FORM NIS-2
: 7. Description of work:        Installed 2 new 3" - 150&#xb9; WNFF Flan    es
: 8. Tests Conducted:          Hydrostatic~pneumatic              Nominal Operating Pressure~g Other              Pressure~150    si Test Temp. 125 F.
: 9. Remarks:
Applicable Manufacturer's Data Report to be attached CERTIFICATE OF COMPLIANCE To  certify that the statements made in this report are correct  and this    Re lacement Repair or Replacement conforms to Section XI of the ASME Code.
I    ~
Signed: ~
(Owner or Owner's Designee)                Title                  Date CERTIFICATE OF INSPECTION Q  the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel W~I9~lf Inspectors and the State or Province of              Ohio                        employed by have inspected the t                  b<<k              I described in this gdhU,"i or replacement has been constructed in accordance with Section XI of the ASME Code. By signing pi this certificate, neither the Inspector nor his employer takes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor-his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with-this inspection.
  *Arkwright Boston Mutual Insurance Company Date:,        /~
Factory Mutual Systems (Inspector)
COMMISSION NO.
Commissions:        NB 7719 (State or Province, National Board)
          ~i, i r"
I 4
    <<M
~
l.nf  ~
k'
Page 3 of 0 NIS-2 SUPPLEMENTAL SHEET
: l. OWNER:          FLORIDA POWER R LIGHT CO.              DATE: October 26, 1988 P.O. Box 529100 Miami, Florida 33152
: 2. PLANT:          St. Lucie Unit I                      UNIT!
P.O. Box 128 Fort Pierce, FL
: 3. WORK                                                  3OB NO, PC/M    178-188 PERFORMED      FPL Plant Construction BY:            P.O. Box 14000                        CWO NO.:      6652 Juno Beach, FL
: 0. IDENTIFICATION                                        PROCESS SHEET NO.:
OF SYSTEM:      ICW Lube Water Flange Replacements    6652-1264 Rev. 20 6652-1269 Rev. 6
: 5. DESCRIPTION OF V/ORK:
Installed 2 new 3" - 150&#xb9; WNFF Flanges
e ~ ~l W Page  4  of 4 NIS-2 SUPPLEMENTAL SHEET
: l. OWNER:              FLORIDA POWER      dc LIGHT CO.              DATE: October 26, 1988 P.O. Box 529100 Miami, Florida 33152
: 2. PLANTt              St. Lucie Unit I                              UNIT:    1 P.O. Box 128 Ft. Pierce, PL
: 3. WORK .                                                            3OB NO. PC/M 178-188 PERFORMED          FPL Plant Construction BY:                P.O. Box 14000                                CWO NO.:      6652 Juno Beach, FL IDENTIFICATION                                                    PROCESS SHEET NO.:
OF SYSTEM!          ICW Lube Water Flange Replacements            6652-1264 Rev. 20 6652-1269 Rev. 6
: 5. ADDITIONALMATERIAL (Excluding Welding Material)
Heat/Lot No.
or CFC or Manufacturer            Specification              Type R Description            RIR/Report Hub AShiE-SA-105            3" - 150&#xb9; WNPP Plange                  &#xb9; HT. GCYV Grade B                                                    3R 7072A AS ME-SA-105            3" - 150&#xb9; WNPP Flange              HT.&#xb9;  XS2Z Grade B                                                    3R 7072B
4
'km
  ~ f Jv h.
l I'
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS
~ t>>,  in ~ t&tsttsaresss          As required by the provisions of the ASME Code Section XI'age I of rJ'.
OV/NER:                    FLORIDA POWER      tEt LIGHT CO.              DATE: October 24, 1988 P.O. Box 529100 Miami, Florida 33152
: 2.      PLANT:                    St. Lucie Unit I                                UNIT:
P. O. Box 128 Ft. Fierce, Florida
: 3.      V/ORK                                                                      3OB NO. PC/M: N/A PERFORMED                  FPL Plant Construction BY:                        P. O. Box 14000                                CWO NO.:              6745 Juno Beach, Florida
: 0.      IDENTIFICATION                                                            PROCESS SHEET NO.:
OF SYSTEM:                Diesel Oil Line                                6745-1381 Rev. 2 6 1382 Rev.0 FPL/Backf it Repair Organization
                        *P.O. Number - NY 422524 (Fipe)                                PO&#xb9;, 3OB&#xb9;, etc.
                        *P.O. Number - 43967-99153B (Elbows      C. Couplings)
Type Code Symbol Stamp            N/A Authorization No.                  N/A Expiration Date                  N/A ANSI B31.7 (1969)
S.      a. Applicable Construction Code SECTION El                  Edition                                Addenda
: b. Applicable Edition of Section XI utilized for repairs or replacements:            1983 Summer 83 Addenda
: 6.      Identification of components repaired or replaced and replacement components See Page 4 of 4 for material list Name of              Name of      Mfg's.      Nat'l            Other    Year  Repaired      ASME Code Component              Mfg.          SJTN      Bd. &#xb9;          Identif-  Built  Replaced        Stamped ication          /Replace-        (Yes/No) ment Pipe and Line No. DO-13 Elbows                                N/A      N/A          per NCR 1-245        Replaced              N/A Pipe and                                                    Line No. DO-14 Elbows                  N/A          N/A      N/A          per NCR 6745-2215M    Replaced              N/A SEB PAGE 4 OF 4 FOR REPLACEMENT MATERIALON LINE DO-13 SBE PAGE 4 OF 4 FOR REPLACEMENT MATERIALON LINE DO-14
f g5 H.
-Pg
~
Page    2 of' FORM NIS-2
: 7. Description of work:        See su  lement sheet for descri tion of work Pa~e  3 S. Tests Conducted:          Hydrostatic      Pneumatic  X    Nominal Operating Pressure      4o Other              Pressure~ltu    si Test Temp. 120 F.
: 9. Remarks:
(Applicable Manufacturer's Data Report to be attached)
CERTIFICATE OF COMPLIANCE To  certify that the statements made in this report are correct  and this    Re lacement Repair or Replacement conforms to Section XI of the ASME Code.
0 Signed:
(Owner or Owner's Designee)              Title                  Date CERTIFICATE OF INSPECTION lp the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                        Ohio                  employed by report on      ciao  e'9 have inspected the                                              described in this H and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer takes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner.fqr any personal injury or property damage or a loss of any kind arising from or connected with this inspection.            s
  *Arkwright Boston Mutual Insurance                                                            C CompanY FactorY hfutual SYstems Date:      /~P-    .&#xc3;                                        Commissions:        NB 7719 (Inspector)                    (State or Province, National Board)
  . l V
i/
Page  3 of 0 NIS-2 SUPPLEMENTAL SHEET
: 1. OWNER:          FLORIDA POWER R LIGHT CO.            DATE:    October 24, 1988 P.O. Box 529100 Miami, Florida 33152
: 2. PLANT:          St. Lucie Unit I                      UNIT:
P. O. Box 128 Pt. Pierce, Florida
: 3. WORK                                                  3OB NO. PC/M      N/A PERFORMED      FPL Plant Construction BY:            P. O. Box 14000                      CWO NO.:    6745 Juno Beach, Plorida IDENTIFICATION                                        PROCESS SHEET NO.:
OF SYSTEM:      Diesel Oil Line                    6745-1381 Rev.2 6745-1382 Rev.0
: 5. DESCRIPTION OF WORK:
Repair Line  &#xb9; 1-2"-DO-14 Repair Line  &#xb9; I-2"-DO-13
                    'p ~
c' f
4 '"< 4l ~ IeC u+
Page  1 of 0 NIS-2 SUPPLEMENTAL SHEET
: 1.      OWNER:              FLORIDA POWER R LIGHT CO.                DATE:    October 24, 1988 P.O. Box 529100 Miami, Florida 33152 St. Lucie Unit I                          UNIT:
P. O. Box 128 Ft. Pierce, Florida
: 3.      WORK                                                          JOB NO. PC/M      N/A PERFORMED          PPL Plant Construction BY:                P. 0. Box 14000                          CWO NO.:    6745 Juno Beach, Florida IDENTIFICATION                                                PROCESS SHEET NO.:
OF SYSTEM:          Diesel Oil Line                            6745-1381 Rev.2 6745-1382 Rev.0
: 5.      ADDITIONALMATERIAL (Excluding Welding Material)
Heat/Lot No.
or CFC or Manufacturer              Specification          Type R Description            RIR/Report 2R 5771A B.P. Shaw
  ~  ~                        ASME-SA 106 GR.B      2"SCH. 40 Pipe              HT&#xb9; L83791 ASTM A105                                          2R 5807 Hub. Inc.                    ASME SA105              2" 3000&#xb9; 90  Elbow          HT&#xb9; MA81 ASTM  A 105                                        ZR 5807 Hub. Inc.                    ASME SA105            2" 3000&#xb9; CPLG                HT&#xb9; CR85
+q ~
    ~ ~
A V
lI p la
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS lg    ~ g g pool ~ Caeaate      As required by the provisions of the ASME Code Section XI Page  I of  0 I.        OV/NER:                  FLORIDA POSER R LIGHT CO.                        DATE:      October 20, 1988 P.O. Box 529100 Miami, Florida 33152
: 2.        PLANT:                  St. Lucie Unit I                                UNIT:
P. O. Box 128 Ft. Pierce, Florida
: 3.        V/0RK                                                                    3OB NO. PC/M:      179-188 PERFORMED                FPL Plant Construction BY:                      P.O. Box 14000                                  CWO NO        6740 Juno beach, Florida IDENTIFICATION                                                            PROCESS SHEET NO,:
OF SYSTEM:              Auxiliary Feedwater Pipe                            179-188-1376 P.ev. I FPL Backfit Repair Organization PO&#xb9;, 3OB&#xb9;, etc.
PO&#xb9; 61215-51388
                                                                                  . 'ype  Code Symbol Stamp    N/A Authorization N/A Expiration Date      N/A ANSI B31.7 (1969).
: 5.        a. Applicable Construction Code SECTION III              Edition                        Addenda
: b. Applicable Edition of Section XI utilized for repairs or replacements: 1983 Summer 83 Addenda
: 6.        Identification of components repaired or replaced and replacement components See Page 4 of 4 for material list Name of                Name of    Mfg's.      Nat'l          Other    Year    Repaired  ASME Code Component                Mfg.        S/N        Bd. &#xb9;        Identif-    Built    Replaced    Stamped ication            /Replace-    (Yes/No) ment Line No. I-2-BF-Pipe                                N/A Between Veld Nos.      Replaced      N/A 7B and 12 SE PAGE 4 OF 4 FOR REPLACEMENT PIPE
J t
a'I",
4
Page  2  of  0 FORM NIS-2
: 7. Description of work:        See Su    lement Sheet for descri tion of work Pa e    3
: 8. Tests Conducted:        'ydrostatic      X Pneumatic          NomInal Operating Pressure Other              . Pressure~1562 si Test Temp. l20 P.
: 9. Remarks:
(Applicable Manufacturer's Data Report to be attached)
CERTIFICATE OF COMPLIANCE To  certify that the statements made in this report are correct      and this    Re lacement Repair or Replacement conforms to Section XI of the ASME Code.
Signed:
(Owner or Owner's Designee)                  Title                    Date CERTIFICATE OF INSPECTION I, the Undersigned, holding a valid commission issued by the-National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                  Ohio                          employed by p        eu
                    - have inspected 19' or replacement has been constructed the
                                                <<  I2.
                                                      <<h in accordance  with Section  Xl I
of 1dg the ASME described hUf, in this Code. By signing this certificate, neither the Inspector nor his employer takes any warranty,          expressed  or implied, concerning the repair or replacement described in this report. Furthermore,          neither  the  Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected. with this inspection-
* Arkwright Boston Iiutual Insurance Company Factory I.futual Systems                              COMMISSION NO.
Date:      /0-~-g6                                              Commissions:
(Inspector)                      (State or Province, National Board)
fr 0
gC
"(
Page  3  of  0 NIS-2 SUPPLEMENTAL SHEET
: l. OWNER:          FLORIDA POWER 4 LIGHT CO.                DATE: October 20, 1988 P.O. Box 529100 Miami, Florida 33152
: 2. PLANT:          St. Lucie Unit I                          UNIT:      I P. O. Box 128 Ft. Pierce, Florida
: 3. WORK                                                      3OB NO. PC/M    179-188 PERFORMED      FPL Plant Construction BY:            P. 0. Box 14000                          CWO NO.:
Juno Beach, Florida IDENTIFICATION                                            PROCESS SHEET NO.:
OF SYSTEM:      Auxiliary Feedwater Pipe                  179-188-1376 Rev.l
: 5. DESCRIPTION OF WORK:
Replacement of Two Inch Carbon Steel Pipe
E I
t!
i~).
jf f>
pl~
4>i
Page  0  of 0 NIS-2 SUPPLEMENTAL SHEET 0
: 1. OWNER:            FLORIDA POWER R LIGHT CO.                  DATE: October 20, 1988 P.O. Box 529100 Miami, Florida 33152
: 2. PLANT:              St. Lucie Unit I                          UNIT:
P. 0. Box 128 Ft. Pierce, Florida
: 3. WORK                                                          3OB NO. PC/M      179-188 PERFORMED          FPL Plant Construction BY:                P. 0. Box 14000                            CWO NO.:      6740 Juno Beach, Florida IDENTIFICATION                                                PROCESS SHEET NO.:
OF SYSTEM:          Auxiliary Feedwater Pipe                    179-188-1376 Rev.l
: 5. ADDITIONALMATERIAL (Excluding Welding Material)
Heat/Lot No.
or CFC or Manufacturer            Specification          Type 8 Description            RIR/Report AStfE-SA 106                                          2R 9167 McJunkin Corp.          Grade B              2" SCH. 160 C/S Pipe (SEILS)    HTg N14724
V  4 ~
                  ~ I  l Ql l
P,'r
      ~c, h
C'~ a
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the provisions of the ASME Code Section XI Page  I of  0 I~    OWNER:                FLORIDA POWER 8( LIGHT CO.                      DATE!
P.O. Box 529100                                          3/31/87 Miami, Florida 33152
: 2. PLANT:                      LUCIE'NIT I                                UNIT:
ST.
P.O. BOX 1200 JENSEN BEACH,FLA. 33457
: 3. WORK                                                                  3OB NO. PC/M:
PERFORMED                                                                                98-186 FPL PLANT CONSTRUCTION BY:                                                                    CWO NO.:
P.O. BOX 1400 JUNO BEACH, FLA. 33408                                            6566 TIFICATI N                                                      PROCESS SHEET NO.:
HYDROGEN PURGE PENETRATION                                        1122 VALVES                                            FPL/BACKFIT Repair Organization p~
POP, 3OB/P, etc.
P.O .&#xb9;43967-99250B/P .0 .&#xb9;C08068-37232 Type Code p  ppp Authorization No.                NA Expiration Date                NA
* CODE CASE    N62-2(1621-2) WHERE APPLICABLE
: 5. a. Applicable Construction Code SECTION 111~80 Edition          SUMMER  1982          Addenda  *
: b. Applicable Edition of Section XI utilized for repairs or replacements:      1980 EDITION,WINTER 198(
p>>
: 6. Identification of components repaired or replaced and replacement components Name of Component Name of Mfg.    '/N  Mfg's.. Nat'l Bd. a Other Identif-ication Year Built Repaired Replaced
                                                                            /Replace-ASME Code Stamped (Yes/No) ment I-V-25-11      PACIFIC      48412                AT PEN.&#xb9;56              REMOVED          NO I-V-25-13      PACIFIC      48412                AT PEN  ~ &#xb9;57            REMOVED          NO
  -V-25-15      PACIFIC      48416                AT PEN.&#xb9;58              REMOVED          NO I-V-25-11      A.DARLIN E-A108-1-1        NA    AT PENs&#xb9;56      1987    REPLACED          YES
  - 13      A. DARL IN  E-A108-1-2    NA    AT  PEN.&#xb9;57      1987    REPLACED          YES A. DARLIN E-A108-1-3        NA    AT PEN.&#xb9;58      1987    REPLACED          YES II                                                                1984 P        HUB          NA                                            REPLACED        NO
                    ~
                      ~
4 t'(
-4 Y P T +
I
  .k f 'I 0
Page  2  of 0 FORM NIS-2
: 7. Description of work:      SEE SUPPLEMENTAL SHEET FOR DESCRIPTION OF WORK PG.3 OF 4
: 8. Tests Conducted:        Hydrostatic      Pneumatic f      Nominal Operating Pressure Other              Pressure~pi      si Test Temp.
* P.~AYBIENT
: 9. Remarks:                                                ATTACHED Applicable Manufacturer's Data Report to be attached CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this      REPLACEMENT Repair or Replacement conforms to Section XI of the ASME Code.
Signed:
(Owner or Owner's Designee)
Xiii Title /4j<          +A~A9P,P~~~
Date
                                                                                                ~ ~
                                                                                                        /g CERTIFICATE OF INSPECTION I9 the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                                              employed by
* have inspected the HYoROGEN                                      described in this report on                  19~P    and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furth'ermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
* ARKWRIGHT BOSTON MUTUAL INSURANCE COMPANY FACTORY MUTUAL SYSTEMS                            COMMISSION NO.
Commissions:
Inspector                      (State or Province, National Board
      ~ C f
$ 'I 44 0
Page  3 of 0 NIS-2 SUPPLEMENTAL SHEET
: l. OWNER:            FLORIDA POWER R LIGHT CO.                DATE:
P.O. Box 529100 Miami, Florida 33152
: 2. PLANT:            ST. L'UCIE-I                              UNIT:
P.O. BOX 1200 JENSEN BEACH,FLA. 33457
: 3. WORK                                                        JOB NO. PC/M FPL PLANT CONSTRUCTION P.O. BOX 1400 CWO NO.:
JENSEN BEACH,FLA. 33408                              6566 IDPNT[FICATION                                              PROCESS SHEET NO.:
OF SYSTEM:                                                        98-186-1122 H2 PURGE PENETRATIONS
: 5. DESCRIPTION OF WORK:
THIS WORK IS FOR THE REPLACEMENT OF THE INBOARD-VALVE (VALVE CLOSEST TO THE" REACTOR CONTAINMENT VESSEL) ON CONTAINMENT PENETRATIONS P-56,P-57 AND P-58. THE EXISTING VALVES HAVE FLANGED ENDS AND THE NEW VALVES ARE BUTT WELDED. THIS MODIFICATION IS BEING IMPLEMENTED TO IMPROVE THE CONTAINMENT VESSEL INTEGRITY WITH RESPECT TO,POST ACCIDENT LEAKAGE RATES BY REPLACING FLANGED CONNECTIONS WITH WELDED CONNECTIONS.
Pl
  ~(g 4
4~ )y
        'h
    \
      ~    r Page  0 of  0 NIS-2 SUPPLEMENTAL SHEET
: l.      OWNER:              FLORIDA POWER R LIGHT CO.                      DATE:
P.O. Box 529100 Miami, Florida 33152
: 2.        PLANT:              ST. LUCIE I                                    UNIT:
P.O. 30X 1200 JENSEN BEACH,FLA. 33457
: 3.        WORK                                                              3OB NO. PC/M 98-186 PERFORMED          FPL PLANT CONSTRUCTION BY:                P.O. BOX  1400                                CWO  NO,'566 JENSEN BEACH,FLA  ~ 33408
: 0.        IDENTIFICATION                                                    PROCESS SHEET NO.:
OF SYSTEM:          H2 PURGE PENETRATIONS 98-186-1122
: 5.        ADDITIONALMATERIAL (Excluding Welding Material)
Heat/Lot No.
or CFC or, Manufacturer            Specification              Type dc Description            RIR/Report ANCHOR/DARLING CO.                                    I -V-25-11                      RI R  &#xb9; W I LLIAHS PORT, PA.      SA 216-WCB                3" GATE VALVE                  2R  8056 ANCHOR/DARLING CO.                                    I-V-25-13                      RIR  &#xb9; WILLIAMSPORT, PA.          SA 216-WCB                3"  GATE VALVE                  2R 8056 ANCHOR/DARLING CO.                                    I -V-25-15                      RIR  &#xb9; WILL IANSPORT, PA.          SA 216-WCB                3"  GATE VALVE                  2R 8056 HUB INC ~                    SA 106                    3" S/40                        HT. &#xb9;Y86126 TUCKER GEORGIA              GRADE B                    PIPE                            RI R&#xb9; 2R6052
                                                          ~ ~,
a
'PF f
: j. -y
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the provisions of the ASME Code Section XI Page  1 of  0
: 1. OWNER:                FLORIDA POWER R LIGHT CO.                      DATEs P.O. Box 529100 3/] 7/87 Miami, Florida 33152
: 2. PLANT:                ST. LUCIE UNIT    1 UNITs P.O, BOX 1200 JENSEN BEACH,FLA 33457 JOB NO. PC/M:
PERFORMED            FPL PLANT CONSTRUCTION                                  28-187 BY:                    P.O. BOX 1400                                CWO NO.:
JUNO BEACH,FLA    33408                                6581 PROCESS SHEET NO.:
OF SYSTEM:            REFUELING WATER STORAGE                                        28-187-1154 TANK/NOZZLE REPLACEYENT                      FPL/BACKFIT Repair Organization PO/$ , 3OB/k, etc.
PO&#xb9; C43967-97915 Type Code Symbol Stamp Authorization No.
                                                  *AWWA  0100-1972        Expiration NA
                                                  *ANSI 896.1-1972        Date
: 5. a. Applicable Construction Code SECTION iE
* Edition                          Addenda
: b. Applicable Edition of Section XI utilized for repairs or replacements:1974      thru  Sum.75 ADOENDA
: 6. Identification of components repaired or replaced and replacement components Name of      Name of      Mfg's.      Nat'1          Other    Year    Repaired    ASME Code Component        Mfg.        S/N      Bd. 0        Identif-  Built  Replaced      Stamped ication          /Replace- (Yes/No) ment 3>> NOZZLE      CHICAGO LOCATIIIN 148o  RWST                    NA                      AT 148      1972    REMOVED    NO 3"  NOZZLE SEE PAGE          REPLACE-148  RWST  ,
HUB  INC.      NA          iVA          4 OF 4      1987  YrNT        NO
$  C,
~ll~
-p'Ps L
'j,;
: g. ~
0
Page  2  of  0 FORM NIS-2
: 7. Description of work:      SEE SUPPLEt~ENT SHEET FGR DESCRIPTION OF ':ORK PG.3 OF 4
: 8. Tests Conducted:        Hydrostatic      Pneumatic    X  Nominal Operating Pressure Other              Pressure~ly      si Test Temp. * .FP(AH81ENT)
: 9. Remarks:                                                NA Applicable Manufacturer's Data Report to be attached CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this Repair or Replacement conforms to Section XI of the ASME Code.
Signed:
(Owner or Owner's Designee)                Title                  Date CERTIFICATE OF INSPECTION Q  the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel. Inspectors and the State or Province of                  OHIO              -
employed by have inspected the      RWST NOZZLE FOR LINE I-3"-CS-46          described in this report on                  19~      and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
* ARKQRIGHT BOSTON MUTUAL INSURANCE COMPANY FACTORY MUTUAL SYSTEt':S COMMISSION NO.
r Elate:                                                        Commissions:
Inspector                      (State or Province, National Bo rd
t I ~
12 C
Page  3  of 0 NIS-2 SUPPLEMENTAL SHEET
: 1. OWNER:            FLORIDA POWER 4 LIGHT CO.
P.O. Box 529100 o~~E:  3/jg/87 Miami, Florida 33152
: 2. PLANT:            ST. LUCIE-1                              UNIT:
P.O. BOX 1200 JENSEN BEACH,FLA 33457
: 3. WORK                                                        JOB NO.
PERFORMED                                                            PC/M'8-187 FPL PLANT CONSTRUCTION BY:                P.O. BOX 1400                          CWO NO.:
JUNO BEACH,FLA  33408                              6581 IDENTIFICATION                                              PROCESS SHEET NO.:
OF SYSTEM:        REFUELING WATER STORAGE                              28-187-1154 TANK/NOZZLE REPLACEMENT
: 5. DESCRIPTION OF WORK:
THIS WORK IS FOR THE REPLACEMENT OF THE REFUELING WATER TANK (RWT) NOZZLE FOR LINE I-3"-CS-46. THE EXISTING NOZZLE HAS EXTENSIVE PITTING AND CORROSION, THEREFORE IT WAS CONDISERED ADVISIBLE TO REPLACE IT.
l 4
1~'~a>
4
Page 0 of  0 NIS-2 SUPPLEMENTAL SHEET
: l. OWNER:              FLORIDA POWER R LIGHT CO.                      DATE:  ~/ I 7/&7 P.O. Box 529100 Miami, Florida 33152
: 2. PLANT:                                                            UNIT:
ST. LUCI E 1 P.O. BOX 1200
: 3. WORK                JENSEN BEACH,FLA 33457                        JOB NO. PC/M PERFORMED BY:                FPL PLANT CONSTRUCTION P.O. BOX  1400 CWO  NO,'581 IDENTIFICATION      JUNO BEACH, FLA    33408                      PROCESS SHEET NO.:
OF SYSTEM:
REFUELING WATER STORAGE                                  28-187-1154 REPLACEMENT ATEggg/NOZZLE (Excluding Welding Material)
Heat/Lot No.
or CFC or Manufacturer          Specification                Type 4 Description            RIR/Report HUB  INC.              ASME-SB 241
* HEAT  &#xb9;14855 TUCKER, GEORGIA        ALLOY 6061 T6              3" SCH. 80  ALUMINUM PIPE      RIR &#xb9;7886 HUB, INC.              ASME-SB247                  3" 150 &#xb9;STD. SLIP-ON          HEAT &#xb9;XA 107 TUCKER, GEORGIA        6061 T6                    FLANGE RF                      RIR &#xb9;7878'3 HUB  INC.              AS ME-SB 209                13/16"PLATE (RADIUS)          HEAT  &#xb9;531191 TUCKER, GEORGIA        6061 T651                  SB209T6061 T651                RI R &#xb9;7869 MATERIAL IN ACCORDANCE WITH FCR 1222
                                                  ~ ~
k}}

Latest revision as of 14:20, 4 February 2020

Inservice Insp Rept for Second 10 Yr Interval
ML17222A600
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/30/1988
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17222A599 List:
References
NUDOCS 8812080235
Download: ML17222A600 (232)


Text

Page 1 of 10 FORM NIS-1 OWNERS'REPORT FOR INSERVICE INSPECTIONS As required by the provisions of the ASME CODE RULES

1. Owner Florida Power 6 Li ht Co. P.O. Box 14000 Juno Beach Fl. 33408
2. PLANT St. Lucie Nuclear Power Plant P.O.Box 128 Ft.Pierce Fl. 33454
3. Plant Unit 1
7. Components Inspected Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No REACTOR VESSEL COMBUSTION ENG. CE-67109 N/A N/A RPV CLOS. HEAD COMBUSTION ENG. CE-67229 N/A N/A STM GEN.1A COMBUSTION ENG. CE-67508 N/A N/A RESSURIZER COMBUSTION ENG. CE-67604 N/A N/A

.C.PUMP 1A1 BYRON JACKSON 681-N-445 N/A N/A REACTOR COOLANT EBASCO Pg. 7 of 10 N/A N/A SAFETY INJ.CL.1 EBASCO Pg. 7 of 10 N/A N/A CHARGING EBASCO Pg. 7 of 10 N/A N/A MAIN STEAM EBASCO Pg. 7 of 10 N/A N/A FEEDWATER EBASCO Pg. 7 of 10 N/A N/A 88i2080235 SSii30 PDR ADOCK 05000335 O PDC ote: Suppl'cmental sheets in form of lists, sketches, or drawings may be used, provided, (1) size is 8 1/2 in. x 11 in.; (2) information in items 1 through 6 on this report is included on each sheet; and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

>p;

' C i4 g I

Page 2 of 10 NIS-1 REPORT (Continued)

8. Examination Dates: 7-11-1988 to 9-1-1988
9. Inspection Interval: Second 10 Year 02-11-88 to 02-10-98 First Period 02-11-88 to 02-10-91
10. Abstract of Examinations The Inservice Examination of selected Class I and II components and piping systems of Florida Power and Light Company's St.Lucie Plant, Unit 1, was performed during the refueling outage which began on July 11, 1988. This was the first outage in the first inspection period of the Second 10-year Interval (Program B).

The components and piping systems examined were selected per the Second Ten Year Inspection Plan, which was prepared per the requirements of Section XI of the ASME Code, 1983 Edition, through Summer of 1983 addenda and Code Case N-408.

Manual Ultrasonic, Liquid Penetrant, Magnetic Particle, and

.Visual nondestructive techniques were used in the examination of the selected components, piping systems, and their supports.

See attached Summary Tables for complete examination results.

Eddy Current examinations were conducted by Combustion Engineer-ing from July 20, 1988 through August 6, 1988 on lA and 1B Steam Generators. There were 8057 tubes examined in Steam Generator lA, and 8161 tubes were examined in Steam Generator 1B. See the attached NIS-BB report for the summary of examination results.

The augmented Feedwater Nozzle follow up examination program continued this outage. One hundred percent of the area from the nozzle ramp out to a point of one pipe diameter on the elbow side was examined using ultrasonics.

Snubber functional testing and visual examinations were conducted in accordance with St. Lucie Unit-1 Plant Technical Specifi-cation 4.7.10. Examination and testing services were supplied by Wyle Laboratories.

System pressure testing was conducted by the plant to applicable Plant Technical Specifications and Procedures. The Instrumented Inspection Technique . was used as applicable. A summary of the specific systems tested is included in this report on Page 6.

D ia (

Page 3 of 10 NIS-1 REPORT (Continued) ll. Conditions Noted

12. Corrective Measures Recommended and Taken CLASS I REACTOR VESSEL A visual (VT-3) examination (B-N-1) was conducted on accessible areas of the vessel interior. Ultrasonic examinations were performed on 1/3 of the vessel to,flange weld and on 1/3 of the flange ligament area. No rejectable indications were noted. One third of the flange to head weld and one head meridional weld were examined using ultrasonic and magnetic particle techniques.

No rejectable indications were noted.

STEAM GENERATOR lA (PRIMARY SIDE)

The nozzle inner radius section on the two (2) reactor coolant outlet nozzles were volumetrically (UT) examined. No recordable indications were noted.

PRESSURIZER Volumetric (UT) examinations were conducted on the upper shell to head weld and the upper shell longitudinal weld. In addition, the support skirt to lower head weld was surface (MT) examined.

No recordable indications were noted.

REACTOR COOLANT PUMPS Surface (PT) examinations were performed on 1A1 reactor coolant pump support integral attachments. No recordable indications were noted.

MAIN REACTOR COOLANT PIPING Surface (MT,PT), and volumetric (UT) examinations were conducted on eight (8) circumferential welds, ten (10) longitudinal welds, and three (3) branch connection welds. No rejectable indications were noted. This included two (2) welds on the surge line.

REACTOR COOLANT PIPING Visual, surface, and volumetric examinations were conducted on selected piping welds, valves, and supports. No rejectable indications were noted.

a Jj<a I-

Page 4 of 10 NIS-1 REPORT (Continued)

11. Conditions Noted
12. Corrective measures Recommended and Taken CLASS I (Cont.)

SAFETY INJECTION/CHARGING PIPING Visual, surface, and volumetric examinations were conducted on selected piping welds, valves, and supports. Visual examination revealed incomplete thread engagement on valve V-1405 (one stud/

nut) and flange FE-3321. Per Plant procedures, the bolting was adjusted to meet minimum thread engagement and re-examined.

Valves V-3227 and V-3124 were found to have boric acid buildup at bolted connections (Cover Plates). The affected areas were cleaned, bolting tightened, and re-inspected satisfactory.

Visual examination revealed support I SIH-199 had a loose nut on a U-bolt. This was evaluated as improper installation. Six (6) other supports of the same type were inspected showing no discrepant conditions per IWF-2430. The four (4) bolts which connect the spring can base plate to the pedestal on support CH-129-316, were identified as being inadequately engaged. The condition was evaluated acceptable as is.

CHEMICAL AND VOLUME CONTROL Visual, and surface examinations were conducted on selected piping welds, valves, and supports. No recordable indications were noted.

CLASS IZ MAIN STEAM Visual(VT-3), surface (MT), and volumetric (UT) examinations were conducted as applicable on selected piping welds, supports and integral attachments. No rejectable indications were noted.

MAIN FEEDWATER Surface (MT) and volumetric (UT) examinations were conducted as applicable on seven (7) piping welds. Surface Examination revealed indications in the area of interest of two welds (BF-14-4-SW-1 & BF-51-FW-2B). The indications were evaluated as tooling marks and the area of concern was subjected to additional surface prep, re-examined and found acceptable.

Augmented examinations were done on the feedwater nozzle for 1B steam generator. Several geometric indications were recorded and determined to be due to root geometry and nozzle transition.

~+t

~l E

>dg i1 t

Page 5 of 10 NIS-1 REPORT (Continued) ll. ConditionsRecommended

12. Corrective measures Noted and Taken SAFETY INJECTION/CONTAINMENT SPRAY PIPING Visual, volumetric, and surface examinations were conducted on selected piping welds, valves and supports. No rejectable indica-tions were noted.

SNUBBER EXAMINATION AND TESTING Visual examination was conducted on 1004 of the Plants'nubber population per the Plant Technical Specifications. A failure in the initial ten percent functional test sample and failures in the next two test samples resulted in a total of 132 snubbers being functionally tested. Complete examination and test results are on file at the Plant. A summary of the functional test results is included with this report.

SYSTEM LEAKAGE/PRESSURE TESTING The system leakage tests and visual (VT-2) examinations of class I systems were performed- by the Plant prior to plant startup.The system leakage test was conducted during Reactor Coolant (RCS) overpressure. The pressure testing documented on page 6 of this report includes all testing done from 4/16/87 up to 8/28/88.

The Pressure test requirements for the first Ten Year Interval have been met. Documentation packages for all the system leakage tests and pressure tests are'n file at the Plant Site.

All the above conditions were dispositioned in accordance with Plant Procedures.

The Examination Summary Tables included with this Report provide the results for the non-destructive examinations performed.

An explanation of the Summary Table format is also included.

N 4

~

+

8 I.

Page 6 of 10 NIS-1 REPORT(Continued)

Pressure Testing Summary Report Test No. System Description Method/Type Results 1-IPT-07 RCS System Leakage SYS. LEAK Packing gland leakage four valves, test sat.

1-IPT-16 3"-CS-108 & 3"-CS-109 HYDROSTATIC Satisfa'ctory 1-IPT-17 "A" Aux.feedwater pump Satisfactory discharge 1-IPT-18 "B",Aux.feedwater pump Satisfactory discharge 1-IPT-19 "C" Aux.feedwater pump Packing gland leakage discharge two valves,2-4 dpm one valve check body hinge plugs,3 dpm,Sat.

1-IPT-26 Containment spray NAOH lines Satisfactory 1-IPT-27 Intake cooling water lube water 1A HYDROSTATIC Satisfactory pump 1B Satisfactorv 1C 5 dpm leak HCR 1-105 1-IPT-29 A Charging pump disch. Satisfactory 1-IPT-33 B Charging pump disch. Satisfactory 1-IPT-34 C Charging pump disch. Satisfactory 1-IPT-36 A,B,&C AFW Suction Satisfactory 1-IPT-37 Atmospheric storage Hydrostatic Satisfactory CCW.Surgy tk RWST,CST, Boric Aczd mfcup Spent Fuel pool,diesel oil 1-IPT-38 Spenf Fuel pool, intake Hydrostatic Satisfactory cooling water dxsch.

1-IPT-40 NaOH Tank Hydrostatic Satisfactory 1-IPT-41 SI from HCVs TO check Unsatisfactory valves (4 LINES) seat leakage: 3 valves 1-IPT-41 SI retest between HCV anh check valves.

Satisfactory 1-IPT-42 1A,1B Diesel oil Hydrostatic Satisfactory transfer pump suction 1-IPT-43 Shutdown cooling tie Hydrostatic Satisfactory lines 1-IPT-44 LP & HP SI recirc.line Hydrostatic Satisfactory 1-IPT-45 S.

1A2 I. Tanks 1B1, 1B2, 1A1 Hydrostatic Satisfactory 1-IPT-46 1A & 1B Diesel Qil Hydrostatic Unsatisfactory thru Transfer pump dz.sch. wall leakage zn two locations, repaired NCR-1-245 1-240 per

Page 7 of 10 NIS-1 REPORT (Continued)

Line numbers for the Piping systems with items examined (NDE) this outage.

CLASS I REACTOR COOLANT SAFETY INJECTION CHARGING/LETDOWN I-42-RC-123 I-12-SI-148 I-2-CH-147 I-30-RC-112 I-6-SI-110 I-2-CH-148 I-30-RC-115 I-6-SI-112 I-12-RC-108 I-6-SI-113 I-12-RC-151 I-3-SI-140 I-3-RC-109 I-2.5-RC-157 I-2-RC-116 I-2-RC-125 I-2-RC-142 CLASS IZ MAIN STEAM MAIN FEEDWATER

-I-35.5-MS-3 I-20-BF-14 I-34-MS-29 I-20-BF-55 I-34-MS-28 I-18-BF-51 I-18-BF-52

~ ~

~ ~

lh P,,ii'4 Il I

1'"-

~P q fl!l 2y

Page 8 of 10 NIS-1 REPORT(Continued)

We certify that the statement made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No.~N A Expiration Date N A Date I l Z I Q Signed Florida Power & Li ht Co. By Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the Mutual Insurance Com an w

National Board of Boiler and Pressure Vessel Inspectors and /

of Norwood Mass. have inspected the components described in this Owner's Data Report during the period 11 Jul 1988 to 1 Se tember 1988 and state that to the best of my knowledge and belief, the owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Inspector's Signature Commissions k'F National Board, State, Province, and Endorsements Date I 2

A Pj;"

Page 9 of 10 NIS-1 REPORT

l. Owner: Florida Power and Liciht ~Co. 700 Universe Blvd.

Juno Bch. FL. 33408

2. Plant: St. Lucie Nuclear Power Plant P.O.Box ~128 Ft. Pierce FL. 33454 3.Plant Unit: 1 4.Owner Certificate of Authorization ~N A 5.Commerical Service Date: 21 December 1976 6.Unit National Board No. A ~N REPORT NUMBER ORGANIZATION DESCRIPTION OF SERVICES JNS-PSL-100-88 FPL INSERVICE INSPECTION FINAL REPORT FPL EDDY CURRENT EXAMINATION OF STEAM GENERATORS FINAL REPORT CE EDDY CURRENT EXAMINATION OF STEAM GENERATORS FPL SNUBBER VISUAL EXAMINATION AND FUNCTIONAL TESTING FINAL REPORT 1 IPT 07F 1 IPT 16F TEST DOCUMENTATION FOR 1-IPT-17,thru 1-IPT-19, INSERVICE PRESSURE TESTING 1 IPT 26F 1 IPT 27 F 1 IPT 29F 1 IPT 33F 1-IPT-34, 1-IPT-36 1-IPT-37,1-IPT-38 1 IPT 40 I THRU 1 IPT 46

II

] ~

Page 10 of 10 FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As required by the provisions of the ASME CODE RULES EDDY CURRENT EXAMINATION RESULTS PLANT: St. Lucie Unit 5 1 EXAMINATION DATES: 20 July 1988 thru 6 August 1988 TOTAL TUBES TUBES TOTAL TOTAL INDICATIONS PLUGGED AS PLUGGED PLUGGED STEAM TUBES PREVENTIVE THIS TUBES GENERATOR INSPECTED 204 394 40% MAINTENANCE OUTAGE IN S/G 1004'13 8057 904

  • 40 ** 141 603 8161 522 62
  • 42 **** 97*** 455 LOCATION OF INDICATIONS (204 1004)

STEAM U BENDS EGGCRATES DRILLED SUPPORTS TOP OF TUBE SHEET GENERATOR 1 TO 8 9 TO 10 TO g 1 EGGCRATE DHB to DCB H/L C/L H/L C/L H/L C/L A 29 452 56 77 83 286 34 24 194 44 31 45 190 56 REMARKS '

S/G A: 113 Indications located in 101 tubes.

  • S/Q B: 62 Indications located in 60 tubes, 5 of the 60 tubes are also ASR tubes.
      • S/Q B Row 116 line 124,cold leg was inadvertently left unplugged but was reported during 2/87 outage; see LER g 335-88-006.
        • $ /Q B 41 = ASR and 1 TBP ( row 116 line 122)

ASR = Adjacent stay rod tube TRS = Tube restriction TBP = To be plugged CERTIFICATION OF RECORD We certify that the statements in this report are correct and the tubes inspected were tested in accordance with the requirements of Section XI of the ASME Code.

Florida Power & Light Co.

DATE BY

pl FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST. LUCIE NUCLEAR PLANT P.O.BOX 128 FT.PIERCE, FLORIDA 33454 UNIT 1 STEAM GENERATOR 1A& 1B 1988 EDDY CURRENT RESULTS CUMULATIVE REPORT

T.

0>>,

Q3a g?;

p$ l j~v

CUMULA' VE R=PORT 87/88, ST. LUC 1 E S/G A, UNIT STEAM G"NERATOR: A PAGE: 1 OF 4 LOCATiON: ALL DATE: 89/89/88 CRiTERiA: 48$ TO 188'A. ABR, TRS TIME: 89'~i' I I 1 IEXTENT I I I I I CURRENT I IROWILINIHEATIIILEGIREQITSTIRENIREELIPROSEI LOCATION I VOLTS IMILIDEB I  % I CHI I I I I I I I I I I I I I I I 1 521 121888121 C IF/LIF/LIRPII 27FI588SNI81H+ 8. 8 SB I le il 11881 521 11 21 181888121 C IF/I IF/LIRPII 35F1588SNI81H" 8. 4 PS I 1.$ 1 11811 521 11 361 181999991 C IF/LIF/LIRPII 28FI588BNIVS2- 1.4 PC I 1.81 I 871 621 il 141 241888141 C IF/LIF/LI RPI I 21F1588SNI81H+ 8.4 PB I 8 71 11861 471 1 I 211 251888121 C IF/LIF/I.I RPI I 21F1588SNI81H+ 8.5 SS I So71 I 971 551 11 141 261888221 C IF/LIF/LI RPI I 22F 1588SNI$ 2H" 8.5 PS I 8.51 11131 4$ 1 I 1 211 271999991 C I F/L F/L I RP I I 22F 15888M I 8 1 H+

I Se8 PC I 1 71 I 821 681 11 381 281888131 C IF/LIF/LI RPI I 22F I 5888N ITSH+ 4.5 PB I 8.51 11181 431 11 671 291888121 C IF/LIF/LIRPII 38FISSSSNI82K+ So 2 PS I 2.41 11131 481 1 I 981 381888421 C IF/L IF/I. RP I I 39F 15888N 181H+

I 8. 6 SS I Se51 I 991 531 11 I I I C IF/LIF/LIRPII 39FI5888NI85H+ 8. 8 SS I le41 I 731 751 11 431 311888781 C IF/LI I I I I I I I IABRI I 451 311888781 C IF/LI I I I I I I I IABRI I 461 321888781 C IF/LI I I I I I I I IASRI I I I I C IF/LIF/Ll I 72F1548SMI I I I IASRI I 171 331888421 C IF/LIF/LIRPII 23FI588SMITSC+ 3.9 PS I 8.41 11831 581 1 I 431 331888781 C IF/LI I I I I I I IABRI I I I I C IF/LIF/Ll I 72FI548SNI I I I IASRI I 45I 331000701 C IF/LI I I I I I I I IASRI I 121 341888121 C IF/LIF/I.IRPII 23FI588SNISiH+ 8.5 PC I Sa91 I 781 711 11 321 361888131 C IF/LIF/LIRPII 24FI588SMITSC+ 20 2 PS I 1+21 11881 451 1 I 331 371888131 C IF/LIF/LIRPII 24FI588SNISiH+ 8. 7 PS I 8 41 I 871 631 il 931 371888121 C IF/L IF/L I RPI I 41F I 5888N 1$ 1H+ 8.4 PS I 111 11811 511 1 I 191 391888121 C IF/L IF/L I RPI I 24F15888MI TSH+ 1.5 PB I So51 11821 581 il I I I C IF/LIF/L I RPI I 24F 1588SN I TSC+ 4e4 PB I 8.61 11181 431 1 I 1831 391$ 8843I C IF/L IF/L I RPI I 41F15888NI89C+ 8.$ PB I 1e51 11131 411 1 I 331 471888141 H IF/LIF/LIRPII 1$ FI58$ 8NI83H- Ss 1 SC I 1.61 11141 441 11 911 471888781 C IF/LI I I I I I I I IASRI I 931 471888781 C IF/LI I I I I I I I IASRI I 981 481888781 C IF/LITECI I I I I I I IASRI I 941 481$ 88781 C IF/LI I I I I I I I IABRI I 211 491888121 H IF/LIF/LIRPII iiFI58$8NITSH+ 4.5 PC I 4e21 11121 411 11 931 491888781 C IF/LI I I I I I I I IABRI I 41 581888121 C IF/LIF/LIRPII 37F1588SNITSH+ 8.7 SC I Se7I I Sil 53IM11 I I I C IF/I. IF/I. I RPI I 37F 15888MI 81H+ 8. 8 88 I 1.41 11891 441 ll 381 581888141 H I F/L IF/L I RPI I 1 1F I 5888N I 81H+ 8. 9 I 1.81 I 781 691 11 981 581888121 C IF/LtF/LIRPII 44FI588SMITSH+ 2.4 PS I 1.31 11181 43! 1 I 71 511888141 C IF/LIF/LIRPII 37Ft5888NIVS2+ 8. 8 PS I 8 61 I 741 731 1 I 281 521888121 H IF/LIF/LIRPII liFI588SMI81H- So 5 PC I 1.31 11121 411 1 I 211 531999991 H If/LIF/LIRPII 11FI5888NI84H+ 8.2 I 8.51 11121 '411 1 I 381 581999991 H ITSCITSCIGNSI 13FI5888MISiK- 8.2 PS I 1 51 I 591 861 11 251 591888131 H IF/LIF/LIRPII 13FI588BMI86H+ 8.5 PS I 8 61 I 941 58 I 11 I 931 591999991 C IF/LIF/LIRPII 51FI588SNI$ 9H+ 8. $ PB I 2.21 I 981 531 il 61 681888211 C IF/LIF/LIRPII 37FI58$ SMI81H+ 8. 6 PS I is81 11831 491 1 I 131 611999991 C IF/LIF/LIAPII 48FI588BNI89H+ 8.8 SS I 2.21 11821 581 1 I I I I I 1 I I I I I I I I I I FLORIDA POWER 4 LIGHT COMPANY

ff

'I fg Ca

'/

.'c

+

C Qi k

I ff;,

'I:J I

CUMULATIVE REPORT 87/88, ST. LUCIE S/G A. UNIT 1 STEAln GENERATOR: A PAGE: "" OF 4

LOCATION: ALL DATE: 89/89/88 CRITERIA: 48'A TO 188/,ASR, TRS TIME: 69 51 I I I I IEXTENT I I I I I CURRENT I IROWILINIHEATIIILEGIREQITSTIREMIREELiPRQBEI LOCATION IVOLTSIMfLIDEGI 5 ICHI I I I I I I I I I I I I I I I I I 161 62 I 888411 H IF/LIF/LI RPI I 14FI588SNI81H+ 8. 6 PS I 1.31 11881 541 1 I I 1141 641999991 C IF/L IF/L I RPI 49FI588SNI89H+ 8. 8 I PC I 1.11 I 991 541 1 I I 431 651888221 H IF/LI I I I I I I I IASRI I 451 651888211 H IF/LI I I I I I I I IABRI I I 1811 651888121 C IF/LIF/LIRPII 52F 1588SN 82H- 8,4 I PS I 2.2l 11851 471 il I 321 661888221 H ITSCITSCIGNSI 14FI588BMITSH+ 2.6 PS I 8 81 11111 441 11 I 421 661888431 H IF/LI I I I I I I I IASRI I I 461 661888221 H IF/LI I I I I I I I IASRI I I 431 671888211 H IF/LI I I I I I I I IASRI I I 4SI 6? 1888211 H IF/LI I I I I I I I IASRI I I 471 691888211 H IF/LIF/LIRPII f5FI588SNI83H" 8. 5 PS I 8.61 11131 411 1 I 11811 691999991 C IF/LIF/LI RPI I 53F1588SMI89H+ 8.8 PS I 2 31 11811 521 11 I 321 781888211 H IF/LIF/LIRPII 15F1588SNI82H+ 8.5 SS I 8.61 11821 511 ll 11861 721999991 C IF/LIF/LI RPI I 54FI588BNI89H+ 8.8 PS I 8.81 I 961 551 il I 371 491 731888141 731888111 H IF/LIF/LIRPII 15F1588SNI82H+ 8o4 IF/LIF/LIRPII 15FI5888NISBC- 8.4 SS I 8.51 I 991 531 il I H SB I 8.71 11841 491 1 I I 631 731888121 H IF/LIF/LIRPII 8?FI588SNITSC+ 4.8 PS I 8.71 11861 451 1 I I 981 761888131 C IF/LIF/LIRPII 55F1588SMITSH+ 1.5 PS I 1.61 11131 421 1 I I 781 781999991 H IF/I. IF/L I RPI I 88FI588SNI82H+ 8e8 PB I 8.81 11861 481 11 I 581 881888141 H IF/LIF/LIRPII 89FI588SNI83H+ 8e8 PS I 8.81 11871 481 1 I I 461 821888881 H IF/LIF/LIRPII 11FI588SNITSC+ So 8 I 1.61 I 891 681 11 I I I I H IF/LIF/LIRPII 11FI588SMITSC+ So 5 PC I 8.51 11881 471 1 I I 581 821999991 H IF/I IF/L I RPI I 16FI588SMITSC+ 6.4 PS I 1.81 I 881 681 11 I 1281 821999991 H IF/LIF/LIRPII 53FI588SMI89C+ 8.8 PS I 1.41 11881 531 1 I I 571 831888141 H IF/LIF/LIRPII 89FI588SN182H+ 8eB PS I 1.51 1 if 1 I 451 il I 911 831888781 H IF/LI I I I I I I I IASRI I I 931 831888781 H IF/LI I I I I I I I IASRI I I 951 831999991 C IF/LIF/LI RPI I S?F 1588SN I 89H+ PS I 2.21 I 951 561 il I 981 841888781 H IF/LI I I I I I I I IASRI I I 941 841888781 H IF/LI I I I I I I I IABRI I I I I I C IF/LIF/LI I 72F 154 8SN I I I IASRI I I 1121 841999991 H IF/LIF/LI RPI I 53FI588SMI89H+ 8.8 PS I 1.81 11151 481 1 I I 391 851888441 C IF/L IF/I. I RPI I 18F1588SNITBH+ Be 2 PS I 8.91 I 1 131 411 11 I 911 851888781 H IF/LI I I I I I I I 'ASRI I I 931 851888781 H IF/LI I I I I I I I IASRI I I 961 861888121 C IF/LIF/LIRPII 58F 1588SM I 81H- 8.5 PC I 2.11 11841 491 1 I 11881 861999991 C I F/L IF/L I RP I I S?F 1588SN I 89H+ 8.8 PS I 1.61 I 951 561 1 I I 921 I iei I 891888121 881999991 C IF/LIF/LIRPII 58FI588SNI84H+ 8o3 PS I 8.41 I 861 641 il C IF/LIF/LIRPII 58F1588BMI89H+ 8o 1 PC I 5.61 11111,421 11 11871 891888121 C IF/LIF/LI RPI I 58FI588BNI82H- 8.6 BS I 2.21 11881 451 fI I f281 981999991 H IF/LIF/LIRPII 55F I 588SM I 81H+ 8. 5 PB I 1.41 I 781 791 11 I 1241 981888131 H IF/LIF/LIRPII SSFIS88SMI83H+ 8.3 PS I 8.61 11851 491 1 I I 421 941999991 C IF/LIF/LIRPII ifFI588BMITSH+ 8.5 SB I 8.71 11841 481 1 I I 1281 961999991 H IF/I IF/LIRPII 5?FI588SMI89C+ 8.8 I is BI I 611 841 1 I I 4311 811888781 H IF/LI I I I I I I I I ABRI I I I I I I I I I I I I I I I I I FLORIDA POWER 4 LIGHT COMPANY

p I

p4 V

Ig

'gf

~e F% t k:

CUNULATIVE REPORT 87/88, ST. LUCIE S/G Aq UNIT 1 STEAN GENERATOR: A PAGE: 3 OF 4 LOCATION: ALL DATE: 89/89/88 CRITERIA: 4$ % TO 188%,ASR, TRB TINE: $ 9: Sl:25 I I I I I EXTENT I I I I I CURRENT I I ROW ILINIHEAT¹ I LEGIREQITSTIRENIREELIPROHEI LOCATION IVOLTSIMILIDEGI % ICHI I I I I I I I I I I I i I I I I I 4511811888781 H IF/LI I I I I I I I IASRI I I 4211821888781 H IF/LI I I I I I I I IASRI I I 4611821888781 H IF/LI I I I I I I I IASRI I I 18611821999991 C IF/LIF/LI RPI I 61FI58SSNI89M+ 8. 8 PS I Re 31 11881 441 11 I 4311831888781 H IF/LI I I I I I I I IASRI I I 4511831888781 H IF/I I I I I I I I I IASRI I I 11811841999991 H IF/LIF/LIRPII 46F 1588SM I 89C+ 8. 8 PS I 1. 61 11$ S I 491 11 I 2111871888131 C IF/LIF/L RPI I 13F I 5888M 81M+

I 1 S. 2 SS I 1. 2 I 11871 461 11 I 5311871999991 C IF/LIF/LI RPI 86F 158$ SN I SRM-I 8. 5 SS I S. 61 11141 481 11 6111871999991 C IF/LIF/LIRPII $ 6FI58SSNISRH- Se 2 SS I 8. 61 11861 581 il I

1411881888121 C IF/LIF/LIRPII 13FI58$ 8MI84H- Se 4 PS I 8. 81 Iiiil 421 il I

I 7411881999991 C IF/LIF/L RPI I $ 6F 15888M I TSH+

I l. 1 PS I 8. 61 I ill I 461 1 I I 9811881888121 C IF/LIF/LI RPI I 63FI588SNITSH+ 1.4 PS I 2. SI 11161 431 11 I 9911111888121 C IF/LIF/LI RPI 63FI58SSNI89H+

I 8. 8 PS I Re 41 11881 531 1 I I 2411121$ $ 8121 C IF/LIF/LI RPI I 14F1588SMI83H+ 8. 1 PB I Se 81 11161 481 ll I 9611121999991 C IF/LIF/LI RPI I 64FIS8$ SNI89H+ 8. 8 PS I i. 21 I 991 531 il I 7711131999991 C I F/L IF/L I RPI I 87FIS8$ SNITSH+ 3.9 I S. 91 11181 431 1 I I I I I C IF/LIF/LI RPI I 87F158SBMI 81H+ 8. S SS I 8. 41 11811 511 1 I I 1711151888131 C IF/LIF/LI RPI I 1SFI58$ 8NI$ 4H+ 8. 4 PC I Re 31 11871 441 11 I 11311151888121 H IF/LIF/LIRPII 48F 15888N I 89H+ Se 8 PB I 6. 31 I 991 521 1 I I 1411161888411 C IF/LIF/LI RPI I 15F 15888M I SSH+ 8. 8 SS I le 71 I 9SI 551 il I 2211161888421 C IF/LIF/LI RPI 15F 15888M I 81H+ 8. 8 I BS I Se 71 11811 581 il I 1511171888411 C IF/LIF/LIRPII 15F158$ 8N I 84M+ 8. 1 SB I Se 91 I 851 631 11 I 1411181888411 C IF/LIF/LIRPII 15FI58$ 8NITSH+ 1.8 PS I i. 2 I I 611 831 il I 4211181888431 C IF/LIF/LI RPI I 1SFI5888NI83H+ 8. 5 PB I Se 41 I 821 661 11 I 351 1191888441 C IF/LIF/LI RPI I 16F I 58$ 8N1$ 2H+ 8. 8 SB I 1. Sl ,11841 471 il I 9111191888781 H IF/LI I I I I I I I I ABRI I I 11311191999991 H I F/LIF/LI RPI I 49FI588SMIS9C+ 8. 8 PB I 2. 11 I 951 571 il I 9811281888781 H IF/LI I I I I I I I IASRI I I 9411281888781 H IF/LI I I I I I I I IASRI I I 9111211888221 H IF/LI I I I I I I I IABRI I I 9311211888221 H IF/LI I I I I I I I IASRI I I 1411221999991 H IF/LIF/LIRPII 16FI5888MITBM+ 8.8 PS I 2. 31 I 871 48IN11 I I I I H IF/LIF/LI RPI I 16FI5888NITSH+ 1.2 PS I 2. SI I 941 411Nl I I I I I H IF/LIF/LIRPII 16F 15888M I TBM+ 2. 4 PS I 2. 11 I 821 53 Nll 1

I I I I H IF/LIF/LIRPII 16F 158$ 8N I TSH+ Re 9 PS I 1. 91 I 911 44 I Ni I I I I H IF/LIF/LIRPII 16F 15888M (TSM+ 3. 3 PB I 1. 41 I 571 78 I Ni I I I I I M IF/LIF/LIRPII 16F 15888M fbi H":S. 5 SB I Se 91 . 11141 481 11 I I I I H IF/LIF/LIRPII 16FI5888NISPH+ 8, 8 PC.I 1. 81 I 991 511 1 I I 3411221888141 H IF/LIF/LI RPI I 16F1588SMf8$ M+ SS I Se 91 I 891'621 11 ll

...Seek>'9F I 9611221888121 H IF/LIF/I.I RPI I 158$ 8N'181M+'" 8. 9 SS I Se 61 I 961 561 I 5811241999991 H IF/LIF/LI RPI I 17FI58$ SNITBH+ 8. 6 PS I 1>> 61 11811 521 1 I I 2211381999991 H IF/I IF/L I RPI I 18F 15888M I SRM- 8. 5 PS I le 31 11131 411 1 I I 9611321888211 H IF/LIF/LIRPII 42FI58$ 8NIS9C+ 8.8 PB I ie 11 11831 511 1 I I 10211321888121 H IF/LIF/LIRPII 42F 158$ 8MI$9H+ 8. 8 PS I 3. 31 11111 441 11 I I I I I I I I I I I I I I I I FLORIDA POWER 4 LIGHT COMPANY

,1j

'J it'

~ J

~4 Clog VI P

CUMULATIVE REPORT 87/88, ST. i UCIE S/G A, UNIT 1 STEAN GENERATOR:~ A PAGE: 4 OF 4 LOCATION: Ai L DATE: 89/89/88 CRITERIA: 48M TO 188'A, ASR.~ TRB TIME: 89:51:25 I I I IEXTENT I I I I I CURRENT I ROWILINIHEATOILEGIREQITSTIREMIREELIPROBEI LOCATION IVOLTSINILIDEGI 5 ICHI I I I I I I I I I I I I I I I 1311331888131 H I F/L IF/L I RPI I 19F 1588SM I TSH+ 1.3 SS I 8.81 I 931 47IN11 2111331888131 H IF/L IF/L I RPI I 19FI588SN ITSC+ 2.8 SS I 8e71 11151 421 11 7311331888121 H IF/L IF/L I RPI I 29F 1588SMI81H+ 8o5 PS I 8.51 I 851 661 il 1211341888131 H I F/L IF/L I RPI I 19F1588SNITSH+ 8e5 PS I 1.11 I 731 781 11 4311351999991 H IF/LI I I I I I I I IASRI I I I I H I F/L I 81C I I 19FI588SMI I I I IABRI I 4511351888131 H I F/LI I I I I I I I IABRI I I I I H IF/LIF/LI I 19FI588SNI I I I IASRI I 9711351888111 H I F/L IF/L I RPI I 42FI588SNI89H+ SC I 1.81 971 561 il 4211361888781 H IF/L I I I I I I I I IABRI I 4611361888781 H I F/LI I I I I I I. I IASRI I 4311371888781 H I F/LI I I I I I I I IASRI I 4511371888131 H I F/LI I I I I I I I IASRI I 3811381888121 H I F/L IF/L I RP I I 28F 1588SN 182H+ 8.2 PS I 8.81 11871 461 il 3211441888121 H I F/LIF/L I RPI I 21F 1588SM I TSH+ 8. 1 PB I 1.31 I 821 58IN11 9511451888111 H I F/L IF/L I RPI I 44FI588SMI82H" 8.5 PS I 8 51 11121 431 11 2711471888121 H I F/L IF/L I RPI I 22FI588SNITSH+ 8.8 PS I 8.81 I 941 571 il 6911471999991 H IF/LIF/LIRPII 32F1588SNI85H+ 8.6 I 8.31 11841 511 11 1511511888441 H I F/L IF/L I RP I I 23F 1588SN I TSH+ 8.8 SS I 2.31 I 961 44INil I I I H IF/LIF/L I RPI I 23FI588SNI81H+ 8. 9 SC I 18o31 11121 431 1 I 3211521999991 H IF/I IF/L I RPI I 23F 1588SNI82H+ 8.4 SS I 8.71 11861 481 1 I 7211541999991 H I F/L I F /L I RP I I 34F 1588SMI84H+ 8.2 SS I 8.91 I 871 641 11 311591999991 H IF/L186HIRPII 67FI548SNI I I ITRSI I I I I I I I I I I I I I I I I NUMBER OF TUBES SELECTED FROM CURRENT OUTAGE: 141 NO TREND ANALYSIS REQUESTED FLORIDA POWER 4 LIGHT COMPANY

P th

'k V

CUMULATIVE REPORT 87/88, ST. LUCIE S/G B. UNIT i TEAM GENERATOR: T 8 PAG=: 1 QF LOCATION: ALL DATE: 89/C9/68 CRITERIA: 4W TO 188'A, ASR,TBP TIME: iS:19:36 I I I IEX)ENT I I I I I CURRENT I IROWILINIHEATQILEGIREQiTSTIREMIREELIPROSEI LOCATION IVOLTSIMILIDEGI / ICtll I I I I  ! I I I I I I I I I I I I 441 181999991 C I F/L I F /L I RP I I iSFI588BNI82H+ 8. 5 PS I 8.51 11891 491 1 I I 31 251999991 C I F/L IF/L I RPI I 35F 1588BD 181H" 8. 7 SS I 8. 81 I 641 841 11 I 431 311888781 H IF/LI I I I I I I I IABRI I I 451 311888781 M IF/LI I I I I I I I IABRI I I 421 321888781 H IF/LI I I I I I I I IASRI I I 461 321888781 H IF/LI I I I I I I I IASRI I I 431 331888781 H IF/LI I I I I I I I IASRI I 451 331888111 H IF/LI I IASRI I

I iiil 371888431 C I F/L IF/L I RP I I I I I 44F 1588BN I 89C+ 8. 8 PS I

I 1.21 I I I 981 591 11 I

I 781 421999991 C I F/L IF/L I RP I I 33F I 588SMI 8 iH+ 8. 8 SS I 8 91 11151 441 11 I 511 471888121 H I F/L IF/L I RP I I 81F 1588SN184H+ 8. 6 PB I Se81 - 11191 431 11 I 911 471888781 C IF/LI IRITI I I I I I I ABRI I I 931 471888781 H IF/LI I I I I I I I I ABRI I I 981 481888781 H IF/LI I I I I I I I I ABRI I I 941 481888781 H IF/LI I I I I I I I I ABRI I I 911 491888211 H IF/LI I I I I I I I IASRI I 931 491888781 H IF/LI I I I I I IASRI I I I Iiiil 8

I 1281 541999991 C IF/L IF/L I RPI I 46F 1588BN I 81M+ 8. 7 PS I 8.41 491 11

~,' 131 591888221 H I F/L I F/I I RP I I 12F 15888M I 81H+ 8. 4 PS I leSI I 941 631 il 42I 681999991 H IF/L IF/L I RPI I 13F 1588BM I TBC+ 8e 1 PS I ie81 I 911 641 11 121 621888221 H IF/LIF/LI RPI I 13F 1588BN I TSH+ 1. 1 PS I 8 61 I 931 631 il 361 621999991 H I TBCI TSC I GNB I 13F 1588SN I TSC+ 4. 1 SS I 8.91 I 891 55IMil I 311 651888121 H ITBCITBCIGNSI 14F 1588SN I 81M- 8. 5 I 2m 31 11141 441 11 I 431 651888221 H 181HI I RI T I I I I I I ABRI I I 451 651888221 H 181HI I RIT I I I I I I I ABRI I I 221 661888221 H I F/L IF/I. I RP I I 14F 1588SN I 81H+ 8. 8 BS I Si91 11171 481 1 I I 481 661888221 H IF/LIF/LI RPI I 14F1588SNI82H+ 8. 8 PB I 8.81 11881 491 1 I I 421 661888221 H 181HI IRITI I I I I I IABRI I I 461 661888221 H 181HI IRITI I I I I I IASRI I I 431 671888121 H IF/LI I I I I I I I IASRI I I 451 671888121 H 181HI I RIT I I I I I IASRI I I 471 671888221 H I F/I. I F/L RP I I 14F1588SNITSC+

I 6o3 BS I 1.21 I 671 741 1 I I 441 681888211 H IF/LIF/LIRPII 14F 1588BN I TSC+ 7. 5 PS I 1 61 11861 Sil il I 1221 781999991 C I F/L I F/I. I RP I I 49F 588SM 189C+I 8. 8 PB I 8.81 I 871 671 il I 631 751999991 H I F/L I F/L I RP I I 87F 158SSN I 8 iM+ 8. 4 SB I lo21 11841 531 11 I 1351 771999991 H I F/L I F/L RP I I 51F I 58SSMI 89H+

I 8. 8 PS I 1.41 11881 491 1 I I 911 831888781 H I ITEH I RPI I I I I I I IASRI I I 931 831888781 H I F/L I I RI T I IASRI I,

I I I I I I I 981 841888781 H IF/LI I I I I I I I IASRI I I 941 841888781 H IF/LI I I I I I IABRI I I 911 851888781 M 181CI I RIT I I I I I I IASRI I I I. I I H 181C 181C I I 56FI58SBNI I I I IABRI I

. 931 851888781 I I 521 861888121 I I I

I H

H C I I

I 81CI 181C 181C I

I RIT I I

F/L I F /L I RP I I 82F I I I I

56FI58SSMI I

158SSN I TBC+

I I

6. 7 PS I

I I

I 1.21 I

I I I I

I 11861 IABRI IASRI I

521 i

il I

I I

FLORIDA POWER AND LIGHT COMPANY

f

'lid 4.

II

~i f

j"'-IA r

) ( ~ ~

~

CUMULATIVE REPORT 87/88, ST. t.UCI E B/6 9, UNIT l STEAM E GENERATOR:

G B PAGE: 2 O"

'CATION:

L ALL DATE: 89/89/88 CRITERIA:T ~ 48)! TO 188/, ASR, TBP

~

~ TIME: 18: .'9:~e I I I I EXTENT I I I I I CURRENT I I ROW (LIMNIHEAT¹ ( LEG(REQITST(REM(REEL(PROBE( LOCATION (VOLTS( NIL IDEGI A I CHI

( ( I I I I I I I I ( I I I I I I 481 92(888121 C IF/LIF/L RPI I 18F 158QSN I TSC+

I 6. 5 PS I 1.11 11171 42( ll I 134 941999991 1 H IF/LIF/LIRPII SGF(58QBM(82H+ 8.9 SS I 8 81 11831 551 ll I 541 96(88812( C IF/LIF/LI RPI I 84F (5888M(81H- 8. 4 SS I 1. 1( 11141 461 il I 351 99(88812( C IF/LIF/LI RPI 11F(58QBN(TSC+

I 6.5 PS I 8.91 1184( 531 ll I 43( 99(999991 C IF/L(F/L RPI I 11F (58QSN I TSC+

I 6.8 PC I 1.SI I 971 441 Ml I I 1351 991999991 H IF/LIF/LI RPI 44FI588SM(89H+

I Qe8 PS I 2 il 11161 43( ll I 126(1881999991 H IF/LIF/LIRPII 45F(588SN(89C+ 8. 8 PS I 1 91 981 591 ll I 4S(1811888121 H IF/I I I I I I I I I IASRI I I I I I C IF/LIF/LIRPII 11F 1588BNITSC+ 5.9 SC I 8.91 I 811 681 Nl I I 421182188812( H IF/LI I I I I k I I I ABRI I I 46li82188878( H IF/LI I I I I I I -

I I ABRI

~ I 48(182(88812( C IF/LIF/LI RPI I 11F (58QSM(81H+ 8.7 SS I 3.11 11131 461 1(

I 43(183(888121 H IF/L( I I I I I I I I ABRI I I I I I C IF/LIF/LIRPII 12F 1588SM I TSC+ 9. 5 PS I 8.81 (1161 441 il I 45(1831888781 H IF/LI I I I I I I I IASRI I I 17(185(88812( C IF/LIF/LI RPI I 12F (58QSM I TSC+ 2.4 PS I 8.81 11891 58( ll I 39118SI888411 C ITSHITSHIGNSI 12FI58QSNIQSH+ 8. 1 SS I 8.41 11121 471 il I 37(187(88814( C ITSHITSHIGNBI 12F 1588SN I 81H+ 8. 5 PS I 1.21 11811 571 il I 43(1871888121 C IF/LIF/LI RPI I 12F 1588SN I 81H+ Qo5 PB I 3.SI 1185( 54( il I 47(189(88812( C IF/LIF/LI RPI I 13F(58QBMIQiH- 8. 3 PS I 2.31 11171 42( il I 411181888141 H IF/LIF/LI RPI I 34F(588SNI82H+ 8.3 PS I 8.41 11811 551 11 I 69(113(88812( C IF/LIF/LI RPI I 88F 1588SN I 81H+ 8.8 PC I 1 SI I 95( 681 il I I I I C IF/LIF/LI RPI I QBF (58QSN I 81H+ 8.5 I 1.8( 1189( 49( il I 781116(99999( C IF/LIF/LI RPI I 88F(588SM(TSC+ 4.8 SS I 8.91 (113( 451 11 I 9111191888411 H (81CI I RITI I I I I I I ABRI I I 93(119(88841( H IF/LI I I I I I I I I ABRI I I I I I H I F/L.(F/L I RPI I 38F (58QSM I TSH+ 1.4 PS I 1 41 (1881 581 il I 66(128(88812( C IF/LIF/LI RPI I 89FI588SNITSC+ 2o6 PC I 2e ll (113( 45( ll I 98(128(88841( H IF/I I I I I I I I I IASRI I I I I I H IF/LIQ1C I I 38F 1588SN(83H+ Qe4 PS I Q.SI 1119( 48( 11 I 94(128(88814( H IF/LI I I I I I I I IASRI I I 911121(88841( H (F/LI I I I I I I I IASRI I I I 931121(888411 I I H IF/LIF/LI I 38F(58QSMITSH+ is 7 PC I 6.1( I 291 72( il I H I ITEHI RPI I I I I I I IASRI I I 6611221999991 H IF/LIF/LI RPI I 26F(58QSNITSC+ 4.6 PS I 8.61 (1141 431 11 I 98(122(88822( H IF/LIF/LIRPI I 38F(588BNITSH+ 8.2 PS I 1 QI I 791 731 ll I 116(122(888411 H IF/LI I RPI I I I I I ITBPI I I 15(125(88812( H IF/LIF/LI RPI I 17F 15888M I 81H+ Q. 1 PS I 311 1119( 421 ll I 5811261999991 H IF/LIF/LIPIDI 26F 158QBN(81H+ 8. QQ SS I 8.91 11181 47( 1(

I 18811261888121 H I F/L I F /L I RP I I 39F I SGQBN189H+ 8.8 PS I 7e81 11171 421 1(

I 98 I 128(88821( H IF/LIF/LIRPII 46F (588BN(81H+ 8. 3 PS I 8.9( 11821 551 il I 94(138(88821( H IF/L,IF/LIRPII 48F (588SN(81H+ 8,4 SS I Qe61 1114( 441 ll I 188 (138 I 88821 I H IF/LIF/LIRPII 46F(58QSM(89C+ 8.8 PS I 1.7( 11181 41( ll I 188 11321888211 H IF/LIF/LIRPII 41F (5888M(89H+ 8.8 PS I 3.51 I 851 681 il I 72(134(999991 i I H IF/LIF/LI RPI I 28F 158QBN I TSH+ 8.9 PS I 8.71 I

11861 511 il

( I ( I I I I I I I FLORIDA POWER AND LIGHT COMPANY

f I

'p'y k4

~II ~

I ~

CUMULATIVE REPORT 87/88t ST. 'CIE S/G Bs UNIT 1 STEAN GENERATOR: 8 PAGE: 3 OF 3 LOCATION: ALL DATE: 89/89/aa CRITERIA: 488 TO 188/.ASR, TBP TINE: 18'19 a6 I I I I IEXTENT I I I I CURRENT I I ROMILINIHEAT¹liEGIREQiTSTIRENIREELIPRO&EI LOCATION I VO'B I NIL I DEG I 5  ! CH I I I I I I I I I  ! I I I I I i I I 94 I 134 I 88813 I H IF/LIF/LI RPI I 41F I S88SN I 89H+ 8. 8 PS I 2.8I I 187 I S8I 1 I I 43 I 135 I 88878 I H I81CI I RITI I I I I I IASRI I I 45 I 135 I 88878 I H I 81CI I RIT I I I I I I IASRI I I 69 1135I99999I H I FILIF/L I RPI I 29F I 588SN I TSK+ 8.7 PS I 8.81 I119I 42I il I I I I H IF/LIF/LI RPI I 29F I 588SN I 85C+ 8,4 PB I 8.6I I 114 I 46 I 1 I I 6 I 136 I 88812 I H I F/L IF/L I RP I I 3SF I S88SN I VS2+ 8,4 PS I 8.7I I 119 I 41 I 1 I I 42I136I88878I H I81CI I RITI I I I I I IABRI I I 46I1361888781 H IF/LI I I I I I I I 'ASRI I I 43 I 137I 888781 H I81CI IRITI I I I I I IASRI I I 45I137I88878I H I ITEHI RPI I I I I I I IASRI I I 92I138I88811l H IF/LIF/LIRPII 42FI588SNI89H+ 8. 8 PB I 1.1I I 189 I 49 I 1 I I 12 I 148I 88841 I H IF/LIF/LIRPII 22F I 588BN I 81H" 8,5 SS I 8 9I I 581 88I 1 I I 28 I 148 I 88813 I H IF/LIF/LIRPII 22F I 588SN I TSH+ 1.4 PS I 1(8I I116I 43I 11 I 1 I 151 I 88812 I H IF/LIF/LIRPII 36F I 588SD I81H+ 8. 6 SS I 2.1I I 114 I 44 I 1 I I 21 I 151 I 99999 I H IF/LIF/LI RPI 23FIS88SNITSH+

I 8.3 PS I 1.2I I 185 I 52 I 1 I I 55 I 155 I 99999 I H IF/L IF/L I RPI I 33FIS88SNI84H- 8,4 PS I 8.5I l114I 46I il I I I I I I I I I I I I I MUI(IBER OF F T TUBES SELECTED FRON CURRENT OUTAGE: 97 NO TREND ANALYSIS REQUESTED FLORIDA POWER AND LIGHT CONPANY

t V 1I

FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST. LUCIE NUCLEAR PLANT P.O.BOX 128 FT.PIERCE, FLORIDA 33454 UNIT 1 1988 OUTAGE SNUBBER FUNCTIONAL TESTING REPORT

J

~ 4

Tag ¹: 1-010 Lockup Velocity 1.340 PASS. 1.480 PASS.

Mfg/Cap.: ITT-200 Bleed Rate 0.015 PASS. 0.128 PASS.

Serial ¹: 5571 Test Load 193 257 Mark¹: SS-21B Tag ¹: 1-016 Lockup Velocity 1.480 PASS. 1.480 PASS.

Mfg/Cap.: ITT-200 Bleed Rate 0.036 PASS. 0.038 PASS.

Serial ¹: 5573 Test Load 193 257 Mark¹: SS-8 1B Tag ¹: 1-018 Lockup Velocity 3.140 PASS. 1.400 PASS.

Mfg/Cap.: ITT-50 Bleed Rate 0.067 PASS. 0.067 PASS.

Serial ¹: 11180 Test Load 20 20 Mark¹: 1A2

gl let lg

~ ~

F, t n~ ~

Breakaway: 53.9 P.9%, PASS. 13.4 0.2%, PASS.

Initial Drag: 14.9 0.2%, PASS. 14.2 0.2%, PASS.

Tag ¹: 1-022 Peak Drag: 25.0 0.4%, PASS. 29.7 P 5% PASS Mfg/Cap.: PSA-3 Activation (PSA): 0.009 PASS 0.006 PASS Serial ¹: 101 Release (A/D)

Mark ¹: RC-005-34B Test Load: 4500 75 P% 4500 75 0'/

Final Drag: 15.0 0.3%, PASS. 10.9 0.2%, PASS.

Peak Drag: 25.2 P4% PASS 26.9 0.4%, PASS.

Breakaway: 39.0 0.7%, PASS. 20.0 0.3%, PASS.

Initial Drag: 26.1 P 4%i PASS. 12.4 0.2%, PASS.

Tag ¹: 1-027 Peak Drag: 45.1 0.8%, PASS. 27.6 P 5%i PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.005 PASS 0.006 PASS Serial¹: 100 Release (A/D)

Mark ¹: RC-005-55B Test Load: 4634 77.2% 4407 73.4%

Final Drag: 19.5 0.3%, PASS. 18 ~ 1 0.3% PASS.

Peak Drag: 34.2 0.6%, PASS. 28.8 0 5%i PASS.

Breakaway: 19.8 0.3%, PASS. 12.2 0.2%, PASS.

Initial Drag: 19.0 0 3% PASS. 18.3 03% PASS.

Tag ¹: 1-029 Peak Drag: 33.9 0.6%, PASS. 31.2 0.5%, PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.003 PASS 0.011 PASS Serial ¹: 114 Release (A/D)

Mark ¹: RC-005-62A Test Load: 4590 76 5% 4957 82.6%

Final Drag: 29.8 P 5% PASS 12.2 0.2%, PASS.

Peak Drag: 42.9 P 7%, PASS. 25.1 P 4% PASS Breakaway: 27.8 P.5%, PASS. 3.7 0.1% PASS Initial Drag: 27.1 0.5%, PASS. '6.4 P 4% PASS.

Tag ¹: 1-031 Peak Drag: 52.0 P.9%, PASS. 47.3 P.8% PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.002 PASS 0.003 PASS Serial ¹: 29505 Release (A/D)

Mark ¹: RC-005-90 Test Load: 4326 72.1% 4458 74.3%

Final Drag: 32.7 05% PASS. 41.0 0.7%, PASS.

Peak Drag: 56.9 P 9% PASS 60.8 1.0% PASS.

Breakaway 25.6 0.4%, PASS. 25.6 0.4% PASS.

Initial Drag: 25.4 0.4%, PASS. 4.9 0.1%, PASS.

Tag ¹: 1-035 Peak Drag: 36.4 P.6% PASS. 15.4 0.3%, PASS.

Mfg/Cap.: PSA-3 Activation (PSA); 0.007 PASS 0.006 PASS Serial ¹: 19348 Release (A/D)

Mark ¹: MS-1076-3164 Test Load: 4648 77.5% 4656 77 6'/

Final Drag: 13.9 0.2%, PASS. 7.1 P.1% PASS.

Peak Drag: 32.2 05% PASS 22.4 04% PASS.

(if Kl Q&ll aM 47.

t4

n io od 0 0 Breakaway 133.0 0.3%, PASS. 145.2 0.3% PASS.

Initial Drag 141.5 0.3%, PASS. 205.0 0 4'/ PASS Tag ¹: 1-036 Peak Drag 240.3 05%, PASS. 311.1 0.6%, PASS.

Mfg/Cap.: PSA-35 Activation (PSA) 0.002 PASS 0.000 PASS Serial ¹: 8452 Release (A/D)

Mark ¹: MS-649-314 Test Load: 37576 75 2% 39577 79.2%

Final Drag: 162.3 0.3%, PASS. 248.9 P5% PASS.

Peak Drag: 279.4 0.6%, PASS. 328.2 07% PASS.

Breakaway 235.5 0.2%, PASS. 380.6 0.3%, PASS.

Initial Drag 324.5 0,3%, PASS. 377.0 03% PASS Tag ¹: 1-044 Peak Drag 908.9 0.8%, PASS. 1101.7 P 9%, PASS.

Mfg/Cap.: PSA-100 Activation (PSA) 0.004 PASS 0.01 0 PASS Serial ¹: 1229 Release (A/D)

Mark ¹: BF-549-8 Test Load: 89670 74 7'I 90182 75.2%

Final Drag: 269.6 0.2%, PASS. 683.2 P.6% PASS.

Peak Drag: 961.4 P.8% PASS. 1331.0 1.1%, PASS.

Breakaway 49.5 0.3%, PASS. 45.6 0.3%, PASS.

Initial Drag 65.4 0.4%, PASS. 40.5 P.3% PASS Tag ¹: 1-045 Peak Drag 92.2 P.6%, PASS. 60.5 P4% PASS Mfg/Cap.: PSA-10 Activation (PSA) 0.038 0.018g over, FAILI 0.040 0.020g over, FAILI Serial ¹: 164 Release (A/D)

Mark ¹: BF-549-11 Test Load: 12054 80 4% 11053 73.7%

Final Drag: 79.1 05% PASS. 47.3 0.3%, PASS.

Peak Drag: 107.8 0.7%, PASS. 68.8 P5% PASS.

Breakaway 49.0 0.3%, PASS. 42.5 0.3%, PASS.

Initial Drag 44.2 0.3%, PASS. 32.0 0.2% PASS.

Tag ¹: 1-046 Peak Drag 75.4 0 5'/ PASS 52.2 0.3%, PASS.

Mfg/Cap.: PSA-10 Activation (PSA) 0.010 PASS 0.013 PASS Serial ¹: 171 Release (A/D)

Mark ¹: BF-549-11 Test Load: 11895 79.3% 11407 76.P Final Drag: 48.6 0.3%, PASS. 52.2 03% PASS.

Peak Drag: 78.8 0 5'/ PASS 69.5 0.5%, PASS.

Breakaway 144.0 03% PASS. 263.5 P 5% PASS.

Initial Drag 120.8 0.2%, PASS. 274.5 05% PASS Tag ¹: 1-047 Peak Drag 402.6 0.8% PASS. 436.8 0.9%, PASS.

Mfg/Cap.: PSA-35 Activation (PSA) 0.001 PASS 0.001 PASS Serial ¹: 8453 Release (A/D)

Mark ¹: BF-661-4020 Test Load: 37527 75 38406 76.8%

Final Drag: 176.9 1'.4%,

PASS. 344.0 0.7%, PASS.

Peak Drag: 464.8 09% PASS. 483.1 1.P%, PASS.

>pi l

1 'c1 l II 4/

1 1~1

Breakaway 20.0 0.3%, PASS. 13.7 0.2%, PASS.

Initial Drag 14.9 0.2%, PASS. 5.1 0.1%, PASS.

Tag ¹: 1-054 Peak Drag 29.5 P 5% PASS. 21.2 0.4%, PASS.

Mfg/Cap.: PSA-3 Activation (PSA) 0.009 PASS 0.008 PASS Serial ¹: 111 Release (A/D)

Mark ¹: SI-968-565 Test Load: 3821 63.7% 3733 62.2%

Final Drag: 15.4 0.3%, PASS. 25.6 P 4% PASS.

Peak Drag; 28.8 0.5%, PASS. 41.5 07% PASS.

Breakaway 14.4 0.2%, PASS. 15.9 0.3%, PASS.

Initial Drag 26.1 P 4% PASS 23.9 0.4%, PASS.

Tag ¹: 1-055 Peak Drag 37.6 0.6%, PASS. 42.5 0.7%, PASS.

Mfg/Cap.: PSA-3 Activation (PSA) 0.010 PASS 0.009 PASS Serial ¹: 119 Release (A/D)

Mark ¹: Sl-968-1205 Test Load: 3792 63.2% 3975 66.2%

Final Drag: 21.5 P 4% PASS 8.8 0.1% PASS.

Peak Drag: 35.4 p.6% PASS. 3P P P5% PASS.

Breakaway 42.9 0.3%, PASS. 30.3 0.2%, PASS.

Initial Drag 50.0 0.3%, PASS. 47.8 03% PASS.

Tag ¹: 1-057 Peak Drag 81.2 P 5% PASS. 102.7 0.7%, PASS.

Mfg/Cap.: PSA-10 Activation (PSA) 0.006 PASS 0.008 PASS Serial ¹: 113 Release (A/D)

Mark ¹: SI-969-1190 Test Load: 11797 78 6% 11 675 77.8%

Final Drag: 46.6 P3% PASS 46.1 03% PASS.

Peak Drag: 76.9 0 5'/ PASS 91.5 0.6%, PASS.

Breakaway 42.7 0.3%, PASS. 37.8 0.3% PASS.

Initial Drag 55.4 04% PASS. 62.7 0.4%, PASS.

Tag ¹: 1-063 Peak Drag 87.8 P.6% PASS. 75.9 P5% PASS.

Mfg/Cap.: PSA-10 Activation (PSA) 0.009 PASS 0.012 PASS Serial ¹: 100 Release (A/D)

Mark ¹: SI-969-6217 Test Load: 11200 74 7% 10724 71.5%

Final Drag: 27.3 0.2%, PASS. 42.P 0.3% PASS.

Peak Drag: 66.1 P 4% PASS. 58.3 0.4%, PASS.

Breakaway 31.0 0.2%, PASS. 28.8 0.2%, PASS.

Initial Drag 45.9 03% PASS. 42.7 P.3% PASS.

Tag ¹: 1-064 Peak Drag 60.0 0.4%, PASS. 66.6 P4% PASS.

Mfg/Cap.: PSA-10 Activation (PSA) 0.01 1 PASS 0.011 PASS Serial ¹: 112 Release (A/D)

Mark ¹: Sl-969-6217 Test Load: 11712 78.1~4 11248 75 0%

Final Drag: 33.2 0.2% PASS. 42.2 0.3%, PASS.

Peak Drag: 49.3 0.3%; PASS.* .! 63.9 04% PASS.

lg EN

~

g4 V(

Il pl

s 0 19.0 0.3%, PASS. 20.4 0.3%, PASS.

Breakaway'nitial Drag: 44.9 P.7% PASS 24.9 P 4% PASS Tag ¹: 1-066 Peak Drag: 67.3 1.1% PASS. 50.5 0.8% PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.004 PASS 0.004 PASS Serial ¹: 19345 Release (A/D)

Mark ¹: Sl-970-1248 Test Load: 4436 73 9% 4070 67.8%

Final Drag: 22.P P 4% PASS. 31.7 P 5% PASS.

Peak Drag: 42.7 P 7% PASS. 58.1 1.0%, PASS.

Breakaway: 44.9 0.3%, PASS. 104.9 P.7% PASS.

Initial Drag: 88.6 0 6% PASS 89.3 0.6%, PASS.

Tag ¹: 1-069 Peak Drag: 108.1 P.7% PASS 259.1 1.7%, PASS.

Mfg/Cap.: PSA-10 Activation (PSA): 0.007 PASS 0.008 PASS Serial ¹: 16611 Release (A/D)

Mark ¹: SI-971-1229 Test Load: 1 1 749 78.3% 1 1 297 75.3%

Final Drag: 44 4 03% PASS. 79 5 P5% PASS.

Peak Drag: 66 1 0 4'/ PASS 219.4 1.5%, PASS.

Breakaway 46.6 0.8%, PASS. 38.1 0.6%, PASS.

Initial Drag: 48.6 0.8%, PASS. 43.9 0.7%, PASS.

Tag ¹: 1-070 Peak Drag: 137.6 2.3%, PASS. 83.2 1.4%, PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.007 PASS 0.003 PASS Serial ¹: 30535 Release (A/D)

Mark ¹: SI-971-6229 Test Load: 5109 85.2% 5007 83 5%

Final Drag: 59.5 1.0%, PASS. 4P P P 7% PASS.

Peak Drag: 153.0 2.5%, PASS. 65.9 1.1%, PASS.

Breakaway: 39.5 0.7%, PASS. 37.8 0.6%, PASS.

Initial Drag: 39.8 0.7%, PASS. 39.3 07% PASS.

Tag ¹: 1-071 Peak Drag: 57.3 1.0%, PASS. 56.9 P.9% PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.009 PASS 0.011 PASS Serial ¹: 112 Release (A/D)

Mark ¹: SI-971-6236 Test Load: 4736 78 9% 4831 80.5%

Final Drag: 26.8 0.4%, PASS. 48.6 0.8%, PASS.

Peak Drag: 45.1 0.8% PASS. 62.2 1.0%, PASS.

Breakaway: 46.6 0.3% PASS. 52.0 0.3%, PASS.

initial Drag: 43.7 03% PASS. 53.4 P4% PASS.

Tag ¹: 1-072 Peak Drag: 69.5 0.5%, PASS. 75.6 P 5%i PASS.

Mfg/Cap.: PSA-10 Activation (PSA): 0.01 1 PASS 0.015 PASS Serial ¹: 101 Release (A/D)

Mark ¹: SI-972-1243 Test Load: 1 2200 81.3% 12151 81.0%

Final Drag: 25.1 0.2%, PASS. 66.4 0.4%, PASS.

Peak Drag: 544 P4% PASS. 88.8 0.6%, PASS.

C g

b

$~

4

+I g

k f

Vd I

Breakaway: 499.5 8.3%, 199¹ over, FAIL! 499.7 8.3%, 199.7¹ over, FAIL!

Initial Drag: 460.7 7.7%, 160.7¹ over, FAIL! 491.7 8.2%, 191.7¹ over, FAILI Tag ¹: 1-073 Peak Drag: 499.5 8.3%, 199¹ over, FAIL! 499.7 8.3%, 200¹ over, FAILI Mfg/Cap.: PSA-3 Activation (PSA): 0.000 PASS 0.000 PASS Serial ¹: 26881 Release (A/D)

Mark ¹: Sl-972-6240 Test Load: 3287 54.8% 341 8 57.0%

Final Drag: 478.7 8.0%, 178.7¹ over, FAIL! 493.1 8.2%, 193.1¹ over, FAILI Peak Drag: 499.5 8.3%, 199¹ over, FAIL! 499.7 8.3%, 200¹ over, FAILI Breakaway: 25.4 0.4%, PASS. 20.5 0.3%, PASS.

Initial Drag: 16.6 03% PASS. 13.2 0.2%, PASS.

Tag ¹: 1-076 Peak Drag: 28 1 ~ 05% PASS. 24.4 0.4%, PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.003 PASS 0.004 PASS Serial ¹: 29502 Release (A/D)

Mark ¹: SI-973-6224 Test Load: 4041 67.3% 4085 68.1%

Final Drag: 12.2 0.2%, PASS. 29.0 0 5% PASS.

Peak Drag: 27.1 0.5%, PASS. 43 9 07% PASS.

Breakaway: 28.3 05% PASS. 41.2 0.7%, PASS.

Initial Drag; 15.1 0.3%, PASS. 33.7 0.6% PASS.

Tag ¹: 1-079 Peak Drag; 32.2 05% PASS 60.3 1.0% PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.010 PASS 0.027 0.007g over, FAILI Serial ¹: 19349 Release (A/D)

Mark ¹: Sl-868-163 Test Load: 7605 1 26.8% 4890 81.5%

Final Drag: 58.8 1.0% PASS. 57.1 1.0%, PASS.

Peak Drag: 78.6 1.3% PASS. 75.9 1.3%, PASS.

Breakaway: 27.6 0.5%, PASS. 20.5 0.3%, PASS.

Initial Drag: 22.0 0.4% PASS. 16.4 0.3% PASS.

Tag ¹: 1-080 Peak Drag: 39 3 0.7% PASS. 54.7 09% PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.027 0.007g over, FAIL! 0.027 0.007g over, FAILI Serial ¹: 19352 Release (A/D)

Mark ¹: Sl-868-410 Test Load: 2350 39.2% 695 11.6%

Final Drag: 49.0 0.8% PASS 15.4 0 3%, PASS.

Peak Drag: 75.9 1.3% PASS. 35.4 0.6%, PASS.

Breakaway. 19.8 0.3% PASS. 13.9 0.2%, PASS.

Initial Drag: 18.1 0.3%, PASS. 7.3- 01% PASS Tag ¹: 1-081 Peak Drag: 26.4 04% PASS. 16.6 0.3%, PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.005 PASS 0.006 PASS Serial ¹: 17189 Release (A/D)

Mark ¹: SI-676-67 Test Load: 4743 79.0% 4802 80.0%

Final Drag: 17.8 0.3% PASS. 9.8 0.2% PASS.

Peak Drag: 26.1 0.4%, PASS. 16.8 03% PASS.

l ll I

I" I

~

f 3O

ee re Breakaway: 32.0 0.2%, PASS. 37.8 0.3% PASS.

Initial Drag: 29.0 0.2%, PASS. 32.9 0.2%, PASS.

Tag ¹: 1-085 Peak Drag: 44.4 0.3%, PASS. 48.8 P.3% PASS Mfg/Cap.: PSA-10 Activation (PSA): 0.013 PASS 0.013 PASS Serial ¹: 115 Release (A/D)

Mark ¹: Sl-676-127 Test Load: 12212 81.4% 11932 79.5%

Final Drag: 24.4 0.2%, PASS. 31.7 0.2%, PASS.

Peak Drag: 38.5 P.3% PASS. 47.8 0.3%, PASS.

Breakaway: 13.7 0.2%, PASS. 16.1 0.3%, PASS.

Initial Drag: 11.8 0.2%, PASS. 7.7 0.1% PASS.

Tag ¹: 1-087 Peak Drag: 28.4 0.5%, PASS. 36.3 0.6% PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.006 PASS 0.003 PASS Serial ¹: 18843 Release (A/D)

Mark ¹: SI-676-250 Test Load: 4780 79.7% 4619 77 P%

Final Drag: 22.2 P 4% PASS. 27.3 P.5% PASS Peak Drag: 60.5 1.P% PASS. 114.2 1.9%, PASS.

Breakaway: 17.8 0.3%, PASS. 7.6 0.1% PASS.

Initial Drag: 9.6 0.2%, PASS. 10.0 0.2%, PASS.

Tag ¹: 1-091 Peak Drag: 20.2 0.3%, PASS. 23.4 04% PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.004 PASS 0.008 PASS Serial ¹: 19353 Release (A/D)

Mark ¹: SPS-417 Test Load: 4165 69 4% 4070 67.8%

Final Drag: 12.5 0.2%, PASS. 8.0 0.1%, PASS.

Peak Drag: 24.4 P 4% PASS. 21.4 0.4% PASS.

Breakaway: 11.5 0.2%, PASS. 6.6 0.1%, PASS.

Initial Drag: 17.8 0.3%, PASS. 7.3 0.1% PASS.

Tag ¹: 1-094 Peak Drag: 25.9 P.4% PASS 15.9 0.3%, PASS.

Mfg/Cap.: PSA-3 Activation (PSA); 0.009 PASS 0.010 PASS Serial ¹: 102 Release (A/D)

Mark ¹: CS-832-118 Test Load: 4487 74 8'/ 4187 69.8%

Final Drag: 9.8 0.2%, PASS. 3.7 0.1%, PASS.

Peak Drag: 17.8 P.3% PASS 11.0 0.2%, PASS.

Breakaway; 12.9 0.2%, PASS. 19.5 0.3%, PASS.

Initial Drag: 23.4 P4% PASS. 11.0 P.2% PASS.

Tag ¹: 1-095 Peak Drag: 30.0 P 5% PASS. 21.7 P.4% PASS Mfg/Cap.: PSA-3 Activation (PSA): 0.011 PASS 0.011 PASS Serial ¹: 110 Release (A/D)

Mark ¹: CS-878-115 Test Load: 4560 76 0% 4282 71 4%

Final Drag: 10.7 0.2%, PASS. 11.2 0.2%, PASS.

Peak Drag: 18.1 03% PASS. 42.7 p.7% PASS

P P

P l~

r,~

P Breakaway 18.5 0.3%, PASS. 13.4 0.2%, PASS.

Initial Drag: 18.8 0.3%, PASS. 11.7 0.2%, PASS.

Tag ¹: 1-096 Peak Drag: 89.0 1.5% PASS. 29.5 P5%, PASS Mfg/Cap.: PSA-3 Activation (PSA): 0.004 PASS 0.007 PASS Serial ¹: 19360 Release (A/D)

Mark ¹: CC-1865-9 Test Load: 4055 67 6% 4041 67 3%

Final Drag: 18.3 0.3%, PASS. 14.4 0.2%, PASS.

Peak Drag: 36.1 0.6%, PASS. 35.9 P.6% PASS.

Breakaway. 48.1 0.3%, PASS. 9.0 0.1%, PASS.

Initial Drag: 72.7 0.5%, PASS. 22.9 0.2%, PASS.

Tag ¹: 1-101 Peak Drag: 'I 01.0 P 7% PASS. 74.4 P 5% PASS Mfg/Cap.: PSA-10 Activation (PSA): 0.025 0.005g over, FAILI 0.016 PASS Serial ¹: 16443 Release (A/D)

Mark ¹: CC-17-1 Test Load: 11000 73.3% 11000 73.3%

Final Drag: 58.1 P.4%, PASS. 30.7 0.2%, PASS.

Peak Drag: 86.6 0.6%, PASS. 78.3 P5% PASS.

Breakaway: 63.7 0.4%, PASS. 60.5 0.4%, PASS.

Initial Drag: 58.1 0.4%, PASS. 57.6 0.4%, PASS.

Tag ¹: 1-102 Peak Drag: 88.8 0.6%, PASS. 94.7 0.6%, PASS.

Mfg/Cap.: PSA-10 Activation (PSA): 0.007 PASS 0.010 PASS Serial ¹: 14478 Release (A/D)

Mark ¹: CC-14-2 Test Load: 11907 79 40/ 11736 78.2%

Final Drag: 56.9 04% PASS. 60.3 P.4% PASS.

Peak Drag: 89.5 0.6% PASS. 98.1 07% PASS Breakaway: 22.2 0.4%, PASS. 26.6 04% PASS Initial Drag: 23.4 P 4% PASS 32.9 P 5%i PASS.

Tag ¹: 1-106 Peak Drag: 32.0 P5% PASS. 32.9 0.5%, PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.009 PASS 0.011 PASS Serial ¹: 19358 Release (A/D)

Mark ¹: CH-64-40 Test Load: 4875 81.2% 4963- 82.7%

Final Drag: 22.0 P.4% PASS 21.5 P 4% PASS.

Peak Drag: 32.7 0 5% PASS 31.2 P5% PASS.

Breakaway 61 9.8 10.3%, PASS. 129.3 2.2% PASS.

Initial Drag: 460.9 7.7%, 160.9¹ over, FAILI 483.9 8.1%, 183.8¹ over, FAILI Tag ¹: 1-114 Peak Drag: 499.5 8.3%, 199¹ over, FAILI 499.7 8.3%, 200¹ over, FAILI Mfg/Cap.: PSA-3 Activation (PSA): 0.003 PASS 0.001 PASS Serial ¹: 26882 Release (A/D)

Mark ¹: Sl-972-6240 Test Load: 3733 62.2% 3924 65 4'l Final Drag: 400.9 6.7%, 100.9¹ over, FAILI 439.2 7.3%, 139.2¹ over, FAILI Peak Drag: 499.5 8.3%, 199¹ over, FAIL! 499.7 8.3%, 200¹ over, 'FAlL!

yk~

ling~'

e o 0 e Breakaway: 12.7 3.2%, PASS. 11.0 2.7% PASS.

initial Drag: 12.7 3.2%, PASS. 13.1 3.3%, PASS.

Tag ¹: 1-117 Peak Drag: 15.2 3.8%, PASS. 16.5 4.1%, PASS.

Mfg/Cap.: A/D-41 Activation (PSA):

Serial ¹: 1297 Release (A/D) 54.500 PASS. 54.100 PASS.

Mark ¹: RC-1-221A Test Load: 322 80.5% 334 83 5%

Final Drag: 12.1 3.0%, PASS. 15.1 3.8% PASS.

Peak Drag: 14.4 3.6% PASS. 30.4 7.6%, 10¹ over, FAILI Breakaway: 4.8 1.4% PASS 6.3 1.8%, PASS.

initial Drag: 33.8 9.7%, 16.3¹ over, FAILI 19.9 5.7%, 2.4¹ over, FAILI Tag ¹: 1-118 Peak Drag: 50.0 14.3%, 32¹ over, FAILI 50.0 14.3%, 32¹ over, FAILI Mfg/Cap.: PSA-1/4 Activation (PSA): 0.011 PASS 0.010 PASS Serial ¹: 29367 Release (A/D)

Mark ¹: RC-1-124B Test Load: 266 6 Oo/ 311 88 9%

Final Drag: 35.2 10.1%, 17.7¹ over, FAILI 5.1 1.5%, PASS.

Peak Drag: 50.0 14.3%, 32¹ over, FAILI 50.0 14.3%, 32¹ over, FAILI Breakaway: 6.5 1.6%, PASS. 5.6 1.4%, PASS.

Initial Drag: 5.0 1.2%, PASS. 8.5 2.1%, PASS.

Tag ¹: 1-120 Peak Drag: 9.8 2.4% PASS. 10.8 2.7%, PASS.

Mfg/Cap.: A/D-41 Activation (PSA):

Serial ¹: 1287 Release (A/D) 5.200 FAIL. 113.200 FAIL.

Mark ¹: RC-1-192A Test Load: 0 P P% 9 2.2%

Final Drag: 6.3 1 6'/ PASS 6.5 1.6% PASS.

Peak Drag: 8.9 2.2%, PASS. 7.6 1.9%, PASS.

Breakaway: 3.0 0.9%, PASS. 3.5 1.0%, PASS.

Initial Drag: 4.7 1.4% PASS. 4.7 1.3%, PASS.

Tag ¹: 1-121 Peak Drag: 6.8 1.9%, PASS. 6.9 2.0%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.011 PASS 0.013 PASS Serial ¹: 19778 Release (A/D)

Mark ¹: RC-5-475 Test Load: 261 74 6'/ 253 72.3%

Final Drag: 2.9 0.8%, PASS. 4.8 1.4% PASS.

Peak Drag: 4.5 1.3%, PASS. 7.2 2.1%, PASS.

Breakaway 8.2 2.3%, PASS. 13.9 4 0%i PASS.

Initial Drag: 6.5 1.9'/, PASS. 9 9 2.8%, PASS.

Tag ¹: 1-122 Peak Drag: 16.4 4.7%, PASS. 12.8 3.7%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.012 PASS 0.007 PASS Serial ¹: 4152 Release (A/D)

Mark ¹: CH-129-99 Test Load: 296 84.6/o 282 80 6%

Final Drag: 10.7 3.1%, PASS. 9.6. 2.8%, PASS.

Peak Drag: 15.7 4 5%,PASS.<<.: " 12.1 3.4%, PASS.

"C ep,"

y4 pt

e o Breakaway: 1.9 0.5%, PASS. 3.1 09%, PASS.

Initial Drag: 4.9 1.4%, PASS. 5.9 1.7% PASS.

Tag ¹: 1-123 Peak Drag: 6.9 2.0%, PASS. 8.0 2.3% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.008 PASS 0.009 PASS Serial ¹: 11412 Release (A/D)

Mark ¹: RC-217-5 Test Load: 271 77 4% 274 78.3%

Final Drag: 2.7 0.8%, PASS. 4.4 1.3%,

PASS.'.9%,

Peak Drag: 4.5 1.3% PASS. 6.5 PASS.

Breakaway: 3.4 1.0%, PASS. 2.5 07%, PASS.

Initial Drag: 2.7 0.8%, PASS. 3.2 0 9'i PASS Tag ¹: 1-124 Peak Drag: 4.0 1.1%, PASS. 4.2 1.2%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.011 PASS 0.009 PASS Serial ¹: 36531 Release (A/D)

Mark ¹: CH-65-54C Test Load: 280 80.0% 283 80.9%

Final Drag: 3.1 09% PASS 3.4 1.0%, PASS.

Peak Drag: 4.2 1.2%, PASS. 4.2 1.2% PASS.

Breakaway 7.7 2.2%, PASS. 9.8 2.8% PASS.

Initial Drag: 9.2 2.6%, PASS. 13.1 3.8% PASS.

Tag ¹: 1-125 Peak Drag: 11.7 3.4%, PASS. 16.1 4.6% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.012 PASS 0.011 PASS Serial ¹: 20283 Release (A/D)

Mark ¹: CH-142-9 Test Load: 275 78.6% 267 76.3%

Final Drag: 9.9 2.8%, PASS. 16.0 4.6%, PASS.

Peak Drag: 14.2 4.0% PASS. 21.5 6.1% 4¹ over, FAILI Breakaway 9.0 2.6%, PASS. 9.1 2.6%, PASS.

Initial Drag; 8.6 2.5%, PASS. 13.3 3.8%, PASS.

Tag ¹: 1-126 Peak Drag: 11.7 3.3%, PASS. 16.4 4.7%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.01 1 PASS Serial ¹: 36814 Release (A/D)

Mark ¹: CH-143-30C Test Load: 248 70.9% 229 65 4'/

Final Drag: 8.8 2.5%, PASS. 11.7 3.4%, PASS.

Peak Drag: 12.0 34% PASS 14.7 4.2%, PASS.

Breakaway: 7.5 2.1%, PASS. 6.4 1.8%, PASS.

Initial Drag: 7.2 2.0% PASS. 7.4 2.1% PASS.

Tag ¹: 1-127 Peak Drag: 9.6 2.7%, PASS. 9.2 2.6% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.011 PASS 0.009 PASS Serial ¹: 20210 Release (A/D)

Mark ¹: RC-215-9A Test Load: 264 75.4% 266 76 0'/

Final Drag: 3.7 1.0%, PASS. 7.4 2 1o/ PASS Peak Drag: 6.0 1.7% PASS. 10.1 2.9%, PASS.

lg

."I gi

lo od Breakaway: 2.1 0.6%, PASS. 6.1 1.7%, PASS.

Initial Drag: 3.2 P 9%, PASS. 7.0 2.0%, PASS.

Tag ¹: 1-128 Peak Drag: 5.4 1.5%, PASS. 9.4 2.7%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.009 PASS Serial ¹: 29182 Release (A/D)

Mark ¹: MSI-22-3A Test Load: 246 70.3% 240 68.6%

Final Drag: 5.3 1.5% PASS. 7.3 2.1%, PASS.

Peak Drag: 7.6 2.2%, PASS. 10.4 3.0% PASS.

Breakaway. 4.7 1.4%, PASS. 4.8 1.4%, PASS.

Initial Drag: 4.8 1.4%, PASS. 5.6 1.6%, PASS.

Tag ¹: 1-130 Peak Drag: 6.0 1.7%, PASS. 6.7 1.9% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.008 PASS Serial ¹: 11850 Release (A/D)

Mark ¹: MSI-20-3A Test Load: 278 79 40/ 262 74.9%

Final Drag: 3.6 1.0%, PASS. 5.1 1.5%, PASS.

Peak Drag: 5.0 1.4%, PASS. 6.2 1.8%, PASS.

Breakaway: 5.1 1.5%, PASS. 6.8 1.9%, PASS.

Initial Drag: 3.3 09% PASS. 6.8 1.9% PASS.

Tag ¹: 1-131 Peak Drag: 6.0 1.7%, PASS. 9.2 2.6%, PASS.

Mtg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.009 PASS Serial ¹: 20296 Release (A/D)

Mark ¹: MSI-16-3A Test Load: 68.3% 227 64.9%

239'.8 Final Drag; 1.1% PASS. 6.8 1.9%, PASS.

Peak Drag: 8.1 2.3% PASS. 9.P 2.6% PASS.

Breakaway: 4.2 1.2%, PASS. 5.5 1.6%, PASS.

Initial Drag: 2.8 0.8%, PASS. 7.4 2.1%, PASS.

Tag ¹: 1-132 Peak Drag: 5.4 1 5'/ PASS 10.8 3.1%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.009 PASS Serial ¹: 29371 Release (A/D)

Mark ¹: CH-125-356 Test Load: 273 78.0% 269 76.9%

Final Drag: 2.8 0.8%, PASS. 8.7 2.5%, PASS.

Peak Drag: 5.3 1 5% PASS 11.2 3.2%, PASS.

Breakaway: 4.2 1.2%, PASS. 3.8 1.1%, PASS.

Initial Drag: 4.6 1.3%, PASS. 5.1 1.5% PASS.

Tag ¹: 1-133 Peak Drag: 5.7 1.6% PASS. 7.6 2.2%, PASS.

Mtg/Cap.: PSA-1/4 Activation (PSA): 0.007 PASS 0.010 PASS Serial ¹: 11838 Release (A/D)

Mark ¹: MSI-14-3A Test Load: 277 79.1% 269 76.9%

Final Drag: 2.1 0.6% PASS. 4.7 1.3%, PASS.

Peak Drag: 4.4 1.3% PASS. 6.2 1.8%, PASS

Qy I f/'y

s 0 Breakaway: 3.2 P 9% PASS 6.8 1.9% PASS Initial Drag: 7.2 2.1% PASS. 4.7 1.4% PASS.

Tag ¹: 1-134 Peak Drag: 10.0 2.9%, PASS. 7.7 2.2%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.008 PASS 0.009 PASS Serial ¹: 29193 Release (A/D)

Mark ¹: CH-129-339 Test Load: 280 80.0% 277 79.1%

Final Drag: 2.5 0.7%, PASS. 4.0 1.1%, PASS.

Peak Drag: 5.6 1.6% PASS. 6.8 1.9% PASS.

Breakaway: 3.2 09% PASS. 3.1 09% PASS.

Initial Drag: 4.4 1.3%, PASS. 4.5 1.3% PASS.

Tag ¹: 1-135 Peak Drag: 5.9 1.7% PASS 6.9 2.p% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.008 PASS Serial ¹: 19085 Release (A/D)

Mark ¹: RC-220-105 Test Load: 257 73 4% 256 73. 1%

Final Drag: 4.0 1 to/o PASS 4.8 1.4% PASS.

Peak Drag: 5.2 1.5%, PASS. 5.8 1.7% PASS.

Breakaway 12.8 3.7%, PASS. 8.3 2.4%, PASS.

Initial Drag 10.7 30% PASS. 13.2 3.8% PASS.

Tag ¹: 1-136 Peak Drag; 13.9 4.0%, PASS. 16.7 4.8% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.007 PASS Serial ¹: 11835 Release (A/D)

Mark ¹: RC-217-5 Test Load: 271 77 40/ 265 75 7%

Final Drag: 6.5 1.9% PASS 11.8 3.4%, PASS.

Peak Drag: 10.1 2.9% PASS. 15.4 4.4%, PASS.

Breakaway 9.5 2.7%, PASS. 9.2 2.6%, PASS.

Initial Drag: 12.3 3.5%, PASS. ,11.9 34% PASS Tag ¹: 1-137 Peak Drag: 17.4 5p% PASS. 16.0 4.6%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.014 PASS 0.012 PASS Serial ¹: 12898 Release (A/D)

Mark ¹: CH-129-339 Test Load: 257 73.4% 255 72.9%

Final Drag: 4.3 1.2% PASS. 9.9 2.8%, PASS.

Peak Drag: 9.2 2.6% PASS. 14.4 4.1%, PASS.

Breakaway 2.3 0.7%, PASS. 3.2 0.9%, PASS.

Initial Drag: 4.4 1.3%, PASS. 7.6 2.2% PASS.

Tag ¹: 1-138 Peak Drag: 6.9 2.0%, PASS. 9.8 2.8'/o PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.010 PASS 0.01 0 PASS Serial ¹: 29197 Release (A/D)

Mark ¹: RC-114-129 Test Load: 248 70.9% 244 69.7%

Final Drag: 3.4 1.0%, PASS. 4.5 1.3% PASS.

Peak Drag: 5.6 1.6% PASS. 6.7 1.9%, PASS.

I N

/

A~*

Tf Ow

Breakaway 2.4 0.7%, PASS. 3.9 1.1%, PASS.

Initial Drag 2.1 06% PASS 3.7 1.1%, PASS.

Tag ¹: 1-139 Peak Drag 4.1 1.2%, PASS. 5.0 1.4%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.013 PASS 0.012 PASS Serial ¹: 11428 Release (A/D)

Mark ¹: RC-221-162 Test Load: 269 76 9'/ 247 7P 6'/

Final Drag; 2.6 P 7% PASS 3.7 1.1% PASS.

Peak Drag: 4.2 1.2'/o PASS. 4.9 1.4% PASS.

Breakaway 5.4 1.5%, PASS. 4.0 1.2%, PASS.

Initial Drag 4.8 1.4%, PASS. 6.4 1.8%, PASS.

Tag ¹: 1-140 Peak Drag 6.9 2.0%, PASS. 8.3 2.4%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.009 PASS 0.012 PASS Serial ¹: 20290 Release (A/D)

Mark ¹: CH-187-38A Test Load: 262 74.9% 262 74.9%

Final Drag: 2.9 0.8%, PASS. 6.5 1.9%, PASS.

Peak Drag: 4.6 1.3%, PASS. 8.5 2.4%, PASS.

Breakaway 3.1 09%, PASS. 7.0 2.P% PASS.

Initial Drag 2.5 0.7%, PASS. 6.6 1.9%, PASS.

Tag ¹: 1-141 Peak Drag 4.2 1 2o/ PASS 7.6 2.2%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.008 PASS 0.008 PASS Serial ¹: 20179 Release (A/D)

Mark ¹: CH-143-26C Test Load: 237 67 7'/ 228 65.1%

0 Final Drag: 3.5 1.0% PASS. 7.1 2.0%, PASS.

Peak Drag: 4.7 1.3%, PASS. 8.3 2.4%, PASS.

Breakaway 6.1 1.7%, PASS. 5.9 1.7% PASS.

Initial Drag 6.7 1.9%, PASS. 9.7 2.8%, PASS.

Tag ¹: 1-142 Peak Drag 0.5 0.1%, PASS. 15.5 44% PASS Mfg/Cap.: PSA-1/4 Activation (PSA) 0.010 PASS 0.009 PASS Serial ¹: 29370 Release (A/D)

L Mark ¹: CH-141-74 Test Load: 253 72 3% 252 72.0%

Final Drag: 3.8 1.1%, PASS. 10.9 3.1%, PASS.

Peak Drag: 8.3 2.4%, PASS. 16.9 4.8% PASS.

Breakaway 50.0 14.3%, 32¹ over, FAILI 50.0 14.3%, 32.5¹ over, FAILI Initial Drag 47.2 13.5%, 29.7¹ over, FAILI 48.8 13.9%, 31.3¹ over, FAILI Tag ¹: 1-144 Peak Drag 50.0 14.3%, 32¹ over, FAILI 50.0 14.3%, 32¹ over, FAILI Mfg/Cap.: PSA-1/4 Activation (PSA) 0.000 PASS 0.000 PASS Serial ¹: 19781 Release (A/D)

Mark ¹: RC-128-99 Test Load: 268 76.6% 265 75.7%

Final Drag: 44.8 12.8%, 27.3¹ over, FAILI 48.8 13.9%, 31.3¹ over, FAILI Peak Drag: 50.0 14.3%, 32¹ over, FAILI 50.0 14.3%, 32¹ over, FAILI

4 ~ 'l'! I I ~

Q V

4

~j p

Breakaway 16.5 4.7%, PASS. 13.1 3.7%, PASS.

Initial Drag: 15.6 45% PASS 12.1 3.4%, PASS.

Tag ¹: 1-145 Peak Drag: 18.5 5.3%, 1¹ over, FAIL! 19.0 5.4%, 1¹ over, FAILI Mfg/Cap.: PSA-1/4 Activation (PSA): 0.015 PASS 0.01 0 PASS Serial ¹: 20293 Release (A/D)

Mark ¹: CH-143-34C Test Load: 279 79.7% 281 80.3%

Final Drag: 15.3 4.4% PASS 12.0 34% PASS Peak Drag: 19.0 5.4%, 1¹ over, FAIL! 17.4 50% PASS.

Breakaway 3.8 1.1%, PASS. 2.9 0.8%, PASS.

Initial Drag 3.3 0.9%, PASS. 3.8 1.1%, PASS.

Tag ¹: 1-147 Peak Drag 5.0 1.4% PASS. 5.6 1.6% PASS Mfg/Cap.: PSA-1/4 Activation (PSA) 0.014 PASS 0.012 PASS Serial ¹: 19101 Release (A/D)

Mark ¹: CH-141-36C Test Load: 264 75 40/ 274 78.3%

Final Drag: 3.3 1.0%, PASS. 4.0 1.1%, PASS.

Peak Drag: 4.8 1.4% PASS. 6.0 1.7%, PASS.

Breakaway: 4.1 0.3%, PASS. 4.6 0.3%, PASS.

Initial Drag: 8.1 P5% PASS. 10.6 P.7% PASS.

Tag ¹: 1-148 Peak Drag: 2.0 P.1% PASS. 15.5 1.0%, PASS.

Mfg/Cap.: PSA-1 Activation (PSA): 0.014 PASS 0.012 PASS Serial ¹: 20184 Release (A/D)

Mark ¹: RC-1-124A Test Load: 274 18.3% 267 17.8%

Final Drag; 5.0 0.3%, PASS. 8.0 05% PASS.

Peak Drag; 7.8 0 5% PASS 12.1 0.8%, PASS.

Breakaway. 1.6 0.5%, PASS. 2.7 P.8%, PASS.

Initial Drag: 4.0 1 1'/ PASS 5.4 1.6%, PASS.

Tag ¹: 1-150 Peak Drag: 6.2 1.8% PASS. 7.0 2.0%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.014 PASS 0.013 PASS Serial ¹: 11427 Release (A/D)

Mark ¹: MSI-8-3A Test Load: 254 72.6% 267 76.3%

Final Drag: 2.7 0.8%, PASS. 5.2 1.5% PASS.

Peak Drag: 5.0 1.4% PASS. 7.0 2.0%, PASS.

Breakaway 5.8 1.7%, PASS. 4.4 1.3%, PASS.

Initial Drag: 7.0 2.0%, PASS. 7.5 2.1%, PASS.

Tag ¹: 1-151 Peak Drag: 9.8 2.8% PASS. 11.8 3.4%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.005 PASS 0.004 PASS Serial ¹: 11830 Release (A/D)

Mark ¹: CH-142-17 Test Load: 283 80:9~/ 282 80.6%

Final Drag: 4.1 1.2% P,ASS. 8.8 2.5'/, PASS.

Peak Drag: 7.0 4 t 2.0%, PASS~."

" 14.7 4.2%, PASS.

"~i V

'I 1((

4~

QP

Breakaway 3.1 0.9%, PASS. 6.6 1.9%, PASS.

Initial Drag: 13.1 3.8%, PASS. 29.7 8.5%, 12.2¹ over, FAILI Tag ¹: 1-153 Peak Drag: 21.5 6.1%, 4¹ over, FAILI 45.2 12.9%, 28¹ over, FAILI Mfg/Cap.: PSA-1/4 Activation (PSA): 0.002 PASS 0.002 PASS Serial ¹: 19782 Release (A/D)

Mark ¹: RC-165-11 Test Load: 251 71.7% 262 74.9%

Final Drag: 7.7 2.2%, PASS. 12.5 3.6%, PASS.

Peak Drag: 12.0 34% PASS 17.5 5.0%, 0¹ over, FAILI Breakaway: 1.9 0.5%, PASS. 3.1 09% PASS.

Initial Drag: 2.5 P 7% PASS 4.1 1.2%, PASS.

Tag ¹: 1-154 Peak Drag: 4.0 1.2% PASS. 5.8 1.7%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.008 PASS Serial ¹: 20182 Release (A/D)

Mark ¹: MSI-18-3A Test Load: 277 79 1'I 281 80.3%

Final Drag; 2.0 P.6% PASS. 4.2 1.2% PASS.

Peak Drag: 3.6 1.0% PASS. 6.4 1.8%, PASS.

Breakaway 3.9 1.0%, PASS. 8.3 2.1%, PASS.

Initial Drag: 15.5 39% PASS 13.3 3.3% PASS Tag ¹: 1-155 Peak Drag; 18.6 4.7%, PASS. 50.0 12.5%, 30¹ over, FAILI Mfg/Cap.: A/D-41 Activation (PSA):,

Serial ¹: 1302 Release (A/D) 47.200 PASS. 45.200 PASS.

Mark ¹: RC-128-99 Test Load: 324 81.0% 319 79 8%

Final Drag: 6.9 1.7% PASS. 48.7 12.2%, 28.7¹ over, FAIL!

Peak Drag: 10.0 2.5%, PASS. 48.7 12.2%, 29¹ over, FAILI Breakaway 7.7 1.9%, PASS. 3.4 09% PASS Initial Drag: 7.1 1.8% PASS. 7.1 1.8% PASS.

Tag ¹: 1-156 Peak Drag: 9.9 2.5%, PASS. 10.4 2.6%, PASS.

Mfg/Cap.: A/D-41 Activation (PSA):

Serial ¹: 1293 Release (A/0) 56.500 PASS. 52.100 PASS.

Mark ¹: MSI-12-3A Test Load: 342 85 5% 326 81 5%

Final Drag: 6.7 1.7% PASS. 6.4 1.6% PASS.

Peak Drag: 8.8 2.2%, PASS. 10.2 2.5%, PASS.

Breakaway: 1.4 0.4%, PASS. 4.6 1.3%, PASS.

Initial Drag: 2.2 0.6%, PASS. 6.0 1.7% PASS.

Tag ¹: 1-157 Peak Drag: 4.9 1.4%, PASS. 8.2 2.3% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.011 PASS 0.013 PASS Serial ¹: 19784 Release (A/D)

Mark ¹: RC-219-6B Test Load: 277 79.1% 276 78 9%

Final Drag: 3.8 1.1% PASS. 5.4 1.5% PASS Peak Drag: 6.7 1.9%, PASS. 7.0 2.0% PASS.

"4 l'>g

/~

j

~f

~

I fc

Breakaway 5.7 1.6%, PASS. 3.2 0.9%, PASS.

Initial Drag 3.8 1.1%, PASS. 6.1 1.7% PASS.

Tag ¹: 1-158 Peak Drag 5.6 1.6%, PASS. 8.0 2.3%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.009 PASS 0.011 PASS Serial ¹: 19021 Release (A/D)

Mark ¹: CH-142-18 Test Load: 282 80. 6% 278 79 40/

Final Drag: 3.7 1 0% PASS 5.6 1.6%, PASS.

Peak Drag: 5.2 1.5%, PASS. 7.2 2.1%, PASS.

Breakaway 7.0 2.0% PASS. 10.8 3.1%, PASS.

Initial Drag 9.1 2.6% PASS. 9.6 2.7%, PASS.

Tag ¹: 1-160 Peak Drag 1 1.8 3.4% PASS. 14.3 4.1%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.008 PASS 0.010 PASS Serial ¹: 36815 Release (A/D)

Mark ¹: CH-142-18 Test Load: 302 86.3% 285 81 4%

Final Drag: 6.7 1.9%, PASS. 7.9 2.3%, PASS.

Peak Drag: 9.8 2.8%, PASS. 10.1 2.9% PASS.

Breakaway 10.2 0.7%, PASS. 19.3 1.3%, PASS.

Initial Drag 12.7 0.8% PASS. 16.6 1.1%, PASS.

Tag ¹: 1-161 Peak Drag 27.3 1.8%, PASS. 27.1 1.8% PASS.

Mfg/Cap.: PSA-1 Activation (PSA) 0.007 PASS 0.012 PASS Serial ¹: 12790 Release (A/D)

Mark ¹: RC-165-11 Test Load: 1149 76.6% 1139 75 90/

0 Final Drag: 11.0 0.7%, PASS. 19.3 1.3%, PASS.

Peak Drag: 23.7 1.6%, PASS. 30.0 2.0% PASS.

Breakaway 4.3 1.2%, PASS. 5.3 1.5%, PASS.

Initial Drag 6.5 1.9% PASS. 7.6 2.2%, PASS.

Tag ¹: 1-162 Peak Drag 8.6 2.5%, PASS. 9.5 2.7%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.005 PASS 0.010 PASS Serial ¹: 20255 Release (A/D)

Mark ¹: RC-217-5 Test Load: 273 78.0% 276 78 9%

Final Drag: 2.8 0.8%, PASS. 7.7 2.2%, PASS.

Peak Drag: 5.7 1.6% PASS. 9.7 2.8%, PASS.

Breakaway 2.8 0.8%, PASS. 6.2 1.8%, PASS.

Initial Drag 2.2 0.6% PASS. 5.7 1.6% PASS.

Tag ¹: 1-163 Peak Drag 4.7 1.3%, PASS. 7.7 2.2%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.010 PASS 0.011 PASS Serial ¹: 29187 Release (A/D)

Mark ¹: SI.69-58 Test Load: 241 68 9% 244 69.7%

Final Drag: 4.2 1.2%, PASS. 6.5 1.9% PASS.

Peak Drag: 7.3 2.1%, PASS. 8.5 2.4% PASS.

prt c ~

wl (l

C t

Breakaway. 3.5 1.0% PASS. 4.3 1.2%, PASS.

Initial Drag: 4.6 1.3%, PASS. 5.8 1.7% PASS.

Tag ¹: 1-164 Peak Drag: 6.3 1.8%, PASS. 9.1 2.6% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.008 PASS Serial ¹: 20294 Release (A/D)

Mark ¹: Sl-39-6 Test Load: 276 78 9% 276 78 9%

Final Drag: 2.6 0.8%, PASS. 5.0 1.4%, PASS.

Peak Drag: 4.0 1.2%, PASS. 7.0 2.0%, PASS.

Breakaway 8.6 2.5%, PASS. 8.0 2.3%, PASS.

Initial Drag: 11.3 3.2%, PASS. 11.6 3.3%, PASS.

Tag ¹: 1-165 Peak Drag: 14.6 4.2% PASS. 15.2 4.3% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.010 PASS Serial ¹: 19061 Release (A/D)

Mark ¹: RC-221-148 Test Load: 237 67 7% 241 68.9%

Final Drag: 8.5 2.4%, PASS. 11.1 3.2%, PASS.

Peak Drag: 11.7 3.4%, PASS. 13.9 4.0% PASS.

Breakaway. 2.9 0.8%, PASS. 3.8 1.1%, PASS.

Initial Drag; 4.9 1.4%, PASS. 6.7 1.9%, PASS.

Tag ¹: 1-167 Peak Drag; 10.8 3.1%, PASS. 11.8 34% PASS Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.008 PASS Serial ¹: 29338 Release (A/D)

Mark ¹: CH-67-81 Test Load: 271 77 40/ 275 78.6%

Final Drag: 3.2 09% PASS 7.0 2.0%, PASS.

Peak Drag: 8.6 2.5%, PASS. 10.7 3.0%, PASS.

Breakaway: 3.6 1.0%, PASS. 4.1 1.2%, PASS.

Initial Drag: 4.2 1.2%, PASS. 6.3 1.8% PASS.

Tag ¹: 1-168 Peak Drag: 5.7 1.6% PASS. 8.6 2.5%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.010 PASS 0.008 PASS Serial ¹: 20137 Release (A/D)

Mark ¹: RC-114-129 Test Load: 270 77.1% 275 78 6'/

Final Drag: 7.8 2.2% PASS. 7.1 2.0% PASS.

Peak Drag: 9.4 2.7% PASS. 11.0 3.1%, PASS.

Breakaway 2.7 0.8%, PASS. 3.7 1.0% PASS Initial Drag: 3.7 1.1% PASS. 4.2 1.2% PASS.

Tag ¹: 1-169 Peak Drag: 5.6 1.6% PASS. 6.2 1.8%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.012 PASS 0.011 PASS Serial ¹: 20247 Release (A/D)

Mark ¹: RC-44-26 Test Load: 250 71.4% 242 69 1o/

Final Drag: 2.4 0.7% PASS 4.7 1 3% PASS Peak Drag: 3.8 1.1%, PASS. 6.7 1.9% PASS.

L4

'F I

V

0 Breakaway. 3.5 1.0%, PASS. 7.0 2.0%, PASS.

Initial Drag: 8.1 2.3%, PASS. 10.3 2.9%, PASS.

Tag ¹: 1-170 Peak Drag: 12.9 3.7%, PASS. 16.4 47% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.011 PASS 0.010 PASS Serial ¹: 19106 Release (A/D)

Mark ¹: RC-220-112 Test Load: 251 71.7% 252 72.0%

Final Drag: 3.8 1.1%, PASS. 12.9 3.7%, PASS.

Peak Drag: 10.9 3.1%, PASS. 20.7 5.9%, 3¹ over, FAILI Breakaway 5.4 1.6% PASS. 4.6 1.3%, PASS.

Initial Drag: 5.2 1.5% PASS 5.7 1.6%, PASS.

Tag ¹: 1-171 Peak Drag: 7.8 2.2%, PASS. 8.4 2.4%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.014 PASS 0.012 PASS Serial ¹: 20201 Release (A/D)

Mark ¹: RC-218-26 Test Load: 259 74.0% 257 73.4%

Final Drag: 3.5 1.0%, PASS. 5.9 1.7%, PASS.

Peak Drag: 5.3 1.5%, PASS. 8.4 2.4%, PASS.

Breakaway 8.4 2.1%, PASS. 9.5 2.3%, PASS.

Initial Drag: 6.8 1.6% PASS. 12.8 3.1%, PASS.

Tag ¹: 1-172 Peak Drag: 10.0 2.4% PASS. 17.1 4.2% PASS.

Mfg/Cap.: A/D-41 Activation (PSA):

Serial ¹: 1298 Release (A/D) 49.000 PASS. 53.000 PASS.

Mark ¹: RC-44-11 Test Load: 323 78 8% 329 80.2%

Final Drag: 9.9 2.4%, PASS. 9.3 2.3%, PASS.

Peak Drag: 13.1 3.2% PASS. 14.7 3.6% PASS.

Breakaway. 5.0 1.4%, PASS. 3.2 0.9%, PASS.

Initial Drag: 4.2 1.2%, PASS. 4.1 1.2%, PASS.

Tag ¹: 1-173 Peak Drag: 5.8 1.7% PASS. 5.5 1.6% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.010 PASS Serial ¹: 29183 Release (A/D)

Mark ¹: CH-67-81 Test Load: 256 73.1% 255 72.9%

Final Drag: 2.9 0.8%, PASS. 3.6 1.0% PASS.

Peak Drag: 4.2 1.2%, PASS. 5.1 1.5%, PASS.

Breakaway 2.2 0.6%, PASS. 3.0 0.8%, PASS.

Initial Drag: 3 2 4 0.9%, PASS. 5.0 1.4% PASS.

Tag ¹: 1-175 Peak Drag: 4.2 1.2%, PASS. 7.3 2.1% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.01 1 PASS 0.010 PASS Serial ¹: 19075 Release (A/D)

Mark ¹: RC-220-112 Test Load: 257 73.4% 249 71.1%

Final Drag; 3 3 09% PASS. 4.8 1.4%, PASS.

Peak Drag: 5.1 1.5%, PASS. 7.0 2.0%, PASS.

v 4 '

l-

~

(4

Breakaway 3.0 0.9% PASS. 4.5 1.3% PASS.

Initial Drag: 5.6 1.6%, PASS. 6.7 1 9% PASS Tag ¹: 1-176 Peak Drag: 7.8 2.2%, PASS. 9.1 2.6%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.013 PASS 0.013 PASS Serial ¹: 20194 Release (A/D)

Mark ¹: MSI-2-H1 Test Load: 259 74 0% 261 74.6%

Final Drag: 4.2 1.2% PASS. 5.2 1.5% PASS.

Peak Drag: 5.9 1.7% PASS. 6.6 1.9%, PASS.

Breakaway: 7.5 2.1%, PASS. 5.8 1.7% PASS.

Initial Drag: 5.4 1.5%, PASS. 7.5 2.1% PASS.

Tag ¹: 1-177 Peak Drag: 10.8 3.1% PASS. 11.1 3.2% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.001 PASS 0.003 PASS Serial ¹: 20133 Release (A/D)

Mark ¹: RC-222-43 Test Load: 264 75 4% 269 76.9%

Final Drag: 5.5 1.6% PASS 6.7 1.9%, PASS.

Peak Drag: 18.6 5.3%, 1¹ over, FAIL! 10.0 2.8% PASS.

Breakaway 4.4 1.3% PASS. 4.6 1.3%, PASS.

Initial Drag: 6.0 1.7% PASS 6.6 1.9% PASS.

Tag ¹: 1-178 Peak Drag: 8.2 2.3% PASS. 8.5 2.4%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA). 0.012 PASS 0.013 PASS Serial ¹: 11836 Release (A/D)

Mark ¹: MSI-4-H1 Test Load: 252 72.0% 254 72 6%

Final Drag; 2.3 0.6%, PASS. 4.6 1.3% PASS.

Peak Drag: 3.6 1.0%, PASS. 6.2 1.8% PASS.

Breakaway 3.4 0.2%, PASS. 7.4 05% PASS.

Initial Drag: 15.4 1.0%, PASS. 23.7 1.6% PASS.

Tag ¹: 1-179 Peak Drag: 46.6 3.1%, 17¹ over, FAIL! 42.2 2.8%, 12¹ over, FAILI Mfg/Cap.: PSA-1 Activation (PSA): 0.010 PASS 0.009 PASS Serial ¹: 453 Release (A/D)

Mark ¹: RC-216-15 Test Load: 659 43 9% 698 46.5%

Final Drag: 10.7 07% PASS. 16.1 1.1%, PASS.

Peak Drag: 31.7 2.1%, 2¹ over, FAILI 29.5 2.0%, PASS.

Breakaway 4.3 1.2%, PASS. 5.1 1.5% PASS.

Initial Drag: 5.1 1.5% PASS. 5.8 1.7% PASS.

Tag ¹: 1-180 Peak Drag: 8.1 2.3%, PASS. 9.1 2.6%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.012 PASS 0.011 PASS Serial ¹: 19103 Release (A/D)

Mark ¹: RC-220-114 Test Load: 264 75.4%o 268 76.6%

Final Drag; 3.5 1.0% P,ASS. 5.5 1.6%, PASS.

Peak Drag: 6.5 1.9%,,PASS: ' 9.4 2.7%, PASS.

~

ft l, s

~

1+"

V I

f/~

1 jI,i

e o o Breakaway 3.0 0.9%, PASS. 4.7 1.4%, PASS.

Initial Drag: 4.0 1.1% PASS. 4.6 1.3%, PASS.

Tag ¹: 1-181 Peak Drag: 7.2 2.1%, PASS. 6.9 2.0%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.005 PASS Serial ¹: 19786 Release (A/D)

Mark ¹: RC-215-9B Test Load: 262 74.9% 268 76.6%

Final Drag: 3.6 1.0%, PASS. 4.8 1.4% PASS.

Peak Drag: 6.0 1.7%. PASS. 7.0 2.0%, PASS.

Breakaway 13.6 3.9%, PASS. 16.0 4.6% PASS.

Initial Drag: 15.4 44%, PASS. 21.2 6.1% 3.7¹ over, FAIL!

Tag ¹: 1-183 Peak Drag: 26.7 7.6%, 9¹ over, FAILI 27.8 7.9%, 10¹ over, FAILI Mfg/Cap.: PSA-1/4 Activation (PSA): 0.007 PASS 0.007 PASS Serial ¹: 20189 Release (A/D)

Mark ¹: MSI-3-H1 Test Load: 232 66.3% 230 65.7%

Final Drag: 12.9 3.7%, PASS. 16.3 4.7% PASS.

Peak Drag: 23.2 6.6%, 6¹ over, FAILI 21.4 6.1%, 4¹ over, FAILI Breakaway: 5.9 1.7%, PASS. 8.2 2.3% PASS.

Initial Drag: 7.7 2.2%, PASS. 7.6 2.2%, PASS.

Tag ¹: 1-184 Peak Drag: 9.6 2.7%, PASS. 9.3 2.7%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.011 PASS 0.009 PASS Serial ¹: 20209 Release (A/D)

Mark ¹: RC-218-26 Test Load: 269 76.9% 268 76.6%

Final Drag: 1.6 0.5%, PASS. 6.8 1.9%, PASS.

Peak Drag: 4.5 1.3%, PASS. 8.4 2.4%, PASS.

Breakaway 4.2 1.0%, PASS. 17.7 4 4% PASS Initial Drag: 12.4 3.1%, PASS. 14.0 3.5% PASS.

Tag ¹: 1-185 Peak Drag: 14.9 37% PAS 19.9 5.0% PASS.

Mfg/Cap.: A/D-41 Activation (PSA):

Serial ¹: 1290 Release (A/D) 54.700 PASS. 51.500 PASS.

Mark ¹: CH-64-45A Test Load: 331 82.8% 327 81.8%

Final Drag: 12.1 3.0%, PASS. 17.7 4.4%, PASS.

Peak Drag: 14.9 37% PASS 23.8 5.9%, 4¹ over, FAILI Breakaway 7.6 2.2%, PASS. 7.6 2.2%, PASS.

Initial Drag: 5.2 1.5%, PASS. 6.6 1.9% PASS.

Tag ¹: 1-187 Peak Drag: 10.2 2.9%, PASS. 12.1 3.4%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.005 PASS 0.003 PASS Serial ¹: 19774 Release (A/D)

Mark ¹: Sl-69-60 Test Load: 281 80.3% 277 79.1%

Final Drag: 6.3 1.8%, PASS. 6.8 1.9% PASS.

Peak Drag: 9.6 2.7%, PASS. 15.1 4.3%, PASS.

lpga b

Breakaway 1.5 04% PASS 4.2 1.2%, PASS.

Initial Drag 6.3 1.8%, PASS. 8.3 2.4%, PASS.

Tag ¹: 1-188 Peak Drag 11.0 3.1%, PASS. 10.8 3.1%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.013 PASS 0.003 PASS Serial ¹: 19785 Release (A/D)

Mark ¹: RC-150-H7 Test Load: 275 78.6% 278 79 4o/

Final Drag: 3.3 09%, PASS. 8.1 2.3%, PASS.

Peak Drag: 5.4 1.6%, PASS. 9.7 2.8%, PASS.

Breakaway 5.5 1.6%, PASS. 5.5 1.6%, PASS.

Initial Drag 6.8 1.9% PASS. 6.7 1.9% PASS.

Tag ¹: 1-189 Peak Drag 9.9 2.8%, PASS. 10.1 2.9%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.011 PASS 0.010 PASS Serial ¹: 19775 Release (A/D)

Mark ¹: Sl-69-60 Test Load: 258 73 7% 261 74 6%

Final Drag: 3.3 0 9'/ PASS 9.2 2.6%, PASS.

Peak Drag: 5.0 1.4%, PASS. 11.4 3.2%, PASS.

Breakaway 3.1 P.9% PASS 1.8 0.5%, PASS.

Initial Drag 3.3 0 9'/ PASS 7.0 2.0% PASS Tag ¹: 1-192 Peak Drag 6.6 1.9% PASS. 11.9 34% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.013 PASS 0.013 PASS Serial ¹: 19789 Release (A/D)

Mark ¹: B-3-795 Test Load: 330 94.3% 330 94.3%

Final Drag: 3.5 1.0% PASS. 4.9 1.4% PASS.

Peak Drag: 5.8 1.7% PASS. 9.7 2.8%, PASS.

Breakaway 18.0 4.5%, PASS. 6.2 1.6%, PASS.

Initial Drag: 10.1 2.5% PASS. 8.8 2.2%, PASS.

Tag ¹: 1-194 Peak Drag: 22.6 5.6%, 3¹ over, FAILI 14.5 3.6% PASS.

Mfg/Cap.: A/D-41 Activation (PSA):

Serial ¹: 1294 Release (A/D) 53.500 PASS. 51.200 PASS.

Mark¹: MSH-7B Test Load: 322 80;5% 320 80 p'/

Final Drag: 11.4 2.8%, PASS. 15.8 4.0% PASS.

Peak Drag: 22.4 5.6%, 2¹ over, FAILI 23.8 6.0%, 4¹ over, FAILI Breakaway 3.2 09% PASS 4.1 1.2%, PASS.

Initial Drag 2.7 P.8% PASS. 4.3 1.2%, PASS.

Tag ¹: 1-195 Peak Drag 5.0 1.4% PASS. 6.0 1.7% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.011 PASS 0.01 1 PASS Serial ¹: 11388 Release (A/D)

Mark ¹: MPR-200-250 Test Load: 284 81.1% 272 77 70/

Final Drag: 1.4 P.4% PASS 3.2 0.9% PASS.

Peak Drag: 2.9 0.8%, PASS. 5.2 1.5%, PASS.

Attb- < ~ ~ e ~

N ff

e I Breakaway 8.3 2.1%, PASS. 6.7 1.7%, PASS.

Initial Drag: 2.4 0.6%, PASS. 4.4 1 1'/ PASS Tag¹: 1-196 Peak Drag: 6.8 1.7%, PASS. 9.2 2.3%, PASS.

Mfg/Cap.: A/D-41 Activation (PSA):

Serial ¹: 1295 Release (A/D) 50.800 FAIL. 48.900 FAIL.

Mark¹: MSH-7A Test Load: 286 71.5o/o 286 71 5o/

Final Drag: 0.0 0.0%, PASS. 0.0 P P% PASS.

Peak Drag:

Breakaway 6.9 2.0%, PASS. 7.8 22% PASS Initial Drag 6.0 1.7%, PASS. 6.5 1.9% PASS.

Tag ¹: 1-197 Peak Drag 7.8 2.2% PASS. 8.5 2.4%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.010 PASS 0.01 1 PASS Serial ¹: 12655 Release (A/D)

Mark ¹: MPR-201-16 Test Load: 233 66 6% 237 67.7%

Final Drag: 6.7 1.9% PASS. 7.2 2.1%, PASS.

Peak Drag: 8.5 2.4%, PASS. 9.2 2.6%, PASS.

Breakaway 5.6 1.6%, PASS. 4.0 1.1%, PASS.

Initial Drag 4.0 1.1%, PASS. 3.6 1.0%, PASS.

Tag ¹: 1-198 Peak Drag 5.0 1.4%, PASS. 4.8 1.4% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA) 0.045 0.025g over, FAIL! 0.036 0.016g over, FAILI Serial ¹: 20218 Release (A/D)

M ik¹: MPR 200 20 Test Load: 88 25.1% 46 13.1%

Final Drag: 4.2 1.2%, PASS. 4.4 1.3%, PASS.

Peak Drag: 6.0 1.7%, PASS. 6.4 1.8%, PASS.

Breakaway 22.0 0.4%, PASS. 6.1 01% PASS Initial Drag 26.6 0.4%, PASS. 22.0 0 4O/ PASS Tag ¹: 1-201 Peak Drag 38.8 0.6% PASS. 39.0 P 7%, PASS.

Mfg/Cap.: PSA-3 Activation (PSA) 0.002 PASS 0.003 PASS Serial ¹: 29628 Release (A/D)

Mark ¹: CS-678-2135 Test Load: 4531 75 5% 4377 72.9%

Final Drag: 20.7 0.3% PASS. 13.7 0.2%, PASS.

Peak Drag: 31.0 0.5%, PASS. 26.1 0.4% PASS.

Breakaway 50.0 14.3% 32¹ over, FAILI 50.0 14.3%, 32.5¹ over, FAIL!

Initial Drag 49.4 14.1%, 31.9¹ over, FAILI 49.6 14.2%, 32.1¹ over, FAILI Tag ¹: 1-203 Peak Drag 50.0 14.3%, 32¹ over, FAILI 50.0 14.3%, 32¹ over, FAILI Mfg/Cap.: PSA-1/4 Activation (PSA) 0.000 PASS 0.000 PASS Serial ¹: 19107 Release (A/D)

Mark ¹: CH-240-H10 Test Load: 269 76 9% 255 72 9%

Final Drag: 48.8 13.9%, 31.3¹ over, FAILI 49.5 14.1%, 32.0¹ over, FAILI Peak Drag: 50.0 14.3%, 32¹ over, FAILI 50.0 14.3%, 32¹ over,'FAILI

V P

~ % I A ~

t ll.

g4

0 0 Breakaway 28.6 0.2%, PASS. 34.6 0.2%, PASS.

Initial Drag: 41.7 0.3%, PASS. 20.7 0.1% PASS.

Tag ¹: 1-206 Peak Drag: 63.2 0.4%, PASS. 38.8 0.3%, PASS.

Mfg/Cap.: PSA-10 Activation (PSA): 0.003 PASS 0.004 PASS Serial ¹: 11392 Release (AG)

Mark ¹: BF-659-32 Test Load: 11358 75.7% 12066 80 4'/

Final Drag: 28.3 0.2%, PASS. 22.9 0.2%, PASS.

Peak Drag: 50.5 0.3%, PASS. 42.0 0.3%, PASS.

Breakaway. 2.2 0.6%, PASS. 2.6 0.8%, PASS.

Initial Drag: 3.6 1.0%, PASS. 3.4 1.0%, PASS.

Tag ¹: 1-217 Peak Drag: 4.9 1.4%, PASS. 5.7 1.6% PASS.

Mtg/Cap.: PSA-1/4 Activation (PSA): 0.011 PASS 0.011 PASS Serial ¹: 19030 Release (A/D)

Mark ¹: B-9-501 Test Load: 276 78 9'/ 271 77.4%

Final Drag: 2.4 P.7% PASS 4.2 1.2%, PASS.

Peak Drag: 4.3 1.2%, PASS. 5.8 1.6% PASS.

Breakaway 2.4 0.7%, PASS. 2.8 0.8% PASS.

Initial Drag: 2.9 0.8%, PASS. 4.2 1.2%, PASS.

Tag ¹: 1-219 Peak Drag: 4.2 1.2%, PASS. 5.6 1.6% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.012 PASS 0.013 PASS Serial ¹: 11408 Release (A/D)

Mark ¹: CH-235-H9 Test Load: 273 78 P% 268 76.6%

Final Drag: 3.0 0 9'/ PASS 5.0 1.4% PASS.

Peak Drag: 3.0 0.9%, PASS. 5.0 1.4%, PASS.

Breakaway: 12.3 1.9% PASS 9.3 1.4%, PASS.

Initial Drag: 5.7 0 9% PASS 8.8 1.4%, PASS.

Tag ¹: 1-220 Peak Drag: 11.6 1.8%, PASS. 11.8 1.8%, PASS.

Mfg/Cap.: PSA-1/2 Activation (PSA): 0.011 PASS 0.011 PASS Serial ¹: 10720 Release (A/D)

Mark ¹: CH-235-H10 Test Load: 505 77 7% 510 78 5%

Final Drag: 5.7 p 9% PASS 9.1 1.4% PASS Peak Drag: 11.3 1.7%, PASS. 13.8 2.1%, PASS.

Breakaway 3.6 1.0% PASS. 5.7 1.6%, PASS.

tnitial Drag: 5.1 1.5% PASS 5.4 1.5% PASS.

Tag ¹: 1-221 Peak Drag: 7.3 2.1%, PASS. 6.5 1.9% PASS.

Mtg/Cap.: PSA-1/4 Activation (PSA): 0.011 PASS 0.010 PASS Serial ¹: 19081 Release (A/D)

Mark ¹: CH-235-H11 Test Load: 243 69 4% 246 70.3%

Final Drag: 3.0 09% PASS 5.3 1.5%, PASS.

Peak Drag: 4.7 1.4% PASS. 6.7 1.9% PASS.

g o 0 o e 0 Breakaway: 44.2 0.3%, PASS. 20.5 0.1%, PASS.

Initial Drag: 51.0 03% PASS. 23.7 0.2%, PASS.

Tag ¹: 1-222 Peak Drag: 71.5 0 5'I PASS 105.9 0.7%, PASS.

Mfg/Cap.: PSA-10 Activation (PSA): 0.026 0.005g over, FAILI 0.036 0.016g over, FAILI Serial ¹: 8219 Release (A/D)

Mark ¹: CS-678-1555 Test Load: 10016 66.8% 9601 64.0%

Final Drag: 24.6 0.2%, PASS. 20.5 0.1%, PASS.

Peak Drag: 40.3 0.3%, PASS. 123.2 0.8%, PASS.

Breakaway 3.3 0.5%, PASS. 8.9 1.4%, PASS.

Initial Drag: 7.0 1.1%, PASS. 3.4 0.5%, PASS.

Tag ¹: 1-223 Peak Drag: 9.7 1.5%, PASS. 7.0 1.1%, PASS.

Mfg/Cap.: PSA-1/2 Activation (PSA): 0.006 PASS 0.021 0.001g over, FAILI Serial ¹: 16089 Release (A/D)

Mark ¹: RC-164-H1 Test Load: 432 66.5% 456 70 2%

Final Drag: 7.2 1.1%, PASS. 18.9 2.9% PASS.

Peak Drag: 7.2 1.1%, PASS. 18.9 2.9%, PASS.

Breakaway 2.6 0.8%, PASS. 6.6 1.9%, PASS.

Initial Drag: 3.2 09% PASS. 6.3 1.8%, PASS.

Tag ¹: 1-224 Peak Drag: 13.0 3.7% PASS 7.4 2.1%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.011 PASS 0.008 PASS Serial ¹: 19082 Release (A/D)

Mark ¹: RC-244-H1 Test Load: 242 69.1% 255 72.9%

Final Drag: 2.4 0.7%, PASS. 6.8 2.0%, PASS.

Peak Drag: 8.2 2.3%, PASS. 8.2 2.3%, PASS.

Breakaway: 4.9 1.4% PASS. 6.3 1.8%, PASS.

Initial Drag: 4.9 1 4% PASS 6.3 1.8%, PASS.

Tag ¹: 1-226 Peak Drag: 7.9 2.2%, PASS. 6.3 1.8%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.013 PASS 0.010 PASS Serial ¹: 19073 Release (A/D)

Mark ¹: RC-246-H3 Test Load: 255 72.9% 260 74.3%

Final Drag; 3.2 0.9%, PASS. 4.6 1.3%, PASS.

Peak Drag: 6.2 1.8%, PASS. 5.7 1.6%, PASS.

Breakaway 9.7 2.8%, PASS. 9.8 2.8%, PASS.

Initial Drag: 12.3 3.5% PASS 17.0 4.9% PASS.

Tag ¹: 1-228 Peak Drag: 12.3 3.5%, PASS. 17.0 49% PASS Mfg/Cap.: PSA-1/4 Activation (PSA): 0.005 PASS 0.001 PASS Serial ¹: 20282 Release (A/D)

Mark ¹: RC-247-H2 Test Load: 261 74:6'Yo 256 73 1%

Final Drag: 7.2 2.1%, PASS. 14.4 4.1%, PASS.

Peak Drag: 7.2 2.1%; PASS.." 14.4 4.1%, PASS.

'" ~

), 'h' a4

'ty k'-

Sp

'P ~>

'I g 1

A f'gy

Breakaway 28.5 7.1%, 8¹ over, FAIL! 33.0 8.2%, 13.0¹ ovel', FAILI Initial Drag: 30.3 7.6%, 10.3¹ over, FAILI 28.1 7.0%, 8.1¹ over, FAILI Tag ¹: 1-229 Peak Drag: 38.5 9.6%, 18¹ over, FAIL! 34.7 8.7%, 15¹ over, FAILI Mfg/Cap.: A/D-41 Activation (PSA):

Serial ¹: 1304 Release (A/D) 52.700 PASS. 53.100 PASS.

Mark ¹: RC-247-H3 Test Load: 327 81.8% 321 80.2%

Final Drag: 25.6 6.4%, 5.6¹ over, FAIL! 30.5 7.6%, 10.5¹ over, FAILI Peak Drag: 39.4 9.9%, 19¹ over, FAILI 35.7 8.9%, 16¹ over, FAILI Breakaway 3.0 0.9% PASS. 7.P 2.0%, PASS.

Initial Drag: 12.4 3.5% PASS. 30.9 8.8%, 13.4¹ over, FAILI Tag ¹: 1-230 Peak Drag: 12.4 3.5%, PASS. 30.9 8.8%, 13¹ over, FAILI Mfg/Cap.: PSA-1/4 Activation (PSA): 0.003 PASS 0.005 PASS Serial ¹: 20288 Release (A/D)

Mark ¹: RC-247-HS Test Load: 281 80.3% 283 80 9%

Final Drag: 7.1 2.0%, PASS. 23.0 6.6%, 5.5¹ over, FAILI Peak Drag: 7.1 2.0%, PASS. 23.0 6.6%, 5¹ over; FAILI Breakaway. 4.2 1.2%, PASS. 2.2 P.6% PASS.

Initial Drag: 3.5 1.0%, PASS. 4.5 1.3%, PASS.

Tag ¹: 1-231 Peak Drag: 5.6 1.6% PASS. 6.2 1.8% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.013 PASS 0.009 PASS Serial ¹: 29178 Release (A/D)

Mark¹: RCGV-13 Test Load: 255 72.9% 258 73.7%

Final Drag: 1.7 0.5%, PASS. 4.4 1.3%, PASS.

Peak Drag: 4.1 1.2%, PASS. 6.1 1.7% PASS.

Breakaway 4.0 1.2%, PASS. 5.7 1.6% PASS.

Initial Drag: 3.0 0.9%, PASS. 5.2 1.5% PASS.

Tag ¹: 1-232 Peak Drag: 4.1 1.2%, PASS. 6.7 1.9% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.008 PASS 0.005 PASS Serial ¹: 15060 Release (A/D)

Mark¹: RCGV-14 Test Load: 279 79.7% 280 80.0%

Final Drag: 2.1 0.6%, PASS. 5.2 1.5% PASS.

Peak Drag: 3.5 1.0%, PASS. 6.1 1.7%, PASS.

Breakaway 2.6 0.7%, PASS. 3.2 0.9% PASS.

Initial Drag: 3.8 1.1% PASS. 4.9 1 4o/ PASS Tag ¹: 1-233 Peak Drag: 5.8 1.7% PASS. 6.6 1.9% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.009 PASS 0.009 PASS Serial ¹: 15062 Release (A/D)

Mark ¹: RCGV-15 Test Load: 270 77.1% 265 75.7%

Final Drag: 1.3 0.4%, PASS. 4.5 1.3%, PASS.

Peak Drag: 3.1 0.9%, PASS. 6.2 1.8%, PASS.

I A

,)~

~ 4'>

Pj lg

Breakaway. 2.1 0.6%, PASS. 2.1 0.6%, PASS.

Initial Drag: 3.0 0.8%, PASS. 3.4 1.0% PASS.

Tag ¹: 1-234 Peak Drag: 3.8 1.1%, PASS. 4.8 1.4% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.01 0 PASS 0.009 PASS Serial ¹: 15061 Release (A/D)

Mark ¹: RCGV-22 Test Load: 264 75.4% 260 74.3%

Final Drag: 3.0 0.9%, PASS. 3.4 1.0%, PASS.

Peak Drag: 4.3 1.2%, PASS. 4.6 1.3%, PASS.

Breakaway. 6.4 1.8%, PASS. 6.7 1 9%, PASS.

Initial Drag: 2.6 0.7%, PASS. 7.9 2.2% PASS.

Tag ¹: 1-235 Peak Drag: 4.9 1.4%, PASS. 9.8 2.8% PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.010 PASS 0.007 PASS Serial ¹: 20199 Release (A/D)

Mark ¹: RCGV-26 Test Load: 248 70.9% 254 72.6%

Final Drag: 4.2 1.2%, PASS. 7.9 2.3%, PASS.

Peak Drag: 6.8 1.9%, PASS. 10.6 3.0%, PASS.

Breakaway: 6.8 1.9%, PASS. 5.7 1.6%, PASS.

Initial Drag: 4.3 1.2%, PASS. 7.3 2.1%, PASS.

Tag ¹: 1-236 Peak Drag: 8.0 2.3%, PASS. 11.4 3.3% PASS Mfg/Cap.: PSA-1/4 Activation (PSA): 0.003 PASS 0.004 PASS Serial ¹: 19115 Release (A/D)

Mark ¹: SI-101-6 Test Load: 257 73.4% 249 71.1%

Final Drag: 3.5 1.0%, PASS. 6.7 1.9% PASS.

Peak Drag: 6.1 1.7% PASS. 9.5 2.7%, PASS.

Breakaway: 6.7 1.9%, PASS. 7.9 2.3% PASS.

Initial Drag: 3.8 1.1%, PASS. 9.5 2.7% PASS.

Tag ¹: 1-237 Peak Drag: 6.8 2.0%, PASS. 12.4 3.5%, PASS.

Mfg/Cap.: PSA-1/4 Activation (PSA): 0.005 PASS 0.005 PASS Serial ¹: 12653 Release (A/D)

Mark ¹: Sl-101-13 Test Load: 255 72.9% 255 72.9%

Final Drag: 4.5 1.3%, PASS. 10.4 3.0%, PASS.

Peak Drag: 7.6 2.2%, PASS. 13.3 3.8%, PASS.

Breakaway 434.3 P.4% PASS. 203.7 0.2%, PASS.

Initial Drag: 223.3 P.2%, PASS. 294.0 0.2%, PASS.

Tag ¹: 1-238 Peak Drag: 1048.0 P.9%, PASS. 1071.2 0.9%, PASS.

Mfg/Cap.: PSA-100 Activation (PSA): 0.005 PASS 0.009 PASS Serial ¹: 2126 Release (A/D)

Mark ¹: MS-649-275 Test Load: 81179 67 6% 81 398 67.8%

Final Drag: 518.5 P 4% PASS 327.0 0.3%, PASS.

Peak Drag: 1238.3 1.0%, PASS. 1080.9 0.9%, PASS.

))'F, 4'

5.3 0.4%, PASS. 9.3 P.6% PASS.

Breakaway'nitial Drag: 7.9 05% PASS. 7.2 p 5%0 PASS.

Tag ¹: 1-239 Peak Drag: 59.0 3.9%, PASS. 12.7 0.8%, PASS.

Mfg/Cap.: PSA-1 Activation (PSA): 0.010 PASS 0.009 PASS Serial ¹: 12755 Release (A/D)

Mark ¹: SI-676-149 Test Load: 1222 81 1200 80.0%

5'/'.4%

Final Drag: 5.9 PASS 10.3 0.7%, PASS.

Peak Drag: 11.9 0.8%, PASS. 16.4 1.1%, PASS.

Breakaway. 9.6 1.5%, PASS. 7.3 1.1%, PASS.

Initial Drag: 7.9 1.2%, PASS. 8.6 1.3% PASS.

Tag ¹: 1-240 Peak Drag: 10.3 1.6%, PASS. 10.8 1.7%, PASS.

Mfg/Cap.: PSA-1/2 Activation (PSA): 0.009 PASS 0.009 PASS Serial ¹: 14569 Release (A/D)

Mark ¹: SPS-467 Test Load: 512 78.8% 515 79.2%

Final Drag: 6.7 1.0% PASS. 6.8 1.0%, PASS.

Peak Drag; 9.2 1 4'/ PASS 8.2 1.3%, PASS.

Breakaway. 3.4 0.5%, PASS. 2.6 0.4%, PASS.

Initial Drag: 3.3 0.5% PASS. 4.0 P.6% PASS.

Tag ¹: 1-241 Peak Drag: 5.1 0.8% PASS. 5.4 0.8%, PASS.

Mfg/Cap.: PSA-1/2 Activation (PSA): 0.014 PASS 0.015 PASS Serial ¹: 14572 Release (A/D)

Mark ¹: SPS-467 Test Load: 493 75 8% 505 77.7%

Final Drag: 3.0 P 5% PASS. 5.2 0.8% PASS.

Peak Drag: 4.4 0.7%, PASS. 6.8 1.0%, PASS.

Breakaway 51.2 0.9%, PASS. 31.2 0.5% PASS.

Initial Drag: 32.5 0.5% PASS. 36.8 0.6%, PASS.

Tag ¹: 1-242 Peak Drag: 82.7 1.4% PASS. 77.3 1.3% PASS.

Mfg/Cap.: PSA-3 Activation (PSA): 0.002 PASS 0.004 PASS Serial ¹: 30534 Release (A/D)

Mark ¹: Sl-971-6229 Test Load: 4634 77 2% 4568 76.1%

Final Drag: 34.9 P.6%, PASS. 34.6 0.6% PASS.

Peak Drag: 72.5 1.2%, PASS. 67.1 1.1% PASS Breakaway 10.8 2.7%, PASS. 8.5 2.1%, PASS.

Initial Drag: 0.9 0.2%, PASS. 9.4 2.4%, PASS.

Tag ¹: 1-243 Peak Drag: 5.0 1.2%, PASS. 13.1 3.3%, PASS.

Mfg/Cap.: A/D-41 Activation (PSA):

Serial ¹: 1335 Release (A/D) 40.200 PASS. 43.400 PASS.

Mark ¹: RC-95-H3A Test Load 319 79 8% 338 84 5%

Final Drag: 10.2 2.5% PASS. 6.6 1 7'/ PASS Peak Drag: 15.0 3.8%, PASS. 12.0 3.0% PASS.

Ql~k~

FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST. LUCIE NUCLEAR PLANT P.O.BOX 128 FT.PIERCE, FLORIDA 33454 UNIT 1 1988 OUTAGE INSERVICE INSPECTION

SUMMARY

TABLES

11 pt 8

II ~

t klW4 4,

k'g I

fQ '1 J

f r,r

  • (>>

I

Summary Table Format Inservice Inspection Summary Outage (Year) Period Interval Class Components SYSTEM (l)

ZONE NUMBER'(J)

N I 'GT 0

ASME 0 N SEC. XI R S E H

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION CATGY NDE E I 0 E REMARKS ITEM NO METH PROCEDURE C G M R CAL BLOCK DWG. NO.(K)

(L) (M) (p) (R) (S) (U)

(N) (Q)

(0)

(V)

(A) Denotes the date of the inspection plan table (B) Denotes the current revision number of the plan (C) Identifies the outage number within the period (D) Identifies the year of the outage (E) Identifies which period (First, Second, Third)

(F) Identifies which interval (First, Second, Third, Fourth)

(G) Identifies the ASME Code Class (H) Identifies the page number of the table (I) Identifies the System applicable to this table (J) Denotes the applicable Zone number for this table (K) Identifies the applicable isometric drawing number for this table (L) Identifies the item number associated with the item (M) Denotes the component or weld identification number (N) Identifies the component or weld description (0) Denotes the elevation level (P) Denotes the ASME Code Category (Q) Denotes the ASME Code Item Number (R) Denotes the NDE Method to be used for the examination (S) Identifies which NDE procedure was used (T) Identifies the results of the NDE examinations (U) Denotes any remarks associated with the examination results (V) Identifies the ultrasonic calibration block to be used

~I

~g <

DATE: 11/14/88 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 1 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS REACTOR VESSEL N I 0 ZONE HUMBER: 001 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMIHAT I OH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT I F ICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK**

REF. DWG. NO. 01-001-A 000200 7-203 8-A UT 1.5 DEG NDE 5.12 - 001 C C 8-9-88 UT: EXAHINED FROM FLANGE(FROM UPPER SHELL TO FLANGE GIRTH B1 ~ 30 UT 5.7 DEG NDE 5.12 - 001 C STUD HOLES 1 TNRU 18 INCLUSIVE (1/3).

WELD UT 12.5 NDE 5.12 . 001 C RCB

~*UT-8**

REF. D'WG. NO.01-001 000760 FL-01 THRU 54 B-G-1 UT 0 DEG ~ NDE 5.12 - 001 C C 8-9-88 UT: EXAMINED 1/3 OF FLANGE THREADS IH BASE MATERIAL B6.40 LIGAMENT AREA. 1-18 STUDS INCLUSIVE.

(FLANGE)

RCB

    • UT-8**

001010 AK-01 B-N-1 VT-3 HDE 4.3 - 045 C C 8-4-88 VT-3: COMPLETE ALIGNMENT KEY 9 0 DEGREES B13.10 RCB

    • H/A**

001020 AK-02 B-N.1 VT-3 HDE 4.3 - 045 C C 8-4-88 VT-3: COMPLETE ALIGNMENT KEY 9 90 DEGREES 813.10 RCB

    • N/Ae>>

001030 AK.03 B-H-1 VT-3 NDE 4.3 - 045 C C 8.4-88 VT-3: COMPLETE ALIGNMENT KEY 9 180 DEGREES B13.10 RCB

    • N/A**

001040 AK-04 B-H-1 VT-3 HDE 4.3 - 045 C C 8.4-88 VT-3 COMPLETE ALIGHHENT KEY 9 270 DEGREES B13.10 RCB

    • H/A**

$ 4,I C

ki,

ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 2 DATE: 11/14/88 VIS IOH: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPOHENTS REACTOR VESSEL N I 0 ZONE HUMBER: 001 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT I F ICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DWG. NO.01-001 001050 ON- IE-A B-H-1 VT-3 HDE 4.3 - 045 C C 8-4-88 VT-3: COMPLETE, PITTIHG INTERGRAL EXT. MATING SURFACE B13.10 QOD RCB

    • H/A~*

001060 OH-IE-B B-N-1 VT-3 HDE 4.3 - 045 C C 8-4.88 VT-3: COMPLETE INTERGRAL EXT. MATING SURFACE B13.10 HDE 5.1 Q180D RCB

    • H/A~>>

si

~ ssS t'l

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 3 EVI SION: 0 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 'I COMPONENTS REACTOR PRESSURE VESSEL CLOSURE HEAD N I 0 ZONE NUMBER: 002 ASME S ONGT SEC ~ XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHT I F ICATION ITEM HO METHOD PROCEDURE T C G M R ~~CALIBRATION BLOCK**

REF. DHG. NO.01-002 001080 209-03A 8-A UT 0 DEG. NDE 5.14 - 001 C C 7-27.88 MT:COMPLETE,LOCATEO DIRECTLY PEEL SEGMENT WELD 9 60 DEGREES 81.22 UT 45 DEG. NDE 5.14 - 001 C ABOVE STUD HOLE TEH RCB UT 60 DEG ~ NDE 5.14 - 001 C 7-27-88 UT:PARTIAL DUE TO SHROUD,134 OF RCB MT NDE 2.2 - 004 C THE IIELD WAS EXAMINED.

001140 209-02 B-A MT HDE 2.2 - 004 C C 7-27-88 MT: EXAM AREA INCLUSIVE OF AREA FLANGE FLEX AREA, (HEAD TO 81.40 UT 0 DEG. NDE 5.14 - 001 C FROM STUD HOLE OHE(1) TO EIGHTEEN(18)

FLANGE HELD) UT 45 DEG. HDE 5.14 - 001 C INCLUSIVE. 7-27-88 UT: 1/3 RCB UT 60 DEG. HDE 5.14 - 001 C DONE, OBSTRUCTIOH DUE TO SHROUD, PARTIAL COVERAGE.

    • UT-3A**

i4 DATE: 11/14/88 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 4 EVI SION: 0 IHSERVICE IHSPECTIOH

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS STEAM GEHERATOR 1A PRIMARY N I 0 ZOHE NUMBER: 003 ASHE S ON 6T SEC. XI T RSEH

SUMMARY

EXAMIHAT ION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT I F I CATION ITEM HO METHOD PROCEDURE T C G M R *~CALIBRATION BLOCK*>>

REF. DWG. NO.01-003 001380 OH-IR.B 8-D UT 45 DEG. HDE 5 '3 - 001 C C 8-5-88 UT: COMPLETE OUTLET NOZZLE(45 D) INNER 83.140 UT 60 DEG. HDE 5 '3 0 001 C RADIUS RCB

~*UT-2, UT-4A**

001400 OH- IR-A B-D UT 45 DEG. HDE 5.13 - 001 C C 8-5-88 UT: COMPLETE OUTLET NOZZLE(315 D) INNER 83.140 UT 60 DEG. HDE 5.13 - 001 C RADIUS RCB

<<*UT-2, UT-4A**

li DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE 5 eyISIPH INSERVICE IHSPECTIOH

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS PRESSURIZER N I 0 ZONE HUMBER: 005 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK**

REF. DWG. NO.01-005 001900 PRZ-8.411 B-8 UT 0 DEG. NDE 5.1 - 001 C C 8-4-88 UT: COMPLETE

  • TOP HEAD TO UPPER SHELL CIRC. B2.11 UT 45 DEG. HDE 5.1 - 001 C WELD UT 60 DEG. NDE 5.1 - 001 C RCB

~*UT-4A**

001910 PRZ-L1 ~ B-B UT 0 DEG. NDE 5.1 - 001 C C 8-4-88 UT: COMPLETE UPPER SHELL LONGITUDINAL WELD 82.12 UT 45 DEG. NDE 5.1 - 001 C 9 0 DEG UT 60 DEG. NDE 5.1 - 001 C RCB

    • UT-4A**

930 PRZ-410-02 B-H MT NDE 2.2 - 015 C C 8-3-88 MT: COMPLETE SUPPORT SKIRT TO LOWER HEAD 88.20

'WELD RCB

~*H/A**

l.(pl 1, Pl g I

DATE: 11/14/88 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 7 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT PIPING LOOP "A" PUMP 1A2 TO REACTO N I 0 ZONE NUMBER: 009 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMIHAT IOH AREA CATGY EXAM A E I 0 E REMARKS HUMBER IDENT IF I CAT IOH ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*>>

REF. DUG. NO.01-009 002440 RC-115-4-508 B-J UT 0 DEG. HDE 5.3 - 007 C C 7-29-88 MT: COMPLETE BRANCH CONNECTION SAFETY IHJ 89.31 UT 45 DEG. HDE 5.3 - 007 C 8-9-88 UT: COMPLETE 5.3 - 007 HOZ ~

RCB Ml'DE UT 60 DEG. NDE 2.2 - 006 C

C

    • UT 6**

d g}

I I

la

$h I'

DATE: 11/14/88 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE 8 VISION: 0 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT PIPING LOOP "A" S G 1A TO PUMP 1A N I 0 ZONE NUMBER: 012 ASME S ONGT SEC ~ XI T RSEM

SUMMARY

EXAHINATION AREA CATGY EXAM A E I 0 E REHARKS NUMBER IDENT IF ICATION ITEH NO METHOD PROCEDURE T C G H R **CALIBRATIONBLOCK**

REF. ONG. NO.01-012 002770 1A-'I-112-C 8-J UT 0 BEGS NDE 5.3 - 005 C C 7-23-88 MT: COMPLETE S/G NOZZLE TO EXTENSION PIECE 89.11 UT 45 DEG. NDE 5.3 - 005 C RCB UT 60 OEG. NDE 5.3 - 005 C RCB MT NDE 2.2 - 002 C

>>>>UT-6>>>>

002790 RC-112-1-500L- LS-A 8-J UT 45 DEG ~ NDE 5.3 - 006 C C 7-23-88 HT: COMPLETE ELBOII LONGITUDINAL SEAM 89.12 UT 60 DEG. NDE 5.3 - 006 C 8-9.88 UT: COHPLETE RCB MT NDE 2.2 - 002 C

    • UT 6>>>>

REF. DWG. NO. 1-012 800 RC-112-1-500L-LS-8 8-J UT 45 DEG. NDE 5.3 - 006 C C 7-23-88 MT: COHPLETE ELBOM LONGITUDINAL SEAM 89.12 UT 60 DEG. NDE 5.3 - 006 C 8-9-88 UT: COMPLETE RCB MT NDE 2.2 - 002 C

    • UT.6**

002810 RC-112-3-503 8-J UT 0 DEG. NDE 5.3 - 006 C C 7-23-88 MT: COMPLETE ELBOII TO PIPE 89.11 UT 45 DEG. NDE 5.3 - 006 C 8-9-88 UT: COMPLETE RCB UT 60 OEG. NDE 5.3 - 006 C RCB MT NDE 2.2 - 002 C

    • UT-6>>>>

002820 RC-112-3-503-LS-A 8-J UT 45 DEG. NDE 5.3 - 006 C C 7-23-88 HT: COHPLETE PIPE LONGITUDIHAL SEAM 89.12 UT 60 DEG. NDE 5.3 - 006 C 8-9-88 UT: COMPLETE RCB MT NDE 2.2 - 001 C

  • Ul'-6**

002830 RC.112-3-503.LS-B 8-J UT 45 DEG. NDE 5.3 - 006 C C 7-23-88 MT: COMPLETE PIPE LONGITUDINAL SEAM 89.12 UT 60 DEG ~ NDE 5.3 - 006 C 8.9-88 UT: COMPLETE RCB MT NDE 2.2 - 001 C

    • Ul'-6*>>

4fgk A,

g1

/pe x>

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 9 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT PIPING LOOP "A" S G 1A TO PUMP 1A H I 0 ZOHE NUMBER: 012 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*>>

REF.. DMG. NO. 1-012 002920 RC-112-2-500M-LS-A 8-J UT 45 DEG. NDE 5.3 - 006 C C 7-23-88 MT: COMPLETE ELBOW LONGITUDINAL SEAM 89.12 UT 60 DEG. HDE 5.3 - 006 C 8-9-88 UT: COMPLETE RCB MT HDE 2.2 - 001 C 0*UT P*

002930 RC-112-2-500M-LS-8 8-J UT 45 DEG. NDE 5.3 - 006 C C 7-23-88 MT : COMPLETE ELBSI LOHGITUDIHAL SEAM 89.12 UT 60 DEG. HDE 5.3 . 006 C 8-9-88 UT: COMPLETE RCB MT NDE 2.2 - 001 C A*UT 6**

002940 RC-112-5-503 8-F UT 0 DEG. NDE 5.3 - 002 C C 7-23-88 PT: COMPLETE, LIGHT PINK ELBSI TO SAFE END 85.130 UT 45 DEG. HDE 5.3 - 002 C INDICATIONS FROM GRINDING MARKS, PRESENT RCB UT 0 DEG. HDE 5.3 - 006 C 9 360 DEGREES INTERMITTENT. 8-5-88 UT:

RCB UT 45 DEG. NDE 5.3 - 006 C COMPLETE (UT-59)

UT 60 DEG. NDE 5.3 - 006 C 8-9-88 UT: COMPLETE (UT-6)

PT HDE 3.3 - 002 C **UT-59,UT-6*"

002960 RC-112-FH-3-500G 8-J UT 0 DEG. HDE 5.3 - 002 C C 7-23-88 PT: LIGHT PINK INDICATIONS FROM SAFE EHD TO PUMP 1A1 89.11 UT 45 DEG. HDE 5.3 - 002 C GRINDING MARKS PRESENT(360 RCB PT HDE 3.3 - 001 C DEGREES, INTERMITTENT) 8-5.88 RCB UT: COMPLETE

  • ~UT-59**

002970 RC-112.16-507 8-J MT HDE 2.2 - 001 C C 7-23-88 MT: COMPLETE BRANCH COHHECTION DRAIN NOZZLE 89.32 RCB

<<*H/A**

dg,'g h

p

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 VISION: 0 IHSERVICE INSPECTION SUHHARY REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT PIPING LOOP "A" PUHP 1A1 TO REACTO N I 0 ZONE NUHBER: 013 ASHE S ONGT SEC. XI T RSEN

SUMMARY

EXAHIHAT IOH AREA CATGY EXAH A E I 0 E REMARKS NUHBER IDEHT IF I CATION ITEH NO HETKOO PROCEDURE T C G H R **CALIBRATIONBLOCK**

REF. DWG. HO. 1-013 002980 RC-112-FM-3-500H 8-J UT 0 OEG. NDE 5.3 0 003 C C 7-27-88 PT: COHPLETE REACTOR COOLANT PUHP 1A1 TO 89.11 UT 45 DEG. NDE 5.3 - 003 C 8-5-88 Ul': COHPLETE SAFE EHD PT HDE 3.3 . 015 C RCB

    • UT 59*>>

002990 RC-112-5-504 8-F UT 0 OEG. NDE 5.3 - 003 C C 7-27-88 PT: COMPLETE SAFE EHD TO PIPE 85.130 UT 45 DEG. NOE 5.3 - 003 C 8-5-88 UT: COMPLETE,UT-59 RCB UT 0 DEG. HDE 5.3 - 004 C 8-9.88 UT: COHPLETE,UT-6 RCB UT 45 DEG ~ HDE 5.3 - 004 C UT 60 DEG. HDE 5.3 - 004 C **UT-59,UT-6**

PT HDE 3.3 . 014 C 000 RC-112-5-504-LS-A 8-J UT 45 DEG. HDE 5.3 - 004 C C 7-28-88 HT: COMPLETE PIPE LONGITUDINAL IIELD 89.12 UT 60 DEG. HDE 5.3 004 C 8-9-88 UT: COHPLETE RCB MT HDE 2.2 - 008 C

    • UT 6>>*

003010 RC-112-5.504-LS-B 8-J UT 45 DEG. HDE 5.3 - 004 C C 7-28-88 HT: COHPLETE PIPE LONGITUDINAL IIELD 89.12 UT 60 OEG. NDE 5.3 - 004 C 8-9-88 UT: COMPLETE RCB HT HDE 2.2 - 008 C

<<<<UT-6>>>>

)g>

ff

DATE: 11/14/88 ST ~ LUCIE NUCLEAR PLANT UHIT 1 PAGE: 11 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHO INTERVAL CLASS 1 COMPOHEHTS PRESSURIZER SURGE LINE N I 0 ZOHE NUMBER: 016 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DMG. NO. 1-016 003430 RC-2-505-C 8-J UT 45 OEG. NDE 5.4 - 006 C C 8-3-88 PT: COMPLETE PIPE- TO.P IPE 89.11 UT 60 DEG. NDE 5.4 - 006 C 8-3-88 UT: COMPLETE RCB PT NDE 3.3 - 046 C INPUT 23*I 003440 RC-2-505-B B-J UI'5 DEG. NDE 5 ' - 006 C C 8-3-88 PT: COMPLETE PIPE-TO.ELBON 89.11 Ur 60 DEG. HDE 5.4 - 006 C 8-3-88 UT: COMPLETE RCB PT HDE 3.3 - 047 C

    • UT 23**

)I >>

~ts<

A f

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 12 VISIGH: 0 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT PUMP 1A1 H I 0 ZONE NUMBER: 017 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DWG. NO. 1-017 003530 01-017.004 B-K-1 PT HDE 3.3 - 033 C C 8-1-88 PT: COMPLETE SUPPORT LUG ¹1 810.20 RCB

    • H/A*>>

003540 01-017-005 8-K-1 PT HDE 3.3 - 034 C C 8-1-88 PT: COMPLETE SUPPORT LUG ¹2 810.20 RCB

    • N/A**

003550 01-017.006 8-K-1 PT HDE 3.3 - 035 C C 8-1-88 PT: COMPLETE o SUPPORT RCB LUG ¹3 B10.20

<<~H/A**

v t

,1

+ '1

DATE: 11/14/88 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 13 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS LPSI 1A1 H I 0 ZONE NUMBER: 021 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMIHAT ION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF ICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK**

REF. DWG. NO. 1-021 004090 SI-112-FW-7 UT 45 DEG. NOE 5.4 - 001 C C 7-25-88 PT: COMPLETE RCB EL.34'-J PEHETRATIOH EL.34'CB

¹37-TO-PIPE 89.11 UT 60 DEG. HDE PT HDE 5.4 - 002 3.3 . 011 C C 7-25-88 UT: COMPLETE , I.D.

GEOMETRY, REFLECTORS FROM THE ROOT OF THE WELD (60 DEGREE)

    • UT-38**

004100 SI-112.6-SW-3 UT 45 DEG. NDE 5.4 - 001 C C 7-25-88 PT: COMPLETE RCB EL.34'-J PIPE-TO-ELBOW EL.34'CB 89.11 UT 60 DEG. HDE PT HDE 5.4 - 002 3.3 - 010 C C 7-25-88 UT: COMPLETE, I.DE GEOMETRY, REFLECTORS FROM THE ROOT OF THE WELD.(60 DEG.)

>>>>UT-38>>>>

110 SI-112-6-SW-2 8-J UT 45 DEG. HDE 5.4 - 001 C C 7-25-88 PT: COMPLETE ELBOW-TO-PIPE 89.11 UT 60 OEG. NDE 5.4 - 002 C 7-25-88 UT: COMPLETE( I.DE RCB PT NDE 3.3 - 005 C GEOMETRY, REFLECTORS FROM THE ROOT OF THE RCB WELD (60 DEG.)

    • UT-38**

004120 S1-112.6-SW-1 8-J UT 45 DEG. HDE 5.4 - 001 C C 7-25-88 PT: COMPLETE PIPE-TO-ELBOW B9.11 UT 60 DEG. NDE 5.4 -'02 C 7-25-88 UT: COMPLETE, I.O.

WELD' RCB PT NDE 3.3 - 009 C GEOMETRY, REFLECTORS FROM THE ROOT OF THE RCB IIELD.(60 OEG.)

    • UT-38**

004130 SI-112-FW-8 8-J UT 45 DEG. NOE 5.4 - 001 C C 7-25-88 PT: COMPLETE ELBOW-TO-PIPE 89.11 UT 60 DEG ~ NDE 5.4 - 002 C 7-25-88 UT: COMPLETE, I.O.

RCB PT HDE 3.3 - 008 C GEOMETRY, REFLECTORS FROM THE ROOT OF THE RCB (60 DEG.)

>>*UT-38**

004140 SI -112-7-SW-1 B-J UT 45 DEG. HDE 5.4 - 004 C C 7-28-88 PT: COMPLETE PIPE-TO.ELBOW 89.11 UT 60 DEG. HOE 5.4 - 004 C 8-2-88 UT: COMPLETE( 60 DEGREE ;ROOT RCB ~ PT HDE 3.3 - 032 C GEOMETRY'*UT-38**

i

~

)

gP

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 14 VISIOH: 0 INSERVICE INSPECTION SUHMARY REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COHPOHEHTS LPSI 1A1 H I 0 ZOHE NUHBER: 021 ASHE OHGT SEC. XI RSEH SUHHARY EXAHINATIOH AREA CATGY EXAH E I 0 E REMARKS HUHBER IDENTIFICATION ITEM NO HETHOD PROCEDURE T C G H R **CALIBRATIOHBLOCK**

REF. DWG. HO. 1-021 004150 SI-112-FW-9 8-J UT 45 DEG. NDE 5.4 - 004 C C 7-28-88 PT: COHPLETE, LIGHT PINK ELBOW-TO-PIPE 89.11 UT 60 DEG. HDE 5.4 - 004 C INDICATIOHS FROH GRINDING MARKS ~

RCB PT HDE 3.3 - 031 C 8-2-88 UT: COHPLETE, 60 DEGREE; ROOT RCB GEOHETRY.

    • UT-38**

004160 SI-112.8.SW-1 B-J UT 45 DEG. HDE 5.4 - 004 C C 7-27-88 PT: COMPLETE P IPE- TO.PIPE 89.11 UT 60 DEG. NDE 5.4 - 004 C 8-2-88 UT: COMPLETE(60 DEGREE; ROOT RCB PT HDE 3.3 - 017 C GEOMETRY.

    • UT-38~*

4170 SI-112-FW-10 8-J UT 45 DEG. HDE 5.4 - 004 C C 7-27-88 PT: COMPLETE PIPE-TO-PIPE 89.11 UT 60 DEG. HDE 5.4 - 004 C 8-2-88 UT: COMPLETE,60 DEGREE; ROOT RCB PT HDE 3.3 - 016 C GEOMETRY'~UT-38~~

004180 SI -112-9-SW-1 B-J UT 45 DEG. NDE 5.4 . 015 C C 8.4-88 PT: COHPLETE PIPE- TO.PIPE 89.11 UT 60 DEG. HDE 5.4 - 016 8-12-88 UT: COHPLETE, I.D. GEOHETRY.

RCB PT'DE 3.3 - 048 C C

    • UT-38**

004190 SI -112- FW-11 8-J Ul'5 DEG. HDE 5.4 - 015 C C 8-10-88 PT: COMPLEl'E PIPE-TO.PIPE 89.11 UT 60 DEG. NDE 5.4 - 016 C 8-12-88 UT: COMPLE'tE,60 DEG ~ I.DE RCB PT NDE 3.3 . 063 C GEOHETRY.

    • UT-38**

004200 S I-112-10-SW-1 8-J UT 45 DEG. NDE 5.4 - 010 C C 7-25 88 PT: COHPLETE PIPE-TO-PIPE 89.11 UT 60 DEG. HDE 5 ' - 011 C 8-3-88 UT: COHPLETE, 60 DEG. I.D.

RCB PT NDE 3.3 - 041 C GEOHETRY.

    • Ut 38*i 004210 SI -112- FW-12 8- J UT 45 DEG. NDE 5.4 - 010 C C 7-25-88 PT: COHPLETE PIPE-TO PIPE 89.11 .UT 60 DEG. HDE 5.4 - 011 C 8-3-88 UT: COMPLETE,60 DEG.;I.D.

RCB PT HDE 3.3 - 040 C GEOMETRY.

    • UT-38**
~

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 15 VISION: 0 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS LPSI 1A1 N I 0 ZONE NUMBER: 021 ASHE S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF ICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATION BLOCK**

REF. DWG. NO. 1-021 004220 SI-112-11-SW-1 8-J UT 45 DEG ~ NDE 5.4 - 008 C C 7-25-88 PT: COMPLETE PIPE-TO-PIPE 89.11 UT 60 DEG ~ NDE 5.4 - 009 C 8-2-88 UT: COMPLETE,I.D. GEOMETRY RCB PT NDE 3.3 - 044 C

    • UT 38**

004230 S I -112- FW-13 8-J UT 45 DEG ~ NDE 5.4 - 008 C C 8-2-88 PT: COMPLETE BEGS PIPE-TO-PIPE 89.11 UT 60 OEG. NDE 5.4 - 009 C 8-2-88 UT: COMPLETE, 60 OEG.;I.D.

RCB PT NDE 3.3 - 043 C GEOMETRY.

    • UT-38**

004240 SI -112-12-SW-1 8-J UT 45 DEG. NDE 5.4 - 008 C C 8-2-88 PT: COMPLETE PIPE- TO-PIPE 89.11 UT 60 DEG. NDE 5.4 - 009 C 8-2-88 UT: COHPLETE, 60  ; I.D.

RGB PT NDE 3.3 - 042 C GEOMETRY'*UT 38*4 004250 S I -112. FW-14 8-J UT 45 BEGS NDE 5.4 - 008 C C 7-25-88 PT: COMPLETE PIPE TO.PIPE 89. '11 UT 60 DEG. NDE 5.4 - 009 C 8-2-88 UT: COMPLETE, I.D. GEOMETRY.

RCB PT NDE 3.3 . 039 C

    • UT 38**

004260 SI -112-13-SW-1 8-J UT 45 DEG. NDE 5 4 - 010 C C 7-25-88 PT: COMPLETE PIPE- TO.P IPE 89.1'I UT 60 OEG. NDE 5.4 - 011 C 8-3-88 UT: COHPLETE,60 DEG.; 1.0.

RCB PT NDE 3.3 - 038 C GEOMETRY

    • UT-38**

004270 S I -112- FW.15 8-J UT 45 DEG. NDE 5.4 - 010 C C 8-2-88 PT: COHPLETE PIPE TO.PIPE 89.11 UT 60 DEG ~ NDE 5.4 - 0'11 C 8-3-88 Ul': COMPLETE, I.D. GEOMETRY.

RCB PT HDE 3.3 - 045 C.

    • UT-38**

004280 S I -112-14-SW-1 8-J UT 45 DEG. HDE 5.4 - 010 C C 7-25-88 PT: COMPLETE PIPE-TO-PIPE 89.11 UT 60 DEG. NDE 5.4 - 011 C 8-3-88 UT: COMPLETE( 60 OEG. I.D.

RCB PT NDE 3.3 - 037 C GEOMETRY

    • UT-38*+

a sL (1 'I) i'0

~f)

II Q

DATE: 11/14/88 ST ~ LUCIE HUCLEAR PLANT UHIT 1 PAGE: 16 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPOHEHTS LPSI 1A1 H I 0 ZONE NUMBER: 021 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF ICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK>>>>

REF. DWG. HO. 1-021 004290 S I -112- FW-16 8-J UT 45 DEG. NDE 5 ' - 015 C C 8-12-88 PT: COMPLETE PIPE-TO-ELBN 89.11 UT 60 DEG. NDE 5.4 - 016 C 8-12-88 UT: COMPLETE, I.D. GEOMETRY,360 RCB 'PT HDE 3.3 - 065 C DEG. INTERMITTENT.

    • UT 38**

004300 S I -112- FW-17 8-J UT 45 DEG ~ HDE 5.4 - 016 C C 7-25-88 PT: COMPLETE ELBSI-TO-PIPE 89.11 UT 60 DEG. NDE 5.4 - 016 C 8-12-88 UT: COMPLETE, 60 DEG. I.D.

RCB PT HDE 3.3 - 004 C GEOMETRY.

    • Ul'-38**

004310 S I-148-2-SW-2 8- J UT 45 DEG. NDE 5.4 - 016 C C 7-25-88 PT: COMPLETE PIPE-TO.ELBSI 89.11 UT 60 DEG. HDE 5.4 - 016 C 8.12-88 UT: COMPLETE, 60 DEG. I.D.

RCB PT NDE 3.3 - 003 C GEOMETRY.

    • UT-38>>*

004320 SI-148.2-SH-3 B-J UT 45 DEG. NDE 5.4 - 016 C C 7-25-88 PT: COMPLETE ELBN-TO-PIPE 89.11 UI'0 DEG. HDE 5.4 - 016 C 8-12-88 UT: COMPLETE,60 DEG. I.D.

RCB PT NDE 3.3 - 007 C GEOMETRY.

    • UT-38*>>

004330 S I -148-2-SM-4 8-J UT 45 DEG. HDE 5 4 - 016 C C 7-25-88 PT: COMPLETE PIPE-TO-TEE 89.11 UT 60 DEG. NDE 5.4 - 016 C 8-12-88 UT: COMPLETE, 60 DEG. I.D.

RCB PT HDE 3.3 - 006 C GEOMETRY.

>>>>UT-38>>*

004340 V-3624 B-0-2 VT-1 HDE 4.1 - 001 C C 7-23-88 VT-1: COMPLETE BOLTING 87.70 RCB

    • H/A>>*

004370 SI -148-1-Su-1 B-J UT 45 DEG ~ NDE 5.4; 013 C C 8-12-88 PT: COMPLETE PIPE-TO-ELBN 89. '11 UT 60 DEG. HDE 5.4 - 013 C 8-12-88 UT: COMPLETE( 45 DEG. ROOT RCB PT NDE 3.3 - 066 C GEOMETRY.SCAH LIMITATIONS.

    • UT 35**

l'4

'+N V

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE 17 VISION: 0 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPOHENTS LPSI 1A1 N I 0 ZONE NUMBER: 021 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER I DENT IF I CATION ITEM NO METHOD PROCEDURE T C G M R <<*CALIBRATIOH BLOCK*>>

REF. DUG. NO. 1-021 004380 Sl -148-1-SM-2 8-J UT 45 DEG. NDE 5.4 - 007 C C 7-26-88 PT: COMPLETE ELBOH-TO.PIPE 89.11 UT 60 DEG. HDE 5.4 . 007 C 8-2 88 UT: COMPLETE, 60 DEGREE,I.O.

RCB PT HDE 3.3 - 012 C GEOMETRY LESS THAN 20X OAC

>>>>UT-35>>>>

004390 SI.148-FH-2 8-J Ul'5 OEG. HDE 5.4 - 007 C C 7-26-88 PT: COMPLETE PIPE-TO-TEE 89.11 UT 60 DEG. HDE 5.4 - 007 C 8-2-88 UT: COMPLETE,60 DEGREE( I.O.

RCB PT HDE 3.3 - 013 C GEOMETRY< 20K DAC.

    • UT-35**

004400 SI -148-2-SN-5 8-J UT 45 DEG. HDE 5.4 - 007 C C 7-26-88 PT: COMPLETE, I.D. TAG LIMITATION TEE-TO ELBCM 89.11 UT 60 DEG. NDE 5.4 - 007 C 8" TO 12" CCM FROM 0 REF.g 7 U.ST RCB PT HDE 3.3 - 018 C FROM TOE OF HELD. TAG IS 'WELDED 'TO RCB PIPE. (LIMITATION BY PROCEDURE OHLY) 8-2-88 UT: COMPLETE,60 DEGREE, I.O.

GEOMETRY < 20K DAC.

    • UT 35**

004410 S I -148- FM.3 8-J UT 45 DEG. NDE 5.4 - 007 C C 8-2-88 PT: COMPLETE ELBN-TO PIPE 89.11 UT 60 OEG. NDE 5.4 - 007 C 8-2 88 UT: COMPLETE, 60 DEGREE; I.D.

RCB PT HDE 3.3 - 036 C GEOMETRY < 20K OAC.

  • <<UT 35**

004450 SI-148.4-SW.1 8-J UT 45 DEG. NDE 5.4 - 013 C C 8.11-88 PT: COMPLETE PIPE-TO-ELBN 89.11 UT 60 DEG. HOE 5.4 - 013 C 8 12-88 UT: COMPLETE, 45 DEG. ROOT RCB PT HDE 3.3 - 061 C GEOMETRY.

  • <<UT 35**

A 004460 SI-148-FW.5 8-J UT 45 DEG ~ NDE 5 ' - 013 C C 8-12-88 PT: COMPLETE ELBOH-TO-VALVE (V-3227) 89.11 UT 60 DEG. HDE 5.4 - 013 C 8-12-88 UT: COMPLETE, SCAN LIMITATION RCB PT NDE 3.3 - 064 C

    • UT-35**

tQ Ag

ST. LUCIE NUCLEAR PLANT UNIT PAGE: 18 DATE: 11/14/88 1 VISION: 0 INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPOHEHTS LPSI 1A1 N I 0 ZONE NUMBER: 021 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT I F ICATION ITEM NO METHOD PROCEDURE T C G M R ~*CALIBRATIOH BLOCK**

REF. DUG. NO. 1-021 004470 V-3227 B-G-2 VT-1 NDE 4.1 - 006 C C 8-11-88 VT-1:HEAVY BORIC ACID RESIDUE BOLTING 87.70 VT-1 HDE 4.1 - 011 C BUILDUP(CNF-88-1-016.FOLLN UP EXAM RCB REQUIRED'-23-88 RCB VT-1:COMPLETE, CNF CLOSED PER PMO XA88081509-1203.

    • H/A'0*

004490 RC-151- FW-1 8-J UT 45 DEG. NDE 5.4 - 014 C C 8-'11-88 PT: COMPLETE VALVE-TO.ELBN (V-3227) 89.11 UT 60 DEG. NDE 5.4 - 014 C 8.12-88 UT: COMPLETE(

RCB PT NDE 3.3 - 059 C

    • UT-35+*

00 RC-151-1-Sll-1 B-J UT 45 DEG. HDE 5.4 - 014 C C 8-11-88 PT: COMPLETE ELBSl-TO-ELBSI B9.11 UT 60 DEG. NDE 5.4 - 014 C 8 12 88 UT: COMPLETE, 45 DEG. ROOT RCB PT NDE 3.3 - 058 C GEOMETRY.

    • UT 35**

004510 RC-151- FW-2 8-J UT 45 DEG. HDE 5.4 - 014 C C 8-11-88 PT: COMPLETE ELBOW-TO-SAFE EHD 89.11 UT 60 DEG. NDE 5.4 - 014 C 8-12-88 UT: COMPLETE RCB PT NDE 3.3 - 057 C 4+UT 35**

004520 RC-6-508A B-F PT HDE 3.3 - 056 C C 8-11-88 PT: COMPLETE SAFE END-TO-SI NOZZLE B5 ~ 130 NDE 5.11 RCB

    • UT-23)UT-16*>>

w' DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 19 Vl SIGH: 0 INSERVICE INSPECTION SUMHARY REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COHPOHENTS LOOP 1A1 SAFETY INJECTION PIPING SUPPORTS H I 0 ZONE NUMBER: 021 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAH A E I 0 E REMARKS NUHBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G H R **CALIBRATIONBLOCK**

REF. DWG. NO. 1-021S 004610 S I H-200 F-C VT-3 NDE 4.3 - 009 C C 7-21-88 VT-3: COMPLETE, FOLLOW UP EXAM SLIDIHG BASE SUPPORT F3.10 PER IWF-2420,NRI,RESUME NORHAL SCHEDULE RCB t*N/A**

004630 S I -969-6199 F-8 VT-3 NDE 4.3 - 043 C C 8-2-88 VT.3: COMPLETE RIGID STRUT F3.10 RCB

    • N/A**

004640 S I H-199 F-C VT-3 NDE 4.3 005 C C 7-21-88 VT-3: LOOSE NUT ON LEFT SlOE OF SLIDIHG BASE SUPPORT F3.10 VT-3 HDE 4.3 - 053 C SUPPORT CLAMP, LOOKING DOWNSTREAM, CNF RCB 88-1-003. 8-23-88 VT-3:

RCB COMPLETE,CNF CLOSED PER NCR 1-209.REEXAMINE 2/1 ~

    • N/A**

004650 Sl H-198 F-C VT-3 NDE 4.3 - 010 C C 7-21-88 VT-3: COMPLETE, FOLLOW UP EXAM SLIDING BASE SUPPORT F3.10 PER IWF-2420,NRI,RESUME NORMAL SCHEDULE RCB

    • N/Ak*

004680 S I H-197 F-C VT-3 NDE 4.3 - 011 C C 7-21-88 VT-3:"COHPLETE,FOLLOW UP EXAM SLIDING BASE SUPPORT F3.10 PER IWF-2420,HRI,RESUME NORMAL SCHEDULE RCB

  • IN/A**

004690 SI-969-6197 F-8 VT-3 HDE 4.3 - 044 C C 8-2-88 VT-3: COMPLETE RIGID SWAY STRUT F3.10 RCB

    • N/A**

004700 S I H-196 F-C VT-3 HDE 4.3 - 012 C C 7-21-88 VT-3: COMPLETED, FOLLOW UP EXAH SLIDING BASE SUPPORT F3.10 PER IWF-2420,NRI,RESUME NORMAL SCHEDULE RCB

    • N/A*0

Q' I

,4 '1

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 20 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS LOOP 1A1 SAFETY INJECTION PIPING SUPPORTS N I 0 ZONE NUMBER: 021 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS HUMBER IDEHTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DWG. NO. 1-021S 004720 SIH-195 F-C VT-3 HDE 4.3 - 007 C C 7-21-88 VT-3: COMPLETE,FOLLOWUP EXAM PER SLIDING BASE SUPPORT F3.10 IWF-2420,HRI,RESUME NORMAL SCHEDULE RCB t*H/A*0 004750 SIN-194 F-C VT-3 HDE 4.3 - 014 C C 7-21-88 VT-3: COMPLETE, FOLLOW UP EXAM SLIDIHG BASE SUPPORT F3 ~ 10 PER IWF-2420,HRI RESUME NORMAL SCHEDULE RCB

    • N/AA*

004760 SI-969-6194 F B VT-3 NDE 4.3 - 008 C C 7-21-88 VT-3:COMPLETE RIGID SWAY STRUT F3.10 RCB 4*N/A**

004770 S I H-193 F-C VT-3 HDE 4.3 - 013 C C 7-21-88 VT-3: COMPLETE, FOLLOW UP EXAM SLIDING BASE SUPPORT F3.10 PER IWF-2420,NRI,RESUME NORMAL SCHEDULE RCB

    • N/A%A

e fw

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 21 VISION: 0 IHSERVICE IHSPECT ION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS LPSI 1B2 N I 0 ZONE NUMBER: 024 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DUG. HO. 1-024 005930 S I -110- FN-9A B-J UT 45 DEG. HDE 5.4 - 003 C C 7-27-88 PT: COMPLETE PEHETRAT ION ¹39- TO.PIPE 89.11 UT 60 DEG. HDE 5.4 - 003 7-28-88 UT: COMPLETE,60 DEGREE: ROOT RCB PT HDE 3.3 - 029 C GEOMETRY.

    • UT-38*+

005940 SI-110.8-SW-5 B-J UT 45 DEG. HDE 5.4 - 003 C C 7-27-88 PT: COMPLETE PIPE-TO.ELBSI B9.11 UT 60 DEG. NDE 5.4 - 003 C 7-28-88 UT: COMPLETE 60 DEGREE;ROOT RCB PT NDE 3.3 - 021 C GEOMETRY.

    • UT-38~*

005950 SI-110.8.S'N.4 B-J UT 45 OEG. HDE 5.4 - 003 C C 7-27-88 PT: COMPLETE q 5.4 - 003 ELBSI-TO PIPE B9.11 UT 60 OEG. HDE C 7-28-88 UT: COMPLETE,60 DEGREE;ROOT RCB PT HDE 3.3 - 020 C GEOMETRY'~UT-38*~

005960 SI-110.8.SW-3 8-J UT 45 DEG. NDE 5.4 - 003 C C 7-27-88 PT: COMPLETE PIPE-TO.ELBOW 89.11 UT 60 DEG. HDE 5.4 - 003 C 7-28.88 UT: COMPLETE,60 DEGREE; ROOT RCB PT HDE 3.3 - 022 C GEOMETRY.

    • UT-38**

005970 SI-110-8-S'N-2 B-J UT 45 DEG ~ HDE 5.4 - 003 C C 7-27-88 PT: COMPLETE ELBN-TO.PIPE 89.11 UT 60 DEG. HDE 5.4 - 003 C 7-28-88 Ul': COMPLETE( 60 DEGREE; 3.3 - 019 ROOI'EOMETRY.

RCB PT HDE C

~*UT-38**

005980 SI-110-8-SW-1 B-J UT 45 DEG. HDE 5.4 - 012 C C 7-27-88 PT: COMPLETE PIPE-TO.ELBSI 89.11 UT 60 DEG. NDE 5.4 - 012 C 8-4-88 UT: COMPLETE(45 DEGREE RCB PT HDE 3.3 - 027 C>> IHSIGHI FICANT IND i 60 DEGREES GEOMETRY

    • UT 38++

005990 S I -110- FM.10 B-J UT 45 DEG. HDE 5.4 - 012 C C 7-27-88 PT: COMPLETE ELBSI-TO PIPE 89.11 UT 60 DEG. HDE 5.4 - 012 C 8-4-88 UT: COMPLETE,45 DEG. INSIGNIFICANT RCB PT HDE 3.3 - 028 C IHD.,60 DEG. GEOMETRY.

    • UT-38**

g ~

(~f r

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 22 VISION: 0 IHSERVICE IHSPECTIOH

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS LPSI 1B2 N I 0 ZONE NUMBER: 024 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF ICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DWG. HO. 1-024 006000 S I -110-9-SM-'l B-J UT 45 DEG. HDE 5.4 . 003 C C 7-27-88 PT: COMPLETE PIPE-TO-ELBN 89.11 UT 60 DEG. NDE 5.4 - 003 C 7-28-88 Ul': COMPLETE, 60 DEGREEl ROOT RCB PT HDE 3.3 - 026 C GEOMETRY.

<<*UT-38*>>

006010 SI-110-FII-11 B-J UT 45 DEG. HDE 5.4 - 003 C C 7-27-88 PT: COMPLETE ELBSI-TO-PIPE B9.11 UT 60 DEG. HDE 5.4 - 003 C 7-28-88 UT: COMPLETE, 60 DEGREE; ROOT RCB PT HDE 3.3 - 023 C GEOMETRY'*UT 38**

006020 SI -110-10-SN-2 B-J UT 45 DEG. HDE 5.4 - 003 C C 7-27-88 PT: COMPLETE, LIGHT PINK PIPE-TO-ELBN B9.11 UT 60 DEG. NDE 5.4 - 003 C INDICATIONS FROM GRINDING MARKS PRESENT RGB PT HDE 3.3 - 024 C 360 DEGREES INTERMITTENT. 7-28-88 UT:

COMPLETE,60 DEGREE; ROOT GEOMETRY.

    • UT-38'*

006030 SI-110-10-SN-1 8-J UI'5 DEBS NDE 5.4 - 003 C C 7-27-88 PT: COMPLETE LIGHT PINK ELBON-TO.PIPE B9.11 UT 60 DEG. NDE 5.4 - 003 C INDICATIOHS 360 DEGREES INT. GRIHDING RCB PT HDE 3.3 - 025 C MARKS 7-28.88 RCB UT: COMPLETE, 60 DEGREE; ROOT GEOMETRY.

    • UT 38<<<<

006040 S I -110- FN-12 8-J UT 45 DEG. HDE 5.4 - 005 C C 7-28-88 PT: COMPLETE PIPE-TO-ELBN 89.11 UT 60 DEG. NDE 5.4 - 005 C 8-4-88 UT: COMPLETE,60 DEGREE) ROOT RCB PT NDE 3.3 - 030 C GEOMETRY.

    • UT-38**

4 4~

S

DATE: 11/14/88 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 23 EVISIOH: 0 INSERVICE INSPECTIOH

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPOHENTS LOOP 1B2 SAFETY INJECTION PIPING SUPPORTS H I 0 20HE NUMBER: 024 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK>>>>

REF. DWG. NO.01-024S 006360 S I -971-235 F.B VI'-3 HDE 4.3 - 003 C C 7-21-88 VT-3: CNF-88-'1-001,COTTER PIN ON RIGID SHAY STRUT F3.10 VT-3 HDE 4.3 - 051 C LONER ASSEMBLY ARE HOT PROPERLY BEHT.

RCB 8-23-88 VT-3: COMPLETE( CNF CLOSED PER RCB NCR 1-209.REEXAMIHE 2/1 ~

    • N/A>>>>

~ '

DATE: 11/14/88 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 25 VISION' INSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS LOOP B HOT LEG-S.I.S S.D COOLING N I 0 ZONE NUMBER: 028 ASME S ON 0T SEC. Xl T RSEH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF I CATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DWG. NO. 1-028 007660 Sl-130-FW-2 8-J PT HDE 3.3 - 050 C C 8 8-88 PT: COMPLETE VALVE (MV-3652) TO ELBOW 89.11 NDE 5.4 RCB

    • UT-37
  • DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 26 VISION: 0 INSERVICE INSPECTIOH

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS CHARGING LINE TO LOOP 1B1 N I 0 20HE NUMBER: 031 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENI'IFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*~

REF. DMG. NO.01-031 008920 CH-148-SW-2 8-J PT NDE 3.3 - 049 C C 8-9.88 PT: COMPLETE TEE TO PIPE 89.40 RCB

    • N/A*%

g

'l giC

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 27 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS CHARGING LINE TO LOOP 101 SUPPORTS H I 0 ZOHE NUMBER: 031 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM HO METHOD PROCEDURE T C G M R <<<<CALIBRATIOH BLOCK**

REF. DNG. HO.01-031S 008990 CH-129-316 F-C VT-3i4 NDE 4.3 - 004 C C 7-27-88 VT-3)4:INADEQUATE THREAD VARIBLE SPRING SUPPORT F3.50 VT-3,4 HDE 4.3 - 052 C ENGAGEMENT OH THE SPRING CAH BASE RCB PLATE,CNF-88-1-002 8.23-88 RCB VT-3,4: COMPLETE,CHF CLOSED PER NCR 1-209. REEXAMINE 2/1.

    • H/A**

I

'ter Jg

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 28 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS CHARGIHG LINE TO LOOP 1A2 H I 0 ZONE NUMBER: 032 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REHARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R "*CALIBRATIOH BLOCK**

REF. DWG. NO.01-032 009460 CH-147-SM-26A 8-J PT HDE 3.3 055 C C 8-11-88 PT: COMPLETE PIPE TO COUPLING 89.40 RCB

    • H/A**

009580 CH-147-S'N-34 8-J PT NDE 3.3 - 054 C C 8.11-88 PT: COMPLETE COUPLIHG TO PIPE 89.40 RCB

    • H/A**

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 29 VI SION: 0 IHSERVICE IHSPECTIOH

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS LOOP 1A2 PRIMARY DRAIN H I 0 ZONE NUMBER: 034 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER I DENT I F I CAT I ON ITEM NO METHOD PROCEDURE T C G M R <<*CALIBRATIOH BLOCK"*

REF. DWG. NO. 1-034 010070 18-507-B B-F PT NDE 3.3 - 067 C C 8-13-88 PT: COMPLETE NOZZLE TO SAFE END B5.140 RCB

    • H/A**

010140 B-G-2 VT-1 HDE 4.1 - 007 C C 8-13-88 VT-1: COMPLE'IE FLANGE BOLTIHG (8 STUDS & 16 B7.50 HUTS)

RCB

    • H/A**

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 30 VISION: 0 INSERVICE INSPECTION SUHHARY REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COHPONENTS LOOP 182 PRIMARY DRAIN N I 0 ZONE NUMBER: 035 ASHE S ONGT SEC. XI T RSEN SUHHARY EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HETNOO PROCEDURE T C G H R ~*CALIBRATION BLOCK"*

REF. DMG. NO. 1-035 010150 18-507-C 8-F PT NDE 3.3 - 069 C C 8-13-88 PT: COHPLETE NOZZLE TO SAFE END 85. 140 RCB

    • N/A**

~a k

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 31 VI SION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONENTS LETDOWN LINE FROM LOOP 1B1 H I 0 ZONE NUMBER: 037 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*"

REF. DWG. NO. 1-037 010440 RC-142-FW.6 B-J PT NDE 3.3 - 068 C C 8-13-88 PT: COMPLETE PIPE TO ELBOW B9.40 RCB

    • H/A**

6' DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 32 VISION: 0 IHSERVICE IHSPECTIOH

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 1 COMPONENTS PRESSURIZER RELIEF LINE N I 0 ZONE HUMBER: 038 ASME S OHGT SEC. Xl T RSEH

SUMMARY

EXAMIHAT ION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT I F ICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DUG. HO. 1-038 011180 V-1405 B-G-2 VT-1 HDE 4.1 - 005 C C 8-10-88 VT: INCOMPLETE THREAD VALVE BOLTING 87.70 VT-1 HDE 4.1 - 010 C EHGAGEMEHT,CNF 88-1-014,FOLLOM UP EXAM RCB REQUIRED. 8-19.88 RCB VT: COMPLETE, CNF CLOSED PER PWO XA88081509-2947.

    • H/A**

011250 V-1404 8-G-2 VT-1 HDE 4.1 - 003 C C 8-10-88 VT.1: COMPLETE VALVE BOLTING 87.70 RCB

    • H/A**

~tP

'S

ATE: 11/14/88 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 33 I SION: 0 INSERVICE IHSPECTIOH SUHMARY REPORT OUTAGE 1 ( 1988) ~ FIRST PERIODS SECOHD INTERVAL CLASS 1 COHPONENTS PRESSURIZER RELIEF VALVE PIPING SUPPORTS H I 0 ZONE NUHBER: 038 ASHE S OHGT SEC. XI T RSEH SUHHARY EXAHIHATION AREA CATGY EXAH A E I 0 E REMARKS NUMBER IDENTIFICATION ITEH HO METHOD PROCEDURE T C G H R **CALIBRATIONBLOCK>>>>

REF. DWG. No.01-038S 011310 RC-005-53A F-8 VT-3 HDE 4.3 - 047 C C .8-10-88 VT-3: COMPLETE RIGID STRUT ASSEMBLY F3. 10 RCB

    • N/A**

\

gt' y v

ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 34 DATE: 11/14/88 VISION: 0 INSERVICE INSPECTIOH SUMHARY REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 1 COMPONEHTS SI 1A1 OUTSIDE CONTAINMENT N I 0 ZONE NUMBER: 039 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAHINATION AREA CATGY EXAH A E I 0 E REMARKS NUMBER IDENTIFICATION ITEH NO HETMOO PROCEDURE T C G H R **CALIBRATIONBLOCK**

REF. DUG. NO. 1-039-B 011400 B-G-2 VT-1 HDE 4.1 - 002 C C 7-23-88 VT-1: IHCOMPLETE THREAD FLANGE BOLTING 87.70 VT.1 HDE 4.1 - 008 C ENGAGEMENT,CNF 88-1-012,FOLLSI UP EXAM RAB HEEDED. 8-23.88 RAB VT-1: COMPLETE,CNF CLOSED PER PNO ¹ XA88081509-3858.

    • N/A~~

011470 V-3124 B-G-2 VT-1 NDE 4.1 - 004 C C 7-23-88 VT-1: BORIC ACID RESIDUE AROUND BOLTING 87.70 VT-1 NDE 4.1 - 009 C STUDS.CNF-88-1.013. FOLLOW UP EXAH RAB REQUIRED. 8-22-88 VT-1:

RAB COMPLETE,CNF CLOSED PER PWO ¹ XA88081509-4806,CLEANED, NO DEGRADATION.

~*N/A**

1" ~

~ p c4 I o<

,I

.J, I,

'j 1

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 35 I SION: 0 INSERVICE INSPECTION SUHMARY REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND IHTERVAL CLASS 1 COHPOHEHTS SI 1A1 OUTSIDE CONTAINHENT SUPPORTS N I 0 ZONE HUHBER: 039 ASHE S ONGT SEC. Xl T RSEH

SUMMARY

EXAHIHATION AREA CATGY EXAM A E I 0 E REMARKS HUHBER IDENT IF ICAT ION ITEH HO HETHOO PROCEDURE T C G H R **CALIBRATIONBLOCK**

REF. DWG. NO. 01-039-BS 011980 SIH-171 F-C VT-3 NDE 4.3 - 002 C C 7-23-88 VT-3(4: COHPLETE SLIDIHG BASE SUPPORT F3.10 5 RAB-44H/A**

012030 SIH-49 F-C VT-3 HDE 4.3 - 050 C C 8-13-88 VT-3: COHPLETE (AUGHEHTED)

HANGER F3.10 RAB

  • IN/A**

012040 S I -868-1295 F-8 VT-3 HDE 4.3 - 015 C C 7-23-88 VT 3: SHIH SLIPPIHG OUT(S.S.

BOX RESTRAINT F3.10 VT-3 HDE 4.3 - 054 C PIPE( C.S. SUPPORT.8-23-88 VT-3 0 RAB COHPLETE, CHF RAB CLOSED PER HCR 1-209. REEXAMINE 2/1.

    • H/A**

012050 S I H-48 F-C VT-3 HDE 4.3 - 049 C C 8-13-88 VT-3: COHPLETE (AUGMENTED)

HANGER F3.10 RAB

    • H/A%A 012060 S I -868.131 F-8 VT-3 HDE 4.3 - 006 C C 7-23-88 VT-3: COHPLETE RIGID SHAY STRUT F3 '0 RAB
    • H/A**

012110 S IH-45 F-C VT-3,4 NDE 4.3 - 001 C C 7-23-88 VT: COHPLETE SPRING HAHGER F3 F 50 VT-4 RAB

    • M/A**

I

'Z

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 . PAGE: 36 VISION: 0 INSERVICE IHSPECTIOH

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 2 COMPONEHTS STEAM GENERATOR 1A SECONDARY SIDE H I 0 ZONE NUMBER: 041 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK**

REF. DWG. NO.01-041 013480 SG-1A-S1 C-C MT HDE 2.2 - 010 C C 7-28-88 MT: COMPLETE KEY BRACKET 9 0 DEGREES C3.10 RCB

    • H/A%A 013490 SG-1A-SS C-C MT HDE 2.2 - 011 C C 7-30-88 MT: COMPLETE KEY BRACKET 9 180 DEGREES C3.10 RCB
    • H/A*4 013500 SG-1A-S2 C-C MT HDE 2.2 - 010 C P 7-28-28 MT: PARTIAL EXAM, IHSULATIOH CLEVIS BRACKET 9 45 DEGREES C3.10 RING BLOCKING ONE SIDE, COMPLETE EXAM 3RD RCB PERIOD WITH CONE TO UPPER SHELL WELD.
    • H/A*>>

013510 SG-1A-S3 C-C MT NDE 2.2 - 010 C P 7-28-88 MT: PARTIAL( INSULATIOH RING SUPPORT BRACKET 9 90 DEGREES C3.10 BLOCKING ONE SIDE, COMPLETE 3RD PERIOD.

RCB

    • N/A*A

DATE: 11/14/88 ST ~ LUCIE HUCLEAR PLANT UNIT 1 PAGE: 37 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 2 COMPONENTS MAIN STEAM LIHE 1A1 INSIDE CONTAINMENT H I 0 ZONE NUMBER: 063 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMIHAT IOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DWG. HO.01-063 020110 MSH-78 C-C MT NDE 2.2 . 019 C C 8-11-88 MT: COMPLETE TRUHHION (T=3/4") C3 ~ 20

    • H/A%A 020390 MSH.81 C-C MT HDE 2.2 - 019 C C 8-11-88 MT: COMPLETE TRUNNION (T=3/4") C3.20
    • H/A%*

+II I

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 38 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 2 COMPONENl'S MAIN STEAM LINE 1B1 INSIDE CONTAIHMEHT N I 0 ZONE HUMBER: 064 ASHE S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DWG. NO.01-064 020620 MS-53-FW.1 C-F-2 MT HDE 2.2 - 021 C C 8-9.88 MT: COMPLETE S/G EXl'. PIECE-TO.ELBOH C5.51 NDE 5 '

    • UT.45**

020630 MS-53-FW-'I-LR C-F-2 MT NDE 2.2 - 021 C C 8-9-88 MT: COMPLETE LOHG SEAM C5.52 HDE 5.2

    • ur-45 020640 MS-53-FN-1-SR C-F-2 MT HDE 2.2 - 021 C C 8-9-88 MT: COMPLETE LONG SEAM C5.52 HDE 5.2
    • UT 45**

020680 MSH.74 C-C MT HDE 2.2 - 017 C C 8-6-88 MT: COMPLETE TRUNNIOH (T=3/44) C3.20

  • IN/A*1 020840 MSH-75 C-C MT NDE 2.2 - 022 C C 8-9-88 MT: COMPLETE UELDED LUGS (4) (T=1 1/4") C3.20
    • H/A**

020850 MS-649-314 C-C MT NDE 2' - 022 C C 8-9-88 MT: COMPLETE MELDED LUGS (8) (T=1 1/2") C3.20

  • IN/A*I 021000 MSH-77 C-C MT HDE 2.2 - 017 C C 8-6.88 MT: COMPLETE TRUNNION (T= 3/4") C3.20
    • N/A~*

g

'+

h

DATE: 11/14/88 ST. LUCIE HUCLEAR PLANT UHIT 1 PAGE: 39 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT 0 OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 2 COMPONEHTS MAIN STEAM LINE 1B1 OUTSIDE CONTAINMENT N I 0 ZONE NUMBER: 066 ASME S OH 0T SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT I F I CAT ION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DMG. NO.01-066 021850 MS-3-1-SM.S C-F-2 MT HDE 2.2 - 016 C C 7-27-88 MT: COLPLETE PIPE-TO RELIEF NOZZLE C-5.81

    • N/A**

021890 MS-3 SN-25 C-F-2 UT 45 DEG. HDE 5.2 - 003 C C 7-27-88 MT: COMPLETE PIPE-TO-PIPE C5.51 UT 60 DEG. NDE 5.2 - 003 C 7-30-88 UT: COMPLETE MT HDE 2.2 - 016 C

+*UT 44**

021900 MS-3-1-SM-25-LS-A C-F-2 Ul'5 DEG ~ HDE 5.2 - 004 C C C 8-8-88 UT: COMPLETE,45 DEG. GEOMETRIC PIPE LOHG SEAM C5.52 UT 60 DEG. HDE 5.2 - 004 C IHD I CAT IOHS, SLAG, INS IGNI F I CANT.

MT HDE 2.2 - 020 C 8-8-88 MT: COMPLETE SAUT 44%i 021926 MS-3-1-FW-2-LS-A C-F-2 UT 45 DEG. HDE 5.2 - 004 C C 8-8-88 M'I: COMPLETE PIPE LONG SEAM C5.52 UT 60 OEG. HDE 5.2 - 004 C 8-8.88 UT: COMPLETE STM TRSL MT HDE 2.2 - 020 C

    • Ur-44.*

021935 MS-3-1-V1 C-G MT HDE 2.2 - 016 C C 7-27-88 MT: COMPLETE VALVE TO VALVE C6.20 STM TRSL

    • N/A**

'k >

~

t

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 40 VISION: 0 INSERVICE INSPECTION SUHHARY REPORT 0 OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 2 COHPONEHTS MAIN FEEDWATER TO STEAM GENERATOR 1A1 INSIDE CONTA N I 0 ZONE NUMBER: 067 ASHE S ONGT SEC. XI T RSEH

SUMMARY

EXAHIHAT ION AREA CATGY EXAH A E I 0 E REMARKS NUMBER IDEN'llF ICATION ITEH HO METHOD PROCEDURE T C G H R **CALIBRATIONBLOCK*>>

REF. DWG. NO.01-067 022050 BF-14.4-SW-1 C-F-2 UT 45 DEG ~ NDE 5.2 - 005 C C 8-11-88 UT: COMPLETE, ROOT GEOHETRY < 20X ELBSI-TO PIPE C5 ~ 51 UT 60 DEG. HDE 5.2 - 005 C DAC HT HDE 2.2 . 023 C 8-11-88 HT: LINEAR IHDICATIOHS, HT HDE 2.2 - 025 CNF-88-1-015.FOLLSI UP EXAM REQUIRED.

UT 0 DEG. HDE 5.18 - 002 8-16-88 HT: COHPLETE,CHF CLOSED OUT.

>>>>UT-41>>>>

022090 BF-51-FW-3A C-F-2 UT 45 DEG. NDE 5.2 - 006 C C 8-6-88 HT: COHPLETE PIPE-TO-ELBOW CS ~ 51 UT 60 DEG. HDE 5 ' - 006 C 8-9.88 UT: COMPLETE( ROOT GEOHETRY.

MT HDE 2 ' - 018 C

    • UT-43*>>

100 BF-51.FW-28 C-F-2 MT HDE 2.2 - 012 C C 8-1-88 HT:LINEAR IHDICATIOH, CHF ELBSI-TO-PIPE C5.51 MT HDE 2.2 - 024 C 88-1-010.EVALUATION,COLD LAP.

RCB UT 0 DEG. HDE 5.18 - 001 C 8-16-88 HT:COMPLETE (FOLLOWUP EXAH),UT 0 RCB HDE 5.2 DEGREE OF AREA,CNF CLOSED PER NCR 1-228.

022110 BF-51-FW-1B C-F-2 UT 45 DEG. NDE 5.2 . 008 C C 8-1-88 HT: COHPLETE ,NOH-RELEVANT PSIDER P IPE- TO.S/G EXTENSION C5.51 UT 60 DEG. HDE 5.2 - 008 C ACCUMULATIOH DUE TO PERHEABILITY.

MT HDE 2.2 . 013 C 8-8-88 UT: COHPLETE

    • UT 43**

"a gl.

~+ 4

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 41 VISION:,0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND IHTERVAL CLASS 2 COMPONENTS MAIN FEEDWATER TO STEAM GENERATOR 181 IHSIDE CONTA H I 0 ZONE NUMBER: 068 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G H R **CALIBRATIONBLOCK**

REF. DUG. HO.01-068 022340 BF-52-FH-2B C-F-2 UT 45 DEG. HDE 5.2 - 007 C C 8-2-88 MT: COMPLETE ELBN-TO.PIPE C5.51 UT 60 DEG. HDE 5.2 - 007 C 8-8-88 UT: COMPLETE, ROOT GEOMETRY.

MT HDE 2.2 . 014 C

    • UT-43**

022350 BF-52-FW-2A C-F-1 UT 45 DEG. HDE 5.2 - 007 C C 8-2-88 MT: COMPLETE PIPE-TO-S/G EXTENSION C-5.51 UT 60 DEG. HDE 5.2 - 007 C 8-8-88 UT: COMPLETE MT NDE 2.2 - 014 C

  • IUT 43**

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 42

"-VISION: 0 INSERVICE INSPECTION SUHHARY REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 2 COHPONENTS HAIN FEEDNATER TO S G 1A1 OUTSIDE CONTAINMENT N I 0 ZONE NUHBER: 071 ASME S ONGT SEC. XI T RSEN SUHMARY EXAMINATION AREA CATGY EXAH A E I 0 E REMARKS NUHBER IDENT IF ICATION ITEH NO HETHOD PROCEDURE T C G H R **CALIBRATIONBLOCK**

REF. DUG. NO.01-071 023380 BF-55-FIJ-1 C-F-2 UT 45 DEG. NDE 5.2 - 001 C C 7-27-88 HT: COHPLETE VALVE-TO-PIPE (V-9248) C5.51 UT 60 DEG. NDE 5.2 - 001 C 7-30-88 UT: COHPLETE,ONE SIDED EXAM DUE HT NDE 2.2 - 007 C TO CONFIGURATION.

  • ~UT-42**

V

~i

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 43 VISION: 0 IHSERVICE INSPECTIOH

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 2 COMPOHEHTS MAIN FEEDHATER TO S G 181 OUTSIDE COHTAINMEHT N I 0 ZONE NUMBER: 072 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMIHATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF ICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK**

REF. DUG. NO.01-072 023490 BF-19-Fll-1 C-F-2 UT 45 DEG. HDE 5.2 - 002 C C 7-27-88 MT: COMPLETE VALVE-TO-PIPE (MV-09-8) C5.51 UT 60 DEG. NDE 5.2 . 002 C 7-30-88 UT: COMPLETEtSCAH LIMITATION DUE MT HDE 2.2 - 005 C TO 1" DRAIN LINE.

I t>>

( 1

DATE: 11/14/88 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 44 VI SIOH: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOHD INTERVAL CLASS 3 COMPOHEHTS COMPONENT COOLING HEAT EXCHANGER A&B INLET HEADERS H I 0 ZONE NUMBER: 100 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMIHATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK>>"

REF. DWG. HO.01-100 031100 CC-998-11 F-8 VT-3 HDE 4.3 - 028 C C 7-29-88 VT-3: COMPLETE RIGID SHAY STRUT F3.10 031130 CC-998-65 F-B VT-3 NDE 4.3 - 027 C C 7-27-88 VT-3: COMPLE'TE RIGID STRUT F3.10 031190 YPH-1 F-C VT-3,4 HDE 4.3 - 023 C C 7-29-88 VT-3,4:

VARIBLE SPRING HANGER F3.50 VT-3,4 HDE 4.3 - 058 C COMPLETE,CHF-88-1-008,PAINTED SCALE ON SPRIHG CAN.

8-23-88 VT-3,4: COMPLETE,CNF CLOSED PER HCR 1-209. NO REEXAM REQUIRED.

  • >>H/A*>>

031220 YPH-4 F-C VT-3 HDE 4.3 - 040 C C 7-29-88 VT-3; COMPLETE ROO HANGER F3.10

    • N/A**

031250 YPH-110 F-C VT-3 HDE 4.3 - 041 C C 7.29-88 VT-3: COMPLETE SLIDING BASE SUPPORT F3.10

    • N/A'>>>>

031290 YPH-176 F-C VT-3,4 HDE 4.3 - 022 C C 7-29-88 VT-3 4: COMPLETE, CHF-88-1.007 VARIABLE BASE SUPPORT F3.10 VT-3,4 HDE 4.3 - 057 C FOR SPRING CAH SCALE BEING PAINTED OVER ~

8-23.88 VT-3(4: COMPLETE(CHF CLOSED PER NCR 1-209.HO REEXAM REQUIRED.

    • H/A>>>>

I g;

k J

DATE: 11/'l4/88 ST. LUCIE HUCLEAR PLANT UHIT 1 VISION: 0 IHSERVICE IHSPECTIOH

SUMMARY

REPORT OUI'AGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPONENTS COMPONENT COOLING PUMP 1A-1B-1C INLET SUPPORTS N I 0 ZONE,NUMBER: 105 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF ICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DWG. NO.01-105 032720 CC-28-1 F-8 VT.3 NDE 4.3 - 032 C C 7-29-88 VT-3: COMPLETE RIGID TIE BAR ASSEMBLY F3.10 032750 CC-28-3 F-B VT.3 HDE 4.3 - 031 C C 7-29-88 VT-3: COMPLETE BOX RESTRAINT F3.10 032800 CC-28-7A F-B VT-3 NDE 4.3 - 037 C C 7-29-88 VT-3: COMPLETE RIGID SWAY STRUT F3.10 0 860 CC-28-11 F-B VT-3 NDE 4.3 - 029 C C 7-29.88 VT-3: COMPLETE RIGID SWAY STRUT F3.10

1 I

II C

+1

'1 0

DATE: 11/14/88 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 46 I SION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPOHEHTS CIRCULATING WATER HEAT EXCHANGER -ARB- DISCHARGE T N I 0 ZONE NUMBER: 107 ASME OHGT SEC. XI RSEK

SUMMARY

EXAMINATION AREA CATGY EXAM E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE C G M R **CALIBRATIONBLOCK*~

REF. DWG. NO.01-107 033280 CW-1000-9A F-B VT-3 HDE 4.3 - 035 C C 7-29.88 VT-3: COMPLETE RIGID S'WAY STRUT F3.10 033330 CW-'1000-148 F-B VT-3 HDE 4.3 - 020 C C 7-29-88 VT-3: HEAVY RUST ON BOLTS AND BOX RESTRAINT F3.10 VT-3 NDE 4.3 - 055 C HUTS AT BASE 8 TWO (2) NUTS ARE NOT COMPLETELY ENGAGED.

CHF-88-1-005(FOLLOW UP EXAM REQUIRED.8-23-88 VT-3:COMPLETE,CHF CLOSED PER NCR 1-209.REEXAMINE 2/'l.

350 O'W-1000-90 F-C VT-3I4 HDE 4.3 - 021 C C 7-30.88 VT-3,4: INCOMPLETE THREAD SPRING BASE RESTRAINT ASSEMBLY F3.10 VT-3,4 NDE 4.3 - 056 C ENGAGEMENT)HEAVY RUST,CNF-88-1-006.

8-23-88 VT-3(4: COMPLETE, CNF CLOSED OUT PER HCR 1-209.REEXAMIHE 2/1.

    • H/Ala 033410 CW-1001-14A F-B VT-3 HDE 4.3 - 036 C C 7-29-88 VT-3: COMPLETE RIGID SWAY STRUT F3.10 033470 YPH-105 F-C VT-3 NDE 4.3 - 034 C C 7-29.88 VT-3: COMPLETE SLIDIHG BASE SUPPORT ASSEMBLY F3.10
    • H/At*

ls l,

0

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UNIT 1 I SION: 0 IHSERVICE INSPECTIOH

SUMMARY

REPORT OUl'AGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPONENTS CIRCULATING WATER INLET SUPPORTS H I 0 ZONE NUMBER: 109 ASME S OHGT SEC. Xl T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*~

REF. DWG. NO.01-109 033930 CW.999-75A F-B VT-3 HDE 4.3 - 033 C C 7.29-88 VT-3: COMPLETE RIGID SWAY STRUT F3.10 033980 CW.999-225A F-B VT-3 HDE 4.3 - 039 C C 7-29-88 VT-3: COMPLETE RIGID STRUT F3.10 033990 CW.999-235 F-B VT-3 HDE 4.3 - 038 C C 7-29.88 V'I-3: COMPLETE BOX RESTRAINT F3.10

0 DATE: 11/'l4/88 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 48 I SION: 0 IHSERVICE INSPECTIOH SUHHARY REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPOHEHTS CIRCULATING WATER INLET SUCTION SUPPORTS N I 0 20NE NUMBER: 110 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUHBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DWG. NO.01-110 034240 ISH-2 F-8 VT-3 HDE 4.3 - 026 C C 7-28-88 VT-3: COMPLETE BOX RESTRAINT F3 '0 034250 ISH-3 F.B VT-3 NDE 4.3 - 024 C C 7-28-88 VT-3: COMPLETE SADDLE RESTRAINT F3. 10 034260 ISH-4 F-8 VT-3 HDE 4.3 - 025 C C 7-28-88 VT 3: COMPLETE SADDLE RESTRAINT F3.10 270 ISH-5 F.B VT-3 HDE 4.3 - 030 C C 7-28-88 VT-3: COMPLETE BOX RESTRAINT F3.10

P f'~

i

DATE: 11/14/88 ST. LUCIE NUCLEAR PLANT UHIT 1 VISION: 0 INSERVICE IHSPECTIOH

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPONENTS AUXILIARY FEEDWATER PUMP 1C TO MAIN FEED'WATER SUPP H I 0 ZONE HUMBER: 112 ASME S ONGT SEC. Xi T RSEH

SUMMARY

EXAMIHATION AREA CATGY EXAM A E I 0 E REMARKS NUHBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DWG. NO.01-112 034620 BF-3.6 F-8 VT-3 NDE 4.3 - 018 C C 7-28-88 VT-3: COMPLETE RIGID TIE BAR ASSEMBLY F3. '10 034680 BF-4-1 F-C VT-3 HDE 4.3 - 017 C C 7-28-88 VT-3: COMPLETED RIGID RESI'RAINT F3.10

    • H/AA*

034740 BF-4-8 F-B VT-3 NDE 4.3 - 019 C C 7-28-88 VT-3; COMPLETE RIGID SWAY STRUT F3.10 o

s

'l V cry a>

DATE: 11/14/88 ST. LUCIE HUCLEAR PLANT UNIT 1 vISION: 0 INSERVICE INSPECTION

SUMMARY

REPORT 0 OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPOHENTS AUXILIARY FEEDIJATER.CONDENSATE TANK TO AUXILIARY F N I 0 ZONE NUMBER: 114 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMIHATION AREA CATGY EXAM A E I 0 E REMARKS HUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK*>>

REF. DUG. NO.01-114 035190 BF-3-H1 F-C VT-3 HDE 4.3 - 016 C C 7-28-88 VT-3: COMPLETE RESTRAINT F3.10

    • H/A**

P II I II g,'

DATE: 11/14/88 ST. LUCIE HUCLEAR PLAHI'NIT 1 PAGE: 51 VISION: 0 IHSERVICE INSPECTION

SUMMARY

REPORT OUTAGE 1 (1988), FIRST PERIOD, SECOND INTERVAL CLASS 3 COMPOHEHTS AUXILIARY FEEDWATER TO MAIN FEEDWATER SUPPORTS H I 0 20HE NUMBER: 115 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R *~CALIBRATION BLOCK**

REF. DWG. HO.01-115 035200 BF-4-H1 F-C VT-3 HDE 4.3 - 042 C C 8-1-88 VT-3: HEAVY CORROSION OH U BOLT RESTRAINT F3 '0 VT-3 NDE 4.3 - 059 C ,CHF-88-1-009,FOLLOW UP EXAM REQUIRED.

8 24-88 VT-3: COMPLETE,CNF CLOSED PER NCR 1-209.REEXAMINE 2/1 (ENVIRONMENT)

    • H/A**

rq

'lv

>)

i I

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS I ~ ~ IMtaOeeesrs As required by the provisions of the ASME Code Section XI Page 1 of 0

1. OWNER: FLORIDA POWER 4 LIGHT CO. DATE! October 26, 1988 P.O. Box 529100 Miami, Florida 33152
2. PLANT: St. LUcie Unit I UNITt P.O. Box 128 Fort Pierce, Florida WORK JOB NO. PC/M: 178-188 PERFORMED FPL Plant Construction BY: P.O. Box 14000 CWO NO.: 6652 Juno Beach, Florida IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM: ICW Lube Water Flange 6652-1264 Rev. 20 Replacements 6652-1269 Rev. 6 Repair Organization POf/, 3OBO, etc.

P.O. 0 C43967-65676 Type Code Symbol Stamp N A Authorization No. N/A Expiration Date N/A ANSI B31.7 (1969)

a. Applicable Construction Code SECTION III Edition Addenda
b. Applicable Edition of Section XI utilized for repairs or replacements: 1983 Summer 83 Addenda
6. Identification of components repaired or replaced and replacement components Name of Name of Mfg's. Nat'l Other Year Repaired ASM E Code Component Mfg. S/N Bd. 4 Identif- Built Replaced Stamped Ication /Replace- (Yes/No) ment Line No.

F lange N/A N/A N/A 1-3"-CW-)01 1979; Replaced N/A Line No.

Flange N/A N/A 1-3"-CW-302 1979 Replaced N/A Line No.

Flange Hub N/A N/A 1-3"-CW-301 1988 Replacement N/A Line No.

F lange I lub N/A 1-3"-CW-302 1988 Re'placement N/A

Is

~ w'i t i',,

v3 I

Page 2 of 0 FORM NIS-2

7. Description of work: Installed 2 new 3" - 150¹ WNFF Flan es
8. Tests Conducted: Hydrostatic~pneumatic Nominal Operating Pressure~g Other Pressure~150 si Test Temp. 125 F.
9. Remarks:

Applicable Manufacturer's Data Report to be attached CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this Re lacement Repair or Replacement conforms to Section XI of the ASME Code.

I ~

Signed: ~

(Owner or Owner's Designee) Title Date CERTIFICATE OF INSPECTION Q the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel W~I9~lf Inspectors and the State or Province of Ohio employed by have inspected the t b<<k I described in this gdhU,"i or replacement has been constructed in accordance with Section XI of the ASME Code. By signing pi this certificate, neither the Inspector nor his employer takes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor-his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with-this inspection.

  • Arkwright Boston Mutual Insurance Company Date:, /~

Factory Mutual Systems (Inspector)

COMMISSION NO.

Commissions: NB 7719 (State or Province, National Board)

~i, i r"

I 4

<<M

~

l.nf ~

k'

Page 3 of 0 NIS-2 SUPPLEMENTAL SHEET

l. OWNER: FLORIDA POWER R LIGHT CO. DATE: October 26, 1988 P.O. Box 529100 Miami, Florida 33152
2. PLANT: St. Lucie Unit I UNIT!

P.O. Box 128 Fort Pierce, FL

3. WORK 3OB NO, PC/M 178-188 PERFORMED FPL Plant Construction BY: P.O. Box 14000 CWO NO.: 6652 Juno Beach, FL
0. IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM: ICW Lube Water Flange Replacements 6652-1264 Rev. 20 6652-1269 Rev. 6

5. DESCRIPTION OF V/ORK:

Installed 2 new 3" - 150¹ WNFF Flanges

e ~ ~l W Page 4 of 4 NIS-2 SUPPLEMENTAL SHEET

l. OWNER: FLORIDA POWER dc LIGHT CO. DATE: October 26, 1988 P.O. Box 529100 Miami, Florida 33152
2. PLANTt St. Lucie Unit I UNIT: 1 P.O. Box 128 Ft. Pierce, PL
3. WORK . 3OB NO. PC/M 178-188 PERFORMED FPL Plant Construction BY: P.O. Box 14000 CWO NO.: 6652 Juno Beach, FL IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM! ICW Lube Water Flange Replacements 6652-1264 Rev. 20 6652-1269 Rev. 6

5. ADDITIONALMATERIAL (Excluding Welding Material)

Heat/Lot No.

or CFC or Manufacturer Specification Type R Description RIR/Report Hub AShiE-SA-105 3" - 150¹ WNPP Plange ¹ HT. GCYV Grade B 3R 7072A AS ME-SA-105 3" - 150¹ WNPP Flange HT.¹ XS2Z Grade B 3R 7072B

4

'km

~ f Jv h.

l I'

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS

~ t>>, in ~ t&tsttsaresss As required by the provisions of the ASME Code Section XI'age I of rJ'.

OV/NER: FLORIDA POWER tEt LIGHT CO. DATE: October 24, 1988 P.O. Box 529100 Miami, Florida 33152

2. PLANT: St. Lucie Unit I UNIT:

P. O. Box 128 Ft. Fierce, Florida

3. V/ORK 3OB NO. PC/M: N/A PERFORMED FPL Plant Construction BY: P. O. Box 14000 CWO NO.: 6745 Juno Beach, Florida
0. IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM: Diesel Oil Line 6745-1381 Rev. 2 6 1382 Rev.0 FPL/Backf it Repair Organization

  • P.O. Number - NY 422524 (Fipe) PO¹, 3OB¹, etc.
  • P.O. Number - 43967-99153B (Elbows C. Couplings)

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A ANSI B31.7 (1969)

S. a. Applicable Construction Code SECTION El Edition Addenda

b. Applicable Edition of Section XI utilized for repairs or replacements: 1983 Summer 83 Addenda
6. Identification of components repaired or replaced and replacement components See Page 4 of 4 for material list Name of Name of Mfg's. Nat'l Other Year Repaired ASME Code Component Mfg. SJTN Bd. ¹ Identif- Built Replaced Stamped ication /Replace- (Yes/No) ment Pipe and Line No. DO-13 Elbows N/A N/A per NCR 1-245 Replaced N/A Pipe and Line No. DO-14 Elbows N/A N/A N/A per NCR 6745-2215M Replaced N/A SEB PAGE 4 OF 4 FOR REPLACEMENT MATERIALON LINE DO-13 SBE PAGE 4 OF 4 FOR REPLACEMENT MATERIALON LINE DO-14

f g5 H.

-Pg

~

Page 2 of' FORM NIS-2

7. Description of work: See su lement sheet for descri tion of work Pa~e 3 S. Tests Conducted: Hydrostatic Pneumatic X Nominal Operating Pressure 4o Other Pressure~ltu si Test Temp. 120 F.
9. Remarks:

(Applicable Manufacturer's Data Report to be attached)

CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this Re lacement Repair or Replacement conforms to Section XI of the ASME Code.

0 Signed:

(Owner or Owner's Designee) Title Date CERTIFICATE OF INSPECTION lp the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Ohio employed by report on ciao e'9 have inspected the described in this H and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer takes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner.fqr any personal injury or property damage or a loss of any kind arising from or connected with this inspection. s

  • Arkwright Boston Mutual Insurance C CompanY FactorY hfutual SYstems Date: /~P- .Ã Commissions: NB 7719 (Inspector) (State or Province, National Board)

. l V

i/

Page 3 of 0 NIS-2 SUPPLEMENTAL SHEET

1. OWNER: FLORIDA POWER R LIGHT CO. DATE: October 24, 1988 P.O. Box 529100 Miami, Florida 33152
2. PLANT: St. Lucie Unit I UNIT:

P. O. Box 128 Pt. Pierce, Florida

3. WORK 3OB NO. PC/M N/A PERFORMED FPL Plant Construction BY: P. O. Box 14000 CWO NO.: 6745 Juno Beach, Plorida IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM: Diesel Oil Line 6745-1381 Rev.2 6745-1382 Rev.0

5. DESCRIPTION OF WORK:

Repair Line ¹ 1-2"-DO-14 Repair Line ¹ I-2"-DO-13

'p ~

c' f

4 '"< 4l ~ IeC u+

Page 1 of 0 NIS-2 SUPPLEMENTAL SHEET

1. OWNER: FLORIDA POWER R LIGHT CO. DATE: October 24, 1988 P.O. Box 529100 Miami, Florida 33152 St. Lucie Unit I UNIT:

P. O. Box 128 Ft. Pierce, Florida

3. WORK JOB NO. PC/M N/A PERFORMED PPL Plant Construction BY: P. 0. Box 14000 CWO NO.: 6745 Juno Beach, Florida IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM: Diesel Oil Line 6745-1381 Rev.2 6745-1382 Rev.0

5. ADDITIONALMATERIAL (Excluding Welding Material)

Heat/Lot No.

or CFC or Manufacturer Specification Type R Description RIR/Report 2R 5771A B.P. Shaw

~ ~ ASME-SA 106 GR.B 2"SCH. 40 Pipe HT¹ L83791 ASTM A105 2R 5807 Hub. Inc. ASME SA105 2" 3000¹ 90 Elbow HT¹ MA81 ASTM A 105 ZR 5807 Hub. Inc. ASME SA105 2" 3000¹ CPLG HT¹ CR85

+q ~

~ ~

A V

lI p la

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS lg ~ g g pool ~ Caeaate As required by the provisions of the ASME Code Section XI Page I of 0 I. OV/NER: FLORIDA POSER R LIGHT CO. DATE: October 20, 1988 P.O. Box 529100 Miami, Florida 33152

2. PLANT: St. Lucie Unit I UNIT:

P. O. Box 128 Ft. Pierce, Florida

3. V/0RK 3OB NO. PC/M: 179-188 PERFORMED FPL Plant Construction BY: P.O. Box 14000 CWO NO 6740 Juno beach, Florida IDENTIFICATION PROCESS SHEET NO,:

OF SYSTEM: Auxiliary Feedwater Pipe 179-188-1376 P.ev. I FPL Backfit Repair Organization PO¹, 3OB¹, etc.

PO¹ 61215-51388

. 'ype Code Symbol Stamp N/A Authorization N/A Expiration Date N/A ANSI B31.7 (1969).

5. a. Applicable Construction Code SECTION III Edition Addenda
b. Applicable Edition of Section XI utilized for repairs or replacements: 1983 Summer 83 Addenda
6. Identification of components repaired or replaced and replacement components See Page 4 of 4 for material list Name of Name of Mfg's. Nat'l Other Year Repaired ASME Code Component Mfg. S/N Bd. ¹ Identif- Built Replaced Stamped ication /Replace- (Yes/No) ment Line No. I-2-BF-Pipe N/A Between Veld Nos. Replaced N/A 7B and 12 SE PAGE 4 OF 4 FOR REPLACEMENT PIPE

J t

a'I",

4

Page 2 of 0 FORM NIS-2

7. Description of work: See Su lement Sheet for descri tion of work Pa e 3
8. Tests Conducted: 'ydrostatic X Pneumatic NomInal Operating Pressure Other . Pressure~1562 si Test Temp. l20 P.
9. Remarks:

(Applicable Manufacturer's Data Report to be attached)

CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this Re lacement Repair or Replacement conforms to Section XI of the ASME Code.

Signed:

(Owner or Owner's Designee) Title Date CERTIFICATE OF INSPECTION I, the Undersigned, holding a valid commission issued by the-National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Ohio employed by p eu

- have inspected 19' or replacement has been constructed the

<< I2.

<<h in accordance with Section Xl I

of 1dg the ASME described hUf, in this Code. By signing this certificate, neither the Inspector nor his employer takes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected. with this inspection-

  • Arkwright Boston Iiutual Insurance Company Factory I.futual Systems COMMISSION NO.

Date: /0-~-g6 Commissions:

(Inspector) (State or Province, National Board)

fr 0

gC

"(

Page 3 of 0 NIS-2 SUPPLEMENTAL SHEET

l. OWNER: FLORIDA POWER 4 LIGHT CO. DATE: October 20, 1988 P.O. Box 529100 Miami, Florida 33152
2. PLANT: St. Lucie Unit I UNIT: I P. O. Box 128 Ft. Pierce, Florida
3. WORK 3OB NO. PC/M 179-188 PERFORMED FPL Plant Construction BY: P. 0. Box 14000 CWO NO.:

Juno Beach, Florida IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM: Auxiliary Feedwater Pipe 179-188-1376 Rev.l

5. DESCRIPTION OF WORK:

Replacement of Two Inch Carbon Steel Pipe

E I

t!

i~).

jf f>

pl~

4>i

Page 0 of 0 NIS-2 SUPPLEMENTAL SHEET 0

1. OWNER: FLORIDA POWER R LIGHT CO. DATE: October 20, 1988 P.O. Box 529100 Miami, Florida 33152
2. PLANT: St. Lucie Unit I UNIT:

P. 0. Box 128 Ft. Pierce, Florida

3. WORK 3OB NO. PC/M 179-188 PERFORMED FPL Plant Construction BY: P. 0. Box 14000 CWO NO.: 6740 Juno Beach, Florida IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM: Auxiliary Feedwater Pipe 179-188-1376 Rev.l

5. ADDITIONALMATERIAL (Excluding Welding Material)

Heat/Lot No.

or CFC or Manufacturer Specification Type 8 Description RIR/Report AStfE-SA 106 2R 9167 McJunkin Corp. Grade B 2" SCH. 160 C/S Pipe (SEILS) HTg N14724

V 4 ~

~ I l Ql l

P,'r

~c, h

C'~ a

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the provisions of the ASME Code Section XI Page I of 0 I~ OWNER: FLORIDA POWER 8( LIGHT CO. DATE!

P.O. Box 529100 3/31/87 Miami, Florida 33152

2. PLANT: LUCIE'NIT I UNIT:

ST.

P.O. BOX 1200 JENSEN BEACH,FLA. 33457

3. WORK 3OB NO. PC/M:

PERFORMED 98-186 FPL PLANT CONSTRUCTION BY: CWO NO.:

P.O. BOX 1400 JUNO BEACH, FLA. 33408 6566 TIFICATI N PROCESS SHEET NO.:

HYDROGEN PURGE PENETRATION 1122 VALVES FPL/BACKFIT Repair Organization p~

POP, 3OB/P, etc.

P.O .¹43967-99250B/P .0 .¹C08068-37232 Type Code p ppp Authorization No. NA Expiration Date NA

  • CODE CASE N62-2(1621-2) WHERE APPLICABLE
5. a. Applicable Construction Code SECTION 111~80 Edition SUMMER 1982 Addenda *
b. Applicable Edition of Section XI utilized for repairs or replacements: 1980 EDITION,WINTER 198(

p>>

6. Identification of components repaired or replaced and replacement components Name of Component Name of Mfg. '/N Mfg's.. Nat'l Bd. a Other Identif-ication Year Built Repaired Replaced

/Replace-ASME Code Stamped (Yes/No) ment I-V-25-11 PACIFIC 48412 AT PEN.¹56 REMOVED NO I-V-25-13 PACIFIC 48412 AT PEN ~ ¹57 REMOVED NO

-V-25-15 PACIFIC 48416 AT PEN.¹58 REMOVED NO I-V-25-11 A.DARLIN E-A108-1-1 NA AT PENs¹56 1987 REPLACED YES

- 13 A. DARL IN E-A108-1-2 NA AT PEN.¹57 1987 REPLACED YES A. DARLIN E-A108-1-3 NA AT PEN.¹58 1987 REPLACED YES II 1984 P HUB NA REPLACED NO

~

~

4 t'(

-4 Y P T +

I

.k f 'I 0

Page 2 of 0 FORM NIS-2

7. Description of work: SEE SUPPLEMENTAL SHEET FOR DESCRIPTION OF WORK PG.3 OF 4
8. Tests Conducted: Hydrostatic Pneumatic f Nominal Operating Pressure Other Pressure~pi si Test Temp.
  • P.~AYBIENT
9. Remarks: ATTACHED Applicable Manufacturer's Data Report to be attached CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this REPLACEMENT Repair or Replacement conforms to Section XI of the ASME Code.

Signed:

(Owner or Owner's Designee)

Xiii Title /4j< +A~A9P,P~~~

Date

~ ~

/g CERTIFICATE OF INSPECTION I9 the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of employed by

  • have inspected the HYoROGEN described in this report on 19~P and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furth'ermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
  • ARKWRIGHT BOSTON MUTUAL INSURANCE COMPANY FACTORY MUTUAL SYSTEMS COMMISSION NO.

Commissions:

Inspector (State or Province, National Board

~ C f

$ 'I 44 0

Page 3 of 0 NIS-2 SUPPLEMENTAL SHEET

l. OWNER: FLORIDA POWER R LIGHT CO. DATE:

P.O. Box 529100 Miami, Florida 33152

2. PLANT: ST. L'UCIE-I UNIT:

P.O. BOX 1200 JENSEN BEACH,FLA. 33457

3. WORK JOB NO. PC/M FPL PLANT CONSTRUCTION P.O. BOX 1400 CWO NO.:

JENSEN BEACH,FLA. 33408 6566 IDPNT[FICATION PROCESS SHEET NO.:

OF SYSTEM: 98-186-1122 H2 PURGE PENETRATIONS

5. DESCRIPTION OF WORK:

THIS WORK IS FOR THE REPLACEMENT OF THE INBOARD-VALVE (VALVE CLOSEST TO THE" REACTOR CONTAINMENT VESSEL) ON CONTAINMENT PENETRATIONS P-56,P-57 AND P-58. THE EXISTING VALVES HAVE FLANGED ENDS AND THE NEW VALVES ARE BUTT WELDED. THIS MODIFICATION IS BEING IMPLEMENTED TO IMPROVE THE CONTAINMENT VESSEL INTEGRITY WITH RESPECT TO,POST ACCIDENT LEAKAGE RATES BY REPLACING FLANGED CONNECTIONS WITH WELDED CONNECTIONS.

Pl

~(g 4

4~ )y

'h

\

~ r Page 0 of 0 NIS-2 SUPPLEMENTAL SHEET

l. OWNER: FLORIDA POWER R LIGHT CO. DATE:

P.O. Box 529100 Miami, Florida 33152

2. PLANT: ST. LUCIE I UNIT:

P.O. 30X 1200 JENSEN BEACH,FLA. 33457

3. WORK 3OB NO. PC/M 98-186 PERFORMED FPL PLANT CONSTRUCTION BY: P.O. BOX 1400 CWO NO,'566 JENSEN BEACH,FLA ~ 33408
0. IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM: H2 PURGE PENETRATIONS 98-186-1122

5. ADDITIONALMATERIAL (Excluding Welding Material)

Heat/Lot No.

or CFC or, Manufacturer Specification Type dc Description RIR/Report ANCHOR/DARLING CO. I -V-25-11 RI R ¹ W I LLIAHS PORT, PA. SA 216-WCB 3" GATE VALVE 2R 8056 ANCHOR/DARLING CO. I-V-25-13 RIR ¹ WILLIAMSPORT, PA. SA 216-WCB 3" GATE VALVE 2R 8056 ANCHOR/DARLING CO. I -V-25-15 RIR ¹ WILL IANSPORT, PA. SA 216-WCB 3" GATE VALVE 2R 8056 HUB INC ~ SA 106 3" S/40 HT. ¹Y86126 TUCKER GEORGIA GRADE B PIPE RI R¹ 2R6052

~ ~,

a

'PF f

j. -y

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the provisions of the ASME Code Section XI Page 1 of 0

1. OWNER: FLORIDA POWER R LIGHT CO. DATEs P.O. Box 529100 3/] 7/87 Miami, Florida 33152
2. PLANT: ST. LUCIE UNIT 1 UNITs P.O, BOX 1200 JENSEN BEACH,FLA 33457 JOB NO. PC/M:

PERFORMED FPL PLANT CONSTRUCTION 28-187 BY: P.O. BOX 1400 CWO NO.:

JUNO BEACH,FLA 33408 6581 PROCESS SHEET NO.:

OF SYSTEM: REFUELING WATER STORAGE 28-187-1154 TANK/NOZZLE REPLACEYENT FPL/BACKFIT Repair Organization PO/$ , 3OB/k, etc.

PO¹ C43967-97915 Type Code Symbol Stamp Authorization No.

  • AWWA 0100-1972 Expiration NA
  • ANSI 896.1-1972 Date
5. a. Applicable Construction Code SECTION iE
  • Edition Addenda
b. Applicable Edition of Section XI utilized for repairs or replacements:1974 thru Sum.75 ADOENDA
6. Identification of components repaired or replaced and replacement components Name of Name of Mfg's. Nat'1 Other Year Repaired ASME Code Component Mfg. S/N Bd. 0 Identif- Built Replaced Stamped ication /Replace- (Yes/No) ment 3>> NOZZLE CHICAGO LOCATIIIN 148o RWST NA AT 148 1972 REMOVED NO 3" NOZZLE SEE PAGE REPLACE-148 RWST ,

HUB INC. NA iVA 4 OF 4 1987 YrNT NO

$ C,

~ll~

-p'Ps L

'j,;

g. ~

0

Page 2 of 0 FORM NIS-2

7. Description of work: SEE SUPPLEt~ENT SHEET FGR DESCRIPTION OF ':ORK PG.3 OF 4
8. Tests Conducted: Hydrostatic Pneumatic X Nominal Operating Pressure Other Pressure~ly si Test Temp. * .FP(AH81ENT)
9. Remarks: NA Applicable Manufacturer's Data Report to be attached CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this Repair or Replacement conforms to Section XI of the ASME Code.

Signed:

(Owner or Owner's Designee) Title Date CERTIFICATE OF INSPECTION Q the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel. Inspectors and the State or Province of OHIO -

employed by have inspected the RWST NOZZLE FOR LINE I-3"-CS-46 described in this report on 19~ and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

  • ARKQRIGHT BOSTON MUTUAL INSURANCE COMPANY FACTORY MUTUAL SYSTEt':S COMMISSION NO.

r Elate: Commissions:

Inspector (State or Province, National Bo rd

t I ~

12 C

Page 3 of 0 NIS-2 SUPPLEMENTAL SHEET

1. OWNER: FLORIDA POWER 4 LIGHT CO.

P.O. Box 529100 o~~E: 3/jg/87 Miami, Florida 33152

2. PLANT: ST. LUCIE-1 UNIT:

P.O. BOX 1200 JENSEN BEACH,FLA 33457

3. WORK JOB NO.

PERFORMED PC/M'8-187 FPL PLANT CONSTRUCTION BY: P.O. BOX 1400 CWO NO.:

JUNO BEACH,FLA 33408 6581 IDENTIFICATION PROCESS SHEET NO.:

OF SYSTEM: REFUELING WATER STORAGE 28-187-1154 TANK/NOZZLE REPLACEMENT

5. DESCRIPTION OF WORK:

THIS WORK IS FOR THE REPLACEMENT OF THE REFUELING WATER TANK (RWT) NOZZLE FOR LINE I-3"-CS-46. THE EXISTING NOZZLE HAS EXTENSIVE PITTING AND CORROSION, THEREFORE IT WAS CONDISERED ADVISIBLE TO REPLACE IT.

l 4

1~'~a>

4

Page 0 of 0 NIS-2 SUPPLEMENTAL SHEET

l. OWNER: FLORIDA POWER R LIGHT CO. DATE: ~/ I 7/&7 P.O. Box 529100 Miami, Florida 33152
2. PLANT: UNIT:

ST. LUCI E 1 P.O. BOX 1200

3. WORK JENSEN BEACH,FLA 33457 JOB NO. PC/M PERFORMED BY: FPL PLANT CONSTRUCTION P.O. BOX 1400 CWO NO,'581 IDENTIFICATION JUNO BEACH, FLA 33408 PROCESS SHEET NO.:

OF SYSTEM:

REFUELING WATER STORAGE 28-187-1154 REPLACEMENT ATEggg/NOZZLE (Excluding Welding Material)

Heat/Lot No.

or CFC or Manufacturer Specification Type 4 Description RIR/Report HUB INC. ASME-SB 241

  • HEAT ¹14855 TUCKER, GEORGIA ALLOY 6061 T6 3" SCH. 80 ALUMINUM PIPE RIR ¹7886 HUB, INC. ASME-SB247 3" 150 ¹STD. SLIP-ON HEAT ¹XA 107 TUCKER, GEORGIA 6061 T6 FLANGE RF RIR ¹7878'3 HUB INC. AS ME-SB 209 13/16"PLATE (RADIUS) HEAT ¹531191 TUCKER, GEORGIA 6061 T651 SB209T6061 T651 RI R ¹7869 MATERIAL IN ACCORDANCE WITH FCR 1222

~ ~