FLORIDA POWER AND LIGHT COMPANY NUCLEAR ENGINEERING DEPARTMENT P.O. Box 14000 Juno Beach, Florida 33408 SECOND INSERVICE INSPECTION INTERVAL SECOND INSPECTION PERIOD SECOND OUTAGE 1993 SUINMARYREPORT SUBMITTAL Prepared by Equipment, Support and Inspection Group Code Programs Section For St. Lucie Nuclear Power Plant P.O. Box 128 Ft. Pierce, Florida 33454 Commercial Service Date: December 21, 1976 NRC Docket Number: 50-335 Document Number: ISI-PSL-SR-93 Revision Number: 0 Date: September 6, 1993 I
9309170229 9035000335 PDR ADOCH, 8
v ~z' 1993
SUMMARY
REPORT SUBMITTAL Page 2 of 22 ABSTRACT This document summarizes the St. Lucie Nuclear Power Plant, Unit 1, 1993 Inservice Inspection activity performed during the period from March 29, 1993 through June 19, 1993.
This Report complies with the ASME Boiler and Pressure Vessel Code,Section XI, 1983 Edition through the Summer 1983 Addenda, Article IWA-6000, paragraph IWA-6230.
This document provides a summary of the examinations performed, conditions noted and corrective actions taken or recommended as documented within the NIS-1 Owners'eport for Inservice Inspections.
This Report also includes the NIS-BB Owners'eport for Eddy Current Inspections and copies of NIS-2 Owners'eports for Repairs and Replacements performed since the preceding summary report submittal.
1993
SUMMARY
REPORT SUBMITTAL Page 3 of 22 FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules
- 2. PLANTt St. Lucie Nuclear Power Plant 6501 South Highway A1A, Jensen Beach, Florida 34957
- 3. PLANT UNITt 1 4e OWNER CERTIFICATE OF AUIIIORIZATION(IF REQUIRED)
N/A
- 5. CoaetERcIAL SERvIcE DATE: 12/21/76 6. NATIONAL BOARD NUhKER FOR UNIT: N/A
- 7. CoMFoNENTs INsFEcTED:
Manufacturer or Component or Manufacturer or Installer Serial State or National Appurtenance Installer No. Province No. Board No.
Reactor Vessel Combustion 67109 N/A N/A Engineering Pressurizer Combustion 67604 N/A N/A Engineering team Generator 1A ombustion 67508 N/A N/A Engineering team Generator 1B Combustion 67509 N/A N/A Engineering Reactor Coolant Pump Byron Jackson N/A N/A N/A 1A1 Reactor Coolant Pump yron Jackson N/A N/A N/A 1A2 Reactor Coolant Pump Byron Jackson N/A N/A N/A 1B1 Reactor Coolant Pump Byron Jackson N/A N/A N/A 1B2 Reactor Coolant Piping Ebasco I-12-RC-108 N/A N/A I-12-RC-162 IP-RC-103 I-2-RC-113 I-2-RC-122 I-2-RC-142 I-2-RC-148
I' 1993 SUhGVIARY REPORT SUBMITTAL Page 4 of 22 Manufacturer or Component or Manufacturer or Installer Serial State or National Appurtenance Installer No. Province No. Board No.
afety Injection Piping Ebasco I-24-SI-504 N/A N/A I-12-SI-149 I-12$ I-153 I-12$ 1406 I-12$ 1410 I-12$ 1417 I-12-SI460 I-12$ 1 475 I-12-SI-814 I-10-SI-127 I-10$ I-130 I-10$ 1420 I-10-SI422 I-6-SI-110 I-6$ I-111 14 $ 1-113 I-6$ I-129 I-6$ I-213 I-6 $ 1425 14 $ 1-210 I-3-SI-208 I-2$ I-218 I-2$ I-147 Chemical and Volume Ebasco I-2-CH-A74 N/A N/A Control Piping I-2-CH-136 I-2-CH-147 I-2-CH-148 Shutdown Cooling Heat Ebasco N/A N/A N/A Exchanger Main Stcam Piping Ebasco I-34-MS-28 N/A N/A I-34-MS-29 Containment Spray Piping Ebasco I-12-CS-11 N/A N/A I-24-CS41 Component Cooling Ebasco I-24-CC-32 N/A N/A ater Piping I-22-CC-33 I-20-CC-26 I-8-CCPO I-8-CCM Circulating Water Piping Ebasco I-30-CW-20 N/A N/A pent Fuel Pool Cooling Ebasco I-10-FS-508 N/A N/A Piping I-8-FS-502 Fcedwater Piping Ebasco IQ-BF-28 N/A N/A I-2-BF-38 Condensate Piping Ebasco I-8-C-58 N/A N/A I-8-C-85 I-8-C-87 I-6-C-54 IA-C-90
1993
SUMMARY
REPORT SUBMITTAL Page 5 of 22
- 8. EXAhIINATIONDATES: ~Mh2 1993( J l9 1993
- 9. sEcoND INsPEcTIGN INTERYAL FRoM: Februa 11 1988 Yo Februa 10 1998 10+ SECOND INSPECTION PERIOD FRohI: Februa 11 1991 Yo Februa 10 1995 11, APPLIcABLE EDITIGN oF SEGTloN XI: 1983 Edition thru Summer 1983 Addenda
- 12. DATE/REYIsIoN oF INsPEGTIQN PLAN: Revision 3 'Se tember 6 1991 13, ABsH&cT oF ExAMINATIONs. INcLUDE A LlsI'F ExAMINATIQNsAND A sTATEMENT coNGERNING sTATUs OF WORK REQUIRED FOR THE CURRENT INIERVAL'.
During the 1993 refueling outage, FPL conducted nondestructive examinations of selected components at St. Lucie Nuclear Power Plant Unit 1 The examinations were performed
~
during the period from March 29, 1993 through June 19, 1993. These examinations constitute the Second Outage of the Second Period of the Second 10-Year Inservice Inspection Interval of Commercial Operation.
The examinations performed falls within the percentages as identified in Table IWB-2412-1 of Inspection Program'B" (50% to 67%).
This summary report covers all inservice inspection activities which have occurred since the last outage which ended on December 21, 1991.
NDE EXAMINATIONS Manual ultrasonic, liquid penetrant, magnetic particle, and visual examination techniques were used in the inservice examinations of selected components, systems, and their supports. Appendix A through C provides Examination Summary Tables.
ZONE 002 REACTOR PRESSURE VESSEL CLOSURE HEAD-Volumetric and surface examinations were performed on one peel segment weld at 180 degrees, and on 1/3 of the head to flange weld. The additional requirements of Regulatory Guide 1.150 were also complied with. The head to flange weld is divided into 33 1/3% of the weld to be performed each period, in order to stay consistent with the First Interval. A Visual (VT-3) examination was conducted on the closure head mating surfaces.
ZONE 004 STEAM GENERATOR 1B-A Visual (VT-1) examination was performed on the primary manway studs and nuts,
1993
SUMMARY
REPORT SUBMITTAL Page 6 of 22 ZONE 005 PRESSURIZER-A Visual (VT-1) examination was performed valve V-1202, and additional examinations were performed on the pressurizer water space nozzles, steam space nozzles and the heater penetrations for evidence of boric acid.
ZONE 016 PRESSURIZER SURGE LINE-A volumetric and surface examination was conducted on the nozzle to safe-end weld and an elbow to pipe weld.
ZONE 017 REACTOR COOLANT PUMP 1A1-Volumetric examination was conducted on the flywheel bore and keyway areas, Regulatory Guide 1.14 is applicable.
ZONE 018 REACTOR COOLANTPUMP lA2-Volumetricexamination was conducted on the flywheel bore and keyway areas, Regulatory Guide 1 14 is applicable.
~
ZONE 019 REACTOR COOLANT PUMP 1B1-Volumetric examination was conducted on the flywheel bore and keyway areas. Regulatory Guide 1.14 is applicable. Surface examinations were performed the four support lugs. Limitations were noted due to a nut located 1/2 inches from the toe of the weld being examined. Volumetric examinations were performed on 12 of the 16 reactor coolant pump studs. The additional 4 studs are rescheduled for the next outage.
ZONE 020 REACTOR COOLANTPUMP 1B2-Volumetric examination was conducted on the flywheel bore and keyway areas, Regulatory Guide 1. 14 is applicable.
ZONE 022 SAFETY INJECTION PIPING-Surface and Volumetric examinations were conducted on six piping welds. One elbow to pipe weld is being rescheduled to the next outage in order to perform the volumetric examination. Visual (VT-3) examinations was conducted on two supports.
ZONE 024 SAFETY INJECTION PIPING-One Visual (VT-1) examination was performed on valve bolting. Two Visual examinations were performed on one valve internal surface and one component supports.
ZONE 025 COMBINED PRESSURIZER SPRAY LINE PIPING-Surface and Volumetric examinations were conducted on one tee to pipe weld.
ZONE 028 SHUTDOWN COOLING LINE 1B-Visual (VT-1) examination was conducted on valve bolting.
ZONE 029 SHUTDOWN COOLING LINE lA-Visual (VT-3) examination was conducted on one valve internal surface. One elbow weld and the elbow base material was examined by the visual (VT-1) and volumetric examination method per Nuclear Regulatory Commission (NRC)Bulletin 88-08, supplement 3. FPL'S Backfit Quality Control Department performed one surface examination on a branch connection following
1993
SUMMARY
REPORT SUBMITTAL Page 7 of 22 flushing to reduce the radiation level.
ZONE 031 CHARGING LINE-One support was visually (VT-3) examined.
ZONE 032 CHARGING LINE-Surface examinations were conducted on four welds.
Visual (VT-3/VT-4) examinations of three supports were examined. No rejectable conditions were noted.
ZONE 033 PRIMARY DRAIN-Visual (VT-1) examination of Bolting on one flange was performed.
ZONE 036 PRIMARY DRAIN-Visual (VT-1) examination of Bolting on one flange was performed.
ZONE 037 LETDOWN PIPING-Two pipe welds were examined by the surface examination method. Four variable spring hangers/supports were examined visually (VT-3/VT-4).
ZONE 039 COMBINED SAFETY INJECTION PIPING-One pipe to pipe weld was examined by the volumetric and surface examination method. Four supports were examined by the visual (VT-3/VT-4) examination method.
ZONE 040 COMBINED SAFETY INJECTION PIPING-One elbow to pipe weld was examined by the volumetric and surface examination method. One tee to valve weld was examined by the surface examination method, the volumetric examination method is rescheduled for the next outage. One support was examined by the visual (VT-3) examination method.
ZONE 041 STEAM GENERATOR 1A (Secondary Side)-The steam generator feed ring was examined by the Visual examination method as an ongoing additional examination.
Results of this examination activity can be found in the PSL-1 steam generator secondary side inspection and sludge lancing report.
ZONE 042 STEAM GENE<RATOR 1B (Secondary side)-The steam generator feed ring was examined by the Visual examination method as an ongoing additional examination.
Results of this examination activity can be found in the PSI 1 steam generator secondary side inspection and sludge lancing report.
ZONE 043 LOW PRESSURE SAFETY INJECTION DISCHARGE PIPING-Eight piping welds were examined by the surface examination method.
ZONE 044 LOW PRESSURE SAFETY INJECTION DISCHARGE HEADER-One valve to pipe weld was examined by the surface and volumetric method.
1993
SUMMARY
REPORT SUBMITTAL Page 8 of 22 ZONE 049 SHUTDOWN COOLING LINE OUTSIDE CONTAINMENT-Augmented visual (VT-1) examinations were performed on line 10-SI-420 at 12 specific support locations.
ZONE 050 SHUTDOWN COOLING LINE-One circumferential and one long seam weld examined by the surface examination method. Four supports examined by the visual (VT-3/VT-4) examination method.
ZONE 051 SHUTDOWN COOLING LINE A INSIDE CONTAINMENT-Augmented visual (VT-1) examinations were performed on line 10-SI-420 at 18 specific support locations.
ZONE 052 SHUTDOWN COOLING LINE-Two circumferential welds and four long seams were examined by the surface examination method. Three supports were examined by the visual (VT-3) examination method:
ZONE 056 SHUTDOWN COOLING HEAT EXCHANGER B-The outlet nozzle to vessel weld was examined by the surface and volumetric examination method. The body to tubesheet weld was examined by the volumetric examination method.
ZONE 059 SAFETY INJECTION TANK DISCHARGE PIPING-Three welds were examined by the surface examination method. One variable spring base support was examined by the visual (VT-3/VT-4) examination method.
ZONE 061 HIGH PRESSURE SAFETY INJECTION IA-One pipe to elbow weld was examined by the surface and volumetric examination method.
ZONE 062 HIGH PRESSURE SAFETY INJECTION HEADER B PIPING-Three welds were examined by the surface and volumetric examination method. One tee to valve weld was rescheduled till the next outage to complete the volumetric examination.
ZONE 063 MAIN STEAM 1AI-One circumferential weld and three long seams were examined by the surface and volumetric examination method.
ZONE 064 MAIN STEAM IB1-One support was examined by the visual (VT-3) examination method on the trunnions only.
ZONE 068 MAINFEEDWATER LINE IB1 INSIDE CONTAINMENT-Continuous volumetric examination of the nozzle ramp out to mid elbow on the horizontal run.
ZONE 071 MAINFE<EDWATER LINE 1B1 OUTSIDE CONTAINM<NT-Volumetric examination performed on a pipe to penetration weld. The surface examination has been rescheduled till the next outage.
1993 SMEARY REPORT SUBMITTAL Page 9 of 22 ZONE 073 LPSI/HPSI/CS LOOP A INLET PIPING-Four welds were examined by the surface examination method. One support was examined by the visual(VT-3) examination method.
ZONE 080 SHUTDOWN COOLING HEAT EXCHANGER 1A-Two welds were examined by the surface examination method. Three supports were examined by the visual (VT-3/VT-4) examination method.
ZONE 086 COMBINED HP AND AUXILIARYHP HEADER-Two pipe welds examined by the surface examination method.
ZONE 087 CHARGING PUMP DISCHARGE-Two welds examined by the surface examination method. In addition to the scheduled examinations, augmented and/or additional examinations were conducted. Appendix D provides Augmented Examination Summary Tables. Described below is a narrative discussion of the additional/augmented examination conducted.
As a follow up to the NRC Bulletin 79-13, FPL conducted a continuous scan (100% of the base metal) from the nozzle ramp out to a point one pipe diameter upstream of the pipe to elbow weld on the horizontal pipe run. This is done every period on one Main feedwater line, on alternating Steam Generators, In response to NRC Bulletin 88-08, Supplement 3, one fitting which could be subjected to unacceptable thermal stresses due to outleakage from the RCS during operation was examined.
In response to industry issues regarding inconel 600 material a visual examination was conducted on 100% of the pressurizer heater penetrations and steam space instrument nozzles to the extent possible. No leakage or recordable indications were noted.
EDDY CURRENT TESTING-The Eddy Current Examinations of Steam Generators A and B, were performed by Florida Power and Light Company during the period from April 7, 1993 through April 22, 1993. Steam Generator Eddy Current examination requirements, examination methods, and the extent and frequency of examinations are governed by the St. Lucie plant Technical Specifications, 7506 tubes in Steam Generator 1A and 7844 tubes in Steam Generator 1B were examined. See Appendix E attached, NIS-BB Owners'ata Report for Steam Generator examination results.
SNUBBER EXAMINATIONS AND TESTING-Snubber visual examinations and functional testing were conducted in accordance with the St. Lucie Unit 1 Plant Technical Specifications 4.7.10 and the additional requirements of ASME Section XI. Testing services were supplied by Siemens Nuclear Power Services Incorporated. See Appendix F for a summary results of Snubber Examination and tests.
1993
SUMMARY
REPORT SUBMITTAL Page 10 of 22 SYSTEM PRESSURE TESTING-System pressure testing was conducted by the St, Lucie Plant in accordance with Plant Technical Specifications and plant procedures.
ABSTRACT OF CONDITIONS NOTED.
All indications/conditions identified during the conduct of inservice inspection activities are documented in accordance with the NDE Examination Procedure applicable to the examination being performed.
All indications/conditions observed are compared against the acceptance criteria of Section XI.
Components whose examination either confirms the absence of indications/conditions or reveals indications/conditions that do not exceed the acceptance criteria of Section XI, are considered acceptable for continued service.
Components whose examination reveals indications/conditions that exceed the acceptance criteria of Section XI are documented on applicable examination records as prescribed in the NDE procedure and submitted on a Customer Notification report (CNR) to the Plant representative for evaluation and disposition in accordance with plant procedures.
Components whose examination reveals indications/conditions are compared against previous examination results.
Summarized below is an abstract of the conditions noted:
ZONE SUMt/ IDENT METH DESCRIPTION 005 001885 V-1202 VT-1 Damaged Valve Bolting 016 003360 HIB VT-3/4 Dual Spring Hanger Out of Tolerance 016 003370 H2B VT-3/4 Dual Spring Hanger Out of Tolerance 029 007850 V-3480 VT-3 Erosion noted on disc seat and body interior surface 032 009700 CH-141-36C VT-3/4 Inadequate Thread Engagement, Verify spring can settings 032 009710 CH-141-78 VT-3/4 Verify spring can settings 032 009670 CH-130-66 VT-3/4 Verify spring can settings 039 012200 SI-868-2311 VT-3 Light Rust on Spherical Bearing 040 013330 SIH-21 VT-3/4 Spring Settings out of tolerance 041 013465 SG-IA-FR VT Verify Examination Results 043 014230 SI410-2-SW-3 PT Two L'inear indications 0.3" 059 016550 SI476-158 VT-3 Missing Cotter Pin, strut is frozen 059 018110 SIH-244 VT-3/4 Incomplete Thread Engagement 080 027560 CS-678-202 VT-3 Frozen Strut 080 027580 CS-678-206 VT-3 Cotter Pin not bent, Incomplete Thread Engagement, Light Rust on spherical bearing 080 027620 CSH-52 VT-3/4 Spring can settings off scale
1993
SUMMARY
REPORT SUBMITTAL Page 11 of 22
- 15. ABSTRACT OF CORRECHVE MEASURES RECOMMENDED AND TAKEN.
All recorded indications and/or conditions noted were compared against the acceptance standards of the ASME Boiler and Pressure Vessel Code,Section XI (where acceptance criteria exists).
Indications exceeding the acceptance criteria were submitted to the plant for evaluation, disposition and corrective action in accordance with plant procedures.
Summarized below are the corrective measures recommended and/or taken:
ZONE SUM CORRECTIVE MEASURES RECOMMENDED/TAKEN 0'05 001885 V-1202 Replacement 016 003360 HIB Re-adjustment 016 003370 H2B Re-adjustment 029 007850 V-3480 Engineering Evaluation Acceptable As-Is 032 009700 CH-141-36C Engineering Evaluation Acceptable As-Is, recommended replacing bolt 032 009710 CH-141-78 Re-adjustment 032 009670 CH-130-66 Engineering Disposition Accept As-Is 039 012200 SI-868-2311 Clean and Lubricate 040 013250 SI-868-83 Replace Cotter Pin, Clean and Lubricate Spherical Bearing 040 013330 SIH-21 Re-adjust settings 041 013465 SG-IA-FR Engineering Evaluation Acceptable As-Is 043 014230 SI410-2-SW-3 Engineering Evaluation Remove and or reduce the size of indication by light surface grinding or buffing 050 016550 SI-676-158 Engineering Evaluation Replace cotter pin, clean and lubricate 059 018110 SIH-244 Retightened 080 027560 CS-678-202 Clean and Lubricate Strut 080 027580 CS-678-206 Cotter pin was bent, Clean and Lubricate strut, Incomplete Thread Engagement is Acceptable As-Is 080 027620 CSH-52 Engineering Evaluation determined this condition to be caused by a drawing error, DCR-SLM-93469 issued to correct drawing error, Reset spring can.
GEOMETRIC REFLECTORS-Numerous geometric reflectors were noted during the ultrasonic examination activity. These geometric reflectors were determined to be caused by a number conditions, such as, beam redirection, configuration of the part or parts being joined, pronounced root, backing bars, and from the inside and outside diameter surface. No corrective action was required.
1993
SUMMARY
REPORT SUBMITTAL Page 12 of 22 DEGRADED TUBES-As a result of indications identified during Eddy Current Inspections, 69 tubes were plugged in Steam Generator 1A, and 61 tubes were plugged in Steam Generator 1B. The 1993 Eddy Current Results Cumulative Report for both Generators is included with this summary report.
SNUBBER EXAMINATIONANDTESTING-Seven mechanical and hydraulic snubbers examined and/or tested resulted in failure. All failures were repaired and/or replaced.
PREVIOUS EXAMINATIONRESULTS-All indications or conditions that exceeded the acceptance criteria were compared against the preservice and previous examination documentation where available.
We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.
Certificate of Authorization NO. (if applicable) N/A Expiration Date N/A Date +~ p 19 p Signed by Ow: Florida Power and Light Company in this Owners'eport during the period 'o CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/ or the State or Province of Florida and employed by Arkwright Insurance of Norwood Mass. have inspected the components described and state that to the best of my knowledge arid belief, the Owner has performed examinations and taken corrective measures described in the Owners'eport in accordance with the requirements of the ASME Code,Section XI. By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
t 0 Date: ~,
Inspector's Signature 19~7 Commissions National Board, State, Province, and Endorsements
1993
SUMMARY
REPORT SUBMITTAL Page 13 of 22 FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules
- 2. PLANT: St. Lucie Nuclear Power Plant 6501 South Highway A1A, Jensen Beach, Florida 34957
- 3. PLANT UNIT: 4. OWNER CERTIFICATE OF AUTHORIZATION(IF aaqUIRED) N/A
- 5. CohtMERcIAL SERvIcE DATE: 12/21/76 6., NATIONAL BOARD NUMBER FOR UNIT:
N/A ADDITIONALREPORTS REPORT NUMBER RESPONSIBLE DESCRIPTION/TITLE ORGANIZATION ISI-PS L-100-93 FPL 1993 FINALREPORT OF INSERVICE EXAMINATIONS N/A FPL ON-SITE EXAMINATION AND TESTING OF MECHANICALAND HYDRAULICSNUBBERS JPN-ESI-93-361 FPL PSL-1 STEAM GENERATOR SECONDARY SIDE INSPECTIONS AND SLUDGE LANCING N/A FPL PSL-1 STEAM GENERATOR 1993 TUBE EXAMINATIONREPORT
1993
SUMMARY
REPORT SUBMITTAL Page 14 of 22 APPENDIX A CLASS I
SUMMARY
TABLES
DATE: 09/07/93 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE 1 REVISION: 0 INSERVICE INSPECTION SLWHARY SECOND INTERVAL, SECOND PERIL, SECOND OUTAGE (1993)
CLASS 1 CCHPLETED COMPONENTS ACTOR PR SSURE SSE CLOSURE M AD N I 0 ZONE NUMBER: 002 ASHE S ONGT SEC. Xl T RSEK SUHHARY EXAHIMATI ON AREA CATGY EXAM A E I 0 E REHARKS MUHBER IDENT IF I CAT ION ITEH NO HfTMCO PROCEDURE T C G H R ~*CALIBRATION BLOCK~
MO 01-00 001100 209.03C B-A HT MDE 2.2.2 C C 4-22-93 Hl'OHPLETEDD 144 DUE TO SMROIO PEEL SEGHENT MELD Q 180 $ 1.22 UT 0 NDE 5.14-1 C SMRSS DEGREES UT 45 NDE 5.14-1 C 4/22/93 UT COMPLETE SLAG INDICATION RCB UT 60 NDE 5.14-1 C
~ UT-3A~~
001180 CKHS B.M.1 VT-3 NDE 4.3.66 C C 4-26.93 CCHPLETE CLOSURE MEAD HATING SURFACE B13.10 RCB
- ~N/A~*
09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 2 DATE:
REVISION: 0 INSERVI CE INSPECTION SNB(ARY SECOND INTERVAL, SEGNO PERICO, SECNlD OUTAGE (1993)
CLASS 1 COHPLETED COHPONEHTS T AH GEH RAT PR HAR N I 0 ZONE NUHBER: W3 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHI NATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENT IF I CATION ITEN NO HETHCO PROCEDURE T C 0 H R *~CALIBRATIOH BLOCK~
F D 1-003 001212 STEAH GENERATOR TUBES B.Q ECT HOE 1.3 C C 4.21-93 7,506 TUBES INSPECTEOI 69 TUBES U-TUBE DESIGN (85'19) 816.20 ~ CHR 93.1.048 C PLUGGED THIS OUTAGE, 1,082 TOl'AL TUBES RCB PMO/CMO 3521/61 C PLUGGED IH STEAH GENERATOR
- ~H/A~*
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 3 REVISION: 0 IHSERVICE INSPECTION SUHHARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 COHPLETED COHPONENTS S'IEAH G NERAT 1 PR NARY SID N I 0 ZONE NUHBER: 004 ASHE S OHGT SEC. Xl T RSEH SOD(ART EXAHIHAT ION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDEHT I F I CAT I OH ITEH NO HETHDO PROCEDURE T C 0 H R ~CALIBRATIOH BLOCK~~
REF DUG HO 01-004 001482 STEAH GENERATOR TUBE 8-0 ECT NDE 1.3 C C 4-21 93 7,844 TUBES INSPECTEDI 61 TUBES U-TUBE DESIGN 98519) 816.20 CHR 93.1.049 C PLUGGED THIS OUTAGE, 736 TOTAL TUBES RCB PMO 3521/61 C PLUGGED THIS STEAH GENERATOR
~~LATER**
001720 1B.PHS.A 8.0-2 VT-1 NDE 4.1-22 C C 4/20/93 COMPLETE PRIHARY HANMAY (0 DEGREES) 87.30 STUDS RCB
%AH/A%0 001730 1B.PHH-A 8-G-2 VT.l NDE 4.1 22 C C 4/20/93 COHPLETE PRIHARY HANNAY (0 DEGREES) 87.30 NUTS RCB
- N/A~*
DATE: 09/07/93 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 4 REVI SIGH: 0 INSERVICE INSPECTION SQQ(ARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 'I COHPLETED COHPONENTS
~RS U~R N I 0 ZONE NUHBER: 005 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHINATIOH AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATIOH I TEH NO HETHOD PROCEDURE T C G H R *~CALIBRATION BLOCK D NO 01-00 001885 V-1202 B.G-2 VT.1 NDE 4.1-26 C 4-26-93 BOLTING DI SCREPANCI EST REPLACED SAFETY VALVE TO FLANGE BOLTING 87.50 CNR 93.1.054 C BOLTING; VISUAL VT-1 AND VT.2 (8) PNO 3606 C EXAHINATIONS PERFORHED BY BACKF IT RCB NIS 2 SL-1-11-073 PNO 7089 ~~N/A~
NIS 2 SL-1-11-079 NIS 2 SL-1-11-075 PNO 5669 NIS-2 SL-1-11-092 VT-2 H93-1093 HIS 2 SL-1-11-077 VT 2 H93-1094 001886 V.1202 REPLACE VT.2 H93.1093 C C 06-15 93 PRESSURIZER SAFETY RELIEF VALVE SAFETY VALVE (S/N VALVE NIS-2 SL-1-11-092 C S/N N54495.00.0003 HAS REPLACED BY N54495-00.0002 PlJO 3606 C S/N54495-00.0002, VT-2 EXAHINATIOH RCB PERFORHED BY BACKFIT.
- N/A~+
HATER SPACE NOZZLES REF. DllG. NO. 01-00 001951 404-07 LER VT 1 NDE 4.1-5 C C 4-2-93 COHPLETE TEHPERATURE NOZZLE 93.04 RCB
- 1N/A%4 001952 404-12A LER VT-'I NDE 4.1-5 C C 4-2-93 COHPLETE LEVEL HOZZLE Q 0 DEGREES 93.04 BOTTOH HEAD RCB
'HN/AIO 001953 404.128 LER VT-1 NDE 4.1-5 C C 4-2-93 COHPLETE LEVEL NOZZLE 0 180 DEGREES 93 04 BOTTOH HEAD RCB
- ~N/A~~
DATE: 09/07/93 SI'. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 5 REV IS I OM: 0 INSERVICE INSPECTION
SUMMARY
SECOMD INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 CCHPLETED COMPONENTS P~RESSUI! lR N I 0 ZONE NUMBER: 005 ASHE S ONGT SEC. XI T RSEH SISHARY EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF I CAT I OH ITEN NO METHOD PROCEDURE T C G N R ttCALIBRATIOH BLOCK*t MG MO 01- 0 001955 A1 THRU HH4 LER VT-1 NDE 4.1-1 C C 3-31-93 CONPLETEI GENERAL VISUAL OF HEATER PEMETRATIOHS (120) 93-04 ACCESSIBLE AREAS FOR EVIDENCE OF RCB BORIC ACID; INSULATED ttN/Att STEAN SPACE MOZZLES REF. DMG. NO.01-005 001956 404.10A LER VT-1 HDE 4.1-5 C C 4-2.93 COMPLETED LEVEL NOZZLE 0-0 DEGREES 93.04 RCB
- N/Att 001957 404-10B LER VT-1 NDE 4.1-5 C C 4-2-93 C(HPLETE LEVEL NOZZLE Q 180 DEGREES 93-04 RCB ttH/Att 001958 404-10C LER VT 1 NDE4.1 5 C C 4-2-93 COMPLETE PRESSURE TAP NOZZLE Q 195 93.04 DEGREES RCB ttk/Att 001959 404-100 LER VT-1 HDE 4.1-5 C C 4-2-93 COMPLETE PRESSURE TAP NOZZLE 0 345 93 04 DEGREES RCB ttN/Att
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 6 REVISION: 0 INSERVICE IHSPECTIOH SQDIARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 COMPLETED COMPONENTS R S R R R N I 0 ZONE MWBER: 016 ASHE S ONGT SEC. XI T RSEH SINHARY EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF I CAT IOH ITEH MO METHOD PROCEDURE T C G H R **CALIBRATIOHBLOCKte 1 C 108 R F MG HO 01-01 003350 RC.6-509 8"F PT HDE 3.3-16 C C 4-15-93 PT COMPLETE HOT LEG NOZZLE-TO-SAFE-END B5.130 UT 45 MDE 5.11 1 C 4-1'9.93 UT COHPLETET UT 23 FROM SAFE END RCB UT 60 AX NDE 5.11.1 C SIDE AND UT-16 FROM NOZZLE SlDE
<<%T-16,UT-23~
003360 N I8 F C VT-3 HDE 4.3-13 C C 4/3/93 SPRING CAN SETTING NOT IAM DUAL SPRIHG CAN HANGER F3.50 CHR 93.1.013 C JPM PSL-93-0087 RCB A+M/Ate 003370 H28 F-C VT-3 MDE 4.3-14 C C 4/3/93 SPRIHG CAM SETTINGS MOT IAM DUAL SPRING CAN HAHGER F3.50 CHR 93-1-014 C JPN PSL-93-0087 RCB esN/A~a 003390 RC 1 505-A 8-J PT NDE 3+3-16 C C 4-15-93 PT COMPLETE ELBOM TO PIPE 89.11 UT 45 HDE 5.4-7 C 4/19/93 UT COMPLETE COUNTERBORE AND ID RCB UT 60 AX NDE 5.4-7 C i UT-23~*
ROOT GEOMETRY
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 7 REVISION: 0 INSERVI CE INSPECTION SUHHARY SECOND INTERVAL, SECOND PERIIX), SECOND OUTAGE (1993)
CLASS 1 COHPLETED COHPONENTS ACT N I 0 ZONE NUHBER: 017 ASNE S ONG T SEC. XI T RSE k SUHHARY EXAHIHAT I ON AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HETNOD PROCEDURE T CGH R *ICALIBRATION BLOCK e F NG NO -017 003570 01 017.008 RG 1.14 UT 25 NDE 5.15 1 C C 4-3-93 COHPLETE FLYllkEEL BORE AND KEYllAY N/A RCB WIN/AI0
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 8 REVISION: 0 INSERVICE INSPECTION SQDIARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 CDHPLETED COHPONENTS N I 0 ZONE NUHBER: 018 ASHE S ONGT SEC. XI, T RSEH SUHHARY EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENT I F I CAT ION ITEH NO HETNOD PROCEDURE T C 0 H R ~'CALIBRATION BLOCK F DUG NO. 01-01 003720 01.018.008 RG 1.14 UT.25 NDE 5.15.2 C C 4 3 93 UT COHPLETE FLYNNEEL BORE AND KEYMAY N/A RCB
- ~LATER~
DATE: 09/07/93 Ste LUCIE NUCLEAR PLANT UNIT 1 PAGE: 9 REVISION: 0 INSERVICE INSPECTION SUHHARY SECOND INTERVAL, SECOND PERl, SECOND CUTAGE (1993)
CLASS 1 COMPLETED CDHPONENTS ACT A T P N I 0 ZONE NUMBER: 019 ASHE S ONGT SEC+ Xl T RSEH SUHHARY EXAHINATION AREA CAT 0Y EXAH A E I 0 E REHARKS NUMBER IDENTIFICATION ITEH NO HETKOO PROCEDURE T C G H R ~~CALIBRATION BLOCK*~
IIG MO 01-019 003830 01-019.004 8-K 1 PT NDE 3.3-9 C C 4-9.93 PT COHPLETE LIHITATION DUE 'fO SUPPORT LUG ¹2 B10.20 MUT 1/2" FROH MELD TOE RCB 10M/A*4 003840 01.019.005 B K-1 P'I MDE 3.3-9 C C 4.9-93 PT COHPLETE SUPPORT LUG ¹3 810.20 RCB
- N/Aa*
003850 01-019-006 B K-1 PT NDE 3.3-23 C C 4-19-93 PT COHPLETE FAINT NON RELEVANt SUPPORT LUG ¹4 810.20 COMDTIONS NOTED RCB
- N/A**
003860 01.019.007 B-K-1 PT NDE 3.3.9 C C 4 9-93 PT COHPLETE LIHITATION DUE TO SUPPOR'I LUG ¹1 810.20 MUT 1/24 FROH TOE OF IJELD RCB
~*LATER~~
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UHIT 1 REVISION: 0 IHSERVI CE IHSPECT I OH SIWNARY SECOND INTERVAL, SECOMD'PERIOD, SECOHD OUTAGE (1993)
CLASS 1 COMPLETED COMPONENTS ACTOR COOLAM P 18 N I 0 ZONE NUMBER: 020 ASHE S OKGT SEC. XI T RSEH
SUMMARY
EXAHIHATION AREA CATGY EXAM A E I 0 E REMARKS MINBER IDENT IF I CAT IOM ITEN NO METHOD PROCEDURE T C G N R ~~CALIBRATIOM BLOCX
- R F. DIIG HO 01 020 004010 01-020.00B RG 1.14 UT-25 MDE 5.15.4 C C 4/3/93 COMPLETE FLYNHEEL BORE AHD KEYHAY N/A RCB
- LATER**
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 11 REV I S ION: 0 INSERVICE IHSPECTIOH SUHHARY SECOND INTERVAL, SECOND PERIIO, SECOND OUTAGE (1993)
CLASS 1 COHPLETED COHPOHENTS OOP 1A AFE Y HJ CTIOM P P G HS 0 CTHT N I 0 ZOHE HISSER: 022 ASHE S ONGT SEC. Xl T RSEH SUHHARY EXAHINATION AREA CATGY EXAM A E I 0 E REHARKS NUHSER IDEHTIFICATIOH ITEH HO HETNOO PROCEDURE T C G H R P*CALIBRATION BLOCKP*
-6.SI-113 REF. DMG HO 01-022-004930 81.113.7-SM.2 BJ PT MDE 3.3 17 C C 4-15-93 PT COMPLETE PIPE TO-ELBOM 89.11 UT 45 NDE 5.4 6 C 4.17-93 UT COHPLETE ROOT GEOHETRZ RCB UT 60 AX HDE 5.4-6 C INTERHITTENT UT-38PP 004940 Sl -113-7-SM.1 8-J PT MDE 3.3-17 C C 4-15-93 PT COMPLETE ELSOM.TO PIPE 89.11 UT 45 HDE 5.4-6 C 4-17-93 UT COMPLETE ROOT GEOHETRY RCB UT 60 AX NDE SA-6 C INTERHITTENT PPN 38*P 005000 SI-113-10.SM-1 BJ PT NDE 3.3-17 C C 4.15.93 PT COMPLETE PIPE-TO PIPE 89.11 UT 45 NDE 5.4-6 C 4-17-93 UT COMPLETE ROOT GEOHETRY RCB UT 60 AX NDE 5.4-6 C IHTERHITTEHT 38PP S - 49 R F DMG NO 01-022-005160 Sl-149-2-SM-3 8 J PT NDE 3.3-18 C C 4-15-93 PT COMPETE PIPE TO PIPE 89.11 UT 45 NDE 5.4.3 C 4-16-93 UT COMPLETE COUNTERBORE AMD ROOT RCB N 60 AX NDE 5A-3 C GEOMETRY P UT-35PP 005180 Sl-149-FM-3 SJ PT NDE 3.3-18 C C 4.15-93 PT COHPLETE ELBON.TO.PIPE 89.11 N 45 NDE 5.4-3 4-16-93 UT 45 8 60 COHPLETE RCB UT 60 AX MDE 5.4-3 ROOT GEOHETRY IHTERHITTEMTLY PPN 35PP
.6.S1-113 REF DMG. HO. 0 022 8 005310 81-968-6204 F 8 VT-3 MDE 4.3-40 C C 4-15-93 COHPLETE BOX RESTRAIN'I F2.10 RCB
- PH/AP*
DATE: 09/07/H ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 12 REVISION: 0 IHSERVICE INSPECTION SQDIART SECOND INTERVAL, SECOND PERI&, SECOND IXITAGE (1993)
CLASS 1 COHPLETED CCHPOHENTS OOP 1A SAF I N TION P P NG N 'IH'I N I 0 20NE NUHBER: 022 ASHE S OHGT SEC. XI T RSEH SUHHARY EXAHIHAT ION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDEHI'IFI CAT I OH I TEH HO HE'INOO PROCEDURE T C G H R ~~CALIBRATION BLOCK ~
-6 S .113 REF D'IC NO '01-0 ~
005410 S I.968.6208 F.B VT-3 NDE 4.3-41 C C 4-15-93 COHPLETE-RIGID SHAT STRUT F2.10 RCB oPN/Aoo
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 13 REVISION: 0 INSERVI CE INSPECTION
SUMMARY
SECOND INTERVAL, SECOHD PERICO, SECOND OUTAGE (1993)
CLASS 1 COMPLETED COMPONENTS 18 SAFETY NJE T P MS N I 0 ZONE NUMBER: 024 ASHE S ONGT SEC. XI T RSEH
SUMMARY
EXAHIMATIOH AREA CATGY EXAH A E I 0 E REMARKS HUHBER IDEMTIFICATIOH ITEN NO METHOD PROCEDURE T C G H R *tCALIBRATION BLOCK *
-12 RC-1 3 REF D NO 01-024-006270 CV-3247 8-G-2 VT-1 NDE 4.1-13 C C 4/5/93 COMPLETE BOLTIHG REHOVED; 16 BOLTING (16 STUDS B 16 NUTS) B7.70 BONNET STUDS 2.0" DIAMETER/ 16 MUTSI 16 RCB HINGE PIN STUDS 7/84 DIAMETER, 16 HINGE PIN NUTS.
- tH/Att 006280 CV-3247 B.H.2 VT-3 NDE 4.3.15 C C 4-5-93 COMPLETE) PITTING NOTED Q 5 VALVE INTERHAL SURFACE B12.50 O'LOCK TO 7 O'LOCK POSITION; VISUAL RCB PERFORHED ON NEM DISC AND DISC ARH.
ttM/Att I-6 SI-110 REF DIIG. NO 01-024 B 006400 SIN-233 F-'C VT-3 NDE 4.3-57 C C 4-24-93 COMPLETE SLIDING BASE SUPPORT F3.10
- tN/Att
DATE: 09/07/93 ST. LUCIE kUCLEAR PLAHT UHIT 1 PAGE: 14 REVI SION: 0 INSERVICE INSPECTION SUHHARY SECOND INTERVAL, SECOMD PERI(e, SECOND OUTAGE (1993)
CLASS 1 COMPLETED COHPONENTS BND RS PRAY LIN N I 0 ZONE NUMBER! 025 ASHE S OHGT SEC. Xl T RSEH
SUMMARY
EXAMINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HETHOO PROCEDURE T C G H R "<<CALIBRATION BLOCK ~
4 C-103 REF DUG. NO.01-025 006540 RC-103A-SN 2 B-J PT MDE 3.3-36 C C 5-3.93 MELD IDEkTIFICATIOM ETCHED B TEE TO-PIPE B9.11 UT 45 AX kDE 5.4-12 0 STAMP IMG HARKSIH THE EXAHlMATION AREA/
RCB UT 45 CIRC MDE 5.4.12 CRS ACHIEVED, DID kOT IHTERFERE HITH UT 60 AX NDE 5 4 12 (PT) EXAH. 1 GEOMETRIC IMDICATIOH DETERHIMED TO BE CAUSEDBY THE ROOT, 360 DEG.
INTERHITTEHTLY
- MT-40
ST. LUCIE NUCLEAR PLAHT UNIT PAGE: 15 DATE: 09/07/93 1 REVISION: 0 IHSERVICE INSPECT IOH SIIQIARY SECOND INTERVAL~ SECOND PERIOD, SECOND OUTAGE (1993) r CLASS 1 CONPLETED CONPOHENTS OOP 18 SNUTDDMN COOL NG IN N I 0 ZONE HUNBER: 02B ASHE S ONGT SEC. XI T RSEH SUNNARY EXANIHATIOH AREA CATGY EXAH A E I 0 E RENARKS HUNBER IDEHTIFICATIOH ITEN HO NETNOD PROCEDURE T C G H R ~*CALIBRATIOH BLOCK S -130 RE DMG HO 1.0 8 007730 NV.3651 B-G-2 VT-1 NDE 4 1-27 C C 4/28/93 CONPLETE EXANINED IH PLACE BOLTING (16 BOLTS f NUTS) B7+70 RCB
+AH/Aaa
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 16 REV IS I OH: 0 INSERVICE INSPECT IOH SUHHARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 COMPLETED COIPONENTS OOP 1 SHUT HG N N I 0 ZONE NUMBER: 029 ASHE S ONGT SEC. XI T RSEH
SUMMARY
EXAHIMATION AREA CATGY EXAM A E I 0 E REHARKS NUMBER IDENTIFICATIOH I TEH NO HEI'NOO PROCEDURE T C G H R ~~CALIBRATION BLOCK~
-RC-16 .08 S R F D NO. 01-02 007835 FITTING B 6 8 88-08 UT 45 NDE 5.4-2 C C 4/15/93 VT-1 COMPLETE ELB(AI BETNEEN RC-162-Fll-1 8 SUPP 3 VT-1 NDE 4.1-17 C 4.15-93 UT 45 8 60 COMPLETE Ql.4 UT 60 MDE 5.4.2 C SCAN LIHITATION 3" PIPE SUPPORT RCB
- UT-50 ~
-1 .RC-162 REF. DUG. NO 01.029 007850 RC-162-1-SM.5 BJ PT TS9.5REV3 C C 5/5/93 PT BY BACKFIT QC; FOLLONING BRANCH CONNECTION (2") 89.32 HETN. 1 IR H93-1393 FLUSHING RADIATION LEVEL 7 R/NR CONTACT RCB 3.3.37 a*N/A*a I-10-S -127 REF DUG NO.01-029 007920 V-3480 8 H-2 VT-3 NDE 4o3-22 C C 4/12/93 EROSION IH DISK SEAT, BODY IHTERNAL SURFACES 812.50 CNR 93-1.019 C PLANT DISPOSITION USE-AS- IS RCB NCR 1-773 C aaN/Ate
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE! 17 REVISION: 0 INSERVI CE INSPECTION SUHHART SECOND IHTERVAL, SECOND PERIL, SECOND OUTAGE (1993)
CLASS 1 COHPLETED COHPONEHTS CKARG NG N TO OOP 181 N I 0 ZONE NUHBER: 031 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAH I NATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HETHOD PROCEDURE T C G H R **CALIBRATIONBLOCK~~
- -CH-148 REF NG H 1.0 009020 CH-129-104 F-8 VT-3 NDE 4.3-50 C C 4-23-93 COHPLETE BOX RESTRAINT F2.10 RCB
- ~N/A~
ST. LUCIE NUCLEAR PLANT UNIT PAGE: 18 DATE: 09/07/93 1 REVI SION: 0 IMSERVICE INSPECTION
SUMMARY
SECOND IHTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 CCHPLETED COHPONEHTS HARB NG IME TO OOP 1A M I 0 ZONE NUMBER: 032 ASHE S ONG7 SEC. XI T RSEH SUHHART EXAHINATIOM AREA CATGY EXAH A E I 0 E REHARXS ITEH NO METHOD PROCEDURE T C G H R ttCALIBRATIOM BLOCK
- NUHBER IDEHTIFICATIOH
. H 147 REF. DUG. MO 0 C 009270 CH-147.FW-14 B-J PT NDE 3.3-14 C C 4.15.93 PT COMPLETE ELBDU TO PIPE 89.40 RCB
- tN/Att
.2.CH-147 REF DUG MO. 01-032-B 009380 CH.147-QI-22C 8-J PT NDE 3.3-33 C C 4-28-93 PT COMPLETE PIPE-TO.ELBSI- 89.40 RCB ttN/Att CH-14 R F D . MO 01-032-A 009500 CH.147.QI-27A 8-J PT NDE 3.3-15 C C 4-15.93 PT COMPLETE PIPE- TO COUPL IHG 89.40 RCB
- H/A**
-2 RC-148 REF. DUG. NO. 01-032-A 009660 4-507A 8-F PT NDE 3.3-11 C C 4-13.93 PT COMPLETE LIGHT GRINDING SAFE END-TO-NOZZLE 85.140 MARKS SEEM 360DEG. INTERMITTENT LIGHT RCB BLEEDOUT, .7 TO 1" DOHNSTREAH ttN/A~
-2.CH-147 REF. DUG. NO. 01-032-C 009670 CH.130-66 F C VT-3 NDE 4.3-72 C C 4-28.93 NEED SPRING CAN ACCEPTANCE VARIABLE SPRING HANGER F3.50 VT-4 HDE 4.3-72 C CR I TER IA; ENGINEERING DISPOSITION RCB CNR 93-1-059 C ACCEPT, KO FURTHER ACTION REGUIRED.
ttN/Att 009700 CH.141.36C F-C VT-3 NDE 4.3.70 C C 4-28-93 IKADEOUATE THREAD EKGAGEHENT; VARIABLE SPRING HAHGER F3.50 VT-4 NDE 4.3-70 C ACCEPTABLE AS-IS) EKGINEERIKG RECOHHEKDS RCB CHR 93-1-057 C REPLACEHEMT OF BOLT; SPRIKG CAN SETTIKGS ACCEPTABLE AS-IS.
ttN/Att
09/07/93 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 19 DATE:
REVI SION: 0 INSERVI CE INSPECTION SUHHART SECOND INTERVAL, SECOND PERIOD, SECOMD OUTAGE (1993)
CLASS 1 COHPLETED COHPOMEHTS CMAR ING N TO LOOP 1A N I 0 ZONE NUMBER: 032 ASHE S ONG T SEC. XI T RSE H SUHHARY EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUMBER IDEHTIFICATION ITEH NO HETHOO PROCEDURE T CGH R *iCALIBRATIOM BLOCK~
-2.CM. 47 R F. NG N 1-0 ~
009870 CH.143-30B F C VT-3 NDE 4.3 42 C C 4 15-93 COHPLETE - LIHITATION INSULATION RIGID RESTRAINT F3.10 PREVENTS PIPE CLAHP BOLTIMG TO BE RCB EXAHINED
- ~M/Aii
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 20 REVISIOH: 0 INSERVICE IHSPECTIOH SUHHARY SECOND INTERVAL, SECOHD PERIOD, SECOND OUTAGE (1993)
CLASS 1 COHPLETED COHPOHEHTS 1A1 PR HAR RA N I 0 ZOHE HINBER: 033 ASHE S ONGT SEC+ Xl T RSEH SUHHART EXAHINAT ION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENT IF ICATIOH ITEH NO HETHOO PROCEDURE T C G H R ~~CALIBRATION BLOCK~~
-2. -113 REF. MG 0 01-033 010060 FLHG 2.RC.113 to 3-NH.500 B.G 2 VT-1 NDE 4.1-3 C C 3-31-93 COHPLETE EXAHINED IN PLACE FLAHGE BOLTING (8 STUDS 4 16 B7.50 NUTS)
RCB APH/A%4
DATE: 09I07j93 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 21 REVISION: 0 INSERVICE INSPECTION SUHHARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 CCHPLETED COHPONENTS OOP 1B1 PRIHARY RA N I 0 ZONE NUHBER: 036 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHIHAT ION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HETNOO PROCEDURE T C G H R ~~CALIBRATION BLOCK~~
- -RC-122 R F. Dl5. 0 01-036 010340 FLNG 2 RC-122 to 3.NH 500 B.G.2 VT-1 NDE 4.1.2 C C CCHPLETE 3-31 93, EXANINED IN PLACE FLANGE BOLTING (8 STISS, 16 87.70 NJTS)
RCB
~/A~
09/07/93 ST ~ LUCIE HUCLEAR PLAHT UNIT 1 PAGES 22 DATE:
REVISION: 0 IHSERVICE INSPECTION SNWARY SECOHD INTERVAL~ SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 COMPLETED CONPOHENTS TDONN LINC FROM OOP 181 H I 0 ZONE NUMBER: 037 ASHE S ON G T SEC. XI T RSE H
SUMMARY
EXAMINATION AREA CAT GY EXAM A E I 0 E REMARKS NUMBER IDENT I F I CAT I OH ITEM HO METHOD PROCEDURE T CGH R *~CALIBRATIOH BLOCK*i
~ RC 14 REF. DUG MO 0 -0 7 8 010360 RC-142 FN-1A BJ PT NDE 3.3-6 C C 3-31-93 COMPLETE PIPE TO COUPLING 89.40 RCB
- iH/A~
010480 RC-142-FII.BB 8-J PT MDE 3.3-25 C C 4.21-93 PT COMPLETE PIPE-TO ELBOH 89.40 RCB
- sH/A+a
09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 23 DATE:
REVISION: 0 INSERVICE IMSPECTIOH SWHARY SECOND INTERVAL SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 COMPLETED COKPOHEHTS COMB N D S P P M OOPS 'IA1 8 1A2 OUTS N I 0 ZONE NUMBER: 039 ASHE S OMGT SEC. XI T RSEH
SUMMARY
EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTI F I CATION ITEN MO NETKCO PROCEDURE T C G H R ~~CALIBRATIOH BLOCK+~
--S-l RF DUG N 1 011880 Sl.113.2-SH-3 B-J PT NDE 3.3-20 C C 4/16/93 PT COMPLETE- LIHITATIOH DUE TO PIPE.TO.PIPE 89.11 UT 45 MDE 5.4-4 C SUPPORT Sl-868-226 2.5" AT TOE OF MELD RAB UT 60 AX NDE 5.4-4 C 4-16-93 UT COMPLETE CDUHTERBORE AHD ROOT GEOMETRY
~ UT.38~
012150 SIN.43 F-C VT-3 NDE 4.3-45 C C 4/16/93 VT COMPLETE.
SPRING HANGER F3.50 VT-4 MDE 4.3-45 C RAB
- N/A~
012170 SI.868-226 F-8 VT 3 NDE 4.3-44 C C 4-16.93 COHPLETE TRUMHIOH F2.10 RAB
~~H/A~~
012180 SIN-41 F-C ~ VT-3 MDE 4.3.43 C C 4.16.93 COMPLETE HANGER F3.10 01N/A14 012200 Sl 868 2311 F-B Vf 3 NDE 4.3-37 C C 4 16.93 LIGHT RUST ON SPHERICAL RIGID SHAY STRUT F2.10 CKR 93-1-038 C BEAR I HGSI 5-14-93 REEXAMINATION RAB VT-3 NDE 4.3-87 C FOLLOHING CORRECT I VE ACT IGNI MAINTENANCE CLEAN AHD LUBRICATE
~ PN/AOP
09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 24 DATE:
REVISION: 0 INSERVICE INSPECTION SUHHARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 IXNPLETEO COHPONENTS BIN D Sl PIP N OOPS 1B1 6 1 2 TS D CTHT N I 0 2ONE NUHBER: 040 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHIHAT I ON AREA CAT GY EXAH A E I 0 E REHARKS NUHBER IDENT IF I CATION ITEH NO HETNOD PROCEDURE T C G H R ~~CALIBRATION BLOCK+~
-S -110 REF DMG. NO 01-040-012350 V-3144 BH2 VT3 NDE 4.3-68 C C 4-27-93 COHPLETE INTERNAL SURFACE 812.50 RAB
~N/A~
SI-11 R F D NO 01 040-012760 SI-111-Fu-2 BJ PT NDE 3.3-26 C C 4.23-93 PT COHPLETE ELBOM.TO-PIPE- e9.11 Ur 45 NDE 5.4-9 C 4/26/93 UT COMPLETE INTERHITEHT ID RAB UT 60 NDE 5.4 9 C GEOHETRY
- ST 38~*
1993
SUMMARY
REPORT SUBMITTAL Page 15 of 22 APPENDIX B CLASS 2 SUINARY TABLES
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 25 REVISION: 0 INSERVICE INSPECTION
SUMMARY
SECOND INTERVAL, SECOMD PERIOD, SECOND OUTAGE (1993)
CLASS 2 COHPLETED COHPOMENTS 1 AH NERAT 1 S CONDARY SID N I 0 ZONE NUMBER: 041 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHIMATI ON AREA CAT GY EXAH A E I 0 E REHARKS NUHBER IDENT IF I CAT IOM ITEN NO HETNOO PROCEDURE T C G H R ~~CALIBRATIOM BLOCK ~
EF DUG NO.01-041 013465 SG.1A-FR KRC VISUAL NDE 4.4-1 0 C 4-12.93 VISUAL PERFORMED, ABB EVALUATION FEED RING AUG ACCEPTABLE FOR FURTHER INFORHATION SEE RCB PSL-1 STEAII GENERATOR SECONDARY SIDE INSPECTION & SLUDGE LANCING REPORT
DATE: 09/07/93 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGEc 26 REVI SION: 0 INSERVICE INSPECT IOH SUWQRY SECOND INTERVAL, SECOHD PERICO, SECOND OUTAGE (1993)
CLASS 2 COHPLETEO COHPONEHTS STEAN GENERAT 1 S COHDAR'Y SID N I 0 ZONE NUHBER: 042 ASHE S ONGT SEC. XI T RSEH SUWQRY EXAMINATION AREA CATGY EXAH A E I 0 E RENARKS NUHBER IDENT I F I CATION I TEH HO KETHOO PROCEDURE T C G H R ~~CALIBRATIOH BLOCK~'+
F D N 01-04 013665 SG-1B.FR KRC VT NDE 4.4-2 C C 4.4-2 HATER LEVEL TOPHIGH TO COHPLETE FEED RING AUG VT NDE 4.4.3 C INSPECTIOH 4/16/93 IHSPECTION CONPLETE RCB
09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 27 DATE:
RE V I SIGH: 0 INSERVICE INSPECTION
SUMMARY
SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 2 CCHPLETED COKPONENTS PSI PUMP 1A S 1B D SCKARGE HEADER P N N I 0 ZONE NUMBER! 043 ASHE S ONGT SEC. Xl T RSEH SUHHARY EXAHINAY ION AREA CATGY EXAM A E I 0 E REMARKS ITEH NO HETMOO PROCEDURE T C 0 H R *tCALIBRATIOH BLCNX
- NUMBER IDENT IF I CAT ION
.1 -S .417 REF. DUG. NO. 01-043-013900 SI-417.3-SN.2 C-F PT MDE 3.3 3 C C 3.29.93 COMPLETE REDUCER TO TEE C5.11 RAB
~ tM/Att 013910 S I-417-3 QI 3 C-F PT NDE 3.3.3 C C 3-29-93 COMPLETE TEE.TO ELBOM C5.11 RAB ttN/At*
013920 Sl-417-3.SN.4 C-F PT MDE 3.3 3 C C 3-29-93 COHPLETE TEE-TO PIPE C5.11 RAB t*M/Att
-1 S .410 REF. DUG. MO 01-043 B 014130 SI-475-2-SM.S C-F PT NDE 3.3-2 C C 3-29-93 COHPLETE TEE TO REDUCER C5.11 RAB t*N/At*
014140 SI.475-2-QI-1 C-F , PT KDE 3.3-2 C C 3-29.93 COHPLETE TEE TO PIPE C5.11 RAB ttM/A**
12.SI-410 REF. DWG. NO. 01-043-C 014230 Sl.410.2-QI.3 C-F PT NDE 3.3 1 C 3/29/93 (2) 3" LINEAR INDICATIONS, PIPE TO-TEE C5.11 CNR 93-1-003 C LOCATED Lt15.3~L OF IIELD; INDICATIONS RAB KCR 1-751 REDUCED TO ACCEPTABLE'IZE. (1) LINEAR PT TS 9.5 H93-460 C .1" ACCEPTABLE. IMDICAT IONS MERE REDUCED UT TS 10.1 H93 459 TO AN ACCEPTABLE LIHIT BY LIGHT GRINDIHG. (3) ROUND < I/16" t*N/Att
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 28 REVI 8 IOM: 0 IMSERVICE INSPECTION SCARY SECOND INTERVAL, SECOND PERICO, SECOND OUTAGE (1993)
CLASS 2 COHPLETED COHPONEMTS PS PUHP 1A 8 1B D S MARGE MADERPPM M I 0 ZONE NUHBER: 043 ASHE S ONGT SEC. XI T RSEN SUHHARY EXAHIMAT ION AREA CATGY EXAH A E I 0 E REHARXS NUMBER IDENTIFICATION ITEH MO METHOD PROCEDURE T C 0 K R ~~CALIBRATIOM BLOCK~*
S .814 REF. DUG ~ NO 01-043 014395 Sl-814-FN.8 CF PT NDE 3.3-5 C C 3-29.93 COMPLETE VALVE (V.3453)-TO.TEE C5.11 RAB
~~N/A~
S -475 REF DUG. NO 01 04 -8 014610 S I -475.4-SM-1 CF PT NDE 3.3-4 C C 3-29.93 COHPLETE PIPE-TO-FLANGE-(FE-3306) C5.11 RAB
- M/A*a
DATE: 09/07/93 ST ~ LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 29 REVI SION: 0 IHSERVI CE INSPECTION SUHHARY SECOND INTERVAL, SECOND PERIa) ~ SECOND OUtAGE (1993)
CLASS 2 CONPLETED COHPOHENTS PSI PUHP 0 S BARGE HEADER PIP NG TO LOOPS 1A1 1A N I 0 ZONE NUHBER: 044 ASHE S OHGT SEC. XI T RSEH SUHHARY EXAHIHAT I OH AREA CATGY EXAN A E I 0 E REHARKS NUHBER IDENT I F I CATION ITEN NO NEtNDO PROCEDURE T C G H R aaCALIBRATION BLOCK*e
-6 Sl 1 R F DMG. NO. 01 044-015240 S 1.129. FM.1 C F1 PT NDE 3.3-21 C 0 4/16/93 PT INDICAT IOHS 8.7"CM 1/16, VALVE (V.3615)-TO.PIPE C5.11 UT 45 HDE 5+4 5 C 8.4"CM 1/32- 7.6"CM 1/32, 6"CM 1/32 ALL Ut 60 AX HDE 5.4-5 C ACCEPTABLE; 4/16/93 UT OHE SIDE EXAN DUE TO CONFIGURATION-INTERNITTENT ROOT GEOHETRY IDEHTIFIEO
-*UT.60ii
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 30 REVISIOH: 0 INSERVICE INSPECTION
SUMMARY
SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 2 CDHPLETED COMPONENTS SM TDOMM N M OUTS ID A MM NT N I 0 ZONE NUHBERI 050 ASHE S OHGT SEC. XI T RSEH
SUMMARY
EXAHIMATION AREA CATGY EXAM A E I 0 E REKARKS NUMBER IDEHT IF ICATION ITEH NO HETHCO PROCEDURE T C G K R ttCALIBRATIOH BLOCKtt 10-Sl 422 REF. DIJG. NO. 01- 50.C 016470 Sl 422 FH 9 CF PT NDE 3.3-32 '
C 4 24 93 PT COMPLETE ELBSI.TO PIPE C5.11 RAB ttN/Att 016474 SI-422-FH-9.LS.A CF PT MDE 3.3-32 C C 4-24-93 PT COHPLE'IE LONG SEAN NOT PIPE LONG SEAH C5.12 VISIBLE RAB
- tN/Att 016476 SI.422-FII.9.LS.B C-F PT MDE 3.3.32 C C 4.24-93 PT COHPLETE LONG SEAN NOT PIPE LONG SEAM C5.12 VISIBLE RAB t t N/At*
(
I 016550 Sl-676-158 RIGID SHAY STRUT ASSY.
F C F3.10 VT-3 CMR NDE 4.3.69 93-1.056 C
C 4-27.93 HISSING STRUT FROZEN' COTTER PIN)
RAB VT-3 NDE 4.3-73 30-93 REEXAMINED FOLLNING CORRECTIVE ACT ION ttN/Att 016570 SI.676.224 F-B VT-3 NDE 4.3 63 C C 4-24.93 COMPLETE RESTRAINT F2.10 RAB
- K/Att
- D.S -422 REF. DUG. MO 01-050-016600 S I-676.2315 CLAMP RESTRAINT F.C F3.10 VT.3 MDE 4.3 64 C C, 4-26 93 COHPLE'TE RAB ttN/A*t
DATE: 09/07/93 ST. LUCIE NUCLEAR PLAMT UMIT 1 PAGE: 31 REVISION: 0 INSERVICE INSPECTION SNORT SECOND INTERVAL, SECOND PERIOD, SECOND IXJTAGE (1993)
CLASS 2 COHPLETED COMPONENTS S T SIM COOLING ME OUTS D 1'HENT N I 0 ZDME MUHSER: 05D ASHE S OMGT SEC, XI T RSEH
SUMMARY
EXAHINATION AREA CATGY EXAH A E I 0 E REHARXS NUMBER IDEMT IF ICATIOM ITEK MO KETNOD PROCEDURE T C G H R ~CALIBRATIOM BLOC&~
SI 422 RE DUG. NO 01 050-016720 SIH.1 F.C VT-3 MDE 4.3.62 C C 4-24 93 COHPLETE - EXAHINATIOM OF THE SPRING HANGER F3.50 VT-4 MDE 4.3-62 C CEILING ATTACNHENI'AS PERFORMED RAB REHOTELY ktN/A1*
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 32 REVISION: 0 INSERVICE IMSPEC'I ION SUHHAR'Y 0- M 2ONE NUMBER: 051 N A NSIDE COMTAIMN SECOND INTERVAL, SECOND PERICO, SECOND OUTAGE MT ASHE SEC. XI CLASS 2 COMPLETED COMPONENTS S
T N
ON I
RSEH 0T (1993) 0
SUMMARY
EXAHIMATIOM AREA CATGY EXAM A E I 0 E REHARKS NUMBER IDENTIFICATIOM I TEH NO METHOD PROCEDURE T C G H R ttCALIBRATIOH BLOCKtt
-10 -4 0 R F DUG. MO 01-051 016732 I.10.SI-420 GEHERAL VT-1 NDE 4.1-6 C C 4-13-93 COMPLETE INSIDE COMTAIMHEHT SNUTDONM COOLING LIME AUG VT 1 NDE 4.1 7 C 4-12-93 COMPLETE OUTSIDE CONTAIMHEMT ttN/Att
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 33 REVISION s 0 INSERVI CE I NSPECT ION SIPNARY P SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 2 COMPLETED COMPONENTS NUTDOUN COOL MG M 8 INSIDE CONTAINMENT M I 0 2OME NUMBER: T 052 ASNE S OHGT SEC. XI T RSEN
SUMMARY
EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION I TEH NO HETNOO PROCEDURE T C G H R t<<CALIBRATION BLOCK<<t
-10 S -422 R F DUG. MO. 01.0 017410 SI.422-FM-I6 C F NDE 3.3 29 C C 4 24-93 PT COMPLETE PI'5.11 PIPE-TO.ELBOM CTHT
<<*M/Att 017414 SI-422-FM 16 LR C-F . PT NDE 3,3-29 C C 4-24-93 PT COMPLETE, NO LONG SEAN ELBSI LONG SEAN C5.12 VIS ISLE CTHT
- <<N/Att 017416 SI 422 FU-16 SR C-F PT NDE 3.3 29 C C 4-24-93 PT COMPLETE, NO LONG SEAN ELBOM LONG SEAN C5.12 VISIBLE CTHT t*N/Att i 017420 SI-422.15.SM.1 ELBOM TO CTHT.
PIPE C-F C5.11 PT NDE 3.3 29 C C 4-24-93 PT COMPLETE t*M/A
- 017424 SI -422.15-SQ. I -LS-A C-F PT MDE 3.3 29 C C 4-24.93 PI'OMPLETE MO LONG SEAH VISIBLE PIPE LONG SEAll C5.12 CTHT.
t<<N/Att 017426 S I.422" 15-SU-I-LS-8 C-F PT MDE 3.3-29 C C 4-24-93 PT COMPLETE NO LONG SEAM PIPE LONG SEAN C5.12 VIS I CTHT. LBLE'<<M/Att SI 422 REF. DUG. MO. 01-052-A 017520 SI-970.6250 F-B VT.3 NDE 4.3.59 C C 4-24-93 COMPLETE BOX RESTRAINT F2.10
- IM/Att
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 34 REVI SIGH: 0 IHSERVICE INSPECTION SUWQRY SECOND INTERVAL, SECOHD PERI(0, SECOND OUTAGE (1993)
CLASS 2 CONPLETED CONPONENTS SNUTDOMH ING H 8 NS D TAINNENT N I 0 ZONE NUNBER: 052 ASNE S ONG T SEC. XI T RSE N SUNNARY EXANIHATIOH AREA CATGY EXAH A E IO E RENARKS HUHBER IDENTIFICATION ITEH NO NETHOD PROCEDURE T CGN R ~CALIBRATIOH BLOCKii
-10.SI-422 REF. DUG. HO 01-05 .8 017530 S I N-251 F C VT-3 HDE 4.3-58 C C 4/26/93 VT CONPLETE.
HANGER F3.10
~~M/Ai~
017560 Sl H-252 F~C VT-3 NDE 4.3.60 C C 4-26-93 CONPLETE CLANP COVERED BY BASE RESTRAIHT F3.10 I H SULAT I OH
~*H/A~*
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 35 REVISION: 0 INSERVICE IHSPECTION SQDIARY SECOND INTERVAL, SECOND PERIODS SECOND OUTAGE (1993)
CLASS 2 COMPLETED COHPONENTS SMUTDOW COO M H T XCHAMG N I 0 ZONE NUHBER: 056 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAH I MAT ION AREA CATGY EXAH A E I 0 E REMARKS NUMBER IDEHT IF I CAT IOM ITEH NO HETHOO PROCEDURE T C G H R ~~CALIBRATION BLOCK*~
F NG N 010 6 017610 2-2742.1 C-B NDE 4.2 4-27-93 PT COHPLETE OUTLET NOZZLE-TO VESSEL MELD C2.33 PT NDE 3.3-35 4-27.93 UT 0 LIHITED VESSEL SIDE ONLY' RAB UT 0 NDE 5.1-1 LAHIHATION 4-27-93 UT 45 COHPLETE UT 45 NDE 5.1.1- L 4.27-93 UT 60 GEOMETRY UT 60 NDE 5 1 1" L *~M/A~
017630 2.2702 CA UT 0 NDE 5.1-1 C C 4 27-93 UT 0 DEGREE COMPLETE BDOY TO-TUBESHEET MELD C1.30 UT 45 MDE 5 ~ 1-1 C C 4 27-93 UT 45 LAHINATIONS, SLAG, RAB UT 60 NDE 5.5-1 C GEOMETRY 4-27-93 UT 60 DEGREE
'OMPLETE WT.56~~
DATE: 09/07/93 Sl'. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 36 REVISIOH: 0 INSERVICE IMSPECTIOH
SUMMARY
SECOND INTERVAL, SECOND PERI, SECOND OUTAGE (1993)
CLASS 2 COMPLETED COHPOMENTS Af Y MJECT AMK SCNARG P 1B H I 0 ZONE NUMBER: 059 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHINATIOM AREA CATGY EXAM A E I 0 E REHARKS NUHBER IDENT IF ICATION ITEH NO METHOD PROCEDURE T C G H R ~~CALIBRATIOM BLOCK~~
-12 S -460 REF DUG NO 0 ~ 0 017940 SI-460-FH-1 C-F PT NDE 3.3.10 C C 4-10-93 PT COMPLETE NOZZLE-TO.ELBOH C5.11 CTHT k/Ae*
017970 Sl-460 I-SN 1 C-F PT NDE 3.3.10 C C 4-10-93 PT COMPLETE ELBOM-TO PIPE C5.11 CTHT
~*M/A~*
018030 Sl.460-2-SM-5 C-F PT MDE 3.3-10 C C 4/10/93 PT COHPLETE TNO 0.1" LINEAR ELBOM TO PIPE C5.11 IND I CAT IOHS ACCEPTABLE CTHT
- M/A~*
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 37 REVISION: 0 IMSERVICE IHSPECT ION SWHARY SECOHD INTERVAL, SECOND PERIOD, SECOMD OUTAGE (1993)
CLASS 2 COMPLETED COMPONENTS AF TY HJ T AH 181 PIPI M I 0 ZONE NUMBER: 059 ASHE S ONGT SEC. Xl T RSEH SUHHARY EXAlll NATION AREA CATGY EXAM A E I 0 E REHARKS NUMBER IDENT IF ICATION I TEH HO METHOD PROCEDURE T C G H R ~~CALIBRATIOH BLOCK~~
S -460 REF DUG 0 0 018110 SI H-244 F.C VT.3 MDE 4.3-20 'C C 4/9/93 INCOMPLETE THREAD EHGAGEHEHT VARIABLE SPRING BASE SUPPORT F3.50 VT-4 NDE 4.3-20 C 4/13/93 CHR CLOSED OUT PER ISI-90.036 CTHT CHR 93-1.018 C LETTER 4/15/93 REEXAMINATION VT 3 NDE 4.3-48 C FOLLOUIHG CORRECTIVE ACl'IOH VT.4 NDE 4.3-48 ~~M/A~
DATE: 09/07/93 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 38 REVI SION: 0 INSERVICE INSPECTION SQWARY SECOND INTERVAL, SECOND PERICO, SECOND OUTAGE (1993)
CLASS 2 COHPLETED CDHPONENTS PS P A N AD 1 N I 0 20NE NUHBER: 061 ASHE S ONGT SEC. XI T RSEH SUHHART EXAHINATIOH AREA CATGY EXAH A E I 0 E RENARKS NUHBER IDENTIFICATION ITEN NO HETNDO PROCEDURE T C G H R ~~CALIBRATION BLOCK~
.3.S - R F UG. 0 01-061-A 018390 SI.208.1.SM-2 C-F-1 PT NDE 3.3 7 C C 4-7-93 PT COMPLETE PIPE TO.ELBDM C5.21 UT 45 NDE 5.4 1 C C 4-7.93 UT SCAN LIHITATION ID ROOT RAB UT 60 AX NDE 5.4-1 C GEOHETRYe
0 DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE0 39 REVI SION: 0 INSERVICE INSPECTION SUHHARY SECOND INTERVAL, SECOMD PERICO, SECOMD QJTAGE (1993)
CLASS 2 COHPLETED COHPOMENTS PS PS 1 B TO HEADER 8 N I 0 2OME NUMBER: 062 ASHE S ONGT SEC. XI T RSEK SUHHARY EXAHIMATI ON AREA CATGY EXAH A E I 0 E REHARKS NUMBER IDENT I F I CATION ITEH NO HETNOO PROCEDURE T C G H R seCALIBRATION BLOCK*e S 21 F DUG. NO 01-062-019170 SI-213.1.SN.3 C-F-1 Ir NDE 3.3-31 C C 4-24.93 PT COHPLETE 0.1" ROUND REDUCER TO PIPE C5.11 UT 45 AX MDE 5.4-10 C IND I CAT10N ACCEPTABLE Uf 45 CIRC NDE 5.4-10 C 4/26/93 UT COHPLETE ID ROOT GEOHETRY UT 60 AX NDE 5.4 10 C
- UT-54~~
S 10 REF. DUG. MO. 01 019190 SI-210.FM.4 C.F-1 PT NDE 3.3-2B C C 4-23.93 PT COHPLETE VALVE (V.3653) - TO.PIPE C5.21 UT 45 NDE 5.4 8 C 4-26-93 UT COHPLETE COUNTERBORE GEOHETRY UT 60 AX MDE 5.4-8 C
~ tUT 61 04
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 40 REVISION: 0 INSERVICE INSPECTION SUHHARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 2 COMPLETED COHPONENTS IN STEAM N A1 NS DE CONTA NHENT N I 0 20NE NUMBER: 063 ASHE S ONGT SEC. XI T RSEH SUHHART EXAHINATION AREA CATGY EXAM A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HETKDO PROCEDURE T C 0 H R ~~CALIBRATION BLOCK~~
S 8 REF DUG. NO.01-063 020430 HS-28.FII.SA-LR C.F-2 C5.51 Hl'DE UT 45 AX 2.2.1 5.2 1 C C C
4-22-93 4-23-93 HT COMPLETE 2.5 T EXTRADOS ELBDU UT 45 DEGREE COHPLETE ELBSl LONG SEAH NDE UT 60 AX NDE 5.2-1 C 4-23-93 UT 60 DEGREE COMPLETE UT 45 CIRC NDE 5.2-1 C
- aUT.45at 020440 HS.28-Fil-SA-SR C-F-2 HT NDE 2.2-1 C 4.22.93 HT COMPLETE 2.5 T INTRADOS ELW ELBSI LONG SEAN C5.51 Ul'5 AX NDE 5.2-1 C 4/23/93 UT 45 DEGREE CDHPLETE UT 60 AX NDE 5.2-1 C UT 45 CIRC NDE 5.2-1 C
- UT-45~
020450 HS-28-5.SN-1 C-F 2 HT NDE 2.2-3 C C 4-21-93 HT CCHPLETE ELBN TO-PIPE C5.51 UT 45 CIRC NDE 5.2 1 C 4-23-93 UT 45 COMPLETE UT 45 AX NDE 5.2 1 C 4-23-93 UT 60 COMPLETE ID GEOHETRY UT 60 AX NDE 5.2-1 C a+@ 45*@
020460 HS.28.5.SM-1-LS-A C-F-2 HT NDE 2.2-1 C C 4-22-93 HT COMPLETE 2.5 T OF LONG SEAH PIPE LONG SEAH c5.52 UT 45 AX NDE 5.2-1 C 4-23-93 UT 45 DEGREE COMPLETE UT 60 AX NDE 5.2-1 C UT 45 CIRC NDE 5.2 1 C
- UT-45~*
DATE: 09/07/93 Sl'. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 41 REVISION: 0 INSERVICE INSPECTION SINDIARY SECOND INTERVAL, SECOND PERIM, SECOND OUTAGE (1993)
CLASS 2 COHPLETED CCHPONENTS N STEAH N 1 S TAINH N N I 0 ZONE NINBER: 064 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENT IF ICATION ITEH NO KETHOD PROCEDURE T C G H R ~~CALIBRATION BLOCgaa
-34.HS 29 REF. DMG NO 01-064 021170 HSH.74 F 8 VT 3 KDE 4.3 67 C C 4.27 93 EXAHINED TRUNIONS ONLY TRUNNION F2.10
- ~N/A~
DATE: IN/07/93 ST. LUCIE NUCLEAR PLAHI'NIT 1 PAGE: 42 REVISIOH: 0 INSERVICE INSPECTION SUKKARY SECOND INTERVAL, SECOND PERIOD, SECOHD OUTAGE (1993)
CLASS 2 COKPLE'IED COKPONEHTS N F E MAT T N RAT 1 1 H DE COHT N I 0 ZONE NUKBER: 068 ASKE 8 ONGT SEC. XI T RSEH SUKNARY EXAHIHATION AREA CATGY EXAK A E I 0 E REKARKS NUKBER IDENT I F I CAT I OH ITEN NO KETNOO PROCEDURE T C G K R ~~CALIBRATIOH BLOCK ~
F DIIG NO 01-068 022360 AUGKENTED EXAKINATIOH B 79-13 UT 45 AX NDE 5.16.1 C C C 4.30.93 AUGKENTED EXAK COKPLETE ID ROOT NOZZLE RAMP TO KID ELBOH H/A UT 60 AX NDE 5.16.1 C C GEOKETRY AND SPOT INDICATION.
INDICATION LOCATIONS AND AKPLITIOES HERE CONSISTENT MITH THOSE OBSERVED IN 1988
- UT-43**
ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 43 DATE: 09/07/93 REV I SION: 0 INSERVICE INSPECTION SUHHARY SECOKD INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 2 COHPLETED COHPOKENTS PS KPSI CS PUHPS OOP 1A N T P P N N I 0 ZONE NUHBER: 073 ASHE S ONG T SEC. XI T RSE N I 0 SUHHARY EXAHI NATION AREA NUHBER IDENT IF ICATION CATGY ITEH NO EXAH HETKOO PROCEDURE A
T E
CGH E
R REHARXS
~iCALIBRATION BLOCX i CS.41 REF. DNG. NO 1 0 023670 CS.41-1-SM 10 CF PT NDE 3.3-13 C C 4-14.93 PT COHPLETE i
TEE-TO-REDUCER C5.11 i~K/A~
- 4.CS-4 REF. DMG. NO. 01-0 -8 023710 CS.41. I-SN-1 C F P'I NDE 3.3 12 C C 4.14-93 PT COHPLETE PIPE-TO TEE C5.11
- +N/At&
I-6-S .4 5 REF. DIJG. NO 01 073.C 024076 SI-425-I-SN-I C-F PT NDE 3.3-13 C C 4.14.93 PT COHPLETE TEE TO PIPE C5.11 4f N/A&
(
024160 Sl-425-FN.4 C-F PT NDE 3.3-13 C C '-14-93 PT COHPLETE REDUCER-TO FLANGE C5.11
~iK/A~~
-24.S1-504 REF. DUG NO 01-0 .A 024180 SI-676.50 F-B VT-3 KDE 4.3-36 C C 4.14-93 COHPLETE BOX RESTRAINT F3.10 itN/A%1 14-CS-7 REF DUG. NO 0 073.
024330 CSK.22 F C VT-3 NDE 4.3-35 C C 4-14-93 THIS SPRIKG NANGER IIAS REPLACED VARIABLE SPRING BASE SUPPORT F3.50 VT-4 BY RIGID RESTRAINT Sl-676 217t PER JPN-PSLP-93-0087.
- N/A~
DATE: 09/07/93 St. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 44 REVISION: 0 INSERVICE INTERVALED INSPECtlOH SWHARY SECOND SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 2 COMPLETED COMPONENTS S TDOhl COO NG H A XCHANGER 1A TO SH N I 0 ZONE NUMBER: 080 ASHE S ONGT SEC. XI T RSEH
SUMMARY
EXAMINATION AREA CAT GY EXAM A E I 0 E REMARKS NUMBER IDENt I F I CAT I OH ITEH MO METHOD PROCEDURE T C G H R ~~CALIBRATIOH BLOCK ~
S -406 R F DUG. HO 01 080.
027315 Sl-406. FH.5A C-F PT NDE 3.3-8 C C 4.10-93 COMPLETE PIPE-TO.ELBOH C5.11 t*H/Akk 1 CS-11 REF. DUG MO 01 080.
027460 CS. II-FH.6 C-F Pt MDE 3.3-8 C C 4 10-93 COMPLETE PIPE TO-PEHETRATIOH 35B C5.11
~1H/Aki
-1 S -406 RE DUG MO 01-080.B 027560 CS.678-202 F-C VT-3 NDE 4.3-24 C C 4-10-93 FROZEN STRUT RIGID STRUT ASSEMBLY F3.10 CMR 93-1-023 ~
C 5-13-93 REEXAMINED FOLLOHIHG CORRECTIVE VT 3 NDE 4.3-79 C ACTIOH CLEANED AND LUBRICATED STRUTS IIH/A0P 027580 CS.678-206 F C VT-3 NDE 4.3-25 C 4-10-93 INCOMPLETE THREAD ENGAGEMENT, RIGID STRUT ASSEMBLY IJELDED F3.10 CHR 93-1-024 C ACCEPTABLE COTTER PIN HAS CORRECTED BY MCR 1-782 C BENDINGI LIGHT RUST HAS CLEANED OF VT-3 MDE 4.3-80 5-13-93 REEXAMINED FOLLDHIHG CORRECTIVE AC'tlOH i*H/A4*
DATE; IN/07/93 ST. LUCIE NUCLEAR PLANT UMIT 1 PAGE% 45 REVISIOH: 0 IKSERVICE IKSPECTIOK SQQIARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 2 COMPLETED COHPOKENTS NUTD L NG k A XCMAMG R 1 T T. SPRA M I 0 2OME NUMBER: 080 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAMINATION AREA CAT 0Y EXAM A E I 0 E REMARKS MUHBER IDENT IF ICATIOH ITEH MO HETKOO PROCEDURE T C 0 H R iiCALIBRATIOM BLOCK~
1 - S.11 REF DllG 0 01- 0.
027620 CSK-52 F-C VT 3 NDE 4.3-23 C, 4 10 93 SPRING CAN SEtTIMG OFF SCALE VARIABLE SPRING HANGER F3.50 Vt-4 NDE 4.3-23 C 5-7.93 REEXAH FOLLOMING RESETTING OF CMR 93-1-022 C SPRING TO ITS CORRECT SETI'ING.
KCR 1-778 C DETERHINED TO BE A DRAMIKG ERROR)
VT 3 NDE 4.3-75 DCR-SLH.93-069 ISSUED TO CORRECt FIGURE VT-4 KDE 4.3.75 NUMBER
~*M/Ai*
DATE: 09/07/93 ST ~ LUCIE NUCLEAR PLANT UNIT 1 REVI SION: 0 INSERVICE INSPECTION SUHHARY SECOND IHTERVAL, SECOND PERIOD@ SECNID OUTAGE (1993)
CLASS 2 COHPLETED COHPONENTS COHB N D HP 8 UX ARY KP HEADERS TO LOOP 1B N I 0 20NE NUHBER: 086 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHI NATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENT IF ICATION ITEH NO HETHCO PROCEDURE T C G H R ~~CALIBRATION BLOCK**
-S IS. NO 01-086.
029090 Sl -218 SM-11A C-F.1 PT NDE 3.3.24 C C 4-19.93 PT COHPLETE ELBml-TO PIPE C5.30
~*N/A~
-147 REF DUG. NO. 01-M6-029140 S1.147.FII-1 C-F-1 PT NDE 3.3.24 C C 4-19-93 Pl'OHPLETE PIPE. TO-VALVE 4V-3143) C5.30
~N/A~
ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 47 DATE: 09/07/93 REVISION' IHSERVICE INSPECTION SUNNARY SECOND INTERVAL, SECOND PERIOD, SECOHD OUTAGE (1993)
CLASS 2 CONPLETED CONPONEHTS HAR HG P HARGE TO HPSI PUNP S HARG N I 0 20HE HUNGER: 087 ASNE S ONGT SEC+ XI T RSEH SUHHART EXANIHAT IOH AREA CATGY EXAN A E I 0 E RENARKS NUNBER IDENTIFICATION ITEN HO HETHCO PROCEDURE T C G H R ttCALIBRATION BLOCKtt
.CH 74 R F. DUG. NO 01 087 029360 CN.A74 SU-3 C-F-1 PT NDE 3.3-19 C C 4.16 93 PT CDNPLETE.
TEE-TO PIPE C5.30
- tN/Att 2-CH-136 REF. DllG. NO. 01-087-029800 CH.136-SN-14L C-F-'I PT NDE 3.3-22 C C 4-16-93 Pr INDICATIONS 2 Cu 1/16 ROUHD-BRANCH SADDLE WELD C5.41 .
34 CM ~ 16 LINEAR ALL ACCEPTABLE 11N/At t
1993
SUMMARY
REPORT SUBMITTAL Page 16 of 22 APPENDIX C CLASS 3 SUING'SKY TABLES
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 , PAGE: 48 REVI SION: 0 INSERVICE INSPECTION SIWHARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 3 COHPLETED COMPONENTS POMEHT COOL NG- HUTDOW COOLING HX 1 CHARG N I 0 ZONE NUMBER: 102 ASHE S ONGT SEC. Xl T RSEH SUHHARY EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICAI'IOH ITEN NO METHOD PROCEDURE T C G H R *~CALIBRATION BLOCK ~
CC-26 REF. DUG NO 031710 CC-22.6 F.B VT 3 NDE 4.3-56 C C 4-16-93 COMPLETE DRAHIMG Dl SCREPEHCY, BOX RESTRAINT F2.10 CNR 93-1-067 C DOES NOT SHOU PIPE CLAHPS PLAHT DISPOSITION NO ERROR, SHOW OH DRAHIKG C.22-6A 44M/A**
031750 CC.22-9 F B VT-3 MDE 4.3 49 C C 4.16-93 COMPLETE BOX RESTRAINT F2.10
- ON/Ak*
DATE: 09/07/93 ST ~ LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 49 REVISION: 0 INSERVICE INSPECTION SWHARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 3 COMPLETED COMPONENTS COMPOM N'I MG IIAT R PUMPS 1 1B AMD 1C N T N I 0 20NE MUHBER: 105 ASHE S ON 0T SEC+ XI T RSEH
SUMMARY
EXAHINATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEH NO HETMOD PROCEDURE T C G H R ~~CALIBRATIOM BLOCK*~
C -2 REF. DUG 0 0 10-032910 YPH.20 F-C VT-1 MDE 4.1.34 C C 2-9-93 AUGMENTED EXAMINATION CORROSION RIGID BASE SUPPORT F3.10 Vl'-3 NDE 4.3.76 C CNR 93.1.002 C NCR 1-745 C NCR 1-746 C ~N/A~*
C -3 R F DUG MO 01-10 ~
033080 YPH.180 F-C VT-3 NDE 4.3.38 C C 4-14.93 NO IDEHT IF I CA'T ION PLATES SPRING BASE SUPPORT F3.50 VT-4 MDE 4.3.38 5-17 93 REEXAHINED FOLLONING CORREC'TIVE CMR 93-1-039 C ACT ION NCR 1-784 C VT-4 NDE 4.3-88 ~~H/A~
033085 YPH-180 D-A VT-3 NDE 4.3.38 C C 4-14-93 COMPLETE INTEGRAL ATTACHMENT D1.40
( 14M/Ato CC-33 F NG NO 0 033090 YPH-181 F.C VT-3 NDE 4.3-39 C C 4-14-93 HO ACCEPTAHCE CRITERIA FOR SPRING BASE SUPPORT F3.50 VT-4 NDE 4.3-39 C SPRING CAM; PER NCR 1-784 NO ACTIOH CMR 1.93.040 C REQUIRED SETTING IIITHIN ACCEPTABLE MCR 1-784 C TOLERANCE
- IH/A*0 033095 YPH-181 D A VT-3 HDE 4.3-39 C C 4-14-93 COMPLETE INTEGRAL ATTACHMENT D1.40 44N/Akt
0 DATE: 09/07/93 Sl'. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 50 REVISION: 0 IHSERVI CE INSPECTION
SUMMARY
SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 3 COMPLETED COMPONENTS C RCU AT MG MAT R lkl'AK COOL NG l!T PHPS HARD N I 0 ZONE NUMBER: 110 ASME S OMGT SEC. XI T RSEH
SUMMARY
EXAMI HAT I OH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT I F I CAT ION ITEH NO METHOD PROCEDURE T C G N R *+CALIBRATIOH BLOCK ~
30 CM 20 REF DlJG NO 01-110.B 034310 IS H-9 F.B VT-3 NDE 4.3-61 C C 4-26.93 COMPLETE SADDLE RESTRAINT F2.10
~*N/A~~
034315 ISH.9 DA VT MDE 4.3-61 C C 4-26.93 COMPLETE INTEGRAL ATTACHMENT D1.20
- N/A~~
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 51 REVISION: 0 INSERVICE INSPECTIOM SUHHART SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 3 CCHPLETED COHPONENTS SP MT FUE NG PUMPS T H MANGE N I 0 ZONE NUMBERS 111 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HETNOD PROCEDURE T C G H R **CALIBRAI'IONBLOCK~
FS- 08 REF. DUG. NO. 1-111-034500 FSH.6 F.C VT.3 NDE 4.3.53 C C 4-24 93 COMPLETE - USED BINOCULARS FOR VARIABLE SPRIMG HANGER F3.50 VT-4 NDE 4.3-53 C VIEN OF CEILING ATTACNHENT
- ~M/A~*
FS-502 REF. D'IIG NO 1- 11 B 034520 FSN-8 F-B VT-3 NDE 4.3-52 C C 4-24 93 COHPLETE PIPE SADDLE F2.10
~~M/A*>>
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 REVISION: 0 INSERVICE INSPECTIOM SWNARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 3 COHPLETEO COHPONENTS LIARY F EDNAT R PUMP 1A S 18 TO HA N FEEDNATER N I 0 20ME NUMBER: 113 ASHE S ONG T SEC. XI T RSE H SUHHARY EXAHIMATI ON AREA CATGT EXAH A E I 0 E REHARKS NUHBER IDENT I F I CATION I TEH NO HETNOO PROCEDURE T CGH R iiCALI BRAT ION BLOCK~i F R F DUG. MO 01 11 034820 BF-1005.557 F-C 'T-3 NDE 4.3-10 C C 4-3-93 COMPLETE SLIDING BASE SUPPORT F3.10
~*M/A~~
034825 BF-1005-557 D-A VT NDE 4.3-10 C C 4/3/93 COHPLETE INTEGRAL ATTACNHENT D1.20 mM/Aae
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE! 53 REVISION: 0 IMSERVICE INSPECTION
SUMMARY
SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 3 COMPLETED COMPONENTS AUXI IAR F E HAT 0 HA H F DMATE M I 0 ZONE NINBER! 116 ASHE S ONGT SEC+ XI T RSEH SUHHART EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF ICATION ITEN NO HETHCO PROCEDURE T C G H R ~~CALIBRATIOH BLOCK~~
BF-38 REF IJG. MO.01-116 035390 BF-5-H3 F C VT-3 HDE 4.3 17 C C 4.8.93 COMPLETE RESTRAINT F3.10
- N/A**
DATE: 09/07/93 Sr. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 54 REVISION: 0 INSERVICE INSPECTION SUHHARY SECOND INTERVAL, SECOND PERICO, SECOllD OSAGE (1993)
CLASS 3 COHPLETED CSPONENTS C DENSAT SUCT ON TO AUXI IARY F NAT R PUHPS N I 0 ZONE NWBER: 118 ASHE S ONG T SEC. XI T RSE H SUHHARY EXAMINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENT I F I CATION ITEH NO HETHOD PROCEDURE T CGH R ttCALIBRATION BLOCK t C- REF DNG 0 01 B.
035650 CH-125 F.B VT-3 NDE 4.3.11 C C 4/3/93 COHPLETE BOX RESTRAINT F2.10 ttN/Att 035655 CH-125 D.A VT-3 NDE 4.3-11 C C 4/3/93 COHPLETE INTEGRAL ATTACHHEHT D1.20 ttN/Att
DATE: 09/07/93 ST. LUCIE NUCLEAR PLAMT UNIT 1 PAGE: 55 RE VI SION: 0 INSERVICE INSPECTION
SUMMARY
SECOMD INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 3 COMPLETED COMPONENTS COMDENSAT -SU T TO AUX ARY FEEDUAT R PUMP N I 0 20HE NUHBER: 119 ASKE S ONGT SEC. XI T RSEH
SUMMARY
EXAMINATION AREA CATGY EXAH A E I 0 E REMARKS NUMBER IDENT IF I CATION ITEH NO METHOD PROCEDURE T C G H R *~CALIBRATIOH BLOCK~*
.8-C-85 REF DUG M 01-119.B 035710 CH-129 F C VT.1 NDE 4.1-4 C 4/3/93 SEVERE CORROSIOH OH PIPE AND VARIABLE SPRING HANGER F3.50 CNR 93.1-012 C SPRING CROSS SSECTIOM VT 3 MDE 4.3-8 C TMICXNESS Ok LINE T .3274, DEPTH OF PIT CMR 93-1-010 C .021>> REMAINING MALL .306" CHR 93.1-065 C ~N/A~*
NCR 1-768 C 035720 CK-130 F-C VT-3 NDE 4.3-19 C C 4.8-93 COMPLETE CORROSION SLIDING BASE SUPPORT F3.10 CNR 93-1.017 C 5-20-93 REEXAMINATION FOLLOUING VT 3 NDE 4.3.91 CORRECTIVE ACTION THICKNESS OH LINE T CKR 93-1-065 C .297", DEPTH OF PITTING .031" REHAlklkG NCR 1-768 C MALL ~ 266
- ~k/A**
035730 CH-131 F-C VT-3 MDE 4.3-18 C C 4/8/93 COMPLETE CORROSION AND IKCOHPLETE SLIDIKG BASE SUPPORT F3.10, CNR 93-1-016 C THREAD ENGAGEHENT VT 3 NDE 4.3-89 C ask/A@a 035740 CH-132 F-C VT-3 MDE 4.3-5 C C 4/3/93 SEVERE CORROSION SLIDING BASE SUPPORT F3.10 CNR 93.1-007 C 5/20/93 REEXAHINED FOLLOMIHG CORRECTIVE VT-3 NDE 4.3.92 C ACTION teak/Aif 035750 CH-133 F-C VT-3 NDE 4.3 30 C 4-12-93 HEAVY CORROSION OM BASE SUPPORT SLIDING BASE SUPPORT St TIE BAR F3.10 CNR 93-1-029 C 5-20 93 REEXAHIHED FOLLOUIKG CORRECTIVE VT-3 NDE 4.3.90 ACT IGNI
- ek/A**
035760 CH-134 F-C VT-3 NDE 4.3-29 C 0 4-12-93 SEVERE CORROSION SLIDIMG BASE SUPPORT 8 TIE BAR F3.10 CNR 93-1-028 C 5-20-93 REEXAMINATION FOL LONI HG VT-3 KDE 4.3-93 C CORRECTIVE ACTION
~*N/A~*
DATE: 09/07/93 ST ~ LUCIE NUCLEAR PLAHT UNIT 1 PAGEI 56 REVISION: 0 INSERVICE INSPECTION SINHARY SECOND INTERVAL, SECOKD PERIOD, SECOND OUTAGE (1993)
CLASS 3 COMPLETED COHPOHENTS EMSATE SUCT OM TO AUXIL ARY f KAT PUMPS N I 0 ZONE NUMBER: 119 ASHE S OMGT SEC. XI T RSEH
SUMMARY
EXAMI KATION AREA CATGY EXAH A E I 0 E REMARKS NUMBER IDEHTIF ICATION ITEH KO METHOD PROCEDURE T C G H R >>>>CALIBRATIOM BLOCK>>>>
.B.C-B R F DUG KO 01-11 035770 CH-135 FC VT3 NDE 4.3.21 C C 4/10/93 COMPLETE) COULD KOI'EAD SCALE VARIABLE SPRING HANGER F3.50 VT.4 NDE 4.3-21 C OM INCH SIDE
>>>>H/A>>>>
I-B C 87 REF. DUG MO 01-11 035780 CN-136 F C VT-3 MDE 4.3.9 C C 4/3/93 IKCOHPLETE THREAD ENGAGEHEHT SLIDING BASE SUPPORT F3.10 CNR 93-1-011 C 5/13/93 REEXAHIMED FOLLOHIHG CORRECTIVE NCR 1-760 C ACTIOH; REHOVED LOCK NUTS NOT REQUIRED'HIS VT-3 NDE 4.3-86 SUPPORT ALSO HODI flED,
- >>K/A>>>>
035800 CM-138 F C VT 3 NDE 4.3-27 C C 4.12-93 HEAVY CORROSION OH HAIN RUK OF SLIDING BASE SUPPORT F3.10 CKR 93 1 026 C PIPE HISSIKG LOCKNU'Tg PC/H 076-193H C PC/H 076-193M DELETED THIS SUPPORT; MAS NCR 1-777 C REPLACED MlTHCH 138R VT-3 MDE 4.3.85 5-13 93 REEXAMINED FOLLOHING CORRECTIVE ACTION
- N/A>>>>
035802 CM-138R LATER VT-3 NDE 4.3-85 C C 5 13 93 PRESERVICE EXAHINATIOH OH KEII BASE SUPPORT LATER SUPPORT PER PC/H 076-193H
>>*M/A>>>>
035810 CH-139 F C VT-3 NDE 4.3-26 C 4-12-93 IKCOHPLETE THREAD EKGAEHEHI' SLIDIMG BASE SUPPORT F3.10 CNR 93-1-025 SEVERE CORROSION AROUMD PIPE ACCEPTABLE HCR 1-777 C AS-IS IMPLEMENT PC/H 076 VT-3 NDE 4.3-81 193'-13-93 REEXAH FOLLOMING CORRECI'IVE ACTION
>>>>K/A>>>>
-6 C-90 REF. OMG. MO.01-119.
035820 CH.140 F.C VT.3 NDE 4.3.7 C C 4/3/93 SEVERE CORROI SION SLIDING BASE SUPPORT F3.10 CKR 93-1-009 C HOOI FIED IAll PC/H 076 193H (REDESIGN)
NCR 1-756 C 5/13/93 REEXAHIME FOLLONIKG CORRECTIVE VT-3 NDE 4.3-84 C ACT I OH
>>>>M/A>>>>
DATE: 09/07/93 S'f. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 57 REVISION: 0 INSERVICE INSPECTION
SUMMARY
SECOMD IHTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 3 COMPLETED CDHPOKEHTS COMDEHSAT SU TIOK TO AUX ARY FEEDNATER PUMPS N I 0 ZONE NUMBER: 119 ASHE S ON 0 T SEC. Xl T RSE H SNNARY EXAHINATIOH AREA CATGY EXAH A E 10 E REMARKS NUMBER IDENT I F I CAT IOH I TEH MO KEYHOD PROCEDURE T CGH R ++CALIBRATIOK BLOCK*+
~ - R F. DMG. NO 01-119-A 035825 CH-140 0 A VT-3 NDE 4.3-7 C C 4-3-93 COMPLETE INTEGRAL ATTACKHENT D1.20 Ur-T MDE 5.18-1 C 01H/AOO
.6.C C R F DUG NO 01-119-A 035830 CH 141 F-C VT-3 KDE 4.3 6 C C 4/3/93 SEVERE CORROSION SLIDING BASE SUPPORT F3.10 CNR 93.1-008 C 5/13/93 REEXAH FOLLNIING CORRECTIVE HCR 1-757 C ACTION VT-3 MDE 4.3-83 UT-T MDE 5.18.1 I1N/A10 035835 Ck-141 D.A VT-3 MDE 4.3.6 C C 4-3-93 COMPLETE INTEGRAL ATTACKHENT 01.20
( C-90 REF DMG. HO. 01-119-A
- 1N/A*0 035850 CH-1C3 F-C VT-3 NDE 4.3-28 C C 4-'12-93 CORROSION ON SPRINGER SPRING BASE ASSEHBLY F3 '0 VT-4 MDE 4.3-28 C HCR 1-779 REHOVED SUPPORT)
CMR 93-1.027 C 5-13-93 REEXAHINED FOLLNIlNG CORRECTIVE NCR 1-779 C ACTION PC/H 076.193H C **N/A~~
VT-3 KDE 4.3.82
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANI'NIT 1 PAGE 58 REVISIOH: 0 INSERVICE IHSPECTION
SUMMARY
SECOND INTERVAL, SECOMD PERICO, SECOND OUTAGE (1993)
CLASS 3 COMPLETED COMPONENTS Cll FR PEH 1 TO CONT NH H N UMT1 N I 0 ZONE NUMBER: 122 ASHE S ONGT SEC. XI T RSEH
SUMMARY
EXAHIKATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEH NO HETMCO PROCEDURE T C G H R **CALIBRATIOMBLOCK+*
.C .4 REF DUG NO. 01.1 036250 CC-1865-6174 F~8 VT-3 NDE 4.3-47 C C 4 16 93 COMPLETE BOX RESTRAINT QELDED F2.10
- ~M/A~
036260 CC-1865-6174 D-8 VT-3 NDE 4.3.47 C C 4-16.93 COMPLETE INTEGRAL ATTACHMENT D2.20
~~M/A~
DATE: 09/07/93 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 59 REVISION: 0 INSERVICE INSPECTION SUHHARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 3 COHPLETED COHPONENTS CCll FROM TA MHEMT COOLING UM T 1 0 PEM 17 N I 0 ZONE MUHBER: 126 ASHE S ONGT SEC. XI T RSEH SUHHART EXAMINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HETKOO PROCEDURE T C G H R *aCALIBRATIOM BLOCK
-C -44 R NG MO. 01-126-036860 CC.1899.6173 F.B VT-3 NDE 4.3.46 C C 4-16-93 COMPLETE BOX RESTRAINT F2.10
'PAN/Atk 036865 CC-1899.6173 D-8 VT-3 NDE 4.3.46 C C 4-16-93 COHPLETE INTEGRAL AT'TACHHEMT D2.20 RCB 44N/A%4
1993
SUMMARY
REPORT SUBMITTAL Page 17 of 22 APPENDIX D AUGMENTED EXAMINATIONSUMKARYTABLES
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 REVISION: 0 IHSERVICE INSPECTION SUHHARY SECOND IHTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 AUGHENTED COHPOHEHTS GENERATOR 1A PR HARV H I 0 ZONE NUMBER: 003 ASHE S ONG T SEC. Xl T RSE H SUHHARY,EXAHIHATION AREA CATGY EXAH A E I 0 E REHARKS NUMBER IDEHTIFICATIOH ITEM NO HETHOD PROCEDURE T CGH R **CALIBRATIOHBLOCK>>>>
F WG HO.01-003 001440 1A-PHS-A B.G 2 - VT-1 HDE 4 '-25 A C 4-20-93 COHPLETE PRIHARY HANNAY (0 DEGREE ) 87.30 STUDS RCB
- H/A>>*
001450 1A-PHN-A 8-0-2 VT-1 NDE 4.1-25 A C 4-20-93 COHPLETE PRIHARY HANHAY (0 DEGREE) HUTS 87.30 RCB
- H/A*>>
001460 1A-PMS-8 8-0-2 VT-1 NDE 4.1-24 A C 4-20-93 COMPLETE PRIMARY MANHAY (120 DEGREES) 87.30 STUDS
- >>H/A>>*
001470 1A-PHN-8 8-0-2 VT-1 NDE 4.1-24 A C 4-20-93 COMPLETE PRIMARY HANHAY (120 DEGREES) 87.30 NUTS RCB
>>>>H/A>>*
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 REVISIOM: 0 INSERVICE INSPECTION
SUMMARY
SECOND INTERVAL/ SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 AUGHENTED COHPONENTS GENERATOR 18 PR HARY SIDE N I 0 ZONE NUHBER: 004 ASHE S ONGT SEC. Xl T RSEM
SUMMARY
EXAHIMAT ION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HEI'NOO PROCEDURE T C G H R **CALIBRATIONBLOCK**
EF. DWG NO.01-004 001740 18-PHS ~ 8 B-G.2 VT-1 NDE 4.1 23 A C 4-20-93 COHPLETE PRIMARY HANNAY (120 DEGREES) 87.30 STUDS RCB
- >>N/A>>>>
001750 18-PHN-8 8-G-2 VT-1 NDE 4.1-23 A C 4-20-93 COHPLE'IE PRIMARY HANNAY (120 DEGREES) 87.30 NUTS RCB
>>N/A>>>>
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 62 REVISION: 0 INSERVICE INSPECTION
SUMMARY
SECOND INTERVAL, SECOND PERIOD, SECOHD OUTAGE (1993)
CLASS 1 AUGMENTED CONPONEHTS UUEJ H I 0 ZONE NUMBER: 005 ASHE S OHG T SEC. XI T RSE M
SUMMARY
EXAHIHAT ION AREA CATGY EXAH A E I 0 E REMARKS NUMBER IDENT IF I CATION ITEN NO METHOD PROCEDURE T CGH R ~~CALIBRATIOH BLOCK**
REF. DWG. NO.01-005 001805 V.1200 B-G-2 HIS-2 SL-1-11-079 C 7-13 REPLACED NOZZLE AND DISC SAFETY VALVE TO FLANGE BOLTIHG 87.50 PHO 7089 C ASSEMBLY; (8) NIS-2'NO SL.1.11-078 C 6.16 REINSTALLEO VALVE S/H RCB 3604 C N72356-00-001;12-29.92 DISC INSERT 8 VT-1 H93-699 NOZZLE REPLACED BY HYLE LABS, PER PC/
VT-2 H93-1094 087.191H.
NIS-2 SL.1.11-028 C **H/A~~
PIQ 5634 C VT-2 llYLE 42761-3 001855 V-1201 8-G-2 HIS-2 SL-1-11-055 A C 6-16.93 REPLACED PRESSURIZER SAFETY SAFETY VALVE TO FLANGE BOLTING B7.50 PIJO 3605 C RELIEF VALVE S/H 54495 00-0002; HB 6116(
(8) VT-2 H93.1094 C 'WITH CROSBY VALVE S/H H54495-00-0004.
RCB
- IN/A*0 v 890 PRZ-S (1 TMRU 20) B-G.2 NIS-2 SL-1-11-074 A C 8-10-93 REPLACED NUMBER 12 STUD AHD GEAR HANIJAY STUDS AHD NUTS B7.20 CNO 6248 C HUT DUE TO THREAD DAMAGE.
RCB VT-1 H93-999 C VT-2 H93-1706 C
- H/A**
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 63 REVISIOH: 0 IHSERVICE INSPECTION SUNHARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 AUGNENTED CONPOHEHTS 1A SHUTDOMN COOLING LINE N I 0 ZONE HUHBER: 029 ASHE S OHG T SEC. XI T RSE H SUHNARY EXANIHATION AREA CAT GY EXAH A E I 0 E REHARKS HUHBER IDEHTIFICATIOH ITEN NO METHOD PROCEDURE T CGH R **CALIBRATIONBLOCK*~
- -RC.106 REF. DUG. NO.01-029 008000 V-1215 8-G-2 HIS-2 SL 1-11-081 A C 6-28-93 REPLACED BLIND FLAHGE BOLTING BOLTING 87.70 PNO 7251 C DUE TO CORROSIOH, NOVA HACHIHE PRODUCTS; RCB VT.2 H93-1094 C
- H/A*4
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 64 REVI SIGH: 0 INSERVICE INSPECTION SUHHARY SECOND IHTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 AUGHEHTED COHPOHEHTS IHG IHE TO LOOP 1A H I 0 ZONE NUHBER: 032 ASHE S ONGT SEC. Xl T RSEH SUHHARY EXAHINATIOH AREA CATGY EXAH A E I 0 E REMARKS NUHBER IDEHTIFICATIOH ITEH HO HETHOD PROCEDURE T C G H R *~CALIBRATIOH BLOCK**
-2.C .147 REF. DIIG NO. 01-032-C 009710 CK-141-78 F-C VT-3 NDE 4.3.71 A C 4-28-93 HEED SPRING CAH SETTING VARIBLE SPRING BASE SUPPORT F3.50 VT-4 NDE 4.3-71 C 5-12-93 REEXAHINED AFTER ADJUSTHEHT RCB CNR 93-1.058 C VT-4 NDE 4.3-78 C
- H/A**
DATE: 09/07/93 ST. LUCIE NUCLEAR PLAN'I UNIT 1 PAGE: 65 REVI SION: 0 IHSERVICE INSPECTION
SUMMARY
SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 AUGMENTED COMPOHEHTS OW LINE FROM LOOP 181 H I 0 ZONE HUHBER: 037 ASME S ONG T SEC. XI T RSE H
SUMMARY
EXAMIHAT ION AREA CATGY EXAM A E IO E REMARKS NUMBER IOEHTIFICATION ITEM HO METHOD PROCEDURE T CGM R <<<<CALIBRATION BLOCK**
RC-14 REF. DIJG. NO. 01-037-8 010770 RC-1.BA F-C VT-3 NDE434 A C 3-31-93 COMPLETE VARIBLE SPRING NAHGER F3.50 VI'-4 HDE 4.3-4 C RCB
- H/A<<>>
010790 RC-1-110 F-C VT-3 NDE 4 ~ 3-3 A C 3-31-93 COMPLETE COHSTAHT SPRING HANGER F3.50 VT-4 NDE 4.3-3 C 4-3-93 EXAMINED FOR HOT S COLO REFERENCE RCB VT-3 HDE 4.3 12 C HARKERS ONLY
- H/A<<>>
010850 RC-1-222 F-C VT-3 NDE 4.3-2 A C 3-29-93 VT-3 AND VT-4 COMPLETE VARIBLE SPRING HANGER F3 ~ 50 VT-4 HDE 4.3-2 C RCB
- H/A<<*
v 870 RC-1-25A F-C VT-3 HDE 4.3-1 A C 3-29.93 VT-3 AND VT-4 COMPLETE VARIBLE SPRING BASE SUPPORT F3.50 VT-4 NDE 4.3 1 C RCB
- <<H/A*>>
DATE: 09/07/93 ST. LUCIE NUCLEAR PLAN'I UNIT 1 PAGE: 66 REVISION: 0 INSERVICE INSPECTIOH
SUMMARY
SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 1 AUGMENTED COMPONENTS UR RELIEF INE N I 0 ZONE NUMBER: 038 ASME S ONGT SEC. XI T RSEN
SUMMARY
EXAMIHATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*~
I-2 .RC- 56 REF. DWG. HO.01-038 011120 V-1402 B-G-2 NIS-2 SL-1-11-076 A C 6-15-93 REPLACED PILOT DISC DUE TO VALVE BOLTIHG B7.70 PlQ 3607 C SCRATCHES; DRESSER INDUSTRIES/ S/N ABT RCB VT.2 M93-1094 C 56, A-565 GR 616,2500¹.
- H/A*4
DAZE: 09/07/93 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 67 REVISION: 0 INSERVICE INSPECTIOH
SUMMARY
SECOND INTERVAL, SECOND PERIOD, SECOND OUZAGE (1993)
CLASS 1 AUGMENTED COMPONENTS NED P PING LOOPS 1B1 S 182 OUTSIDE CTMZ.
N I 0 ZONE HUNBER: 040 ASHE S ONGT SEC. XI T RSEH
SUMMARY
EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R ~~CALIBRATIOH BLOCK**
-S -111 REF. DMG. NO 01-040.8 013250 SI.868-03 F-8 VT-3 NDE 4.3-55 A C 4-24-93 MISSING COTTER PIN; RIGID SHAY STRUT F2.10 CHR 93-1-052 C PAINTED SMERICAL BEARING)
RAB VT-3 NDE 4.3 65 C 4 26 8 4-29-93 REEXAMINED FOLLSIIHG VT-3 NDE 4.3-74 C CORRECTIVE ACTION, HAIHTENAHCE REPLACE CO'ZTER PIN, REMOVE PAINT AND LUBRICATE
- ~H/A~~
013280 SI H-23 F-C VT-3 NDE 4.3-51 A C 4-24.93 COMPLETE RESTRAINT F3.10 RAB
- lH/Alt 013330 S I M.21 F-C VT-3 NDE 4.3-54 A C 4-24-93 SPRING CAH SETTING OUT OF SPRING MANGER F3.50 VT-4 HDE 4.3-54 C TOLERAHCEZ 5-11-93 REEXAMINE RAB CHR 93-1-051 C FOLLOHING RE-SET OF SPRING HCR 1-790 C VT-4 HDE 4.3-77 *AN/A*%
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 68 REVISION: 0 INSERVICE INSPECTION SUHMARY SECOND INTERVAL, SECOHD PERIOD, SECOHD OUTAGE (1993)
CLASS 2 AUCHENTED COHPONENTS OWN COOLIHG L NE A OUTSIDE COHTAINHENT N I 0 ZONE NUHBER: 049 ASHE S ONG T SEC. Xl T RSE H SUHHARY EXAMINATION AREA CATGY EXAH A E IO E REHARKS NUHBER IDENT IF ICATION ITEN NO METHOD PROCEDURE T CGH R **CALIBRATIONBLOCK~*
1-1 -SI-420 REF. DWG. NO. 01-049-B 016030 S I H-20 F-C VT-1 NDE 4.1 7 A C VT-1 OF LINE 10-S1-420 AT SUPPORTS SPRING HANGER F3.50 VT-4 4/13/93
- H/A*0 016040 S I -676-226 F-C Vr-1 NDE 4.1-7 A C VT-1 OF LINE 10-Sl-420 AT SUPPORTS RIGID SWAY STRUT ASSY. F3.10 4/13/93
- AH/A**
016050 SI-676-2275 F-C VT-1 NDE 4.1-7 A C VT-1 OF LINE 10 S1-420 AT SUPPORTS RIGID SWAY STRUI'SSY. F3.10 4/13/93
- N/A**
60 S1-676-9230 F-8 VT-1 NDE 4.1-7 A C VT-1 OF LINE 10-SI-420 AT SUPPORTS RIGID RESTRAINT F2.10 4/13/93
- N/A**
016070 S1-676-2316 F-C VT-3 NDE 4.3-34 A C 4-12-93 COHPLETE RIGID SWAY STRUT ASSY. F3.10
- H/A**
016080 SI H.17 F-C VT-3 HDE 4.3-31 A C 4/13/93 COHPLETE CLEVIS HAHGER F3.10
- N/A4t 1-10-S1-420 REF. DWG. NO. 01-049-A 016100 S I -676-2375 F-B VT-1 NDE 4.1-7 A C VT-1 OF LINE 10-SI-420 AT SUPPORTS BOX RESTRAINT F2 ~ 10 4/13/93
- N/A~*
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 69 REVISIOH: 0 INSERVICE INSPECTION
SUMMARY
SECOND INTERVAL, SECOHD PERIOD, SECOHD OUTAGE (1993)
CLASS 2 AUGMENTED COMPONENTS COOLING LIME A OUTSIDE CONTAINMENT N I 0 ZONE HUHBER: 049 ASHE S ONGT SEC ~ XI T RSEH
SUMMARY
EXANIHATIOH AREA CATGY EXAM A E I 0 E REHARKS NUMBER IDENTIFICATIOH ITEN NO HETHOO PROCEDURE T C G H R >>>>CALIBRATIOH BLOCK*>>
1-10-SI-420 REF. DWG. NO. 01-049-016110 SI-676-2376 F-C VT-1 NDE 4.1-7 A C VT-1 OF LINE 10-SI-420 AT SUPPORTS PIPE CLAMP RESTRAINT F3.10 4/13/93
>>*N/A>>*
016120 SI.676-2395 F-8 VT-3 HDE 4.3-32 "
A C 4-12-93 COMPLETE BOX RESTRAINT F2 ~ 10
- H/A>>*
016130 SIN-14 F-C VT-1 HDE 4.1-7 A C VT-1 OF LINE 10-SI-420 AT SUPPORTS BASE RESTRAINT F3 ~ 10 4/13/93
>>*H/A>>>>
v 50 Sl-676-245 F-C VT-1 HDE 4.1-7 A C VT-1 OF LINE 10-SI-420 AT SUPPORTS RIGID SWAY STRUT ASSY. F3.10 4/13/93
- H/A>>>>
016190 SI.676-2505 F.C V'I-1 NDE 4.1 C VT-1 OF LINE 10-SI-420 AT SUPPORTS RIGID SWAY STRUT ASSY. F3.10 4/13/93
>>>>H/A>>>>
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 70 REVISION: 0 IHSERVICE IHSPECTIOH SUHHARY SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 2 AUGHENTED COMPONENTS DOMN COOLING LINE A NSIDE COHTAINHENT N I 0 ZONE NUHBER: 051 ASHE S OHGT SEC. XI T RSEH SUHHARY EXAHIHATIOH AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDEHT I F ICATION ITEN NO NETHOO PROCEDURE T C G H R **CALIBRATIONBLOCK**
1-10-SI-420 REF. DMG. HO. 01-051-A 017050 SI -973.1219 F.C VT-1 NDE 4 ~ 1-6 A C VT-1 OF LIHE 10-SI-420 AT SUPPORTS RIGID SMAY STRUT ASSY. F3 ~ 10 4/13/93
- N/A*>>
017070 S I -973.15 F-C VT-1 HDE 4.1-6 A C VT-1 OF LINE 10 Sl-420 AT SUPPORTS RIGID SMAY STRUT ASSY. F3.10 4/13/93
- H/A>>*
017080 S I -973-1220 F-C VT-1 NDE 4.1-6 A C VT-1 OF LINE 10-SI-420 AT SUPPORT CLAHP RESTRAINT F3.10 4/13/93
- H/A*>>
100 S I H-221 F-C VT-1 HDE 4.1-6 A C VT-1 OF LINE 10-SI-420 AT SUPPORTS BASE RES'IRAINT F3.10 4/13/93 .
>>>>N/A>>>>
017110 S I H-222 F-C VT-1 HDE 4.1-6 A C VT.1 OF LINE 10-SI-420 AT SUPPORTS BASE RESTRAINT F3.10 4/13/93 .
>>>>H/A>>*
017120 Sl -973 6222 F C VT 1 NDE 4.1-6 A C VT-1 OF LINE 10-S1-420 AT SUPPORTS RIGID SMAY STRUT ASSY. F3.10 4/13/93-
- N/A**
017130 S I H.223 F-C VT-3 HDE 4.3-33 A C 4-13.93 COHPLETE BASE RESTRAINT F3.10
>>>>H/A**
DATE: 09/07/93 ST. LUCIE NUCLEAR PLAHT UHIT 1 PAGE: 71 REVISIONS 0 INSERVICE INSPECTION SUNHARY SECOND INTERVAL, SECOND PERIODS SECOHD OUTAGE (1993)
CLASS 2 AUGHEHTED CONPONEHTS OWN COOLING L NE A INSIDE COHTAINMEH H I 0 ZONE NUHBER: 051 ASHE S ONG T SEC. XI T RSE N SUNMARY EXANIHATION AREA CATGY EXAN A E I 0 E RENARKS HUHBER IDENT I F I CAT IOH ITEN NO HETKOD PROCEDURE T CGH R **CALIBRATIOHBLOCK**
SI-420 REF. DWG NO.01-051 017140 S I -973-6223 F.C VT-1 HDE 4.1-6 A C VT-1 OF LINE 10.SI-420 AT SUPPORTS RIGID SMAY STRUT ASSY. F3.10 4/13/93-
- H/A**
017150 SIN.224 F-C VT-1 NDE 4.1-6 A C VT-1 OF LINE 'IO-SI-420 AT SUPPORTS BASE RESTRAINT F3.10 4/13/93
>>*H/A**
017160 Sl -973-1224 F-C VT 1 HDE 4.1-6 A C VT.1 OF LIHE 10.$ 1-420 AT SUPPORTS RIGID SMAY STRUT ASSY. F3.10 4/13/93-
- >>H/A**
1-10-SI-420 REF. DHG. NO.01-051.B 0171SO SIH-225 F-C VT-1 NDE 4.1-6 A C VT-1 OF LIHE 10-Sl-420 AT SUPPORTS BASE RESTRAINT F3;10 4/13/93-
>>*H/A>>>>
017190 Sl -973-6225 F-C VT-1 HDE 4 ~ 1-6 A C VT-1 OF LINE 10-SI-420 AT SUPPORTS RIGID SMAY STRUT ASST. F3.10 4/13/93-
- H/A>>*
017200 SI H-226 F C VT-1 NDE 4.1-6 A' VT-1 OF LINE 10-SI-420 AT SUPPORTS BASE RESTRAINT F3.10 4/13/93
- >>H/A>>*
017210 S I -973-6226 F-C VT-'I HDE 4.1-6 A C VT-1 OF LIHE 10-SI-420 AT SUPPORTS RIGID SHAY STRUT ASSY ~ F3.10 4/13/93 .
- H/A**
ST. LUCIE NUCLEAR PLANT UHIT PAGE: 72 DATE: 09/07/93 1 REVISION: 0 INSERVICE INSPECTION
SUMMARY
SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 2 AUGMENTED COMPONEN'IS COOLING LINE A INSIDE COHTAINMEHT N I 0 ZONE NUMBER: 051 ASME S ONGT SEC. XI T RSEH
SUMMARY
EXAMINATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK>>>>
1-10.S -420 REF. DWG. HO. 01-051-B 017230 SIN-227 F-C Vl'-1 NDE 4.1-6 A C VT-1 OF LINE 10-SI-420 AT SUPPORTS BASE RESTRAINT F3.10 4/13/93
- H/A**
017240 S I H.228 F-C VT-1 HDE 4.1-6 A C VT-1 OF LINE 10.S1-420 AT SUPPORTS BASE RESTRAINT F3.10 4/13/93
- M/A**
017250 S I -973-1228 F-C VT-1 NDE 4.1-6 A C VT-1 OF LIHE 10.S1-420 AT SUPPORTS RIGID SIIAY STRUT ASSY. F3.10 4/13/93 .
- H/A**
60 S 1.973-6228 F-C VT-1 NDE 4.1-6 A C VT-1 OF LINE 10.S1-420 AT SUPPORTS RESTRAINT F3.10 4/13/93-
- M/A**
DATE: 09/07/93 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 73 REVISION: 0 INSERVICE INSPECTION
SUMMARY
INTERVALED SECOND SECOND PERIOD, SECOND OUTAGE (1993)
CLASS 3 AUGHENTED COMPONENTS ENT COOLING HATER HX 1A !L 18 INLET HEADERS H I 0 ZONE NUMBER: 100 ASME S OHG T SEC. XI T RSE H
SUMMARY
EXAHINATIOH AREA CATGY EXAM A E I 0 E REHARKS NUMBER IDENTIFICATION ITEM NO HETHOD PROCEDURE T CGM R *~CALIBRATION BLOCK**
CC-11 REF. DWG. NO 01-100 031190 YPH-1 F-C NIS-2 SL-1-11-002 A C 6-4 93 SPRING CAN AND ROD EYES REPLACED VARIABLE SPRING HANGER F3.50 PC/M 026-192H C PRO 3446 C VT-3 M92.127 VT-4 M92-127 **N/A4*
ST. LUCIE NUCLEAR PLANT UNIT PAGE: 75 DATE: 09/07/93 1 REVI SI OH I 0 IHSERVICE INSPECTION
SUMMARY
SECOND INTERVAL, SECOND PERIOD, SECOHD OUTAGE (1993)
CLASS 3 AUGMENTED COMPOHENTS AT HG WATER - INLET N I 0 ZONE NUMBER: 109 ASHE S ONGT SEC. XI T RSEH
SUMMARY
EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF ICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK*~
CW-71 REF DWG. NO. 01-109-A 034220 YPH-150 F-C Hl S-2 SL-1.11.032 A C -4.93 REPLACED U BOLT AND HUI'S DUE TO ROO 8 CLAMP HANGER ASSEMBLY F3.10 PWO 5502 C CORROSION) BERGEN PATERSON VT-3 M92-1629 C
- H/A*0
ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 76
%/07/93 I: 0 INSERVI CE INSPECl'OH
SUMMARY
SECOND INTERVAL, SECOHD PERIOD, SECOND OU'IAGE (1993)
CLASS 3 AUGMENTED COMPONENTS TE N TO AUXILIARY FEEDHATER PUMPS H I 0 3ER: 119 ASME S ONG T SEC. XI T RSE H
=.XAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS IDENTIFICATION ITEM HO METHOD PROCEDURE T CGH R ~~CALIBRATION BLOCK~~
I-6-C-90 REF DMG. HO. 01-1'l9-A
.H-143R LATER VT 3 NDE 4.3-82 A C 5-13-93 HDI RESTRAINT INSTALLED UNDER RIGID RESTRAINT LATER PC/M 076-193M.
- H/A~*
1993
SUMMARY
REPORT SUBMITTAL Page 18 of 22 APPENDIX E NIS-BB OWNERS.'ATA REPORT FOR EDDY CURRENT EXAMINATIONRESUI TS
Page1 of1 FORM NIS-BB ONNEFIS'ATA REPORT FOR EDDY CURRENT EXAMINATIONRESULTS As required by the provlslons of the ASME CODE RULES EDDY CURRENT EXAMINATIONRESULTS PLANT: St. Lucia Unlt1 EXAMINATIONDATES: AP RIL 7, 1993 thru APRIL 22, 1993 TOTAL TUBES TUBES TOTAL TOTAL TUBES PLUGGED AS PLUGGED PLUGGED STEAM TUBES P REVENTIVE THIS TUBES GENERATOR INSPECTED 20'5 - 39% 40% ~ 100% MAINTENANCE OUTAGE IN S/G 7506 1730 54 69 1082 7844 1276 54 61 736 LOCATION OF INDICATIONS (20% - 100'Vo)
U BENDS EGGCRATES DRILLED SUPPORTS TOP OF TUBE SHEET TOTAL STEAM 1TOS 9AND10 TO ¹1 EGGCRATE INDICATIONS GENERATOR DHB to DCB H/L C/L H/L C/I. H/I. C/L 20% 3$ % 40% 100%
163 1226 239 137 134 654 30 2519 54 128 789 231 68 72 484 62 1766 58 Remarks:
CERTIFICATION OF RECORD We certify that the statements In this report are correct and the tubes Inspected were tested ln accordance with the requirements of Section XI of the ASME Code.
Florida Power & Light Co.
DATE: PREPARED BY: ~
S/G E D CURR NT COORDINATOR REVIEWED BY:
I'E T SUPE VISOR APPROVED BY:
S/ PROGRAM M GER an FPL Group company
FOR NNS USE ONLY JPN ESr JP-ESI-15. 1A CUSTOMER NOTIFICATION REPORT PAGE / OP~
- 1. PLANT/UNIT NO, 2 ~ REPORT NO. /
57-, C~grz @~re // YEAR UNXT NUMBER PROM: o~(d<W A'~l< TITLE Q
~
INFORMATXON QI 5'ap< Coca .
+ ACTION DATE.~a 4 ~ XTEM DESCRXPTION. 5 ~ ITEM LOCATXON:
D 0 CLLSS 1 g 2 g 3 g NNS P&ID NO E F PROG TEM NO CB DWG S
- /8 ELEV'UILDING C C ZONE NO. WELD MAP 5 R 0 COMPONENT XD COMPONENT DESC.
I P D N
- 6. DESCRIPTION OF NOTED CONDITION: &A'4~~ ~+Sr/>> ~~~~87 T
IT I IpR/c. 2/ 199$ Has Z~wnuz 7/I E add'.u64uuk err Cumru ger OF chub 7hZ//ArGfC bEAAC h re& DdCAA4HTw~ +~ig 7' 5 0 I cSd 8'EKAf 2 Wr 74' m4a/r N 0 N Vhf K A. ~dr& 4Ewo E$ 2 ruPg g/ ZbO 47+~ A/A) .IW I/g/.
E R S E
- 10. ZNXTXAL REVIEWS NDE <~pvW
~p gYES gNO r"./
/~ g
~~~ REVIEWS gYES QNO IV 5/g PRIE.MR.I YES gNO IYEs gN0 ACIES INO X C iud E MGR. ESI gYES NNO gYES QN W Ai0SS y'Y~s SNo.
E D 7. DXSPOSXTXON AdAAd Cd'7/At Ig ~COdg gA/
rl "-r"-E'c.<W rrrrfHs ra '/5/4/R N X IP cs o / 7 CZA Eeo
~
- r-" mrs~
N 0 E S E I R T Cont. on Pages thrn II +zz N 0 S.PREPARED BY G N 9 REVIEWED DATE Zz BY:
BY'PPROVED DATE "z
'A 11. PLANT DISPOSITXON.
P C NCR NO PWO/CWO NO OTHER L T A
0 I 12 ~ PLANT CLOSE-OUT CORRECTXVE ACTION COMPLETED (as required)
N T N INSPECTION REPORT No.
TITLE 13 CLOSEOUT:
REVIEWED BY: DATE z0 UPERVISOR-CLOSED BYa JPN/
EA r'Dr'NR DATE
<8'C'7 co.rd.
PLUGGABLE TUBES LIST PSL-1 JPN/ESI SECTION 04/93 BOBBIN 6 HRPC EXAN CNR N: 93-1.048 COMPONENT :S/G A Page : 2 of 4 Date : 04/22/93 T Ime: 1000 I l I (R<<( (TES TED I I (
STABILIZER I I I I l (ROM(LINE I ZONE IEXT (LEG I EXT ENT I REEL l CHI PLUG LOC'N I LOCATIOH (
X (Volts(oeg( Dataset
+ + + + + + + + + + + +
I rl sl 1(TEH( C (TEH PLIACO 12( I VS2 0.0 I 45( 1.2(109(1S-DEG I 8( lz(TEK( C ITEK PLIAC018.04( I 02H 1.0 ( 43( 3.1(111(1S.DEG 13( 12(TEHI C ITEH PLIAH056-14( I 01H 0.4 ( 73( 0.6( 76(2S IHP I 32( 141 >>ITEM( C ITEH PL(AH056.14( ll I 03H 0.4 I 4ol 1.8(113(1S.DEG
( as( 29( 13(TEH( C ITEH PLIAH056-14( 1( (
OZH -0.1 I sol 2.6(131(1S.DEG
( 46( 30( 13(TEHI C ITEH PL(AKOS6-14( I 01H 0.4 ( 63( 1.6( 13(1S-DEG 34( 13(TEHI C ITEH PLIAH056 141 I 03H 0.1 ( s4( 1'9(llrlls-DEG I
( 98( 34( 15(TEHI C ITEH PLIAH056 14( I 05H 0.0 I 42( 1.3(118(ls-oEG I 14( 4o( 13(TEHI C ITEH PL(Acoz9-o6( I 02H 0.3 l 4sl F 1(109(1S-DEG I I 24( 4o( 13(TEH( C ITEH PLIAM056-14( I 06H -0.5 (41( 0.6(113(1S.OEG
( 89( 41( 15(TSHI H ITSH PLIAHOSO-14( HOT LEG I TSH 0.1 lcsl( 1.0( 95(RPC100XTSH(
1(TEN( C ITEH PLIAH062-14( ( vsz -o.4 (PTP( O.e( 93(2S-IHP 47( 15(TEHI C ITEH LIAH056.141 I 01H 0.0 1 6(108(2s.ool I I z6( 48( 4(TEHI C ITEH PLIAH122-27( 1( ( OZK 0.4 ( 4s( 0 9(109(1S OEG I (121( 49( 16(TEH( C ITEH PLIAH056-14( (
09H 0.1 I 42( 1 8(114(1 EG I
( lz( so( 4(TEH( C ITEH PL(AH122 27( (
OZK 0.5 ( sz( 0.9(101(1S DEG I 37( 551 4(TSHI H (TSH PLIAH070 16( KOT LEG (
TSH 0.1 (csl( 1.7( 70(RPC100XTSHI I >>I ss( 4(TSH( H ITSH PLIAH065 15( (
TSH 0.2 (Ezl( 1.6( 98(RPclooxTsH(
I 3( sr( 1(TSNI H (TSH PLIAH005 02( HOT LEG I TSH 0.1 (CKI( 1.8(126(RPC100XTSHI I 14( se( 4(TEH( C (TEH PLIAH122-27( I 02H 0.0 I 59( 1.4( 92(1S DEG I 221 58( 4(TEH( C ITEH -
PLIAC115.26( l Tsc 6.1 ( se( 1.3( 93(1S.DEG l115( 59( 16(TSH( H ITSH PLIAH09 I ( TSH 0.1 IEZI I 0.8(112(RPC100XTSH(
( sl( 65( 3(TEH( C ITEH PL(AH122-27( I 05H 0.4 ( as/ o s(107(2s-IHP I 33( 67( 4(TEHI C (TEH PLIAH122 27( (
TSH 2.9 ( s4( 0.6(10011S-OEG I
( 88( r4( 18(TECI H (TEC PLIAH122-27( l 01H 0.3 1.0(106(1S.OEG (lzr( rs( lr(TEc( H ITEC PLIAH122.27( I 09H -0.2 2 4(116(1S.DEG I
( 3e( re( 4(TSH( H (TSH PLIAH050-14( HOT LEG I TSH 0.1 (csl l 0.9( 68(RPC100XTSH(
I 42( 78( 4(TEH( C ITEH PLIAH122-27( I 01H 0.6 1.9(110(1S-DEG (83( 81( 18(TECI H ITEC PL(AH122.27( (
02H -0.6 ( 48( 0.8(106(1S.DEG I>>l 83( 4(TEHI C ITEH PL (AC081-19( I TSM 0.1 ( so( 2.6(104(1S-DEG
( as/ 18(TSHI H (TSH PL(AH101-21( HOT LEG I TSH 0.2 ICEI I 5.3( 36(RPC100XTSH(
( sl( er( 5(TEHI C ITEH PLIAH056 14( I'3H 4.4 I 45( 1.4(109(1S.DEG I 62( ee( S(TEH( C ITEH PLIAH056-14( I 05H 0.0 ( ss( 1 ~ 11 9711S-DEG I
( 94( ee( 19(TECI H ITEC PLIAH122-27( I 01H -0.6 ( 53( 0.6( 98(1S-DEG I rzl 90( 5(TEH( C (TEH PLIAH066-14( I 01H -0.6 I 43( 1.0(113(1$ -DEG I (117( 93( 17(TEC( H ITEC PLIAH122 zrl (
TSH 0.8 I 42( 0.9(114(1S-DEG I 96( 94( 19(TECI H ITEC pL(AH122-zr( (
09H -O.Z 3.0(109(1S.DEG
( 44( 96( 6(TEHI C ITEH PLIAC002-01( I 02H 0.9 ( 4z( 1.5(111(4S ~ NDD I 64( 96( SITEHI C ITEH PL(AH056 14( I TSH 6.4 ( so( 0.6(104(ls-oEG (134 ( 96( 17(TEHI C ITEH PL(AC001.01( I 01H 0.3 ( 49( 3.4(103(1S-DEG
( 4o( 98( 6(TSH( H (TSK <<NPL(AK050.14( 1( I TSH 0.7 ( 43( 1.8( 90(RPC100XTSH(
(137( lol( 11(TSKI H (TSH PLIAH050.14( (
TSH 0.0 (EZI( 1.8( 90(RPC100XTSH(
+ +
PLUGGABLE TUBES LISt PSL.1 JPN/ESI SECTION 04/93 BOBBIN 8 HRPC EXAM CNR ¹ t 93 '.048 CCHPONEMT :S/G A Page : 3 of 4 Date : 04/22/93 Time : 1000
( ( ( (REGI TEST EO I ( I STABILIZER ( I I I I I IRDMILINEIZONEIEXTIL EGI EXTE NT I REEL I CH( PLUG LOC'M (
LOCAT ION (X (Volts(Oeg( Dataset
+ + + + + + + + +
( 46( 104( 6(TEH( C ITEH PLIAK056-14( 02H 0.3 I 41( 0.9(112(1S-DEG I
( 77( 105( 5(TEH( C (TEH PLIAC014-03( 01H 0.6 I 4SI 2.7(108(1S.DEG I I 5( 109( 2(TSHI H ITSH PLIAH105 21( TSH 0.2 IASI I 2.4( 69(RPC100XTSHI I 521 110( 5(TEHI C ITEK PLIAH056 14( 06H 0.5 0.51 10511S-DEG I 4( 112( 2(TSH( H ITSH PL(AH105-21( HOT LEG TSH 0.1 ICEI I 2.1( 96(RPC100XTSH(
( 1( 1131 2(TEHI C ITEH PLIAH122-27( 02K 0.2 ( 62( 1.6( 91(1S-OEG (
PL (AC101.23( 01H 0.8 4SI 2 '(108(1S-OEG I 86( 114( 10(TEHI C ITEN I I I 29( 115( 6(TEHI C ITEH PLIACOOS-02( 06N 0.0 I 41( 1.9(116(1S.DEG I I 2( 116( 2(TEHI C (TEH PLIAC109-25( 02H 0.4 I >>I 3.8(103(1S.DEG I 12( 116( 6(TSHI H ITSH PLIAH092-20( TSH 1.8 ~ (AHI( 5.9( 78(RPC100XTSK(
( 11 119( 2(TEHI C ITEH PL(AC111-25( 02H -0.5 ( 43( 2.9( 110( 1S-OEG I 5( 119( 2(TEHI C ITEH PLIAC109 25( 03H .0.7 ( 47(
1.4 I 108( 1S-OEG (
I 501 120( 6(TEHI C ITEH PL(AH056 14( 02H 0.3 ( SS( 0.4( 96(2S-IHP I (106( 122( 10(TEHI C ITEH PLIAC102.24( 09H .0.2 I 44( 5 '(111(1S.DEG
( 45( 131( 7(TEH( C ITEH PL(AC084.19( TSH 0 7 I 671 1.6( 83(2S-IHP I I 6( 134( 2(TEHI C ITEH PL(AC116.26( VS2 0.0 0.7( 87(2S.001 (
( 39( 135( 7(TEH( C (TEH PL(AH122-27( 05H .0.3 I SOI 0 4(10312S-IHP (
( 75( 135( 9(TSH( H ITSH PL(AHO83-17( KOT LEG TSH 0.1 (CEI( 1.7( 47(RPC100XTSH(
3( 139( 2(TEH( C ITEH PLIAH122-27( 05H 0.7 ( 90( 1.2( 43(1S-DEG
( 25( >>9( 7(TSHI H ITSH PL(AH085 17( TSK 2.0 I >>I 1 '( 84(RPC100XT Kl
( 43( 139( 7(TEH( C ITEH PLIAC086-20( 02H 0.4 ( 44( 2.6(110(1S.DEG 71 141( 2(TEHI C ITEH PL(AC116-26( VS2 .0.2 S4( 0.6( 99(2S.NDD I
(
I 94( 142( 10(TEHI C ITEH PLIAC115-26( 09C 0.0
(
( 42( 2 '( 11211S.DEG (
7( 147( 2(TEH( C ITEH PLIAC116-26( VS2 0.5 I 75( O'Sl 74(2S.O01 I 2(TEK( C (tEH PLIAC111 251 03H 0.4 3.8(113(1S-DEG I I 7( 149( 2(TEHI C ITEH PL(AC116-26( VS2 -1.1 ( 60( 1.3( 92(2S-IHP I I 191 149( 8(TEHI C ITEH PLIAH122-27( 03H 0.6 ( 43( 0'71111(2 IH I
+ +
Nunber of Pluggable Tubes: 69 Naker of Indications 69 Selection Criteria:
PerCent 't.ll....: 40 Includes ADI,NQI,OSI,DTI,DRI,LPI,TBP,TRS,PTP,CSI,ASI,CHI,AHI,CEI,EZI Codes Note:
Pr r : Joy . Johnson PSL Corrective Action Request ¹ 010792 requires the plug located fn "A" S/G Cold Leg, Row 32, Line 142 to be removed and replaced during this outage (Plug S/M 4770, code ¹ J8052.1) per Revi w by: olfgang K. Keise A.J. Flowers.
FOR NNS USE ONLY JPN - ESZ JP-ESI-15.1A CUSTOMER NOTXFXCATION REPORT PAGE / OF
- 1. PLANT/UNIT NO. 2. REPORT NO.
5r, CgerAre // YEAR UNIT NUMBER
- 3. TO-'alo r ~o~WW 5 + ~ Q ZNFORMATXON + ACTXON PRON: oLA Alg E EoJC TYTLE:ESX S NEC7 CoodoO. DATE..~ZI PZ
- 4. XTEM DESCRXPTXON: 5 ~ XTEM LOCATXON:
D 0 CLASS 1Q 2Q 3Q NNS PtNID NO E F CB DWG S o o ELEV; C C ZONE NO WELD MAP BUILDXNG 5 Mrc R 0 COMPONENT XD COMPONENT DESC Wr'.
X N P D DESCRIPTXON OF NOTED CONDITION: &A'4~7 r~Sri~fr C~~.e<
Ar&r& ~d~~n~ IJr/r~
T I Spuds. 2/ (993 PhS Zd~77FIZ CMAfl&TO~
lg~.
I 0 I T 78E 7adE c.uArn)i- herr dF cAor 7ENar(4C
<So 8'EÃri/2 ~cr bdOCrCl~rW ~ 5 xcrg+Cr 7MrirSITI~ 7 ri A'C. ~o N 0 N 77@ K.g. Q~r6- 4&0 E$ 2-eOF-9/- ZOO 4d~
c.
4' j> //)/.
E R 10 XNITIAL REVIEWS 4y,g.'/l~ REVAMP WS 0 0 CLOSEOUT S E NDE s~P~R. /YES QNO .us~
I VI Sly PRON gYES QNO
%/YES QNO KIP Crea Q YES Q YES NO NO cg E MGR ESI QYES INO S W ANTE pf les i// SPo.
E D 7. DXSPOSXTION dAAcf CrrPrgr71c9c lg r COd-g re+
N I 77/C A'~PC. M 7-urfHs' sP / ZZP Eeo - r-"
AL/4/R 2~or&m-G S C ]S m c 7 4d I P N 0 E S E I Cont. on Pages thru R T N
II0 8 PREPARED BY: DATE i/ P3 G N . 9.REVZEWED BY. DATE APPROVED BY: DATE A 11. PLANT DISPO XTION:
P C NCR NO PN CNO NO. 8"8/ OTHER L T -
A I 12. PLANT CLOSE-OUT CORRECTXVE ACTION COMPLETED (as required)
N 0 T N XNSPECTION REPORT No DATE
- 13. CLOSEOUT:
REVXEWED BY DATE PERVISOR - %8BK" PROGRAMS rVOK CNR CLOSED BY: ~< ~ C/A~ DATE Y Z5'g JPN/ S 5 c5 E~ co~rd-
PLUGGABLE TUBES LIST PSL.1 JPM/ESI SECTION 04/93 BOBBIN B KRPC EXAK CKR ¹ : 93-1-049 CCKPONENT:S/G 8 Page : 2 of 4 Date : 04/21/93 Time : 1945 IREGI TESTEO I STABILIZER I I I I I I I I I ( (
(ROM(LIME(ZONE(EXT(LEG( EXTEHT I REEL I cHI PLUG Loc'N I LOCATION (
X (Volt's(oeg( Dataset
+ + + + + + + +
53( 7( 12(TEH( C ITEH PL(BC097.24( 1( I 03C -0.1 1.1 (113 (CS-MDD
(
( 6S( 11( 12(TEH( C ITEH LIBC032 OSI I 01H 0.7 3.9(118(1S-DEG 13(TEH( C ITEH PL (BH121-30 ( 1( I 04H 0.5 0.5(107(1S-DEG (
6( 2C( 16(TSH( H (TSH PL(BH007 02( I TSH 0.1 IASI I 1 ~ 2(100(RPC100XTSH(
(103( 33( 12(TEH( C ITEH PLIBH121-30( 11 (
04H 0.4 ( sr( 0'6( 59(zs-KDD I (107( 33( 12(TEH( C (TEH PLIBH121.30( I 02H 0.4 1 41120(ls-DEG I (TEHI C ITEH PL I BH121-30 I OZH -O.6 0.7(113(1S-DEG (
l l l (
67( 35( 13(TEH( C ITEH PL I BH121 30( I 02H 0.4 ( Co( 2'll119(1S.DEG I
(
(101( 35( 12(TEKI C ITEH PLIBH124-30( I 01H 0.8 ( 86( 1.0( 60(2S-NDD 39( ITEH PLIBH121.30( 1( 02H -0.4 77( 1,4( 75(4S-MDD
( 93( 12(TEH( C I I (101( 39( 12(TEH( C ITEH PLIBH121 30( 1( I 01K -0.5 ( 61( 0.7( 96(Zs-ool 45( 12 I T ITEH PLIBH121-30( OIH 0.8 r6( 2.2( 76(1S-DEG 1111( EH I C ( (
1 51( 15(TEHI C (TEH PL IBH115-23( I 01H 0.6 ( 63(
0 8( 93(ls-DEG I I I I 46( 54( llTEHI C ITEH PLIBC095-24( ( osc -o.C ( 43( 0.7(115(1S DEG 63( PLIBH056.16( 1( HOT LEG TSH 0.0 (CSI( 1.4( 66(RPC100XTSHI I 57( 1(TSHI ITSH H (
(134( 64( 18(TEH( C ITEH PLIBH121 30( I 01H ( SC( 1.0(104(1S-DEG I L(BHo33-os( HOT LEG TSH'.6 0.1 (CEI( 1'.2( 91(RPC100XTSH(
( 25( 65( 15(TSH( H ITSH I PLIBH115.23( 1( TSH 2.6 1 ~ OI 92(zs-IKP l I 90( 74( 7(TECI H ITEC (
ITECI H ITEC PL (BH115-23 ( OIH 0.4 ( 46( 0.7(114(2S-IKP I I I (
(122( 7C( 6(TEH( C ITEH PL(BH115-23 ( I 10H ( 6r( 0.6( 87(2S-IKP I PL (BH115.23 ( I 02H -0.5 0.6(111(1S-DEG l sol 80( C (TEH 1( I (100( 80( 7(TEC( H ITEC PL IBHll 23( I TSH 2.6 I rol 1'6( 85(1S-DEG I (135( 83( 18(TEHI C ITEH PL(BH115 23( 1( ( 09H 0.0 ( Cz( 3.3(119(1S-DEG I 1O(TEH( C ITEH PL(SHITS-23( I 01H 0.4 ( 41( 0'9(120(ls-OEG I I 52( 84( 10(TEHI C ITEH PLIBH115-23( 1( I TSH 3.8 ( so( 1.0( 88(1S-DEG (130( 86( 18(T EH I C (TEH lecos3-13( I 09H 0~0 I czl 0.8!115(1S-DEG I (134( 86( 18(TEH I C (TEH PL(BH115 23( I 01H -0.3 I 52( O.S(104(1S.DEG 87( 10(TEH( PLIBH121-30( 1( I 01H 0.5 0.8(113(1S-DEG
( 41(
C ITEH
( 75( 87( 8(TEH( C ITEH PL(BC013-03( 1( I 01H 0.6 I czl 4.1(118(1S-DEG I (102( 88( 7(TEH( O'ITEH GNRL(ecoo3-ol( 11 I 01H 0.5 ( 63( 1.3( 94(1S-DEG (129( 89( 6(TEH( C ITEH I BC053 13( (
09H 0.0 1 71116(1 s-DEG I I 86( 90( 8(T<<l ITEH C PL IBH115.231 1( (
03H 0.8 ( 6z( 0.8( 95(lS-NDD (
(134( 90( 18(TEH( C ITEH pL(eco95-24( 11 (
oSc 0.5 ( r6( 0.9( 74(ls DEG I l>>5( 95( 18(T<<l C ITEH PL(BH11S-23( 1( I 02H
.0.4 I 60( 0.9( 94(2S-IKP I (110( 96( 6(TSHI H ITSH PLIBH085-19( HOT LEG I TSH 0.1 (CEI( 0.7( 53(RPC100XTSH(
(126( 98( 6(TECI H ITEC PL(BH115 23( (01H -05 I 51( 0'6(107(ls DEG
( rs( 99( 8(T<<( C ITEH PLIBK121 30( 1( I 01H 0.6 ( 6r( 0.9( 88(1S-DEG I 89( 99( SITE.I H ITEC PL(BH115-23( I TSH 0.8 ( SS( 0.9(104(1S.DEG 1110( 100( 6(TECI (TEC PL(BH115-23( 1( (
01H 0.1 ( rl( 0.7( 83(CS-NDD
( 24( 1OZ( S(TSH( H ITSH PLIBHOBO 2 I 1( HOT LEG I TSH 0.1 (CEI ( 1.3( 76(RPC100XTSH(
lllol 104( 6( Hl H (TSH PLIBH085.19( HOT LEG TSH 0.2 IcEII 1.2( 92(RPC1 OXTSHI I rll 105( SITEHI C ITEH IL(ec097-24( 1( I 02C 0.1 ( 47( 1.0(114(1S-DEG I
+
PLUGGABLE TUBES LIST PSL.1 JPM/ESI SECTION 04/93 BOBBIN S HRPC EXAM CMR S : 93.1.049 COMPONENT :S/G B Page : 3 of 4 Date: 04/21/93 T lee: 1945 (RED( I TEsTEo I I sTABILlzER I I I I I IROMILINEIZONEIEXTILEGI EXTEHT I REEL I CHJ PLUG Loc'N I LOCAT I OH I X (volts(oeg( Dataset
+ +
Ilz6( lo61 6(TEcl H ITEC (BH104-26( I 09N -0.3 I 541 1 ~ 5110311S.DEG (1321 106( 18(TEN( C ITEH PL(SH115.231 (
01H .0.3 ( 47( 1.0(108(1S.OEG I 951 1071 7ITEGI H JTEC PLISH115 23( I 01H 0.3 1 0111312$ .001
( 34( 1081 11ITEH C (TEH PL(BC009 02( (
OIH 0.8 I 431 2 9(11411S OEG I 521 1081 11ITEHI C ITEH PLJBC016 041 I olH o.r I 48( 3.81113(1S.DEG
( 12( 112( S(TEH( C ITEH PL IBH121-301 I 03H 09 I 491 1.8110611S-DEG I 431 113( 11(TEHJ C ITEH PLIBC010 021 I 01H 0.2 2.0111111S-DEG I re( 114( 3ITEHI C ITEH PLIBH121 301 I 05H
.0.1 I 62( 0.71 9411S-DEG I er( 11s( 31TEcl H ITEC PLIBH115 231 I 01H
-0.5 I 421 0.5112011S-DEG I 16( 116( 5ITEHI c ITEN PLIBC097.24( I TSC 3.9 I 69( 1.31 7011S.DEG I 99( 117( ZITEcl H ITEC PLIBH115-231 I 01H'.0.5 0.8111411S-DEG I 41 118( 17(TEN( C ITEH PLIBH115 23( I 02H 0.5 I 6o( 0.6( 9711S-DEG I 901 1261 21TEcl H ITEC PL(BC095-24( ( oec -0.2 I 4z( o.e(118(1s-oEG I rel 13o( 3(TEH( C ITEH PLIBH115-231 I TSH 1.2 I 481 1 6111811S-OEG
( 7( 131( 17ITEHI C ITEH PLIBC096-241 I vs2 -1.6 I se( 1'Ol 99(1S DEG I I I ITEHI C ITEN PL(BC096-241 I vsz -o.6 I rzl 0.71 8211S-DEG 0.5 sl(
I 851 1391 I 7( 1431 I I I 2(TEC( H ITEC 17ITEKI c ITEN ITEHI C JTEH PLJSH115.23(
PLIsco96 241 PLIBC096-241 I 01H I vsZ -1.1 I vs2 -1.4 I
I 831 I 831 1 'l 0.4(107J1S-DEG 66(1S-NDD 0.91 70(1S-MDD I 71 1471 17ITEHI C ITEH PLJBC096-241 1( I vsz -o.S I 6sl 1 2( 9112S-D01 I 511 1471 2ITEHI C ITEH PLIBC083-221 I 02H 0.4 I 48( 4.9 1110(1S-DEG 7( 149( >>ITEM( C ITEH PL(BC096-241 11 ( vs2 -o.r (PTPI 2.71135 (1S-DEG I 391 1631 2(TEHJ C ITEH PLJBH115-23( 11 I 01H 0.6 0.81110(1S-DEG Maker of Pluggable Tubes : 61 Nunber of indications 65 Selection Criteria:
PerCent T.M. ...: 40 Includes ADI,NQI,OSI,OTI,DRI,LPI,TBP,TRS,PTP,CSI,ASI,CHI,AHI,CEI,EZI Codes P r by J. C. Johnson Reviewed by M. K. Heise
CUMMULATIVE DISTRIBUTION
SUMMARY
ST. LUCIE UNIT g 1 04/93 COMPONENT : S/G A Page : 1 of 1 Date : 04/26/93 Time: 0900 Examination Dates : 04/07/93 thru 04/22/93 Total Number of Tubes Inspected 8519 Total Indications Between 20% and 394 2519 Greater than or equal to 404 54 Total Tubes Plugged as Preventive Maint Total Tubes Plugged from Hot Leg Top of Tubesheet MRPC Examination..............:
Total Tubes Plugged This Outage.........: 69 Location Of Indications 20% to 100<
Hot Leg Cold Leg TSH .5 to 01H -2.1 : 654 TSC .5 to 01C -2.1 : 30 01H -2.0 to 08H +2.0 : 1226 01C -2.0 to 08C +2.0 : 239 08H +2.1 to DHB -3.1 : 137 08C +2.1 to DCB -3.1 : 134 DHB -3.0 to DCB -3.0 : 153 an FPL Group company
CUMMULATIVE DISTRIBUTION
SUMMARY
ST. LUCIE UNIT P 1 04/93 COMPONENT : S/G B Page : 1 of 1 Date : 04/26/93 Time: 1200 Examination Dates : 04/07/93 thru 04/21/93 Total Number of Tubes Inspected 8519 Total Indications Between 20% and 394 1766 Greater than or equal to 404 58 Total Tubes Plugged as Preventive Maint Total Tubes Plugged from Hot Leg Top of Tubesheet MRPC Examination...............
Total Tubes Plugged This Outage.......-.: 61 Location Of Indications 204 to 1004 Hot Leg Cold Leg TSH .5 to 01H -2.1 484 TSC .5 to 01C -2.1 : 62 01H -2.0 to 08H +2.0 789 01C -2.0 to 08C +2.0 : 231 08H +2.1 to DHB -3.1 58 08C +2.1 to DCB -3.1 : 72 DHB -3.0 to DCB -3.0 128 an FPL Group company
1993
SUMMARY
REPORT SUBMITTAL Page 19 of 22 APPENDIX F 1993 OVTAGE SNUBBER FUNCTIONAL TESTING SU1VBXARY
SUMMARY
REPORT On-Site Examination and Testing of Mechanical and Hydraulic Snubbers Florida Power & Light Company St. Lucie Unit 1 1993 Refueling Outage Prepared By Dl ri 1 n'. Motley - ESI C. Fiallo - ANII G. Kozlowskl - NR Vault lSl Files
0 Table of Contents Section Descri tion
'I.O Scope of Work 2.0 Summary of Corrective Actions 3.0 Summary of NonConformance Reports 4,0 Summary of Test Results 8 Corrective Actions Appendix A List of Previous Failures & Test Results Appendix B List of Sample Selection & Test Results Appendix C .List of Tests Performed due to Visual Anomalies Appendix D Personnel Certifications Appendix E Equipment Calibration Records Appendix F Immediate Corrective Action Memo &
PSL Snubber Acceptance Criteria Appendix G Engineering Correspondence & NCR's
IIVTROD U Tl N This summary describes the work performed to'nspect and test safety-related mechanical and hydraulic snubbers during the 1993 Refueling Outage at St. Lucie Unit ¹1, beginning March 29, 1993 and concluding in Sune 19, 1993. The scope of the work identified in the following section was performed in accordance with Quality Instruction document Ql-10-PR/PSL-6; Revision 6, "Control Inspection and Monitoring of Mechanical and Hydraulic Shock Arrestors and complies with the surveillance requirements identified by ASME Section XI and Technical Specification 3/4 7-9. The acceptance criteria used for functional testing of the various snubbers is identified in a document entitled; "St. Lucie Plant - Units 1 8 2 Snubber Test Acceptance Criteria JPE-M-87-103; Revision 14".
While every effort is made to document all anomalous conditions found during visual examination or testing, the ability to perform immediate corrective action to replace items such as cotter pins, washers, broken lockwires, etc. is authorized by letter dated 3/24/93, entitled "Immediate Corrective Action List For Snubbers". Typically, If immediate corrective action could not be performed, an NCR was generated.
I Ex min i The scope of visual examinations and testing was performed by Siemens Testing Services, Inc., formerly known as Qualtec Testing Services. Personnel performing examinations, testing or quality control functions were certified in accordance with the QTS Project Plan, QTS-PP-7082-PSL as required by Florida Power 8 Light Purchase Order No. 890681-90003. A copy of the Project Plan may be found on file at the QC Vault. Reference ISI Transmittal ¹ ISI-92-015, Item 233. A copy of all,personnel certifications can be found in Appendix D.
III. VI I Ex min ln accordance with the provisions described in Generic Letter 90-09, FPL's Technical Specifications have been changed to incorporate an alternative visual inspection schedule. Since no unacceptable snubbers were found during the 1991 refueling outage visual inspections, FPL selected only a percentage of the snubbers to inspect although the provisions of the Generic Letter do allow deferral of all inspections to the next inspection interval.
A Visual Examination Checklist was used to determine evidence of impaired operability or damage for approximately twenty percent of the snubber population. An inspection was made to verify; 1) that all required hardware was in place; 2) absence of physical damage to the snubber or attaching components; and 3) the as found snubber cold setting was within range of normal thermal movement. Any snubber which did not satisfy the conditions identified on the Visual Examination Checklist was either corrected by the examiner in accordance with the Immediate Corrective Actions letter or the snubber was removed and tested. Any deviations which were found as result of the examination were identified by Deviation Report or NonConformance Report, (See Section 2.0)
V.Fn nl ln Previously failed snubbers from the Unit 1 1991 Refueling Outage and a 10% sample of the total snubber population were removed and tested in accordance with the Technical Specifications. Functional testing was additionally performed to establish operability based on VT exams. Results from each test were reviewed against the PSL 1 Acceptance Criteria; Revision 14. Any conditions which deviated from this criteria was identified to Florida Power 8 Light via the contractors Deviation Report. Snubbers which failed the Functional Test were reviewed against a Trending List to determine if snubbers installed at the particular location have experienced repeated failures.
Engineering was requested to evaluate the snubber for upgrade in capacity or type
( Reference PC/M 278-192 ) as a result of the review. In each case, however, all failures were reported to engineering for stress evaluation via a Nonconformance Report (NCR). Degraded snubbers ( those with drag values greater than 2% but less than 5%, were reviewed to determine if degradation fell within the snubbers range of thermal movement. Results for all snubbers tested can be found in Section 4.0.
SECTlON 1.0 St. Lucie Unit N Snubber Summary Report 1993 Refueling Outage Examination and Testing Scope of Vfork
- 4'***'A****
4
'I
Section 1.0 St. Lucie Unit 1 Sco eof Work As part of Unit 1 Refueling Outage work scope, the following inspections, tests and other related tasks were performed:
Visually examined 59 of 232 mechanical and hydraulic snubbers.
Functionally tested 16 snubbers which failed or were modified during the previous outage.
Q Functionally tested 43 of 232 mechanical and hydraulic snubbers as part of the selected sample.
QD Replaced the seals in 5 of 16 Steam Generator hydraulic snubbers:
Tag-1-003, S/N-4301, Relnstalled at Tag-1-007.
Tag-1-004, S/N-5574, Relnstalled at Tag-1-013.
Tag-1-007, S/N-5580, Stored as a spare.
Tag-1-008, S/N-5582, Reinstalled at Tag-1-004.
Tag-1-013, S/N-5577, Stored as a spare.
(Spares: S/N-5568, at Tag-1-003 & S/N-5570 at Tag-1-008.)
Completed modifications required by Plant Change/Modification packages:
PC/I 278-192'CR-1-770, Tag-1-237, Upgraded with a Llsega Hydraulic.
NCR-1-771, Tag-1-236, Upgraded with a Llsega Hydraulic.
'l St. Lucie Unit N Snubber Summary Report - 1993 Refueling Outage Summary of Corrective Actions
Section 2.0 St. Lucie Unit P1 Summar Of Corrective Action Xag 2h. l5adC MLqLQRQ 1-225 RC-245-H1 1-93-PSL-1-225 12112 PSA-1 Deviation
Description:
Snubber paddle showed interference with U-bolt pipe attachment. U-bolt clamp was rotated on pipe.
Dlsposltlon lnstructlons: U-bolt clamp was positioned per drawing RC-245-H1 and reinspected to insure no interference remained.
Deviation Results: No further action.
~R 12112 NCR: n/a
~T'>q 1-206 N~ My~rk BF-659-32 D l i n R 2-93-PSL-1-206 r '~l~
61230/95 gggf~
LSG-3062 Deviation
Description:
Snubber paddle alignment agrees with sht: 1 of 5 but disagrees with sht. 4 of 5 in drawing BF-659-32.
Disposition Instructions: Engineering identified that the as-found configuration was correct and revised the drawing.
Deviation Results: No further action.
61230/95 NCR: 1-762 egg ~N gy~rk ] D vl l R Sad.aLC 5LffL@m 1-207 BF-659-32 3-93-PSL-1-207 61230/97 LSG-3062 Deviation
Description:
Snubber paddle alignment agrees with sht. 1 of 5 but disagrees with sht. 4 of 5 in drawing BF-659-32.
Disposition Instructions: Engineering identified that the as-found configuration was correct and revised the drawing.
Deviation Results: No further action.
~R 61230/97 NCR: 1-762
~T~
1-147 gyr~
CH-141-36C D vi ion
. 4-93-PSL-1-147 SmmlM JHXalGau 19101 PSA-1/4 Deviation
Description:
Snubber failed the functional test for drag.
Disposition Instructions: This snubber was replaced with a spare PSA-1/4 snubber. The work was performed by Construction Services in accordance with CWO 6312.
Deviation Results: Replacement snubber installed.
38523 NCR: 1-772
Xaa~ Hadst 5-93-PSL-1-236 SadaLC 1-236 S l-101-6 38496 PSA-1/4 Deviation
Description:
Snubber was in a degraded range per its'unctional test.
Disposition instructions: Snubber was replaced with a Lisega Hydraulic snubber in accordance with PCM 278-192. Work was performed by Construction Services in accordance with CWO 5060.
Deviation Results: Replacement snubber installed.
~R 61211/36 NCR: 1-771 Xaa Ha. J~N Red.aLC 5LaLGau 1-132 CH-125-356 6-93-PSL-1-132 38502 PSA-1/4 Deviation
Description:
Snubber failed the functional test for acceleration.
Disposition Instructions: This snubber was replaced with a spare PSA-1/4 snubber. The work was performed by Construction Services in accordance with CWO 6312.
'eviation Results: Replacement snubber installed.
~RI M: 11432 Xaa.2h.
1-237 mlad&
I-101-13 7-93-PSL-1-237 Serial ~Cap 38490 PSA-1/4 Deviation
Description:
Snubber failed the functional test for acceleration.
Disposition Instructions: Snubber was replaced with a Usega Hydraulic snubber in accordance with PCM 278-192. Work was performed by Construction Services in accordance with CWO 6312.
Deviation Results: Replacement snubber installed.
~RI M: 61211/99 NCR: 1-770
~TI Nq 1-226
~M~~rk RC-246-H3 v R 8-93-PSL-1-226 r Qgri~ ~f 19073 PSA-1/4 Deviation
Description:
Snubber failed the functional test for acceleration.
Disposition Instructions: This snubber was replaced with a spare PSA-1/4 snubber. The work was performed by Construction Services in accordance with CWO 6312.
Deviation'esults: Replacement snubber installed.
~R 38013 NCR: 1-775 X.m Ha EbuJR Rerh~JJE EEGL@m 1-15.1 CH-1 42-17 9-93-PSL-1-15'I 38498 PSA-1/4 Deviation
Description:
Snubber initial breakaway drag indicates degradation.
Disposition Instructions: Snubber with-in range.
Deviation Results: Original snubber reinstalled.
38498 NCR: n/a
~T~
1-165 JY~lr I+
RC-221-148 l
10-93-PS L-1-165 SmlaLC 38491 Mal~
PSA-1/4 Deviation
Description:
Snubber pipe clamp bolts damaged.,
Disposition Instructions: Damaged bolts replaced by Construction Services, in accordance with CWO 6310.
Devlatlon Results: No further action.
R I m n N: 38491 NCR: n/a jgg 1-004
~N SS-4-1A
%eh~ jest!KaLGm 11-93-PS L-1-004 5574 ITT-200 Deviation
Description:
Snubber spherical bearing cracked during testing.
Disposition Instructions: Bearing replaced with a spare.
Deviation Results: No further action.
5582 NCR: n/a
~T~N gI~'Jcr 1-194 N~ flak MSH-78 D
13-93-PSL-1-194 Sar3alM j HalGm 61211/34 LSG-3018 Deviation
Description:
Siemens was unable to reinstall this snubber due to M/M delays. Snubber was turned over to the ISI supervisor.
Disposition Instructions: Snubber was reinstaited by Construction Services in accordance with CWO 6310.
Deviation Results: Snubber installed.
R I men N: 61211/34 NCR: n /a XQ9 KQ Kkr~ D QgZfy~ ~fgQgy 1-196 MSH-7A 14-93-PSL-1-196 1397 A/D-41 Deviation
Description:
Siemens was unable to reinstall this snubber due to M/M delays. Snubber was turned over to the ISI supervisor.,
Disposition Instructions: Snubber was reinstalled by Construction Services in accordance with CWO 6310.
Deviation Results: Snubber installed.
Re I N: 1397 NCR: n/a
St. Lucie Unit N Snubber Summary Report - 1993 Refueling Outage Summary of NonConformance Reports
ection 3.0 St. Lucie Unit P1 Summar of NonConformance Re orts 1-132
'gQ ggg~
1-769
~) t~
38502 ggg~
GH-125-356
~i II IUUUIIUIUI 6-93-PSL-1-132 p~i~y Functional UUUIUUU reported anomaly did not cause any code overstress or overload conditions. The root cause can be attributed to vibration. Replacement of the failed snubber with a functionally tested spare Is acceptable. Spare snubber PSA-1/4, SN-11432, was installed.
~T HM ~iJ
~i~ Hark ~UUU
.. ~I~:
gym~
1-147 ggg>lip 1-772' 19101 f~m~
CH-141-36C 4-93-PSL-1-147
. ~m~
Functional I n This snubber failed the functional test for drag.
I n Engineering performed a detailed evaluation of the test results and determined that the reported anomaly did not cause any code overstress or overload conditions. The root cause canbe attributed to vibration. Replacement of the failed snubber with a functionally tested spare is acceptable. Spare snubber PSA-1/4, SN<8523, was Installed.
~~r gpss cl~r ~r " 'IUUI 1-206 gym~
1-762 gym~ ~mt~ ~nl~k~
61230/95 BF-659-32 . 2-93-PSL-1-206 Visual sheets1 and3, but notwithsheet4. Engineering reviewed thedrawing and identified the as-found configuration to be correct. A D.C.R. was generated to revise the drawing.
XRQ ~r~l IIUJIIIUU ggmf~
1-207 1-762 61230/97 gym~
BF-659-32
+j~l~ ~n 3-93-PSL-1-207 Visual Dl I I sheets1 and3, but notwithsheet4. Engineering reviewed the drawing and identified the as-found configuration to be correct. A D.C.R. was generated to revise the drawing.
~T ~N gyral ~r l!UUUUU gym~ 1~ ~imi~ ggg~ Qy~t~ ~nm~
1-226 1-775 19073 RC-246-H3 8-93-PSL-1-226 Functional Dl I Engineering performed a detailed evaluation of the test results and determined that the reported anomaly did not cause any code overstress or overload conditions. The root cause can be attributed to aging. Replacement of the failed snubber with a functionally tested spare is acceptable. Spare snubber PSA-1/4, SN-38013, was installed.
Xaa KQH Rex4~J Hark ~IUUU Jl~t~
1-236 gym t~
1-771
~m~
38496 gym'~
SI-101-6 Qy~t~
5-93-PSL-1-236 Amm~t Functional reported anomaly did not cause any code overstress or overload conditions, The root cause can be attributed to aging. Oue to the repeated failers ln this snubber location, it was replaced with an upgrade using a Lisega snubber, model 3018RF1 as specified ln PCM-278-192. Snubber LSG-3018, SN-61211/36,was installed.
~T QQQ ~(~I ~DI i~
~Nm 1-237 t~ Qymt~
1-770 gym~ gym~~J.')mt~ ~n~tg 38490 SI-1 01-13 7-93-PSL-1-237 Functional Dl I I l reported anomaly did not cause any code overstress or overload conditions. The root cause can be attributed to aging. Due to the repeated failers in this snubber bcation, it was replaced with an upgrade using a Lisega snubber, model 3018RF1 as specified ln PCM-278-192. Snubber LSG-3018, SN-61211/99, was installed.
St. Lucie Unit N Snubber Summary Report - 1993 Refueling Outage Summary of Test Results and Corrective Action
Section 4.0 St Lucie Unit Functional Test Results TENSlON COMP RESSlON Breakaway n/a n/a n/a nla TAG ¹ 1-003 lnltfal Drag 1144.6 PASS 1541.6 PASS Mark ¹ SS-3-1A Actlvatlon 2.36 PASS 2.46 PASS Type & S/N ITT-200, 4301 Test Load 38039 PASS 37283 PASS Devlatlon n/a Final Drag 1079.2 PASS 1417.8 PASS NCR n/a Lockup n/a n/a n/a n/a Bcpl acem't ITT-200, 5568 Bleed Rate nla nla n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ 1-004 fnltfal Drag 1563.9 PASS 1331.3 PASS Mark ¹ SS-4-1A Actfvatlon 2.60 PASS 2.49 PASS Type & S/N ITT-200, 5574 Test Load 37403 PASS 31907 PASS Devlatlon 11/12-93-PS L-1-004 Final Drag 1466.9 PASS 1094.6 PASS NCR n/a Lockup n/a n/a n/a n/a Rep 1acem't ITT-200, 5582 Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a nla n/a TAG ¹ 1-007 lnltfal Drag 1232.5 PASS 1273.5 PASS Mark ¹ SS-7-1A Actlvatlon 2.54 PASS 2.64 PASS Type & S/N ITT-200, 5580 Tost Load 38498 PASS 30760 PASS Devlatfon n/a Final Drag 1078.0 PASS 1118.6 PASS NCR n/a Lockup n/a n/a nl'a nla Replacem't ITT-200, 4301 Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ 1 -008 Inltlal Drag 917.4 PASS 1380.7 PASS Mark ¹ SS-8-1A Actlvatlon 2.61 PASS 2.64 PASS Type & S/N ITT-200, 5582 Tost Load 43467 PASS 55008 PASS Devlatlon n/a Ffnal Drag 799.3 PASS 1269.9 PASS NCR n/a Lockup n/a n/a n/a n/a Rep 1acem't ITT-200, 5570 Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ 1-01 3 lnltlal Drag 1615.3 PASS 1539.4 PASS Mark ¹ SS-13-1 B Actlvatlon 2.66 PASS 2.53 PASS Type 8 S/N ITT-200, 5577 Test Load 26738 PASS 40653 PASS Devlatlon n/a Ffnal Drag 1411.0 PASS 1395.9 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't ITI -200, 5574 Bleed Rate n/a n/a n/a n/a Breakaway nla n/a n/a n/a TAG ¹ 1-0 I 7 lnltlal Drag 96.0 PASS 106,1 PASS Mark ¹ 1A1 Actlvatlon n/a PASS n/a PASS Type & S/N ITI-35, 111?8 Test Load 20820 PASS 20295 PASS Devlatlon n/a Ffnal Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Rep lacem't n/a Bleed Rate n/a n/a n/a n/a
0 TEST RESULTS CONTINUED TENSION COMPRESSION Breakaway n/a n/a n/a n/a TAG ¹ 1-021 lnltlat Drag 19.7 PASS 11.9 PASS Mark ¹ RC-005-34A Actlvatlon 0.013 PASS 0.01$ PASS Type & S/N PSA-3, 105 Test Load 4505.2 PASS 4342.1 PASS Devlatlon n/a Final Drag 20.8 PASS 10.8 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Blood Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 0 1-022 Initial Drag 55.4 PASS 97.5 PASS Mark ¹ RC-005-34B Actlvatlon n/a n/a n/a n/a Type & S/N LSG-3062, 61245/200 Test Load 17529.7 PASS 17483.2 PASS Devlatlon n/a Ffnal Drag n/a nla n/a n/a NCR n/a Lockup nla n/a n/a n/a Rep lacem't n/a Bleed Rate nla n/a nla n/a Breakaway n/a . n/a n/a n/a TAG 0 1-023 'lnltlal Drag 33.6 PASS 47.7 PASS Mark ¹ RC-005-36 Actlvatlon 0.020 PASS 0.017 PASS Type & S/N PSA-10, 167 Test l oad 11067.7 PASS 10813.9 PASS ~
Devlatlon n/a Final Drag 23.7 PASS 16.6 PASS NCR n/a Lockup nla n/a n/a n/a Replacem't n/a Bleed Rate nla n/a n/a nla Breakaway n/a n/a n/a n/a TAG 4 1 -024 lnltlal Drag 22.9 PASS 29.1 PASS Mark ¹ RC-005-12A Actlvatlon 0.019 PASS 0.019 PASS Type & S/N PSA-10, 166 Test Load 12178.7 PASS 11075.7 PASS Devlatlon n/a Ffnal Drag 22.9 PASS 30.9 PASS NCR 'n/a Lockup nla n/a n/a n/a Replacem't n/a Blood Rate n/a n/a n/a n/a Breakaway n/a n/a n/a TAG 1-035 Mark ¹ Inf MS-1076-316 lnltlal Drag Actlvatlon Test Load 10.7 0.011 PASS PASS 14.5 0.007 '/a PASS PASS Type & S/N PSA-3, 19348 5385.0 PASS 4802.7 PASS Devlatlon n/a Final Drag 13.4 PASS 11.7 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Rate
'leed n/a n/a n/a n/a Breakaway n/a n/a n/a TAG 0 1-052 lnltlal Drag 229.7 . PASS 159.1 PASS Mark ¹ BF-549-17 Actlvatlon 0.020 PASS 0.014 PASS Type & S/N PSA-100, 1241 Test Load 99990 PASS 97730 PASS Devlatlon n/a Final Drag 319.2 PASS 228.9 PASS NCR n/a Lockup n/a n/a Replacem't n/a Bleed Rate n/a n/a Breakaway n/a n/a n/a n/a TAG 4 1-070 lnltlal Drag 163.7 PASS 141.0 PASS Mark ¹ S(-971-6229 Actlvatlon n/a PASS n/a PASS Type & S/N PMH-2200, 1424 Test Load 13145.8 PASS 13319.0 PASS Devlatlon n/a Final Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a
TEST RESULTS CONTINUED TENSION COMPRESSION Broakaway n/a n/a n/a n/a TAG ¹ 1-073 lnltlal Drag 30.1 PASS 40.5 PASS Mark 0 S l-972-6240 Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3052, 61233/32 Test Load 5307.7 PASS 5390.9 PASS Devlatlon n/a Final Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bloed Rate n/a n/a n/a n/a Breakaway n/a n/a nla n/a TAG ¹ 1-085 lnltlal Drag 114.7 PASS 15.7 PASS Mark 4 S I-676-127 Actlvatlon 0.017 PASS 0.013 PASS Type & S/N PSA-10, 115 Test Load 11427.4 PASS 11081.8 PASS Devlatlon n/a Final Drag 13.9 PASS 17.1 PASS NCR n/a Lockup n/a n/a nla n/a Rep1acem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ 1-101 lnltlal Drag 28.2 PASS 39.1 PASS Mark 0 CC-17-1 Actlvatlon 0.019 PASS 0.013 PASS Type & S/N PSA-10, 16443 Test Load 11458.1 PASS 10920.2 PASS Devlatlon n/a Final Drag 31.9 PASS 39.1 PASS NCR n/a Lockup nla n/a nla n/a Replacem't n/a Bleed Rate nla n/a n/a nla Breakaway -
n/a .-n/a' "n/a n/a TAG ¹ 1-114 lnltlal Drag 29.3 PASS 41.4 PASS Mark 0 S I-971-6240 Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3052, 61233/33 Test Load 5256.4 PASS 5320.6 PASS Devlatlon n/a Final Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bloed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ lnltlal Drag 6.7 PASS 12.0 PASS Mark 4 RC-1-124 B Actlvatlon 0.007 PASS 0.006 PASS Type & S/N PSA-1, 26007 Test Load 1284.5 PASS 1272.1 PASS Devlatlon n/a Final Drag 11.4 PASS 9,9 PASS NCR n/a Lockup nla n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ 1-121 lnltlal Drag 2.7 PASS 3.8 PASS Mark ¹ RC-5-475 Actlvatlon 0.013 PASS 0.012 PASS Type & S/N PSA-1/4, 19778 Test Load 287.3 PASS 258.8 PASS Devlatlon n/a Final Drag 2.7 PASS 3.4 PASS NCR n/a Lockup n/a n/a n/a n/a
,Replacem't n/a- Bleed Rate n/a n/a n/a Breakaway n/a nla n/a n/a TAG ¹ 1-124 lnltlal Drag 1.7 PASS 1.8 PASS Mark 4 CH-65-54G Actlvatlon 0.011 PASS 0.008 PASS Type & S/N PSA-1/4, 36531 Tost Load 289.6 PASS 288$ PASS Devlatlon n/a Final Drag 1.7 PASS 1.7 PASS NCR n/a Lockup n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a
TEST RESULTS CONT/NUED TENSION COMPRESSION Breakaway n/a n/a n/a n/a TAG 0 1-126 Inltlal Drag 7.3 PASS 14.3 PASS Mark ¹ CH-143-30C Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3018, 61211/82 Tost Load 534.7 PASS 531.1 PASS Devlatlon n/a Final Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ i -128 Inltlal Drag 1.9 PASS 2.6 PASS Mark ¹ MS I-22-3A Actlvatlon 0.008, PASS 0.006 PASS Type.& S/N PSA-1/4, 38527 Test Load 296.2 PASS 269.2 PASS Devlatlon n/a Final Drag 2.0 PASS 2.2 PASS NCR n/a Lockup n/a n/a n/a n/a Reptacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 0 1-129 Inltfal Drag 6.8 PASS 7.9 PASS Mark ¹ RC-1-124C Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3018, 61211/64 Tost Load 577.7 PASS 552.3 PASS Devlatlon n/a Final Drag n/a n/a . n/a n/a NCR n/a Lockup n/a nla n/a n/a Repfacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 4 1-332 Inltlal Drag 5.2 PASS 3.2 PASS Mark ¹ CH-125-356 Actlvatlon 0.016 PASS 0.026 FAIL Type 8 S/N PSA-1/4, 38490 Test Load 271.7 PASS 116.3 PASS Devlatlon 6-93-PSL-1-132 Ffnal Drag 3.4 PASS 4.9 PASS NCR 1-769 Lockup n/a n/a n/a n/a Replacem't PSA-1/4, 11432 Blood Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 4 1-134 lnltlal Drag 8.4 PASS 7.1 PASS Mark ¹ CH-129-339 Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3018, 61211/39 Test Load 571.1 PASS 567.3 PASS
- Devlatlon n/a Final Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Rep lacem't n/a Bloed Rate n/a n/a n/a n/a Broakaway n/a n/a n/a n/a TAG 4 1-135 lnltlal Drag 2.5 PASS 2.8 PASS Mark ¹ RC-220-105 Actfvatlon 0.009 PASS ~
0.008 PASS Type & S/N PSA-1/4, 19085 Test Load 297.7 PASS 286.6 PASS Devlatlon n/a Final Drag 2.7 PASS 2.5 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a . Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 4 1-136 Inltlal Drag 2.3 PASS 3.2 PASS Mark ¹ RC-217-5 Activation 0.014 PASS 0.011 PASS Type & S/N PSA-1/4, 36995 Test Load 288.1 PASS . 246.5 PASS Devlatlon n/a Ffnal Drag 2.5 PASS 2.8 PASS NCR n/a Lockup n/a n/a n/a n/a Rep lacem't n/a Bloed Rate n/a n/a n/a n/a
II 0
7ES7 RESULTS CONTINUED TENSION COMPRESSION Breakaway n/a n/a n/a n/a TAG ¹ 1-137 lnltlal Drag 8.5 PASS 10.6 PASS Mark ¹ CH-1 29-339 Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3018, 61211/1 01 Test Load 587.0 PASS 576.3 PASS Devfatlon n/a Final Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ 1-141 Inltlal Drag 3.4 PASS 4.5 PASS Mark ¹ CH-1 43-26C Actlvatlon 0.012 PASS 0.012 PASS Type & S/N PSA-1/4, 37654 Test Load 267.2 PASS 256.3 PASS Deviation n/a Final Drag 2.9 PASS 4.5 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a
'/a Breakaway n/a n/a n/a TAG ¹ 1 -342 Inltlal Drag 3.6 PASS 3.1 PASS Mark ¹ CH-141-74 Actlvatlon 0.006 PASS 0.006 PASS Type & SIN PSA-1/4, 36991 Test Load 300.7 PASS 285.6 PASS Devlatlon n/a Final Drag 3.6 PASS 3.1 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ 1- l43 Inltlal. Drag 4.9 PASS 5.1 PASS Mark ¹ B-2-H1 Actlvatlon 0.010 PASS 0.008 PASS Type 8 S/N PSA-1, 15149 Test Load 1365.5 PASS 1332.7 PASS Devlatlon n/a Final Drag 5.3 PASS 5.3 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ I -145 Inltlal Drag 10.8 PASS 9.5 PASS Mark ¹ CH-143-34C Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3018, 61211/26 Test Load 574.9 PASS 566.2 PASS Devlatlon n/a Final Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Re pl ace m't n/a Bleed Rate . n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG "¹ 1 -1 47 Inltlal Drag 26.2 FAIL 34.8 FAIL Mark ¹ CH-141-36C Actlvatlon 0.011 PASS 0.008 PASS Type & S/N PSA-1/4, 19101 Test Load 298.9 PASS 285.2 PASS Devlatlon 4-93-PS L-1-147 Final Drag 21.4 FAIL 27.6 FAIL NCR 1-772 Lockup n/a n/a nfa n/a Rep lacem't PSA-1/4, 38523 Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a
.TAG ¹ i-151 Inltlal Drag 4.1 PASS 6.7 PASS Mark ¹ CH-142-17 Actlvatlon 0.007 PASS 0.007 PASS Type & S/N PSA-1/4, 38498 Test Load 236.6 PASS 265.8 PASS Devlatlon 9-93-PSL-1-151 Final Drag 2.6 PASS 6.0 PASS NCR n/a Lockup n/a n/a n/a n/a Replace m't n/a Blood Rate n/a n/a . n/a n/a
TES7 RES UL7S CON7/NUEO TENSION COMPRESSION Breakaway n/a n/a n/a n/a TAG ¹ 1-161 Inltlal Drag 6.5 PASS 10.2 PASS
' Mark ¹ Devlatlon RC-165-11 Type & S/N LSG-3018, 61213/82 n/a Activation Test Load Final Drag
'n/a 583.9 n/a PASS PASS n/a n/a 575.6 n/a PASS PASS n/a NCR n/a Lockup n/a n/a n/a n/a Rep lacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 4 1-165 Inltlal Drag 3.5 PASS 3.4 PASS Mark ¹ RC-221-148 Actlvatlon 0.008 PASS 0.009 PASS Type & S/N PSA-1/4, 38491 Test Load 301.2 PASS 265.2 PASS Devlatlon 10-93-PSL-1-165 Final Drag 3.3 PASS 3.3 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 4 1-170 Inltlal Drag 3.1 PASS 3.9 PASS Mark ¹ RC-220-112 Actlvatlon 0.007 PASS 0.007 PASS Type & S/N PSA-1/4, 38494 Test Load 292.3 PASS 290.9 PASS Devlatlon n/a Final Drag 3.3 PASS 3.1 PASS, NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 4 1-178 lnltlal Drag 2.9 PASS 4.6 PASS Mark ¹ MSI-2-H1 Actlvatlon 0.010 PASS 0.010 PASS Type & S/N PSA-1/4, 20194 Test Load 271.8 PASS 263.0 PASS Devlatlon n/a Final Drag 3.9 PASS 3.5 PASS NCR n/a Lockup n/a n/a n/a n/a Rep lacem't n/a Bleed Rate n/a n/a n/a n/a Break'away n/a n/a n/a n/a TAG 4 1-177 Inltlal Drag 3.9 PASS 7.5 PASS Mark ¹ RC-222-43 Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3018, 61211/1 1 Test Load 569.0 PASS 560.0 PASS Devlatlon n/a Ffnal Drag n/a n/a n/a , n/a NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a TAG ¹ i-184 Inltlal Drag 5.4 PASS 4.8 n/a PASS Mark ¹ RC-218-26 Actlvatlon 0.011 PASS 0.010 PASS Type & S/N PSA-1/4, 20209 Test Load 249.1 PASS 256.8 PASS Devlatlon n/a Final Drag 6.3 PASS 4.1 PASS NCR n/a Lockup n/a n/a n/a n/a Rep lacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 0 1-185 lnltlal Drag 10.0 PASS 10.4 PASS Mark ¹ CH-64-45A Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3018, 61211/1 00 Test Load 587.6 PASS '581.7 PASS Devlatlon n/a Final Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a
7EST RESULTS CONTINUED TENSION COMPRESSION Breakaway n/a n/a n/a n/a TAG ¹ 1-187 lnltlal Drag 4.6 PASS 5.0 PASS Mark ¹ SI-69-60 Actlvatlon 0.007 PASS 0.006 PASS Type & S/N PSA-1/4, 36992 Test Load 312.7 PASS 278.2 PASS Devlatlon n/a Final Drag 4.6 PASS 4.6 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Blood Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ 1-194 lnltlal Drag 7.4 PASS 11.3 PASS Mark ¹ MSH-7B Actlvatlon 10.8 FAIL 11.02 FA1L Type & S/N LSG-3018, 61211/34 Tost Load 575.2 PASS 666.9 PASS Devlatlon 13-93-PS L-1-194 Final Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ Inltlal Drag 3.6 PASS 6.7 PASS Mark ¹ MSH-7A Actlvatlon n/a PASS n/a PASS Type & S/N AD-41, 1397 Tost Load 321.1 PASS 296.4 PASS Devlatlon 14-93-PSL-1-196 Final Drag 6.6 PASS 6.5 PASS NCR n/a Lockup n/a n/a n/a n/a Rep lacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a TAG ¹ 1-200 Inltfal Drag 11.0 PASS 12,4 n/a PASS Mark ¹ CS-678-1930 Actlvatlon 0.010 PASS 0.010 PASS Type & S/N PSA-1,12754 Test Load 1284.5 PASS 1266.7 PASS Devlatlon n/a Final Drag 11.9 PASS 10.2 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bloed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a TAG ¹ 1-203 Inltlal Drag 5.1 PASS 7.0 n/a PASS Mark ¹ CH-240-H10 Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3018, 61211/37 Tost Load 657.4 PASS 546.7 PASS Devlatlon n/a Final Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Rep lacem't n/a Bleed Rate n/a n/a n/a n/a n/a n/a TAG ¹ 1-206 Breakaway lnltlal Drag 85.9 PASS n/a 103,2 n/a PASS Mark ¹ BF-659-32 Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3062, 61230/95 Tost Load 18474.7 PASS 18590.0 PASS Devlatlon 2-93-PS L-1-206 Final Drag n/a n/a n/a n/a NCR 1-762 Lockup n/a n/a n/a n/a Replacem't n/a Bloed Rate nla n/a n/a nla Breakaway n/a TAG ¹ 1-207 Inltlal Drag 43.5 n/a PASS n/a 111,0 n/a PASS Mark ¹ BF-659-32 Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3062, 61230/97 Tost Load 18420.0 PASS 18455.3 PASS Devlatlon 3-93-PSL-1-207 Final Drag n/a n/a n/a nla NCR 1-762 Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a
0 0
7ES7 RESULTS CONTINUED TEN SlON COMPRESSION Breakaway n/a n/a n/a n/a TAG ¹ 3-208 lnltlal Drag 94.8 PASS 60.3 PASS
' Mark ¹ Type & S/N Devlatlon MS-649-33 PSA-35, 8472 n/a Actlvatlon Tost Load Final Drag 0.016 37310 131.8 PASS PASS PASS 0.0'I1 40550 29.5 PASS PASS PASS NCR n/a Lockup n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ 1-209 lnltlal Drag 54.2 PASS 100.1 PASS Mark ¹ MS-649-33 Actlvatlon 0.014 PASS 0.012 PASS Type & S/N PSA-35, 8460 Test Load 40210 PASS 39370 PASS Devlatlon n/a Final Drag 50.4 PASS 109.9 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a . n/a TAG ¹ 3-2'1 8 Inltlal Drag 3.9 PASS 4.9 PASS Mark ¹ B-9-501 Actlvatlon 0.010 PASS 0.008 PASS Type & S/N PSA-1, 2882 Test I.oad 1304.4 PASS 1303.0 PASS Devlatlon n/a Final Drag 4.0 PASS 3.9 PASS NCR n/a Lockup n/a n/a n/a n/a Rep lacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ l-23 9 lnltlal Drag 2.3 PASS 2.6 PASS Mark ¹ CH-235-H9 Actlvatlon 0.012 PASS 0.012 PASS Type & S/N PSA-1/4, 11408 Test Load 301.7 PASS 280.1 PASS Devlatlon n/a Final Drag 2.3 PASS 1.7 PASS NCR n/a Lockup n/a n/a n/a n/a Rep lacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ 1-220 Inltlal Drag 6.8 PASS 9.0 PASS Mark ¹ CH-235-H10 Actlvatlon 0.010 PASS 0.012 PASS Type & S/N PSA-1/2, 10720 Tost Load 545.8 PASS 506.4 PASS Devlatlon n/a Final Drag 7.0 PASS 8.4 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TA'G ¹ 1-221 lnltlal Drag 3.1 PASS 2.7 PASS Mark ¹ CH-235-H11 Actlvatlon 0.013 PASS 0.011 PASS Type & S/N PSA-1/4, 19081 Tost Load 277.2 PASS 289.8 PASS Devlatlon n/a Final brag 2.3 PASS 3.3 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bloed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG ¹ 'i-225 Inltlal Drag 9.0 PASS 5.1 PASS Mark ¹ RC-245-H1 Actlvatlon 0.010 PASS 0.008 PASS Type & S/N PSA-1, 12112 Test Load 1265.6 PASS 11263.8 PASS Devlatlon 1-93-PS L-1-225 Final Drag 9.1 PASS 6.3 PASS NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a
'J TEST RESULTS CONTINUED TENSION COMPRESSION Breakaway n/a n/a n/a n/a TAG 0 1-226 Inltlal Drag 2.3 PASS 4.8 PASS e Mark ¹ Type & S/N Devlatlon NCR RC-246-H3 PSA-1/4, 19073 8-93-PS L-1-226 1-775 Actlvatlon Test Load Final Drag Lockup 0.027 69.8 2.6 n/a FAIL PASS PASS n/a 0.026 83.0 3.6 n/a FAIL PASS PASS n/a Replacem't PSA-1/4, 38013 Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 4 1-229 Inltlal Drag 3.5 PASS 7.9 PASS Mark ¹ RC-247-H3 Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3018, 61211/41 Test Load 563.8 PASS 556.9 PASS Devlatlon n/a Final Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Replacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 4 1-230 lnltlal Drag 6.0 PASS 9.5 PASS Mark ¹ RC-247-H5 Actlvatlon n/a PASS n/a PASS Type & S/N LSG-3018, 61211/86 Test Load 554$ PASS 552.7 PASS Devlatlon n/a Final Drag n/a n/a n/a n/a NCR n/a Lockup n/a n/a n/a n/a Rep lacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 0 1-236 lnltlal Drag 8.4 PASS 5.3 PASS Mark ¹ SI-101-6 Actlvatlon 0.014 PASS 0.013 PASS Type & S/N PSA-1/4, 38496 Test Load 266M PASS 279.0 PASS Devlatlon 5-93-PS L-1-236 Final Drag 5.7 PASS 6.3 PASS NCR 1-771 Lockup n/a n/a n/a n/a Rep lacem't LSG-3018, 61211/36 Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 0 1-237 lnltlal Drag 6.2 PASS 19.8 FAIL Mark ¹ SI-101-13 Actlvatlon 0.021 FAIL 0.023 FAIL Type & S/N PSA-1/4, 38502 Tost Load 280.6 PASS 84.1 PASS Devlatlon 7-93-PSL-1-237 Final Drag 4.8 PASS 6.5 PASS NCR 1-770 Lockup n/a n/a n/a n/a Replace m't LSG-3018, 61211/99 Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a TAG ¹ 1-238 fnltlal Drag 256M PASS n/a 244.4 n/a PASS Mark ¹ MS-649-275 Actlvatlon'.017 PASS 0.015 PASS Type & S/N PSA-100, 2126 Test Load 10014 PASS 10519 PASS Devlatlon n/a Final Drag 243.5 PASS 264.3 PASS NCR n/a Lockup n/a n/a n/a n/a Rep lacem't n/a Bleed Rate n/a n/a n/a n/a Breakaway n/a n/a n/a n/a TAG 0 1-242 fnltlal Drag 112.8 PASS 135.3 PASS Mark ¹ S I-971-6229 Actlvatlon n/a PASS n/a PASS Type & S/N PMH-2200, 1890 Test Load 13311.2 PASS 13384.0 PASS Devlatlon n/a Final Drag n/a nla n/a n/a NCR n/a . Lockup .n/a n/a n/a n/a Rep lacem't n/a Bleed Rate n/a n/a n/a
TEST RESULTS CONTINUED TENSION COMPRESSION Breakaway nla n/a nla n/a TAG 4 1 -243 lnltlal Drag 4.8 PASS 5.8 PASS Mark ¹ RC-95-H3A Actlvatlon n/a PASS n/a PASS Type & S/N AD-41, 1335 Test Load 334.6 PASS 307.1 PASS Devlatlon n/a Final Drag 5.2 PASS 5;6 PASS NCR n/a Lockup nla n/a nla n/a Replacern't n/a Bleed Rate n/a n/a n/a n/a
Re: St. Lucie Unit
~
~ ~
1 Docket No. ~ 50-335 1993 Spring Refueling Outage
~ ~
Inservice Ins ection Re orts
~ ~
ENCLOSURE 2 NIS-2 Owner's Re orts of Re airs and Re lacements
1993
SUMMARY
REPORT SUBMITTAL Page 20 of 22 APPENDIX 6 NIS-2 OWI.'MRS'EPORT FOR REPAIRS AZ6) REPLACEMENTS
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~00 2 FORM NIS-2 OiVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. , Florida Power & Light Co. Date: 6/4/93 P.O. Box 529100 SheeL I of Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: NA Jensen Beach, FL 34957 PCM ¹: 026-192M
- 3. Work Pcrformcd By: Florida Power &, Light Co. PWO¹: 3446 6501 South Hwy. A1A WO ¹: 88023046 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdentiTication of System: Component Cooling Water Type Code Symbol Stamp N/A YPH-1 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31,7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components; 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Spring Can Bergen Paterson NA Type: VS1A Replaced Size 15 Spring Can Bergen Paterson NA NA Type 3100A NA Replacement N Size 15 R<<Eyes Bergen Paterson NA NA 1/4" x 13" 1991 Replacement CS-A-36
- 7. Description of Work: Replace spring can located on line I-24"-CC-11 in accordance with PCM 026-192M.
t~~
- 8. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure (ISLT)
Other: VT VT2~ VT3 X ~psig Test Temp.~'F
PSL-1, NIS-2 TRACKING NO. S L - 1 - 1 1 -~00 2 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory VT 3 8 4 inspection was performed and witnessed by a certified inspector.
- 10. Inspection Report Numbers: M92-127 APPLlCABLE MANUFACTURES DATA REPORTS TO BE ATTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this /Repair X'eplacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Owner or Owner's Designee, Title
& (g/V Dale ~Pu'7 19~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ff11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or toss of any kind arising from or connected with this. inspection.
Commissions Inspector's S gnature National Board, State, Providence and Endorsement Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1 -~00 3 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- l. Owner: Florida Power & Light Co. Date: 6/7/93 P.O. Box 529100 Sheet:
Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: NA Jensen Beach, FL 34957 PCM ¹: NA 3, Work Performed By Florida Power & Light Co. PWO¹: 2871 6501 South Hwy. A1A WO ¹: 90027900 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Safety Injection Type Code Symbol Stamp N/A V3463 Authorization No. N/A (b) Component identification:
(Maik Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicablc Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Studs (1/2" -13 unc Velan NA ASTM A- 453 1970 Replaced N x 1 3/4")
Studs (1/2" -13 unc Nova 868450 NA SA 564 1992 Replacement x 1 3/4") Gr 630 Nuts (1/2"-13 unc A 194, GI'8 1970 2B'elan 2B'uts (1/2"-13 unc Nova 15964 NA NA SA 194, Gr8 1992 Replaced Replacement N
- 7. Description of Work: Replace valve bonnet bolting on line l-2"-SI-485.
- 8. Tests Conducted: Hydrostatic Other:VT 1
~ Pneumatic VT 2 X
+
VT 3 ~pstg Test Temp ~'P Nominal Operating Pressure (ISLT) X
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~00 3 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leak test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1099 APPLtcABLE MANuFACTURES DATA REPoRTB To BE ATTACHED Certificate of Compliance We cerdty that the statements made In the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of uthorization No.: N/A Signed 0 ner or 0 er's Designee, Title Date ~o 19~
CERTIFICATE,OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspecto s Signature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~00 0 FORM NIS-2 OKVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power A Light Co. Date: 6/3/93 P.O. Box 529100 Sheet:
Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: NA Jensen Beach, FL 34957 PCM ¹:
- 3. Work Performed By: Florida Power A, Light Co, PWO¹'611 6501 South Hwy. A1A WO ¹: 92002804 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Main Steam Type Code Symbol Stamp N/A Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Rcplaccmcnt Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. (Y or N)
OI'eplacement V08171 Velan New weld no: NA A-1 "05 NA Repaired 92-207
- 7. Description of Work: Performed weld build up of damaged bonnet stud holes. Valve installed in line l-4"-MS-1 3.
- 8. Tests Conducted: Hydrostatic Other:VT1
~ VT2 Pneumatic X VT3 .
Nominal Operating Pressure (ISLT) X
~pstg Test Terep.~'F
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~00 5 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: Final visual & PT performed per weld repair program. A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1OQQ APPLICABLE MANUFACTURES DATA REPORTS TO BE ATTACHED Certificate of Compliance We cerdty that the statements made in the report are correct and this +XRepalr Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed wner or Owner's Designee, Title Date ~dWd, 19~9 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~00 6 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provlstons of the ASME Code Sectfon XI
- 1. Owner. Florida Power k Light Co. Date: 8/30/93 P.O. Box 529100 Shccl 1 of 3 Mami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: NA Jensen Beach, FL 34957 PCM ¹: 281-189 3, Work Performed By; Florida Power k Light Co. PWO¹: 2213 6501 South Hwy. A1A WO ¹: 91033284 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Intake Cooling Water Type Code Symbol Stamp N/A .
ICW PP 1B Authorization No, N/A (b) Component Identification:
(Matk Number) Expiration Date N/A (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: N A (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement ICW Pump Byron Jackson 701-N-0852 1 stage 1972 Replaced vertical ICW Pump Byron Jackson 701-N-854 NA 1 stage 1972 Replacement Johnston Pum vertical Column Studs 1"-8 unc 2A-5" Allied Nut & Heat ¹ SA-193 NA Replacement Bolt 34623 Gr B8M Column Nuts 1"-8 unc 2B Allied Nut & Heat ¹ A194 NA Replacement Bolt 702804 Gr 8M Dfsch. Head Studs 3/4"-1 0 unc 2A Allfed Nut & Heat ¹ NA SA-193 NA Replacement Bolt N9426 Gr B8M Disch. Head Nuts 3/4"-10 unc 2A Allied Nut & Heat ¹ A194 NA Replacement Bolt 506225 Gr 8M
- 7. Description of Work: Replace discharge head, three pump columns, impeller case 8 suction bell in accordance with Self Lube modification instructions as provided by PCM 281-189. Work scope also fncfuded replacement of various boltfng.
- 8. Tests Conducted: Hydrostatic Other: VT 1
~ Pneumatic VT 2 X VT 3 Nominal Operating Pressure (ISLT) X
~pslg Test Temp.~'p
PSL-1, NIS-2 TRACKING NO. S L 1 1 -~00 6 FORD NIS-2 (Back) Sheet 2 of 3
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a YT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1022 APPLICABLE MANUFACTURES DATA REPORTS TO BE ATTACHED Certificate of Compliance We csrlify that ths stalemsnle made in the report are correct and this +Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Date wner or Own r'esignee CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~00 6 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI SUPPLEMENTAL SHEET
- 1. Owner. Florida Power & Light Co. Date: 8/30/93 P.O. Box 529100 Miami, FL 33152 Sheet: 3 of 3
- 2. Plant: St. Lucie Plant Unit ¹: 1 6501 South Hwy. AlA Jensen Beach, FL 34957 P.O. ¹: NA
- 3. Work Performed By: Florida Power & Light Co, PCM ¹: 281-189 6501 South Hwy. AIA Jensen Beach, FL 34957 PWO ¹: 2213 XA¹: 91033284 CWO ¹: NA Process Sheet: N/A Repair Organization P.O. NoJob No., ect.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A 4, Identification of System: Intake Cooling Water
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. ~ Addcrxh (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1983 Edition, thru the Summer 1983 addenda
- 6. Identification of Components Repaired or Replaced and Replacement Components:
National Replaced ASME Name of Name of Manufacturer Other Year Code Board Repaired Component Manufacturer Serial No. Identification Built No. or Stamped Replacement (Y or N)
Suet. Bell Studs Nova Heat ¹ NA A-1 93 NA Replacement 3/4"-10 unc 2 0130 G B8 Suet. Bell Studs Allied Nut & Heat ¹ ,NA A-1 94 Replacement 3/4"- 0 unc 2B Bol 506225 Gr 8 Impel. Case Stud Allied Nut & Heat ¹ A-193 Replacement 3/4"-10 unc 2A Bol N9426 Gr B8M Impel. Case Nuts Allied Nut & Heat ¹ NA A-194 NA Replacement 3/4"-10 unc 2B Bolt 506225 Gr SM Suet. Bell Nuts Byron N/A A-194 N/A Replaced 3/4-10UNC28 HH Jackson GR SM Suction Bell Nuts Allied Nut & Heat ¹ N/A A-194 N/A Replacement 3/4'-10UNC28 HH Bol 506255 GR SM
PSL-1, NIS-2 TRACKING NO. S L-1-1 1 -~01 1 FORM NIS-2 ON'NERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provtstons of the ASME Code Sectton XI
- 1. Owner: Florida Power A Light Co. Date: 8/26/93 P.O. Box 529100 S lice L' of Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: NA Jensen Beach, FL 34957 PCM ¹: 284-190M
- 3. Work Performed By: Florida Power 4 Light Co. IWO¹: 0103 6501 South Hwy. A1A WO ¹: 90027459 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Intake Cooling Water Type Code Symbol Stamp N/A 14 -CW405 Authorization No. N/A (b) Component klentification:
(Mark Number) Expiration Date N/A (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: N A (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped or
'ART Material No. No. (Y or N)
Replacement Rigid Strut Bergen RIR ¹ 3AD- ¹ NA Replacement Patterson 6100 2252-7
- 7. Description of Work: Replace rigid strut installed on line l-3"-CW-305 due to bent rod. Replacement performed in accordance with PCM 284-190M.
- 8. Tests Conducted: Hydrostatic Other: VT \
~ VT2 Pneumatic VT3 NA ~pstg Test Temp ~'P Nominal Operating Pressure (ISLT)
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~01 1 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: None.
- 10. Inspection Report Numbers:
APPLICABLE MANUFACTURE'S DATA REPORTS TO BE ATTACHED Certificate of Compliance We cerlity that the statements made In the report are correct and thts QRepatr +XReplacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A I
Signed Date ~F>< 19~
w r or Owner'esignee, e CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle tf11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Sign ture National Board, State, Providence and Endorsement 19~
PSL-I, NIS.2 TRACKING NO. S L I \ -~pl FORM NIS.2 OWNER'S REPORT FOR REPhlRS OR REPLhCEMENTS hs Requlrcd by tbe Provisions of the hSME Code Sectton XI
- 1. Owner. Florida Power & Light Co, Date: NR'/ d6 I 109 P.O. Box 529100 Sheet:
Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: <//t Jensen Beach, FL 34957 PCM ¹: >bI 3 Work Performed By Florida Power & Light Co. PWO ¹: N//ri 6501 South Hwy. AIA wo¹: N//)
Jensen Beach, FL 34957
- 4. (a) Identificationof System:
CWO ¹: arrl'$C Presses Sh~jqq r/k, Type Code Symbol Stamp N/A bowie Aa.to NaKG-OP Authorizauon No. N/A (b) Component Identification:
(Mad Nu~ Expiration Date N/A (c) Code Ciass:
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case; None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Ediuon thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components; Type of Name of Manufacturer National Other Year Replaced ASME Code
'omponent or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement LlN¹ MO ~
9 F'>PS I 3" Lrll q33 //l kpr.AQelp Her%i NO LIQ8'O 5 t'IP5' IC6R 7 c( - " 433 I'N5 PePLA22lII¹L lS"NurS A/lDV~ ~//) w) R~<
gl 'ambic
/8 toe H641 AtO ~
N/ IP Go1 Ci 3 /CA.Aeni
- 7. Description of Work: RGP~AM& 8.A.N pL/Pl f L)IS QHAR&8 pt PlihJ67, SauipJC hnefSRI ~ QHan'6a> hf OI'PEN F(-/t46r= OAJ
)-$ "-gg- $ 55 4 /OWeR. A.AA)6C DH I-5'-Qtf-9 /
- 8. Tests Conducted; Hydrostatic Pneumatic Nominal Operating Pressure (ISLT)
Olher: VT I VT 28 VT 3 Lrr@psl¹ Test Temp, r 'p
0 t
~
' ~ '
~ ~
~ ~
~ 1 ~ ~ ~ ~ 0
~ ~
~ ~
.~ t~
~ 1 ~ ~ 1 ~ 1 1 11 4,
1 ~ ~ ~ ~ ~ ~ ~ ~ 1 ~ ~
~ 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ 1 1 ~ ~ ~ ~ ~ ~ C ~ ~ ~ ~
1 ~ ~ ' ~ ~ ~ ~ ~ . ~
~ ~ ~ ~ ~ ~
~ ~
~
~
1 0
~
~
~ ~ ~
~
~
~
0
~ ~
4 ~ ~
~ ~ ~ ~: ~, 1 ~ ~
~ ~
~ ~
~ ~ ~ ~ ~ ~ ~ ' ~ ~ ~ ~ ~ ' ~ ~ ~
~ g$ ; ~ I
~ 1 ~
~ $ I 11St ~ ~ 1 ~ .1
~ ~ ~ C
' ~ .: ~
>I
~ ~
" e. =88
~%RESS : II>LH urLa LUNAR
~ LIE
~PHRS uSLN IISLSS
~PRIE
~POLL IIaLIR IISEIR aPRi5
~~P~g+
uaLIE IggLgg r L ltL tAt L
i L
)
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~01 2A FORM NIS-2 ON'NERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1, Owner: Florida Power & Light Co. Date: 9/7/93 P.O. Box 529100 Sheet I of 5 Mami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: NA Jensen Beach, FL 34957 PCM ¹: NA 3 Work Performed By; Florida Power & Light Co. PWO¹: 2274 6501 South Hwy. A1A WO ¹: 91032956 Jensen Beach, FL 34957 CWO ¹: 6430 Process Sheet: N/A
- 4. (a) Identification of System: Boric Acid Makeup Type Code Symbol Stamp N/A (b) Component Identification: I4"H-933 Authorization No. N/A (Maik Number) Expiration Date N/A (c) Code Class: 2
. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: N A (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or PorN)
Replacement 3 SCH40 Pipe Combustion Heat ¹: NA SA-31 2/376 NA Replacement En ineerin W27342 T 304 SS 3" SCK40 Elbow ¹ Custom Alloy Heat NA SA-403 NA Replacement F7607 T 304 SS 3" SGH 40 Elbow Taylor Forge Heat ¹ NA SA-403 NA Replacement Long Radius Stainless LGIK-2 WP 304 2" 90 Degree Elbow Alloy Stainless Heat ¹ NA SA-182 NA Replacement Product Cor . 99788 T 304 SS 3" Pipe Cap Taylor Forge Heat ¹ SA-403 NA Replacement LGRT WP 304 3" Weld Neck RF Ideal Forging & Heat ¹ SA 182 Replacement Flange Hublre. 8654114 T 304 SS
- 7. Description of Work: Replace pipe and elbows between FW 21 and FW 22 due to pin hole leak (Reference NCR 1-738). Additional work peformed by Construction Services on CWO 6430.
- 8. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure (ISLT) t~
~X Other: VT VT2 X VT 3 ~psig Test Temp~'P
PSL-I, NIS-2 TRACKING NO. S L-1-1 1-~01 2 A FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Scctlon XI PI SUPPLEMENTAL SHEET
- 1. Owner. Florida Power h, Light Co. Date: 9/7/93 P.O. Box 529100 Mami, FL 33152 Shcct: 3 of 5
- 2. Plant: St. Lucie Plant Unit ¹: 1 6501 South Hwy. AIA 1
Jcnscn Beach, FL 34957 P.O. ¹: NA
- 3. Work Performed By: Florida Power 4 Light Co. PCM ¹: NA 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 2274 XA ¹: 91032956 CWO ¹: 6430 Process Sheet: N/A Repair Organizauon P.O. No., Job No., cci.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System: Boric Acid Makeup
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition.
(b) Applicable Edition of Section XI Utilized for Repairs and
~ Akhxh Replacement Components 1983 Edition, thru the Summer 1983 addenda.
- 6. IdcntiTication of Components Repaired or Rcplaccd and Replacement Components:
National Replaced ASME Name of Name of Manufacturer Other Year Code B d Repaired Component Manufacturer Serial No. Identification Built N or Stamped Replacement P or N) 3"x 3"x2 WFI Nuclear Heat ¹ Z8 NA SA-182 F304 Replacement Reducln ee oduc s 3" SCH 40 Tee Hub Inc. Heat ¹ SA403 WP NA Replacement 14330 304L 2" SCH 80 Pipe Hub Inc. Heat ¹ SA-312 Replacement 474901 T e304SS CH 933 FW 601 FPL Weld Trav¹ SS 304 '1993 Replacement f
91-2116 CH 933 FW 602 FPL Weld Trav¹ SS 304 1993 Replacement 91-2 17 CH 933 FW 608 FPL Weld Trav¹ SS 304 1993 Replacement 9-286 CH 933 FW 609 FPL Weld Trav¹ SS 304 1993 Replacement 91-1 28 CH 933 FW 610 FPL Weld Trav¹ SS 304 1993 Replacement 91-1288
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~01 2A FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Rettulred by the Provlslons of the ASME Code Section XI SUPPLEMENTAL SHEET
- 1. Owner. Florida Power & Light Co. Date: 9fI/93 P.O. Box 529100 Miami, FL 33152 Sheet: 4 of A'6
- 2. Plant: St. Lucie Plant Unit ¹: 1 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: NA
- 3. Work Performed By: Florida Power & Light Co. PCM ¹: NA 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 2274 XA ¹: 91032956 CWO ¹: 6430 Process Sheet: N/A Repair Organization P.O. No., Job No., ect.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System: Boric Acid Makeup
- 5. (a) ApplicableConstructionCodeANSIB31.7, 1969Edition. ~ Adthxh (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1983 Edition, thru the Summer 1983 addenda
- 6. Identification of Components Repaired or Replaced and Replacement Components:
National Replaced ASME Name of Name of Manufacturer Other Year Code Board Repaired Component Manufacturer Serial No. Identification Built or Stamped Replacement (Y or N)
CH 933 FW 61 1 R2 FPL Weld Travelor ¹ NA 304 SS 1993 Replacement N 92-1289 B CH 933 FW 612 FPL Weld Travelor ¹ NA 304 SS 1993 Replacement N 92-1290 GH 933 FW 613 FPL Weld Travelor ¹ NA 304 SS 1993 Replacement N 92-1291 GH 933 FW 614 FPL Weld Travelor ¹ NA 304 SS 1993 Replacement N 92-1292 CH 933 FW 616 FPL Weld Travelor ¹ NA 304 SS 1993 Replacement N 92-1295 GH 933 FW 617 FPL Weld Travelor ¹ NA 304 SS 1993 Replacement N 92-1296 GH 933 FW 618 FPL Weld Travelor ¹ NA 304 SS 1993 Replacement N 92-1297 CH 933 FW 619 FPL Weld Travelor ¹ NA 304 SS 1993 Replacement N 92-1298
PSL1, NIS 2 TRACKING NO. S L-1-1 1-~01 2A FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Pi SUPPLEMENTAL SHEET
- 1. Owner: Florida Power &, Light Co. Date: 9/7/93 P.O. Box 529100 8P'f Miam, FL 33152 Sheet: 5
- 2. Plant: St. Lucie Plant Unit ¹: 1 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: NA
- 3. Work Performed By: Florida Power & Light Co. PCM ¹: NA 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 2274 XA ¹: 91032956 CWO ¹: 6430 Process Sheet: N/A Repair Organization P.O. No., Job No., ect.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System: Boric Acid Makeup
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. ~ Atkienda 5Q!
(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1983 Edition, thru the Summer 1983 addenda.
6, IdentiTication of Components Repaired or Replaced and Replacement Components:
National Replaced ASME Name of Name of Manufacturer Other Year Code Board Repaired Component Manufacturer Serial No. Identification Built No. 0 Stamped i'eplacement (Y or N)
GH 933 FW 623 FPL Weld Travehr ¹ 304 SS 1993 Replacement 92-1299 GH A02 FW 601 FPL Weld Travelor ¹ 304 SS 1993 Replacement 92-1302
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~01 2A FORM NIS-2 (Back) Sheet 2 of 5
- 9. Remarks: A hydrostatic test was performed under CWO 6430. No leakage was Identified.
- 10. Inspection Report Numbers: M93.1 Q3Q APPLCABLE MANUFACTURES DATAREPORTS TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this @Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Au rizatio No.: N/A Signed Ow or wner s esi ee, Title Date 1 19~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel
'Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Si n ure National Board, State, Providence and Endorsement Date
0 PSL-'I, NIS-2 TRACKING NO. S L 1 1 -~01 3 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power &, Light Co. Date: 8/30/93 P.O. Box 529100 Sheet:
Mami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A 3, Work Performed By; Florida Power & Light Co. PWO¹: 2895 6501 South Hwy. A1A WO ¹: 90027902 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdentiTication of System: Intake Cooling Water Type Code Symbol Stamp N/A SB 21386 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Butterlly Valve Henry Pratt N/A N/A SA-516 N/A Replaced 3e GR 55 Co.
Butterfly Valve Henry Pratt SN 0112 169-1-1 N/A SA-516 1992 Replacement 3e Co. Ht¹ 412L6541 GR 70 Studs N/A N/A SA-1 93 N/A Replaced 5/8-1 1UNC GR B7 Studs Allied Nut & Heat ¹ N/A SA-1 93 N/A Replacement 5/8-1 1UNC Bolt Co. 8078593 GR B7 Nuts N/A N/A N/A A-194 N/A Replaced 5/8-1 1UNC 2B GR 2H Nuts Nova Machine .Heat ¹ N/A SA-1 94 N/A Replacement 5/8-1 1UNC 2B Products 8079196 GR 2H
- 7. Description of Work: Replace valve and associated bolting.
I~~
Nominal Operating Pressure (ISLT) X
- 8. Tests Conducted: Hydrostatic Other: VT Pneumatic VT 2 X VT 3 ~ ~pslg Test Temp.~'P
PSL-t, NIS-2 TRACKING NO. S L 1 1 -~01 3 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1191 APPLIcABLE MANUFACTURES OATA AEPORTS To BE ATTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this +Repair x Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Owner or ner's 0 Ignee, Title Date ~31 19~~
CERTIFlCATE OF lNSERVlCE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shat( be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~01 5 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- l. Owner. Florida Power & Light Co. Date: 8/13/93 P.O. Bbx 529100 Sheet: 1 of 2 Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A
- 3. Work Performed By Florida Power & Light Co. PWO¹: 4839 6501 South Hwy. AlA WO ¹: 92005465 Jensen Beach, FL 34957 CWO ¹ NA Process Sheet: N/A
- 4. (a) Identification of System: Intake Cooling Water Type Code Symbol Stamp N/A SH 21004 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Nut N/A N/A N/A A-194 N/A Replaced 5/8"-1 1UNC-2B Nut Allied Nut & Heat No. N/A SA-194 Gr SM N/A Replacement 5/8 -1 1UNC-2B Bolt Co. 703563 TYP 316 SS
- 7. Description of Work: Replace carbon steel valve bonnet nut with stainless steel nut due to corrosion. Carbon nut was installed in error.
t~~ ~ ~'p
- 8. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure (ISLT) X Other: VT VT 2[X@ VT 3 ~pslg Test Temp
PSL-1, NI5-2 TRACKING NO. S L - 1 -1 1 -~01 5 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1p95 APPLICABLE MANUFACTURES DATAREPOATB TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this /Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A SIgned r~G 4r 3 ~ 8A'AD &ddedeZ /0 Dale ~daT Ie Ia 93 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass, have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed In the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector'B S gnature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L - 1 - 1 1 -~01 3 PPI FORM NIS-2 OAVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 11/17/92 P.O. Box 529100 Slleet 1 of Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: NA Jensen Beach, FL 34957 PCM ¹: NA
- 3. Work Performed By. 'Florida Power & Light Co. PWO¹: 0815 6501 South Hwy. A1A XA ¹: 89025718 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Intake Cooling Water Type Code Symbol Stamp N/A (b) Component Identification: SS-21-3B1 Authorization No. N/A (Mark Number) Expiration Date N/A
. (a) Applicable Construction Code ANSI B31.7, 1969Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. (Y or N) oi'eplacement 3" Strainer Body Zurn Ht:9086-3 SB-148 1979 Replaced sn: 8883 AI 954 3" Strainer Body Zurn Ht: 85769 SB-148-74 1985 Replacement sn:S74 Gr 954
- 7. 'Description of Work: Replace strainer body due lo leakage. Refernce NCR 1-353.
- 8. Tests Conducted: Hydrostatic Ottrer:VT I
~ Pneumatic VT2 X VT3 Nominal Operating Pressure (ISLT) X
~petg Teet Temp.~'F
PSL-t, NIS-2 TRACKING NO. S L 1 1 -~01 8 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory Inservice Leakage test was performed and witnessed by a VT 2 certified inspector.
- 10. Inspection Report Numbers: M93-1025 APPLCABLE MANUFACTURE'S OATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this /Repair X Replacement conforms to the rules of the ASME Code,Section XI ~
Type Code Symbol Stamp: N/A Certificate of Authorization No.:
Signed N/A Own r or Owner's Designee, Title (g>g Jg g~py Date ~/, 19~@
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of
'nd the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Si nature National Board, State, Providence and Endorsement Date
PSL-1, NIS-2 TRACKING NO. S L- 1 -1 1-~02 0 FORM NIS-2 OWNERtS REPORT FOR REPAIRS OR REPLACEMENTS As Requfred by the Provfsfons of the ASME Code Section Xr 1, Owner: Florida Power & Light Co. Date: 8/19/93 P.O. Box 529100 Sheet 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: NA Jensen Beach, FL 34957 PCM ¹: 246-190M
- 3. Work Performed By: Florida Power & Light Co. I WO¹. 5331 6501 South Hwy. A1A WO ¹: 92008092 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet. N/A
- 4. (a) Identification of System: Intake Cooling Water Type Code Symbol Stamp N/A SS-21-3A1 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: N A (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. (Y or N)
OI'eplacement r
3" Strainer Body Zurn S/N'882 NA SB-148, AL 1979 Replaced 954 3" strainer Body Hayward S/N: 1 SB-148, 74 NA Replacement Industries Allo
- 7. Description of Work: Replace ICW Lube Water strainer due to corrosion induced thru wall leakage.
- 8. Tests Conducted: Hydrostatic Other: VT1
~ Pneumatic VT 2~X VT 3 Nominal Operating Pressure (ISLT) X
~pstg Test Tersp.~'F
PSL-1, NIS-2 TRACKING NO. S L-1; 1 1-~02 0 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory Inservice Leakage test was performed and witnessed by a VT 2 certified inspector.
- 10. Inspection Report Numbers: M93 1025 APPLICABLE MANUPACTUREB DATA REPORTS To BE ATTACHED Certificate of Compliance We sentry that the statements made In the report are correct and thts Repatr QXReptacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Aut z tion No.: A Signed Ow er er's 0 gnee, Title Date '8 19~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report In accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspec or's Signature National Board, State, Providence and Endorsement Date
PSL-1, NIS-2 TRACKING NO. S L-1 -1 1-~02 1 h
FORM NIS-2 OKVNERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power k Light Co. Date: 8/19/93 P.O. Box 529100 Sheet~ 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: NA Jensen Beach, FL 34957 PCM ¹: 246-190M
- 3. Work Performed By: Florida Power h, Light Co. PWO¹: 5339 6501 South Hwy. A1A WO ¹: 92042317 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System; Intake Cooling Water Type Code Symbol Stamp N/A SS-21-3A2 Authorization No, N/A (b) Component Identification:
(Maik Number) Expiration Date . N/A (c) Code Class: 3
. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: N A (b) Applicable Edition of Section XI Utilized for Repairs and Rcplacemcnt Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. PorN) oi'eplacement 3 Strainer Body Zurn S/N: 8887 SA 148, AI 1 979 Repiaced 954 3" Strainer Body Hayward S/N: 6 NA SA 148, 74 NA Replacement ndustries Allo
- 7. Description of Work: Replace ICW Lube Water strainer due to corrosion induced thru wall leakage.
- 8. Tests Conducted: Hydrostatic Other:VT1
~ VT2 Pneumatic X VT3~ ~pstg Nominal Operating Pressure (ISLT) x Test Temp.~'P
PS L-1, Nl S-2 TRACKING NO. S L - 1 - 1 1 -~02 1 FORM N IS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory Inservice Lekage test was performed and witnessed by a VT 2 certified inspector.
- 10. Inspection Report Numbers: Mg3 1o25 APPLCABLE MANUFACTURE'S OATA REPoRTB To BE ATTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Aut tion No.: A Signed Date r or Owner's eslgnee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Signature National Board, State, Providence and Endorsement D te
'L PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~02 2 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co. Date: 8/19/93 P.O. Box 529100 Sheet: 1 pf Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: NA Jensen Beach, FL 34957 PCM ¹: 426-190M 3, Work Performed By. Florida Power &, Light Co, PWO¹: 5338 6501 South Hwy. A1A WO ¹: 92042316 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: intake Cooling Water Type Code Symbol Stamp N/A SS-21-3B2 Authorization No. N/A (b) Component Identification:
(Mek Number) Expiration Date N/A (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: N A (b) Applicablc Edition of Section XI Utilized for Repairs and Rcplaccment Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. of (Y pf N)
Replacement 3 Strainer Body Zufn S/N: 8886 NA SB-148, AL 1979 Replaced 954 3" Strainer Body Haywood S/N: 7 SB-148, 74 Replacement Industrial Allo
- 7. Description of Work: Replace ICW Lube Water strainer due to corrosion induced thru wall leakage.
t~~ + ~
- 8. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure (ISLT) X Other: VT VT 2+X VT 3 pstg Test Temp.~ 'P
PSL-1, NIS-2 TRACKING NO. S L - 1 -1 1 -~02 2 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory Inservice Leakage Test was performed and witnessed by a VT 2 certified inspector.
10, Inspection Report Numbers: M93-1025 APPLCABLE IlANUFACTURES DATAREPORTS TO BE ATTACHED Certificate of Compliance We certify that the statements made In the report are correct and thfs QRepafr QXRepfacement conforms to the rules of the ASME Code, Section XL Type Code Symbol Stamp: N/A Certificate of Au orization No.: N/A Signed Date W 19 5M ner or 0 er's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's ig nature National Board, State, Providence and Endorsement 19~
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~02 6
~n, FORM NIS-2 OWNERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co. 7/26/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N'/A 3 Wo,k Performed By Florida Power & Light Co. PWO¹: 5693 6501 South Hwy. A1A WO¹: 92048678 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Main Steam Type Code Symbol Stamp N/A 1/2"-MS-111 Authorization No. N/A (b) Component Identification: 1 (Maik Number) I-1-MS-112 Expiration Date N/A I-1-MS-1 14 (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A, Code Case: N -41 6 (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. PorN) oi'eplacement 1 1/2" Tee N/F N/A ASTM N/A Replaced 3000¹ A 105 1 1/2 Tee Energy Steel Heat No. N/A ASME N/A Replacement 3000¹ and Su I R43 N S 05 Insert Reducer N/F N/A ASTM N/A Replaced 3000¹ A 105 Insert Reducer Hub Inc. Heat No. N/A ASME N/A Replacement 3000¹ 0974 SA 105
- 7. Description of Work: Replace one 1 1/2"tee and 2 insert reducers due to external corrosion.
- 8. Tests Conducted: Hydrostatic Other:VT I~X
~ Pneumatic VT2~X VT3~ ~pstg Nominal Operating Pressure (ISLT) X Test Temp~'2
d 0
PS L-1, NI S-2 TRACKING NO. S L - 1 - 1 1 -~02 6 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory insetvice leakage test was performed and witnessed by a VT-2 certified inspector.
New weld No. (MS-111) FW-974,FW-975, FW-952 (MS-112),FW-1,FW-1A (MS-114) FW-1,FW-2A,FW-3A,FW-4A,FW-5A.
- 10. Inspection Report Numbers: M92-1335 (VT-1)
M92-975(VT-2)
APPLCASLE MANUFACTURES DATAAEPORTS TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this QRepair X Repiacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Aut orizatlon No.'/A Signed er ner'esignee, Title Date 19~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector'gnature National Board, State, Providence and Endorsements Date
PSL-I, NIS-2 TRACKING NO. S L 1 1-~02 8 FORM NIS-2 01VNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provistoas of the ASME Code Section XI
- l. Owner: Florida Power & Light Co. Date 12/29/92 P.O. Box 529100 Sheets 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucio Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: 087-191M
- 3. Work Performed By: Florida Power & Light Co. PWO¹: 5634 6501 South Hwy. A1A XA ¹: 92047840 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdentificationofSystem: Reactor Coolant Type Code Symbol Stamp N/A V1200 (S/N 0004) Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 1
. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: N / A (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board identification Built Repair'ed Stamped Material No. No. or (Y or N)
Replacement Disc Insert Crosby Valve S/N:N88212- A 458-71; 1977 Replaced Co. 32-0004 Gr 651 Disc Insert Crosby Valve S/N:N88212- NA SA 458 1991 Replacement Co. 38-0050 Gr 651 Nozzle Crosby Valve S/N: N88213- A 458-71; 1977 Replaced Co. 32-0005 Gr 651 Nozzle Crosby Valve S/N:N88213- A 458 1990 Replacement Co.40-001 9 Gr 651
- 7. Description of Work: Disc insert & nozzle replaced by Wyle Laboratories to facilitate Flexi-Disc Trim modification per PCM 087-191M. (Valve Serial Number:
N 54495-00-0004)
- 8. Tests Conducted: Hydrostatic Other: VT 1~ 2~
~ VT Pneumatic VT 3 ~X Nominal Operating Pressure (ISLT)
~psig Test Temp. 'F
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~028 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: Steam leakage tests were satisfactorily performed by the vendor.
- 10. Inspection Report Numbers: Wyle Rpt No.: 42761-3 APPLCABLE MANUFACTURES DATA REPORTS TO BE ATTACKED Certificate of Compliance We certify that the statements made in the report are correct and this /Repair QXReplacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed ~ca~ Q . C. ~pc Date 2 19~
Owner or Owner's Designee, Title ~~/So/
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹10 starting on 04/90, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal in]uty or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Signature National Board, State, Providence and Endorsements Date
0 PSL-1, NIS-2 TRACKING NO. S L-1 -1 1-~03 2 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provlslons of the ASME Code Section XI
- l. Owner. Florida Power & Light Co. Date: 8/4/93 P.O. Box 529100 Sheet 1 of Miam, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. AlA P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A 3 Work Performed By Florida Power & Light Co. PWO¹: 5502 6501 South Hwy. A1A WO ¹: 92043006 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdcntificationofSystcm: Component Cooling Water Type Code Symbol Stamp N/A YPH-150 Authorization No. N/A (b) Component Identification:
(Maik Number) Expiration Date N/A (c) Code Glass: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicablc Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Rcplaccd and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. of (Y of N)
Replacement 1" U-Bolt N/F N/A N/A 1" /CS N/A Replaced (30" Pipe Dia.)
1 U-Bolt Bergen- Heat¹ N/A A36-91 N/A Replacement (30" Pipe Dfa) Paterson J2533 1 -8 Nuts N/F N/A 1" /CS N/A Replaced 1"
Nuts Bergen- Heat¹ N/A SA-563 N/A Replacement 1"-8 (Heavy Hex) aterson 33812 GRA
- 7. Description of Work: Replace U bolt and nuts of support located on line I-30"-CW-79 due to corrosion.
- 8. Tests Conducted: Hydrostatic Other:VT1
~ VT2 Pneumatic VT3 X Nominal Operating Pressure (ISLT)
~pstg Test Temp.~'P
A PSL-t, NIS-2 TRACKING NO. S L 1 1 -~93 2 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory visual inspection was performed by a VT-3 certified inspector after installation of new U-Bolt and nuts.
- 10. Inspection Report Numbers. 'M92-1629 (VT-3)
APPLICABLE MAHUFACTuRES DATAREPDRTB To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this /Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp:
Certificate of Au orization No.:
Signed ner or N/A N/A er's Designee, Title CERTIFICATE OF INSERVICE INSPECTION Date a
~ t9~
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Ins pector's Signature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~03 3 FORM NIS-2 OiVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- l. Owner: Florida Power & Light Co. Date: 6/9/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. AlA P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A
- 3. Work Performed By: Florida Power & Light Co. PWO¹: 5947 6501 South Hwy. A1A WO ¹: 9205215 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Auxiliary Steam Type Code Symbol Stamp N/A 1A AFW P1A Authorization No. N/A (b) Component Identification: Expiration Date N/A (Mark Number)
(c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year RepIaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement 3/4 " All thread Allied Nut & Heat ¹ 5112 N/A SA-193 N/A Replacement 3/4'-10UNC-2AX6'/4" Bolt Co. GR B7 Nuts Allied Nut & EO4277 N/A SA-1 94 N/A Replacement 3/4-1 OUNC-28 Bolt Co. GR 2H Studs N/A N/A N/A A-193 N/A Replaced 3/4"-1 OUNC-2A GR B7 Nuts N/A N/A N/A A-194 N/A Replaced 3/4"-1 OUNC-28 GR 2H
- 7. Description of Work: Cut and dressed all thread as required and replaced suction & discharge bolting to facilitate thread engagement.
Nominal Operating Pressure (ISLT) X
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~03 3 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leak was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1045 APPLiCABLE MANUFACTURE'S DATA REPORTS To BE ATTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Author'tion No.: N/A Signed Date 4 /~ 19 0 r ner's Desi e, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Aikwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions
.Inspector's ignature National Board. State, Providence and Endorsements Date 19~5
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~03 4 FORM NIS-2 OYVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power &, Light Co. Date: 7/12/93 P.O. Box 529100 Sheet:
Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. AIA P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A
- 3. cwork Performed By; Florida Power & Light Co. PWO¹: 6012 6501 South Hwy. A1A
%0 ¹: 92053092 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Auxiliary Steam Type Code Symbol Stamp N/A (b) Component Identification: 1A AFW P1B Authorization No, N/A (Mark Number} Expiration Date N/A (c) Code Class: 2
~ (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983", s
- 6. IdcntiTication of Components Repaired or Replaced and Replacement Components: I Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. (Y or N) oi'eplacement 3/4" Allthread Nova Mach. Heat ¹ N/A SA-1 93 N/A Replacement No 3/4 -1 OUNC-2AX6'/4" Products 8078476 GR B7 Nuts Allied Nut 8 Bol Heat ¹ N/A SA-1 94 N/A Replacement 3/4-10 UNC-2B EO42 G 2H Studs N/A N/A N/A A-193 N/A 3/4"-10UNG-2A GR B7 Replaced'/A Nuts N/A N/A N/A A-194 Replaced 3/4"-10UNC-2B GR2
- 7. Description of Work: Cut ailthread as required and replaced suction & discharge flange bolting.
- 8. Tests Conducted: Hydrostatic Other: VT 'I
~ Pneumatic VT 2~X
~
VT 3 Nominal Operating Pressure (ISLT) X
~pstg Test Temp.~'F .
PSE-1, NIS-2 TRACKING NO. S E-1-1 1-~03 5 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power A Light Co. Date: 7/13/93 P.O. Box 529100 ShccL 1 of Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucic Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM¹: N/A
- 3. Work Pcrformcd By. Florida Power 4 Light Co. PWO>>: 6011 6501 South Hwy. A1A WO ¹: 92053091 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdcntiTication of System: Auxiliary Steam Type Code Symbol Stamp N/A (b) Component Identification: 1A AFW P1C Authorization No. N/A (Madt; Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdcntiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board identification Built Repaired Stamped Material No. No. or (Y.or, N)
Replacement Studs N/A N/A A-193 N/A Replaced 3/4"-1 OUNC-2A GR B7 Allthread OUNC-2AX6'/A Nova Machine Heat No. N/A SA-193 N/A Replacement 3/4"-1 Products 8078476 GR B7
- 7. Description of Work: Cut all thread as required and replaced suction & discharge bolting to facilitate thread engagement.
t~~ ~
- 8. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure (ISLT) X Other: VT VT 2~X VT 3 ~pstg Test Temp.~'F
PSL-1, NIS-2 TRACKING NO. S L - 1 -1 1 -~03 5 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was perfomed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1066 APPLICABLE MANUFACTURES DATAREPORTS TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this /Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Aut r'zatio No.: N/A Signed Date N 19~>
Owne or n esl e, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1. 1 1-~03 7 F ORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co. Date: 8/4/93 P.O. Box 529100 Sheet:
Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. AIA P.O.¹: B93671-30023 Jensen Beach, FL 34957 PCM¹: N/A 3 Work Performed By'lorida Power & Light Co. PWO¹: 5390 6501 South Hwy. A1A WO ¹. 9204290501 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdcntiTication of System: Safety Injection Type Code Symbol Stamp N/A (b) Component identification: 'Blind Flange Authorization No. N/A (Mark Number), Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Studs N/A N/A A-193 N/A Replaced 3/4"-10UNC-2A GR B7 Threaded Rod Nova Machine Heat¹ N/A SA-193-86 N/A Replacement 3/4"-10UNC-2AX6'roducts 8078476 GR B7 Nut N/A N/A N/A A-194 N/A Replaced 3/4 -1 OUNC-2B GR 2H Nut Allied Nut & Heat¹ N/A SA-194 N/A Replacement 3/4"-1 OUNC-2B Bolt Co. E04277 GR 2H
- 7. Description of Work: Cut threaded rod as required and replaced bolting & gasket due to external blind flange leakage. Line 3"-SI-468.
- 8. Tests Conducted: Hydrostatic Other: VT t~ ~ Pneumatic VT 2~X VT 3 Nominal Operating Pressure (ISLT) X
~pstg Test Temp~'P
PSL-1, NIS-2 TRACKING NO. S L -1 -1 1 -~03 7 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1103 (VT-2)
APPLtcABLE MANuFAcTuREs DATA REPORTS To BE ATTACNEO Certificate of Compliance Ws certlty that the atatemenis made in the report are correct and this QRepatr X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Aut 'zation No N/A Signed 0 er or Ow eCB Designee, Title Date ~W 19~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions lns actor's Signature National Board, State, Providence and Endorsements Date
PSL-I, NIS-2 TRACKING NO. S L-1-1 1-~03 8 FORM NIS-2 01VNERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 6/11/93 P.O. Box 529100 Sheet: 1 of 3 Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. AlA P.O.¹: NA Jensen Beach, FL 34957 PCM ¹: NA 3, Work Performed By; Florida Power & Light Co. PWO¹: 4402 6501 South Hwy. A1A WO ¹: 92001620 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdentjTication of System: Safety Injection Type Code Symbol Stamp N/A SR-07-1A Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. (Y or N) oi'eplacement Hex Nuts N/A N/A A-194 N/A Replaced 5/8"-11 unc 2B Gr 2H Hex Nuts 5/8"-11 unc 2B Nova Machine Heat ¹ N/A SA-194-86 N/A Replacement Products 8079196 Gr 2H Hex Nuts 5/8"-11 unc 2B Allied Nut 8 Heat ¹ N/A SA-194 N IA Replacement Bolt Co. 010067 Gr 2H Flange Bolting N/A NIF N/A A-193 N/A Replaced 5/8"-1 1 unc 2A Gr B7 Threaded Rod Nova Machine Heat¹ N/A 'A-193-86 N/A Replacement 5/8-11 unc 2A Products 8078476 Gr B7 Flange Bolting N/A N/F N/A A/193 N/A Replaced 1/2 -13 unc 2A Gr. B7
- 7. Description of Work: Replaced inlet'and outlet flange bolting.
- 8. Tests Conducted: Hydrostatic Other: VT I
Nominal Operating Pressure (ISLT) X psig Test Temp.~'P
0 PSL-1, NIS-2 TRACKING NO. S L-1 -1 1-~03 8 FORM NIS-2 (Back) Sheet 2 of 3
- g. Remarks: A satisfactory inservice leak test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: Mg3.gge APPLtcABLE MANuFACTURES DATA REPORTS To BE ATTACREo Certificate of Compliance We certify that the statements made in the report are correct and this +Repatr X Rspiacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of thorization No.: N/A Signed ner o wner Designee, Title Dale ~i'tr, 19~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this Inspection.
Commissions inspector's Signature National Board, State, Providence and Endorsements Date
PSL-I, NIS-2 TRACKING NO. S L-1-1 1-~03 8 FORM NIS-2 0'tVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI PL SUPPLEMENTAL SHEET
- l. Owner: Florida Power & Light Co. Date: 6/1 1/93 P.O. Box 529100 Miami, FL 33152 Sheet: 3 of 3
- 2. Plant: St. Lucie Plant Unit ¹: 1 6501 South Hwy. AlA Jensen Beach, FL 34957 P.O. ¹: NA
- 3. Work Performed By: Florida Power & Light Co. PCM ¹: NA 6501 South Hwy. AlA Jensen Beach, FL 34957 PWO ¹: 4402 XA ¹'2001620 CWO ¹: NA Process Sheet: N/A Repair Organization P.O. No., Job No., cct.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System: Safety Injection
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. ~ Addenda (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1983 Edition, thru the Summer 1983 addenda.
- 6. Identification of Components Repaired or Replaced and Replacement Components:
ASME Name of Name of Manufacturer National Board Other 'ear Replaced Repaired Code Component Manufacturer Serial No. Identification Built No. or Stamped Replacement (Y or N)
Threaded Rod Allied Nut & Heat ¹ N/A SA-193 N/A Replacement 1/2-13 unc 2Ax6'ex Bolt Co. 8866807 Gr B7 Nut N/A N/F N/A A-194 N/A Replaced 1/2 -13 unc -28 Gr 2H Hex Nut Allied Nut 8 Heat ¹ N/A SA-194 N/A Replacement 1/2-13 unc -28 Bolt Co. B81716 Gr 2H
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~04 9 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1"
- 1. Owner. Florida Power A Light Co. Date'/12/93 P.O. Box 529100 Sheet:
Mami, FL 33152 Unit: 1
- 2. Plant: St. Lucic Nuclear Plant 6501 South Hwy. A1A P.O.¹: B93671-30023 Jensen Beach, FL 34957 PCM¹: N/A 3 Work Performed By Florida Power 0 Light Co. PWO¹: 5305 6501 South Hwy. A1A WO ¹ 92040616 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdentificationofSystem: Safety Injection Type Code Symbol Stamp N/A V3247 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A I
(c) Code Class: 1
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicablc Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or porN)
Replacement Disc Atwood Morrill S/N 4-095 N/A A-351 N/A Replaced 12" /1500 lbs. Heat ¹ A5131 GR CFSM Disc Atwood Morrill S/N 18628 N/A A-351 N/A Replacement 12" /1500 lbs. Heat ¹ B5270 GR CFSM I
- 7. Description of Work: Replaced valve disc.
- 8. Tests Conducted: Hydrostatic Other: VT I
~ Pneumatic VT 2 X VT 3 X ~pstg Test Temp ~'F Nominal Operating Pressure (ISLT) X
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~04 9 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified Inspector.
- 10. Inspection Report Numbers: M93-1155 (VT-2)
NDE 4.3-15 (VT4)
APPLCABLE MANUFACTURES OATA REPORTS TO BE ATTACHEO Certificate of Compliance We certttr that the statements made In the report are correct and thts QRepatr QXReptacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Aut orizatlon No.: N/A Signed 0 ner or Ow r's Designee, Title Date ~m- ta~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed ln the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature National Board, State, Providence and fndorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~05 3 FORM NIS-2 OWNERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 8/27/93 P.O, Box 529100 Sheet: 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: 335-190M 3 Work Performed By Florida Power & Light Co. PWO¹: 6506 6501 South Hwy, A1A WO¹: 93001443 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Component Cooling Water Type Code Symbol Stamp N/A V14151 Authorization No. N/A (b) Component Identificathn:
(Mark Number) Expiration Date N/A (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Stud N/A N/A A-193 N/A Replaced 1-1/8-8un-2Ax8 1/2 GR B7 Stud Allied Nut & Heat ¹ N/A SA-193 N/A Replacement 1-1/8-8un-2Ax8 1/2 Bolt Co. 58854 GR B7 Nl PL Nut N/A N/A N/A A-194 N/A Replaced 1-1/8-8UN-2B GR 7 Nut Allied Nut & Heat ¹ N/A SA-1 94 N/A Replacement 1-1/8-8UN-2B Bolt Co. 152250 GR 7
- 7. Description of Work: Replace valve bolting as necessary.
- 8. Tests Conducted: Hydrostatic Other: VT 1
~ Pneumatic VT 2~X VT 3 ~pstg Test Terep ~'p Nominal Operating Pressure (ISLT) X
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~05 3 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1410 APPLCABLE MANDFADTuRES DATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this @Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Owner or ner's 0 lgnee, Tltl Date ~$ 'F 19~5 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's ignature National Board, State, Providence and Endorsoments Date
(
0
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~05 5 FORM NIS-2 01VNER'S REPORT FOR REPAIRS OR REPLACEMENTS t
As Required by the Provlslons of the ASME Code Section XI
- l. Owner: Florida Power & Light Co. Date: 6/16/93 P.O. Box 529100 Sheet: 1 pf Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucio Nuclear Plant 6501 South Hwy. A1A P.O.¹: B91671-01216 Jensen Beach, FL 34957 PCM ¹: N/A
- 3. Wore performed By. Florida Power & Light Co. PWO¹: 3605 6501 South Hwy. AlA WO ¹: 93010256 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Reactor Coolant Type Code Symbol Stamp N/A V1201 Authorization No. N/A (b) Component identification:
(Mark Number) Expiration Date N/A (c) Code Class: 1
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section Xl Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. pf (Y or N)
Replacement Pressurizer Safety Crpsby Valve S/N NB-6116 A-351 1972 Replaced Relief Valve N54495 00.0002 CFSM Pressurizer Safety Crosby Valve 6/N A-351-72 1977 Replacement Relief Valve N 54495.00.0004 CFSM
- 7. Description of Work: Replaced pressurizer safety relief valve.
- 8. Tests Conducted: Hydrostatic Other: VT I
~ Pneumatic VT 2~X VT 3 ~pstg Test Temp ~'P Nominal Operating Pressure (ISLT) X
PSL-I, NIS-2 TRACKING NO. S L-1-1 1 -~05 5 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector,
- 10. Inspection Report Numbers: M93-1 094 APPLICABLE MANUFACTURES DATA REPORTS To BE AlTACkEO Certificate of Compliance We certify that the statements made in the report are correct and this Repair QXRepiacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Owner or Owner's 0 e
ignee, Title Date ~J, 19~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or loss of any kind arising from or connected with this inspection.
e Commissions Inspector's Signature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~05 6 FORM NIS-2 04VNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power &, Light Co. Date: 6/2/93 P.O. Box 529100 Sheet' of Miami, FL 33152 Unit:
- 2. PlanL St. Lucie Nuclear Plant 6501 South Hwy. AIA P.O.¹: B93671-30023 Jensen Beach, FL 34957 PCM ¹: N/A
- 3. Work Performed By: Florida Power & Light Co. PWO¹: 4304 6501 South Hwy. A1A WO ¹: 92001111 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdentificationofSystem: Main Steam Type Code Symbol Stamp N/A HCV-08-2A Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) ApplicableConstruction CodeANSIB31.7, 1969Edition. Addenda: N/A.CodeCase: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Rcplaccd and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. (Y or N)
Replacement 6" Steam dump WKM Valve Co. N/A N/A 174 PH N/A Replaced valve inner plug 600lbs.
6" Steam dump WKM Valve Co. Heat No. N/A 17-4 N/A Replacement valve inner plug 83171 600!bs.
- 7. Description of Work: Replaced valve plug .
- 8. Tests Conducted: Hydrostatic Other: VT1
~ Pneumatic VT 2 X VT 3 ~ Nominal Operating Pressure (ISLT) X
~pstg Test Temp.~'F
I t
I'
PSL-1, NIS-2 TRACKING NO. S L-'I -1 1-~05 5 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1082 APPLCABLE MANuFACTUAPBDATA AEPOATS To BE ATTACHED Certificate of Compliance We certify that the statements made ln the report are correct and this Repair QXReplacement conforms to the rules of the ASME Code,Section XI ~
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed itr rN /Ill/ (fi/ t Date PA + I 9~>
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE lNSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Signature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~05 7 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provlslons of the ASME .Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 6/2/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit
- 2. Plant: St. Lucic Nuclear Plant 6501 South Hwy. A1A P.O.¹: B93671-30023 Jensen Beach, FL 34957 PCM ¹: N/A 3 Work Performed By Florida Power & Light Co. PWO¹: 4302 6501 South Hwy. A1A WO ¹: 92001110 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Main Steam Type Code Symbol Stamp N/A HCV-08-2B Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 2
. (a) ApplicableConstructionCodeANSIB31.7, 1969Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replaccmcnt Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped
'aterial No. No. or (Y or N)
Replacement 6" Steam dump WKM Valve Co. N/A N/A 17-4 PH N/A Replaced valve inner plug 600 lbs.
6" Steam dump WKM Valve Co. 83171 N/A 17K PH N/A Replacement valve inner plug 600 lbs.
- 7. Description of Work: Replaced valve plug.
- 8. Tests Conducted: Hydrostatic Ottter: VT1
~ Pneumatic VT 2 X VT 3 Nominal Operating Pressure (ISLT) X
~pstg Test Temp.~'P
PSL-1, NIS-2 TRACKING NO. S L 1 1-~05 7 FORM NIS-2 (Back) Sheet 2 of 2
- g. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: Mg3-1p82 APPLtcABLE MANuFACTuRES DATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed era Date ~P8 3 19 93 Owner or Owner's Designee, Title CERTIFICATE Oj= INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Signature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~06 2 F ORM NIS-2 01VNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 6/10/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152
- 2. Plant: St. Lucie Nuclear Plant UniL'.O.¹:
6501 South Hwy. A1A B93671 30023 Jensen Beach, FL 34957 PCM ¹: N/A 3 Work Performed By'lorida Power & Light Co. PWO¹: 3640 6501 South Hwy. A1A WO ¹: 92051714 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Intake Cooling Water Type Code Symbol Stamp N/A V21005 Authorization No. N/A (b) Component Identification:
(Mark Number)
Expiration Date N/A (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. of (Y or N)
Replacement Disc Paulson S/N 809-2109 N/A SB-150 1990 Replaced
( 2" Valve) En ineerin (Valve) GR 630 Valve Disc Paulson (P/N) N/A SB-150 N/A Replacement
( 2" Valve) En ineerin 809-204 GR 630
- 7. Description of Work: Replaced disc due to wear.
- 8. Tests Conducted: Hydrostatic Orher: VT 1
~ Pneumatic VT 2 X VT 3 Nominal Operating Pressure (ISLT) X
~psrg Test Temp.~'F
PSL-1, NIS-2 TRACKING NO. S L 1 1 -~06 2 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1025 APPLCABLE MANUFACTURE'S DATA REPORTS TO BE ATTACHED Certificate of Compliance We certify thai the statemenls made in ths report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed 0 ner A/f~W wne s Designee, Title Dale ~rr, 19~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions 1 inspector's Signature National Board, State, Providence and Endorsernents Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~06 rt FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co. Date: 7/12/93 P.O. Box 529100 Shcct: 1 of Miami, FL 33152 Unit; 1
- 2. Plant: St. Lucic Nuclear Plant 6501 South Hwy, A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A 3 Work Performed By'lorida Power & Light Co. PWO¹: 6202 6501 South Hwy. A1A WO ¹ 92055420 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Component Cooling Water Type Code Symbol Stamp N/A Authorization No. N/A (b) Component Identification: YPH-131 (Mark Number) Expiration Date N/A (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. of (Y or N)
Replacement Spring Can Bergen Paterson N/F N/A VS1F N/A Replaced Size 19 Spring Can 'ergen Paterson B-066685 N/A VS 3100F/19 N/A Replacement
- 7. Description of Work: Replace spring can due to corrosion
- 8. Tests Conducted: Hydrostatic Other:VTI~
~ VT2 Pneumatic VT3 ~X Nominal Operating Pressure (ISLT)
~pstg Test Temp.~'6
PSL-1, NIS-2 TRACKING NO. S L 1 1-~06 4 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory visual examination was performed on the new spring can by a VT-3 certified inspector.
- 10. Inspection Report Numbers: Mg3-1121 APPLCABLE MANJFACTURES DATA REPORTS TO BE ATTACHED Certificate of Compliance We certify that the statements made in the repcrt are ccrrsct and this conforms to the rules of the ASME Code,Section XI.
Q Repair +X Replacement Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Date 195~
r or ner'slgnee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inJury or property damage or toss of any kind arising from or connected with this inspection.
Commissions Inspector's gnature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~06 5 FORM NIS-2 01VNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power &, Light Co. Date: 6/7/93 P.O. Box 529100 Slleeu 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. AlA P.O.¹: NA Jensen Beach, FL 34957 PCM ¹: NA
- 3. Work Performed By; Florida Power & Light Co. PWO¹: 3624 6501 South Hwy. A1A WO ¹: 92051669 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdcntificationofSystem: Safety Injection Type Code Symbol Stamp N/A SR-07-1A Authorization No. N/A (b) Component Identification:
(Maik Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. (Y or N)
OI'eplacement Safety Crosby Valve N67788 NA SA-351 Gr CF NA Replaced Relief Valve 0001 8M Safety Crosby Valve N67788 SA-351 GI'F 1992 Replacement Relief Valve 0003 8M
- 7. Description of Work: Replace safety relief valve due to seat leakage.
- 8. Tests Conducted: Hydrostatic Other: VT I
~ Pneumatic VT 2 X VT 3 Nominal Operating Pressure (ISLT) X
~pstg Test Temp.~'F
PSL-1, NfS-2 TRACKING NO. S L 1 1-~06 6 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93 1010 APPLtcABLE MANuFACTURES DATA REPoRTB To BE ATTACHED Certificate of Compliance We certify thai the statements made in the report are correct and this QRepafr X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp:
Certificate of Authorization No.:
Signed wn r or ne N/A N/A Designee, Title Date ~ 19~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Signature National Board, State, Providence and Endorsements Date
1
\
PSL-1, NIS-2 TRACKING NO. S L-1-1 1 -~066 s
FORM NIS-2 0%NERtS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 7/26/93 P.o. Box 529100 Sheet:
Miami, FL 33152 Unit: 1 2, Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.o.¹: B93671 30023 Jensen Beach, FL 34957 PCM ¹: N/A 3 Work Performed By Florida Power & Light Co. PWO¹: 3638 6501 South Hwy. A1A WO¹: 92051656 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Feedwater Type Code Symbol Stamp N/A V09248 Authorization No. N/A (b) Component Identification:
(Maik Number) Expiration Date N/A (c) Code Class: 2 t
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983 '.
IdentiTiicalion of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Studs,bod/ to cover N/F N/A A-193 N/A Replaced 1"-8 UNC-2A GR B7 1"-8 UNC-2A Nova Machine Heat No. N/A SA-193-86 N/A Replacement roducts 8098719 GR B7 Nut,body to cover N/F N/A A-194 N/A Replaced 1"-8UNC-28 GR 2H Nut,body to cover Allied Nut 8 Heat No. N/A SA-1 94 N/A Replacement 1"-8UNC-2B Bol Co. 090309 GR 2H
- 7. Description of Work: Replaced bolting.
- 8. Tests Conducted: Hydrostatic Other:VT1
~ VT2 Pneumatic X VT3~ ~pstg Nominal Operating Pressure (ISLT) X Test Temp.~'F
PSL-1, NIS-2 TRACKING NO. S L 1 1 -~06 6 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1 094 APPLICABLE llANUFACTURES DATAREPORTS To BE ATTACHED Certificate of Compliance We certity that the statements made In the report are correct and this Q Repair QXRepiacemsnt conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed 0 ner or Own s Designee, Title Date ~rpt tsg~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹1 1 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed In the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions n pector's Signature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1 -1 1-~07 1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- l. Owner. Florida Power & Light Co. Date: 6/7/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A
- 3. Work Performed By: Florida Power & Light Co. PWO¹: 3638 6501 South Hwy. A1A WO ¹ 92051658 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Containment Spray Type Code Symbol Stamp N/A V07174 Authorization No. N/A (b) Component Identification:
(Mark Number) V07120 Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None
{b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code ~
Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Stud, body to cover Pacific Valves N/A N/A A-193 N/A Replaced 1-1/2"-8 UN-2A GR B7 Stud, body to cover Control Heat No. N/A A-193 N/A Replacement 1-1/2 SUM-2AX12.2 Com nents 8097296 GR B7 Nut, body to cover Pacific Valves N/A N/A A-194 N/A Replaced 1-1/2"-8UN-2B GR 2H Nut, body to cover Control Heat No. N/A SA-194 N/A Replacement 1-1/2"-SUN-2B Com onents 8866807 GR7
- 7. Description of Work: Replaced 17 Studs and 28 nuts.
- 8. Tests Conducted: Hydrostatic Other: VT I
~ 2~
Nominal Operating Pressure (ISLT) pstg Test Temp.~'P
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~071 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: Valve is installed on the discharge line of RX sump. Due to valve location a ISLT cannot be performed.
- 10. Inspection Report Numbers: N/A APPLCABLE MANUFACTURES DATA REPORTS TO BE ATTACNEO Certificate of Compliance We certify that the statements made In the report are correct and this conforms to the rules of the ASME Code,Section XI.
Q Repair x Replacement Type Code Symbol Stamp: N/A Certificate of Au ization No.: N/A Signed Date ~sc >> f9~&
w er or wne Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ff11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed. or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's fgnature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~073 FORM NIS-2 01VNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 5/21/93 P.O. Box 529100 Sheen 1 of Mami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: B93671-30087 Jensen Beach, FL 34957 PCM ¹: 087-191
- 3. Work Performed By. Florida Power & Light Co. PWO¹: 7089 6501 South Hwy. A1A WO ¹: 93010412 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Reactor Coolant Type Code Symbol Stamp N/A V1 202 Authorization No. N/A (b) Component identification:
(Mark Number) s/n: N54495-00-0003 Expiration Date N/A (c) Code Class: 1
- 5. (a) ApplicableConstruction CodeANSI B31.7, 1969Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement 3K6 Nozzle Crosby N8821 3-38-0 NA 19-9 DL NA Replaced 017 '
3K6 Nozzle Crosby N95581 NA SA182, F316 1992 Replacement 0006 3K6 Disc Insert Crosby N8821 2-44-0 NA 199 DL Replaced ,N 028 3K6 Disc Insert Crosby N 95582-32-0 SB 637, UNS 1992 Replacement 005 N07718
- 7. Description of Work: Replace disc 8 nozzle.
Valve s/n: N54495-00-0003
- 8. Tests Conducted: Hydrostatic Other: VT 1
~ VT 2 Pneumatic VT 3 ~ pstg r
Nominal Operating Pressure (ISLT)
Test Temp.~'p
PSL-t, NIS-2 TRACKING NO. S L-1-1 1 -~07 3 FORM NIS-2 (Back) Sheet 2 of Z
- 9. Remarks: No inspection required for the work performed. This valve was rebuilt and sent to stores as a spare.
- 10. Inspection Report Numbers:
APPLCABLE MANUFACTURES DATA REPORTS TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair +XReplacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Au orization No.: N/A Signed Owner or Ow r's Designee, Title Date ~~ 19~A CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Signature National Board, State, Providence and Endorsement Date 1g S9
PSL.I, NIS-2 TRACKING NO. S L - t - I t -~rrrTrrt FORM NIS-2 OiVNER'S REPORT FOR REPhlRS OR REPLhCEMENTS hs Required by the Provtstons of the hSME Code Section XI
- l. Owner: Florida Power h, Light Co. Dsts: AI '& I'5f lO, I ~isrB P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Phnt 0'/8& 5 (c'c 0 0 l 694 6501 South Hwy. AlA -
8')94$ 9769/ C78(frt( (
Jensen Beach, FL 34957 PCM ¹:
- 3. Work Performed By: Florida Power Sc Light Co. IWO¹ 4/P 6501 South Hwy. AIA WO ¹: pj/p Jensen Beach, FL 34957 CWO¹: bg4g Process Sheet: / /gq 45
- 4. (a) Identification of System:
Type Code Symbol Stamp N/A
@25 Pac:S~utl Z~E'b)
Authorization No. N/A Component fdentification:
(Mark Number) Expiration Date N/A PR655sr& EEr2 (c) Code Class:
QLR55 I
- 5. (a) Applicable Consuuction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of'Components Repaired or Replaced and Replacement Components;
/dan Type of Name of Manufacturer National Other Year Replaced Code
'omponent or Manufacturer Serial or Heat Board Identification Built Repaired Stamped No. No. or Material un'SME Replacement (Y or N) 4f IB- / /p-" fÃ6St(RI~
570m YIArJVlAY Ref Hr)~ ww'/8 PP,6$ 5dPQeM R6'p~gco AIO CDNBt)5 r ro n) HCN RaQem 636(tJ lg(/3'6 b1(t(J +Rv r/r rr &dB< 88KOA Z'tK
(' g('7 YI1 I'D IrR er v IV87 PERrvstls t
- 7. Description of Work: QUN &CK l~ 5(OD 4 ~8(t- /VOI VVM A&A-~f3 Ply 1l) r H 88'R'P W~ RCi &
' 8, Tests Conducted: Hydrostatic Other: VT I VT Pneumatic 2~ VT 3 ~
Nominal Operating Pressure (ISLT) pslg Test Temp. 'F
PSL-I, NIS.2 TRACKING NO. S L 1 1 gg FORM NIS-2 (Back) Sheet 2 of
- g. Remarks: Vi -I ~~~ V r- > e>~P)gfpD RPJD '/VD P(S r"-eGPRAJr" tE5 Fd OiVD .
- 10. Inspection Report Numbers:
APPLfcABLE MArrVPhCTVRES OATA REPORtS To BE AtTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this QRepafrgReptacement conforms to tho rules of tho ASME Code,Section XI.
Type Code Symbol Stamp; N/A Certificate of Authorization No.: N/A Signed Owner or Owner's- sign, Title Dale ~+I i tg CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
,have inspected the components described in this Owner's Report during operating cycle ¹1 starting on ct I and state that to the best of my knowledge and beiiet, ihe Owner has performed examinations and and faken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certiTicate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibod ln the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this fnspection.
Commissions inspector's Sig ture National Board, State, Provtdence and Endorsement Date (, 19~
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~070 s
FORM NIS-2 OKVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- l. Owner: Florida Power & Light Co. Date: 6/1/93 P.O. Box 529100 of 2 Miam, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: B 92671-20225 Jensen Beach, FL 34957 PCM ¹: 087-191M
- 3. Work Performed By: Florida Power & Light Co. PWO¹: 5669 6501 South Hwy. A1A WO ¹: 92048502 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identificationof System: Reactor Coolant Type Code Symbol Stamp N/A V1202 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 1
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Nozzle Crosby N95581-32-0 N/A SA182,316 1992 Replacement 008 S/N 3K6 Disc Insert Crosby N 96682-32-0 N/A SB637 1992 Replacement 007 S/N Nozzle Crosby N 95581-31-0 N/A SA479,316 1990 Replaced 003 S/N 3K6 Disc Insert Crosby N 95582-31-0 N/A SB637 1990 Replaced 004 S/N 3K6
- 7. Description of Work: Replaced disc 8 nozzle on valve S/N N54495-00.005. Valve is to be used for spare. Valve overhauled, tested and returned to stores per MRM 4/30/93.
Wyle Lab..report ¹42956-1
- 8. Tests Conducted: Hydrostatic ~NA Pneumatic NA Nominal Operating Pressure (ISLT) NA Orher: VT I NA VT 2 NA VT 3 NA ~NA psI0 Tesi Temp.~NA 'F
PSL-1, NIS-2 TRACKING NO. S L 1 1 -~07 5 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks:
- 10. Inspection Report Numbers:
APPucABLE MANUFACTuRE's OATA REPORTB To BE ATTACKEO Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A 515ned P W/
Owner or Owner's Designee, Title 1 ///dr (PPjP / 6
- g. /~4)]g V Date ~d8 /, 19~+
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle f/11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his emp'loyer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector'B Signature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~07 6 FORM NIS-2 OVVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 6/15/93 P.O. Box 529100 Sheen I of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. AIA P.O.¹: B91671-01155 Jensen Beach, FL 34957 PCM ¹: N/A
- 3. Work Performed By: Florida Power & Light Co. PWO¹: 3607 6501 South Hwy. A1A WO ¹: 92056047 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Reactor Coolant Type Code Symbol Stamp N/A V1402 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 1
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section Xl Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Pilot Disc Dresser S/N ABT 57 N/A A-565 Gr 616 1991 Replaced 2-1/2" x 4 Industr Heat¹ 49883 2500¹ Pilot Disc Dresser S/N ABT 56 N/A A-565 Gr 616 1991 Replacement 2-1/2" x 4 Industr Heat¹ 49883 2500¹
- 7. Description of Work: Replaced pilot disk due to scratches.
- 8. Tests Conducted: Hydrostatic Other: VT I
~ Pneumatic VT 2 X VT 3 ~pstg Test Terep ~'F Nominal Operating Pressure (ISLT) X
PSL.1, NIS-2 TRACKING NO. S L - 1 -1 1 -~07 6 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1 094 APPLICABLE MANUFACTURE'S DATA REPORTS To BE ATTACNEO Certificate of Compliance We certify that the statements made in the report are correct and this /Repair X Replacement conforms to the rules of the ASME Code,Section XI.
a Type Code Symbol Stamp: N/A Certificate of Authoriza 'on No.: N/A Signed 0 ner or er'slgnee, Title Date ~e'a'a~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of, the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature National Board, State, Providence and Endorsemants Date
t I
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~077 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co. Date: 7/13/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: B91671 01155 Jensen Beach, FL 34957 PCM ¹: N/A 3 Work Performed By. 'Florida Power & Light Co. PWO¹: 3606 6501 South Hwy. AIA WO ¹: 93010257 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Reactor Coolant Type Code Symbol Stamp N/A V1202 Authorization No. N/A (b) Component Identiflcatlon; (Mark Number) S/N 54495404002 Expiration Date N/A (c) Code Class: 1
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Rcplaccd and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Keat Board Identification Built Repaired Stamped Material No. No. or PorN)
Replacement Studs Nova Machine Kt.¹ 67094 & N/A SA-193 N/A Replaced 1-1/4"@UN-2Ax6'tuds Products 8094962 GR B7 Nova Machine 8094962 N/A SA-193 N/A, Replacement 1-1/4"-SUN-2AX6'uts Products GR B7 Nova Machine 8094962 N/A SA-1 94 N/A Replaced 1-1/4"-8 UN-2B Products GR7 Nuts Nova Machine 8094962 N/A SA-194 N/A Replacement 1-1/4 -8UN-2B Products GR7
- 7. Description of Work: Replace inlet flange bolting due to degredation.
- 8. Tests Conducted: Kydrostatlc Other: VT 1 X Pneumatic VT 2~X VT 3 ~ Nominal Operating Pressure (ISLT) X
~pstg Test Temp.~'p
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~077 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1094 APPLtCABLE MANUFACTURES CATA REPORTS To BE ATTACNEO Certificate of Compliance We cerlity that the statements made in the report are correct and this +Repair +XReplacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: NIA Certificate of Authorization No.: NIA Signed Date N 19 M 0 er or Ow s Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector'ignature National Board, State, Providence and Endorsernents Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~07 8 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 6/16/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: B91671 01155 Jensen Beach, FL 34957 PCM ¹: N/A 3 Work Performed By'lorida Power & Light Co. PWO¹: 3604 6501 South Hwy. A1A WO ¹: 92056217 Jensen Beach, FL 34957 CWO ¹ NA Process Sheet: N/A
- 4. (a) IdentiTication of System: Reactor Coolant Type Code Symbol Stamp N/A Vt 200 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 1
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Rcpaircd or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Stud Nova Machine Heat ¹ N/A SA-193 N/A Replaced (Inlet flange) Products 8077354 Gr. B7 All thread Nova Machine Heat ¹ N/A SA-193 N/A Replacement (1-1/4"-8UN-2AX6') Products 8094962 Gr. B7 Nut Nova Machine Heat ¹ N/A SA-194 N/A Replaced, (Inlet flange) Products 6072102 Gr. 7 Nut Nova Machine Heat ¹ N/A SA-194 N/A Replacement (Inlet flange) Products 8094962 Gr. 7
- 7. Description of Work: Reinstall valve s/n N72356-00-001. Cut all thread as required and replaced inlet flange bolting .
- 8. Tests Conducted: . Hydrostatic Other: VT I X
~ Pneumatic VT 2 X VT 3 ~pete Test Terep ~'F Nominal Operating Pressure (ISLT) X
PSL-1, NIS-2 TRACKING NO. S L 1 1 -~07 8 FORM NIS-2 (Back) Sheet 2 of 1
- 9. Remarks: A satisfactory visual inspection was performed on all new bolting material by a VT-1 certified inspector. A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1094 (VT-2)
M93-699 (VT-1)
APPucABLE MANUFACTURE'S OATA REPORTS To BE ATTACHEo Certificate of Compliance We cerlity that the atatementa made In the report are correct and thin Repair QXReplacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Au orization No.: N/A Signed Date 19~2 Owner or 0 esig e, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the OwneCs Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Signature National Board, State, Providence and Endorsements Date 7 /'5
PSL-1, NIS-2 TRACKING NO. S L-1-'I 1-~079 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provlslons of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co. Date: 7/13/93 P.O. Box 529100 ShceL- 1 of Mami, FL 33152 Unit:
- 2. Plant; St. Lucie Nuclear Plant 6501 South Hwy. AlA P.O.¹: B93671-30087 Jensen Beach, FL 34957 PCM ¹: 087-191 3, Work Performed By Florida Power & Light Co, PWO¹: 7089 6501 South Hwy. A1A WO ¹t 93010412 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdentiTicationof System: Reactor Coolant Type Code Symbol Stamp N/A V1200 Authorization No. N/A (b) Component Identification: Expiration Date N/A (Maik Number) S/N N7235640401 (c) Code Class: 1
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. AddcndL'/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdcntiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Yor N)
Replacement 3K6 Nozzle Crosby 6/N NA SA479,316 1990 Replaced N95581-31-0001 Ht.¹ 23045 3K6 Nozzle Crosby S/N SA182, F316 1992 Replacement N 95581-32-0005 Ht ¹33665 3K6 Disc Insert Crosby 6/N SB 637, UNS 1990 Replaced F N 95582.31-0002 N07718 3K6 Disc Insert Crosby S/N SB 637, UNS 1992 Replacement N N 95582-32.0011 N07718
- 7. Descriptionof Work: Replace nozzle and disc assembly.
Valve Installed under PWO 3604.
f SIN: N72356-00-0001)
- 8. Tests Conducted: Hydrostatic Other: VT 1 VT Pneumatic 2~
p VT 3 ~
Nominal Operating Pressure (ISLT) psig Test Temp. 'F ping hair -F-9$
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~079 FORM NIS-2 (Back) Sheet 2 of
- 9. Remarks: No inspections performed as a result of work performed to PWO 7089. Leakage test will be documented via NIS 2 Tracking Report SL-1-11-078.
- 10. Inspection Report Numbers: NA APPLCABLE MAMuFACTURES DATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this @Repair +XRepiacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed oa~e ~5~~ 19 5'~
w er or Own s Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this Inspection.
Commissions inspector's Ignature National Board, State, Providence and Endorsement Date
'4 1
V
PSL1, NtS2TRACKtNG NO. S L-1-1 1-~08 0 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provlslons of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co. Date; 8/17/93 P.O. Box 529100 Sheet 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucio Nuclear Plant 6501 South Hwy. A1A P.O.¹: B91671 01155 Jensen Beach, FL 34957 PCM ¹: N/A
- 3. Work Performed By; Florida Power & Light Co. PWO¹: 3624 6501 South Hwy. A1A WO ¹: 92051626 Jensen Beach, FL 34957 CWO ¹: NA Process Shcct: N/A
- 4. (a) IdentiTication of System: Chemical & Volume Control Type Code Symbol Stamp N/A Authorization No. N/A (b) Component kfentification: V2325 (Maik Number) Expiration Date N/A (c) Code. Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section Xl Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Rcplacemcnt Components; Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Material Manufacturer Serial or Heat No.
Board No.
Identification Built oi'Y Repaired Replacement Stamped or N)
Relief Valve Disk Crosby N 88832 NA Stellite 6B 1985 Replaced 0060 Relief Valve Disk Crosby N88832 NA Stellite 6B 1987 Replacement 0062 Inlet Flange Studs A-1 93 NA Replaced 7/8 Nunc-2A GR B7 inlet Flange Studs Nova Machine Heat ¹ NA SA-193 NA Replacement 1"-8unc-2A 8094962 GR B7 Inlet Flange Nuts NA A-194 Replaced 7/8 Nunc-2B GR 2H Inlet Flange Nuts Nova Machine Heat ¹ SA-194 Replacement 1 -8unc-2B 8057 95 G 2
- 7. Description of Work: Replace degraded valve disc and undersized bolting.
- 8. Tests Conducted: Hydrostatic Other: VT t~ ~ Pneumatic VT 2 X VT 3 Nominal Operating Pressure (ISLT) X
~Pstg Test TemP.~'F trtrs r r rt -I? '8 3 ted $
PSL-1, NIS-2 TRACKING NO. S L 1 1 -~08 0 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1010 APPLtcABLE LlANUFACTUREs DATA REPDRTB To BE ATTACHED Certificate of Compliance We centty that the statements made tn the report are correct and thts +Repatr +X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Ovmer or Own s Designee, Title Date 7 ~ 19~>
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature National Board, State, Providence and Endorsements
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~08 1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- l. Owner: Florida Power & Light Co. Date: 6/28/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A 3, Work Performed By Florida Power & Light Co. PWO¹: 7251 6501 South Hwy. A1A WO ¹; 93012127 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdentificationofSystcm: Reactor Coolant Type Code Symbol Stamp N/A F1215 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 1
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None =
(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Stud(Blind flange) N/A N/A A-193 N/A Replaced 7/8"- 9UNC-2A Gr. B7 All Thread Nova Machine Heat No. N/A SA-193 N/A Replacement 7/8"- Products 809912 Gr. B7 9UNC-2AX6'ut(Blind flange) N/F N/A N/A A-194 N/A Replaced 7/8"- 9UNC-2B Gr. 2H Nut (Heavy Hex) Nova Machine Heat No. N/A SA-194 N/A Replacement 7/8"- 9UNC-2B Products 8079196 Gr. 2H
- 7. Description of.Work: Cut all thread as required and replaced blind flange bolting due to corrosion.
- 8. Tests Conducted: Hydrostatic Other:VTI~
~ Pneumatic VT2~X VT3 Nominal Operating Pressure (ISLT) X
~pslg Test Temp~'p
PSL-1, NIS-2 TRACKING NO. S L 1 1-~08 1 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1094 APPLICABLE MANVPACTURE'S DATA REPORTS TO BE ATTACHED Certificate of Compliance We certity that the eiatemenie made in the repori are correct and thin Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Owner r wn De gnee, Title Date ~4', 19~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's lgnature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1 -1 1-~08 6 FORilf i%IS-2 ON'NER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASltIE Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 6/1/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. AIA P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A 3 Work Performed By; Florida Power & Light Co. PWO¹: 3905 6501 South Hwy. AIA WO ¹: 91012438 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Containment Spray Type Code Symbol Stamp N/A V07166 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board identification Built Repaired Stamped Material k No. No. or (Y or N)
Replacement Bonnet studs Control 8096740 N/A SA-193 N/A Replacement 5/8"-11 UN C-2AX4" Com nents GR B7 Bonnet Nuts Allied Nuts 8 010067 N/A SA-194 N/A Replacement 5/8-11UNC-2B Bolts GR 2H Bonnet studs Pacific N/A N/A SA-193 N/A Replaced 5/8 -1 1UNC-2AX4 Valves GR B7 Bonett Nuts Pacific N/A N/A SA-194 N/A Replaced 5/8"-1 1UNS-2B Valves GR 2H
- 7. Description of Work: Replace bonnet bolting due to degredation.
- 8. Tests Conducted: Hydrostatic Other: VT I
Nominal Operating Pressure (ISLT) X pstg Test Temp.~'P
PSL-t, NIS-2 TRACKING NO. S L-1-1 1 -~08 6 FORM NIS-2 (Back) Sheet 2 of 2
- g. Remarks: A satisfactory inservice leak test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1052 APPLIcABLE MANuFAOTuREs OATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed 0 ner or Owner's Designee, Title (~g~
Data ~~t, 19 93 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle 011 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Signature National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~08 7 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- l. Owner: Florida Power & Light Co. Date: 6/1/93 P.O. Box 529100 SheeL' of Miami, FL 33152 Unit:
- 2. St. Lucie Nuclear Plant Plant.'.
6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A Work Performed By: Florida Power & Light Co. PWO¹: 1122 6501 South Hwy. A1A WO ¹: 92052641 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Main Steam Type Code Symbol Stamp N/A I/8208 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section Xl Utilized for Repairs and Rcplaccmcnt Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. (Y or N)
OI'eplacement 1-3/8" All thread Allied Nut& Bolt Heat No. N/A None N/A Replacement 69501 1-3/8" Nuts Nova Mach. Heat No. N/A None N/A Replacement Prod. M20405
- 7. Description of Work: Cut all thread as required and installed 4 new studs and 8 new nuts.
- 8. Tests Conducted: Hydrostatic ~NA Pneumatic +A Nominal Operating Pressure (ISLT) X Other: VT \~ VT 2 X VT 3 ~pstg Test Tsmp.~'F
PSL.I, NIS-2 TRACKING NO. S L-1-1 1-~087 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1082 APPLIcABLE MANUPAOTURE's DATA REPQRTs To BE ATTAGHEo Certificate of Compliance We certify that the statements made in the report are correct and this Repair QXReplacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Owner or Owner's Designee, Title crrrr
(+p~
3 te 34/pv Date ~e', 19 03 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's lgnature National Board, State, Providence and Endorsements Date 19~5
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~09 0 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co. Date: 6/4/93 P.O. Box 529100 Slleeu I of 2 Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucic Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM¹: N/A 3, Work Performed By Florida Powe'r & Light Co. PWO¹: 5286 ~
6501 South Hwy. A1A WO ¹ 92040672 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Intake Cooling Water Type Code Symbol Stamp N/A (b) Component Identification: TCV 14MB Authorization No. N/A (Mark Number) Expiration Date N/A (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial Or Heat Board Identification Built Repaired Stamped Material No. No. of (Y or N)
Replacement All Thread Rod N/F N/F N/A A-193 N/A Replaced 1-1/4 -7UN-2A GR B7 All Thread Rod Allied Nut & Heat No. N/A SA-193 N/A Replacement 1-1/4 -7UN-24 X 6'ut Bolt Co. 8078593 GR B7 N/F N/A A-193 N/A Replaced 1-1/4 -7UN-28 GR B7 Nut Nova Machine Heat No. N/A SA-194 N/A Replacement 1-1/4 -7UN-28 Products F1892 GR7
- 7. Description of Work: Cut All thread rod as required and installed eight new studs and nuts.
- 8. Tests Conducted: Hydrostatic Othsr: VT 1
Nominal Operating Pressure (ISLT) X pslg Test Temp.~'p
e 0
PSL-1, NIS-2 TRACKING NO. S L-1-1 1 -~09 0 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: Mg3-1 023 APPLCABLE MANUFACTURES DATAREPoRTB To BE ATTACHED Certificate of Compliance We certiiy that the statemenls made in lhe report are correct and this Repair QXReplacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed rp& Jsr V Date ~(JVAE 19 'p3 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹1 1 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report In accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature National Board, State, Providence and Endorsemonts Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1 -~09 2 FORM NIS-2 01VNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provistons of the ASME Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 6/15/93 P.O. Box 529100 Sheet: I of Miami, FL 33152 Unit: I
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. AIA P.O.¹: B93671-30087 Jensen Beach, FL 34957 ,PCM ¹: N/A
- 3. Work Performed By: Florida Power & Light Co. IWO¹: 3606 6501 South Hwy. AIA WO ¹. 93010257 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdentificationofSystem: Reactor Coolant Type Code Symbol Stamp N/A V1202 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 1
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No.. No. or (Y or N)
Replacement Pressurizer Safety Crosby Valve S/N N/A A-351, CFSM N/F Replaced Relief Valve Co. N 54495.00-0003 (body)
Pressurizer Safety Crosby Valve S/N NB6116 A.351, CFSM 1972 Replacement Relief Valve Co. N 54495.00.0002 bod
- 7. Description of Work: Replaced valve with valve s/n N54495-00-002.
- 8. Tests Conducted: Hydrostatic Other: VT 1
Nominal Operating Pressure (ISLT) X pstg Test Temp.~'P
PSL1, NiS 2 TRACKtNfa NO. S L-1-1 1-~09 2 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1 093 APPLCABLE MANUFACTURE'S DATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statemenis made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Au orization No.: N/A Signed Owner or Ow r's Designee, Title Date 1 9~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Signature National Board, State, Providence and Endorsements Date Q~, 19~
PSL-1, NIS-2 TRACKING NO. S L - 1 - 1 1 -~09 6 F ORM NIS-2 OtVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions ot'he ASME Code Section XI
- l. Owner: Florida Power & Light Co. Date: 6/10/93 P.O. Box 529100 Sheet: I of Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A 3 Work Performed By Florida Power & Light Co. IWO¹: 7183 6501 South Hwy. A1A WO ¹: 93011207 Jensen Beach, FL 34957 .
CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Safety Injection Type Code Symbol Stamp N/A LS 3342 Authorization No. N/A (b) Component Identification:
(Mark Number)
Expiration Date N/A (c) Code Class: 2
- 5. (a) ApplicableConstructionCodeANSIB31.7, 1969Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Studs N/F N/A NIA ASTM A-193 N/A Replaced 3/4" UNC- 2A Gr7 AII thread Allied Nut 8 Heat No NIA SA-1 93 N/A Replacement 3/4 -1 0-UNC-2A Bolt Co. 90981 Gr B7 Nuts N/F N/A N/A ASTM A-194 N/A Replaced 3/4"-10-UNC-2B Gr 2H Nuts Allied Nut 8 Heat No. N/A ,
SA-194 N/A Replacement 3/4"-10.UNC-2B Bolt Co. E04277 Gr 2H
- 7. Description of Work: Replace all bolting material installed in the 1B2 SIT level switch due to boric acid build up.
- 8. Tests Conducted: Hydrostatic Other: VT I
~ Pneumatic VT2 X VT 3 ~ ~pstg Test Temp ~'F Nominal Operating Pressure (ISLT) X
e PSL-1, NIS-2 TRACKING NO. S L 1 1 -~09 6 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers'M93-1094 APPLICABLE MANUFACTURES CATA REPORTS TO BE ATTACHED Certificate of Compliance We certity that ihe statements made in the report are correct and this +Repair QXRepiacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed wner o ner'esignee, Title Date ~Nl~, 19~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's ignature National Board, State, Providence and Endorsemants Date /J, 19~
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~09 9 FORM NIS-2 OiVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- l. Owner: Florida Power & Light Co. Date: 6/9/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: B93671 30023 Jensen Beach, FL 34957 PCM ¹: N/A
- 3. Work performed By; Florida Power & Light Co. PWO¹: 1122 6501 South Hwy. A1A WO ¹: 92052643 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Main Steam Type Code Symbol Stamp N/A V 8211 Authorization No. N/A (b) Component Identification; (Mark Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Main Steam Crosby Valve S/N 6XRX10 HA-55 1977 Replaced Safety Relief Valve N55128-00.0019 A21B WBCtaody)
Main Steam Crosby Valve S/N N/A 6XRX10 HA-55 1972 Replacement Safety Relief, Valve N55128-00-0016 A216 WBCtaody)
- 7. Description of Work: Replace valve with s/n N55128-00-0016.
- 8. Tests Conducted: Hydrostatic Other: VT1
~ Pneumatic VT 2 X VT 3 ~pstg Test Temp. ~'P Nominal Operating Pressure (ISLT) X
PSL1, NIS2 TRACKING NO. S L-1-1 1-~09 9 FORM NIS.-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leak test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: Mg3-1082 APPLCABLE MANUFACTURES DATA REPORTS To SE ATTACNED Certificate of Compliance We ceraty that the statements made in the report are correci and this Repair QXReplacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of A ho ization No.: N/A Signed wner or Owner'esignee, Title pi ~O IS~
CERTIFICATE OF INSERYICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature I National Board, State, Providence and Endorsements Date 4 - />, 1S~9
PSL-1, NIS-2 TRACKING NO. S L-1 -1 1-~10 0 PPI FORM NIS-2 0'tVYER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 6/16/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: NA Jensen Beach, FL 34957 PCM ¹: NA
- 3. Work Performed By: Florida Power & Light Co. I WO¹: 8007 6501 South Hwy. A1A WO ¹: 93005065 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System: Reactor Coolant Type Code Symbol Stamp N/A ICI Flange Authorization No. N/A (b) Component Identification: N/A (Mark Number)
Expiration Date (c) Code Class: 1
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: No n e (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement ICI Seal Plug Combustion Serial ¹ 041 SA 479 1983 Replacement
¹ Part N1184 En ineerin Heat ¹ 45508 T e 316 ICI Seal Plug Combustion Serial ¹ 022 SA 479 1983 Replacement Part ¹ N1184 En ineerin Heat ¹ 28119 T e 316
- 7. Description of Work: Install incore instrument nozzle plugs at J7 8 G8 locations due to obstructions within the ICI path preventing insertion of the ICI assembly.
- 8. Tests Conducted: Hydrostatic Other: VT I
Nominal Operating Pressure (ISLT) pslg Test Temp~'P
~X
PSL-1, NIS-2 TRACKING NO. S L-1-1 1 -~10 0 FORM NIS-2 (Back) Sheet 2 of 2 satisfactory inservice leakage test was performed and witnessed by a VT 2
- 9. Remarks:
certified inspector.
- 10. Inspection Report Numbers: M93-1155 APPLICABLE MANUFACTURES DATA REPORTS TO BE ATTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this Repair QXReplacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Autho 'tion No.: N/A Signed Owner or Owner'slgnee, T e CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Sig ture National Board, State, Providence and Endorsement Date
PSL.1, NIS-2 TRACKING NO. S L-1-1 1-~10 2 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of tbe ASME Code Sectton XI
- 1. Owner. Florida Power & Light Co, Date; 8/17/93 P.O. Box 529100 Sheet: 1 of 2 Mami, FL 33152 Unit: 1 2, Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: 282-192 3 Work Performed By, Florida Power & Light Co. PWO¹: 73/4 6501 South Hwy. A1A WO ¹: 93012130 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identification of System; 'hemical & Volume Control Type Code Symbol Stamp N/A Authorization No. N/A (b) Component kfentification: V02134 (Maik Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addend@ N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. (Y or N) oi'eplacement 2" Piston Check Anchor S/N E-7401-9-1 3 N/A N/A SA451 Replacement Valve Darlln HeatN 34191 GR CFSM Bod
- 7. Description of Work: Cut out and replaced valve due to galled bonnet (prevents valve disassembly).
PCM 282-192. New weld numbers FW 600 & FW 601.
8, Tests Conducted: Hydrostatic Other: VT I
~X Pneumatic VT 2~X VT 3 ~ Nominal Operating Pressure (ISLT)
~Seen pst2 Test Temp.~Amhtent '2
h a P
e
PSL-'I, NIS-2 TRACKING NO. S L-1-1 1-~10 2 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory hydrostatic test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1088 APPLICABLE MANUFACTURES DATA REPORTS TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this /Repair +XRepiacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Ovmer or Ow s Designee, Title Date 19~
CERTIFICATE OF INSERYICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any Idnd arising from or connected with this inspection.
Commissions Inspector's gnature National Board, State, Providence and Endorsements Date 0
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~10 3 FORM NIS-2 OWNERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co, Date: 8/3/93 P.O. Box 529100 SheeL 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: N'/A Jensen Beach, FL 34957 PCM¹: N/A 3, Work performed By; Florida Power & Light Co. PWO¹: 1120 6501 South Hwy. A1A WO ¹: 92051623 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdentiTicationof System: Main Steam Type Code Symbol Stamp N/A MV484 Authorization No. N/A (b) Component identification:
(Maik Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31,7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XIUtilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Disc Schutte & N/A A-182 Replaced 4" Trip Throttle Vlv. Koertin F6 410 SS Disc Schutte & N/A A-182 N/A Replacement 4 Trip Throttle Vlv. Koertin F6 410 SS Studs Schutte & N/A'eat¹ N/A A-193 N/A Replaced 7/8"-9 UNC-2A Koertin GR-B1 6 Studs Nova Machine N/A A-193 N/A Replacement 7/8"-9UNC-2AX4 Products 69498 GR-816 Nut, Heavy Hex Schutte & N/A A-1 94 N/A Replaced 7/8"-9UNC-28 Koertin G B4 Nut, Heavy Hex Nova Machine Heat¹ N/A A-194 N/A Replacement 7/8"-9 UNC-28 roducts 60370 3 rad 4
- 7. Description of Work: Replaced the Main Steam throttle valve disc and all body to bonnet bolting.
'eference QC test results per PSLP-92-2547, Rev. 3 for further information on replacement disc material.
- 8. Tests Conducted: Hydrostatic Other: VT1
~ Pneumatic VT 2~X
~~
VT 3 ~pstg Test Temp ~'P Nominal Operating Pressure (ISLT) X
PSL-1, NIS-2 TRACKING NO. S L-1 -1 1-~10 3 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
10, Inspection Report Numbers: M93-1066 APPLICABLE MANUFACTURES DATA REPORTS TO BE ATTACHED Certificate of Compliance We certify that the statements made In the report are correct and thfs QRspafr +XRepfacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp:
Signed 0
N/A Certificate of Authorization No.: N/A er or Own 's Designee, Title Date
~ IS +B CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions specter's Slgnat re National Board, State, Providence and Endorsements Date
PSL-1, NIS-2 TRACKING NO. S L-'I -1 1 -~10 4 FORM NIS-2 OWNERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co. Date: 7/13/93 P.O. Box 529100 Sheet I of Mami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: l4'A Jensen Beach, FL 34957 PCM ¹: N/A
Jensen Beach, FL 34957 CWO ¹ NA Process Sheet: N/A
- 4. (a) Identification of System: Auxiliary Steam Type Code Symbol Stamp N/A Aux. Fd. Gov. Valve Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) ApplicableConstructionCodcANSIB31.7, 1969Edition. Addenda: N/A. CodeCasc: None (b) Applicablc Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdcntiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Re placed ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Stud Woodward N/F N/A A-193 N/A Replaced 1-1/8"-7UNC-2AX8" GR B7 Stud Dresser Rand Heat No. N/A A-193 N/A Replacement 1-1/8"-7UNC-2AX8" N20 GR B7
- 8. Tests Conducted: Hydrostatic Other: VT1 VT2QX Pneumatic ~Q VT 3 ~pstg Test Temp ~'F Nominal Operating Pressure (ISLT) X
PSL-1, NIS-2 TRACKING NO. S L-1-1 1 -~104 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: Mg3.10ee APPucABLE MANUFACTURES DATAREPORTS TO BE ATTACHED Certificate of Compliance We csrdfy that the statements made In Ihe report are correct and thts Repair QXReplacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp:
Certificate of Authori Signed N/A tion No.: N/A wner or Owner's Designee, tie Date
~ IS~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/S1, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature National Board, State, Providence and Endorsements Date
0 0
PSL-1, NIS-2 TRACKING NO. S L - 1 - 1 1 -~10 5
~
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provlstons of the ASME Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 6/4/93 P.O. Box 529100 S Iieet: I 0f Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: C90681-90083 Jensen Beach, FL 34957 PCM ¹: N/A
- 3. Work Performed By: Florida Power & Light Co. PWO¹: 7091 6501 South Hwy. A1A WO ¹: 93010458 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) IdentificationofSystem: Main Steam Type Code Symbol Stamp N/A MS SAFETY Authorization No. N/A (b) Component Identification:
(Mark Number) VALVE Expiration Date N/A V-8211 (c) Code Class: 2 S/N N55128.pp.p16
- 5. (a) ApplicableConstruction CodeANSIB31.7, 1969Edition. Addenda: N/A.CodeCase: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Disc insert Crosby Valves S/N N/A 6XRX10 HA.55 1972 Replaced N 88633-31-0002 19-9DL Disc insert Crosby Valves S/N N/A 6XRX10 HA.55 1991 Replacement N88633-43.0055 A<58, Gr-651
- 7. Description of Work: Replaced disc insert.
- 8. Tests Conducted: Hydrostatic Other:VT1
~ VT2 Pneumatic X VT3 Nominal Operating Pressure (ISLT) X
~psig Test Temp.~'P
e PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~10 5 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leak test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: Mg3-10B2 APPLCABLE llANuFACTUREB DATAREPORTS To BE ATTACHED Certificate of Compliance We certify that the stalemenls made In the report are correct and this Repair x Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed rtna Ovmer or Owner's Designee, Title PA'rxlv Date ~rr' 19 '93 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's. Report during operating cycle ¹1 1 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature National Board, State, Providence and Endorsements
, Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~10 6 FORM NIS-Z OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co. Date: 6/4/93 P.O. Box 529100 S Iieet I of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy, AIA P.O ¹: B93671-30092 Jensen Beach, FL 34957 PCM ¹: N/A
- 3. Work Performed By: Florida Power & Light Co. PWO¹: 7091 6501 South Hwy. A1A WO ¹: 93010458 Jensen Beach, FL 34957 CWO ¹: N/A Process Sheet: N/A
- 4. (a) Identification of System: Main Steam Type Code Symbol Stamp N/A MS SAFETY Authorization No. N/A (b) Component Identification:
(Mark Number) VALVE Expiration Date N/A V-8212 (c) Code Class: 2 (S/N N55128-00-0012)
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Disc insert Crosby valves S/N N/A 6XRX10 HA-55 1972 Replaced N/A N 88633-31-0006 19-9DL Disc insert Crosby valves S/N N/A 6XRX10 HA-55 1991 Replacement N/A N 88633.43-0056 A458, Gr 651
- 7. Description of Work: Replace disc insert ~
- 8. Tests Conducted: Hydrostatic Olhsr: VT 1
Nominal Operating Pressure (ISLT) psIg Test Temp~'p
~X
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~10 6 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leak test was performed and witnessed by.a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1 082 APPLtCABLE MANUFACTURES DATA REPORTS TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair x Repiacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed ACI'InC AIY fx re I Date c~/LA' I 9~5 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle f/11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Sig ature National Board, State, Providence and Endorsemonts Date -/0
I PSL-1, NIS-2 TRACKING NO. S L-1-1 1 -~10 T FORM NIS-2 OKVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power & Light Co. Date: 6/3/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: B93671-30092 Jensen Beach, FL 34957 PCM ¹: N/A 3 Work Performed By Florida Power & Light Co. PWO¹: 7091 6501 South Hwy. A1A WO ¹: 93010458 Jensen Beach, FL 34957 CWO ¹: N/A Process Sheet: N/A
- 4. (a) Identification of System: Main Steam Type Code Symbol Stamp N/A MS SAFETY Authorization No. N/A (b) Component Identification:
(Mark Number) VALVE Expiration Date N/A V-8214 (c) Code Class: 2 S/N N-55128-00-0014
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Disc insert Crosby valves S/N N/A ASTM A<58 1972 Replaced N88633-31-0013 GR651/6R10 Disc insert Crosby valves S/N N/A ASTM A%58 1991 Replacement N 88633-43-0061 GR 651/6R10
- 7. Description of Work: Replace disc insert .
- 8. Tests Conducted: Hydrostatic Other: VT I
~ Pneumatic VT 2~X VT 3 Nominal Operating Pressure (ISLT) X
~pstg Test Terhp.~'P
PSL-1, NIS-2 TRACKING NO. S L-1-1 1-~10 7 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: Mg3-1pe2 APPLICABLE MANUFACTURES DATA REPORTS To BE ATTACHED Certificate of Compliance We cerlity that the statements made in the report are correct and this [@Repair x Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Acrrnc rt'fPECv Owner or Owner's Designee, Title trav Date ~d&d', 19 93 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Signature National Board, State, Providence and Endorsernents Date
e IsSL-1, NIS-2 TRACKING NO. S L-1-1 1 -~10 9 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS s
As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co. Date'/2/93 P.O. Box 529100 Slice'L 1 of Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucic Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A 3 Work Performed By; Florida Power & Light Co, PWO¹: 7425 6501 South Hwy. A1A WO ¹: 93013455 Jensen Beach, FL 34957 CWO ¹: N/A Process Sheet: N/A
- 4. (a) Identification of System: Chemical & Volume Control Type Code Symbol Stamp N/A VCT Spray nozzle, Authorization No. N/A (b) Component identification:
(Matk Number) Lines 2-CH-A55, Expiration Date N/A 2-CH-550, 2SI-500 (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Studs N/A ASTM A-193 N/A Replaced 5/8"-1 1unc-2A GR B7 Studs Republic Heat¹ N/A AS ME SA-193 N/A Replacement 5/8"-11unc-2A En ineered steel 8099572 GR B7 Nuts N/A N/A ASTM A-194 N/A Replaced 5/8"-11unc-2B GR 2H Nuts Nova Machine Heat¹ N/A ASME SA-194 N/A Replacement 5/8"-11unc-2B Products 8090323 GR7
- 8. Tests Conducted: Hydrostatic Other: VT1
~ Pneumatic VT 2~X VT 3 Nominal Operating Pressure (ISLT) X
~pslg Test Temp.~'P
PSL-1, NI9.2 TRACKING NO. S L - 1 - 1 1 -~10 9 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: No leakage detected.
- 10. Inspection Report Numbers: Mg3-1422 APPLiCABLE MANUFACTURES DATA REPORTS TO BE ATTACHED Certificate of Compliance We cecity that the statements made in the report are correct and this Repair +xReptacement conforms to the rules of the ASME Code,Section XI.
r Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Date wner or OwneCS eslgnee, It CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspec or's gn ture National Board, State, Providence and fndorsements Date 19+~
e PSL-1, NIS.2 TRACKING NO. S L-1-1 1-~11 2 FORM NIS-2 OWNERtS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- l. Owner. Florida Power & Light Co. Date: 8/30/93 P.O. Box 529100 Shcct: 1 of Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A 3 Work Performed By'lorida Power & Light Co. PWO¹: /416 6501 South Hwy. AlA WO ¹: 93014145 Jensen Beach, FL 34957 CWO ¹: NA Process Sheet: N/A
- 4. (a) Identificationof System: Component Cooling Water Type Code Symbol Stamp N/A Authorization No. N/A (b) Component Identification:
(Mark Number)
YPH-1 /8 Expiration Date, N/A (c) Code Class: 3
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None summer 1983 (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru
- 6. Identification of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Yor N)
Replacement Spring Can Bergen N/A N/A VS1F N/A Replaced Paterson Size 16 Spring Can Bergen Serial No. N/A VS3100F N/A Replacement Paterson B-060522 Size 16
- 7. Description of Work: Replace degraded spring can due to corrosion.
Line ¹ I-20"-CC-3
- 8. Tests Conducted: Hydrostatic Other: VT 1
~ VT 2 Pneumatic VT 3 ~X Nominal Operating Pressure (ISLT)
~psig Test Temp.~'P
PSL-1, NIS-2 TRACKING NO.' L 1 1 -~11 2 FORM N IS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory visual examination was performed by a VT-3 certified inspector following installation and final adjustment of the new spring can.
10, Inspection Report Numbers: M93-1345 (VT-3)
APPLIOABLE LUWUFAOTuRES DATA REPORTS To BE ATTACHED Certificate of Compliance We certitr that the statements made in ths report are correct and this +Repair QXReptacemsnt conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Date 19~
w er or Owne Designee, T' CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature National Board, State, Providence and fndorsements Date
PSL-1, NIS-2 TRACKING NO. S L-1-1 1 -~11 3 1
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMEVl'S As Required by the Provisions of the ASME Code Section XI
- 1. Owner. Florida Power & Light Co. Date: '/4/93 P.O. Box 529100 Shcct: 1 of Miami, FL 33152 Unit:
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM¹: N/A 3, Work Performed By: Florida Power & Light Co. IWO¹: /654 6501 South Hwy. A1A WO ¹: 93016133 Jensen Beach, FL 34957 CWO ¹: N/A Process Sheet: N/A
- 4. (a) Identificationof System: Chemical & Volume Control Type Code Symbol Stamp N/A Authorization No. N/A (b) Component Identification: V-2324 (Mark Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thru summer 1983
- 6. IdentiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Yor N)
Replacement Stud, Inlet Flange N/A N/A N/A A-193 N/A Replaced 1"-SUNG-2A GR. B7 Threaded Rod Machine Heat¹ N/A SA-193 N/A Replacement 1"-SUNG-2AX6'ova Products 8094962 GR. B7 Nut, Inlet Flange N/A N/A N/A A-194 N/A Replaced 1"-8UNC-2B GR 2H Nut, Inlet Flange Nova Machine Heat¹ N/A SA-194 N/A Replacement 1"-SUNG-28 Products 805 195 GR 2H
- 7. Description of Work: Cut threaded rod as required and replaced undersized inlet flange bolting.
I~~ ~'F
- 8. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure (ISLT) ~x Other: VT VT2 x VT3 ~pstg Test Temp
inSL-1, NIS-2 TRACKING NO. S L 1 1-~11 3 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
- 10. Inspection Report Numbers: M93-1159(VT-2)
APPLtcABLE llAHUFACTURES DATAREPORTS TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this /Repair +XReplacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed ee~ J.. PAD'PH'PideE Owner or Owner's Designee, Title mEC Date ~A> >W IB tg ~3 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boifer and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be Ifable in any manner for any personal Injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions inspector's Si nature National Board, State, Providence and Endorsements Date 7
0 f
PSL-1, NIS-2 TRACKING NO. S L-1-1 1 -~11 4 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner: Florida Power &, Light Co. Date: 8/31/93 P.O. Box 529100 Shcctr I of Mami, FL 33152 Unit: 1
- 2. Plant: St. Lucic Nuclear Plant 6501 South Hwy. A1A P.O.¹; NA Jcnscn Beach,FL34957 PCM ¹: NA 3 Work Pcrformcd By. Florida Power & Light Co. IWO¹: 7486 6501 South Hwy, A1A WO ¹: 93014721 Jensen Beach, FL 34957 CWO ¹: NA Process Shcct: N/A (a) Identification of System: Chemical & Volume Control Type Code Symbol Stamp N/A V2328 Authorization No. N/A (b) Component Identification:
(Mark Number) Expiration Date N/A (c) Code Class: 2
- 5. (a) Applicable Construction Code ANSI B31.7, 1969 Edition. Addenda: N/A. Code Case: No ne (b) Applicable Edition of Section XI Utilized for Repairs and Rcplaccmcnt Components: 1983 Edition thru summer 1983
- 6. IdcntiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Relief Valve Crosby Valve N55254 NA ASME SA 351 1 988 REPLACEIVED (1 1/2" x 2 ) Co. 0009 CF8M Relief Valve Crosby Valve N55254 ASME SA 351 1 988 REPIACEM (1 1/2" x 2') Co. 0008 CF8M
- 7. Description of Work: Replace existing CH PP 1A DISCHARGE RELIEF VALVEwith tested spare to satisfy IST requirements.
t~~ ~
- 8. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure (ISLT) X Other: VT VT 2~X VT 3 ~pslg Test Temp~'p
0 PSL-1, NIS-2 TRACKING NO. S L - 1 -1 1 -~11 4 FORM NIS-2 (Back) Sheet 2 of 2
- 9. Remarks: Valve bench tested prior to installation. (
Reference:
NPWO 7537; W/0 93015224). A satisfactory Inservice Leakage test was performed after valve installation and witnessed by a VT 2 certified inspector.
- 10. Inspection Report Numbers: Mg3.10gB APPLCABLE MANuFAOTUREs DATAREPORTS To BE ATTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Owner or Ow er's Deslg, TI le CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have inspected the components described in this Owner's Report during operating cycle ¹11 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Inspectors SI nature National Board, State, Providence and Endorsement Date
PSL-1, NIS.2 TRACKING NO. S L-1-1 1-~11 6 FORM NIS-2 OWNERtS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1~ Owner: Florida Power & Light Co. Date: 7/14/93 P.O. Box 529100 Sheet: 1 of Miami, FL 33152 Unit: 1
- 2. Plant: St. Lucie Nuclear Plant 6501 South Hwy. A1A P.O.¹: N/A Jensen Beach, FL 34957 PCM ¹: N/A
- 3. Work Performed By Florida Power & Light Co. PWO¹: 7655 6501 South Hwy. A1A WO ¹: 93016134 Jensen Beach, FL 34957 CWO ¹: N/A Process Sheet: N/A
- 4. (a) Identification of System: Chemical & Volume Control Type Code Symbol Stamp N/A (b) Component Identification: V-2326 Authorization No. N/A (Mark Number) Expiration Date N/A (c) Code Class: 2 Applicable Construction Code ANSI B31,7, 1969 Edition. Addenda: N/A. Code Case: None (b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components: 1983 Edition thiu summer 1983
- 6. IdcntiTication of Components Repaired or Replaced and Replacement Components:
Type of Name of Manufacturer National Other Year Replaced ASME Code Component or Manufacturer Serial or Heat Board Identification Built Repaired Stamped Material No. No. or (Y or N)
Replacement Stud, Inlet Flange N/A N/A N/A A-193 N/A Replaced GR B7 Stud,inlet Flange Nova Machine Heat No. N/A SA-1 93 N/A Replacement 1"- 8UNC- 2A oduc s GR B7 Nut, Inlet Flange N/A N/A N/A A-194 N/A Replaced GR 2H Nut, Inlet Flange Nova Machine Heat No. N/A SA-1 94 N/A Replacement 1"- 8UNC-28 Products GR 2H
'or 8073413 or 8098719.
- 7. Description of Work: Undersized bolting (7/8 dia.) installed on inlet flange. Installed correct size studs and nuts (1 "dla.).
Tests Conducted: Hydrostatic Other: VT I
~ Pneumatic VT 2~X VT 3 ~ Nominal Operating Pressure (ISLT) X
~pstg Test Temp. 'F
PSL.I, NIS-2 TRACKING NO. S L-1-1 1-~tt 6 FORM NIS-2 (Back) Sheet 2 of 2
.- 9, Remarks: A satisfactory inservice leakage test was performed and witnessed by a VT-2 certified inspector.
I
- 10. Inspection Report Numbers: M93- 1 159 APPLICABLE LtAHOFACTVAEBDATA REPORTS To BE ATTACHED Certificate of Compliance We certlty that the atatementa made In the report are correct and thin QRepatr+Replacement conforms to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp:
Certificate of Authorization No.:
Signed or Own N/A N/A Designee, Title Cate
~ te~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boikir and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.
have Inspected the components described in this Owner's Report during operating cycle ¹1 1 starting on 12/91, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certiTicate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed ln the Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable ln any manner for any personal Injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions nspector' gnature National Board, State, Providence and Endcrsements Date