Page 1 of ll FPL H)~ ~-1 OWNERS'HEPORP,H)R INSERVICE INSPECTIONS As mqmryd by the provisions of the ASME CODE RULES

l. Owner Florida Power & Li t Co. 700 Universe Blvd Juno Beach Fl. 33408
2. Plant St. Lucie Plant 6501 S MA Jensen Beach Fl. 34957
3. Plant Unit 2 4. Owner Certificate of Autnorization~NA
5. Otaatercial Service Bate 08 08 83 6. National Soard Nimhar for Unit ~NA
7. Caqmnents Inspected Manufacturer Ccaagonent or Manufacturer or installer State or National Appurtenance or Installer Serial No. Province No. Board No HEACIOR V1HSEL 71172 N/A N/A PEKSSUEUZER CXR93E~~ON 71372 N/A N/A ENGINEZRING 2B STE'AM 71272-2 N/A N/A GENERATOR REACTOR COOIANI PIPING FIORIDA POWER &

IZGHI,'O. PAGE 8 OF ll IZNE NQS. ON N/A N/A SAFETY IKEX."ZXON FEDRIDA POWER & LB% NCS ON N/A N/A

~IHNG, CLASS 1 IZGHI'O. PAGE 8 OF 11 ING/IZHXNN IZNE NOS. ON N/A N/A PIPING PAGE 8 OF 11 MAIN STl':AM FIDRIDA HXKR & IZNE NOS. ON N/A N/A PIPING IZGHI'O. PAGE 8 OF 11 SAFl TY INTECZION FIDRIDA POWER & IZNE NOS. ON N/A N/A PIPING, CXASS 2 IZGHI'O. PAGE 8 OF 11 SHUZDOWN CXQIZNG FlDRIDA POWER & IZNE NOS. ON N/A N/A PIPING IZGHI'O. PAGE 8 OF 11 FIORIDA POWER & IZNE NOS. ON N/A N/A PIPING IZGEZ CO. PAGE 8 OF 11 Note: Supp/cmental greets in fo~ of lists, sh tch~ or ~wings.may be1 used, raided(1) size is 8 1/2 m. x 11 xn., (2) mkormat~on in items 6 on this report is included qn each sheet and (3) each sheet m numbered and the number of sheets m recorded aE. the top of this form.

9i03i90262 910307 PDR ADOCK 05000389 PDR

0' Page 2 of 11 NIS-1 REPORT (Continued) 1.Owner: Florida Power ~an Liciht ~oo. 700 Universe Blvd.

Juno Bch.FL.33408 2.Plant: St. Lucis Plant 6501 S. A1A Jensen Beach Fl 34957 3.Plant Unit: 2 '.Owner Certificate of Authorization ~N A 5.commerical Service Date: 8 Aucuust 1983 6.Unit National Board No. A ~N

8. Examination Dates:10-1-1990 tol2-12-1990
9. Inspection Interval: First 10 Year 08-08-83 to 08-07-93.

Third Period 08-08-90 to 08-07-93

10. Abstract of Examinations The Inservice Examination of selected Class I and II components and piping systems of Florida Power and Light Company's St.Lucie Plant, Unit 2, was performed during the refueling outage which began on October 1, 1990. This was the first scheduled outage the third inspection period of the First 10-year Interval (Program B) .

The components and piping systems examined were selected per the First Ten Year Inspection Plan, which was prepared per the requirements of Section XI of the ASME Code, 1980 Edition, through Winter of 1980 addenda.

Manual ultrasonic, liquid penetrant, magnetic particle, and visual nondestructive techniques were used in the examination of the selected components, piping systems, and their supports.

The examinations were performed by FP&L, assisted by Ebasco Services Inc. examiners. See attached Summary Tables for complete examination results.

Eddy current examinations were conducted by FP&L, assisted by ABB Combustion Engineering from October 10, 1990 through October 21, 1990 on 2A and 2B Steam Generators. 8411 tubes in steam genera-tor 2A and 8411 tubes in steam generator 2B were examined. re- See the attached NIS-BB report for the summary of examination sults.

Snubber functional testing and visual examinations were conducted in accordance with St. Lucie Unit-2 Plant Technical Specifi-cation 3.7.10 and ASME Section XI. Testing services were supplied by Qualtec Testing Services Inc..

System pressure testing was conducted by the plant to applicable Plant Technical Specifications and procedures. A summary of the specific systems tested is included in this report on Page 7.

All conditions identified in this report were dispositioned in accordance with St. Lucie Plant, Unit 2 procedures.

Page 3 of 11 NIS-1 REPORT (Continued) 1.Owner: Florida Power and Liciht Co. 700 Universe Blvd.

Juno Bch. FL. 33408 2.Plant: st. Lucia Plant 6501 8. A1A Jensen Beach Fl 34957 3.Plant Unit: 2 4.Owner Certificate of Authorization ~N A 5.commerical Service Date: 8 Aucuust 1983 6.Unit National Board No. ~N A

~1. Conditions Noted

12. Corrective Measures Recommended and Taken CLASS I REACTOR VESSEL Twenty eight of the fifty four reactor pressure (RPV) vessel studs, nuts and washers were examined using ultrasonics (UT),

magnetic particle (MT), and visual (VT) methods, as applicable.

The closure head to flange flange flex area was examined using magnetic particle. No rejectable indications were noted.

STEAM GENERATOR 2B Nineteen volumetric examinations were performed on the 2B steam generator primary head. Areas of examination included the tube-sheet to extension weld, the extension to head weld, and the intersecting meridonal welds. The support skirt to base was also examined using MT. I.D. geometry was recorded at the tubesheet.

No rejectable indications were noted.

PRESSURIZER The studs and nuts on the pressurizer manway were visually exam-ined in place. Also, the studs and nuts on two of the three pressurizer safety valves were visually examined. No recordable conditions were noted.

MAIN REACTOR COOLANT PIPING Surface (MT,PT), and volumetric (UT) examinations were conducted on five circumferential welds, and one branch connection weld. No rejectable indications were noted.

PRESSURIZER SPRAY AND RELIEF PIPING Volumetric (UT) Surface (PT) and Visual (VT-3,4) examinations were conducted as applicable on selected piping welds and sup-ports.No rejectable indications were noted.

Page 4 of 11 NIS-1 REPORT (Continued) 1.Owner: Florida Power and ~iciht ~Co. 700 Universe Blvd.

Juno Bch. FL. 33408 2.Plant: St. Lucie Plant 6501 S. A1A Senses Beach Fl 34957 3.Plant Unit: 2 . 4 D.wner Certificate of Authorization ~N A 5.Commerical Service Date: 8 AucCust 1983 6.Unit National Board No. A ~N ll. Conditions Noted

12. Corrective Measures Recommended and Taken CLASS I (Cont.)

SAFETY INJECTION/CHARGING/LETDOWN PIPING Visual, surface (PT), and volumetric (UT) examinations were con-ducted on selected piping welds, valves, and supports. Visual examination revealed heavy boric acid residue at the body to bonnet interface of valve V-3624. The valve was cleaned, dissas-sembled, and visually examined. No damage or degradation was noted on the interior or exterior surfaces including the gasket seating surface.

Four spring can hangers,SI-4201-7841, SI-4201-7541A, SI-4204-123, and CH-107-R10 were found with the indicators not set on the cold setting stamped on the scale. As found settings were evaluated and found to be within tolerance. Three spring cans were adjusted to the proper setting and will be checked during the next refuel-ing outage. CH-107-R10 was only 8 pounds off setting and was left as is. No rejectable indications were noted.

CLASS ZI STEAM GENERATORS (Secondary side)

Volumetric (UT) examinations were performed on the upper shell to cone weld of 2A Steam Generator. Surface (MT,PT) examinations were performed on selected integral attachments. No reportable indications were noted.

SHUTDOWN COOLING HEAT EXCHANGER 2A A rejectable linear indication was identified by surface examina-tion in the- reinforcement pad to shell weld at the outlet nozzle.

The indication, determined to be lack of fusion between weld passes was ground out , repair welded to restore the fillet weld to the proper size, and re-examined with no further reportable indications noted. In accordance with IWC-2430 an additional reinforcement pad to shell weld, including the nozzle to pad weld was examined. No reportable indications were noted.

Page 5 of 11 NIS-1 REPORT (Continued)

Florida Power and Liciht ~Co. 700 Universe Blvd.

e 1.Owner:

Juno Bch.FL.33408 2.Plant: St. Lucie Plant 6501 S. A~1 Jensen Beach Fl 34957 3.Plant Unit: 2 4.Owner Certificate of Authorization N~A 5.Commerical Service Date: 8 Aucuust 1983 6.Unit National Board No. A ~N

11. Conditions Noted
12. Corrective Measures Recommended and Taken CLASS II (cont.)

SAFETY INJECTION/SHUTDOWN COOLING PIPING Visual, volumetric, and surface examinations were conducted on selected piping welds, valves and supports. No rejectable indica-tions were noted.

MAIN STEAM Visual (VT-3), surface (MT), and volumetric (UT) examinations were conducted as applicable on selected piping welds, supports and integral attachments. No rejectable indications were noted.

MAIN FEEDWATER Visual (VT-3,4), and surface examinations were conducted as applicable on selected supports and integral attachments. No rejectable indications were noted.

SNUBBER EXAMINATION AND TESTING Visual examination (VT-3,4) was conducted on 1004 of the Unit's snubber population per Plant Technical Specifications. A total of 142 snubbers were functionally tested. This included the initial 10 4 sample, the testing of failures from the previous outage, and the subsequent samples as required due to failures this outage. Complete examination and test results are on file at the Plant. A summary of the functional test results is included with this report.

SYSTEM LEAKAGE/PRESSURE TESTING The system leakage tests and visual (VT-2) examinations of class I systems were performed by the Plant priorReactor to plant startup. The system leakage test was conducted during Coolant (RCS)

System overpressure test. The pressure testing documented on page 7 of this report includes all testing done from 4/28/89 up to 12/12/90.

Page 6 of 11 NIS-1 REPORT (Continued) 1.Owner: Florida Power and Liciht ~Co. 700 Universe Blvd.

Juno Bch.FL.33408 2.Plant: St. Lucis Plant 6501 S. A1A Jensen Beach Pl 34957 3.plant Unit: 2 4.owner Certificate of Authorization ~N A 5.Commerical Service Date: 8 AucCust 1983 6.Unit National Board No. A ~N

11. Conditions Noted
12. Corrective Measures Recommended and Taken AUGMENTED EXAMINATIONS I&E 79-13 As a follow up to the I & E Bulletin conducted a continuous scan (1004 of the base metal) from the nozzle ramp out to a point one pipe diameter upstream of the pipe to elbow weld on the horizon-tal pipe run. This is done every period on each Main feedwater line for each Steam Generator. No rejectable indications were found. Nozzle geometry was recorded.

Z&E 88-08, Supplement 3.

In response to Supplement 3 of this bulletin, eight fittings which could be subjected to unacceptable thermal stresses due to outleakage from the RCS during operation were identified for examination. Visual examination to detect any gross descernable distress or structural damage was performed. In addition, volu-metric (UT) examinatons were conducted to the extent possible of the entire fitting at all eight locations. No reportable indica-tions were noted.

In response to industry findings; the feedrings, nozzle thermal sleeves, and distribution boxes for both steam generators were examined to check for erosion and thinning using ultrasonics. No degradation was noted.

The Examination Summary Tables included with this Report provide the results. for the non-destructive examinations performed.

An explanation of the Summary Table format is also included.

Page 7 of 11 NIS-1 REEORT(Conttinued)

1. Owner Florida Pcs~ & Li t Co. 700 Universe Blvd Juno Beach Fl. 33408
2. Plant St. Iucie Nuclear Poly Plant 6501 S. A1A Jensen Beach Fl. 34957
3. Plant Unit 2 4. Owner Certificate of Autborization~NA
5. Carmerical Service Date 08 08 83 6. National Beard Number for Unit~NA Pressure Testing Suaarezy Report Test BDRY System Description Method/~~ ~

Class Results

  • 2-IET-07 RCS SYSTEM IZAEAGE SYS. LEAKAGE SAT.

2-IET-16 2A 2B & 2C AUX. ZZEIMAX1&RJXZEK. LINES HYDRQ&ZIC SAT.

2-IET-05 CHARGING PUMP SUCTION PIPING INSERVICE SAT.

2-IPT-06 CHARGING PUMP DISCHAEKE PIPING INSERVICE SAT.

2-IPZ-29 A CSELHGING DISCHAEKE IZNE INSERVICE SAT.

2-IPT-30 IDOP A & B MAIN STEAM LINES IN'ilICE SAT.

2-IPZ-33 B CHARGING HJMP DISCHARGE PIPING INSEfUTECE SAT.

2-IPT-34 C CKQKING PUMP DISCHARGE PIPING INSERVICE SAT.

2-IET-43 IOOP A & B SHVZDOWN COOLING LINES INSERVICE SAT.

2-IET-45 SAFETY IÃ7ZCXION LINES K) S.I. TANHS INSERVICE 2 SAT.

2-IET-16 IDOP A, B & C AUX. FEED FRCM CST H3NCTIONAL 2/3 SAT.

-IET-26 HJNCTIONAL 2 SAT.

2-IET-28 A & B IOOPS BORIC ACID MAKEIJP SUCTXON HJNCXIONAL SAT.

2-IET-40 HYEKRZINE TANK HJNCTIONAL SAT.

  • A test restart of sat. or satisfactory means no through wall leakage was detected.,

Any leaking qectmnical joints or valve pac3diap glands are identify'.ed and dispositioned

Page 8 of 11 NI8-1 REPORT (Continued) 1.Owner: Florida Power and Liciht ~Co. 700 Universe .Blvd.

Juno Bch.FL.33408 2.Plant: St. Lucis Plant 6501 S. A1A Jensen Beach Fl 34957 3.Plant Unit: 2 4 O.wner Certificate of Authorization ~N A 5.Commerical Service Date: 8 Aucuust 1983 6.Unit National Board No. A ~N Line numbers for the Piping systems with items examined (NDE) this outage.

CLA88 I REACTOR COOLANT SAFETY INJECTION I-42-RC-123 I-12-RC-162 I-3-S I-19 1 I-30-RC-112 'I-4-RC-101 I-30-RC-124 I-3-RC-141 CHARGING/LETDOWN I-12-RC-148 I-3-RC-309 I-2-CH-146 I-12-RC-150 I-3-RC-310 I-12-RC-151 I-2-RC-122 I-12-RC-152 I-2-RC-149 I-12-RC-153 I-12-RC-154 CLA88 Z1 SHUTDOWN COOLING SAFETY INJECTION (HPSX/LPSI)

I-12-SI-407 I-12-SX-101 I-10-SI-556 I-12-SI-412 '-12-SI-103 I-6-SI-110 I-10-SI-363 I-12-SI-410 I-6-SI-111 I-10-SI-472 I-12-SI-457 I-6-SI-112 I-10-SI-474, I-10-SI-164 I-6-SI-462

.44, I-10-SI-417 MAIN". STEAM FEEDWATER CONTAINMENT SPRAY I-35.5-MS-33 I-18-BF-51 I-24-CS-2 I-35.5-MS-3 I-18-BF-52 I-24-CS-41 I-34-MS-28 I-12-CS-10 I-12-CS-407

Page 9, of 11 NIS-1 REPORT (Continued) 1 .Owner: Florida Power and Liciht ~co. 700 Universe Blvd.

Juno Bch.FL.33408 2.Plant: St. Lucis Plant 6501 S. A1A Jensen Beach Fl 34957 3.Plant Unit: 2 4.owner Certificate of Authorization ~N A 5.Commerical Service Date: 8 Aucuust 1983 6.Unit National Board No. A ~N REPORTS USED IN THE DEVELOPMENT OF THE NIS-1 REPORT NUMBER ORGANIZATION JNS-PSL-200-90 FPL INSERVICE INSPECTION FINAL REPORT EDDY CURRENT EXAMINATION FPL OF STEAM GENERATORS FINAL REPORT SNUBBER VISUAL EXAMINATION FPL AND FUNCTIONAL TESTING FINAL REPORT TEST DOCUMENTATION FOR FPL INSERVICE PRESSURE TESTING

Page 10 of 11 N IS-1 REPORT (Continued)

Owner Florida Power & Li ht. Co. 700 Universe Blvd. Juno Beach Fl. 33408 Plant St. Lucie Plant 6501 S. A1A Jensen Beach Fl. 33454 Plant Unit 2 Commerical Service Date 08 08 83 We certify that the statement made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No.~N A Expiration Date N A Date/+~ I~ ~/P/ Signed Florida Power & Li ht, Co. By '

- H'C>

Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and /

Insurance Com an of Norwood Mass. have inspected the components described in this Owner's Data Report during the period 01 October 1990 to 12 December 1990 and state that

.to the best of my knowledge and belief, the owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions nspector's Signature National Board, State, Province, and Endorsements Date

Page 11 of 11 FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As required by the provisions of the ASME CODE RULES EDDY CURRENT EXAMINATION RESULTS PLANT: St. Lucie Unit 2 EXAMINATION DATES: October 10, 1990 thru October 21, 1990 TOTAL TUBES TUBES TOTAL TOTAL INDICATIONS PLUGGED AS PLUGGED PLUGGED STEAM TUBES PREVENTIVE THIS TUBES GENERATOR INSPECTED 204 394 404' 1004 MAINTENANCE OUTAGE IN S/G 8411 144 17 21 242 8411 150 18 180 LOCATION OF INDICATIONS

( 204 100% )

U BENDS EGGCRATES PARTIAL SUPPORTS TOP OF TUBE SHEET STEAM 1 TO 7 8 AND 9 TO 5 1 EGGCRATE GENERATOR DHB to DCB H/L C/L '

H/L C/L H/L C/L 155 2 1 0 143 2 0 10 1 Remarks:

CERTIFICATION OF RECORD We certify that the statements in this report are correct and the tubes inspected were tested in accordance with the requirements of Section XI of the ASME Code.

M+nJ 'pg ) /'7r'ATE

/Z Florida Power & Light Co.

AvPg BY

FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST. LUCIE PLANT 6501 SOUTH HWY A1A JENSEN BEACH, FLORIDA 34957 Commercial Service Date: August 8,1983 UNIT 2 STEAM GENERATOR 2A & 2B LIST OF TOTAL TUBES PLUGGED 1990 CUMULATIVE REPORT

APL CUMMULATIVE DISTRIBUTION

SUMMARY

ST. LUCIE UNIT g 2 10/90 COMPONENT : STG gA Page : 1 of 1 Date : 10/29/90 Time : 2:36 PM Examination Dates  : 10/10/90 thru 10/19/90 Total Number of Tubes Inspected .....: 8411 Total Indications Between 20% and 39% 144 Greater than or equal to 40% 17 Total Tubes Plugged as Preventive Maint : 5 Total Tubes Plugged This Outage.........: 21 Location Of Indications 20% to 100%

Hot Leg Cold Leg TSH -.5 to 01H -2.1 0 TSC -.5 to 01C -2.1 01H -2.0 to 07H +2.0 3 01C -2.0 to 07C +2.0 07H +2.1 to DHB -3.1 1 07C +2.1 to DCB -3.1 DHB -3.0 to DCB -3.0 155 an FPL Group company

JNS/CI CNR 1990-2-58 NCR PAGE OF~ Page 3 of 4 PLUGGABLE TUBES LIST PSL-2 10/90 COMPONENT :STG <<A Page  : 1 of 1 Date : 10/20/90 Time : 9:33 AH

+ + + + + + +

I I I IREQI I TEsTED I I I I I I I I (ROM(LINE(ZONE IEXT (LEG I EXTENT I REEL I CHI PROBE I LOCATION I x Ivoltsloegl oataset

+~ + +

I 93( 27( 13 ITEHI C ITEH PS (AC049 iH 3(A.580.H/ULC i VS4 O.a I 60I 6.9I OIOEGRADEO I C ITEH PSIAC055 IH 3(A-580.H/ULC i vs2 1.0 40( 2.6( OIIHPERFECT I I 87( 51( 13(TEH( I 57I 14ITEHI C ITEH PS(ACO04 IH 3 iA-5SO.H/ULC I OHB 0.2 I 44( 2.9( OIIHPERFEC.PI I131(

ssi 16ITEHI C ITEH PSIAC067 IH 3 IA.SSO-H/ULC i vs2 -o.s IPTPI 3.OI O(001 64( 14(TEHI C ITEH PSIAC004 IH 3(A-580 H/ULC I OHT .0.2 I 62( 6.4( 0(DEGRADED-Pl l134(

(133( 65( 14(TEHi C ITEH PSIAC059 IH 3(A 580 H/ULC I DHT 0.0 I 50I 3.3I OIIHPERFECT I 4(TEcl PSIAH013 3(A-580 H/ULC I DHB O.O I 41( 2 2( OIIHPERFECT (

I 33( 69( H ITEC IH I 38( 70( 4(TEC( H ITEC PSIAH013 IH 3(A-5M-li/ULC I OHB 0.0 I 44( 2.6( 0(IHPERFECT I 4ITEcl H ITEC PSIAH013 IH 3(A-580.H/ULC I OHB 0.0 I 51( 3 7( 0(IH ERFECT I I as) 73( 4ITECI H ITEC PSIAH013 IH 3(A.580.H/ULC i ocs o.o I

'4 I 'SI IDEGRADED I I 43( 77( 18(TEHI C ITEH PSIAC046 IH 3(A-580 H/ULC I OHB I 4OI 3.0( 0(IHPERFECT I 44( -78( 18(TEH C iTEH PSIAC046 (H 3(A-580.H/ULC i OHB Ooo I 54I 5.6I OIOEGRADEO I I 4sl aol 18ITEHI C ITEN PSIAC046 IH 3(A 580 H/ULC I OCB 0.0 I 42( 3.3( 0(IHPERFECT I I 50( 84( 18(TEN( C ITEH SS(ACO47 IH 2(A 580-H/ULC i ocr o.o i 44i 2.6( 0(DEGRADED I 47( 85( 'ITEHI C ITEH PSIAC019 IH 3(A.580.H/ULC I OHB I 47( 3.5( 97(IHPERFECT I I I I ITEHI C ITEH PSIAC019 IH 3(A-580 H/ULC I DCS 0.0 I 59I 5.8( OIIHPERFECT I I 52( 86( 5(TEH( C ITEH PSiAC010 IH 3(A 580-H/ULC ( OCT -O.2 ,

I 52( 4.9( 0(IHPERFECT I I 53I 87I 5ITEHI C ITEH PCIAC010 IH 1(A 580 H/ULC I ocr o.o IPTPI 1.8( 98(IHPERFECT I I 48( as' 6ITEHI C ITEH PS(ACOI9 IH 3(A.580 H/ULC I OHT 0.0 IPTPI 2.4( OIIHPERFECT I 43I 91I 6ITEHI C ITEH PCIAC019 IH 1(A.580-H/ULC I OIIT 0.0 IPTPI Ie2(102(DEGRADED I PCiAC019 IH 3IA-SSO.H/ULC I OCB 0.0 IPTPI 1.9( O(2-s I 42I 94I 6iTEHi C ITEH I 371 97I 6(TEHi C ITEH PSIAC019 IH 3(A-58O-H/ULC I OHB 0.0 I 53( 4.4( 0(IHPERFECT I

+

Naker of Pluggable Tubes: 21 Naker of Indications Selection Criteria :

PerCent ToMe ~ ~ ~ t 40 Includes ADI,NQI,DSI,OTI,ORI,LPI,TBP,TRS,PTP Codes j0-a-Pd

/ I DATA C ROLLER DATE (7 wQ JPN / ESI gfG COORDINATOR DATE

CLISRJLATlvE EXAHINATlON REPORT PSL-2 OUTAGE  : 10/90 COHPOKEKT  : STG fA Page  : 1 of 4 OESCRIPTlOK : 20X To 100X Date : 10/29/90 Time: 2:51 PH I f Extent 1O/90 N/A I (Rod( Lin(Leg(Req(Tst/Note( Loc ation

+---( ---(-- I-- I----I- Reel I

Probe Volts(oeg(ch

--I--- I-"I-- .-I- (

I X (Diff( Location (Volts(oeg(Ch (

X (

I 89( 21( C ITEHITEH SSGMIAC002 (A-580.H/ULC (VS2 (H 2( 21(

I 86( 22( C (TEH(TEH GN(AC002 lA.SBO.H/ULc Ivs3 -.s( z.o( (x a(

( 92( 26( C ITEHITEH GNIAC049 (A.SSO.N/ULC (OSC -.8( 1.O( 22(

( 93( 27( C ITEHITEH PSGYIAC049 (A SSO.H/ULC IVS4 .s( 6.9( (x 3( 6o(

( 98( 28( C (TEH(TEH GN(AC002 (A-sso-H/ULC (vs4 1.6( fx 2( 29(

( 9z( 34( c (TEH(TEH (Ac051 IA 580 H/ULc Ivs4 z.o( (x 3( 34(

34( C ITEHITEH IAC051 (A 580 H/ULC (VS2 .9( (H 3( zo(

( ss( 37( C (TEH(TEH PS(AC041 (A.SSO.H/ULC (VS3 2.3(

44( C (TEH(TEH GN(AC043 IA 580-H/ULC (03H 11.7( .8(135( 1( zof (1111 47( C (TEH(TEH PS(AC057 (A 580 H/ULC (VS2 ~ rl 1.5 I (x 3( 29(

I I I C ITEHITEH PSIAC057 IA sso H/ULc Ivs3 ~ s( 1.S( ze(

( 41( 49( H ITECITEC IAH009 IA 580 H/ULc I .r( (H 3( as)

I 48( 501 H ITECITEC PSIAH010 IA 580 H/ULc I --7( .8( 21(

l124( 50( C (TEH(TEH GM(ACM3 (A.580 H/ULC (VS2 -.8( 1.4( z6(

(126( 50( C ITEHITEH GMIAC003 (A.580-k/ULC (VS1 1.1( (H 3( 22(

( Sr( 51( C ITEHITEH PSGMIACOSS IA SSO.N/ULc lvsz 1.O( z.6( 40(

I 20( 52( C (TEH(TEH SSQI(AC048 (A-sao-x/ULC (06H 32.8( .s(132( 1( 22(

( 84( 52( C ITEHITEH PCIACOS (A.580 H/ULC (VS3 -.1( 1.1(105(H 1( 29(

(126( 4( C ITEHITEH PS(AC 8 lA.sso H/ULc Ivsl .9( Z1(

(123( ssl c ITEHITEH lAc058 IA-580-H/ULc Ivs1 (H 3( zo(

(129( 57( C ITEHITEH PSIAC058 IA 580 H/ULC (DCT .o( .9( 21(

(131( sr( c (TEH(TEH PSQI(AC004 (A 580-H/ULC (OHB .2( 2.9(

58( C ITEHITEH PCIAC067 (A.580.H/ULC (VS4 ~ rl (x 3( zo(

I I I C ITEHITEH PSIAC06 (A 580 H/ULC (VS4 .o( 1.8( (H 3( zs(

I 94( I C ITEHITEH PSGYIAC06 (A 580 H/ULC (VS2 -.e( 3.0( 39(

1127( 59( C (TEH(TEH PS(ACOSS (A-sso-H/ULC (vs1 21 I 48( 60( H ITECITSC PSGNIAH011 (A 580.H/ULC (VS3 1.1( 1.7( (H 3(

f'Z(

I 83( 61( C ITEHITEH PSIAC068 (A-seo-x/ULc (vs3 .6( 1.8( (H 3( 29(

I I I C ITEHITEH GNIAC068 IA 580 H/ULC IVS4 .7( 1.5( 25(

(131 I 61( C (TEH(TEH PC(AC059 (A 580.H/ULC (OHT .o( 1.81 35(

I 36( 621 8 ITECITEC, SSIAH012 (A-580-x/ULC (vs3 .r( .s( (x 2( zo(

( rs( 62( C (TEH(TEH'<:,SS(AC044 (A.580.H/ULC (VS2 .s( 1.3( ar(

63( H (TEC(TSC.* SS(AH012 IA-580-H/ULC (VS3 -..s( .6( (x 2( 22(

(135 ( 63( C ITEHITEH." . IAC004 (A.SSO.H/ULC (VS1 -.7( 1.4( (x 3(

( 94( 64( C (TEH(TENT (AC069 (A 580-H/ULC (VS2 zol (1zs( 64( C (TEH(TEH PS(AC059 (A.SSO.H/ULC (VS'1 1.0( 1.5( 29(

l134( 64( C (TEH(TEH PSGY(AC004 (A.SSO.H/ULC (DHT -.2( 6.4( 62(

1133( 65( C (TEH(TEH PSGM(AC059 (A.SSO-H/ULC (OHT .o( 3.3( (H 3( so(

( 3z( 68( H ITECITEC IAH026 (A.SSO.H/ULC (DHB -0( 1.9( 35(

68( H ITECITEC PSIAH013 (A 580.H/ULC IOHB .o( zo(

69( H ITECITEC PSGNIAH013 (A 5SO H/ULC (DHB .o( 2.2( 41(

I I l H ITECITEC PSGNIAH013 (A 580 H/ULC (DCB .o( 1.4( 33(

35( 69(

---I--------I--"..r(I---(-" -I.

lA-580.H/ULC IDCB I

+---(- -I- I--I- -I H ITECITEC PSGN(AH013 I

.o( (H 3( 22(

(

CIPSRJLAT I VE EXAHlKATlOK REPORT PSL-2 OUTAGE  : 10/90 COHPOKENT  : STG SA Page  : 2 of 4 DESCRlPTIQI: 20X TO 100X Date : 10/29/90 Time: 2:51 FH I I Extent I 10/90 I I /A IRoMILInlLeg(ReqlTst/Hotel Reel Loc ation

'-I- I I I" Probe I"-- - I--""".-I--- I Ivolts(D eglch X (Diff( Location

".-- I-.- I-- I-"I--- .-------.--

I Voltsloeglch ( X I I >>I 69( H ITECITEC IAH013 (A 580.H/ULc loca .ol 1 sl IH 3( 34(

I 381 rol H ITECITEC PSGYIAH013 IA-580 H/ULc IDHB .ol z.61 (H 3( 44(

(4zl ro( H ITECITEC PCIAH013 IA-5M-H/ULC IDCB .01 1.s I I aol rol C ITEHITEH PSGYIAC045 IA.580 H/ULC IVS3 "71 1 81 IH 31 zrl 11361 7o( C ITEH(TEH IAC004 IA.580.H/ULC IVS1 1.4 ( IH 3( 24(

I 431 711 H ITECITEC IAH013 (A 580 H/ULC IDCS .o(

I 451 711 H ITECITEC IAH013 IA-580 H/ULc IDce .ol .81 IH 31 z41 13e( rz( H (TECITEC GNIAH013 IA 80 H/ULC IDCB .o( .81 (H 31 241 I 4ol rzl H ITECITEC PSGYIAH013 IA 580 H/ULc IocT .o( .8( IH 3( 23(

(42( nl H ITECITEC IAH013 IA 580.H/ULC IDHB .ol 1.51 I I I H ITECITEC PSIAH013 IA 580 H/ULC IDCT .ol .71 (H 31 221

( 44( 72( H ITECITEC PSIAH013 IA.5M H/ULc IDHB .ol IH 31 211 I so( n( H ITECITEC GN(AH013 IA-580 H/ULC IDCB .o( .81 IH 3( 24(

11z6( nl C ITEHITEH IAC061 IA.580.H/ULC (08H IH 31 211 I 411 73( H ITECITEC PSGYIAH013 IA.580 H/ULC IDHS .ol 3.71 IH 31 s11

( 4sl 731 H ITECITEC PSGYIAH013 (A-seo-H/ULC loca .ol 2.81 IH 31 451

( 4rl 73( H ITECITEC PCGN(AH013 IA 580.H/ULC IVS3 -.8( 1.51 (H 3( 341 l>>sl 7 I C ITEHITEH PSIAC061 (A.580 H/ULC IVS1 .81 1.21 IH 3( 221 I 421 741 H ITECITEC GNIAH013 IA.580.K/ULc IDHB .ol 1.31 IH 31 311 I I I H ITECITEC GNIAH013 IA.580-H/ULc loca .01 (H 3( zs(

I 441 741 H ITECITEC PSIAH013 IA 580 H/ULC IDCT .ol 1.sl IH 3( 34(

I 411 751 C ITEHITEH PCIAC04 IA 580.H/ULC IDCT 01 1.91 IH 31 27(

I 43( rrl C ITEHITEH PSGYIAC046 (A.580 H/ULC (OHS .ol 3.01 IH 31 401 I s11 rrl C ITEHITEH IAC046 IA.5M H/ULc IDGT .o( 1.31 I s3( rrl C ITEHITEH SSIAC046 IA-sao-H/ULc IDHB .ol .sl IH zl 211 (44( ra( C ITEHITEH PSGYIAC046 IA.580.H/ULc IDHB .ol s.61 IH 3( s4(

I sol ral C ITEHITEH (AC046 IA 580-H/ULC IDHB .ol 1.2( IH 3( 211

( 54( rsl c ITEHITEH PsGNIAc046 IA-seo-H/ULc loca .ol 1.sl IH 31 as)

( 471 r9( C ITEHITEH PS(AC046 IA 580 H/ULc IDHT .ol 1.61 IH 31 27(

I 49( 791 C ITEHITEH IAC046 IA-sao-H/ULc (vs3 ~

.61 1.11 IH 3( 21(

I 481 eol C ITEH(TEH PSGN(AC046 IA.580 H/ULc loca .ol IH 31 4zl I 521 MI C I TEHI TEN~'~i, PS IAC046 (A 580 H/ULC IDHT .ol IH 3( 27(

I I I C ITEHI TEHl, PS IAC046 IA-580.H/ULC IDCB .ol 1.41 IH 3( 24(

( s6( aol C ITEHITEH -'SIAC046 IA 580 H/ULC IDHT .o( 1.61 (H 3( zr(

I sel MI C ITEHITEH IAC046 IA 580 H/ULC IDCS ~ ol IH 31 241 I 47( 81( C ITEHITEH IAC047 IA.580 H/ULC (OCT ~ ol 1.sl IH 3( zs(

I 571 811 C ITEHITEH PSGYIAC047 IA 580-H/ULc IDHT .ol 1.61 IH 31 z6(

I 46( 821 C ITEHITEH SS(AC047 IA 5M H/ULC IDHB .o( 1.61 IH 3(>>I

( 47( as) C ITEHITEH SSGNIAC047 IA 580 H/ULc IDHB .ol .4( 110IH 11 211 I s31 83( C ITEHITEH SCIAC047 (A 580.H/ULC (DCB .ol 1.21 IH zl zel I as/ 84( C ITEH(TEH PSIAC047 IA.580.H/ULC IDCT .o( 1.51 IH 3( z6(

I sol 84( C ITEHITEH SSGNIAC04 IA-580.H/ULc IDGT .ol 2.61 IH zl 441 I 54( 84( C ITEHITEH IAC047 IA 580 H/ULc (ocT I-.-I--I-- I-------

1.31

'--l--l--I- I I .I. . I 01 I --I

CNDRILATl VE EXAHlNAT lON REPORT PSL-2 OUTAGE  : 10/90 COHPONENT  :~ STG fIA Page  : 3 of 4 DESCRlPTION  :~ 20X TO 100X Date : 10/29/90 Time : 2:51 PH I ( Extent I I 1 0/90 I I /A (Rog( Lin(Leg(Req(Tst/ Note( Reel Probe Loc ation (Volts(oeg(Ch X (Diff( Location

'.-I -- I"-I-- I----.-- I----- I.""""- ( (

--I---- I-- I.- ( Volts(Deg(Ch ( X (

(140( 84( C ITEHITEH Pc(AC004 IA 580 H/ULC IOHT .o( 1.5 (104 (H 11 33(

851 C ITEHITEH PSGYIAC019 (A-580-H/ULC (DHB .o( 3.51 97(H 3( 471 I I I C ITEHITEH I AC019 IA 580 H/ULC IV 3 .e( 1.11 IH 31 21(

I I ( C (TEH(TEH PSGYIAC019 lA-580.H/ULC IOCB .o( S.e( 3( 59(

- I 491 esl C ITEHITEH (AC019 (A-580 H/ULC IDHB .o( 31 261 I I ( C (TEH(TEH (Ac019 IA-580 H/ULc (Des .o( 3( 3z(

1 53( 85( C ITEHITEH PSGNIAC010 (A-580 H/ULC (DCB .o( 1.2( 3( 24(

( SS( 85( C (TEH(TEH PSGNIAC010 IA 580 H/ULc IDcB .o( 1.6( 3( 29(

( S9( 851 C ITEHITEH PSIAC010 (A 580 H/ULC (DCS .1( 1.6(

( 46( 86( C (TEH(TEH IAC019 (A 580-H/ULC (DHB .o( 3( zs(

( sz( 86( C ITEHITEH PSGYIAC010 (A 580-H/ULC (OCT -.2( 3( sz(

( S6( 86( C (TEH(TEH IAC010 (A-580-H/ULc (oce .o( z.o( 3( 32(

I sel 86( C ITEHITEH GYIAC010 (A-580.H/ULC (DCB .1( 3( 23( .

( 92( 86( C (TEH(TEH PSIAC075 (A 580 H/ULC (VS2 1.01 .r( 3( 23(

1140( 86( C ITEHITEH 'AC004 IA-SSO H/ULC IDCT .o( 2.O( 3( 33(

871 C ITEHI E IAC019 (A-seo-H/ULc (ocT .ol 1.S( 3( 26(

87( C ITEHITEH PSIAC010 IA sso H/ULc IDcT .o( 1.6(

1 53( 871 C ITEHITEH IC(ACO1O (A 580-H/ULC (VS3 .7( 3( zo(

I 1 I C ITEHITEH PCGYIAC010 (A.seo.H/ULC (DCT .o( 1.81 98(H 11 37(

( SS( 871 C ITEHITEH GN(ACO1O (A 580 H/ULC (OHS .o( 1.2( 3( 24(

I 931 871 C ITEHITEH I cGN(AcorS (A-580-H/ULC (VS4 1 01 .9( 3( z6(

I 97( erl c ITEHITEH PS(ACO7S (A 580-H/ULC (VS2 -.5( .6( (H 3( 22(

I I I C ITEHITEH PS(AC075 (A 580.H/ULC (VS3 .9( .9( 3( 261

( as) 88( C (TEH(TEH (AC019 IA 580 H/ULc IDHT .o( 3( 20(

88( C (TEH(TEH PSGH(AC019 (A-580 H/ULC (DHT .o( 2.4( 3( 38(

I I I C ITEHITEH PSGM(AC019 (A 580.H/ULC (DCT .o( 2.2( 3( 36(

I 521 88( C (TEH(TEH PSGHIAC010 (A-580-H/ULC (DCB .o( .9( 3( zo(

( 94( eel C ITEHITEH GN(AC075 (A-580-H/ULC (VS2 -.8( .r( 3( 23(

I I I C ITEHITEH (AC075 IA 5SO H/ULC IVS4 -.9( .8( 31 241 1139( 89( C (TEH(TEH I CGM(AC004 (A 580.H/ULC (OHT .o( 1.21101 IH 1( 36(

I 43( 91( C ITEHITEH PCGY (AC019 IA sso-H/ULc loHT .o( 1 211021 11 351 I I I C ITEHITEH (AC019 (A-580 H/ULC (DHB .o( 1.61 IH

( 4S( 911 C ITEHITEH PS(ACO19 (A SSO H/ULC IOHB .o( 1.1( 3( z1(

911 C ITEHITEH SCGM(AC004 (A-580 H/ULC (OHT .o( 1.31 IH 3( 23(

I 461 921 C (TEH(TEH PCIAC019 IA 580.H/ULc IDHT DI 2.O( 3( 33(

( Sz( 921 C ITEHITEH GN(Aco11 (A 580 H/ULC (VS3 .8( 3( 26(

I 41( 93( C (TEH(TEH PC(AC019 lA.580.H/ULc IDGT .o( 1.21115(H 1( 21(

I 42( 941 C ITEHITEH PCGYIAC019 (A.seo-H/ULC (DCB .o( 1.9( 3( 3z(

I 391 95( C ITEHITEH PCIAC019 IA 80 H/ULC IDHB .o( 1.9( 3( 32(

I 421 961 C ITEH(TEH PS(AC019 (A.580-H/ULC (DHT ~ 01 1.2( 3( 22(

( 94( 961 C ITEHITEH (Acorr IA 580 H/ULC IVS2 -.r( 1 OI IH 31 23(

I 371 97( C ITEHITEH PSGYIAC019 IA-580-H/ULC (0KB .o( 4.4( 3( S3(

I C ITEHITEH IAC019 80 H/ULC IDCB .o(

-- I "1 "1-- --1-"- . IAI-- --1-.(- 3( 33(

CNefuLAT I VE EXAHIKATION REPORT PSL-2 OUTAGE  : 10/90 COHPOHENT  : STG ¹A Page : 4 of 4 DESCRIPTION : 20X TO 100X Date : 10/29/90 Time : 2:51 PH I (

Extent I 10/90 I I N/A (Rou(Lin(Leg (Req(Tst/Note( Reel Probe Location (Volts(oeg(Ch II (Diff( Location

'-I.-I--I. I.. I I I

- I"--I".I-- I- (

I (Volts(oeg(Ch ( X (

I <<3( 97) C ITEHlTEH GMIAC013 )A 580.H/ULC )04C 26.1( .B)1351 1) zo(

l138( 98( C ITEHITEH PSIACN (A 580.H/ULC IDHB .o( 1.5 ( 3Z(

l 48( 100( C ITEHITEH PSIAC020 IA 580 H/ULC (DCB .o( 1.0( 22) l 4)100( C ITEHITEH PSGNIAC013 IA <<SO H/ULC (vs3 -.5( 1.Z) )H 3) 24(

I 31)101) C ITEHITEH (AC020 IA-<<BO.H/ULC (OCT ~ o( 29)

( 911103( C ITEHITEH GYIAC079 IA 580 H/ULC (vs4 .7) (H 3) zo)

)1321104( C ITEHITEH PSGYIAC083 (A 580 H/ULC (vsz .e( 1'3( (H 3) z6(

( 82)106( C (TEH)TEH PSGN(AC079 IA 580 H/ULC (vs3 .8( ~ rl 21(

( 96)108) C (TEH(TEH (ACOBO (A <<N H/ULC )vsz -rl 1.31 Z3)

) c (TEH(TEH Ps(Acoeo IA <<SO.H/ULC )vs3 -.6( 1.2) 21(

I 94)116) H ITECITEC PSIAH031 (A <<N-H/ULC )vs4 .e) .6( (H 3) 21(

1113)1171 H ITECITEC GNIAH038 )A-<<co-H/ULC (o<<H 29.r( 1.O)133( 23)

I 84(120( H ITECITEC IAH032 (A 580.H/ULC (vs4 .5) IH 3( zo(

I 94)120( H I'IECITEC PSGNIAH033 IA <<SO.H/ULC Ivs2 rl 1.2) Ze)

( 53(127( H (TEC(TEC PS(AHOZ<< (A 580 H/ULC (VS3 1'3l 29(

I 57(127( H I'TECITEC PSGMIAH025 )A-<<ao-H/ULc )VS3 -.6( Z1)

I 91(127) H ITECITEC PSGMIAH034 )A 580 H/ULC )vsz .5) zo(

I 97(127) H ITECITEC PSGYIAH034 )A-580-H/ULC (vs3 1.1(105)H 3( zr(

I 80(128( H ITECITEC PSGMIAH025 )A.<<BO.H/ULC (vs4 Bl .5( zo)

( 87)129) H ITECITEC PSQIIAH035 (A-sao-H/ULc )vs3 z.o) (H 3) 37)

I 931131( H ITECITEC PSIAH035 (A-<<N-H/ULC (vsz .r( 1.4( 30)

I 92(132) H ITECITEC PSIAH035 )A 580 H/ULC IVS2 .6) .7( 22)

I 97(1331 H ITECITEC PCIAH035 (A 5N H/ULC (vsz (H 3) 25(

) 96)134( H (TEC(TEC PSGN)AH036 (A 5N H/ULC )vs3 -.9( .6) )H 3( Z1)

I 96(1381 H ITECITEC PSGYIAH036 )A-580 H/ULC )vs3 -.8) 1.4 I I l1 I H ITECITEC PSGMIAH )A 580.H/ULC (VS3 .6( Z1(

I 95(139( H ITECITEC PSIAH03 )A <<BO.H/ULC (vsz -9( .6) (H 3) zo)

I 97)139( H ITECITEC PSIAH037 (A.<<BO.H/ULC )vsz .9) )H 3) as)

I 85(141) H ITECITEC GMIAH037 (A-58o-H/ULc )VS3 .9( 26(

( 87(143( H (TEC(TEC PSQI)AH037 )A.580 H/ULC )vs3 .8) 24(

( 49(147( H )TEC(TEC PS)AH019 )A 580.H/ULC (OCB .o( 1.1( zr(

I 47(15<<I H ITECITEC'SSGNIAH021 (A 580-H/ULC )VS3 1.o( .61 2) 23(

+--(--I--(--I---'-I- -I I I I (H

-I--I -I-Mmher of INDICATIONS Selected fros Current Outage: 161 Nwher of TUBES Selected frcxs Current Outage: 144

CUMMULATIVE DISTRIBUTION

SUMMARY

ST. LUCIE UNIT g 2 10/90 COMPONENT : STG iB Page : 1 of 1 Date : 10/29/90 Time : 2:44 PM Examination Dates  : 10/10/90 thru 10/21/90 Total Number of Tubes Inspected .....: 8411 Total Indications Between 204 and 394 150 Greater than or equal to 404 9 Total Tubes Plugged as Preventive Maint 9 Total Tubes Plugged This Outage.........: 18 Location Of Indications 204 to 100%

Hot Leg Cold Leg TSH .5 to 01H -2 ~ 1 10 TSC .5 to 01C -2.1 01H -2.0 to 07H +2 ~ 0 0 01C -2.0 to 07C +2.0 07H +2.1 to DHB 3~1 2 07C +2.1 to DCB -3.1 DHB -3.0 to DCB -3 ' 143 an FPL Group company.

~ ~ se ~ ~

JNS/CI CNR 1990-2-59 PAGE OF of Page 3 5 PLUGGABLE TUBES LIST PSL.2 10/90 COMPONENT :STG ¹S Page : 1 of 1 Date : 10/21/90 Time: 1:55 PH

+ + + + '+ ++'+ + + + + + + + + + +

I I I IR<<l I TESTED I I I I I I I I I IRDMILIMEIZONEIEXTIL EGI EXTEHT I REEL I cHI PRosE I LOCATIOM I x (volts(oegl Dataset

+ + + o+o + + + + + + + + + i+ +

I 181 4I 11ITEHI C ITEH PSGYIBC025 1(A 580.H/ULC I TSC 8.5 I 511 0.71108(BALANCE I 1136 I 64 I 14 I TEH I C ITEH PSGYIBCO04 IH 3(A.580.H/ULC (

DHT 0.0 I 47( 4.1 I 0 lool.P I I 32( 68( 4(TEcl H ITEC PCGMIBH018 IH 3(A 580 H/ULC (

OHS 0+4 I 47( 4'3( 0(IHPERFEGT I

( 40( 74( 4(TEcl H ITEC PSIBH018 I IA-580.H/ULc I VS3 0.0 IPTP I 0.0 I 0 (001 I 49I 79I 18ITEHI C ITEH PSQYISC030 IH 3(A 580.H/ULC I DCT 0.0 I 53( 5 9( OIDEGRADED I

I 54( 80( 18(TEHI C ITEH IBC030 IA sm-H/ULC I DCT 0.0 IPTPI O.OI OIIHPERFECT I

( 4r( as( 18(TEN( C (TEH ISC029 IA 580 H/ULc I DCT 0.0 (PTPI 0.0( 0(2-S I as/ 84( 18(TEN( C ITEH PSQYIBC029 IH 3(A 580 H/ULc I DHS 0.0 I 51( 5.4( 0(IHPERFECT I I 76( 841 18(TEHI C (01H IBHO46 IA-sao-H/ULC ( TSH 1.0 IPTPI O.OI OI1-s I 47( 85( 6(TEHI C ITEH PSGNIBC018 IH 3(A-SBO.H/ULC I DCS 0.1 I 47( 4.41 DIDEGRADED I 53( 85( 5(TEH( C ITEH PSGYIBC010 IH 3(A 580.H/ULC I OCB 0.0 I 48( 4 7( OIDEGRADED

( 69( 85( 5(TEH( C ITEH PSGYIBC010 I 1(A.580.H/ULC I TSH 1.4 I 50( 0.6(108(BALANCE I 751 85( 5( I (01H I BH046 IA-SSO.H/ULC I 0.0 IPTPI 0.0( 0(oao I r6( asi s(TEN( C l01H IBK046 IA-580 H/ULc I TSH 0.7 IPTPI 0.0( 0(BALANCE I 69( 87( 5(TEHI C (01H IBH046 IA 580.H/ULC I TSH 1.2 IPTP I O.OI 0 I 1-s I rsl arl s(TEHI C ITEH SCIBC010 1(A-SBO.H/ULC I TSH 0.8 I ro( O.rl 83(BALAMcE I 73( 89( ITEHI C I01H IBHO46 IA 580 H/ULC I TSH 1.2 IPTPI 0.0( 0(BALANCE

( rsl 89( s(TEHI C l01H ISH046 (A-580 H/ULC I TSH 1.2 IPTPI 0 Ol 0(1 s

+ + + + + + + +~ ~ + + + + ++' + '+ +

Number of Pluggable Tubes: 18 Number of Indications Selection Criteria :

PerCent T.Mo Idiot 40 Includes AOI,HOI,DSI,OTI,DRI,LPI,TBP,TRS,PTP Codes PK / ESI DA CONTROLLER DATE

/0 -Z G- (~

JPN(g ESI S/G COORDIM DATE

CUNHULATIVE EXAXlNATlOI REPORT PSL-2 OUTAGE  : 10/90 COHPONENT  : STG ¹B Page : 1 of 4 DESCRIPTION : 20X TO 100X Date : 10/29/90 Time : 2'54 PH I I Extent I 10/90 I I N /A IRoMILin)Leg)Reqlrst/Note( Reel Probe Location )volts(Deglch (Diff( Location

+---I "- I-.- I--- I- ---- I------I- I I I X

I--I- I-"-

( Volta)Deg(Ch I X I I 18) 4I c ITEHITEH PBGYIBC025 IA.580.H/ULC ITSC 8.5( .7(108( 1) 51)

I 54) 22I c ITEHITEH PBGYIBc043 IA-SBO.H/ULC Ivss -.el Ix 3) 25(

I 94( 24I c ITEHITEH Pslec002 )A-5M.H/ULC IDCB .0( ~ rl (x 3( 20(

I 96) 24I C ITEHITEH GNIBC002 IA-580-H/ULC IDSH -.9) 1.3! Ix sl asl I I I C ITEHITEH PSIBCOO IA-580-H/ULC )Dce OI .s( Ix 3) zol I ISI 25) C ITEHITEH IBC040 ) A-580-N/ULC )vss -.sl .8) Ix 3) 21)

I 94) 26I c ITEHITEH sslec002 )A-SM-H/ULC Ivs2 ~ rl )H 3( zo(

26) C ITEHITEH PCIBC002 IA-580 H/ULC (DHT .0) .7( (x sl zol I I I c ITEHITEH ssGNIBG002 (A-SM-N/ULC )vs4 -.rl (X 3( 23)

I 98I 26I c ITEHITEH scIBC002 (A 5M-N/ULC )DCT .OI 1.0I Ix al as/

I100I 28I C ITEHITEH IBC002 IA 580 H/ULC (DCT .0) 1.3 I IH 3( zs(

29( C ITEHITEH IBC049 IA 580 H/ULC !Ocr .0) 1 ~ 1) Ix sl 24(

I 9rl 29( C ITEHITEH GYIBC049 )

A.SBO-H/ULC )VS3 2.0) IH 31 331 I I I C ITEHITEH IBC049 (A-Seo-x/Ul.c Ivs4 .6) 1AI (H sl zsl I 96( 34( C (TEH(TEH Pc(BCDSD IA-580-H/ULC )vsz .sl 1.1( IH 3I 24I I1161 38( C (TBIITEH (BC003 ) A-SBO.H/ULC Ivss 1.0I (x 3( 22(

) 9r) 41I c ITEHITEH PBQIIec052 IA 580 H/ULC lvs4 - 6) 1.7I IN 3) 34) 47I H ITEGITEc PBIBH014 (A.SBO-H/ULC (vsS .7) 1.1I lx sl 22(

I 93I 4 I C ITEHITEH PSGNIBC054 (A 580 H/ULC Ivsa -1.0) IH 3) zo)

) Sr( 51( H ITECITEC PSIBH010 (A-580-x/ul.c Ivss

)131( 5( C ITEHITEH PSIBC003 IA.SBO H/ULC )Dce .0) 1'OI (x 3( 23(

I130I 56( C ITEHITEH PSIBC004 )A-SM-H/ULC (Dcr .OI 1.3I (x 3( z6(

(132) Bl C ITEHITEH IBC004 )A-SM-x/ULC Ivs1 -.sl 1.3I (x 3) 26)

I 49) 591 H ITEclrsc PBIBK015 (A.580.H/ULC (Vss -.9) (x 3( 27) l1311 9) C ITEHITEH IBC004 IA 580 H/ULC )ocr .0( 1.4 I (H 3) zs(

) 134) 64) C )TEHITEH PS)BC004 )A-580-H/ULC (DHr .0( 1.0I (x 3( 24(

) 136( 64) C ITEHITEH PSGYIBC 04 IA 580 H/ULC IDHT .0) (x 3) 4r)

I sal 68) H ITEC)TEC PCGN(BH018 IA 580-H/ULC IDHB .4( 4.3) IH 31 471 I 34( 68I H ITECITEC PCGNIBH018 IA 580 H/ULC )Dce .2) 1.r) IH 3( as(

I 36( 68) N (TEC)TEC IBH018 (A.SBO H/ULC Ivss 1.0I )x 3( 22(

I 39I 69) H )TECITEC ~,". IBH018 (A-580 H/ULC )Vss .7) 1.2) lx 3( 24(

I 36l 70) H ITEc)TEc'PsGNIBH018 IA 580-H/ULC )DCB .2) 1.0I (H 3) 22)

) as/ 70) H (TEC)TEC~ )BH018, )A.SBO-N/ULC )vss .rl 1'3) Ix 3) 25)

I 48) 70) H ITEC(TEC PS(BH018 )A.SBO-H/ULC )vss .7) .8) IH 3( 20(

I >>I 71I c ITEHITEH PBIBc081. )A 580 H/ULC )vs4 -.8) 1.3( )H 3( 23(

72( H )TEc)TEc PsGN)BH01e )A-580-H/ULC )vss -.9) )x sl z1)

( 40) 741 H ITEGITEc PBGYIBH018 )A 580.H/ULC lvss -.9) 2.2) (H 3) 34)

( 42( 76I C ITEHITEH IBC031 IA SBO.H/ULC IDHB .0) 2.0) (x 3( 33(

76I c ITEHITEH Pslec031 (A-580-x/Ul.c IDHB .0( 1.8) (x 3( sz)

) 46) 76I c ITEHITEH PBGNIBc031 (A.SM H/ULC IDHB .0( (H 3( as] I

) Sz) 76( C ITEH(TEH PC(BC031 (A-580 H/ULC (Vss 9) (x 3) as) I I 56) 76( C ITEHITEH PSIBC031 (A-580-x/ul.c Ivss .9) 1.0I I 43)

--I--I--I- --.I---

77( C ITEHITEH IBC030 (A.SBO.H/ULC IDHB .0( 1.9) 3( 30)

)

+---( I

.--""--I--.- I--I-. I--I-- )H I

I

---(---+

I

CUHHULATl VE EXAHlKATloN REPORT PSL-2 OUTAGE: 10/90 COHPONENT  : STG Al Page : 2 of 4 DESCRIPTION : 20X TO 100X Date : 10/29/90 Time : 2:54 PH I I Extent I 1 O/90 /A Loc ation (Voltafoegfch )oiff( Location

)Row(L infLeg)Req)Tat/Note)

+---I-I-"I-- I..-" I.

Reel I

Probe

)

I-.-- -"I"-I--I--I- " I X Volta)Des(ch I X I I I I C (TEH)TEH PSGN(BC030 IA 8 H/ULc locB .of z.sl (H 3) 36)

I 45) rrf c (TEH)TEH SSGY)BCO3O IA.580-H/ULC IDHS .of 1.1) (N 3) 23) 147) 771 c ITEHITEH IBc030 )A 580-H/ULC (DHB .o) )N 3( 22)

I 441 78) C )TEH(TEH PS(BC030 (A'-sao-euLc (Dcs .o) 1.1) IH 3) 23)

I 46) 78) C ITEHITEH IBC030 IA 580 H/ULC IDHB .o( 1.O) (N 3( 21)

I I ) C )TEH)T<< )SC030 )A-SSO-H/ulC )Vs3 -.9) 1.7) )N 3) za)

I I ( C )TEH)TEH PS)BC030 IA SSO.H/ULC IVS 2.2) (N 3) 33)

8) 78) C )TEH(TEH PS)SC030 IA 580 H/ULC IDCS .o) 2'4l )H 31 35)

I so( 781 C ITEH)TEH )SC030 (A.sao-H/ULC (OKB .o) (N.3) zz(

I I I C ITEHITEH PSIBC030 (A.sao.N/ULC )OCT .of 2.2)

) sz) ral c ITEHITEH PsGN(sco3o (A.SBO.H/ULC IVS3 .s) 1.rf )N 3) 28)9)

) 49) 791 c ITEHITEH PsGYIBc030 IA 580 H/ULC )OCT .o) IN 3) 53)

I >>I 79) C (TEH)TEH )BC030 IA-580-H/ULC IOCB .o) 1.ol I. 3) >>I

( s3) 79) C ITEHITEH SSIBC030 IA.580-H/ULc loca .o( 1'2(1061H 1) 31(

I srl 79) C )TEH(TEH PC(SC030 IA 580-H/ULC IDCT ol 13) IN 3) zsl

( sz) 80( C ITEHITEH PCGNISC030 IA.580 H/ULC IDHB .o) .91107IH 11 301 I C ITEHITEH IBC030 )A 580 N/ULC (VS3 -.7) 1.01 IH 31 211 I 54) 80) C ITEHITEH PCIBC030 )A.580 H/ULC IDHB .o) .7)111)H 1( 25)

I I ) C ITEH)TEH PCGY)SC030 IA 580 N/ULc (ocT .o) 2 Sl IN 3( 35)

) 6o) 801 C ITEHITEH P GN)SC030 IA 580 M/ULC IDCB .o) IN 3) zol I 4rf 81) C )TEHITEH PC)BC029 )A.580.H/ULC )OHT .of 2.4) )N 3( 34)

I 491 81) C (TEH)TEH PCGN(BC029 IA.580.H/ULc IDHT .0) 1.91 IH 31 31(

I I ) C (TEH)TEH GN)SCO29 (A.580 H/ULC )DCB .of F 1( IN 3( 23(

I 47) 831 C ITEHITEH PSGYIBC 29 )A.SSO H/ULC )OCT .o( z.z( IN 3( 33)

I 49) 83( C ITEHITEH GYIBC029 (A-580 H/ULC )DHT .o) )N 3) za)

) 89( 83) C )TEH)TEH PS)SC084 )A.580.H/ULC )VS3 -.8( 1.9(

I 46) 84( C ITEHITEH PSGY)BC029 IA 580 H/ULC IDHB .of 5.41 IH 31 511 I I I C ITEHITEH PSGYIBC029 )A-sao.euLc )oca .o( 3.0) IH 31 391 I 48( 841 c ITEHITEH sslsc029 IA.580 K/ULc (DHB .o) .s) )N 2) z1)

I I I C ITEHITEH , IBC029 )A SSO H/ULC )DCT .o) Z.3) sol 84( C . 'PSISC029 IA.SSO.N/ULC IDCT .o) 1.2) )N 3( 24)

I ITEN)TEN

) 76) 84 ( ) ) 01H W.:,, ) SH046< (A 580/HULC )TSH 1.11 .8(107(N 1) 38)

I 47) 85) C )TEH)TEH'PSGN)SCOTS'5)

)A-sao-eULc (oca .1) 4.4) )N 3( 47(

) s1) C ITEHITEH 'SISC010 )A-sao-eulc )oca .o) 1.31110(H 11 311

) s3) 85) C )TEH(TEH PSGY)BC010 IA 580 H/ULc loca .o( 4.7( IH 3( 48)

I 69) asl c ITEHITEH PsGY)sco'lo IA 580 N/ULC ITSH .6)1oa) 1) so)

I 75) 85( ( (0'IH )BH046 IA 580/ISJLC ITSH 1'1I .7(129) 1( 3o)

) as( 861 c ITEH(TEH Isc018 )A 580 H/ULC (DCS .o( IN3) zs(

) so( 86( C ITEHITEH PCGNIBC018 )A.580-H/ULC IDHT .o) 2.S) (N 3) 3S(

( sz( 861 C ITEHITEH PCIBC010 (A-580 H/ULC )DCS'A

.o( 2.2) )N 3( 33(

I 56) 86) C ITEHITEH PSISC010 580 H/ULC IVS3 .7) 1.51 IH 31 27)

I I I C )TEHITEH SCGYISC010 IA 580 H/ULc IDGT .o) )N 3) 27)

76) 86( c I'TEH)TEH scGYlsc010 IA-580-H/ULC ITSH .7) 5)1231 11 361

)

+---) -"I".I- I I I

-' -I-

~

I I I I

CUNNULATlvE KXANIHATlOH REPORT PSL-2 ouTAGE t 10/90 COHPOHEHT  : STG <<8 Page : 3 of 4 DESCRIPTIOH : 20X TO 100X Date : 10/29/90 Time : 2:54 PN I )

Extent ) 10 /90 I I M /A IRoH(Lin)Leg(Req)Tst/Mote) Reel Probe Loc ation (Vo its(beg(ch ) X (Diff) Locat ion ) Vottsf Deg)ch x

'--l--l--I--I- I

)

I


I . I -I- 1-1 I I

) es) as/ C ITEHITEH PSISC070 )A-sso-N/ULC )vQ .s( 1.3) )N 3) 26)

I 47) 87) C ITEHITEH PCIBC018 IA-580 N/ULc IDHT .o) 2.O) 32)

I I I C ITEHITEH SSIBC018 (A-580 N/ULc IDGT .o( .s) IN 2) 2o)

) ssf sr) C ITEHITEH (SC010 IA 580 N/ULC fOCT -sl 1.3( IN 3( 25)

I 691 871 C ITKHITEH SCGYIBC010 IA 580-N/ULC ITSH 1.21 .9)125) 1) 34(

I rs) er( C )TEH(TEH SCGY(SC010 IA.SSO.N/ULC )TSH .s) ~ 71 83) 1( 70)

I s2) se) C ITEHITEH PSGHISC010 IA-580.N/ULC IVQ rl 29(

I s6( se) C ITEHITEH PSIBC010 IA.SSO N/ULC (VS3 .7) 2.o) 31(

I 62) se) C )TEH)TEH PS)BC010 (A 580 N/ULC )VS3 -.8) I>>l 23)

I 72) se) C ITEHITEH PSGMIBC010 IA 5N N/ULC ITSH 1.o) .311351 11 24)

) 49( a9( C ITEH(TEH GYIBC018 IA-580 N/ULC IDCT 1'5) IN 31 27)

I 51) 89) C (TEH(TEH (BC011 )A.580-N/ULC IDHS .1( 1.2( )N 3) 24)

) 73) 89) (O1H )BH046 IA-SN/NJLC ITSH 1.2( 1.1(125) 1) 34)

) 75( 89( C ITEHITEH PSGYISC010 IA.SSO.N/ULC ITSH 1.2) .811241 11 35(

(44) 90( C ITEHITEH ISC019 IA 580 N/ULC )DHB .o) 2.O) 31) 145)>>I C ITEHITEH (BC019 (A.580.N/ULC )DHT '.o( 1.0( IN 3) 22)

I I I C ITEHITEH PC(BC019 )A-sso-N/ULC )vQ .7( 1.81 IN 3( 30)

I I I c ITEHITEH lsc019 )A-580 N/llLc (ocs .o) )N 3) 2O)

( 42) 92) C ITEHITEH ISC019 IA.5N.N/ULC (OCT 01 1.1(

)46)>>( C )TEHITEH PCQIIBC019 IA '580.N/ULC IVQ --rl- 1.21 IN 31 24) 154)>>l C ITEHITEH PSIBC011 (A-SN-N/ULC IVQ 1.01 24)

(60(>>I C )TEH)TEH PSGM)BC011 IA.580-N/ULc IvQ 1.o) .8) fN 3) 2O)

, 93( ITEHITEH ISC 72 IA-SSO.N/ULC IVQ .s) 21)

I 871 C

( 42f 94( C (TEH(TEH PSGM)BC019 fh-sso-N/ULC (ocs .o( 1.41 IN 31 26)

) 46) 94( C ITEHITEH PSGMISC019, )A 580 N/ULC )DCS .o) 28(

) 95( 9S) C (TEH)TEH PS)BC072 IA SSO.N/ULC IVS4 .7( .s( 21)

) 94) 96( C ITEHITEH IBC072 )A.SSO.N/ULC )VS2 -1.01 1.2) as)

( 96) 96) C ITEHITEH PSIBC072 IA-580 N/ULC IVS2 -.r) 1 ~ 1) (N 3) 25)

I C ITEHITEH PSIBC072 IA SSO.N/ULC IVS2 .21 1.2) 26)

I C ITEHITEH'BC 72 )A SN.N/ULC )VQ .8) 1 8) IN 3( 29)

I C )TEH)TEH'c'~ )BC072 IA-SBO.N/ULC I VS4 1.1) 6( l>>l 22)

C ITEHITEH'PSQIIBC012 IA 580 N/ULc (vs4 -.r) 21(

I 891 971 C (TEHITEHl- PSIBC073 IA 580 N/ULC IVS4 1 Ol ~ 9) IN 3 231

( 93( 97) C )TEH(TEH't,"-'S(BC073 ' IA 580 N/UlC IVS2 .8) 23)

) 9r( 97) (TEH(TEH PSISC073' )A.580 N/ULC )TSH 21.5) .r(126(

) 34) 9S( ITEHITEH GMIBC036 )A 580 N/ULC )OHB .o) .9) (N 3( 21)

I I I C ITEHITEH SSISC036 fh-sso-N/ULC (vQ 1.01 .6) )N 2) 21(

I ss) 99( C )TEHITEH Pc)SC019 IA 580 N/ULc locs ol 1.51 IN 31 2r)

( sr) 99) C ITEHITEH Pc(BC019 IA 580 N/ULC IVS3 '-.7) 1.51 IN 3( 2r)

C ITEHITEH ISC020 IA 580 N/ULc IbcT .o) 2.2) 33(

I 34(100) C ITEHITEH PSISC020 Ih 580 N/ULc IDHB .o) 1.1) IN 3) 23)

I 94)ioo) c )TEHIT<< GM)BC073 IA 580 N/ULc Ivs2 -.9) 1 1( (N31 25(

I I I C ITEH)TEH Ql (SC073 )A-SBO.N/ULC )VS2 .7( 1.6) (N 3) 30(

+--I--I--I- I I I I -I--I--I

CLSBCJLAT I VE EXAHINAT I OH REPORT PSL.2 0UTAGE  : 10/90 COHPONENT  : STG iB Page  : 4 of 4 DESCRIPTION : 20X TO 100X Date : 10/29/90 Time : 2:54 PH I I Extent I 10/90 I I N/A (Rou(Lin(Leg(Req(Tst/Note( Reel Probe Loc ation (volts( Deg(Ch X (Diff( Location (Volts( ch(x(

'---l.-.l- -I--I- I

- I---- ---- I--I (

I 93(101( c (TEH(TEH ss(BC074 (A-580.H/ULC (VS3 IH z( at(

(135(101( C ITEHITEH PSGY(BC005 IA-580.H/ULC IVS1 t.o( (H 3( 24(

I 34I102I C ITEHITEH PSIBC020 (A-580.H/ULC (VS3 1.3I I 27I103I C ITEHITEH PSGHIBC020 IA 580-H/ULC (VS3 -.r( 1.1I (H 3( 23(

I 89I103I c ITEHITEH PGIBC074 IA 80 H/ULC IVS rl (H 3( zo(

I 40(104( C ITEHITEH IBC020 IA.580 H/ULC IVS -.7( 1.3I IH 3( zs(

I 16I106I C ITEHITEH SSGNIBC021 IA-580-H/ULC 103C t.o( .7( (H 2( zz(

I 18I106I C ITEHITEH SCGHIBC021 IA 580 H/ULC I03C 1.3I .6( (H 2( zt(

( 32(106( C ITEH(TEH SCGN(BC021 IA 580.H/ULC (VQ -.8( 1.0I (H 2( z6(

I 96(108( C (TEH(TEH (BC075 (A 580.H/ULC (VS2 1.3I IH 3( zr(

( 52(110( C (TEH(TEH GN(BC015 (A-580-H/ULC (VS3 .7( 2.1( IH 3I 35I

( 89(111( C ITEHITEH PSGN(BC076 (A-SM-H/ULC (VS4 .9( 1.3I IH 3( zs(

( 96(114( H ITEC(TEC (BH036 IA-580.H/ULc Ivs2 1.91 I H ITEcl'TEC IBH036 (A-SM.H/ULC (VS2 .o( IH 3( z8(

I H ITECITEC IBH036 (A.580.H/ULC IVS2 1.1I (H 3( 22(

I H ITECITEC PSIBH036 (A-580-H/ULC IVS4 1.Z( (H 3( 23(

(129(115( H ITEC(TEC (BH009 (A-580-H/ULC IOBH .8( 1.31 IH 3( zs(

I 521116( C ITEHITEH PSGNIBC017 IA-580-H/ULC IVS3 .8( (H 3( zo(

I 89(117( H ITEC(TEC PSIBH037 IA 80 H/ULC IVS -t.o( 1.41 (w 3( z6(

I BBI120I H ITECITEC PSGNIBH038 IA-sBo-H/ULc Ivs4 .r( 1.9I I 97(123( H ITEc(TEc Ps(BH039 IA-580.H/ULC (VS3 2.4( (II 3( 34(

I 94I124I H ITECITEC PSGNIBH039 IA-SM H/ULC IVS2 IH 3( zs(

I 55(125( H (TECITEC IBH029 (A 580-H/ULC IVS3 -.8( 1.7( (H 3( 28(

( 60(134( H (TECITEC SSGN(BH03'I IA 580 H/ULC (VS3 -1.0I .8( (H 2( 22(

(108(136( H (TEC(TEC (BH008 IA 580 II/ULC (02C -t.o( 9( (H 3( Z4(

( 93(141( H (TEC(TEC PSIBH042 (A-580-H/ULC IVQ - 7I a.o(

I 95(1431 H ITEc(TEc Ps(BHDM IA-580.H/ULC IVS -.s( (H 3( Z4(

I 96(144( H ITEC(TEC IBH008 (A-580 H/ULC (DCB .o( (H 3( 21(

( 82(150( H (TEC(TEC PS(BHM9 (A.580-H/ULC IVQ .6( (H 3( zo(

I 64(1521 H

+--I--I--I--I--

ITECITEC

--I--- I--

II~

PSIBN035 (A-580.H/ULC (VS2

--I-(H I--I 3( zo(

I--I (

~4~s Number of INDICATIONS,Selected froa Current Outage: 159 .

Naker of TUBES Selected fry Cu rrent Outage : 135

FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST. LUCIE PLANT 6501 SOUTH HWY A1A JENSEN BEACH, FLORIDA 34957 Commercial Service Date: August 8,1983 UNIT 2 1990 OUTAGE INSERVICE INSPECTION

SUMMARY

TABLES

Summary Table Format Inservice Inspection Summary Outage (Year) Period Interval Class Components SYSTEM (I) N I 0 ZONE NUMBER (J) ASME SON GT SEC. XI TR S EH SUIQIARY EXAMINATION AREA CATGY NDE A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METH PROCEDURE T C G M R CAL BLOCK DWG. NO.(K)

(L) (M) (p) (R) (S) (W) (T) (U)

(N) (Q)

(O)

(V)

(A) Date of the inspection plan table was generated.

(B) The current revision number of the plan (C) The outage number within the period (D) Year of the outage (E) Current period (First, Second, Third)

(F) The current interval (First, Second, Third, Fourth)

(G) Applicable ASME Code Class (H) Page number of the table (I) System applicable to this table (J) The applicable Zone number for this table (K) The applicable isometric drawing number for this table (L) Item number associated with the item (M) Component or weld identification number (N) The component or weld description (0) 'Elevation level (P) ASME Code Category (Q) ASME Code Item Number (R) NDE Method to be used for the examination (S) The NDE.,procedure used (T) Result'spoof'he NDE examinations (U) Any remarks associated with the examination results (V) Ultrasonic calibration block to be used

'(W) Status of exam,. C = Completed for Code Credit E = Expanded sample

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE! 1 REVISION: 2 IHSERVICE INSPECTION SUNNARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COHPLETED CONPONEHTS CTOR PRESSURE VESSEL N I 0 20NE HUNBER: 001 ASNE S OH G T SEC. XI T R S E H SUNHARY EXAHIHATION AREA CATGY EXAN A E I 0 E RENARKS NUNBER IDEHTIFICATION ITEN NO NETHOO PROCEDURE T C G H R **CALI BRAT ION BLOCK>>*

REF. DMG. HO.02-001.C S-01 8- G-1 UT-60 NDE 5.7 ; 001 C C 10-17-90: CONPLETE - STUDS 01 THRU 028.

000450 THRU 54 STUD ¹1 THRU STUD ¹54 86.30 HT HDE 2.2 - 004 C SURFACE IHDICATIOH .7" SCRATCH OH RCB NT NDE 2.2 - 005 C SHANK OF ¹ 15, ACCEPT.

HT HDE 2.2 - 015

    • UT-20*>>

000460 N-01 THRU 54 B-G-1 HT NDE 2.2 - 006 C C 10-17-90: NT CONPLETE,STUDS 01 THRU 028, NUT ¹1 TNRU HUT ¹54 B6.10 NT HDE 2.2 - 007 C OUTSIDE SURFACE ONLY.

RCB UT-45 HDE 5.10 - 001 C 10-17-90: UT CONPLETE( STUDS 01 TNRU 028 I.D. SURFACE.

    • N/A*>>

000470 'M 01 THRU 54 B-G-1 VT-1 HDE 4.1 - 001 C C 10-17-90 EXANIHEO MASHERS 1 THROUGH 28 MASHER ¹1 THRU MASHER ¹54 86.50 LIGHT PITTING OH INSIDE SURFACE OF ¹12.

>>*H/A>>>>

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 2 REVISION: 2 INSERVICE INSPECTION SUHHARY REPORT

,FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COHPLETED COHPONENTS ACTOR PRESSURE VESSEL CLOSURE HEAD N I 0 ONE NUHBER: 002 ASHE S ONGT SEC. XI T RSEN SUHHARY EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEN NO HETHOD PROCEDURE T C G H R *~CALIBRATION BLOCK**

REF. DWG. NO.02-002 000850 106-101 B-A HT NDE 2.2 - 003 C C 10-15-90: COHPLETE 0 TO 180 DEGREES FLANGE FLEX AREA B1.40 RCB

    • N/AA*

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 3 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS AM GENERATOR 28 N I 0 ZONE NUMBER: 004 ASME S OHGT SEC. Xl T RSEH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM NO METHOD PROCEDURE T C G M R *<<CALIBRATION BLOCK**

PRIMARY SIDE REF. DWG. NO.02-004 001160 SG-28.109-251 8-H MT HDE 2.2 . 002 C C 10-13 90: COMPLETE SUPPORT SKIRT-TO STAY BASE 88.30 RCB

    • N/A**

001170 SG-28-101-251 8-8 UT-0,45,60 HDE 5.1 - 002 C C 10-19.90: COMPLETE STAY BASE-TO PRIMARY HEAD 82.31 RCB

  • UT27>>>>

001180 SG-28-10'I-254-A 8 8 UT 0)45(60 HDE 5 ~ 1 001 C C 10 7-90: COMPLETE MERIDIONAL AT 36o 82.32 RCB

    • UT27
  • 1190 SG-28-101-254-8 8 ' UT-0,45,60 NDE 5.1 - 001 C C 10-7-90: COMPLETE MERIDIONAL AT 108o 82.32 RCB
  • <<UT27 >>

001200 SG-28-101-254.C B.B UT-0,45,60 HDE 5.1 - 003 C C 10-13-90:COMPLETE MERIDIONAL AT 180o 82.32 RCB

    • UT27<<*

001210 SG-28-101-254-D B-B UT-0,45,60 HDE 5.1 - 003 C C 10-13-90: COMPLETE MERIDIONAL AT 252o 82.32 RCB

  • "UT27
  • 001220 SG-28-101-254-E 8 8 UT-0,45,60 NDE 5.1 - 001 C C 10-7.90: COMPLETE MERIDIOHAL AT 324o 82.32 RCB

<<<<UT27

  • DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 4 REVISION: 2 INSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 'I COHPLETED CCHPONENTS EAH GENERATOR 28 N I 0 ZONE NUMBER: 004 ASHE S OHGT SEC. Xl T RSEH SUHHARY EXAMINATION AREA CATGY EXAH A E I 0 E REMARKS NUHBER IDENTIFICATION ITEH HO METHOD PROCEDURE T C G H R **CALIBRATIOHSLOCK**

PRIHARY SIDE REF. DUG. NO.02-004 001230 SG-28.202-271 8-8 UT-0,45,60 HDE 5.1 . 001 C C 10-7-90: PARTIAL PRIM. EXT. RIHG-TO-HEAD 82.31 UT-0,45,60 NDE 5.1 . 003 C 10-13-90: COHPLETE RCB

    • UT27
  • 001240 SG-28-201-246 B-B UT-0,45,60 HDE 5.1 - 001 C C 10-7-90: PARTIAL PRIH. EXT. RIHG TO-TUBESHEET 82.40 UT-0,45,60 HDE 5.1 - 003 C 10-13-9D: COHPLETE, I.D.

RCB GEOMETRY,TUBESHEET.

+ UT27

  • 001250 SG-28-104-251 8-D UT-0,45,60 HDE 5.1 . 002 C C 10-19-90: CNPLETE, ID GEOHETRY, INLET NOZZLE-TO-HEAD 83.130 UT.0,45,60 NDE 5.1 - 003 C TUBESHEET.

RCB

~~UT27 ~

1260 SG-28-102-251-A 8-D UT.0545,60 NDE 5.1 - 001 C C 10-07.90: COHPLETE OUT. HOZZ..TO-HEAD AT 45o 83.130 RCB

    • UT27
  • 00'1270 SG-28-102-251-8 8-D UT-0,45,60 NDE 5.1 - 001 C C 10-7.90: CNPLETE OUT. NOZZ.-TO.HEAD AT 315o 83.130 RCB
    • UT27
  • 001280 SG-28.101-244-A 8 8 UT-0,45,60 NDE 5.1 001 C C '10-7-90: CNPLETE EXT ~ RING LONG. MELD AT Oo 82.32 RCB
  • UT27
  • 5.

001290 SG.28-101-244.8 8-8 UT 0,45,60 HDE 5.1 - 001 C C 10-7-90: COMPLETE EXT. RING LONG. l!ELD AT 90o 82.32 RCB

  • UT27
  • DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 5 REVISION: 2 IHSERVICE IHSPECTIOH

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPOHENTS EAM GENERATOR 28 N I 0 ONE NUMBER: 004 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK~*

PRIMARY SIDE REF. DUG. NO.02-004 001300 SG.28.101-244-C B-B UT-0,45,60 NDE 5.1 . 003 C C '10-13-90: COMPLETE EXT. RING LONG. HELD AT 180o 82.32 RCB

    • UT27 ~

001310 SG.28-101-244.D 8-8 UT-OI45(60 NDE 5.1 . 003 C C 10-13-90: COMPLETE EXT. RING LONG. HELD AT 270o 82.32 RCB

    • UT27
  • 001320 SG IN IR 8-D UT-45t 60 HDE 5.13 - 001 C C 10-16-90 COMPLETE INLET NOZZLE INNER RADIUS 83.140 RCB
  • UT-2,UT-3A~>>

1330 SG-28.0N-IR-A 8-D UT-45,60 NDE 5.13 - 002 C C 10.7-90: COMPLETE OUT. NOZZ. (45o) INH. RADIUS 83.140 10-17-90: ZONE 1 RE-EXAMIHED RCB

    • UT-2, UT-4A~*

001340 SG.28.0N-IR-B 8-0 UT-45,60 HDE 5.13 - 002 C C 10-7-90: COMPLETE OUT. NOZZ. (315o) IHH. RADIUS 83.140 RCB

    • UT-2, UT-4A**

001350 SG-28-302-252 B-B UT-0 HDE 5.1 - 005 C C 10-31-90: TUBESHEET GEOMETRY RECORDED STAY BASE-TO STAY CYLINDER 82.31 UT-45,60 NDE 5.1 - 005 C lJITH 45 AHD 60 DEGREE SCAHS.

RCB

    • UT27 ~

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 6 REVISION: 2 IHSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COHPLETED COHPONENTS ESSURIZE N I 0 ZONE NUHBER: 005 ASHE S OH G T SEC. XI T R S E H

SUMMARY

EXAHIHATIOll AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH HO HETHOD PROCEDURE T C G M R **CALIBRATIONBLOCK>>>>

REF. DMG. NO.02-005 001465 SV.1200 B-G.2 VT-1 Q19.2/C 001PS C C 01 09 90: BOLTIHG REPLACED, PRESERVICE SAFETY VALVE TO FLANGE BOLTING 87.50 VT-1 HOE 4.1 - 002 C SAT. 10-19-90: (8) COMPLETE RCB

    • H/A*>>

001545 SV-1202 8-G-2 VT-1 Q 19-2/C 001PS C C 01-09-90: BOLTING REPLACEOI PRESERVICE SAFETY VALVE TO FLANGE BOLTING 87.50 VT-1 NOE 4.1 - 004 C SAT 10-'19.90: (8) COMPLETE RCB

>>>>H/A**

001550 HS-01 8-G 2 VT-1 HDE 4.1 - 005 C C 10.22-90: COMPLETE MANMAY STUDS (20) 87.20 HT HOE 2.2 RCB

>>>>H/A>>*

1560 MN-01 8-G-2 VT-1 NDE 4.1 - 005 C C 10-22-90: COHPLETE HANllAY NUTS (20) 87.20 RCB

  • >>H/A>>>>

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 7 REVISION: 2 INSERVICE INSPECTIOH

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS CTOR COOLANT PIPIHG N I 0 ZONE NUMBER: 007 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF I CAT IOH ITEM NO METHOD PROCEDURE T C G M R *~CALIBRATION BLOCK~*

LOOP B NOT LEG REF. DWG. NO.02-007 001890 RC-123.205-771 BJ MT HDE 2.2 - 013 C C 10-26-90: COMPLETE, OHE SIDED EXAN DUE BRANCH CONN.-SHUTDONN COOLING B9.31 UT-0,45,60 HDE 5.3 - 001 C TO BRANCH COHF I GURAT ION.

~ RCB

  • OUT4AO+

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 8 REVI SION: 2 IHSERVICE IHSPECTIOH

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPOHENTS ACTOR COOLANT PIPING N I '0 ONE NUMBER: 012 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM NO METHOD PROCEDURE T C'G M R *~CALIBRATION BLOCK~*

LOOP A STEAM GEN. 2A TO PUMP 2A1 REF. DNG. NO. 02-01 002500 RC-112-1 8-J MT HDE 2.2 - 001 C C 10-12-90: MT COMPLETE S/G 2A HOZZ. EXT.-TO-ELBN 89.11 UT-45 HDE 5.3 - 002 C 10-26-90: UT RE-LOOK TO MONITOR RCB INDICATIOHS. NO CHANGE FROM PRE-SERVICE.

    • 0T P0

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UHIT 2 PAGE: 9 REVISION: 2 IHSERVICE INSPECTIOH

SUMMARY

REPORT FIRST IN'NERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS ACTOR COOLANT PIPING N I 0 OHE NUMBER: 013 ASME S 0 N G T SEC. XI T R S E H

SUMMARY

EXAMIHAT IOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

LOOP A PUMP 2A1 TO REACTOR VESSEL REF. DMG. NO.02-013 002690 RC-112-1066-771 8-F PT NDE 3.3 - 031 C C 10-24-90: PT COMPLETE SAFE END - TO - PIPE 85.50 UT-45 NDE 5.3 - 003 C 10-27-90: UT COMPLETE RCB

~ U'f59

  • DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 10 REV I S ION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS ACTOR COOLAHT PIPING N I 0 ZOHE NUMBER: 014 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK**

LOOP 8 STEAM GEN. 28 TO PUMP 282 REF. DNG. HO.02-014 002930 RC-124-1501-771-D 8-F PT HDE 3.3 - 024 C C 10-23-90: PT COMPLETE,ROUND INDICATION <

ELBSI - TO - SAFE END 85.50 UT-45 HDE 5.3 - 004 C 1/32", ACCEPT.

RCB 10-25-90: UT COMPLETE

  • UT59 >>

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS ACTOR COOLANT PIPING N I 0 HE NUMBER: 015 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMIHATIOH AREA CAT GY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE ,T C G M R **CALIBRATIONBLOCK**

LOOP 8 PUMP 282 TO REACTOR VESSEL REF. DWG. HO.02-015 002970 RC-124-1301-77'I B-F PT HDE 3.3 - 023 C C 10-23-90: PT COMPLETE SAFE EHD - TO - PIPE B5.50 UT-45 NDE 5.3 . 005 C 10-25-90: UT COMPLETE RCB

    • UT59**

DATE: 02/13/91 ST. LUCIE HUCLEAR PLANT UNIT 2 PAGE: 12 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL ~ THIRD PERIODS FIRST OUTAGE ( 1990)

CLASS 1 COMPLETED COMPONEHTS P 2A1 SAFETY INJECTION PIPING N I 0 ZONE NUMBER: 021 ASME S OHG7 SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK>>*

INSIDE COHTAINMENT REF. DWG. NO.02-021 003730 RC-1104-771 8-F PT NDE 3.3 - 028 C C 10-24-90: PT COMPLETE SFTY ~ IHJ. NOZZ.-TO-SAFE EHD 85.50 UT-45 NDE 5.11 005 C 10 27 90: UT COMPLETE RCB

"**UT16,UT23*>>

88-08 Su .3 REF. DHG. NO.02-021 003745 Fitting ¹ 1 AUG UT-45,60 HDE 5.4 - 017 C C 10-27-90: COMPLETE, ELBOM BETHEEN RC.15'l-Fll-2 8 H/A VT SH-1 RCB

    • UT23,UT50*>>

INSIDE CONTAIHMEHT REF. DUG. NO.02-021 3760 RC-151-Fll-1 8-J PT HDE 3.3 - 030 C C 10 24-90: PT COMPLETE PIPE . TO - VALVE (V-3227) B9.11 UT-45,60 NDE 5.4 - 008 C 10-25-90: UT COMPLETE( ID GEOMETRY 360 DEGREES. COMPLETELY RCB

>>*UT35**

003770 V-3227 B M-2 VT 3 HDE 4.3 001 C C 10-7-90:

VALVE INTERNAL SURFACE 812.40 RCB

    • H/A>>>>

003780 V-3227 B.G-2 VT-1 HDE 4' - 007 C C 10-22-90: COMPLETE BOLTING 87.70 RCB

>>*H/A'>>

  • ~

003790 S l-148; Fll-5 8-J PT NDE 3.3 - 028 C C 10-24-90: PT COMPLETE, .2" LIHEAR, VALVE (V-3227) - TO - PIPE 89.11 UT-45,60 NDE 5.4 - 008 C ACCEPT. 10-25-90: UT COMPLETE, ID RCB GEOMETRY 360 DEGREES.

    • UT35**

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 13 REVI SION: 2 IHSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COHPONENTS OOP 2A1 SAFETY INJECTION PIPING H I 0 ONE NUHBER: 021 ASHE S OHGT SEC. XI T RSEH

SUMMARY

EXAHIHATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IOEHTIFICATIOH ITEH HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*>>

INSIDE CONTAINMENT REF. DUG. HO.02-021 003820 S I -148- FH-4 8-J PT NDE 3.3 - 030 C C 10-24-90: PT COMPLETE PIPE - TO - ELBN 89.11 UT-45,60 NDE 5.4 010 C 10-26-90: UT COMPLETE, ID GEOMETRY, RCB IHTERHITTENT, 360 DEGREES.

<<<<UT35<<*

003830 S I.148- F'N.80'I 8-J PT HDE 3.3 - 030 C C 10-24.90: PT COMPLETE ELBN - TO - PIPE B9.11 UT-45,60 NDE 5.4 - 010 C 10-26-90: UT COMPLETE, ID RCB GEOMETRY, IHI'ERHITTENT 360 DEGREES

    • UT35<<>>

003880 S I -516-1-Sll-5 8-J PT NDE 3.3 - 001 C C 10-10-90: PT COMPLETE TEE - TO - PIPE 89.11 UT-45,60 NDE 5.4 - 001 C 10/11/90: UT COMPLETE RCB ROOT GEOMETRY,360 DEGREE INTERMITTENT

<<*UT38**

3900 SI-516-1-SW-3 B-J PT NDE 3.3 - 001 C C 10-10-90: PT COHPLETE ELBN TO - PIPE 89.11 UT-45,60 NDE 5.4 - 001 C 10-11-90: UT COMPLETE RCB ROOT GEOMETRY, 360 DEGREES INTERHITTEHI'.

    • UT38<<*

003930 SI.516.FW.1 8 J PT NDE 3.3 - 001 C C 10-10-90: PT COMPLETE PIPE - TO - VALVE (V-3258) 89.11 UT-45,60 NDE 5.4 - 001 C 10-11-90: UT COMPLETE RCB COUNTERBORE, ROOT GEOMETRY,360 DEGREE INTERHITTEHT

  • UT38<<<<

003950 V-3258'OLTING BG2 VT-1 NDE4.1-008 C C 10-22-90: COMPLETE 87.70 RCB

<<<<H/A<<*

003980 S I;148. FH.1 8-J PT NDE 3.3 - 028 C C 10-24-90: PT COHPLETE PIPE - TO - VALVE (V-3624) 89.11 UT-45,60 NDE 5.4 - 008 C 10-25-90: UT COHPLETE, ID GEOMETRY 360 RCB DEGREES.

  • UT35<<*

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 14 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST IHTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS P 2A1 SAFETY INJECTION PIPING H I 0 ONE NUMBER: 021 ASME S OHGT SEC. XI T RS EH

SUMMARY

EXAMIHATIOH AREA ,CAT GY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G H R ~*CALIBRATIOH BLOCK~*

INSIDE CONTAINMENT REF. DHG. NO.02-021 003990 V-3624 B-H-2 VT-3 HDE 4.3 - 003 C C 11-3-90: COMPLETE( BOHHET TO BODY GASKET VALVE INTERNAL SURFACE B12.40 REPLACED DUE TO CHR 90-2-065 FOR BORIC RCB ACID BUILDUP.

0*N/AA*

004000 V.3624 B-G-2 VT-1 HDE 4.1 - 009 C C 10.22.90: BORIC ACID RESIDUE CNR BOLTING 87.70 VT-1 HDE 4.1 - 025 C 90.2.065 10-27-90: CLEANED 8 RCB REINSPECTED,HO EVIDENCE OF DAMAGE OR CORROSION.

    • N/A*+

DATE: 02/13/91 ST ~ LUCIE NUCLEAR PLANT UNIT 2 PAGE: 15 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST IHTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS IPE SUPPORTS-SAFETY INJECTION PIPING N I 0 OHE NUMBER: 021 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAH A E I 0 E REHARKS NUMBER IDEHTIFICATIOH ITEM HO HETHOD PROCEDURE T C G M R *~CALIBRATIOH BLOCK**

LOOP 2A1 INSIDE CONTAINMEHT REF. DWG. NO.02-021 004010 Sl -4201-7841 F-C VT-3,4 HDE 4.3 . 004 C C 10-9-90: EVALUATION OF SPRING CANS.CNR RIGID FRAME 8 VAR ~ SPRY SUPP. F-123 VT-3,4 HDE 4.3 - 095 C 90.2-053. HCR 2-380 EVAL. FUNCTIONAL, RCB RE-SET TO COLD SETTING 9 1". 11/11/90 VERIFIED.

  • AH/At*

004020 S I -4201.7841 F-C VT-4 NDE 4.3 - 004 C C 11-11-90 COMPLETE SEE II 004010 FOR RIGID FRAME !L VAR. SPR. SUPP. F-4 VT-4 HDE 4.3 095 C DETAILS.

RCB .

    • H/A~*

004050 SI-4201-7541A F-C VT-3,4 NDE 4.3 - 005 C C 10-25.90: EVALUATION OF SETTINGS@ CNR VAR. SPRIHG BASE SUPPORT (1) F-123 VT-3,4 NDE 4.3 - 086 C 90-2-066. HCR 2-408 EVAL: FUHCTIOHAL, RCB RESET COLD SETTING TO 13/16". (HOT SETTING 7/8")

11-16-90: SETTING VERIFIED ~

    • H/A*>>

004060 SI-4201-7541A F-C VT-4 NDE 4.3 - 086 C C HCR 2-408 ACCEPT AS IS.

VAR. SPRING BASE SUPPORT (1) F 4 RCB

    • H/A~~

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPOHEHTS OOP 2A2 SAFETY INJECTION PIPING H I 0 ZONE NUMBER: 022 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

INSIDE COHTAIHMENT REF. DMG. NO. 02-02 004090 RC-703-771 8-F PT NDE 3.3 - 033 C C 10 25-90: PT COMPLETE SFTY IHJ. NOZZ.-TO-SAFE EHD 85.50 UT-45 NDE 5.11 . 006 C 10-27-90: UT COMPLETE RCB

<<*UT16,UT23**

88-08 S .3 REF. DWG. NO.02-022 004105 Fining B 2 AUG UT-45,60 HDE 5.4 - 018 C C 10-27-90: COMPLETE, 88-08.

ELBOH BETHEEH RC-154-FH-2 8 VT SM-1 RCB

<<<<UT23,UT50<<<<

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 17 REVISION: 2 INSERVICE INSPECTIOH

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS OOP 281 SAFETY INJECTIOH PIPING H I 0 ZONE NUMBER: 023 ASME S ON 0T SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E RE)IARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*>>

INSIDE CONTAINMENT REF. DWG. HO.02-023 004480 RC.152-FW-2 8-J PT NDE 3.3 - 029 C C 10-19-90: PT COMPLETE SAFE EHD - TO - ELBSI 89.11 UT-45 NDE 5.11- 002 C 10-20-90: UT COMPLETE, ID GEOMETRY RCB UT-45 HDE 5.11 - 002 C DETECTED FROM THE ELBON SIDE

>>*UT23,UT35>>*

88-08 S .3 REF. DUG. NO.02-023 004485 Fitting ¹3 AUG Ul'-45,60 HDE 5.4 012 C C 10-20-90: COMPLETE( 88-08 ELBON BETNEEH RC-152-FN-2 & VT SM-1 RCB

    • UT23,UT35>>*

HSIDE CONTAIHMEHT REF. DWG. HO.02-023 04530 S I -150- FN.4 8-J PT HDE 3.3 - 036 C C 10-25-90: PT COMPLETE VALVE (V-3237) - TO . PIPE B9.11 UT-45,60 HDE 5.4 - 011 C 10-25-90: UT COMPLETE, ID RCB GEOMETRY, IN'TERMITTEHT, 360 DEGREES

>>*UT35**

b 004620 Sl-4204-1270A 8-K-1 PT HDE 3.3 - 010 C C 10-18-90: COMPLETE - LIMITED EXAM. SEE SHEAR LUGS (8) 810.10 DATA SHEET.

RCB

  • >>H/A>>>>

004720 V-3634. B-G-2 VT-1 HDE 4.1 - 010' C 10-22-90: COMPLETE BOLTING 87.70 RCB

>>*H/A>>>>

004830 V-3260 B-0-2 VT.1 'DE 4.1 - 011 C C 10-22.90: COMPLETE BOLTING 87.70 RCB

>>*H/A*>>

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 18 REVI S IOH: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST IHTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS PE SUPPORTS-SAFETY INJECTION PIPIHG H I 0 ONE NUMBER: 023 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMIHATION AREA CATGY, EXAM A E I 0 E REMARKS NUMBER IDENT I F I CAT ION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK**

LOOP 281 INSIDE CONTAINMENT REF. DIJG. NO.02-023 004850 SI-4204-123 F C VT-3,4 NDE 4.3 - 011 C C 10-10-90: CONVERSION FROM LBS. TO INCHES VAR ~ SPRING BASE SUPPORT (1) F-1234 VT-3,4 HDE 4.3 - 094 C HEEDED. CNR 90-2-049.HCR RCB 2 380,EVAL.FUHCTIONAL, RE SET TO COLD SETTING 9 2595 ¹. VERIFIED 11/11/90.

    • N/Akk 004870 SI-4204-1270A F-C, VT-3 NDE 4.3 . 012 C C 10-10-90:COMPLETE RIGID STRUT SUPPORT F-123 RCB
  • IN/A**

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 19 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS P 2B2 SAFETY INJECTIOH PIPIHG H I 0 ONE NUMBER: 024 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK<<*

INSIDE COHTAIHMEHT REF. DNG. NO.02-024 004940 RC-1304-771 B-F PT HDE 3.3 . 034 C C 10-25-90: PT COMPLETE SAFTY INJ. HOZZ.-TO-SAFE END B5.50 UT-45 HDE5.11 - 004 C 10-27.90: UT COMPLETE RCB HDE 3.3

<<<<UT16,UT23<<<<

004950 RC-153-FW-2 B-J UT-45 HDE5.11 - 003 C C 10-23-90: UT COMPLETE( ID GEOMETRY SAFE EHD - TO - ELBN B9.11 UT-45 NDE 5 '1 - 003 C DETECTED FROM ELBOW SIDE ~

RCB HDE 3.3

<<<<UT23(UT35<<<<

88-08 S .3 REF. DllG. HO.02-024 004955 Fitting II 4 AUG UT-45,60 NDE 5.4 - 013 C C 10.23.90: COMPLETE, 88-08 EXAM.

ELBN BETlJEEH RC-153-Fll-2 B VT Ql 1 RGB

  • <<UT23,UT35**

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 20 REVI SION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS P 282 SPRAY LINE H I 0 OHE NUMBER: 027 ASME S 0 H G T SEC. XI T R S E H

SUMMARY

EXAMIHAT ION AREA CATGY EXAM A E I 0 E REMARKS HUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R ~*CALIBRATIOH BLOCK~~

REF. DUG. NO.02-027 006060 RC.1305-771 B-F PT NDE 3.3 - 041 C C 10-25-90: COMPLETE SAFE EHD - TO - PIPE NOZZLE 85.50 RCB

    • H/A~*

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS UTDSS COOLING 8 NOT LEG INJECTION PIPING N I 0 OHE NUMBER: 028 ASME S ON G T SEC ~ XI T R S E H

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK*>>

88-08 Su . 3 REF. DlJG. NO.02-028.B 006555 Fitting ¹5 AUG VT-1 NDE 4.1 020 C C 10-17-90: VT COMPLETE.

SWEEPOLET Ei AREA 9 UT-45,60 NDE 5.4 - 006 C 10-24-90: UT COMPLETE RC.147-1-SW-8 RCB

    • UT35,UT23>>>>

006605 Fitting ¹ 6 AUG VT 1 HDE 4.1 - 021 C C 10-17-90: COMPLETE.

ELBN BETIIEEH RC-147-1-Sll-1 8 UT-45,60 HDE 5.4 - 004 C SN-2 RCB

>>*UT35**

LOOP B REF. DUG. NO. 02-028-007150 VALVE 3545 8 G 2 VT-1 NDE 4.1 10-22-90: COMPLETE VALVE BOLTIHG 18 STUDS/18 HUTS B7.70 RCB

<<*H/A**

LOOP B REF. DUG. NO. 02-028-8 007210 S I-191-1-SM-5 8-J PT HDE 3.3 - 003 C C 10-11-90:COMPLETE BRANCH COHNECTIOH 89.32 RCB

>>>>N/A>>*

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UHIT 2 PAGE: 22 REVISION: 2 IHSERVICE INSPECTION SUNNARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COHPLETED COHPONEHI'S TDOWN COOLING & NOT LEG INJECTION PIPING H I 0 OHE NUHBER: 029 ASHE S OHGT SEC. XI T RSEH SUHHARY EXAHINATIOH AREA CATGY EXAM A E I 0 E REHARKS NUHBER IDEHTIFICATIOH ITEN NO HETHOO PROCEDURE T C G H R **CALIBRATIONBLOCK*>>

88-08 Su . 3 REF. DMG. NO. 02-029-A 007615 Fitting ¹ 7 AUG VT-1 NDE F 1 - 022 C C 10-17-90:VT COHPLETE.

SMEEPOLET 8 AREA 0 UT-45,60 HDE 5.4 005 C 10-24-90: UT CONPLETE RC-162-1-SW.6 RCB

  • kUT35**

LOOP A REF. DWG. NO. 02-029-A 007620 RC.162-1-SW-S 8-J UT-45,60 HDE 5.4 - 003 C C 10-17-90: EXAHIHED MITH FITTING ¹ 8.

PIPE TO - ELBOM 89.11 NDE 3.3 RCB 4*UT35*l 88-08 Su . 3 REF. OWG. HO. 02-029-A 7622 Fitting ¹8 AUG VT-1 NDE 4.1 - 023 C C 10-17-90:VT CONPLETE.

ELBOW BETWEEN RC-162-1-SW-5 8 UT.45,60 HDE 5.4 - 003 C 10-17-90:UT COMPLETE SM-4 RCB

  • IUT350%

LOOP A REF. DWG. NO. 02-029-007625 RC.162-1-S'W-4 B.J UT 45,60 HDE 5.4 - 003 C C 10-17-90: EXANIHED MITH FITTING ¹ 8.

ELBOW - TO . PIPE 89.11 NDE 3.3 RCB

    • UT35**

DATE: 02/13/9I ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 23 REVISION: 2 INSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS SSURIZER AUXILIARY SPRAY .

N I 0 ZONE NUMBER: 030 ASHE S 0 N G T SEC. XI T R S E H

SUMMARY

EXAHIHATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. DMG. NO.02-030 008090 RC-149-SM-1 8-J PT HDE 3.3 - 011 C C 10-19-90: COMPLETE PIPE - TO - VALVE (V2483) 89.21 RCB

    • N/4*1 008100 CH-146. F'N-28 8-J PT NDE 3.3 - 011 C C 10-19-90: COMPLETE VALVE - TO - PIPE 89.21 RCB 1>>H/411 008110 CH.146-SM-27 8-J PT NDE 3.3 - 011 C C 10-19.90: COHPLETE PIPE - TO - VALVE (V-2431) 89.21 RCB 1>>H/411 8120 CH.146-SII-26 8-J PT NDE 3.3 - 011 C C 10-19-90: COMPLETE VALVE - TO - PIPE 89.21 RCB
    • N/411 008130 CH.146-SM-23 8-J PT NDE 3.3 - 011 C C 10-19-90: COMPLETE PIPE - TO - COUPLING 89.40 RCB
    • H/A11 008140 CH-146-FM-22 8-J PT NDE 3.3 - 011 C C 10-19-90: COMPLETE COUPLING - TO - PIPE 89.40 RCB
    • H/A>>*

I 008150 CH-146-SN-21 8-J PT HDE 3.3 - 032 C C 10-24-90: COMPLETE PIPE - TO - COUPLING 89.40 RCB

    • H/A>>>>

02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 24 DATE:

REVISION: 2 INSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS ESSURIZER AUXILIARY SPRAY N I 0 ONE NUMBER: 030 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK<<<<

REF. DUG. NO.02-030 008160 CH-146-F'W-20 8-J PT NDE 3.3 - 032 C C 10-24-90: COMPLETE COUPLING - TO - PIPE 89.40 RCB

  • <<N/A<<*

008170 CH-146-SM-19 8-J PT NDE 3.3 - 032 C C 10-24-90: COMPLETE PIPE - TO - COUPLIHG 89.40 RCB

    • H/A*<<

008180 CH-146- F'N-18 8-J PT HDE 3.3 - 032 C C 10-24.90: COMPLETE COUPLIHG - TO - PIPE 89.40 RCB

  • <<N/A<<*

8190 CH-146-Su-17 8-J PT NDE 3.3 - 004 ' C 10-11-90: COMPLETE PIPE - TO - ELBN 89.40 RCB

    • N/A*>>

008200 CH-146-FQ-16 8-J PT NDE 3.3 - 004 C C 10-11-90: COMPLETE ELBOM - TO - PIPE 89.40 RCB

<<*N/A<<*

008210 CH-146-QI.15 BJ PT HDE 3.3 - 004 C C 10-11-90: COMPLETE PIPE - TO - ELBN 89.40 RCB

<<*N/A**

008220 CH-146.SM-14 8-J PT HDE 3.3 - 004 C C 10-11-90: COMPLETE ELBN - TO - PIPE 89.40 RCB

    • N/A<<*

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 25 REVI SION: 2 IHSERVICE INSPECTIOH

SUMMARY

REPORT FIRST IHTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS SSURIZER AUXILIARY SPRAY H I 0 ONE NUMBER: 030 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM NO METHOD PROCEDURE T C G M R ~*CALIBRATIOH BLOCK~>>

REF. DNG. NO. 02 030 008230 CH.146-SM.13 8-J PT HDE 3.3 - 032 C C 10-24-90: COMPLETE PIPE - TO - COUPLING B9.40 RCB

    • M/A1*

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 26 REVISION: 2 IHSERVICE INSPECTIOH

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS PE SUPPORTS-PRESSURIZER AUXILIARY SPRAY N I 0 ONE NUMBER: 030 ASHE S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO HETHOD PROCEDURE T C G M R **CALIBRATIONBLOCK"*

'REF. DUG. NO.02-030 008430 CH-106-R10 F-C VT.3 NDE 4.3 - 022 C C 10-11-90: MISALIGNMENT, CNR 90-2-052.

RIGID STRUT F-123 VT-3 NDE 4.3 - 081 C 10-25-90: RE-ALIGNED & RE-INSPECTED, RCB SAT.

    • N/A**

008440 CH-107-R1A F-C VT-3 NDE 4.3 023 C C 10-25-90: COMPLETE RIGID U-STRAP SUPPORT F-123 NOTE HIGH RADIATIOH AREA.

RCB

    • N/A4*

008450 CH-107-R18 F-C VT-3 NDE 4.3 - 024 C C 10-25-90: COMPLETE RIGID STRUT F-123 NOTE: HIGH RAD AREA.

RCB

    • N/Aaa 60 CH-107-R2 F-B VT-3 NDE 4.3 - 025 C C 10-10.90: COMPLETE RIGID FRAHE SUPPORT F-2,3 RCB
    • H/A~*

008480 CH-107-R4 F C VT-3 NDE 4.3 - 026 C C 10-10-90: COMPLETE RIGID U-STRAP SUPPORT F-2,3 RCB

    • N/A~>>

008490 CH.107-R5 F.C VT.3 NDE 4.3 - 027 C C 10-10-90: COMPLETE RIGID U STRAP SUPPORT F.2,3 RCB

%IN/A10 8 ~

C 008500 CH 107-R6 F-C, VT-3 NDE 4.3 - 028 C C 10.10.90: COMPLETE RIGID U-STRAP SUPPORT F.2,3 RCB 4 *OH/At%

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 27 REVI SION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPOHEHTS E SUPPORTS-PRESSURIZER AUXILIARY SPRAY N I 0 HE NUMBER: 030 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMIHAT ION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK>>*

REF. DNG. HO.02-030 008550 CH-'107-R9 F-B VT-3 HDE 4.3 - 029 C C 10-11-90: COMPLETE RIGID FRAME SUPPORT F-2,3 RCB

>>>>H/A**

008560 CH-107-R10 F-C VT-3,4 HDE 4.3 - 030 C C 10-11-90: LBS. TO INCHES CONVERSIOH COMB. HECH ~ SNUB. 8 VAR. S.S. F-123 NEEDED. CHR 90-2-054 INCR 2-380, RCB SETTING CORRECT Q 4 1/2". 528 ¹, COLD SETTING IS 520 ¹. ACCEPT AS IS.

    • H/A>>*

008570 CH-107-R10 F-C VT-4 NDE 4.3 C HCR 2-380 ACCEPT AS IS.

COMB. MECH. SNUB. 8 VAR. S.S. F-4 RCB

    • H/A>>*

08580, CH-107-R11 F-C VT-3 NDE 4.3 - 03'I C C 10-'11-90: COMPLETE RIGID STRUT SUPPORT F-123 RCB

    • H/A>>*

008590 CH-107-R12 F-C VT-3 HDE 4.3 - 032 C C 10-1'1-90: COMPLETE RIGID STRUT SUPPORT F-123 RCB

    • H/A>>>>

DATE: 02/13/91, ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 28 REVISION: 2 IHSERVICE INSPECTIOH

SUMMARY

REPORT FIRST INTERVAL, THIRD'ERIOD, FIRST OUTAGE (1990)

CLASS 1 COMPLETED COMPONENTS P 281 PRIMARY DRAIN N I 0 ONE NUMBER: 035 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS HUMBER IDENT IF I CATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. OHG. NO.02-035 009980 RC-1503-771-8 8-F PT NDE 3.3 - 038 C C 10-11-90: COMPLETE LTDHN 4 DRAIN HOZZ-TO-SAFEEHD 85.50 RCB

  • AH/A4k 009990 RC-122- FH-1 B.J PT NDE 3.3 . 038 C C 10-11-90: COMPLETE DRAIN NOZZLE SAFE END-TO-PIPE 89.11 RCB 4AH/At*

DATE: 02/13/91 ST ~ LUCIE NUCLEAR PLANT UNIT 2 PAGE: 29 REVI SION: 2 IHSERVICE INSPECT IOH SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 1 COHPLETED COHPONEHTS ESSURIZER RELIEF PIPING H I 0 NE NUNBER: 038 ASNE S OHGT SEC. XI T RSEN SUHHARY EXANI NATION AREA CATGY EXAN A E I 0 E RENARKS HUHBER IDENT IF I CATION ITEN NO NETNOO PROCEDURE T C G H R **CALIBRATIONBLOCK*>>

REF. DMG. NO.02-038 010820 RC-309-FM.2 8-J PT NDE 3.3 - 019 C C 10-20-90: PT COHPLETE PIPE TO - VALVE (V-1476) 89.21 RCB

  • <<N/A<<*

010830 V-1476 8-G-2 VT-1 HDE 4.1 - 015 C C 10-20-90: COMPLETE VALVE BOLTIHG (16) 87.70 RCB

    • N/A**

010860 RC.101-1-SM-11 BJ PT HDE 3.3 - 019 C C 10-20 90: PT COHPLETE REDUCER TO ELBOM 89.11 UT-45,60 HDE 5.4 - 016 C 10.22-90: UT, CONTERBORE RCB RECORDED'*UT39>>*

890 RC.101-1-SM-13 8-J PT NDE 3.3 - 019 C C 10-20-90: PT COHPLETE TEE - TO - PIPE 89.11 UT-45,60 HDE 5.4 - 016 C 10.22-90: UT COHPLETE RCB

    • UT39<<*

010900 RC-101- FM-1 8-J PT HDE 3.3 - 019 C C 10-20-90: PT COHPLETE PIPE-TO.PRESS RLF NOZZ SFEEHD 89.11 UT-45,60 NDE 5.4 - 016 C 10-22-90: UT COHPLETE RCB

<<<<UT-39 >>

010910 RC-506-671 8-F PT HDE 3.3 - 019 C C 'l0-20-90: PT COHPLETE RELIEF NOZZLE-TO-SAFE EHD 85.20 UT-45,60 HDE 5.11 - 001 C 10.22-90: UT C(WPLETE RCB

<< p

    • UT-'19
  • 010930 RC-101-1-SM-7 B.J PT HDE 3.3 - 020 C C 10-20.90: PT CONPLETE J

PIPE - TO -ELBOM 89.11 UT-45,60 NDE 5.4 - 016 C 10-22.90: COHPLETE RCB

<<*UT39>>*

ST. LUCIE NUCLEAR PLANT UHIT 2 PAGE: 30 DATE: 02/13/91 REVISION: 2 INSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIQ), FIRST OUTAGE (1990)

CLASS 1 COMPLETED COHPONEHTS SSURI2ER RELIEF PIPIHG N I 0 ZONE NUHBER: 038 ASHE S ONGT SEC. Xl T RSEH SUHHARY EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION I TEH NO HETHOO PROCEDURE T C G H R **CALIBRATIONBLOCK**

REF. DMG. NO.02-038 010940 RC-101.1-SM.6 8-J PT NDE 3.3 - 020 C C 10-20-90: PT COHPLETE ELBOM - TO - PIPE 89.11 UT-45,60 NDE 5.4 - 016 C 10-22-90: COHPLETE RCB

  • >>UT39
  • 0'10950 RC-101.1-SM-5 PT NDE 3.3 - 020 C C 10-20-90: PT COHPLETE 8-J'9.11 PIPE - TO - ELBOM UT-45 NDE 5.4 - 016 C 10-22-90: UT COHPLETE( COUNTERBORE RCB UT-60 NDE 5.4 - 016 C RECORDED MITH 45 DEGREE SCAN'*UT39>>*

010960 RC-101.1-SM-4 BJ PT HDE 3.3 - 020 C C 10-20-90: PT COHPLETE ELBOM - TO - PIPE 89.11 UT-45 NDE 5.4 - 016 C 10-22-90: UT COHPLETE( COUNTERBORE RCB UT-60 NDE 5.4 - 016 C RECORDED 'MITN 45 DEGREE SCAH.

>>*UT39>>>>

11010 V 1477 B-0-2 VT-1 NDE 4.1 - 0'I6 C C 10-20-90: COHPLETE VALVE BOLTING (16) 87.70 RCB

>>>>N/A>>>>

011030 RC.310.1-SM-1 BJ PT NDE 3.3 - 019 C C 10.20-90: PT COHPLETE PIPE - TO . FLANGE 89.21 RCB

    • H/A>>*

DATE: 02/13/91 ST. LUCIE NUCLEAR PLAHT UNIT 2 REVISION: 2 INSERVICE INSPECTIOH

SUMMARY

REPORT FIRST INTERVALED THIRD PERIOD~ FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS AM GENERATOR 2A H I 0 OHE NUMBER: 041 ASME S ON G T SEC. XI T R S E H

SUMMARY

EXAMIHAT I OH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R ~*CALIBRATION BLOCK**

SECONDARY SIDE REF. DWG. NO.02-041 011130 SG-2A-101-221 C-A UT-0,45)60 HDE 5.1 - 004 C C 10-27-90: COMPLETE COHE - TO - UPPER SHELL WELD C1.10 RCB

  • UT25**

011260 SG-2A-104 221-C CC MT HDE 2.2 - 014 C C 10-27-90: COMPLETE CLEVIS BRACKET AT 225o C3.10 RCB A*N/A**

011270 SG.2A-105-221-B C-C MT HDE 2.2 - 014 C C 10.27.90: COMPLETE SUPPORT BRACKET AT 270o C3.10 RCB

  • AH/A4*

DATE: 02/13/91 ST. LUCIE HUCLEAR PLANT UNIT 2 PAGE: 32 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS SI PUMP 2A DISCHARGE PIPING H I 0 OHE NUMBER: 043 ASME S 0 N G T SEC. XI T R S E H

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHT IF I CAT I OH ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK>>>>

OUTSIDE CON'TAIHMENT REF. DWG. HO. 02-043-A O'I1590 SI-417-2-SW-2-LS C-F PT HDE 3.3 - 039 C C 10-18 90: COMPLETE( LOHG SEAM NOT PIPE LONG SEAM C5.12 VISIBLE.

<<<<N/A<<>>

011610 S I -417- FW-3 C-F PT HDE 3.3 - 012 C C 10-18-90: COMPLE'TE PIPE - TO - VALVE (V-3206) C5.11

<<*N/A<<<<

OUTSIDE COHTAINMEHT REF. OWG. HO. 02 043-8 011720 Sl-410-1-SW-5A-LS C-F PT NDE 3.3 - 013 C C 10-18.90: COMPLETE TEE LONG SEAM C5.12

    • N/A<<<<

011790 Sl-410-1-SW-3-LS C-F PT HDE 3.3 . 037 C C 10-18-90: COMPLETE( LONG SEAM HOT PIPE LONG SEAM C5.12 VISIBLE.

  • <<N/A<<<<

OUTSIDE CONTAINMEHT REF. DWG. NO. 02-043-0 012860 SI-462-2-SW-4 C-F PT HDE 3.3 - 005 C C 10-11-90: COMPLETE PIPE - TO - ELBOW C5.11

<<*N/A<<*

012870 Sl -462-2-SW-5 C-F PT NDE 3.3 - 005 C C 10-11-90: COMPLETE ELBOW - TO - PIPE..y, C5.11

<<<<H/A<<*

DATE: 02/13/91 ST ~ LUCIE NUCLEAR PLANT UNIT 2 PAGE: 33 REVISION: 2 IHSERVICE IHSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS I PUMP 2A DISCHARGE PIPING H.l 0 OHE NUMBER: 043 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS HUHBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK*>>

OUTSIDE CONTAINMENT REF. DWG. NO.02-043.D 012880 Sl-462-2-Sl-6 CF PT NDE 3.3 - 005 C C PIPE - TO - ELBOLI C5.11

  • ON/A**

013090 SI-112-2-SM-3 C-F PT HDE 3.3 - 014 C C 10-10-90: PT COMPLETE.

PIPE TO - ELBN C5.21 UT-45,60 HDE 5 4 - 015 C 10-30-90: UT COMPLETE( 45/60 DEGREE:

ROOT GEOMETRY DETECTED, 360 DEGREES INTERMITTENT.

<<*UT38**

013100 SI-112-2-SM.2 C-F PT HDE 3.3 - 014 C C 10-18.90: PT COMPLETE.

ELBN - TO - PIPE C5.21 UT-45 HDE 5.4 - 015 C 10-30-90: UT COMPLETE, 60 DEGREE: ROOT UT-60 HDE 5.4 - 015 C GEOMETRY DETECTED, 360 DEGREES'NTERMITTENT'tUT38lt

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 34 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIM, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPOHENTS PE SUPPORTS-LPSI PUMP 2A DISCHARGE PIPIHG N I 0 ONE NUMBER: 043 ASME S 0 N G T SEC. XI T R S E H

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER I DENT IF I CAT ION ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK~*

OUTSIDE COHTAIHMENT REF. DWG. HO. 02-043-D 013450 S1-2408-94 F-8 VT-3 NDE 4.3 . 035 C C 10-11-90: COMPLETE RIGID FRAME SUPPORT F-123 IIH/A4*

013460 SI.2408-98 F-B VT-3 NDE 4.3 - 036 C C 10-11-90: COMPLETE RIGID FRAME SUPPORT F-123

    • H/A~*

013470 Sl-2408-106 F-8 VT-3 HDE 4.3 - 037 C C 10 11-90: COMPLETE RIGID FRAME SUPPORT F.123

  • +H/A*+

13480 S I -2408-114 F-8 VT-3 NDE 4.3 . 038 C C 10-11-90: COMPLETE RIGID FRAME SUPPORT F.2,3

    • H/At*

DATE: 02/13/91 ST ~ LUCIE NUCLEAR PLANT UNIT 2 PAGE: 35 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS SI PUMP 2B D SCNARGE PIPIHG H I 0 ONE NUMBER: 044 ASHE S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHT IF I CATION ITEM HO METHOD PROCEDURE T C G H R **CALIBRATIONBLOCK**

OUTSIDE COHTAIHMENT REF. DWG. NO. 02-044-A 013880 S I.164-1.SW.9 CF PT HDE 3.3 - 015 C C 10-18-90: COMPLETE PIPE - TO TEE C5.11

    • H/A~>>

014090 Sl-556-1-SW-2 C-F PT NDE 3.3 - 040 C C 10-29 90: COMPLETE TEE - TO - PIPE C5.11

  • AH/A4k 014100 SI -556.1-SW-I C.F PT NDE 3.3 040 C C 10-29.90: COMPLETE PIPE - TO - FLANGE C5.11
    • N/A*4 015440 SI-111.6A-SW-3 C-F PT NDE 3.3 - 008 C C 10-11-90: PT COMPLETE PIPE - TO - ELBOW C5.21 UT-45 NDE 5.4 - 002 C 10-12.90: ROOT GEOMETRY INTERMITTENT 360 UT.60 HDE 5.4 - 002 C DEGREES.
  • iUT384*

015450 Sl-111-FW-8 C-F PT NDE 3.3 - 008 C C 10-11-90: PT COMPLETE ELBOW - TO - PIPE C5.21 UT-45 HDE 5.4 - 002 C 10-12-90: ROOT GEOMETRY INTERMITTEHT 360 UT-60 NDE 5.4 - 002 C DEGREES.

  • UT38*~

015460 S I -111- FW-9 C-F PT NDE 3.3 - 008 C C 10-11-90: PT COMPLETE PIPE - TO - PEHETRATIOH ¹38 C5.2'I, UT-45 NDE 5.4 - 002 C 10.12.90: ROOT GEOMTERY INTERMITTENT UT 60 NDE 5.4 - 002 C 360 DEGREES'~UT38**

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 36 REVI SION: 2 INSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPOHEHTS E SUPPORTS-LPSI PUMP 2B DISCHARGE PIPING N I 0 ZONE HUMBER: 044 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

REF. D'MG. NO. 02-044-C 015610 SI-2410-128 F-C VT-3 NDE 4.3 - 039 C C 10.11.90: COMPLETE RIGID STRUT SUPPORT F-123

    • H/All 015620 S1-2410-134 F-B VT-3 HDE 4.3 - 040 C C '10 11-90: COMPLETE RIGID FRAME SUPPORT F-123
    • M/A*>>

015630 Sl -2410-139 F-B VT-3 NDE 4.3 - 041 C C 10.11-90: COMPLETE RIGID FRAHE SUPPORT F-2,3

  • aN/A*a 15640 SI-2410-143 F-C VT-3,4 NDE 4.3 - 042 C C 10-12-90: COMPLETE, VARIABLE SPRING SUPPORT F-123 NOTE: SCALE DOES NOT SHSI ¹'S OR "'ST INDICATOR OH STAMPED C FOR COLD SETTING.
  • OH/A*0

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 37 REVISION: 2 INSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE ('1990)

CLASS 2 COHPLETED COHPONENTS FETY INJECTION PIPING TO TANK 2B1 N I 0 ONE NUHBER: D47 ASME S ONGT SEC. XI T RSEM SUHHARY EXAHINATION AREA CATGY EXAH A E I 0 E REMARKS NUHBER IDENTIFICATION ITEH NO HETNOO PROCEDURE T C G H R **CALIBRATIONBLOCK~~

INSIDE CONTAINMENT REF. DMG. NO.02-047 016520 SI -111- FM-10 C-F PT NDE 3.3 - 016 C C 10-19-90: PT COHPLETE ~

PIPE - TO - VALVE (V-3260) C5.21 UT-45 NDE 5.4 - 007 C 10-26-90: UT COMPLETE( ID GEOHETRY N/60 UT-60 NDE 5.4 - 007 C SCAN

    • UT3Q*4

DATE: 02/13/91 ST ~ LUCIE NUCLEAR PLANT UNIT 2 PAGE: 38 REVISION: 2 INSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COHPLETED COHPOHENTS PE SUPPORTS-S I PIPING TO TANK 281 H I 0 ONE NUHBER: 047 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHIHAT ION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDEHT IF ICATION ITEH NO METHOD PROCEDURE T C G H R **CALIBRATIONBLOCK~*

INSIDE CONTAINMENT 'REF. DMG. NO.02-047 016530 S I -4204.1440 F-C VT-3 HDE 4.3 - 043 C C 10-10-90: HISSING NUT, PAINTED SPHERICAL RIGID STRUT SUPPORT F-123 VT-3 NDE 4.3 - 082 C BEARINGS.CHR 90-2-050.NUT REPLACEDI BEARING CLEANED. '0-27-90:

RE-EXAH, SAT.

%ON/AA*

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 39 REVI SION: 2 IHSERVICE IHSPECT ION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS UTDOWN COOLING LINE A N I 0 NE NUMBER: 051 ASME S OHGT SEC. XI T" RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE T C 0 M R *~CALIBRATION BLOCK**

INSIDE CONTAINMEHT REF. DHG. HO. 02 051 8 019560 SI-363-8.SM-5 C-F PT HDE 3.3 - 017 C C 10-19-90: COMPLETE MELDOLET - TO PIPE C5.11

  • IN/A*A 019570 Sl-363-8-Ql-6 C-F PT HDE 3.3 - 017 C C 10-19-90: COMPLETE PIPE-TO-FLANGE (AT V-3667) c5.11 0*N/A%1 019660 Sl-363-9.SM-1-LS C-F PT HDE 3.3 - 017 C C 10.19-90: COMPLETE( LONG SEAM HOT PIPE LONG SEAM C5.12 VISIBLE.
    • H/A*1 9670 Sl.363.FH-10 C-F PT HDE 3.3 - 017 C C 10-19-90: COMPLETE PIPE - TO - PENETRATION k4 C5.11

<<~H/A~>>

, ~

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 40 REVISION: 2 IHSERVICE INSPECTION SUHMARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 CONPLETED CONPOHEHTS IPE SUPPORTS-SHUTDOMN COOLING LINE N I 0 ZONE NUHBER: 051 ASHE S OHGT SEC. XI T RSEH SUHHARY EXAHIHATIOH AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDEHTIFICATIOH ITEN HO HETHOD PROCEDURE T C G H R **CALIBRATIOHBLOCK~*

INSIDE CONTAINNENT REF. DMG. HO. 02-051-A 019740 SI-4205-6722 F C VT-3 NDE 4.3 - 044 C C 10-10-90: COMPLETE RIGID STRUT SUPPORT F-123

    • N/A*~'19870 SI-4205-744 F-8 VT-3 HDE 4.3 - 045 C C 10-9-90: RUST ON SPHERICAL BEARINGS, NO RIGID STRUT Ei FRAHE SUPPORT F-123 VT-3 HDE 4.3 . 083 C NOVENENT. CNR Ã0-2-048.CLEANED PER ISI-90-036. 10-25-90:

RE-EXAN SAT.

    • N/A%4 INSIDE COHTAINNENT REF. DUG. HO. 02-051-B 019900 S I -4205-6751 F.B VT-3 HDE 4.3 - 046 C C 10-13.90: CONPLETE RIGID FRAHE SUPPORT F-123

~~N/A**

019910 S I -4205.6756 F 8 VT-3 HDE 4.3 - 047 C C 10-10-90: CONPLETE RIGID FRAHE SUPPORT F 123

    • H/A~~

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 41 REVISION: 2 IHSERVICE INSPECTIOH

SUMMARY

REPORT FIRST IHTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS NUTDOWN COOLING HEAT EXCHANGER 2A H I 0 ZONE NUMBER: 055 ASME S OHGT SEC. XI T RSEH SUHMARY EXAMIHATIOH AREA CATGY EXAH A E I 0 E REMARKS NUMBER IDENTIFICATION ITEH HO HETHOO PROCEDURE T C G H R **CALIBRATIOHBLOCK*>>

REF. DWG. NO.02-055 020620 1-2741-1 C-B PT HDE 3.3 . 042 C C 10-30-90: PT(EXPAHDEO SAHPLE; PAD TO INLET NOZZLE-TO-VESSEL WELD C2.20 MT HDE 2.2 - 018 C PIPE, 4 ROUNDIHDICATIONS. 040>> ACCEPT.

RAB PT NDE 3.3 - P044 C 10 30-90:MT,EXPAHDED SAMPLE; PAD TO VESSEL.

>>>>H/A>>>>

020630 1-2742-1 C-B MT NDE 2.2 017 C C 10-30-90 INDICATION( CNR 90-2-068.

OUTLET NOZZLE-TO-VESSEL WELD C2.20 PT HDE 3.3 - 043 C 10.30.90: PT PAD TO PIPE, COMPLETE.

RAB PT HDE 3.3 - P044 C HCR 2-413, LACK OF FUSION BETWEEN THE FIRST AND SECOND WELD PASSES. GROUND OUT, RE-WELDED AND RE- EXAMINED WITH BOTH MT AHD PT ~ SAT.

    • k/A*>>

02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 42 DATE:

REVISION: 2 INSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COHPLETED COHPONENTS FETY INJECTION TANK 2A2 PIPING N I 0 ONE NUHBER: 058 ASHE S ON G T SEC. XI T R S E H SUHHARY EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HETNCO PROCEDURE T C G H R **CALIBRATIOHBLOCK>>>>

REF. D'IIG. NO.02-058 020950 SI.2A2 C-F PT NDE 3.3 - 002 C C 10.11-90:COHPLETE Sl TANK 2A2 NOZZ-TO-EXT. PIECE C5.11

    • N/A>>*

021160 S I.101- FW-2 C-F PT NDE 3.3 - 035 C C 10-25-90: PT COHPLETE PIPE - TO - VALVE (V-3614) C5.21 UT-45,60 NDE 5.4 - 014 C 10-25-90: UT COHPLETE, ID'EOHETRY, INTERHITTEHT 360 DEGREES.

>>*UT35*>>

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 43 REVISIOH: 2 IHSERVICE INSPECTION SUMHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS IPE SUPPORTS-S I TANK 2A2 PIPING N I 0 ZONE NUMBER: 058 ASHE S OH G T SEC. XI T R S E H

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUHBER I DENT IF ICATION ITEM NO METHOD PROCEDURE T C G H R **CALIBRAT ION BLOCK*>>

REF. DNG. HO.02-058 021170 SI-4200-6356 F-C VT-3,4 NDE 4.3 - 048 C C 10-9-90: PAINT ON INDICATOR PLATE. CNR ¹ VARIABLE SPRING BASE SUPPORT F 123 VT-3,4 NDE 4.3 - 080 C 90-2-047.10.22.90: INDICATOR BELSI C/H VT-3(4 NDE 4.3 - 092 C SETTINGS, 90-2-064. HCR 2-404 EVAL.

FUNCTIONAL, RE-SET TO COLD SETTING 11-12-90: SETTINGS VERIFIED 8 3 1/2.

    • N/A~*

021180 SI-4200.6356 F-C VT-4 HDE 4.3 - 048 C C 11-12-90: COMPLETE( SEE ¹ 021170 FOR VARIABLE SPRING BASE SUPPORT F-4 VT-4 NDE 4.3 - 092 C DETAILS.

A*H/A%I 021200 S I -4200-6364 F-C VT-3 NDE 4.3 - 049 C C 10-9-90: COMPLETE RIGID STRUT SUPPORT F-123

<<~N/A~~

DATE: 02/13/91 ST. LUCIE HUCLEAR PLANT UNIT 2 PAGE: 44 REVI SION: 2 INSERVICE IHSPECTIOH

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS SAFETY INJECTION TANK 281 PIPING H I 0 ONE NUMBER: 059 ASME S,OHGT SEC. XI T RSEH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK~>>

REF. DHG. NO.02-059 021420 SI -103- FW-1 C-F UT-45,60 NDE 5.4 - 009 C C 10-9-90: I.D. GEOMETRY DETECTED VALVE (V-3235) - TO - PIPE C5 ~ 21 DOHE IN 89 NDE 3.3 360 DEGREES, INTERMITTENT. FOLLOHUP FROM 3/2/89. DATA SHEET 5.4-003.

    • UT35**

DATE: 02/13/91 ST. LUCIE HUCLEAR PLANT UNIT 2 PAGE: 45 REVISION: 2 IHSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS AIH STEAH LINE 2A1 H I 0 ONE NUMBER: 063 ASHE S OHGT SEC. Xl T RSEH SUHHARY EXAHIHATION AREA CATGY EXAN A E I 0 E REHARKS HUHBER IDENTIFICATION ITEH HO HETNOD PROCEDURE T C G H R >>*CALIBRATION BLOCK*>>

INSIDE COHTAINHEHT REF. DIJG. NO.02-063 022480 MS-28-FII-4A C-F HT NDE 2.2 - 009 C C 10-22-90: HT COHPLETE

,PIPE - TO - ELBOM C5.21 UT-45,60 NDE 5.2 - 001 C 10-25-90: UT CONPLETE, I.D. GEOHETRY g 360 DEGREES INTERHITTEHT.

    • UT45**

022490 HS.28.FM.4AA-LS C-F HT HDE 2.2 - 009 C C 19-22-90: HT COMPLETE ELBOM LONG SEAM C5.22 UT-45,60 NDE 5.2 - 001 C 10-25-90: Ul'OHPLETE, ID GEOMETRY.

    • UT45**

022500 NS 28 FH-4AB-LS C-F HT HDE 2.2 - 009 C C 10-22-90: MT COMPLETE ELBOH LONG SEAN C5.22 UT-45,60 NDE 5.2 - 001 C 10-25-90: UT COHPLETE

  • UT45**

2550 HS-4100-168 C.C HT HDE 2.2 - 009 C C 10-22-90: COMPLETE INT.~ ATT.~ IIELD HANGER T>>.84"

~ C3.40

~

<<*H/A*>>

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 46 REVISION: 2 IHSERVICE IHSPECTIOH SUHNARY REPORT FIRST INTERVALED THIRD PERIOD ~ FIRST OUTAGE (1990)

CLASS 2 CONPLETED CONPOHEHTS IPE SUPPORTS-HAIN STEAN LINE 2A1 H I 0 ZONE NUNBER: 063 ASKE S ONGT SEC. XI T RSEH SUHHARY EXAHIHAT I ON AREA CATGY EXAH A E I 0 E REHARKS HUHBER IDENT I F I CAT ION ITEN NO HETHOO PROCEDURE T C G H R **CALlBRATIONBLOCK>>>>

INSIDE COHTAINNENT REF. DNG. NO.02-063 022650 HS.4100.13 F-C VT-3,4 NDE 4.3 - 050 C C 10-25-90: EVALUATION OF SETTIHGS ~ CNR, VARIABLE SPRING SUPPORT (2) F-123 VT 3/4 NDE 4.3 - 089 C 90-2-067. HCR 2-408 EVAL: FUNCTIONAL, RESET TO COLO SETTING OF 1 3/4>>. (HOT 1 1/2")

10-25-90: SETTING VERIFIED'*H/A*>>

022660 HS-4100-13 F-C VT-4 NDE 4.3 - 089 C C VARIABLE SPRING SUPPORT (2) F-4

>>*N/A**

022670 HS-4100-15 F-C VT-3,4 HDE 4.3 - 051 C C 10-12-90: LOOSE LOCK HUTS) ACCEPTANCE OF VARIABLE SPRING SUPPORT (2) F-123 VT-3,4 HDE 4.3 - 091 C SPRING SETTINGS. CHR 90 2-056, HCR 2-380. EVAL.: FUNCTIONAL, RESET TO PROPER COLD SETTINGS. 11-11-90:

SETTINGS VERIFIED'125 ¹ COLO. BOTH CANS

>>>>H/A*>>

022680 MS-4100-15 F-C VT.3,4 NDE 4.3 . 051 C C 11-11-90 CONPLETE NCR 2-380.

VARIABLE SPRIHG SUPPORT (2) F-4 VT.4 NDE 4.3 - 091 C

>>>>H/A>>>>

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 47 REVISION: 2 INSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COHPLETED COHPONENTS IN STEAH LINE 2B N I 0 ONE NUMBER: 066 ASHE S ONGT SEC. XI T RSEN SUMHARY EXAHIMATI ON AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HETHOO PROCEDURE T C G H R **CALIBRATIONBLOCK*>>

OUTSIDE CONTAINMENT REF. DUG. NO. 02-066-A 023910 HS-3-SM-P2 C-F HT NDE 2.2 - 012 C C 10-23-90: HT COMPLETE PERE. ¹2 ASSEMBLY-TO-PIPE C5.21 UT-45,60 NDE 5.2 - 002 C 10-24-90: UT COHPLETE, ID GEOHETRY.

  • >>UT44<<>>

023920 HS-3-SM-P2-LS C.F HT NDE 2.2 - 012 C C '10-23-90: HT COMPLETE PIPE LONG SEAH AT SU.P2 C5 ~ 22 UT-45,60 NDE 5.2 - 002 C 10-24-90: UT COMPLETE

    • UT44<<*

023930 MS-3-FW-1 C-F HT NDE 2.2 - 012 C C 10-23-90: HT COMPLETE PIPE - TO - PIPE C5.21 UT-45,60 NDE 5.2 - 002 C 10-24-90: UT COMPLETE( ROOT GEOHETRY.

    • UT44*>>

940 MS-3-FM-1-LS CF HT NDE 2.2 - 012 C C 10-23-90: HT COHPLETE PIPE LONG SEAM AT Fll-1 C5.22 UT-45,60 NDE 5.2 - 002 C 10-24-90: UT COHPLETE

  • >>UT44**

024120 HS-3-1-SW-1 C-F HT NDE 2.2 - 012 C C 10-23-90: HT COMPLETE PIPE - TO - PIPE C5.21 UT-45,60 NDE 5.2 - 002 C 10-24-90: UT COMPLETE

    • UT44<<*

024130 HS-3-1-Ql-1-LS CF HT NDE 2.2 - 011 C C 10-19-90: HT COMPLETE PIPE LONG SEAH AT SM-1 C5.22 UT-45 NDE 5.2 - 004 C 10-22-90: UT COMPLETE, ROOT GEOHETRY UT-60 NDE 5.2 . 004 C ll/45 SCAN

<<*UT44<<*

024140 MS-3-FU-2 C.F HT NDE 2.2 011 C C 10-19-90: HT COHPLETE PIPE - TO - VALVE (HSIV) C5.21 UT.45,60 NDE 5.2 - 004 C 10-22-90: UT COMPLETE, ID GEOMETRY.

    • UT44<<*

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 48 REVISION: 2 INSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COHPLETEO COHPONEHTS AIN STEAH LINE 2B N I 0 ZONE NUHBER: 066 ASHE S 0 N G T SEC. XI T R S E H SUHHARY EXAHIHATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HETHOD PROCEDURE T C G H R **CALIBRATIONBLOCK**

OUTSIDE CONTAINHENT REF. DMG. NO. 02-066-A 024142 HS FW-1 C.F HT NDE 2.2 - 011 C C 10-19-90: HT COHPLETE VALVE - TO - PIPE C5.21 UT-45,60 NDE 5.2 - 003 C C 10-22-90: UT COHPLETE, .054 INDICATION RCB ON ID. SEE EVALUATION IH DATA PACKAGE.

    • UT-45~*

024146 HS-4102-2925 CC HT NDE 2.2 - 011 C C 10-20-90: COHPLETEI LIMITATIONSI SEE MS ATT TRUNNIONS (4) T>1.4" C3.40 DATA SHEET.

    • N/A~~

DATE: 02/13/91 ST. LUCIE HUCLEAR PLANT UNIT 2 PAGE: 49 REVISION: 2 IHSERVICE INSPECTION SUNNARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COHPLETED COHPONEHTS IPE SUPPORTS-HAIN STEAN LINE 2B N I 0 ZONE HUHBER: 066 ASHE S 0 N G T SEC. XI T R S E H SUMHARY EXAHIHATIOH AREA CATGY EXAN A E I 0 E RENARKS NUHBER IDENTIFICATION ITEN HO HETHOO PROCEDURE T C G K R **CALIBRATIOHBLOCK~*

OUTSIDE CONTAINMEHT REF. DMG. NO.02-066.A 024410 MS-4102-2931 F-B VT-3 HDE 4.3 - 054 C C 10-18-90: COHPLETE RIGID FRAHE SUPPORT F 2,3 HT HDE 2.2 - 010 C 10-20-90: COHPLETE

    • N/A*4 024420 MS-4102-2925 F-8 VT-3 NDE 4.3 - 055 C C 10-15-90: COHPLETE RESTRAINT F-2,3

'k*H/A**

DATE: 02/13/91 ST ~ LUCIE NUCLEAR PLANT UNIT 2 PAGE: 50 REVISION: 2 IHSERVICE INSPECTIOH

SUMMARY

REPORT FIRST IHTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED CDMPOHEHTS AIN FEED'WATER TO STEAM GENERATOR 2A H I 0 ZONE NUMBER: 067 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMIHATIOH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATIOH ITEM HO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK~*

INSIDE CONTAIHMENT REF. DUG. NO.02-067 024555 I.S E. 79-13 UT-45,60 HDE 5.16 - 001 C C 10-22-90: COMPLETE.

AUGMENTED EXAM RCB

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE 51 REVI SION: 2 IHSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIIS, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COHPOHEHTS IN FEEDIJATER TO STEAN GENERATOR 2B H I 0 ONE NUMBER: 068 ASHE S OHGT SEC. XI T RSEM

SUMMARY

EXAHIHAT ION AREA CATGY EXAH A E I 0 E REMARKS NUMBER IDENT IF I CATION ITEN NO METHOD PROCEDURE T C G M R *~CALIBRATIOH BLOCK**

INSIDE COHTAIHMEHT REF. DWG. HO. 02.068 024830 BF-4006-6076 C-C HT HDE 2.2 - 008 C C 10-18-90: COMPLETE MANGER LUG T-"1" C3.40

~*H/A~*

024855 1.8 E. 79-13 UT-45,60 HDE 5.16 - 002 C C 10-20-90: COMPLETE AUGMENTED EXAM RCB

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 52 REVISION: 2 INSERVICE INSPECTIOH

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS IPE SUPPORTS-MAIN FEEDWATER TO STEAM GEN. 28-H I 0 ZONE NUMBER: 068 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF I CATION ITEN NO METHOD PROCEDURE T C G M R ~~CALIBRATION BLOCK~*

INSIDE CONTAINMENT REF. DHG. NO.02-068 025030 BF-4006-6076 F-C VT-3(4 HDE 4.3 - 058 C C 10-18-90: VERIFICATION OF SETTING CONSTANT llT. SPRING SUPPORT F-123 VT-3,4 HDE 4.3 088 C HEEDED. CNR 90-2-061.NCR 2-404 RE-EXAM AFTER FILL 8 VENT, '1-13-90:

IHDICATOR AT 3 1/2", ACCEPT AS IS.

    • N/A0*

025040 BF-4006.6076 F-C VT-4 NDE 4.3 HCR 2-404, ACCEPT AS IS.

CONSTANT HT. SPRING SUPPORT F-4

  • AN/A**

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 53 REVISION: 2 IHSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COHPLETED COHPONEHTS PSI NPSI CS PUHPS 2A N I 0 ZONE NUHBER: 073 ASHE S ONGT SEC. XI T RSEN SUHHARY EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDEHTIFICATIOH ITEH NO HETMOD PROCEDURE T C G H R **CALIBRATIOHBLOCK**

INLET PIPING REF. DUG. NO. 02-073-A 027500 CS-41-1-SH-4 C-F PT NDE 3.3 - 006 C C 10-15-90: COHPLETE PIPE - TO . ELBOM C5.11

    • N/A**

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 54 REVISION: 2 INSERVICE INSPECTION SUMHARY REPORT FIRST IN'TERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS LPSI HPSI CS PUMPS 2B N I 0 ZONE NUMBER: 074 ASME S OH G T SEC. XI T R S E H

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEH NO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK**

INLET PIPING REF. DUG. NO. 02-074-A 028900 CS-2-8-SH-2 C-F PT NDE 3.3 - 007 C C 10-15-90: COHPLETE FLANGE TO - PIPE C5.1'I

>>>>N/A>>>>

028910 CS-2-8-SM-2-LS C-F PT NDE 3.3 - 007 C C 10-15-90: COMPLETE AT CS-2-8-SM-2 ~

PIPE LONG SEAH C5.12

  • >>N/A>>*

028920 CS-2.8-SH-1 C-F PT HDE 3.3 - 007 C C 10-15-90: COMPLETE PIPE - TO - ELBM C5.11

>>>>N/A>>*

8940 CS-2-8-SM.1A-LS C-F PT NDE 3.3 - 007 C C 10-15-90: COMPLETE AT CS-2-8-S'N-1.

ELBOH LOHG SEAM C5.12

    • N/A**

DATE: 02/13/91 ST. LUCIE NUCLEAR PLAHT UHIT 2 PAGE: 55 REVISION: 2 INSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS HUTDOWN COOLING HEAT EXCHANGER 28 H I 0 OHE NUMBER: 075 ASME S ONGT SEC. XI T RSEH

SUMMARY

EXAMIHATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDEHTIFICATION ITEM NO METHOD PROCEDURE T C G M R <<~CALIBRATION BLOCK

  • DISCHARGE PIPING REF. DWG. NO. 02-075-A 031410 S I -407- FW-1 C-F PT HDE 3.3 - 009 C C 10.15-90: COMPLETE SDCHX 28 NOZZLE-TO-REDUCER C5.11
    • H/A~*

031420 SI.407-FW-1A-LS C-F PT NDE 3.3 - 022 C C 10-'l5-90: EXAM AREA COVERED WITH CIRC REDUCER LOHG SEAM ,C5.12 WELD'ONG SEAM HOT EVIDENT IH PIPE ~

  • AN/Aaa 031430 Sl-407-1-SW-3 C-F PT HDE 3.3 - 009 C C 10-15-90: COMPLETE REDUCER - TO - PIPE C5.11
  • IH/A**

1440 SI-407-1-SW-3.LS C-F PT HDE 3.3 - 022 C C '10-15-90: AREA COVERED WITH CIRC WELD PIPE LONG SEAM C5.12 EXAM, LONG SEAM HOT EVIDENT.

~~H/A*~

031450 SI-407-1.SW-2 C-F PT HDE 3.3 - 009 C C 10-15-90: COMPLETE PIPE TO - ELBOW C5.11

    • H/A*4 031470 SI.407-1-SW-ZA-LS C-F PT HDE 3.3 - 022 C C 10-15-90: AREA COVERED BY CIRC. WELD ELBOW LONG SEAM C5.12 EXAM, LOHG SEAM NOT EVIDENT.
  • AH/At@

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UHIT 2 PAGE: 56 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COHPOHENTS IPE SUPPORTS-SHUTDOWN COOLING HEAT EXCH. 2B N I 0 2ONE NUMBER: 075 ASME S OHGT SEC. XI T RSEM

SUMMARY

EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUMBER IDEHTIFICATIOH ITEM NO METHOD PROCEDURE T C G H R **CALIBRATIOHBLOCK**

DISCHARGE PIPING REF. DUG. NO.02-075 032150 SI -2405.41 F-C VT-3,4 NDE 4.3 - 059 C C 10-12-90: HEED ACEPTANCE OF SETTIHGS.

VARIABLE SPRING SUPPORT F-123 CNR 90-2-057NCR 2-380( ACCEPT AS AT COLD SETTING 9 2 1/4", 934¹, DESIGN IS 924¹.

A*N/A40 032160 S I -2405-41 F-C VT-3,4 NDE 4.3 - 059 C C NCR 2-380, ACCEPT AS IS.

VARIABLE SPRING SUPPORT F-4

    • N/A~~

032170 SI-2405-40 F-B VT.3 NDE 4.3 - 060 C C 10-12-90: COMPLETE RIGID FRAHE SUPPORT F-2,3

    • N/A~*

DISCHARGE PIPING REF. DUG. NO. 02-075-B 032260 SI-2405-61 F-B VT-3 NDE 4.3 - 062 C C 10-12-90: COMPLETE RIGID FRAHE SUPPORT F.123

    • N/A~*

1

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 57 REVISIOH: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS SHUTDOIJH COOLING HEAT EXCHANGER 2A N I 0 ONE NUMBER: 076 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK**

INLET PIPING REF. DMG. HO. 02-076-A 032880 SI-412.4-SN.S-LS C-F PT HDE 3.3 . 021 C C 10-15-90: COMPLETE PIPE LONG SEAM C5.12 LONG SEAMS NOT VISUALLY DETECTABLE.

<<<<H/A**

032890 Sl-412-4-SN.6 C-F PT HDE 3.3 - 018 . C C 10.15-90: COMPLETE . 4 LINEAR PIPE - TO - REDUCER C5.11 INDICATIONS,.10" TO .20 " IH LENGTH/

ACCEPTABLE.

<<*H/A<<*

032910 S I-412 QI-6A- LS C-F PT NDE 3.3 . 021 C C 10-15-90: COMPLETE REDUCER LONG SEAM C5.12 LONG SEAMS HOT VISUALLY DETECTABLE.

  • <<H/A<<*

2920 SI-412-FN-5 C-F PT HDE 3.3 - 021 C C 10-15-90: COMPLETE REDUCER - TO - SDCHX 2A NOZZLE C5.11

<<<<H/A<<<<

DATE: 02/13/91 ST; LUCIE NUCLEAR PLANT UHIT 2 PAGE: 58 REVISION: 2 INSERVICE INSPECTION SUHNARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 CONPLETED COMPONENTS UTDOUH COOLING HEAT EXCHANGER 2 H I 0 ZONE HUHBER: 077 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHIHATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER IDENTIFICATION ITEN NO HETHOO PROCEDURE T C G H R **CALIBRATIOHBLOCK**

DISCHARGE PIPIHG REF. DWG. NO.02-077 B 033650 SI-472-3-SW-2-LS C-F PT NDE 3.3 - 025 C C 10-22-90: CONPLETE, LONG SEAN HOT PIPE LONG SEAN C5.12 VISIBLE.

    • N/A4*

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 59 REVISIOH: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPOHEHTS UTDSJH COOLING HEAT EXCHANGER 2B H I 0 ZONE HUMBER: 079 ASME S ON 0T SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R <<<<CALIBRATIOH BLOCK**

TO CONTAINMENT SPRAY HEADER REF. D'MG. NO. 02-079-A 035480 CS-10-FN-1-LS C-F PT HDE 3.3 - 026 C C 10-24-90: COMPLETE, LONG SEAM HOT PIPE LONG SEAM C5.12 VISIBLE.

<<*N/A<<<<

035490 CS-10-2-SN.1 C-F PT HDE 3.3 - 026 C C 10-22-90: PT COMPLE'IE PIPE - TO - ELBN C5.11

    • N/A<<*

035510 CS-10-2-SN-1A-LS C-F PT NDE 3.3 - 026 C C 10-22-90: PT COMPLETE ELBOM LONG SEAM C5.12

<<*N/A**

5520 CS-10-FIJ-2 O'-F PT HDE 3.3 - 026 C C 10-22-90: COMPLETE ELBON-TO-VALVE (I-FCV-07-18) C5.11

<<*N/All

DATE: 02/13/91 ST. LUCIE NUCLEAR PLAHT UHIT 2 PAGE: 60 REVISION: 2 IHSERVICE INSPECTION

SUMMARY

REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COMPLETED COMPONENTS PE SUPPORTS-SHUTDOQI COOLING HEAT EXCH. 2B N I 0 ZONE NUMBER: 079 ASME S OH G T SEC. XI T R S E H

SUMMARY

EXAMIHAT I OH AREA CATGY EXAM A E I 0 E REMARKS NUMBER IDENT IF I CAT IOH ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIONBLOCK**

TO COHTAIHMEHT SPRAY HEADER REF. DNG. HO. 02-079-A 035600 SI-2405-33 F-C VT.3 HDE 4.3 - 063 C C 10-11-90: COMPLETE RIGID EYE ROD SUPPORT F-123

<<*H/A**

035640 S1-2405.27 F-8 VT-3 HDE 4.3 - 064 C C 10-11-90: COMPLETE RIGID FRAME SUPPORT F-123

  • IH/A1*

035650 SI.2405-23 F-C VT-3 HDE 4.3 - 065 C C 10-11-90: COMPLETE RIGID STRUT SUPPORT F-123

    • N/Al1 5680 S I.2405-170 F-C VT-3,4 HDE 4.3 - 066 C C 10-4-90:HEEDS EHG ~ EVALUATION ON SPRIHG VARIABLE SPRING BASE SUPPORT F-123 VT-3,4 HDE 4.3 - 084 C CAN SETTINGCHRO 90-2-043.EVAL.:

FUHCTIOHAL PER NCR 2-368 RESET COLO SETTING 9 1 5/8 ",VERIFIED 10-30-90.

H/A 035690 SI.2405.170 F.C VT-4 NDE 4.3 - 066 C C 10-31-90: COMPLETE SEE 035680 FOR VARIABLE SPRING BASE SUPPORT F-4 VT.4 HDE 4.3 - 084 C DETAILS

~*H/A~*

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 REVISION: 2 INSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 2 COHPLETEO COMPONENTS Sl PUMP 28 N I 0' ONE NUHBER: 082 ASHE ONGT SEC. XI T RSEH SUHHARY EXAHINATION AREA CATGY EXAM A E I 0 E REHARKS NUHBER IDEHTIFICATION ITEH NO METHOD PROCEDURE T C G H R **CALIBRATIONBLOCK*>>

REF. DWG. NO.02-082 036490 28-1-3 C-C PT NDE 3.3 - 027 C C 10-22-90:COMPLETE IIELDED SUPPORT C3.70

    • N/A>>>>

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 62 REVI S IOH: 2 INSERVICE INSPECTION

SUMMARY

REPORT FIRST IHTERVAL, THIRD PERIIS, FIRST OUTAGE (1990)

CLASS 3 COMPLETED COMPONENTS POHENT COOLIHG llATER H I 0 ONE NUMBER: 101 ASME S OHGT SEC. XI T RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM A . E I 0 E REMARKS HUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R **CALIBRATIOHBLOCK~*

HEAT EXCHANGERS 2A-28 DISCHARGE REF. DUG. HO. 02-101-036870 CC.2075.72 F-8 VT-3 NDE 4.3 - 067 C C 10 3-90: EHG EVAL. FOR CLEARANCE, MIRE RIGID FRAME SUPPORT F.123 VT-3 HDE 4.3 - 087 C JAMMED BETIIEEH CLAMP 8 ANGLE, CHR II 90-2-046 11-17-90: RE-EXAM AFTER IIIRE REMOVAL.

    • H/A~*

036880 CC-2075-8100 F-B VT 3 HDE 4.3 - 068 C C 10-3-90: COMPLETE, INCLUDED INTEGRAL RIGID FRAME ANCHOR F-2,3 ATTACHMENT. CAT. D-B,D2.20.

    • N/A**

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 63 REVISION: 2 INSERVICE INSPECTION SUHNARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 3 COHPLETED COHPOHEHTS PENT FUEL POOL COOLING N I 0 ONE HUNBER: 104 ASHE S OH G T SEC. XI T R S E H SUNHARY EXANIHATIOH AREA CATGY EXAN A E I 0 E REHARKS NUNBER IDENT I F I CATION ITEN NO HETHOD PROCEDURE T C G N R **CALIBRATIOHBLOCK"*

HEAT EXCHANGER SUPPLY 8 RETURN HEADERS REF. DWG. NO. 02-104-8 037230 CC-2160-6085 F-8 VT-3 NDE 4.3 - 069 C C 10-22-90: HEED EVALUATION OF CLEARAHCES.

RIGID FRAHE SUPPORT F-2,3 CHR II 90-2-062. HCR 2-405I ACCEPT AS IS.

GAP +/- 1/16 " TOTAL OF 1/8".

  • AH/A4k

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 64 REV IS I OH: 2 IHSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 3 COHPLETED COHPOHEHTS OMPONEHT COOLIHG IJATER N I 0 ONE HUNBER: 106 ASHE S OHGT SEC. XI T RSEH SUHNARY EXANINATION AREA CATGY EXAH A E I 0 E REMARKS NUHBER IDENTIFICATION ITEN NO HETHOO PROCEDURE T C G H R **CALIBRATIOHBLOCK~*

RETURN HEADER B REF. DNG. HO. 02-106-C 037700 CC-2M3-53 F-B VT-3 HDE 4.3 - 070 C C 10-22.90: HEED EVALUATION OF CLEARANCES.

RIGID FRAHE SUPPORT F-123 CHR ¹ 90-2-06. NCR 2-405, ACCEPT AS IS

+/- 1/16>> TOTAL 1/Bii.

    • H/A RETURN HEADER B REF. DNG. HO. 02-106-A 037760 CC-2M3.6474 F-C VT-3,4 NDE 4.3 - 071 C C 10-4-90: EHG. EVALUATION NEEDED FOR VARIABLE SPRING SUPPORT F-123 VT-3,4 NDE 4.'3 - 085 C SPRING CAN SETTING. CNR ¹ 90-2-044, NCR 2-368. EVAL.:

FUNCTIONAL, RESET TO 7/8"

'I1.1.90: SETTIHG VERIFIED

    • H/A~*

037770 CC-2063-6474 F-C VT-4 HDE 4.3 - 071 C C 11/1/90: COHPLETE, SEE ¹ 037760 FOR VARIABLE SPRING SUPPORT F 4 VT-4 HDE 4.3 - 085 C DETAILS.

    • H/Akt M

DATE: 02/13/91 ST. LUCIE HUCLEAR PLANT UHIT 2 PAGE! 65 REVI SION: 2 IHSERVICE IHSPECTIOll SUHHARY REPORT FIRST IHTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 3 COHPLETED COHPOHENTS PONENT COOLING HATER H I 0 OHE HUNGER: 107 ASHE S OHGT SEC. XI T RSEH SUHHARY EXAHINATION AREA CATGY EXAH A E I 0 E REHARKS NUHBER ID EHT I F ICATION ITEN HO HETKOO PROCEDURE T C G H R <<*CALIBRATIOH BLOCK<<*

PUHP SUCTION HEADERS REF. DIJG. NO. 02-107-A 037980 CC-2074-19 F-C VT-3,4 NDE 4.3 - 072 C C 10-3-90: PAINTED SETTING PLATE, CHR¹ VARIABLE SPRING SUPPORT F-123 VT-3,4 NDE 4.3 - 078 C 90-2-042. 10-11.90: BOTTOMED OUT VT-3,4 NDE 4.3 - 093 C SPRING CAN CHR 90-2-055. 11-11-90 HCR-2-380, EVAL.: FUNCTIONAL, RE-SET TO COLD SETTING 9 1".

<<<<N/A<<*

037990 CC-2074.19 F-C VT-4 HDE 4.3 - 072 C C 11/11/90 -COHPLETE, SEE ¹ 037980 FOR VARIABLE SPRING SUPPORT F-4 VT-4 HDE 4.3 . 093 C DETAILS.

<<*N/A<<*

PUHP SUCTION HEADERS REF. DMG. NO. 02-107-B 038020 CC-2074-8200 F-B VT-3 HDE 4.3 - 073 C C 10-3-90: COHPLETE ANCHOR (FRAHE TYPE) F-2,3

    • H/A<<*

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UNIT 2 PAGE: 66 REVISION: 2 IHSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 3 COHPLETED COHPOHENTS HDENSATE N I 0 OHE NUHBER: 110 ASHE S ONGT SEC. XI T RSEH SUMHARY EXANIHAT ION AREA CATGY EXAN A E I 0 E REHARKS HUHBER I DENT IF I CAT ION ITEN NO HETHOO PROCEDURE T C G N R **CALIBRATIONBLOCK**

AUX. FEEDNATER PUHPS 2A 5 28 SUCTION REF. DHG. NO. 02-110-8 038250 C-2202-203 F-8 VT-3 NDE 4.3 . 074 C C 10-10-90: COHPLETE RIGID FRANE SUPPORT F-2,3

%IN/A0t

DATE: 02/13/91 ST. LUCIE NUCLEAR PLANT UHIT 2 PAGE: 67 REVISION: 2 INSERVICE INSPECTION SUHHARY REPORT FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (1990)

CLASS 3 COHPLETED COHPONENTS IRCULATING MATE N I 0 ZONE HUHBER: 112 ASHE S ONGT SEC. XI T RSEH SUHHARY EXAHI HAT ION AREA CATGY EXAH A E I 0 E REHARKS HUHBER IDENT IF I CATION ITEH NO HETHOO PROCEDURE T C G H R **CALIBRATIOHBLOCK**

INTAKE C.M. PUHPS 2B 8 2C DISCHARGE HEADERS REF. DMG. NO.02-112.A 038420 CM.3000-13 F-C VT-3 HDE 4.3 - 075 C C 10-10-90: SEVERE CORROSION, CNR ¹ RIGID STRUT SUPPORT F-123 'T-3 NDE 4.3 - 079 C 90-2-051 '0-20-90: RE-LOOK, VT-3 HDE 4.3 - 097 C CORROSION, CNR ¹ 90-2-060. NCR 2-398,EVAL. FUNCTIONAL,CLEAN, LUBRICATE, AND RECOAT. VERIFIED, 11-16.90.

0*N/A4t 038430 CM.3000-7003 F-C 'T-3 HDE 4.3 - 076 C C 10-4-90: CORROSION( CLEARANCE SLID. BASE SUPP. M/RIG. STRUT F-123 VERFICATION CHR ¹ 90-2-045, HCR 2-367 EVAN FUHCTIONAL, CLEAN AND RECOAT, HIGHLY CORROSIVE EHVIROHENT.

  • ~N/A~~

INTAKE C.M. PUHP 2A DISCHARGE HEADER REF. DMG. NO. 02-112-B 8450 CM-3000-7006 F-B VT-3 NDE 4.3 . 077 C C 10-3-90: COHPLETE RIGID FRAHE SUPPORT F-2,3

    • N/A~*

1 '

FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST. LUCIE PLANT 6501 SOUTH HWY A1A JENSEN BEACH, FLORIDA 34957 Commercial Service Date: August 8,1983 UNIT 2 1990 OUTAGE SNUBBER FUNCTIONAL TEST RESULTS

Snubber Functional Test Results tYItTI St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag: 2403 Breakaway: N/A N/A N/A HIA Mfg/Cap Taylo F00 Initial Drag: N/A N/A NIA N/A Mark ¹ SS4-2A Activation: N/A N/A N/A H/A Serial ¹ 3 Test Load: 161.92 N/A 169.68 N/A Deviation Rpt: Final Drag: HIA N/A N/A N/A NCR: LockUp: 71.6 N/A 32.55 N/A Repl S/N: NIA Bleed Rate: 0.38 H/A N/A 1.1 Tag: 2404 Breakaway: N/A N/A N/A N/A Mfg/Cap Taylor.400 Initial Drag: N/A N/A N/A N/A N/A Mark ¹ SS4.2A Activation: N/A N/A N/A Serial ¹ 4 Test Load: 162.3 N/A 168.2 0.56 Deviation Rpt: Final Drag: N/A N/A N/A N/A NCR: LockUp: 47.88 N/A 30.77 N/A Repl S/N: Bleed Rate: 0.12 N/A H/A 0.19 Tag: 2420 Breakaway: 803.1 N/A 782.8 N/A Mfg/Cap, PMHQO Initial Drag: 915.6 N/A 904.9 N/A Mark ¹ 2B2 Activation: N/A N/A N/A NIA Serial ¹ 33336K Test Load: 32.9 N/A 31.38 N/A Deviation Rpt: Final Drag: N/A N/A N/A N/A NCR: LockUp: N/A N/A H/A N/A Repl S/H Bleed Rate: N/A 11.8 1127 N/A Tag: 2-021 Breakaway: 12.4 Pass 8.3, Pass Mfg/Cap LISEGA -675 Initial Drag: 13.1 Pass 8.6 Pass Mark ¹ RC-58-22 Activation: 7.75 PASS 9.77 PASS Serial ¹ 61211/69 Test Load: 486.6 "0.72 536.8 0.8 Deviation Rpt: Final Drag: N/A N/A N/A, N/A NCR: LockUp: 7.75 N/A 9.77 N/A Repl S/N: Bleed Rate:

0 RA PARR 9 A7 PAAR Tag: 2-022 Breakaway: 7.2 Pass 6.8 Pass Mfg/Cap PSA-1/4 Initial Drag: 7.2 Pass 6.8 Pass Mark¹ RC-48-R8 Activation: 0.01 PASS 0.012 PASS Serial ¹ 11896 Test Load: 246.5 0.7 273.8 0.78 Deviation Rpt: Final Drag: 5.6 Pass 6.8 Pass NCR: LockUp:

Bcpl S/N: Bleed Rate:

Tag: 2-023 Breakaway: 10.2 Pass 8.2 Pass Mfg/Cap Lisega-675 initial Drag: 15.7 Pass Pass 10.9 Mark ¹ RC-44-R7 Activation: 9.88 PASS 9.8 PASS Serial ¹ 61211/61 Test Load: 491.3 0.73 561.1 0.83 Deviation Rpt: Final Drag: N/A N/A N/A NCR: LockUp:

Repl S/N: Bleed Rate:

P hc'c 1 dQ PARR

Snubber Functional Test Results mrna St. Lucie Unit 2 1990 Refuefin Outa e TENSION COMPRESSION Tag: 2424 Breakaway: 9.8 Pass 0.01 93 Pass 0.01 Mfg/Cap Llsega475 lnltlal Drag: 10.6 Pass 0.02 93 Pass 0.01 Mark ¹ RCA4-R7 Actlvatlon: 8.88 PASS 10.32 PASS Serial ¹ 61211/66 Test Load: 483.7 0.72 530.2 0.79 Deviation Rpt: Final Drag: N/A N/A N/A N/A NCR: LockUp:

Repl S/N: NIA Bleed Rate: 2,06 PASS PASS Tag: 2425 Breakaway: 8.2 Pass 14.8 Pass Mfg/Cap Usega475 Inltlal Drag: 12.1 Pass 0.02 14.8 Pass Mark ¹ RMS-81 1 Actlvatlon:

10.51 PASS 11.72 PASS Serial ¹ 61211/43 Test Load: 480.3 0.71 532.4 0.79 Deviation Rpt: Final Drag: N/A N/A N/A N/A NCR: LockUp:

Repl S/N: Bleed Rate: 2.19 PASS PASS 1.93 Tag: 2%26 Breakaway: 11.5 Pass 0.02 14.5 Pass 0.02 Mfg/Cap Llsega-675 Inltlal Drag: 11.5 Pass 0.02 14.5 Pass 0.02 Mark ¹ RN7-R14 Actlvatlon: 9.36 PASS 10.88 PASS Serial ¹ 61211/60 Test Load: 484.2 0.72 531 0.79 Devlatlon Rpt: Final Drag: N/A N/A N/A N/A NCR: LockUp:

Bcpl S/N: N/A Bleed Rate: PASS 2.09 1.9 PASS Tag: 2-027 Breakaway: 12.2 N/A 13.3 NIA Mfg/Cap Llsega-675 Inltlal Drag: 12.2 N/A 13.3 N/A Mark ¹ RC-2-R5 Actlvatlon: 9.34 N/A 11.36 N/A Serial ¹ 61211/74 Test Load: 481.5 NIA 536 N/A Devlatlon Rpt: Final Drag: N/A N/A N/A N/A NCR: LockUp: 9.34 N/A 11.36 N/A Repl S/N: Bleed Rate: 2.47 N/A 917 N/A Tag: 2-028 Breakaway: 12.1 Pass 15.4 Pass Mfg/Cap Llsega-675 Inltlal Drag: 13 Pass 15.4 Pass Mark¹ RC-2-R5 Actlvatlon: 6.09 PASS 8.92 PASS Serial ¹ 61211/44 Test Load: 487.3 0.72 531.5 0.79 Devlatlon Rpt: Final Drag: N/A N/A N/A N/A NCR: LockUp: N/A N/A N/A N/A Repl S/N: NIA~ Bleed Rate: 2.28 PARR Pass Tag: 2-029 Breakaway: 2.6 Pass 4.3 Pass Mfg/Cap PSA-1/4 Inltlal Drag: 5.2 Pass Pass 5

Mark ¹ RC-5-R4 Actlvatlon: 0.011 PASS 0.012 PASS Serial ¹ 29195 Test Load: 261.1 0.75 284 0.81 Devlatlon Rpt: Final Drag: 5 5.5 Pass Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Snubber Functional Test Results

~S St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag: 2430 Breakaway: 42 Pass 0.01 10.2 Pass 0.02 Mfg/Cap Usega475 ~

Initial Drag: 8.1 Pass 0.01 10.6 Pass 0.02 Mark ¹ RC.59.A2 Activation: 9.7 PASS 11.48 PASS Serial ¹ 61211/75 Test Load: 484.8 0.72 540.4 0.8 Deviation Rpt: Final Drag: N/A H/A H/A=- H/A NCR: LockUp:

Repl S/N: N/A Bleed Rate: 2.4 1.42 PASS PASS Tag: 2431 Breakaway: 3.5 Pass 7.1 Pass Mfg/Cap PSA.1/4 initial Drag: 6.3 Pass 0.02 7.1 Pass 0.014 Mark ¹ RC.39.R7 Activation: PASS 0.017 PASS Serial ¹ 26328 Test Load: 252.8 0.72 273.8 0.78 Deviation Rpt: Final Drag: 6.7 Pass 6.1 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2433 Breakaway: 2.5 Pass 0.01 5.2 Pass 0.01 Mfg/Cap PSA-1/4 Initial Drag: 5.3 Pass 0.02 5.2 Pass 0.01 Mark ¹ RC-1 8-R9 Activation: 0.01 PASS 0.009 PASS Serial ¹ 38029 Test Load: 262.9 0.75 283.3 0.81 Deviation Rpt: Final Drag: 6.5 5.2 Pass 0,02 Pass 0.01 NCR: LockUp:

R pl S/N Bleed Rate:

Tag: 2-035 Breakaway: 14.3 Pass 15.2 Pass Mfg/Cap Llsega-675 Initial Drag: 14.8 Pass 15.2 Pass Mark ¹ SI-73-R4 Activation: 8.64 PASS 11.99 PASS Serial ¹ 61211/65 Test Load: 503.6 0.75 533.7 0.79 Deviation Rpt: Final Drag:

N/A N/A NCR: LockUp:

Repl S/N: Bleed Rate:

PASH 1 07 PARA Tag: 2-036 Breakaway: 13.5 Pass 37.8 Pass Mfg/Cap PSA-3 Initial Drag: 27.3 Pass 44.7 Pass Mark ¹ Sl<205<590 Activation: 0.011 PASS 0.009 PASS Serial ¹ 16748 Test Load: 4701. 0.78 4489. 0.75 Deviation Rpt: Final Drag: 34.4 Pass 37.7 Pass NCR: LockUp:

Repl S/N: Bleed Rats:

Tag: 2-037 Breakaway: 42.2 Pass 58.7 Pass Mfg/Cap PSA-10 Initial Drag: 92.1 Pass Pass 58.7 Mark ¹ SI<205<080 Activation: 0.012 PASS 0.009 PASS Serial ¹ 12504 Test Load: 12199 0,81 12273 0.82 Deviation Rpt: Final Drag: 57.9 Pass Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Snubber Functional Test Results mm St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag: 2440 Breakaway: 2.7 Pass 0.01 8 Pass 0.02 Mfg/Cap PSA-1/4 Initial Drag: 7.7 Pass 0.02 10 Pass 0.03 Mark ¹ MSI-9 R88 Activation: O.NS PASS 0.009 PASS Serial ¹ 29179 Test Load: 272.5 0.78 271.4 0.78 Deviation Rpt: Final Drag: 6.8 Pass 0.02 Pass 0.03 NCR: LockUp:

Bcpl S/N: N/A Bleed Rate:

Tag: 2443 Breakaway: 3.4 Pass 4.9 Pass Mfg/Cap PSA-1/4 Initial Drag: 5.3 Pass 0.02 4.9 Pass Mark ¹ CH 106.R7 Activation:

0.01 PASS 0.013 PASS Serial ¹ 26320 Test Load: 247.7 0.71 270.8 0.77 Deviation Rpt: Final Drag: 4.6 Pass 4.5 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2445 Breakaway: 12.7 Pass 0.02 11.6 Pass 0.02 Mfg/Cap Llsega-675 Initial Drag: 13 Pass 0.02 11.6 Pass 0.02 Mark ¹ CH-1 08-R4 Activation: 8.34 PASS 9.79 PASS Serial ¹ 61211/55 Test Load: 495.5 0.73 535.2 0.79 Deviation Rpt: Final Drag: N/A '/A N/A N/A

'CR: LockUp:

R pl S/N Bleed Rate: PASS 1.81 PASS Tag: 2-048 Breakaway: 6.6 Pass 20.2 Fall 0.06 Mfg/Cap PSA-1/4 Initial Drag: 15.3 Pass 20.2 Fall 0.06 Mark ¹ MSI-1 O-R? B Activation: 0.009 PASS 0.01 PASS Serial ¹ 19064 Test Load: 246.9 0.71 253.6 0.72 Deviation Rpt: Final Drag: 170.6 Fall 0.49 Pass NCR: LockUp:

Repl S/N: 38518 Bleed Rate; Tag: 2-049 Breakaway: 2.4 Pass 81.9 Fall 0.23 Mfg/Cap PSA-1/4 Initial Drag: 138.2 Fall 0.39 165.6 Fall 0.47 Mark ¹ B-15-R10 Activation: 0.013 PASS 0.015 PASS Serial ¹ 29334 Test Load: 265.9 0.76 281 0.8 Devlatlon Rpt: Final Drag: 135.7 Fall 0.39 163.9 Fall 0.47 NCR: LockUp:

Repl S/N: 37857 Bleed Rate:

Tag: 2-051 Breakaway: 9.2 Pass 17.9 Fall 0.05 Mfg/Cap PSA-1/4 Initial Drag: 13.6 Pass Fall 0.05 19.2 Mark ¹ Sf<201-736B Actlvatlon: 0.013 PASS 0.014 PASS Serial ¹ 19022 Test Load: 256.9 0.73 274.6 0.78 Deviation Rpt: Final Drag: 14.6 20.2 Fall 0.06 Pass NCR: LockUp:

Repl S/N: 38537 Bleed Rate:

Snu ber Func ionalTes Resul s umma St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag: 2452 Break" way: 11.9 Pass 0.03 27.1 Fail 0.08 Mfg/Cap Initial Drag: 18.4 Fall 0.05 28.3 Fail 0.08 PSA-1/4 Mark ¹ SI.4201-730B Activation:

Serial ¹ 38014 Test Load:

Deviation Rpt: Final Drag:

NCR: LockUp:

Repl S/N: 38534 Bleed Rate:

29.6 Pass 14.4 Pass Tag: 2458 Breakaway:

55.5 Pass 0.01 32.3 Pass Mfg/Cap PSA-3 Initial Drag:

PASS 0.007 PASS Mark ¹ SI4200-322C Activation:

Serial ¹ 21266 Test Load:

4755. 0 79 4410. 0.74 Deviation Rpt: Final Drag: Pass 48.4 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: Breakaway: 18.5 Pass 0.03 18.2 Pass 0.03 Mfg/Cap Llsega-675 Initial Drag: 18.5 Pass 0.03 18.2 Pass 0.03 Mark ¹ SI-4200-322 B Activation: 10.08 PASS 11.82 PASS Serial ¹ 61211/54 Test Load: 486.1 0.72 530.1 0.79 plS/N'%59 Deviation Rpt: Final Drag:

LockUp:

N/A N/A N/A N/A NCR:

R 61211/84 Bleed Rate: PASS PASS 2.08 Tag: 2-061 Breakaway: 2.8 Pass 5 -

Pass Mfg/Cap PSA-1/4 Initial Drag: 5.3 Pass 6.2 Pass Mark ¹ SI<200%307 Activation: 0.009 ~

PASS 0.012 PASS Serial ¹ 20285 Test Load: 277A 0.79, 292.1 0.83 Deviation Rpt: Final Drag: 7.3 Pass 5.5 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-062 Breakaway: 5 Pass 6.8 Pass Mfg/Cap PSA-1/4 Initial Drag: 6.2 Pass 9 Pass Mark ¹ SI<200%307 Activation: 0.004 PASS 0 006 PASS Serial ¹ 19070 Test Load: 268.3 0.77 288 0.82 Deviation Rpt: Final Drag: 9.7 Pass 8.2 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-069 Breakaway: 8.5 Pass 9.2 Pass Mfg/Cap PSA-1/4 initial Drag: 11.2 Pass 9.2 Pass Mark ¹ Sf<208-264B Activation: 0.011 PASS 0.013 PASS Serial ¹ 12049 Test Load: 271.7 0.78 296.8 0.85 Deviation Rpt: Final Drag: 10.8 Pass 10.4 Pass NCR: LockUp:

Repl S/N: Bleed Rate;

Snubber Functional Test Results

~S St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag: Breakaway: 194.9 N/A 174.5 N/A 2470 Mfg/Cap Initial Drag: 247 N/A 194.6 N/A PMH.2200 Mark¹ Activation: N/A N/A N/A N/A SI.4200-6348 Serial ¹ PO 87773-1 422 Test Load: 13871. N/A 13495. NIA Deviation Rpt: Final Drag: N/A N/A N/A N/A NCR: LockUp: N/A N/A N/A N/A Repl S/N: Bleed Rate: 26.23 N/A 24,18 N/A 10.8 Pass 10.9 Pass Tag: 2.071 Breakaway:

10.8 Pass 0.02 14.4 Pass Mfg/Cap Usega475 initial Drag:

9.09 PASS 10.56 PASS Mark ¹ S!4208.266B Activation:

Serial ¹ 61211/72 Test Load:

493 0.73 529.2 0.78 Deviation Rpt: Final Drag: N/A N/A N/A N/A NCR: LockUp:

Repl S/N: Bleed Rate: 1,97 PASS PASS Tag: 2-072 Breakaway: 11 Pass 0.01 13.1 Pass 0.01 Mfg/Cap PSA-1 Initial Drag: 15.4 Pass 0.01 13.8 Pass 0.01 Mark ¹ Sl-4205%428B Activation: 0.006 PASS 0.006 PASS Serial 14878 Test Load: 1154. 0.77 1298. 0.87

¹'eviation Rpt: Final Drag: 15.4 13.9 Pass 0.01 Pass 0.01 ,

NCR: LockUp:

R pl S/N Bleed Rate:

Tag: 2-074 Breakaway: 19.4 Pass 28.3 Pass Mfg/Cap PSA-3 Initial Drag: 35.5 Pass 28.3 Pass Mark ¹ St<205-6713B Activation: 0,01 PASS 0.007 PASS Serial ¹ 16752 Test Load: 5000. 0.83 4611. 0.77 Deviation Rpt: Final Drag: 35.7 Pass 25.7 Pass NCR LockUp:

Repl S/N: Bleed Rate:

Tag: 2-075 Breakaway: 23.7 Pass 26,9 Pass Mfg/Gap PSA-3 Initial Drag: 45 Pass 371 Pass Mark ¹ SI<205%713B Activation: 0.009 PASS 0.005 PASS Serial ¹ 16769 Test Load: 4903. 0.82 4458. 0.74 Deviation Rpt: Final Drag: 40.2 Pass 43.4 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-076 Breakaway: 35.4 Pass 30.1 Pass Mfg/Cap PSA-10 Initial Drag: 54.3 Pass 52.8 Pass Mark ¹ SI<205<56C Activation: 0.014 PASS 0.011 PASS Serial ¹ 8928 Test Load: 12103 0.81 11738 78.26 Deviation Rpt: Final Drag: 49 37.5 Pass' Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Snu ber Functianal Tes Results UNlll St. Lucie Unit 2 1990 Refuelin Outa e TENSION COMPRESSION Tag: 2480 Breakaway: 15.4 Pass 0.01 15.4 Pass '0.01 Mfg/Cap PSA-1 Initial Drag: 28.4 Pass 0.02 17.2 Pass 0.0t Mark ¹ SI420544288 Activation: 0.005 PASS 0.006 PASS Serial ¹ 20363 Test Load: 1109.4 0.74 1258.2 . 0,84 Deviation Rpt: Final Drag: 27.3 Pass 0.01 Pass 0.02 NCR: LockUp:

Repl S/N: N/A Bleed Rate:

Tag: 2481 Breakaway: 38.6 Pass 34.6 Pass Mfg/Cap PSA-10 initial Drag: 51 Pass 0.00 40.5 Pass Mark ¹ SI4205.456A Activation:

0.016 PASS 0.016 PASS Serial ¹ 8925,, Test Load: 11430 0.76 11228 0.75 Deviation Rpt: Final Drag: 42.3 Pass 44.5 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2%82 Breakaway: 22.4 Pass 0.00 21.2 Pass 0.00 Mfg/Cap PSA-3 Initial Drag: 29 Pass 0.00 40.7 Pass 0.01 Mark ¹ SI4205-6440B Activation: 0.008 PASS 0.008 PASS Serial ¹ 18687 Test Load: 4753. 0.79 4341. 0.72 Deviation Rpt: Final Drag: 34.7 26.1 Pass 0.01 Pass 0.00 NCR: LockUp:

Repl S/N; N/A Bleed Rate; Tag: 2-083 Breakaway: 19.7 Pass 16.2 Pass Mfg/Cap PSA-3 Initial Drag: 26.6 Pass 27.3 Pass Mark ¹ Sf<205%747 Activation: 0.009 PASS 0.008 PASS Serial ¹ 18679 Test Load: 4521. 0.75 4266. 0.71 Deviation Rpt: Final Drag: 30.4 Pass 27.1 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-084 Breakaway: 30.7 Pass 45.2 Pass Mfg/Cap PSA-3 Initial Drag: 147.3 Pass 46.6 Pass Mark ¹ Sl<204-1 100B Activation: 0.007 PASS 0.005 PASS Serial ¹ 29504* Test Load: 5231 0.87 5188 0.86 Deviation Rpt: Final Drag: 51.8 Pass 56.3 Pass NCR: LockUp:

Repl S/N; Bleed Rate:

Tag: 2-085 Breakaway: 6.2 Pass 9.9 Pass Mfg/Cap PSA-1/4 initial Drag: 9.4 Pass Pass 10.3 Mark ¹ Sl-99-Rt Activation: 0.009 PASS 0.013 PASS Serial ¹ 38027 Test Load: 263.3 0.75 291.5 0.83 Deviation Rpt: Final Drag: 4.8 Pass Pass 7.8 NCR: LockUp:

Repl S/N: Bleed Rate:

ber Fun i n I Yes Resul s mrna St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag: Breakaway: 3.1 Pass 0.01 6.4 Pass 0.02 2486 Mfg/Cap Initial Drag: 6.4 Pass 0.02 7 Pass 0.02 PSA-1/4 Mark ¹ Sl.99.R1 Activation: 0.006 PASS 0.008 PASS Serial ¹ 38026 Test Load: 261.8 0.75 296.1 0.85 Devlatlon Rpt: Final Drag: 6.6 6.7 Pass 0.02 Pass 0.02 NCR: LockUp:

Repl S/N: N/A Bleed Rate:

3.4 Pass 3.1 Pass Tag: 2487 Breakaway:

5.2 Pass 0.01 4.5 Pass-Mfg/Cap PSA-1/4 Initial Drag:

0.013 0.015 PASS Mark ¹ SI4208.61 6B Activation: PASS Serial ¹ 12906 Test Load: 261.5 0.75 270.9 0.77 Deviation Rpt: Final Drag: 5.4 Pass 5.2 Pass NCR: LockUp:

Repl S/N: NA Bleed Rate:

Tag: 2488 Breakaway: 28.2 Pass 0.02 32.9 Pass 0.02 Mfg/Cap PSA-1 Initial Drag: 92.4 Fall 0.06 182.1 Fail 0.12 Mark ¹ SI-4204-1 270B Activation: 0.006 PASS 0.005 PASS Serial ¹ 20359 Test Load:

Final Drag:

1164. 0.78 1289 0.86 Deviation Rpt: 55.4 Pass 0.04 179 Fall 0.12 NCR: LockUp:

R PIS/N 28002 Bleed Rate:

Tag: 2-089 Breakaway: 12.2 Pass 45.8 Pass Mfg/Cap PSA-1 initial Drag: 35.3 Pass 161.4 Fall 0.11 Mark ¹ SI4204-1 270 B Activation: 0.004 PASS 0.005 PASS Serial ¹ 26000 Test Load: 1067. 0.71 1193. 0.8 Deviation Rpt: Final Drag: 46.9 Pass 94 Fall 0.06 NCR: LockUp:

Repl S/N: 28062 Bleed Rate:

Tag: 2-090 Breakaway: 70.3 Pass 42.8 Pass Mfg/Cap PSA-10 initial Drag: 99.4 Pass 102.5 Pass Mark ¹ Sf<204-1 33 Activation: 0.011 PASS 0.009 PASS Serial ¹ 8929 Test Load: 12168 0.81 12267 0.82

'eviation Rpt: Final Drag: 131.6 Pass 86.5 Pass NCR LockUp:

Repl S/N; Bleed Rate:

Tag: 2-091 Breakaway: Pass 440 Pass Mfg/Cap PSA-10 Initial Drag: Pass 2096 Fail 0.14 Mark ¹ BF4007-7012A Actlvatlon:

Serial ¹ 11390 Test Load:

Deviation Rpt: Final Drag:

NCR: LockUp:

Repl S/N: 17850 Bleed Rate:

Snubber Functional Test Results umma St. Lucie Unit 21990 Refueiin Outa e TENSION COMPRESSION Tag: Breakaway: 20.9 Pass 0.00 46.2 Pass 0.00 2492 Mfg/Cap Initial Drag: 24.9 Pass 0.00 1703.9 Fall 0.11 PSA-10 Mark ¹ BF4007-?012A Activation:

Serial ¹ 10166 Test Load:

Deviation Rpt: Final Drag:

LockUp:

NCR'ept S/N: 17851 Bleed Rate:

114.7 Pass 162.4 Pass Tag: 2493 Breakaway:

206.2 Pass 0.00 356.6 Pass Mfg/Cap PSA-35 Initial Drag:

0.011 0.01 PASS Mark ¹ 8 F4007-7017 Activation: PASS Serial ¹ 8928 Test Load: 35.61 0 42.38 0 Devlatlon Rpt: Final Drag: 600.8 Pass 250.8 Pass NCR: LockUp:

Bcpl S/N: Bleed Rate:

Tag: 2%95 Breakaway: 1754. Pass 0.01 604 Pass 0.01 Mfg/Cap PSA-100 Initial Drag: 1977. Pass 0.02 2230. Pass 0.02 Mark ¹ M&4100-1 6B Activation: 0.013 PASS 0.016 PASS Serial ¹ 2373 Test Load: 88.6 0 97.34 0 Devlatlon Rpt: Final Drag: 1831. 2699. Pass 0.02 Pass 0.02 NCR: LockUp:

Rept S/N Bleed Rate:

Tag: 2-096 Breakaway: 725.1 Pass 218.9 Pass Mfg/Cap PSA-100 Inlttal Drag: 1202 Pass 982 Pass Mark ¹ M&4100-16B Actlvatton: 0.019 PASS 0.019 PASS Serial ¹ 1205 Test Load: 88.32 0 89.64 0 Deviation Rpt: Final Drag: 1488. Pass 900.1 Pass NCR: LockUp:

Rept S/N: Bleed Rate:

Tag: 2-101 Breakaway: 4.9 Pass 4.8 Pass Mfg/Cap PSA-1/4 Initial Drag: 5.7 Pass 4.8 Pass Mark¹ SI4201-7201 B Activation: 0.012 PASS 0.01 "

PASS Serial ¹ 26325 Test Load: 261.9 0.75 286.3 0.82 Deviation Rpt: Final Drag: 5.6 Pass 5.3 Pass NCR: LockUp:

Rept S/N: Bleed Rate:

Tag. 2-103 Breakaway: 11.6 Pass 10.3 Pass Mfg/Cap PSA-1 Initial Drag: 14.6 Pass 13.8 Pass Mark ¹ St<203-24B Actlvat ton: 0.01 PASS 0.009 PASS Serial ¹ 14872 Test Load: 1122. 0.75 1254. 0.84 Deviation Rpt: Final Drag: 11.9 19.3 Pass Pass NCR: LockUp:

Rept S/N: Bleed Rate:

Snubber Functional Test Results

~S St. Lucie Unit ¹21990 Refuelin Outa e TENSION COMPRESSION Tag: 2-104 Breakaway: 23.4 Pass 0.02 26.2 Pass 0.02 Mfg/Cap PSA-1 Initial Drag: 26.6 Pass 0.02 47.1 Pass 0.03 Mark¹ SI42ta.24B Activation: 0M8 PASS 0.005 PASS Serial ¹ 14876 Test Load: 1138.6 0.76 1274.4 0.85 Devlatlon Rpt: Final Drag: 26.3 33.4 Pass 0.02 pass 0.02 NCR LockUp:

Repl S/N: N/A Bleed Rate:

Tag: 2.106 Breakaway: 20.5 Pass 30.8 Pass Mfg/Cap PSA-3 Inltlal Drag: 42.7 Pass 0.01 Pass 0.009 Mark ¹ SI4203.581 B Actlvatlon: PASS 0.005 PASS Serial ¹ 21267 Test Load: 4631. 0.77 4396. 0.73 Devlatlon Rpt: Final Drag: 3?.3 Pass 34.6 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag; 2-107 Breakaway: 20.7 Pass 0.00 36.7 Pass 0.01 Mfg/Cap PSALM Inltlal Drag: 39.7 Pass 0.01 39.4 Pass 0.01 Mark ¹ SI-4203-581 B Activation: 0.008 PASS 0.005 PASS Serial ¹ 18680 Test Load: 4789. 0.8 4521. 0.75 Devlatlon Rpt: Final Drag: 43.7 68.9 Pass 0.01 Pass 0.01 NCR: LockUp:

R plS/N Bleed Rate:

Tag: 2-108 Breakaway: 7.5 Pass 147 Pass Mfg/Cap PSA-1 Inltlal Drag: 12.6 Pass 16 2 Pass Mark ¹ Sf<200-314 B Actlvatlon: 0.01 PASS 0.013 PASS Serial ¹ 14884 Test Load: 1127. 0.75 1210 0 81 Devlatlon Rpt: Final Drag: 15.9 Pass 12.9 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-109 Breakaway: 8.8 Pass 13.7 Pass Mfg/Cap PSA-1 Inltlal Drag: 13.3 Pass 14.3 Pass Mark ¹ Sf<200-314B Actlvatlon: 0.009 PASS 0.009 PASS Serial ¹ 19231 , Test Load: 1114. 0.?4 1252. 0.83 Devlatlon Rpt: Final Drag: 13.3 Pass 12.7 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-110 Breakaway: 69.4 Pass 93.7 Pass Mfg/Cap PSA-10 Inltlal Drag: 145 Pass Pass 110.1 Mark ¹ BF-4006-7407 Actlvatlon: 0.011 PASS 0.007 PASS Serial ¹ 11393 Test Load: 12322 0.82 12530 0.84 Devlatlon Rpt: Final Drag: 103.9 Pass Pass 102.5 NCR: LockUp:

Repl S/N: Bleed Rate:

Snubber Functional Test Results

~S St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Breakaway: 26.1 Pass 0.00 TT.1 Pass 0.01 2-111 Tag'fg/Cap 51.T Pass 0.01 PSA-10 Initial Drag: Pass 0.00 87.6 Mark¹ Actlvatlon: 0.014 PASS 0.009 PASS BF.4006-7407 Serial ¹ 10183 Test Load: 12058. 03 12148. 0.81 Deviation Rpt: Final Drag: 73.8 Pass 0.00 88,2 Pass 0.01 NCR: LockUp:

Bcpl S/N: N/A Bleed Rate:

33.1 Pass 41.9 Pass Tag: 2-112 Breakaway:

56.3 Pass 0.00 43.3 Pass Mfg/Cap PSA-10 lnltlal Drag:

0.013 0.016 PASS Mark ¹ B F4008-7020 Actlvatlon: PASS Serial ¹ 10167 Test Load: 12870 0.86 1231 8 0.82 Devlatlon Rpt: Final Drag: 53.1 Pass 51.8 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: Breakaway: 9.6 Pass 0.00 35.3 Pass 0.01 Mfg/Cap PSA-3 Inltlal Drag: 25.9 Pass 0.00 37.3 Pass 0.01 Mark ¹ SPS-27 Actlvatlon: 0.008 PASS 0.01 PASS SerialS/N'-113 18685 Test Load:

Final Drag:

4789. 0.8 4351. 0.73

¹'eviation Rpt: 32.4 Pass 0.01 32 Pass 0.01 NCR: LockUp:

Repl H/A Bleed Rate:

Tag: 2-114 Breakaway: 45.2 Pass 49.5 Pass Mfg/Cap PSA-10 Inltlal Drag: 77.2 Pass 66.4 Pass Mark ¹ B F-4006-741 6 Actlvatlon: 0.013 PASS 0.009 PASS Serial ¹ 8930 Test Load: 12839 0.86 12777 0.85 Devlatlon Rpt: Final Drag: 75.7 Pass 55.2 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-115 Breakaway: 39.6 Pass 105.6 Pass Mfg/Cap PSA-1 0 Inltlal Drag: 140.5 Pass 126.7 Pass Mark ¹ BF-4006-741 6 Actlvatlon: 0.014 PASS 0.009 PASS Serial ¹ 8942 Test l.oad: 12706 0.85 13016 0.87 Deviation Rpt: Final Drag: 108.6 Pass 73.9 Pass NCR: LockUp:

Repl S/N; N/A Bleed Rate:

Tag: 2-117 Breakaway: 2.8 'ass 5.6 . Pass Mfg/Cap PSA-1/4 Inltlal Drag: 5.8 Pass 84 Pass Mark ¹ Sf<206%271 C Actlvatlon: 0.012 PASS 0.011 PASS Serial ¹ 38019 Test Load: 260.1 0.74 292.7 0.84 Devlatlon Rpt: Final Drag: 7.1 7.5 Pass Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Snubber Functianal Test Results

~S St. Lucie Unit 21990 Refueiin Outa e TENSION COMPRESSION Tag: 2-118 Breakaway: 2.7 Pass 0.00 2.7 Pass 0.00 Mfg/Cap PSA-1/2 Initial Drag: 3 Pass 0.00 33 Pass 0.01 Mark ¹ 6IA208-2801 B Activation: 0.014 PASS 0.017 PASS Serial ¹ 14140 Test Load: 538.8 033 553.6 0.85 Deviation Rpt: Final Drag: 32 Pass 0.00 3.7 Pass 0.01 NCR: LockUp:

Repl S/N; N/A Bleed Rate:

Tag: 2-124 Breakaway: 3.1 Pass 5.8 Pass Mfg/Cap PSA-1/4 Initial Drag: 5.5 Pass 0.02 6.7 Pass Mark ¹ RC 98.R12 Activation:

0.009 PASS 0.009 PASS Serial ¹ 29366 Test Load: 276.6 0.79 295.5 0.84 Deviation Rpt: Final Drag: 5.7 Pass 5.4 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-1 27 Breakaway: 3.9 Pass 0.01 6.6 Pass 0.02 Mfg/Cap PSA-1/4 initial Drag: 6.6 Pass 0.02 6.6 Pass 0.02 Mark ¹ MSI-1 3-R1 Activation: 0.007 PASS 0.01 PASS Serial ¹ 19068 Test Load: 268.6 0.77 309.2 0.88 Deviation Rpt: Final Drag: 6.3 7.3 Pace 0.02 Pass 0.02 NCR: LockUp:

I Bleed Rate:

S/N'ag:

2-128 Breakaway: 6.2 Pass 7 Pass Mfg/Cap PSA-1/4 Initial Drag: 7.2 Pass 7 Pass Mark ¹ MSI-13-R4 Activation: 0.01 PASS 0.012 PASS Serial ¹ 19098 Test Load: 270.7 0.77 288.4 0.82 Deviation Rpt: Final Drag: 6.7 Pass 7.3 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-138 Breakaway: 3A Pass 6.7 Pass Mfg/Cap PSA-1/4 Initial Drag: 5.3 Pass 7.2 Pass Mark ¹ MSI-12-R4 Activation: 0.008 PASS 0.014 PASS Serial ¹ 20198 Test Load: 260.9 0.75 281.1 0.8 Deviation Rpt: Final Drag: 5.8 Pass 7.3 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-139 Breakaway: 2.2 Pass 6.3 Pass Mfg/Cap PSA-1/4 Initial Drag: 5S Pass Pass 6.7 Mark ¹ MSI-1 2-R1 Activation: 0.007 PASS 0.01 PASS Serial ¹ 19091 Test Load: 259.1 0.74 286.9 0.82 Deviation Rpt: Final Drag: 6.9 6.4 Pass Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Snubber Functional Test Results

~S St. Lucie Unit 2 1990 Refuelin Outa e TENSION COMPRESSION Tag: 2-140 Breakaway: 2.4 Pass 0.01 '42 Pass 0.01 Mfg/Cap PSA-1/4 Initial Drag: 5.1 Pass 0.01 4$ Pass 0.01 Mark ¹ RC.99.85 Activation: 0.011 PASS 0.013 PASS Serial ¹ 12612 Test Load: 280.7 0$ 295.2 0.84 Deviation Rpt: Final Drag: 4.5 Pass 0.01 5 Pass 0.01 NCR: LockUp:

Rept S/N: N/A Bleed Rate:

Tag: 2-141 Breakaway: 3.4 Pass 5S Pass Mfg/Cap PSA-1/4 tnltlal Drag: 4.8 Pass 0.01 5.7 Pass 0.007 Mark ¹ RC.99 R2 Activation: PASS 0.014 PASS Serial ¹ 29364 Test Load: 268.5 0.77 298.6 0.85 Deviation Rpt: Final Drag: 4.8 Pass 5.6 Pass NCR: LockUp:

Rept S/N: '/A Bleed Rate:

Tag: 2-142 Breakaway: 5 Pass 0.01 4.5 Pass 0.01 Mfg/Cap PSA-1/4 Initial Drag: 6.8 Pass 0.02 5.6 Pass 0.02 Mark ¹ RC-99-RSB Activation: 0.009 PASS 0.012 PASS Ser tat ¹ 12610 Test Load: 270.7 0.77 298.5 0.85 Deviatton Rpt: Final Drag: 5.8 Pass 0.02 5.8 Pass 0.02 NCR: LockUp:

R p N/A Bleed Rate:

S/N'ag:

2-'f43 Breakaway: 3.2 Pass 6.6 Pass Mfg/Cap PSA-1/4 Initial Drag: 6.9 Pass 7.2 Pass Mark ¹ RC-97-R6 Activation: 0.01 PASS 0.012 PASS Serial ¹ 38020 Test Load: 259.8 0.74 281.3 0.8 Deviation Rpt: Final Drag: 4.9 Pass 6.4 Pass NCR: LockUp:

Rept S/N: N/A Bleed Rale:

Tag: 2-145 Breakaway: 20.6 Pass 45.5 Pass Mfg/Cap PSA-10 Initial Drag: '0.1 Pass 53.5 Pass Mark ¹ R~OO-123 Activation: 0,013 PASS 0.016 PASS Serial ¹ 10184 Test Load: ,11989 0.8 11330 0.76 Devtatlon Rpt: Final Drag: 38.6 Pass 50.4 Pass NCR: LockUp:

Rept S/N: Bleed Rate:

Tag: 2-146 Breakaway: 34.3 Pass 44.7 Pass Mfg/Cap PSA-10 Inltlal Drag: 6'f.4 Pass Pass 50.9 Mark ¹ RC-4300 123 Activation: 0.014 PASS 0.008 PASS Serial ¹ 11394 Test Load:,,; 12745 0.85 12621 0.84 Deviation Rpt: Final Drag: 61.5 Pass Pass 38.6 NCR: LockUp:

Rept SIN: N/A Bleed Rate:

Snubber Functional Test Results

~S St. Lucie Unit 2 19 0 Refuelin Outa e TENSION COMP RESS1ON Tag: '2-147 Breakaway: 4.6 Pass 0.00 46.8 Pass 0.01 Mfg/Cap initial Drag: 27.1 Pass 0.00 63.5 Pass 0.01 PSA.3 Mark ¹ RM300-121 Activation: 0.01 PASS 0.008 PASS Serial ¹ 16579 Test Load: 4724.6 0.79 4408 0.73 Deviation Rpt: Final Drag: 30.3 60 Pass 0.01 Pass 0.01 NCR: LockUp:

Repl S/N: NIA Bleed Rate:

20.6 Pass 35.3 Pass Tag: 2-148 Breakaway:

38.6 Pass 0.01 35.3 Pass Mfg/Cap PSA.3 Initial Drag:

0.01 0.006 PASS Mark ¹ RM300-1 21 Activation:

5165.

PASS Serial ¹ 17706 Test Load: 0.86 4868.

Deviation Rpt: Final Drag: 28.8 Pass 40.3 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-149 Breakaway: 25.2 Pass 0.00 15.6 Pass 0.00 Mfg/Cap PSA-3 Initial Drag: 31.1 Pass 0.01 23.1 Pass 0.00 Mark ¹ R ~300-27 Actlvatlon: 0.008 PASS 0.011 PASS Serial ¹ 16571 Test Load: 4717 0.79 4374. 0.73 Deviation Rpt: Final Drag: 35.7 23A Pass 0.00 Pass 0.01 NCR: LockUp:

Bcpl S/N; NIA Bleed Rate:

Tag: 2-150 Breakaway: 9.6 Pass 14.2 Pass Mfg/Cap PSA-1 initial Drag: 17 Pass 14.2 Pass Mark¹ RC-4300-125 Activation: 0.012 PASS 0.011 PASS Serial ¹ 14880 Test Load: 1130. 0.75 1241. 0.83 Deviation Rpt: Final Drag: 13.9 Pass 14.5 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-151 Breakaway: 4.7 Pass 7.9 Pass Mfg/Cap PSA-1 Initial Drag: 8.7 Pass 9.9 Pass Mark ¹ RC-4300-28 Activation: 0.009 PASS 0.01 PASS Serial ¹ Test Load: 1143 0.76 1258. 0.84 Deviation Rpt: Final Drag: ,8.1 Pass 13.3 Pass NCR: 14877'-152 LockUp:

Repl S/N: Bleed Rate:

Tag: Breakaway: 7.6 Pass 8.1 Pass Mfg/Cap PSA-1 Inltla I Drag: 9.3 Pass 8.7 Pass Mark ¹ R ~300-28 Activation: 0.011 PASS 0.01 PASS Serial ¹ 16141 Test Load: 1112. 0.74 1217. 0.81 Devlatlon Rpt: Final Drag: 10 Pass Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Snubber Functionai Test Results

~8 St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag: Breakaway: 10.7 Pass 0.00 25.5 Pass 0.00 2-153 Mfg/Cap Initial Drag: 27.7 Pass 0.00 37.6 Pass 0.01 PSA.3 Mark ¹ Rmaaa 26B Activation: 0.008 PASS 0.008 PASS Serial ¹ 'I6568 Test Load: 4827.7 03 4929 0.82 Deviation Rpt: Final Drag: 26.8 432 Pass 0.01 Pass a.00 NCR: LockUp:

Repl S/N: N/A Bleed Rate:

21.8 Pass 32.5 Pass Tag: 2-154 Breakaway:

47.3 Pass 0.00 41.8 Pass Mfg/Cap PSA 10 Initial Drag:

0.015 PASS 0.014 PASS Mark ¹ R(&300-126 Actlvatlon:

Serial ¹ 9048 Test Load: 11699 0.78 11634 0.78 Deviation Rpt: Final Drag: 54.5 Pass 44.5 Pass NCR: LockUp:

Rept S/N: Bleed Rate:

Tag t 2-155 Breakaway: 14.9 Pass 0.00 32 Pass a&

Mfg/Cap PSA-10 Initial Drag: 38.5 Pass 0.00 32 Pass 0.00 Mark ¹ RC<300-1 26 Actlvatlon: 0.015 PASS 0.015 PASS Serial ¹ 10177 Test Load: 11709 0.78 11264 0.75 Deviation Rpt: Final Drag: 38.8 36.2 Pass 0.00 Pass 0.00 NCR: LockUp:

Repi S/N N/A Bleed Rate:

Tag: 2-156 Breakaway: 9.4 Pass 12.8 Pass Mfg/Cap PSA-1 Inlttal Drag: 15.8 Pass 12.8 Pass Mark ¹ RC-4300-64B Acttvatton: 0.008 PASS o.a1 pAss Serial ¹ 19227 Test Load: 1114. 0.74 1241. 0.83 Devlatton Rpt: Final Drag: 12.3 Pass 15.3 Pass NCR: LockUp:

Repl SIN: Bleed Rate:

Tag: 2-157 Breakaway: 18.1 Pass 15.8 Pass Mfg/Cap PSA-1 initial Drag: 28.4 Pass 16 Pass Mark ¹ R~300-7066 Activation: 0.007 PASS 0.006 pAss Serial ¹ 24728 Test Load: 1162. 0.78 1253. 0.84 Devlatton Rpt: Final Drag: 25.3 Pass 22.4 Pass NCR: LockUp:

Rept S/N: Bleed Rate:

Tag: 2-158 Breakaway: 23.2 Pass 17.2 Pass Mfg/Cap PSA-1 tnlt tat Drag: 26.5 Pass 17.5 Pass Mark ¹ R~300-?066 Activation: 0.007 PASS o.aa? PASS Serial ¹ 24729 Test Load: 1134. 0.76 1294. 0.66 Devtatlon Rpt: Final Drag: 19.8 19.3 Pass Pass LockUp:

NCR'epl S/N: Bleed Rate:

Snubber functional Test Results

~S St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag 2-159 Breakaway: 8.3 Pass 0.01 7.1 Pass 0.00

'fg/Cap 8.6 PSA-1 Initial Drag: Pass 0.01 8.6 Pass 0.01 Mark ¹ RM300-7020 Activation: 0.011 PASS 0.01 PASS Serial ¹ 14882 Test Load: 1148.8 0.77 1251.5 0.83 Deviation Rpt: Final Drag: 9 Pass 0.01 12.2 Pass 0.01 NCR: LockUp:

Repl S/N; NIA Bleed Rate:

Tag 2-160 Breakaway: 18 Pass 22.1 Pass Mfg/Cap PSA-3 Initial Drag: 24.9 Pass 0.00 27.3 Pass Mark ¹ R('&300-12 Activation:

0.008 PASS 0.007 PASS Serial ¹ 20253 Test Load: 4743. 0.79 4400 0,73 Deviation Rpt: Final Drag: 25S Pass 30 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-161 Breakaway: 14.7 Pass 0.00 26.6 Pass 0.00 Mfg/Cap PSA-3 initial Drag: 25.9 Pass 0.00 32 Pass 0.01 Mark ¹ RG4300-1 2 Activation: 0.006 PASS 0.008 PASS Serial¹ 20262 Test Load: 4813 0,8 4394. 0.73 Rpt: Final Drag: 25.9 32

'eviation Pass 0.00 Pass 0.01 NCR: LockUp:

R PIS/N N/A Bleed Rate; Tag: 2-169 Breakaway: 171.2 Pass 76.2 Pass Mfg/Cap PSA-3 Initial Drag: 503.9 Fail 0.08 55?.9 Fall 0.09 Mark ¹ RC-4300-1 39 Activation: 0.029 FAIL 0.029 FAIL Serial ¹ 16762 Test Load: 2565. 0.43 938.6 0.16 Deviation Rpt: Final Drag: 1550. Fall 0.26 111.7 Pass NCR: LockUp:

Repl S/N: 17850 Bleed Rate; Tag: 2-170 Breakaway: 15.4 Pass 38 Pass Mfg/Cap PSA-3 Initial Drag: 30.6 Pass 38 Pass Mark ¹ RC-4300-138 Activation: 0.01 PASS 0.007 PASS Serial ¹ 20264 Test Load: 4740. 0.79 4451. 0.74 Deviation Rpt: Final Drag: 32.1 Pass 39.1 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-174 Breakaway: 8.9 Pass 12.3 Pass Mfg/Cap PSA-1 initial Drag: 13 Pass Pass 13.3 Mark ¹ RC4300%134B Activation: 0.007 PASS 0.012 PASS Serial ¹ 19225 Test Load: 1133. 0.76 1274. 0.85 Deviation Rpt: Final Drag: 10.5 Pass Pass 13.4 NCR: LockUp:

Repl S/N: Bleed Rate:

Snubber Functional Test Results mm St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag: 2-175 Breakaway: 7.6 Pass 0.01 7.7 Pass 0.01 Mfg/Cap PSA-1 Initial Drag: 8.3 Pass 0.01 8.1 Pass 0.01 Mark ¹ RC4300-61 34B Activation: 0.007 PASS 0.007 PASS Serial ¹ 19226 Test Load: 1136,9 0.76 1258 0.84 Deviation Rpt: Final Drag: 9.2 Pass 0.01 7.1 Pass 0.00 NCR: LockUp:

Repl S/N: N/A Bleed Rate:

Tag: Breakaway: 2.1 Pass 6.7 Pass Mfg/Cap PSA-1/4 Initial Drag: 4.5 Pass 0.01 6.7 Pass Mark ¹ RC.97-Rt B Activation:

0.01 PASS 0.012 PASS Serial ¹ 29336 Test Load: 256.4 0.73 271,7 0.78 Deviation Rpt: Final Drag: 5.9 Pass 5.9 Pass NCR: LockUp:

S/N'-177 Repl S/N: Bleed Rate; Tag: 2-178 Breakaway: 3.6 Pass 0.01 32, Pass 0.01 Mfg/Cap PSA-1/4 Initial Drag: 6.3 Pass 0.02 4.1 Pass 0.01 Mark ¹ RC-97-R1B Activation: 0.012 PASS 0.01 PASS Serial ¹ 29333 Test Load: 251.3 0.72 266.8 0.76 Deviation Rpt: Final Drag: 5.9 3.9 Pass 0.02 Pass 0.01 NCR: LockUp:

Repl N/A Bleed Rate:

Tag: 2-181 Breakaway: 7.7 Pass 5.7 Pass

, Mfg/Cap PSA-1/2 Initial Drag: 8.7 Pass 7.3 Pass Mark ¹ SPS-467 Activation: 0.014 PASS 0.012 PASS Serial ¹ 10722 Test Load: 486.9 0.75 533.9 0.82 Deviation Rpt: Final Drag: 8.9 Pass 6.6 Pass NCR: LockUp:

Repl S/N: NA Bleed Rate:

Tag: 2-182 Breakaway: 4.8 Pass 7.4 Pass Mfg/Cap PSA-1/2 initial Drag: 6.3 Pass 74 Pass Mark ¹ SPS-467 Activation: 0.013 PASS 0 016 PASS Serial ¹ 11260 Test Load: 512.1 0.79 530.7 0.82 Deviation Rpt: Final Drag: 5.9 Pass 9$ Pass NCR: LockUp:

Repl S/N:. Bleed Rate:

Tag: 2-183 Breakaway: 8.7 Pass 10.2 Pass Mfg/Cap PSA-1 Initial Drag: 14.1 Pass Pass 10.4 Mark ¹ RC-4300-1 067 Activation: 0.013 PASS 0.011 PASS Serial ¹ 19224 Test Load: 1092. 0.73 1217. 0.81 Deviation Rpt: Final Drag: 14.5 10.6 Pass Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Snubber Functional Test Results N tYl St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag: Breakaway: 15.7 Pass 0.00 25.6 Pass 0.00 2-185 Mfg/Cap Initial Drag: 32.4 Pass 0.01 25.6 Pass 0.00 PSA3 Mark ¹ RC-4300-52 Activation: 0.009 PASS 0.009 PASS Serial ¹ 18688 Test Load: 4843.5 OAl1 4232.7 0.71 Deviation Rpt: Final Drag: 22.3 32 Pass 0.01 Pass 0.00 NCR: LockUp:

Repl S/N: N/A Bleed Rate:

11.2 Pass 25.1 Pass Tag: 2.186 Breakaway:

31.9 Pass 0.01 27.? Pass Mfg/Cap PSA.3 Initial Drag:

0.01 0.008 PASS Mark ¹ RM300-53B Activation: PASS Serial ¹ 16575 Test Load: 4980. 0.83 4?20. 0.79 Deviation Rpt: Final Drag: 34.9 Pass 25.5 Pass NCR'epl LockUp:

S/N; Bleed Rate:

Tag: 2-187 Breakaway: 9.6 Pass 0.01 16.3 Pass 0.01 Mfg/Cap PSA-1 initial Drag: 14.7 Pass 0.01 17.8 Pass 0.01 Mark ¹ R ~300-51 Activation: 0.014 PASS 0.013 . PASS Serial ¹ 14881 Test Load: 1105. 0.74 1241. 0.83 Deviation Rpt: Final Drag: 20.2 Pass 0.01 16 Pass 0.01 NCR: LockUp:

Repl N/A Bleed Rate:

SIN'ag:

2-188 Breakaway: 7.4 Pass 7.8 Pass Mfg/Cap PSA-1 Initial Drag: 8.8 Pass 8.6 Pass Mark ¹ RC-4300-51 Activation: 0.01 PASS 0.009 PASS Serial ¹ 14883 Test Load: 1128. 0.75 1252. 0.83 Deviation Rpt: Final Drag: 7.2 Pass 13 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2.190 Breakaway: 37.4 Pass 24.9 Pass Mfg/Cap PSA-3 Initial Drag: 44.8 Pass 32.9 Pass Mark¹ SPY? Activation: 0.006 PASS 0.003 PASS Serial ¹ 29503 Test Load: 5011. 0.84 4930. 0.82 Deviation Rpt: Final Drag: 41.1 Pass 43.2 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-194 Breakaway: 4.5 Pass 5,2 Pass Mfg/Cap PSA-1/4 Initial Drag: 5.8 Pass 5.9 Pass Mark ¹ MSI-8-R6 Activation: 0.009 PASS 0.012 PASS Serial ¹ 19097 Test Load: 274.4 0.78 284 0.81 Deviation Rpt: Final Drag: 6.9 5.7 Pass Pass NCR: LockUp:

Repl S/N; Bleed Rate:

Snubber Functional Test Results umma St. Lucie Unit 2 1990 Refuelin Outa e TENSION COMPRESSION Tag: Breakaway: 5 Pass 0.00 7.7 Pass 0.01 2.200

" 7.9 Pass 0.01 Mfg/Cap PSA.1 tnltlal Drag: Pass 0.01 7.7 Mark¹ Actlvatlon: 0.008 PASS 0.009 PASS Sl.80.R5 Serial ¹ 21579 Test Load: 1121.3 0.75 1267.4 0.84 Deviation Rpt: Final Drag: 7.8 7 Pass 0.00 Pass 0.01 LockUp:

NCR'epl S/N: N/A Bleed Rate; 5.4 Pass 8.1 Pass Tagt 2.206 Breakaway:

5.7 Pass 0.02 10 Pass Mtg/Cap PSA-1/4 initial Drag:

0.012 PASS 0.012 PASS Mark ¹ MSI.4.86 Activation:

Serial ¹ 19077 Test Load:

260.1 0.74 283.3 0.81 Deviation Rpt: Final Drag: 8.2 Pass 9.2 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-207 Breakaway: 4.6 Pass 0.01 7 Pass 0.02 Mfg/Cap PSA-1/4 Initial Drag: 5.3 Pass 0.02 7 Pass 0.02 Mark ¹ MSI-3-R6 Activation: 0.012 PASS 0.012 PASS Serial ¹ 19093 Test Load: 292.3 0.84 302.5 0.86 Deviation Rpt: Final Drag: 6.3 7.9 Pass 0.02 Pass 0.02 NCR: LockUp:

Repl NIA Bleed Rate:

S/N'ag:

2-208 Breakaway: 4.5 Pass 5.4 Pass Mtg/Cap ~

PSA-1/4 Initial Drag: 6.2 Pass 5.4 Pass Mark ¹ MSI-2-R6 Activation: 0.012 PASS 0.016 PASS Serial ¹ 19084 Test I oad: 249.8 0.71 262.7 0.75 Deviation Rpt: Final Drag: 6.2 Pass 5.5 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-209 'reakaway:

2.6 Pass 4.5 Pass Mfg/Cap PSA-1/4 Initial Drag: 5 Pass 4.5 Pass Mark ¹ MSI-1-R6 Activation: 0.013 PASS 0.013 PASS Serial ¹ 12907 Test Load: 249.1 0.?1 275.3 0.?9 Deviation Rpt: Final Drag: 4 Pass 5.3 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-214 Breakaway: 2.9 Pass 5.2 Pass Mfg/Cap PSA-1/2 Initial Drag: 5.3 Pass 5.7 Pass Mark ¹ CH-2081.147A Activation: 0.016 PASS 0.013 PASS Serial ¹ 10723 Test Load: 471.9 0.73 543.2 0.84 Rpt: Final Drag: 5.4 6 Pass Pass

'eviation NCR: LockUp:

Repl S/N: Bleed Rate:

Snubber Functional Test Results umm St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag: 2-215 Breakaway: 4.1 Pass 0.01 4J Pass 0.01 Mfg/Cap PSA.1/2 Initial Drag: 6.2 Pass 0.01 4g Pass 0.01 Mark ¹ CH 2081-100A Activation: 0.013 PASS 0.012 PASS Serial ¹ 20433 Test Load: 524.? 031 5??.6 0.89 Deviation Rpt: Final Drag:  ?.4 Pass 0.01 52 Pass 0.01 NCR: LockUp:

,Repl S/N; N/A Bleed Rate:

20.7 Pass 18.1 Pass Tag: 2.219 Breakaway: "

34 Pass 0.01 23.2 Pass Mfg/Cap PSA.3 InNaI Drag:

PASS 0.006 PASS Mark ¹ CC 2061-1 01 Activation:

Serial ¹ 20259 Test Load: 4881 0 81 4588. 0.76 Deviation Rpt: Final Drag: Pass 25.5 Pass NCR: LockUp:

Bcpl S/N: Bleed Rate:

Tag: 2-220 Breakaway: 17.2 Pass 0.00 17.1 Pass 0.00 Mfg/Cap PSA-3 Initial Drag: 24.7 Pass 0.00 25.1 Pass 0.00 Mark¹ CC-2061-1 01 Activation: 0.008 PASS 0.007 PASS Serial ¹ 20625 Test Load: 5041. 0.84 4803. 0.8 Deviation Rpt: Final Drag: 27A 25.2 Pass 0.00 Pass 0.00 NCR: LockUp:

Bcpl N/A Bleed Rate:

S/N'ag:

2-223 Breakaway: 193.2 Fall 0.30 -3 Pass-Mfg/Cap PSA-1/2 Initial Drag: 193.2 Fall 0.30 3.6 Pass Mark ¹ CH-2081-1085 B Actlvatlon:

Serial ¹ 14136 Test Load:

Deviation Rpt: Final Drag:

NCR: LockUp:

Bcpl S/N: Bleed Rate:

Tag: 2 225 Breakaway: 47.3 Pass 43.6 Pass Mfg/Cap PSA-10 Initial Drag: 73.8 Pass 106.1 Pass Mark ¹ SI-2407-1 43C Activation: 0.014 PASS 0,01 PASS Serial ¹ 12095 Test Load: 12735 0.85 12986 0.87 Deviation Rpt: Final Drag: 85.3 Pass 116.3 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag; 2-226 Breakaway: 40.6 Pass 63.7 Pass Mfg/Cap PSA-10 Initial Drag: 74.2 Pass 127.1 Pass Mark ¹ SI-240?< OA Activation: 0.015 PASS 0.015 PASS Serial ¹ 10018 Test Load: 11722 0.78 11397 0.76 Deviation Rpt: Final Drag: 101.7 198.6 Pass Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Snubber Functional Test Results mm St. Lucie Unit 2 1990 Refuelin Outa e

'ENSION COMPRESSION Tag: 2-227 Breakaway: '4.9 Pass 0.00 15.8 Pass 0.00 Mfg/Cap PSALM Initial Drag: 25 4 Pass 0 00 15.9 Pass 0.00 Mark ¹ SI.2410.1 57A Actlvatlon: 0.01 PASS 0.006 PASS Serial ¹ 16763 Test Load: 47689 0.79 4540.2 0.76 Deviation Rpt: Final Drag: 22 Pass 0.00 18.7 Pass 0.00 NCR: LockUp:

Rept S/N: NIA Bleed Rate:

Tag: 2.228 Breakaway: 11.6 Pass 11 Pass Mfg/Cap PSA-1 Initial Drag: 16.5 Pass 0.01 16.2 Pass 0.006 Mark ¹ SI.2407-121 A Activation: PASS 0.007 PASS Serial ¹ 19223 Test Load: 1087. 0.72 1266. 0.84 Deviation Rpt: Final Drag: 14.9 Pass 15.2 Pass NCR: LockUp:

Rept 5/N: N/A Bleed Rate:

Tag 2-229 Breakaway: 20.1 Pass 0.00 24.4 Pass 0.00

'fg/Cap PSA-3 Initial Drag: 3? Pass 0.01 30.3 Pass 0.01 Mark ¹ BF-3020-1 19B Activation: 0.009 PASS 0.003 PASS Serial ¹ 29629 Test Load: 5159 0.86 4870. 0.81 Devlatton Rpt: Final Drag: 36.4 Pass 0.01 25.9 Pass 0.00 NCR: LockUp:

Rept 5/N: N/A Bleed Rate; Tag: 2-232 Breakaway: 13.6 N/A N/A Mfg/Cap Llsega-675 Initial Drag: 14.1 NIA 11 3 NIA Mark ¹ CH-1-R3 Activation: 10.97 N/A 12 45 NIA Serial ¹ 61211/49 Test Load: 487.2 N/A 523.5 N/A Deviation Rpt: Final Drag: N/A N/A N/A NCR: LockUp: N/A 12.45 NIA Rept 5/N: Bleed Rate:

N/A g AS N/A Tag: 2.233 Breakaway: 15 Pass 25 5 Pass Mfg/Cap PSA-3 Initial Drag: 31.4 Pass Pass Mark ¹ SI-241 2-112 Activation: 0.01 PASS 0.008 PASS Serial ¹ 20257 Test Load: 4834. 0.81 4324. 0.72 Deviation Rpt: Final Drag: 28.6 Pass 30.1 Pass

. NCR: LockUp:

Rept 5/N: N/A ~

Bleed Rate:

Tag: 2-235 Breakaway: 5.3 Pass 11.2 Pass

'fg/Cap PSA-1/2 initial Drag: 10.9 Pass 12 Pass Mark ¹ B-2501-11 Activation: 0 012 PASS 0.012 PASS Serial ¹ 14135 Test Load: 520.6 552.1 0.85 Devlatton Rpt: Final Drag: 8.8 Pass Pass 8.9 NCR: LockUp:

Rept 6/N: Bleed Rate:

Snubber Functional Test Results

~S St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag t Breakaway: 20.9 Pass 0.00 19.8 Pass 0.00 2-240 Mfg/Cap Initial Drag: 30.8 Pass 0.01 24.9 Pass 0.00 PSA-3 Mark ¹ B F.3020.1 4B Activation: 0.009 PASS 0.006 PASS Serial ¹ 16761 Test Load: 4938.1 OJ2 4650.2 0.78 Deviation Rpt: Final Drag: 25.4 28.8 Pass 0.00 Pass 0.00 NCR: LockUp:

Repl S/N: N/A Bleed Rate:

26.1 Pass 37.7 Pass Tag: 2-268 Breakaway:

149 Pass 0.02 218.2 Pass Mfg/Cap PSA.3 Initial Drag:

0.014 0.005 PASS Mark ¹ B F4004-258 Activation: PASS Serial ¹ 25578 Test Load: 4841. 0.&1 4507. 0.75 Deviation Rpt: Final Drag: 121.9 Pass 199.8 Pass NCR: LockUp:

Repl S/N; N/A Bleed Rate:

Tag: 2C12 Breakaway: 65.4 Pass 0.00 47 Pass 0.00 Mfg/Cap PSA-10 Initial Drag: 83.7 Pass 0.01 107.5 Pass 0.01 Mark ¹ BF4004-9010A Activation: 0.01? PASS 0.014 PASS Serial ¹ 10178 Test Load: 11828 0.79 11371 0.76 Deviation Rpt: Final Drag: 80.3 Pass 0.01 71.4 Pass 0.00 NCR: LockUp:

Repl S/N N/A Bleed Rate:

Tag: 2-313 Breakaway: 31.4 Pass 47.9 Pass Mfg/Cap PSA-10 Initial Drag: 108.3 Pass 55.1 Pass Mark ¹ BF4004-9010A Activation: 0.013 PASS 0.008 .PASS Serial ¹ 8926 Tost Load: 12507 0.83 12484 0.83 Deviation Rpt: Final Drag: 48 Pass 56.2 Pass NCR: LockUp:

Repl S/N; Bleed Rate:

Tag: 2.314 Breakaway: 196.9 Pass 209.6 Pass Mfg/Cap PSA-35 initial Drag: 206.4 Pass 209.6 Mark ¹ MS%1 02-284 Activation: 0.014 PASS 0.013 PASS Serial ¹ ?518- Test Load: 38.69 0 40.02 0 Deviation Rpt: Final Drag: 191.8 Pass 169 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-315 Breakaway: 196.6 Pass 217.5 Pass Mfg/Cap PSA-35 Initial Drag: 272 Pass 242.8 Pass Mark ¹ M&4102-284 Actlvatlon: 0 014 PASS 0.012 PASS Serial ¹ 7803 Test Load: 38.61 0 40.92 0 Deviation Rpt: Final Drag: 227.9 333.5 Pass pass NCR: LockUp:

Bcpl S/N: Bleed Rate:

Snubber Functional Test Results

~S St. Lucie Unit 2 1990 Refuelin Outa e TENSION COMPRESSION Tag: 2-318 Breakaway: 35.3 Pass 0.01 32.9 Pass 0.01 Mfg/Cap PSA-3 Initial Drag: 78.1 Pass 0.01 55.3 Pace 0.01 Mark ¹ BF.4004-38 Actlvatlon: 0.007 PASS 0.003 PASS Serial ¹ 29628 Test Load: 5239.9 037 4934.8 0.82 Devlatlon Rpt: Final Drag: 54 Pass 0.01 87.4 Pass 0.01 NCR: LockUp:

Repl S/N: N/A Bleed Rate:

Tag: Breakaway: 41.9 Pass 56.9 Pass Mfg/Cap PSA.3 Inltlal Drag: 67.6 Pass 0.01 63.4 Pass Mark ¹ B F4004-S8 Actlvatlon:

0.011 PASS 0.007 PASS Serial ¹ 20255 Test Load: 4872. 0.81 4750. 0.79 Devlatlon Rpt: Final Drag: 69.6 Pass 65.5 Pass NCR: LockUp:

Tag:

S/N'.317 Repl S/N:

2-318 Bleed Rate:

31.8 Breakaway: Pass 0.00 61.4 Pass 0.00 Mfg/Cap PSA-1 0 Initial Drag: 71.3 Pass 0.00 61.4 Pass 0.00 Mark¹ M~102-282B Actlvatlon: 0.014 PASS 0.011 PASS

¹ 'erial 16445 Test Load: 12081 0.81 12103 0.81 Devlatlon Rpt: Final Drag: 70.2 Pass 0.00 58.9 Pass 0.00 NCR: LockUp:

I N/A Bleed Rate:

Tag: 2-319 Breakaway: 21.2 Pass 35.4 Pass Mfg/Cap PSA-10 Inltlal Drag: 38.9 Pass 44 8 Pass Mark ¹ M~1 02-282B Actlvatlon: 0.017 PASS 0.013 PASS Serial ¹ 10179 Test Load: 11727 0.78 11670 0.78 Deviation Rpt: Final Drag: 45.6 Pass 86.3 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2.321 Breakaway: 5.4 Pass 12.8 Pass Mfg/Cap Llsega-6?5 Inltlal Drag: 9.9 Pass 13.1 Pass Mark ¹ MS-50-R4 Activation: 10.24 PASS 10.61 PASS Serial ¹ 61211/?1 Test Load: 475.8 0.7 533A 0.79 Devlatlon Rpt: Final Drag: N/A N/A N/A N/A NCR: LockUp:

Repl S/N: Bleed Rate: 3.01 PARR PARR Tag: 2-322 Breakaway: 5.5 Pass Pass Mfg/Cap PSA-10 Inltlal Drag: 6.4 Pass Pass 9.5 Mark ¹ MS-7-R2B Actlvatlon: 0.013 PASS 0.014 PASS Serial ¹ 38022 Test Load: 253.8 0.02 265 0.02 Deviation Rpt: Final Drag: 8.1 Pass Pass 8.3 NCR: LockUp:

Repl S/N: 38531 Bleed Rate:

Snubber Functional Test Results

~S St. Lucie Unit 21990 Refuelin Outa e TENSION COMPRESSION Tag: Breakaway: 17.1 Pass 0.01 21.4 Pass 0.01 2 323 Mfg/Cap Initial Drag: 22.6 Pass 0.02 23.7 Pass 0.02 PSA-1 Mark ¹ MS-3023-118 Activation: 0.003 PASS 0.004 PASS Serial ¹ 26064 Test Load: 11902 0.79 1314.8 0.88 Deviation Rpt: Final Drag: 22 24.1 Pass 0.02 Pass 0.01 NCR: LockUp:

Repl S/N: N/A Bleed Rate:

8.8 Pass 13.5 Pass Tag: 2-324 Breakaway:

9.1 Pass 0.01 16.1 Pass Mfg/Cap PSA-1 Initial Drag:

0.007 0.009 PASS Mark ¹ MS-3023.53 Activation: PASS Serial ¹ 26005 Test Load: 1132. 0.75 1261. 0.84 Deviation Rpt: Final Drag: 11.1 Pass 12.5 Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-325 Breakaway: 15 Pass 0.01 15.5 Pass 0.01 Mfg/Cap PSA-1 Initial Drag: 21.2 Pass 0.01 17.1 Pass 0.01 Mark ¹ MS-3023-93 Activation: 0.004 PASS 0.006, PASS Serial ¹ 21596 Test Load: 1152. 0.77 1276. 0.85 Deviation Rpt: Final Drag: 23 18.8 Pass 0.01 Pass 0.02 NCR: LockUp:

R pl 8/N N/A Bleed Rate:

Tag: 2-327 Breakaway: 3.5 Pass 5.6 Pass Mfg/Cap PSA-1/4 initial Drag: 5S Pass 5.6 Pass Mark ¹ RC-55-R7 Activation: 0.017 PASS 0.016 PASS Serial ¹ 23636 Test Load: 249.9 0.71 273 0.78 Deviation Rpt: Final Drag: 4.8 Pass Pass NCR: LockUp:

Repl S/N: Bleed Rate:

Tag: 2-334 Breakaway: 4.2 Pass Pass Mfg/Cap AD-41 initial Drag: 4.5 Pass 4.1 Pass Mark ¹ VRC-4-R3 Activation: N/A N/A NIA N/A Serial ¹ 1289, Teat Load: 274.8 0.69 317.5 0.79 Deviation Rpt: Final Drag: 4.7 Pass 4.4 Pass NCR: LockUp: N/A N/A N/A NIA Repl S/N: Bleed Rate: 48.04 M/A ao A N/A Tag: Breakaway:

Mfg/Cap Initial Drag:

¹ 'ark Activation:

Serial ¹ Test Load:

Deviation Rpt: Final Drag:

NCR: LockUp:

Repl S/N: Bleed Rate;

FLORIDA POWER & LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST. LUCIE PLANT 6501 SOUTH HWY A1A JENSEN BEACH, FLORIDA 34957 Commercial Service Date: August 8,1983 UNIT 2 1990 OUTAGE NIS-2 REPORTS For Repair/Replacement activities From: 4/28/89 to 12/12/90

PSL-2, MiS-2 TRACKIMG MO. S L - 2- 0 5-~00 3

1. Owner:

t FORM NIS-2 OAVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Florida Power & Light Co. Date: 10-3-90 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2

2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 2752/62 XA ¹: 890828171051 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Intake Cooling Water System. Line No. I-30-CW-72-5 and hanger mark no. CW-3002-7900.
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases (b) Applicable Edition Winter 1980 addenda. ~

of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of National Replaced AS ME Name of Manufacturer Other Year Board Repaired Component Manufacturer Serial No. Identification Built or Stamped Replacement (Y or N)

W6 X 12 HUB INC. N/A N/A HEAT ¹ Replacement N 5-7144

7. Description of Work: Replaced the W6 X 12 wide flange on support CW-3002-7900, due to heavy corrosion.
8. Tests Conducted: Hydrostatic Other ~X

~ Pneumatic Pressure~

~ psig ~~

Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~00 3 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks.'n acceptable visual inspection was performed.

APPLCABLE MANUFACTURE'S DATA REPORTS TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorizati n-No.: N/A Signed Ow r Owner's D sign6e, Ti e Cate ~uW, I2 7/

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions ¹ Inspector's ignature National Board, State, Providencs and Endorsements Date

PSL-2, NIS-2 TRACKING NO. S L-2-0 5-~00 4 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

l. Owner: Florida Power & Light Co. Date: 10-3-90 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co, PCM ¹: N/A 6501 South Hwy. AlA Jcnscn Beach, FL 34957 PWO ¹: 0614/62 XA ¹: 891114032212 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A

4. Identificationof System:

Expiration Date, N/A Isolation valve (SB21304) for train B seal water supply upstream of SS-2.

5. (a) ApplicableConstructionCodeASMESection III,1977Edition,Summer1977Addenda. ~ CodeCases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of Name of National Replaced AS ME Manufacturer Other Year Component Manufacturer Board Repaired Cede Serial No. Identification Built No. or Stamped Replacement (Y or N) 5/8" DIA. - 11 NOVAMACHINE N/A N/A HEAT ¹ Replacement N ALLTHREAD ROD PRODUCTS 8097696 5/8" DIA. - 11 NOVA MACHINE N/A N/A HEAT ¹ Replacement N HVY HEX NUT PRODUCTS 37762

7. 'escription of Work: Valve SB21304 was identified as leaking by its seat. The valve was disassembled and was determined to be reworked during the next shutdown,

~~

due to the work scope. When reassembling the valve the bonnet bolting was

8. Tests Conducted replaced.

Hydrostatic Other~X

~ Pneumatic Pressure~

~ psig Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-0 5-~00 4 FORM N IS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLICABLE MANUFACTURE'S DATA REPORTS TO BE ATTACHED Certificate of Compliance We cecity that ths statements made in the repcri are ccrrsct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Aut orization No.:

Signed N/A or Owne s Designee, TItle Hn'wner Date ~, t9~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signa ure National Board, State, Providence and Endorsements Date 19~/

PSL 2, NIS 2 TRACKING NO. S L-2-05-~00 6 FORM NIS 2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 10-3-90 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. AlA Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3045/62 XA ¹: 900108184323 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Check valve (V09252) for feedwater supply at Steam Generator 2A
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Rcplaccd and Replacement Components:

National Replaced ASME Name of Name of Manufacturer Other Year Repaired Cede Component Manufacturer Serial No. identification Built 0 Stamped r'eplacement (Y or, N)

VALVE ANCHOR E 6047-27-1 N /A 18" - 600¹ REPAIRED V09252 DARLING

7. Description of Work: During the hinge pin gasket removal process, the valve body was gouged. The gouge was weld repaired.
6. Tests Conducted: Hydrostatic Other ~X

~ Pneumatic Pressure~

~ psig ~~

Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-0 5-~00 6 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLICABLE MANUFActuAE's DATA REPOATB To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this X Repair Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authoriza 'on No.: N/A Signed Owner or Owner's Designee, Title Date ~~~~, 19 ~~

CERTIFICATE OF INSERVICE INSPECTION I, the-undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions inspector's Sl nature National Board, State, Providence and Endorsements Date 19~/

PSL 2, NIS 2 TRACKING NO. S L - 2- 0 5 -~00 7 FPL FORM NIS-2 01VNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Rettutred by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 104-90 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power 4 Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3031/ 62 XA ¹: 900105182237 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Reactor Coolant
5. (a) Applicable Construction Code ASME Section HI, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of Name of Manufacturer National Other Year Replaced ASME Component Manufacturer Boardd B Repaired Code Serial No. Identification Built or Stamped Replacement (Y or N)

VALVELOCATION CROSBY N-59336 N/A MODEL ¹ 1979 REPLACED V1200 005 HB-BP-86 VALVELOCATION CROSBY N-59336 N/A MODEL ¹ 1979 Replacement V1200 001 HB-BP-86 1 1/4" DIA. - 8 NOVA MACHINE N/A N/A HEAT ¹ Replacement ALLTHREAD ROD CTS 8077354 1 1/4" DIA. - 8 NOVA MACHINE N/A N/A HEAT ¹ Replacement HVY HEX NUT PRODUCTS 6072102

7. Description of Work: The Pressurizer Safety Relief valve V1200 was found to be leaking past its seat. The leaking valve (S/N 593336.00-005) was removed and

~~

replacement valve (S/N N-59336-00-001) was reinstalled with new studs re~ ~

g. Tests Conducted: Hydrostatic Oh

~

and nuts on the inlet flange.

~ P Pneumatic psig Nominal Operating Pressure Test Temp. 'F

IaSL-2, NIS.2 TRACKING NO. S L-2-00-~00 7 FORM N IS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leak test was performed.

APPLICASLE MANCFACTuRE'8 DATA REPORTS To SE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Aut orization No.: N/A Signed Data ~A ta~/

Owner or Owne s Designee, ltle CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Ct Commissions Inspector's Signature National Board, State, Providence and Endorsements Date 19 V(

PSL-2, NIS-2 TRACKING NO. S L-2-05-~00 8 s

FORM NIS-2 OAVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 104-90 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. AlA Jensen Beach, FL 34957 PWO ¹: 3040/62 XA ¹: 900106164847 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date . N/A

4. IdentiTication of System: Reactor Coolant
5. (a) ApplicableConstructionCodeASMESectionlII,1977Edition,Summer 1977Addenda. ~ CodeCases (b) Applicable Edition of Winter 1980 addenda. ~

Section XI Utilized Code Cases for Repairs and Replacement Components 1980 Edition, thru the

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of National Replaced ASME Name of Manufacturer Other Year Board B d Repaired Code Component Manufacturer Serial No. Identification Built 0 Stamped I'eplacement (Y or N) 1 1/4" DIA. - 8 NOVA MACHINE N/A N/A HEAT ¹ Replacement ALLTHREAD ROD PRODUCTS 8077354 1 1/4" DIA. - 8 NOVA MACHINE N/A N/A HEAT¹ Replacement HVY HEX NUT PRODUCTS 6072102

7. Description of Work: The Pressurizer Safety Relief Valve V1201 was found to be leaking at the inlet

~~

flange. The valve was removed and the gasket seating surface was lapped and the original valve was reinstalled with new studs and nuts.

8. Teals,Oonduoted: Hydrostado Other~X

~ Pneumatto Pressure~

~ psig Nominal Operating Pressure Test Temp. 'P

0 PSL-2, NIS-2 TRACKING NO. S L-2-00-~00 8 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An'acceptable system leakage test was conducted.

APPLICABLE MANUFACTUAE'SDATA IIEPOATS TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization No.:

Signed Owner or 0 N/A ner'B Designee, Title Date ~, t9~ J CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the inspector nor h)s employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsements Date 19~/

SL- 2.-as "ohio FORQ N5-2 0%'HER'S REPORT FOR REPhlRS OR REPLhCKMENTS hs required by the provhices ot the ASME Code Section Xl 0- tS-00 A Page 1 of 5 1 ~ OWNERS FLORIDh POWER dr LIGHT CO. DATP JAR/(J//8'/ /8,/'9~D P.O. Box f29100 Miam4 Florida 331f2 UNIT) II 308 NO. FC/M!

CWONo.t 849R/

2. PLhNTc ST. LUCIB PLANT UNIT Il P. O. Box 1200 PROCESS SHEET NO.!

Jensen Beach, Florida 34957 8494-97(P EeV'iSIDd /

Repair Organization POP, 3OBf, etc, WORK PERFORMED SYt PPL PLANT CONSTRUCTION/BACKPIT P. O. Box 1400 Juno Beach, Plorlda 33408 Type Code Symb.i S~amp AuthortzatIon 0~ IDENTIFICATION No. u//I OF SYSTEM: g ggPggt ~)

~L,I/J(j yl~~Q

( I /I.CrJQN 'Ma=.R ) Expiration ate a Apphoa Ie Constr~tlon C~e SECTION III I974EdttIon I 975 Wlur8R A'dde~a Ita//p/ >6~

b. Applicable Edition of Section XI utilized for repairs or replacements! f980 6Di//dry 8l lao~i'I
6. Identification of components repaired or replaced and replacement components Other RePalred hSME Code Year Sc=/5NIC )ZE5]RP/Al Sl- ZHI Z- I / 4 <8 /kPLR a@DPI

/O'M ¹-

5/-z</z- zs

3 /977 5/- z4lz- /Bl

/fill4 0'l'LBC'e

~l/I Nh I,D,+ /9V7

) )7En 0 pi/p /Ivy HEP~ReE

Home of Haec at Mtgl NaA Other Year Repaired hSNIK Co4e Componeni Mfg 5/H Id ~ ldentM SuN Rapped k ation IRephce- lYeo

]9m )k~~esn 4/A'kpLR Sl-DV/Z- Zo A/a H/g BED'AAd&io sl- z"67- I 0 Ply )974 5/- ZVD7- /Si> 1J/8 )Sr7 4 /9R PepuerD

7. Oescrlptlon oC works PL Al& EC OsD CBRIT Dl- 5L)/Poli A
a. Tests Conductedr sly P Hydrostatic Pneumatlc Nominal Operatlnll Pressure Other Pressure~st Test Temp P.

Remarks s nile hppHcabie Manufacturer's Data Report to be attach CERTIFIChTE OF COMPLIhNCE To certify that the statements made ln this report are correct and this AEPiAQ6'M5nJ or eplacementi'epair conforms to Section XI of the ASME Code.

Sign ed< ) - lf-98 Owner or Owner's Designee Title Date CERTIFICATE OF INSPECTION Q the Undersigned, holding a vaHd commhsion hsued by th National Board of SoBer and Pressure Vessel hspectors and the State or Provtnce of -LO Ia employed by have Inspected the described Jn this report on 19+'D and state t t to st my ow ge and beHef, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or JmpHedp concerning the repair. or replacement described Jn thh report Furthermore, neither the Inspector nor his employer shall be liable In any manner for any persceal lniury or property damage or a loss of any kind arising from or connected with thh Inspection.

4 R8rC uVRia tA Mdi O~ Jnl5~JQAJQG COMMISSION NO.

Dates ~(f - yd Commlssicess 48 71/ 0 PL (State or Province, National Boar

.LdpG

Page4 ot g NIS-2 SUPPLEMENTAL SHEET IRKED I~ 0%'NER! FLORIDA PO%'ER tk LIGHT CO.

P.O. Box 929100 OATEiJnBI ./8, Miami, Fforlda 33192 P LANT'T.0. P.

LUCIB PLANT UNIT II Box 1200 UNIT!

Jensen Beach, Florida 34957

3. WORK JOB NO. FC/M PERFORMED ~/p BY: FPL PLANT CONSTRUCTION/BACKFIT P. O. Box 1400 Juno Beach, Florida 33408 CWO NO.i f3 "/'3Q
0. IDENTIFICATION OF SYSTEM: QDNPDAJei ODDLlhlCi kA/Et
5. DESCRIPTION OF WORK: PROCESS SHEET NO.:

849+- 91O A'av. I

/2~PLueluC. OeC.merci> '8a<eS Ol- SUPPD Ri ~

Page/ ei $

NS4 SUPPLEMENTAL SHEET

l. 0%NER> FLORIDA P0%'ER tk LICHT Co. oaTBa )P/J ./8/l 990 P.O. Sox 929100 Miam4 Florida 33192 UNIT! II
2. PLANT! ST. LUCIS PLANT UNIT II BOB NO. PC/M p////

P. 0. Box 1200 Jensen Beach, Florida 349S7 CWO NO.i

3. V/ORK PERFORMED BY: FPL PLANT CONSTRUCTION/BACKFIT P. O. Box 1400 PROCESS SHEET NO.:

Juno Beach, Florida 33408 8494- 9'7k A'Sv'. l

0. IDENTIFICATION ODHPonJEi Ooo~/nl/. lA~8~

~ ADDITIONALMATERIAL

~ ~

(Excluding Welding Material)

Heat/Lot No.

or CFC or Manufacturer Specification Type 4 Description RIR/Report E5i Id( 4 IhlldRS< Rii- Sl-ZVIZ-/1 l iaaf P A&IX A 8&

4R 1733 5I I:i=i ueR 24oz,n w(o x l5 idIER 5i NE (-2 /IZ- 29 lsdM 09 5i 8'8i- 856 wax z9

]5= Id7dR5&t~ 15= 0;ie A bao 1-ez l-ZPIZ /8/ >>e~d 3/8J,Z,'/

W0= a/JE@V >//. uj4= 857'rt iS Vx+x i3 WR 918>

9'7 S wG -Idio'R&Nd Wi. VQl N4-

- RSr l- ZO@3 -7ad

)VCR a999n-W i' I i en F Z. 9 I5 VR 7793 w4-Cd869 si. A 9& w4'x /9 I pd id' WC Std'8'I +A'8/9 I-&',lZ-Q ISO' IO II 4 9XS xi/z <8 ae/y Sl- 247- I9 I I err k &,7 0 Bx S. '/S 4E 38/9 IQIEi25iA-]~ Sl-Z"/07-Idd I&M 8 >

5>86I Wt'o X IX wx 68si

PSL 2, NIS 2 TRACKING NO. S L-2-0 0-~01 2

's FORM NIS-2 01VNER'S REPORT FOR REPAIRS OR REPLACEMEiNTS Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 10-3-90 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant. St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3011/62 XA ¹: 900105091624 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Reactor Coolant
5. (a) ApplicableConstruction CodeASMEScction III,1977Edition,Summer1977Addenda. ~ CodeCases Winter 1980 addenda. ~

(b) Applicable Edition'of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. IdcntiTication of Components Repaired or Replaced and Replacement Components:

ASME Name of Name of Manufacturer National Other Year Replaced Board B d Repaired Code Component Manufacturer Serial No. N Identification Built or Stamped Replacement (Y or N)

VALVELOCATION CROSBY 59336-00-00 N/A MODEL ¹ 1979 REPIACED V1202 3 HB HP86 VALVELOCATION CROSBY 59336-00-00 MODEL ¹ 1979 Replacement V1202 2 HB HP86 1 1/4" DIA. - 8 NOVA MACHINE N/A N/A HEAT ¹ Replacement ALLTHREAD ROD PRODUCTS 8077354 1 1/4" DIA. - 8 NOVA MACHINE N/A N/A HEAT Replacement HVY HEX NUT PRODUCTS ¹6072102

7. Description of Work: The Pressurizer Safety Relief valve V1202 (S/N 59336-00-003 ) was found

~~

with a steam leak at the inlet flange. The valve was removed with several studs becoming damaged. Both the valve and the inlet flange bolting was

8. Tests Conducted:

replaced.

Hydrostatic Other X

~ Pneumatic pressure~

~ psig Nominal Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~01 2

'ORM N IS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLICABLE MANVFACTVBE'SDATA AEPOATS TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

a Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Owner or Owner'esignee, Title Date 19~/

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's ignature National Board, State, Providence and EndorsenIents Date 19~/

PSL 2, NIS-2 TRACKING NO. S L-2-0 5-~01 3 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 10-3-90 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. AlA Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 0725 / 62 XA ¹: 900204090730 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Check valve (V21523) for train A Seal Water supply to the ICW & CW pumps.
5. (a) Applicable Construction Code ASME Section III,-1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replaccmcnt Components:

ASME Name of Name of Manufacturer National Other Year Replaced Board Repaired Code Component Manufacturer Serial No.

No.

Identification Built or Stamped Replacement (Y or N)

DISC PAULSON N/A M&S ¹ Replacement ENGR.INC 577-791801 DISC NUT W/PIN PAULSON N/A M&S ¹ Replacement E R. INC 577-7951 1 4 HANGER PAULSON N/A PART ¹ Replacement ENGR. INC. 809-208 HANGER PIN PAULSON N/A M&S¹ Replacement ENGR. INC. 577-796251

7. Description of Work: Valve V21523 was disassembled an inspected, which identified the above

~~

internal valve parts as requiring replacement. These valve internal parts were replaced.

0, Tests Conducted:

0 Hydrostatic it ~X

~ P Pneumatic re~

~ psig Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~01 3 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLCABLE MANUFACTURE'S DATA REPORTS To BE ATTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Owner or wner's Designee, Title Date ~~, 19~5" CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any=warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions nspector's Signature National Board, State, Providence and Endorsements Date 19~/

PSL 2, NIS 2 TRACKING NO. S L-2-0 5-~014

~

FORM NIS-2 ON'NER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 10-3-90 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3126/62 XA ¹: 900303011413 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Charging Pump 2A
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases r

6. IdentiTication of Components Repaired or Replaced and Replacement Components:

Manufacturer National Name of Replaced ASME Name of Other Year Component Manufacturer Board Repaired Code Serial No. ~

Identification Built or Stamped Replacement (Y or N) 1 1/4" DIA. - 8 UNION PUMP N/A N/A HEAT ¹ Replacement STUD COMPANY 93335

7. Description of Work: Several cylinder head bolts on 2A Charging Pump were found to be broken oft.

These bolts were replaced in kind.

8. Tests Conducted: Hydrostadc Otner~X

~ Pneumalic Pressure~

~ psig ~~

Nominal Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~01 4 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: A acceptable system leakage test was conducted.

APPLICABLE MANLIPACTURES DATAREPCRTB To BE ATrACHEO Certificate of Compliance We certify that the statements made in the report are correct and this Repair +X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A

~,

I Certificate of A horiz tion No.: N/A Signed or Owner'B eslgnee, itic Date 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore," neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector'B Signature National Board, State, Providence and Endorsements Date ig 0f

PSL-2, NIS-2 TRACKING NO. S L-2-05-~01 5 FORM NIS-2 ON'NER'S REPORT FOR REPAIRS OR REPLACEMENTS As Rettulred by the Provisions of the ASME Code Section XI

1. Owner. Power 8h Light Co. Date: 10-2-90 Plant.'lorida P.O. Box 529100 Miami, FL 33152 Sheet: 1 s

of 2

2. St. Lucie Plant Unit ¹: 2 6501 South Hwy. AIA Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power A Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 0842/62 XA ¹'00414211612 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No., N/A Expiration Date N/A

4. Identification of System: Intake Cooling Water Pump 2B (ICW PP 2B)
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases (b) Applicable Edition Winter 1980 addenda. ~

of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

ASME Name of Name of Manufacturer National Other Year Replaced Board Repaired Code Component Manufacturer Serial No. Identification Built or Stamped Replacement (Y or N) 30" DIA. ELBOW B.F. SHAW N/A N/A HEAT ¹ REPAIRED N

/LINE I-CW-11 W3903

7. Description of Work: A thru wall leak was identified on the discharge elbow of line I-30-CW-11. A

~

pad weld build-up was used to repair the thru wall leak.

0. Tests Conducted: Hydrostatic ~X Other Pneumatic Pressure~op

~ psig s

Nominal Operating Pressure Test Temp, ~AMBIENT 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~01 5 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable pressure test was conducted.

APPLCABLE MANUFACTVRE's DATAREPDRTB To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this QX Repair Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of orizatlon N .: N/A Signed Owner or w r's De ee, Title

~~T '+MB/2 0a~e ~OW I0~>

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during the period 4/89 To 11/90, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsements Date 19 WD

PSL-2, NIS-2 TRACKING NO. S L-2-0 5-~01 6 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 10-3-90 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3191/62 XA ¹: 900517105940 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Charging Pump 2C (CHG PP 2C)
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. IdentiTication of Components Repaired or Replaced and Replacement Components:

National Replaced ASME Name of Name of Manufacturer Other Year Board Repaired Cede Component Manufacturer Serial No. Identification Built or Stamped Replacement (Y or N) 1 1/4" DIA. - 8 UNION PUMP N/A N/A HEAT ¹ Replacement STUD COMPANY 93289 1 1/4",DIA. - 8 NOVA MACHINE N/A N/A HEAT ¹ Replacement HVYHEX NUT 871201

7. Description of Work: The lower west stud of the east cylinder head cover of Charging Pump 2C was

~~

found to be broken. Several studs and nuts were replaced.

8. Tests Conducted; Hydrostatic Other~X

~ Pneumatic Pressure~

~ psig Nominal Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~01 6 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was performed.

APPLICABLE MANUFACTURES DATA REPORTS TO BE ATTACHED Certificate'f Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization No.:

Signed wn r or Owner'signee, N/A Title Date ~, 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or toss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsements Date 19~/

FORM NIS-2 OWNER'5 REPORT FOR REPAIRS OR REPLACEMENTS hs required by the provisions of the ASME Code Section Xl

@is t. iR.~~q QO. SL.~ -0$ - o 1 Page I of I~ OWNER: FLORIDA POWER 4 LIGHT CO. DATEtg@Zgplggg 5, l99D f

P.O. Box 29100 II Miami, Florida 33l f2 UNITs 308 NO. PC/M~ $ 7I- Z90 CWONO.~ 8/0/

2. PLANT! ST. LUCIS PLANT UNIT II P. O. Box 1200 PROCESS SHEET NO.t Jensen Beach, Florida 34957 8(D/- /59/ 4/

Repair Organization PCS, 308k, etc.

9. WORK PERFORMED SYt F PL PLANT CONSTRUCTION/BACKFIT P. O. Box 1400

. Juno Beach, Florida 33408 Type Code hy Pfh p~ha Authorization

0. IDENTIFICATION No. N A OF SYSTEM: NHlA 6ldRW Expiration Date N/A h p I I hdff fh I XI fh df P'h
a. Appuod,ie Constr~tine Code SECTION III1974 Edition 1975 WINTER Addenda ADDENDA
6. Identification of components repaired or replaced and replacement components Other Repaired AS ME Code Name of,. Name of Mf '~ Nat'l Year Identii- Built Repl ed Stampe Component; Mfg. 7ReeP > ce- (Yes/No) ication ment SUPPER( 4 66R.MM-M4 4/o/ - Bo~ PkidR5aihi

FORM N5-2

1. Description of works See e~~.d So/4 S. Tests Conductedi Hydrostatic Pneumat@ Nomina! Operating Pressure Other Presswe ~sl Test Temp. P.

Remarkst ]4g Applicable Manufacturer's Data Report to be attach CBRTIFIChTE OF COMPLNNCE To certify that the statements made ln ttds report are correct and this RkP( rtMrc6NI'palr or ep ement conforms to Section XI of the hSME Code.

~~J~7 Sign cd)

Owner or Owner's Designee Date CERTIFICATE OF INSPECTION Q the Undersigned, holdhg a valid commission hsued by the National Board of Boiler and Prcssure Yessel Inspectors and the State or Province of

  • LDRID employed by have Inspected the PPol W - +Id - 9d Furthermore, described In this report on o . 5 19 To and state that to st my ow ge and ballet, this repair or replacement has been constructed bt accordance sdth Section Xl ol the ASMB Code. By signing this certlflcate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning thc repair or. replacement described h tms report neither the Inspector nor his employer shall bc liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection' Ark+right Insuy'ance Co.

COMMISSION NO. (F1or 1 d~) 60 Dates g -z4-go Commlsslonss (State or,Provtnce> NatIonal Soar

Page 3 ot l NI5-2 SUPPLEMENThL SHEET

1. OWNERS FLORIDh POWER 4 LIGHT CO. DATE O~~aeE 5, ISED f

P.O. Box 29100 Miami, Florida 33lf2

2. PLANT: ST. LUCIS PLANT UNIT II UNIT!

P. O. Box 1200 Jensen Beach, Florida 34957

3. WORK ~OB NO. PC/M P7/- g,g 0 PERFORMED BY: FPL PLANT CONSTRUCTION/BACKFIT P. O. Box 1400 Juno Beach, Florida 33408 4

CWO NO.! 8(pg/

0. IDENTIFICATION OF SYSTEM: P) 8 IAI
f. PROCESS SHEET NO.:

DESCRIPTION OF WORK:

9C 0/- /08/ ~///

IN'siwu ~-is~ dg n/Eve /'l8 >HI-EAVED ML oN MPH J

&PE IN6 QADI& d F SOPPDl-I A" M6 "PILI- 905 ~ l HI5 Pr'-W 8<~0 Der'WEPfd IH8 8~PsAbfz.i/'I OF ~r p7~d'Ar~

0&8D I D /- Rsdid~~ 8 nl~ cocB) Boci,

Page 0 of 4 N5-2 SUPPLEMENTS SHEET 1~ OWNER! FLORIDh POWER d( LIGHT CO. DAVEN'gggzee2 5, I P.O. Box f29100 Miami> Florida 33lf2 ~~'NIT<

II

2. PLANT: "

ST. LUCIH PLANT UNIT II JOB NO. PC/M 9'7I~ Z 90 P. 0. Box 1200 Jensen Beach, Florida 34957.

CWO NO.! Qgg/

3. WORK PERFORMED BYr PPL PLANT CONSTRUCTION/BACKPIT P. O. Box 1400 PROCESS SHEET NO.:

Juno Beach, Plorida 33408 8(o/- gg/ <lg/

0. IDENTIFICATION oF sYsTEM: Npghl '

18RPI ~'(~ IMP/

5. ADDITIONALMATERIAL (Excluding Welding Materia0 Heat/Lot No.

or CFC or Manufacturer Specification Type Description Bc RIR/Repor t EQ6RsV /'l8 QHIEHBG,E 5 (EEL 48 Z,872

>: /i/IA CWO¹: /gag Processsheeu/0-.@AD-/M~ />

Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System:

QQ+ ponIET gooLt /cn~

5. (a) Applicable Construction Code ASME Section Ill, 1977 Edition, Summer 1977 Addenda. ~ Code Cases, Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Rephcement Components 1980 Edition, thru the Code Cases 6..Identification of Components Repaired or Replaced and Replacement Components:

National Replaced ASMF Name of Name of Manufacturer Year Board Repaired Component Manufacturer Serial No. Identification Built Stamped Replacement P or N)

Is lc I f.AA/bC I/QUA 9/~e /837 y s/d'O &Pidddtedst Ntd PI PC I I D&A SR8 //dy77 IOOO ~oui AO

7. Description of Work: C) pD( lin/V DP 8 l LBAI&ED 5/< IItJQH SHIV.

OR A IN OON IJIS0,I IDES ID / HE cP 8 0 Q.M/ tfCkf EX,QlfAAJCi6 R

8. Tests Conduoted: Hydrostsdo ~x Pneumstto Nominal Operating Pressure Other Pressure ff ~ si Test Temp, 4 IF /aArla/ EH /

PSL.2, NIS-2 TRACKING NO. S L ~ 2 ~ 05~dyl FORM NIS 2 (Back} Sheet 2 of/

9. Remarks: g/p APPLCAQLS MAl4%iCluese OATA ArsoAte to ss ATTAO49 Certificate of Compliance We certify that the statements made in Ihe report are correct and thIs + Repair/) Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorizatl No.: N/

Signed Owner or Ownor'e Designee, Title ate /2 19 Py CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and tho State or Provldonco of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during the period 4/89 To 11/90, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME .

Code, Section Xl.

By signing this cortificato neither tho Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed ln the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or lose of any kind arising from or connected with this inspection.

Commissions lns poctor'e Signature Nethnel Board, State, Provldonco and Endorsomente Date 19~/

PSL-2, NIS.2 TRACKING NO. f8 I. 2 ~ QQ'~@2 0 FORM NISe2 OWNER'S REPORT FOR REPhIRS OR REPLhCEMENTS hs Required by the Provisions of the hSME Code Section XI

l. Owner: Florida Power 8t Light Co. Date: /-/(-0/

P.O. Box 529100 Miami, FL 33152 Sheet: 1 of Q

2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach,'FL 34957 P.O.>>: C,86329-921'.( 8 3, Work Performed By: Florida Power 4 Light Co, PCM¹ p//8 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO¹: Ai'8 8( 43- uSe@o CWO ¹: 8(c /8 Process Sheet:8/$ 3 - /08$ AZ Repair Orltanizadon P.O. Nore Job Nots ecc.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System:

/AI/IV,d COD/ /<C~ WN84

5. (a) Applicable Construction Code ASME Section lII, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Rephcement Components:

National Replaced ASME Name of Name of Manufacturer Other Year Boardd B Repaired Code Component Manufacturer ~ Serial No. N Identification Built or Stamped Replacement (Y or N) 4 ZlM6 SA 70oD N/8 /"/8 "/A P6Hot/e~

89- 6582- iR sf 4 Zl Z,O6 0! f/.95A f 8 kPuee~e l 4/ Zl ZO8 Nbl ~lH col 89- o58S-w/ "la @~agro Q,&5 Rite U Zi 2.OS v'.M6'o. oi4 - o3.

7. Description of Work: O'RL l~ y 4 Zl204 g ~i Zl 208 Vlg~ p
g. Tests Conduoted:

/6 ( f mfiH i 'EVt 4 Z(ZOS .- 0 Ialt~e Hydrostado Other X

~ ~

VAI-VS5 PCS Pressure V ZIZO8=

Pneumat to si C V(0 8/48.

8 ~iRaia Nominal Cperatlng Pressure Test Tem . + eF s

~

AM 8 f &d I

PSL.2, NIS.2 TRACKING NC. 8 I. ~ 2 ~ 0 2 ~DO FORM NIS-2 (Sack) Sheet 2 of

9. Remarks:

Ai//I APPLClOLE LIQAFAMJRss OATA RfPONS To ss ATTAR'ertificate of Compliance we oeraty ihat the statements made in the report are oorreot and this conforms to the rules of the ASME Code,Section XI.

Q Repair@ Reptaoement Type Code Symbol Stamp: N/A No.'/A Certificate of Authoriza rmzurw~

Owner or Owner's Oeslpnoe, Title Date ~rZ 19~K CERTIFICATE OF INSERVICE INSPECTION l, the undersigned, hokHng a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Rorkfa and employed by Arkwright insurance of Norwood Mass.

have inspected the components described in this Owner's Report during the period 4/89 To 11/90, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for'any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsomonts Date

PSL2, NIS2 TRACKING NO. 4 I ~ 2 ~ 04 ~011 FORM NIS-2 OWNER'S REPORT FOR REPhIRS OR REPLhCEMENTS F he Required by the Provisions of the hSME Code Section XI

l. Owner: Florida Power 4, Light Co.

P.O. Box 529100 ttstn JA ntu/I 2ry'9, I')st l Miami, FL 33152 Sbscu cr of jf rdtrtst St. Lucie Phnt . UnitN: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O.N: nJ/R

3. Work Performed By: Florida Power 8h Light Co. PCMa: g/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWON. N/g XA ff: ~'/P CWO ff: 50 g g Process SheeLSD93-l 055 <l z.o Repair Orgaiuzation P.O. NoJob Nore ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System:

CDM Panta r OIIQI.IAIt'n

5. (a) Applicable Construction Code ASME Section GI, 1977 Edibon, Summer 1977 Addenda ~ Code Cases (b) Applicable Edition Winter 1980 addenda of

~

Section XI Utilized Code Cases for Repairs and Replacement Components 1980 Edition, thru the

6. Identification of Components Repaired or Rephced and Replacement Components:

National Replaced Name of Name of Manufacturer Other Year Board Repaired Component Manufacturer Serial No. identification Built Nou or Stamped Replacement (Y or N)

ER51 MANhl8'<

Sow oF za d~/f.a( Var) J@PRI R6'o PC W H8R 8Xe,llRue6R W6'51 dHRNHdC.

So< oF 28 ddPA( 7/n ~II APWra~c <Ia CCvl H8RT 6 XCuR~SeR

7. Description of Work: RRGR5 DP 6'Ao51ou ldoRRd5(ojt/ oN f'H8 ~(088'H8'er fD f]

~

0 ld R hl ItIEL Nit 4 6 5u RC'Red R ( v Hd 8R5i Au@ I@8'5i Q'midge'c 8 oxe5.

RBPAÃic 8Y w'8c.avm6

~

u98R6

8. Tests Conducted: Hydrostadc Pneumat to Nomtnal Operation P~essure I4C I Oh Preeeure el Teat Tem . + sF 5'I5<8N

fa lj PSL.2, NIS.2 TRACICNG NO. S L ~ 2 ~ 0 2 ~OS I FORM NI84 (Baclt) Sheet p el p/'strtrt

a. Remarhs: Itl/R APPLIcASLf IlAMSAclu~OATA i%PINTS To OC ATTAO49 Certificate of Compliance We nartlty that the statements made In the report are anrrent and this HRepalr QCf Replanement confonna to the ruloe of the ASME Code, Section Xl.

Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Sfgnod Owner or Owner'e Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commiaaion faaued by the Natfonal 8oard of 8offer and Proaaure Veaaef Inapoctora and the State or Providence of Rorfda and employed by Arkwrfght lnaurance of Norwood Mao!.

have inspected the compononta described in thia Owner'a Report during the period i/81 To 11/90, and state that to the beat of my knowledge and beifef, the Owner haa performed examinations and taken corrective meaeurea doacribed in thfa Owner'a Report in accordance with tho requirements of the ASME Code, Section Xf.

8y signing thia ceNffcate neither the Inspector nor hie employor makea any warranty, expresaed or Implied, concornlng the examlnationa and correctlvo meaeuree deecfbod ln the Owner'e Report.

"Furthermore, neither the frepoctor nor hla empfoyer ahall be liabfe in any manner for any personal injury or proporty damage or foaa of any kind arising from or connocted with thla inspection.

Commiaaiona inspector'e Signature National Board, State, Provfdence and Endoraelnenta Date

L*,p g ~

PSL 2, NIS 2 TRACKING NO. S L-2-05-~02 2 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS "As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 0143-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3832/62 XA ¹: 900410081938 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. IdentiTication of System: Reactor Coolant
5. (a) Applicable Construction Code ASME Section HI, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, tluu the Code Cases

6. IdentiTication of Components Repaired or Replaced and Replacement Components:

Name of National Replaced ASME Name of Manufacturer Other Year Board Repaired Code Component Manufacturer Serial No. Identification Built or Stamped Replacement (Y or N)

OLD VALVE BORG WARNER Not Available N/A N/A N/A REPLACED BONNET

'EW VALVE BORG WARNER 204158 N/A N/A 1990 Replacement Yes BONNET 5/16" DIA. - 18 NOVA MACHINE N/A N/A HEAT ¹ N/A Replacement HVY HEX NUT 11681 5/16" DIA. - 18 NOVA MACHINE N/A N/A HEAT ¹ N/A Replacement ALLTHREAD ROD 868450

7. Description of Work: The bonnet of valve V1442 was identified during the 1989 outage as requiring replacement, due to errosion during the 1990 refueling outage. The bonnet and

~~

all the bolting materials were replaced as Identified above.

re~ ~

8, Tests Conducted: Hydrostadc h ~X

~ P Pneumatic psig Nominal Cperating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~02 2 r

FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLICABLE MANUFACTURE'S DATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificat'e of Aut rizatio No.: N/A S,igned

/Owner or wner s 0 ignee, itic Date ~~~, 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/Bg, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions inspector's g nature National Board, State, Providence and Endorsements Date 19~8

PSL-2, NIS-2 TRACKING NO. S L-2-0 5-~022 F FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Requtred by the Provisions of the ASME Code Section XI

l. Owner: Florida Power & Light Co. Date: 2/8/91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 1659 XA ¹: 900321130709 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Feedwater
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs Code Cases and Replacement Components 1980 Edition, thru the

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of Name of Manufacturer National Other Year Replaced ASME Component Manufacturer Board Repaired Code Serial No. Identification Built No or Stamped Replacement (Y or N) 2-BF-40 Hub, Inc N/A N/A Ht. ¹ N/A Replacement N L80093

7. Description of Work: REPLACEMENT OF PIPING ON AUX. FEED SYSTEM SPOOL PC., LINE ¹l-2-BFPO, CLASS 3, 2" DIA. Due to localized pitting. Work included the cutting &

~~

reweldlng of weld nos. BF 40-SW-2 & BF40-FW-3

a. Tests Conducted: Hydrostatic Other+

~x pneumatic Pressure~

~ psig Nominal Operating pressure Test Temp. 'P

PSL-2, NIS-2'TRACKING NO. S L-2-05-~02 3 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: A satisfactory pressure test was performed.

APPLICABLE MANUFJ+TURE'S DATA REPORTS TO BE ATTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Q Repair QX Replacement Type Code Symbol Stamp: N/A Certificate of Authori tion No.: N/A Signed n r r Owner'eslgne, -Title Date ~e5 2, 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and fndorsements Date

PSL 2, NIS 2 TRACKING NC. S L-2-0 0 -~02 4 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power 8c Light Co. Date: 01-03-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power 4 Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3347 /62 XA ¹: 891201130135 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. IdentiTication of System: Safety Injection
5. (a) ApplicableConstructionCodeASMESectionHI,1977Edition,Summer1977Addenda. ~ CodeCases Winter 1980 addenda. ~

(b) Applicable Edition of Section Xl Utilized for Repairs Code Cases and Replacement Components 1980 Edition, thru the

6. Identification of Components Repaired or Replaced and Replacement Components:

National Replaced ASME Name of Name of Manufacturer Other Year Code Board B d Repaired Component Manufacturer Serial No. Identification Built 0 Stamped I'eplacement (Y or N) 5/8" DIA. - 11 NOVA MACHINE N/A N/A HEAT ¹ Replacement HVY HEX NUT CORP. 22810 5/8" DIA. - 11 NOVA MACHINE N/A N/A HEAT ¹ Replacement ALLTHREAD ROD CORP. 60895

7. Description of Work: The Boric Acid Make-up Pump 2B was identified as having leaks at the suction

~~

flange. The bolting materials and the gasket was replaced with new material.

8. Tests Conducted:

1 Hydrostatic n ~X

~ P Pneumatic urn~

~ psig Nominal Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~02 4 FORM HIS-2 (Sack) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLIDABLE MANUPAcluRE'S DATA REPORTS To BE ATTAcHED Certificate of Compliance We ceniiy that the statements made in the report are correct and this Repair X Reptacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of A ization No.: A Signed Owner or 0 er'signee, ie 7 0Fs~ld' 0~~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury'r property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsements Date

PSL-2, NIS-2 TRACKING NO. S L-2-0 5-~025 FORM NIS-2 OAVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Rettulred by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 10-30-90 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹t 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power 2 Light Co. PCM ¹: 311-288D 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 1591/ 62 XA ¹: 890228133958 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identificationof System: Intake Coolig Water System
5. (a) ApplicableConstructionCodeASMESectionIII,1977Edition,Summer1977Addenda. ~ CodeCases Winter 1980 addenda. ~

(b) Applicable Edition of Section Xl Utilized for Repairs Code Cases and Replacement Components 1980 Edition, thru the

6. IdentiTication of Components Repaired or Replaced and Replacement Components:

National Replaced ASME Name of Name of Manufacturer Other Year Board B d Repaired Code Component Manufacturer Serial No. Identification Built N or Stamped Replacement (Y or N) 5/8" DIA. - 11 NOVA MACHINE N/A N/A HEAT ¹ Replacement ALLTHREAD ROD 60895 5/8" DIA. - 11 NOVA MACHINE N/A N/A HEAT ¹ Replacement HVY HEX NUTS CORP. 22810

7. Description of Work: During the installation of an insulating flange kit on a 4" dia. pressure transmitting sensing line per PC/M 311-288D, several studs and nuts were

~~

damaged do to the removal process. All studs and nuts on this flange were

8. Tests Conducted replaced.

Hydrostatic Other X

~ Pneumatic Pressure~

~ psig Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-0 5-~02 5 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLICABLE MANLIFACTURE'SDATA REPORTS TO BE ATfACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Owner or wner's Designee, Titi Data ~ta . 19 1 >

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions nspector's Signature National Board, State, Providence and Endorsements Date 19~9

PSL 2, NIS 2 TRACKING NO. S L-2-0 8-~02 7 FORM NIS-Z OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

l. Owner: Florida Power & Light Co. Date: 0143-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. AlA Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 0199/62 XA ¹: 900924062735 CWO ¹t N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Intake Cooling Water and Circulating Water (Train B Seal Water Supply)
5. (a) ApplicableConstructionCodeASMESection III,1977Edition,Summer1977Addenda. ~ CodeCases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of Name of National Replaced AS ME Manufacturer Board Other, Year Code Component Manufacturer Serial No. Repaired No.

Identification Built or Stamped Replacement (Y or N) 3" DIA. HENRY PRATT D-44725-5-1 N/A MODEL ¹ 1984 Replacement Yes.

BUTTERFLYVLV 3"-NMKII 3" DIA. HENRY PRATT D-0065-5-4 N/A MODEL ¹ N/A REPLACED BUTTERFLY VLV 3"-NMKI I 5/8" DIA. - 11 NOVA MACHINE N/A N/A HEAT ¹ 1990 Replacement M)

HVY HEX NUT CORP. 22810 5/8" DIA. -1 1 NOVA MACHINE N/A N/A HEAT ¹ 1 984" Replacement IIO ALLTHREAD ROD 8097696

7. Description of Work: Valve SB21305 was removed and replaced including the flange bolting materials, due to the valve leaking and the bolting materials being corroded.
8. Tests Conducted: Hydrostatic Other~X

~ Pneumatic Pressure~

~ psig ~~

Nominal Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~02 7 FORM NISe2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLCABLE MANUFACTURE'S OATA REPORTS To BE ATTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: 'N/A Certificate of Auth rization No.: N/A Signed wner or 0 ner's Des nee, Title Date ~A ~

19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsements Date

PSL-2, NIS-2 TRACKING NO.' L-2-05-~025 FORM NIS-Z OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code.Section XI

l. Owner: Florida Power & Light Co. Date: 01-02-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 1082/ 62 XA ¹: 900809032411 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Intake Cooling Water Lube Water
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of National Replaced ASME Name of Manufacturer Other Year Component Manufacturer Board Repaired Serial No. Identification Built No. or Stamped Replacement (Y or N) 1/2" DIA. - 13 HUB INC. N/A N/A HEAT ¹ Replacement IID ALLTHREAD ROD x5698 1/2" DIA. - 13 HUB INC. N/A N/A HEAT ¹ Replacement IID HVY HEX NUT 6014914

7. Description of Work: During the inspections of the following ICW Lube Water system stralners, several studs and nuts were replaced, due to heavy corrosion.

~

I-SS-21-8

8. Tests Conducted: Hydrostatic Other ~X

~ ~~

I-SS-21-9 Pneumatic Pressure psig Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~028 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLICABLE MANUFACTURE'S DATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Q Repair X Replacement Type Code Symbol Stamp:

Signed Owner or wner s N/A Certificate of Authorization No.: N/A esigne, Title Cate ~ 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty,'expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions inspector's Signature National Board, State, Providence and Endorsements Date 19 9/

PSL-2, NIS-2 TRACKING NO. S L-2-0 5-~02 9 FORM NIS-2 OWNERtS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 1-11-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3658 XA ¹: 900529142527 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Safety Injection Tank 2A2 Outlet V3215
5. (a) ApplicableConstructionCodeASMESectionHIs1977Edition,Summer1977Addenda. ~ CodeCases Winter 1980 addenda. ~

(b) Applicable Edition of Section XIUtilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of Name of Manufacturer National Other Year Replaced ASME Component Manufacturer Board Repaired Code Serial No. identification Built No or Stamped Replacement (Y or N)

Valve Bonnet Nut Nova N/A N/A Heat ¹ N/A Replacement 31807

7. Description of Work: REPLACE NUTON CHECK VALVEFOR SIT 2A2 V3215
g. Tests Conducted: Hydrostatic ~ P Pneumatic re~

~ psig ~~

Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~02 9 FORM NIS-2 (Back) Sheet 2 of 2

g. Remarks: A satisfactory inservice leak test and a VT-3 for the replaced nut was performed APPLCABLE MANUFtIDTURE'8 DATA REPDRTB To BE ATTADHED Certificate of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Q Repair X Replacement Type Code Symbol Stamp: N/A Certificate of A horization No.: N/A Signed ner or Owne s Designee, Title Date ~% t9~

CERTIFICATE OF INSERVICE INSPECTION r

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed In the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board. State, Providence and Endorsements Date

PSL-2, NiS-2 TRACKtNG NO. S L-2-0 0-~02 0 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 2-11-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. AIA Jensen Beach, FL 34957 PWO ¹: 1590 XA ¹: 891213064550 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Intake Cooling Water
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of National Replaced ASME Name of Manufacturer Other Year Component Manufacturer Board Repaired Code Serial No. Identification Built or Stamped Replacement (Y or N)

Butterfly Valve Henry Pratt D-0065-5-1 N/A Model¹: N/A Replaced Y II 3 NMKII Butterfly Valve Henry Pratt D-44725-5-4 N/A Model¹: 1984 Replacement 3 sl r NMKII Heavy Hex Nuts Nova Machine N/A N/A Heat ¹: 1990 Replacement 5/8" Co 22810 All Thread Rod Nova Machine N/A N/A Heat ¹: 1984 Replacement 5/8" Co 8097696

7. Description of Work: REPLACE VALVESB21304 IN ITS ENTIRETY, ALSO REPLACING THE VALVE

~~

BOLTING, DUE TO CORROSION CLASS 2, 3" DIA. BUTl ERFLY VLV.

8, Tests Conducted: Hydrostatic Other~

~x. Pneumatic Pressure~

~ psig Nomtnat Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~03 0 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: A satisfactory hydrstatic test was performed after completion of work. No leakage APPLIcABLE MANUPACTURs'S DATAREPORTS TO ss ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of thorization No.: N/A Signed Date 19~K ner or Owner's slgnee, tie CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measured'escribed in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or

'mplied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor'his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's S gnature National Board, State, Providence and Endorsements Date

PSL 2, NIS 2 TRACKING NO. S L-2-0 5-~031 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 01-03-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 0214 / 62 XA ¹: 901011104748 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Seal water supply to the Intake Cooling Water and the Circulating water pump.
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases (b) Applicable Edition Winter 1980 addenda.

of

~

Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

'/A Name of Name of National Replaced ASME Manufacturer Other Year Component Manufacturer Serial No.

Board B d Identification Built Repaired, Code No or Stamped Replacement (Y or N) 5/8" DIA. - 11 NOVA MACHINE N/A HEAT ¹ 1990 Replacement hD HVYHEX NUT 5/8" DIA. - 11 NOVAMACHINE ALLTHREAD ROD CORP.

', N/A -

N/A ,

22810 HEAT ¹ 1984 Replacement ItD CORP. 8097696 disc Paulson Engr N/A N/A Part ¹ N/A Replaced 809-204

7. Description of Work: The flange bolting on valve V21524 was replaced with new material, due to heavy corrosion.
8. Tests Conducted: Hydrostatic h ~X

~ P Pneumatic re~

~ psig ~~

Nominal Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~03 1 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLICABLE MANUFACTURE'S DATA REPORTS TO BE AlTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Q Repair X Replacement Type Code Symbol Stamp: N/A Certificate of orizatio No.: N/A Signed ner or Owner's slgnee, Title Date ~MR 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle /f05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate'neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsements Date 19 ~/

FORM NIS-2 0%NER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the provisices ot the ASME Code Section Xl Al/6 - 2. KRALKIAI(iAD .SI.-2 DdS'-D82 Page I of 4

l. OWNER: POWER
  • LIGHT CO. DATEt O~MHME 9. 1990 P.O. Box 529IOO Miami, Florida 331f 2 UNITs II LANT'LORIDA BOB NO. PC/M! N(4 CWO NO.i 8@0+
2. P ST. LUCIB PLANT UNIT II P. O. Box 1200 PROCESS SHEET NO.!

Jensen Beach, Plorida 34957 Sao+- /D/z Ns Repair Organization PC4, JOBg, etc.

3.. WORK PERFORMED BYt P PL PLANT CONSTRUCTION/BACKPIT P. O. Box 1400 Juno Beach, Plorlda 33408 Type Code Sp 9 IS N~NA Authorization-

0. IDENTIFICATION R No. N A oF sYsTEM: i 'QIripdnl85QDdrI 'rptidt 1hl& EQ Expiration N/A f a. A.ppllcable Construction Code SECTION III1974 Edition 1975 WINTER Addenda
9. AppS* \ Ed(I 8 I XI lid 81 p 'N:~1999 EP IIIIN 1981 IIINIE ADDENDA
6. Identification of components repaired or replaced and replacement components Other Repaired ASME Code Name of Name of Mf 'w Nat'I Year Repi s.".

Identli- Eoiit

(

'omponent.:>>

Mig. ication eP ce'- (Yes/No) ment

~66 PRATE Wow 4 p g OLI nlh

Page Z of 4 FORM N5-2

7. Description of work> S~E Pw<.E 3ow4 S. Tests Conducteds Hydrostatic pneumatic Nominal Operatinii pressure Other >< !d<q )pressure~ Test Temp. ir.
9. Remarkst </~

AppHcable Manufacturer's Data Report to be attached CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this P6PiAQGM E4 r Repair or Replacement conforms to Section XI of the hSME Code.

/WJ~ y Signed! 3 5o Owner or Owner's Designee Title Dat CERTIFICATE OF INSPECTION Q the Undersigned, holding a vaHd commission hsued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of PL.DN/DC7 employed by have. 'nspected the 80 L N described In this report on '. Z& 19 9~ and state that to st of my ow ge and belief, this repair or replacement has been constructed In accordance with SectIon Xl of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or impHed, concerning the repair or replacement described ln this report Furthermore, neither the Inspector nor his employer shall be Hable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

  • Arkwright Insurance Co.

COMMISSION NO, Dater /de& Commissions'State or Province, National Boar

Page 3 o1 i NIS-2 SUPPLEMENTAL SHEET FLORIDA POWER R LIGHT CO. DATE>I7ggENefg 3. I990 P.O. Box f29100 Miami, Fiorlda 331'f2

2. PLANT! ST. LUCIB PLANT UNIT II UNIT:

P. O. Box 1200 Jensen Beach, Florida 34957

3. WORK JOB NO. PC/M Q/8 PERFORMED BY: FPL PLANT CONSTRUCTION/BACKFIT P. O. Box 1400 Juno Beach, Florida 33408
0. IDENTIFICATION CWO NO.! 8QQ f oFsvsTEM: LQNPonlei Cooi Iuc~ ldRiRIZ
f. DESCRIPTION OF WORK-'ROCESS/-

iieet~ 8@o SHEET NO.s

<D/Z 43 I. l2&PCa~CD BO~itd & PlR/8'RtAL- 'InJ HAND HoLE QOIJ82 (Roi-D D<~AI soi i5 ) R I i II8QQ'yv IIRN sxcIIRAht/c 5iizRIAIE<

zs

4. RSPi.RQ6'D SOi RIRiEÃIRL, Rf VRI IIE P ZIZSS (y"BROS WrfSfl PiPiN& ) IW i RE I Zl- is (AI Eliot.nlO,IZ)
8. l?EPccacao-;-.sory((ATE blNSRiaL-F iPiN6)

IP(N6 R5' Hf I-5'5- Zl-IB

~ MALUS 4 z/29t'N

/ SAQewA~H (5 E CORASIZ)

4. REp~cteec BourAC~ M 8fEZiez. M7M 28 ~vJ HeR ExM8 5 JRawER QovEZ. X 8'nl6E<

Page 0 ot 4 NIS-2 SUPPLEMENTAL SHEET I OWNER! FLORIDA POWER 4c LIGHT CO. DAVE'06&YISE~ ~ ~~<<

P.O. Box 529100 MiamC, Florida 33152 UNITr

2. PLANT! ST. LUCIS PLANT UNlT ll JOB NO. PC/M A/$

P. O. Box 1200 Jensen Beach, F1orida 34957 CWO NO.t 8 (p g +

3. WORK PERFORMED Q,gr FPL PLANT CONSTRUCTION/BACKFIT P. O. Box 1400 PROCESS SHEET NO.:

Juno Beach, Florida 33408 8(o<- /o/z ~Is

0. IDENTIFICATION OF SYSTEM: Lg~ pDgg~i QgDg(yp 5.~ ADDITIONALMATERIAL

~ ~

(Excluding Welding Materiao Heat/Lot No.

or CFC or Manufacturer Specification Type 4 Description RIR/Report

.ADVCl +Q /d x 5 /2 Bo&s <~855 9 N n Qh'/nlE 5 cJAg.8' 804'5 98 Z588 dovA P&N8- 58 >99 H Aea/uE 6P. Bv zl 98(7 Alo VA . 85Ãe - sA ] 5'8 H Adcd>NE c~ g. 87 8~me- s8 /e9 ~8 iAREAvev Par Alod'/l euI~E CÃ. Bv /"- Bx( zÃ8 l77o

PSL-2, NIS-2 TRACKING NO. S L-2-05-~03 3 FORM NIS-2 OWNERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 1-11-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By; Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 1122/62 XA ¹: 900817033359 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Main Steam
5. (a) ApplicableConstructionCodeASMESectionlII,1977Edition,Summer1977Addenda, ~ CodeCases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of National Replaced ASME Name of Manufacturer Other Year Board Repaired Code Component Manufacturer Serial No.

No.

Identification Built or Stamped Replacement (Y or N)

Hex Nut Nova N/A N/A Heat ¹ N/A Replacement 1 3/8" Dia M 22294 M20405 All thread rod Nova N/A N/A 'eat¹ N/A Replacement 1 3/8 Dia 8094962 8087028 8065354

7. Description of Work: MAIN STEAM SAFETIES VALVEV08201

~~

VALVEBOLTING REPIACEMENT, DUE TO CORROSION CLASS 2, 10" X 6"

8. Tests Oonduotsd: Hydrostatlo Other x

~ Pneumatlo Pressure

~ psig Nominal Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~03 3 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: A satisfactory inservice leak test and VT-3 was performed for new bolting APPLCABLE MANUFACTURE'SDATAREPDRTB To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair+X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Auth rization No.: N/A Signed Date 19~8 ner or Owner esl ee, Tltl CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starling on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's S nature National Board, State, Providence and Endorsements Date 19~9

PSL 2, NIS 2 TRACKING NO. S L 0 5-~03 4 FORM NIS-1 OWNERrS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 1-11-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 1122/ 62 XA ¹: 900907035843 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System; Main Steam
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. IdentiTication of Components Repaired or Replaced and Replacement Components:

Name of National Replaced ASME Name of Manufacturer Other Year Board Repaired Component Manufacturer Serial No.

No. Identification Built or Stamped Replacement (Y or N)

Hex Nut Nova N/A N/A Heat¹ N/A Replacement N 1 3/8" M22294

&M20405 All Thread Rod Nova N/A N/A Heat¹ N/A Replacement 1 3/8" 8094962 8087028 8065354

7. Description of Work: MAIN STEAM SAFETIES VALVEV08202 VALVEBOLTING REPLACEMENT, DUE TO CORROSION

~~

CLASS 2, 10" X 6"

8. Tests Conducted: Hydrostatic Other ~x

~ Pneumatic Pressure~

~ pstg Nominal Operating Pressure Test Temp. 'F

PSL2, NIS 2 TRACKING NO. S L-2-05-~02 4 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: A satisfactory inservice leak test and VT-3 was performed for new bolting APPLCASLE MANUFACTURES OATA REPORTS TO BE AlTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Q Repairs Replacement Type Code Symbol Stamp: N/A Certificate of A horiza lon No.: N/A Signed Owner or Owner's D slgnee Title Date ~a. a., 19~<

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/Sg, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsements Date )g e(

PSL-2, NiS-2 TRACKING NO. S L-2-05-~03 5 F FORM NIS-1 OWNERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions or the ASME Code Section XI

1. Owner: Florida Power A Light Co. Date: 2-12-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power 4 Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹'122/62 XA ¹: 900907040046 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Main Steam
5. (a) Applicable Construction Code ASME Section HI, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. IdentiTication of Components Repaired or Replaced and Replacement Components:

Name of Name of Manufacturer National Other Year Replaced ASME Component Manufacturer Board Repaired Code Serial No. identification Built No. or Stamped Replacement (Y or N)

Hex Nut Nova N/A N/A Heat¹ N/A Replacement 3/8" M 22294

& M20405 All Thread Rod Nova N/A N/A Heat¹ N/A Replacement N 1 3/8" 8094962 8087028 8065354

7. Description of Work: MAIN STEAM SAFETIES VALVEV08203

~~

VALVEBOLTING REPLACEMENT, DUE TO CORROSION CLASS 2, 10" X 6"

8. Tests Conducted: Hydrostatic Other~x

~ Pneumatic Pressure~

~ psig Nominai Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~03 5 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: A satisfactory inservice leak test and VT-3 was performed for new bolting APPLCABLE MANUFACTURE'S OATA REPORTS To BE ATTACHED Cer'tificate of Compliance We certify that the statements made in the report are correct and this Repair+X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of thorization No.: N/A Signed wne or wner's eslgn, Title Date 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

2 r

Commissions inspector's Signature National Board, State, Providence and Endorsements Date

PSL-2, NIS-2 TRACKING NO. S L-2-05-~03 6 FORM NIS-Z OSVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner. Florida Power k Light Co. Date: 2-12-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power 8r, Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 1122/62 XA ¹: 900907040205 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Main Steam
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Manufacturer National Name of Replaced ASMF Name of Other Year Board Repaired Component Manufacturer Serial No. identification Built or . Stamped Replacement (Y or N)

Hex Nut Nova N/A N/A Heat¹ N/A Replacement 1 3/8" M22294

& M20405 All Thread Rod Nova N/A N/A Heat¹ N/A Replacement 1 3/8" 8094962 8087028 8065354

7. Description of Work: MAIN STEAM SAFETY VALVEV08204

~~

VALVEBOLTING REPLACEMENT, DUE TO CORROSlON CLASS 2, 10" X 6

6. Tests Conducted: Hydrostatic Other ~x

~ Pneumatic Pressure~

~ pstg Nominal Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~03 6 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: A satisfactory inservice leak test and VT-3 of all replaced bolting was performed APPLICABLE MANUFACTURES DATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

@ Repair +X Replacement Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Date 19~~

ner or 0 ner's Desi nee, Titl CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsements Date /3

PSL 2, NIS 2 TRACKING NO. S L-2-05-~03 7 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner. Florida Power & Light Co. Date: 2-12-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power &, Light Co.

6501 South Hwy. A1A PCM ¹'/A Jensen Beach, FL 34957 PWO ¹: 1122/ 62 XA ¹: 900907040342 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Main Steam
5. (a) Applicable Construction Code ASME Section HI, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of Name of Manufacturer National Other Year Replaced ASME Component Manufacturer Board Repaired Code Serial No. Identification Built No. or Stamped Replacement (Y or N)

Hex Nut Nova N/A N/A Heat¹ . N/A Replacement 1 3/8" M 22294

&M20405 All Thread Rod Nova N/A N/A Heat¹ N/A Replacement 8094962 8087028 8065354

7. Description of Work: MAIN STEAM SAFETY VALVEV08205 VALVEBOLTING REPLACEMENT, DUE TO CORROSION

~~

CLASS 2, 10" X 6"

g. Tests Conducted: 'ydrostatic Other~x

~ Pneumatic Pressure psig Nominal Operating Pressure

.Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~03 7 FORM NIS-2 (Back) Sheet 2 of 2 g5/A 4 0+1

g. Remarks: A satisfactory inservice leak test and VT-ff'of all replaced bolting was performed.

APPLCABLE MANUFACTURE'8 DATAREPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this /Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of A horizatlon No.: N/A Signed ne wn s Designee itic Date, 19~8'ERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions inspector's lgnature National Board, State, Providence and Endorsentents Date

PSL-2, NIS-2 TRACKING NO. S L-2-05-~03 5 FORM NIS-2 OWNERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner. Florida Power & Light Co. Date: 2-12-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 1122/ 62 XA ¹: 900907040456 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Main Steam
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. IdentiTication of. Components Repaired or Replaced and Replacement Components:

Name of National Replaced ASME Name of Manufacturer Other Year Board Repaired Code Component Manufacturer Serial No. Identification Built or Stamped Replacement (Y or N)

-Hex Nut Nova N/A N/A Heat¹ N/A Replacement N 1 3/8" M22294

&M20405 All Thread Rod Nova N/A N/A ~ Heat¹ N/A Replacement 1 3/8" 8094962 8087028 8065354

7. Description of Work: MAIN STEAM SAFETY VALVEV08206

~~

VALVEBOLTING REPLACEMENT, DUE TO CORROSION CLASS 2, 10" X 6"

8. Tests Conducted:

n ~

Hydrostatic ~ P Pneumatic ore~

~ psig Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~03 5 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: A satisfactory leak test and a VT-3 was performed for all replaced bolting.

APPLICABLE MANUFACTUAE'BDATA AEPORTS TO BE ATTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Aut rization No.: N/A Signed Date w 19~~

Owner or ner'slgnee, tie CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsements Date

PSL2, NIS2 TRACKING NO. S L 0 5-~03 9 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 2-12-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of N/A
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. AIA Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power Ec Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 1122/62 XA ¹: 900907040607 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Main Steam
5. (a) Applicable Construction Code ASME Section HI, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XIUtilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

National Replaced ASME Name of Name of Manufacturer Other Year Code Board Repaired Component Manufacturer Serial No. Identification Built No. or Stamped Replacement (Y or N)

Hex Nut Nova N/A N/A Heat¹ N/A Replacement 1 3/8" M 22294

&M20405 All Thread Rod Nova N/A Heat¹ N/A Replacement 1 3/8" 8094962 8087028 8065354

7. Description of Work: MAIN STEAM SAFETY VALVEV08207

~

VALVEBOLTING REPIACEMENT, DUE TO CORROSION

~

CLASS 2, 10" X 6"

8. Tests Conducted: Hydrostatic h ~x

~ Pneumatic Pressure~

~ psig Nominal Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~03 9 FORM N IS-2 (Back) Sheet 2 of N/A

9. Remarks: A satisfactory inservice teak test and a VT-3 for all replaced bolting was APPLCABLE MANUFACllJRE'S DATAREPDRTS TO SE AlTACkED Certificate of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Q Repair +X Replacement Type Code Symbol Stamp: N/A Certificate of Au orization No.: N/A Signed Date W rW 19~~

Owner wn s Designe, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector rior his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's ignature National Board, State, Providence and Endorsements Date 19~9

PSL 2, NIS 2 TRACKING NO. S L-2-05-~04 0 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provlstons of the ASME Code Section XI

l. Owner. Florida Power A Light Co. Date: 2-12-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power 4 Light Co. PCM ¹: N/A 6501 South Hwy. AlA Jensen Beach, FL 34957 PWO ¹: 1122/62 XA ¹: 900907040725 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Main Steam
5. (a) ApplicableConstructionCodeASMESectionHI,1977Edition,Summer 1977Addenda. ~ CodeCases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of National Replaced ASME Name of Manufacturer Other Year Board B d Repaired Code Component Manufacturer Serial No. Identification Built or Stamped Replacement (Y or N)

Hex Nut Nova N/A N/A Heat¹ N/A Replacement 3/8" M 22294

&M20405 All Thread Rod Nova N/A N/A Heat¹ 1 3/8" 8094962 8087028 8065354

7. Description of Work: MAIN STEAM SAFETY VALVE V08208

~

VALVEBOLTING REPLACEMENT, DUE TO CORROSION CLASS 2, 10" X 6"

n. Tests Conducted:

~

Hydrostattc Other

~ Pneumatic Pressure

~ psig Nominal Operattng Pressure Test Temp. 'F

Q

~ o 0 ~ ~ l ~ ~ ~ ~ ~ ~ ~ ~

I

~ ' '

~ ~

~ ~ ~

~ ~ ~ ~

~ ~ 1 ~ ~ ~

~ ~ e ~ ~ ~ ~

0

~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ I ~ ~

~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~

~ ~

~ ~ f) ~

~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~

/ ~/y ~ gg; ~ ~

~ ~ ~ ~ ~ ~ ~

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS hs required by the provisions of the hSME Code Section Xl dig - Z ri77ILK/AIDs sJD. SL. 2-DkDl/

Page 1 of

1. OWNER: FLORIDA POWER 4 LIGHT CO. DATEr OEEEIrIB'&E 8. I990 P.O. Box 529100 Miami, Florida 331i2 UNIT! II JOB NO. PC/M! NIA CWO NO.>
2. PLANT! ST. LUCIB PLANT UNIT II P. 0. Box 1200 PROCESS SHEET NO,!

Jensen Beach, Plorida 34957 8664- /6// /7 7 Repair Organization POd, JOGGLE etc.

3. WORK PERFORMED BYt PPL PLANT CONSTRUCTION/BACKPIT P. O. Box 1400 Juno Beach, Plorida 33408 Type Code ry h \s DNA Authorization
0. 'DENTIFICATION No. N A OF SYSTEM: ( Dlri PorJE i ~DOL747D'+~

Expiration Date N/A

f. a. Applicable Construction Code SECTION 1111974 Edition 1975 WINTER Addenda
b. pp i* di i r i XI ill* ~ 'h:~1980 E IT ON 98 IIINTER ADDENDA
6. Identification of components rcpaircd or replaced and replacement components Other Rcpalred ASME Code Name of;-'; ~

Name of Mf 'a Nat'I Year Repl StamP&

Component'. Mfg. S)N Bd P Identil- Built 1EeeP Mc cc- (Yes/No) ication ment 6es Ac~e 4a~4 r-oa Sic.I 1&h f IR I BRIC@ PEP< E'2O

FORM NIS-2 T. Description of works 6~E PA(~c Sow 0

1. Tests Conductedi Hydrostatic Pneumatic Nominal Operating Pressure Other l5ui ) Pressure~st Test Temp P.
9. Remarks! Nla Applicable Manufacturer's Data Report to be attached CERTIFICATE OF COMPLIANCE To certify that the statements made ln this report are correct and this a@Pi/ldE/rl EA.J /

Repair or Replacement conforms to Section XI of the ASME Code.

SIgned!

Owner or Owner's Designee , Title Da e CERTIFICATE OF INSPECTION Ig thc Undersigned, holdhg a valid commission hsued by the National Board of Boiler and Pressure Vessel inspectors and thc State or Province of /-c.o4zc8 employed by have inspected the SoI I N c L described In this report on o .'g 19 do and state that to t st of my ow ge and belief, this repair or replacement has been constructed h accordance with Section Xl of the hSMB Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described In this report. Furthermore> neither the inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arisIng from or connected with this inspection.

  • ArkwrI fIht Insurance Co.

COMMISSION NO, (Fl or i da) 60 Dates J)~a>- /r Commissioner (State or Province, National Boar

Page 3 of 0 NIS-2 SUPPLEMENTAL SHEET I. OWNER! FLORIDA POWER dc LIGHT CO., DATE~D8<EPI58g 9, l990 f

P.O. Box 29100 Miam4 Florida 331f2

2. PLANT: ST. LUCIS PLANT UNIT II UNIT!

P, O. Box 1200 Jensen Beach, Florida 34957

3. WORK JOB NO. PC/M p/l8 PERFORMED BY: FPL PLANT CONSTRUCTION/BACKFIT P. O. Box 1400 Juno Beach, Florida 33408 cwo No.> BQCI+
0. IDENTIFICATION oP sYsTEM: C Q/A poof E I QpoLINI6 1Alfh8i2
f. PROCESS SHEET NO.-

DESCRIPTION OF WORK:

8Io 0 / - /D // 4 7 I BoL()AC~ MAIS'(~ ia ~6 HARD HoM Codd/Z N RK ZH gg VV /EAT Ey OHR/J & EIL STRAINER WAS AE PtAC6O(//'OOO OOV/PJ EOu 5 4, Sot <<NC~ MAiEA/AL AI VA uVE E 2IIB& (4 8ACKvVASII 919mlC~)

+~i TH&, I- SS-Zl- IA (6.E. LoRNEIL) wAS REPLAMO

9. SOc iiN(~: IAAIERi.-e-PiAN&

A> FLANGE CONNE<rrOn/ (L/NE tI0 OW IZS) 8AdRWASd WAS PEPC.R~c 8 oui /N C~ H A I ER I//LAI ELRN.*E EooI/VIEIIlio'IJ(LINE// Z- E-QMI- /o /)

BAQk.who'd Prie e W& @eh.Re.s'o.

5. Soui/N L. NA / ERI/H A / VALVE lo-2//89 (/ sRQPWksII P/PINC )

PI THE 2- 'S'5- Zl- IA (N E QORNE.IC .) WAS REPLAAEC> BO/ <<N.l~

N Ri EiZIA.L WAS CoRRDaeD e/8YoQD 5'RE E'.

Page 0 et 4 NS-2 SUPPLEMENTAk SHEET I. OWNERS FLORIDA POSER dt LIGHT CO. DATEi06E'ENSCR 9 l<9L P.O. Box f29100 Mlam1y Florida 33lf2 UNI'f! II

2. PLANT! ST. LUCIS PLANT UNIT II JOB NO. PC/M +/$

P. O. Box 1200 Jensen Beach, Florida 34957.

CWO NO > 800 4

3. WORK PERFORMED BY! FPL PLANT CONSTRUCTION/BACKFIT P. O. Box 1400 PROCESS SHEET NO.:

Juno Beach, Florida 33408 8( O<- lD// <I I

0. IDENTIFICATION OF SYSTEM: 0DI fPO PJL I 'OOLIE Cs W87EZ ADDITIONALMATERIAL (Excluding Welding Materiao Heat/Lot No.

or CFC or Manufacturer Specification Type R Description RIR/Report 8/4 l'oV'Fl II ccAH 3 5A- I99 SP. 8/ lobed'/z So~I~ Be 2989 N A &l]N6 5dUR<E pJD VR 8eee-W i93 ~la II x I Z </S zZ <8~v s

,Y)IiedidG 6R. 61 So~i gbVA As~e- su- isa 5/8- <<x5" <l~

g. bl ADII IQE aP. 87 8ac.i z.E6 F88@

NavA /BmE - Sp /95 Q. IAIDO C~E 81 zR 9847 8 hide'8 6/8- u~ iz" el~

N 8 e.I)iud C~A?. 87 Hc) zd 98(o78

PSL-2, NIS-2 TRACKING NO. te I. ~ 2 ~ 0 5 ~tyd 3 FORM NISe2 OWNER'S REPORT FOR REPhIRS OR REPLhCEMENTS hs Rectutred by the Provtslons of the hSME Code Section XI

l. Owner. Florida Power &, Light Co.

P.O. Box 529100 Miami, FL 33152 Shcct: 1 of 4

2. Plant: St. Lucic Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P,O,¹: Aflg
3. Work Performed By: Florida Power & Light Co. PCM¹: pJ(p 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO¹: tV/A m ¹ rd/g CWQ ¹ 84++ Process Sheet: atd249- /LLN 4g Repair Organizadon P.O. No., Job No., cct.

.Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System:

IN (AKC GOO/ /AC> WWEg

5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases (b) Applicable Edition of Section XI Utilized for Repairs and Rephccmcnt Components 1980 Edition, thru the Winter 1980 addenda ~ Code Cases
6. Identification of Components Repaired or Rephced and Rephccment Components:

National Replaced AS ME Name of Name of Manufacturer Other Year Repaired Component Manufacturer Serial No. Identification Built or Stamped Replacement (Y or N)

Ot. i l AC~ Hi& I R NO.

All <dR>/lZ So949t'. a z6/856

7. Oescriptfon of Work: Scf tsdC~ Pl/I(dkC MIF5 0't.ACR A f (d v'-/4-4A udge nlO.

-So-ri W- 1td'RC-VE /l5~e~sr-~ a~a<<C. SDC,((68 NA'i dRIltt R~PT-/fMD &s I H8'Q EckbVV Q)AJd6'CIeD io SPooc. Z- 90-Qnl-Zf id 7/f6'dll 5r/f0'~@ Prl.

tt. Tests Conducted:

( I6<> )

. Hydtostedc Other X

~ .

pneutnsttc Pressure si Nominal Operating Pressure Test Temp. '+ 'F AN&I ~& >

PSL.2, NIS.2 TRACKING NO. S L 0 $ .~0+9 FORM NIS-2 (Back) Sheet 2 of 2 r

9. Remarks: pJ/~

APPLCASUa MAHUFACTUAFSOlTA REPORTS TO SS AlTACHI Certificate of Compliance we sanity that the statements made In the report are nnrrent and this +Repair+Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization .; N/A Signed Owner or Owner's Designee, Title Cate ~l+ VC ttt CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright insurance of Norwood Mass.

have inspected the components described in this Owner's Report during the period 4/89 To 11/90, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions inspector's Signature National 8oard, State, Providence and Endorsemonts Oate 1 g 9'/

PSL-2, NIS-2 TRACKING NO..S I ~ 2 .gg-[jqqJ FORM NIS4 OWNERsS REPORT FOR REPhIRS OR REPLhCEMENTS hs Required by the Provlslons of the hSME Code Section XI s

l. Owner. Florida Power &, Light Co. Dat: I- /g 91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of
2. Plant St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: pf//I
3. Work Performed By: Florida Power 4 Light Co. PCM ¹: g//t 6501 South Hwy. A1A Jense,n Beach, FL 34957 PWO¹: PJ//t XA ¹ pJ/P CWO ¹: Btd2 /5 Process Sheet~/ /Qgq +IdP Repair Orttaniaanon P.O. Nots Job Nose ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System:

Idifta~ OOOI I~& VVFh68

5. (a) Applicable Construction Code ASME Section 111, 1977 Edition, Summer 1977 Addenda. ~ Code Cases (b) Applicable Edition of Winter 1980 addenda. ~

Section XI Utilized Code Cases for Repairs and Replacement Components 1980 Edition, thru the

6. Identification of Components Repaired or Rephced and Rephcement Components:

Replaced AS ME Name of Name of Manufacturer Oth Y Repaired Component Manufacturer Serial No. tdentification Built or Stamped Replacement P or N)

SD IpJ & I IVO.

Al 8RIAI ADVS t~ /886 iran~

90 Gi.eccl s'IR mo

<o aHGeK AIR kpdtddo Vddiu/8 ZI 208

7. Oescription of Work: SDi-IIA6 NR I GR>Rr VVRS P~P~~~W rm BO" 90 6'u5oVV /fi 5Pooc QUm&eff. a-90'-C,el-Z0 ia iIIB Wibc'iRueiuN6'ii. @de'i.n ReAtiit.Wif5 DO@+

Df4 1>dc 9Q "EL8ow PcalJhi-. Dowd5iIIEke 5(Ã Dl= URr~8 AS-Vz/20$ Iw 2- 90 ecO- /I

8. Tests Conduoted:

IS L I Httdrostedo Other X

~ Pneutnstto Pressure

PSL-2, NtS-2TRACKtNGNO. SL 2-05.~0+5 FORM NIS-2 (Back) Sheet 2 of

9. Remarks:

g(~

APPLClBLE MANUFJC1uAE'8 DATA REPORTS To ss ATTAO4H)

Certificate of Compliance We osrdhj that the statements made in the report are oorreot and this conforms to the rules of the ASME Code,Section XI.

HIRepair gf Repiaoement Type Code Symbol Stamp: N/A Certificate of Authorization No.: N Signed Date r- Jdr " 19 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright insurance of Norwood Mass.

have inspected the components described in this Owner's Report during the period 4/89 To 11/90, and state that to the'best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Ovmer's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Slg ture Natkeal Board, State, Providence and Endorsemants Date

PSL 2, NIS 2 TRACKING NO. S L-2-0 5-~04 7 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

l. Owner: Florida Power & Light Co. Date: 0143-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. AlA Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power &, Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3606/62 XA ¹: 900607162009 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Reactor Coolant
5. (a) ApplicableConstructionCodeASMESection III,1977Edition,Summer1977Addenda. ~ CodeCases Winter 1980 addenda. ~

.(b) Applicable Edition of Section XI Utilized for Repairs Code Cases and Replacement Components 1980 Edition, thru the

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of National Replaced ASME Name of Manufacturer Other Year Board Repaired Code Component Manufacturer Serial No. Identification Built or Stamped Replacement (Y or N) 1 1/4" DIA. - 8 NOVA MACHINE N/A N/A HEAT ¹ N/A Replacement HVYHEX NUT CORP. 8094962 1 1/4" DIA. - 8 NOVA MACHINE N/A N/A HEAT ¹ N/A Replacement ALLTHREAD ROD CORP. 67094

7. Description of Work: Safety Relief Valve V1202 (S/N 59336-00-0002) was removed, bench tested and reinstalled. During the reomval process one (1) stud had to be cut out,

~~

because the nut Jammed. The stud and two (2) nuts were subsequently

8. Tests Conducted replaced.

Hydrostatic Other ~X

~ Pneumatic Pressure~

~ pstg Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~04 7 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLICABLE MANUFACTURE'S DATAREPORTS TOBE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI ~

+ Repair QX Repiacement Type Code Symbol Stamp: N/A Certificate of Auth ization o.: N/A Signed Date 19~7 wner or 0 ner's Des ee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector s ig nature National Board, State, Providence and Endorsernents Date t 9~0

PSL 2, NIS 2 TRACKING NO. S L-2-0 5-~04 8 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Sectlou XI

1. Owner: Florida Power & Light Co. Date: 2-11-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3887 XA ¹: 900418124842 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Componant Cooling Water
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases (b) Applicable Edition Winter 1980 addenda.

of

~

Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of National Replaced ASME Name of Manufacturer Other Year Board Repaired Cede Component Manufacturer Serial No. Identification Built 0 Stamped t'eplacement (Y or N)

CS Threaded Rod Nova Machine N/A N/A Heat ¹: N/A Replacement 5/8"-SA-193 Co 60895 CS Nut Nova Machine N/A N/A Heat ¹: N/A Replacement 5/8"-SA-1 94 Co 31695

7. Description of Work: REPLACE ALLNUTS & STUDS FOR VALVESB21235 (CLASS 2, 5/8" BOLTING)
g. Tests Conducted: Hydrostatic Other~X

~ Pneumatic Pressure~

~ psig ~~

Nominat Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~04 8 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: A satisfactory inservice leak test and VT-3 of new bolting was performed.

APPLICABLE MANUFACTVAE'sCATA REPOATB To BE ATfACHEo Certificate of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

/ Repair+X Replacement Type Code Symbol Stamp: N/A Certificate of Aut 'tio No.: N/A Signed ner or wner's 0 lgnee, Titl Date ~Y/" 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions nspector's Signa ure National Board, State, Providence and Endorsements Date

PSL2, NIS 2 TRACKING NO. S L-2-05-~049 F FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 01-02-91 P.O. Box 529100 Miami, FL 33152 Sheet: I of yf2 5
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3638/62 XA ¹: 90102218016 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Main Steam
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of Name of National Replaced ASME Manufacturer Other Year Component Manufacturer Board Repaired Serial No. Identification Built or Stamped Replacement (Y or N)

NEW PIPE PLUG TIOGA PIPE N/A N/A Heat ¹ 1988 Replacement DF 61 NEW DISC PACIFIC XN1 723 N/A Heat¹ 1989 Replacement 5-382

7. Description of Work: Valve MV-08-13 was disassembled and inspected, due to loose parts being

~~

found in the line during the inspection of valve V08163. The inspection of valve MV-08-13 revealed that the above listed internal parts were either

8. Tests Conducted Hydrostatic Other~It

~ Pneumatic Pressure~

~

missing or damaged, which required their replacment.

psig Nominal Operattng Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~04 9 FORM NIS-2 (Back) Sheet 2 of P ~~

s I'~

9. Remarks: An acceptable system leakage test was conducted.

APPLICABLE MANUFACTURES DATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Au orizatio No.: N/

Signed Owner or wnsr's Des nee, Title Date ~2 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsements Date

FORNl NIS 2 OWNER'5 REPORT FOR REPhlRS OR REPLACEMENTS hs required by the p ovisions of the hSME Code Section XI PF%

P4L bll5- x iRRQKInlh Hd. SL. 2-06-odl Page 1 of 4 I~ OWNER: FLORIDA POWER R LICHT CO. DAT<<D6e,~na8P '/.

f P.O. Box 29100 ii IO~t-'NIT~

Miami, Florida 331f2 JOB NO. PC/Mt g4l- ZM CWO NO.! /$ 4'.

2. PLhNTt ST. LUCIE PLANT UNIT II P. O. Box 1200 PROCESS SHEET NO.)

Jensen Beach, Plorida 34957 Zly- /jy/ Ao 3e-z.eo- //99 6o Repair Organization P04, 3080 etc.

3. WORK PERFORMED BY! PPL PLANT CONSTRUCTION/BACKPIT P. O. Box 1400 Juno Beach, Plorlda 33408 Type Code gy I I E P~NA Authorization IDENTIFICATION No. N A OF SYSTEM: R&/1 Q.l r7/0 Qt70t-PR< I Expiration Date N/A S.

6.

a Appuca ie Construction Cue SECTION

  • P II I~ Edl I g I XI 1111974 III* d I P ',~gm Edition 1975 WINTER Identification of components repaired or replaced and replacement components Addenda EDITH'g ADDENDI glgy,.

Repaired hSME Code Mf 'a Other Year Name of Component Name of Nat'I Rc l Identil- Built iRe I cc 'tamP&

Mfg. lcatlon eP (Yes/No) ment HRA*ER YlRRK 4 PAd.l Pt e. >AC~.W Pd, Pea 6 fill E )Zg Nlii 6/77

~l)2 wA/2< 0 PAQ,IP' @-

gd.- 9oo-7020 ST,t&J iiFie-

FORM NS-2 Description of work>

4. Tests Conducted~ Ifydrostatlc Pneumatic Nominal Operating Pressure Other Pressure~ Test Temp, P, Remarks~ n//

Applicable Manufacturer's Data Report to be attached CERTIFICh TE OF COMPLIhNCE To certify that the statements made In this rcport are correct and this P~PH/8 Repair or Replacement conforms to Section XI of the MME Code.

Owner or Owner's Designee ltle CERTIFICATE OF INSPECTION Q the Undcrsignedg holding a valid commission issued by the National Board of Boiler and Pressure Vessel hspectors and thc State or Province of joA employed by have Inspected the ooiP callo s dcscrlbcd In this report on a r'/ ly 9o and state t tto st of my ow gosndbellef,tMs repair or replacement has been constructed br accordance with SectIon XI of the hSMB Code By slgnlng this certificate>-neither the Inspector nor his employer makes any warranty, expressed or impiledp concerning the-repair or replacement described In this report. Fwthcrmorep neither thc inspector nor hh employer. shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

  • Arkwrtght insurance Co.

COMMISSION NO (F I or t da) 60 N~ 77 9 Dates J~~QO Commissions!

(State or Province, National Boar

Page 3 of 4 NIS-2 SUPPLEMENTAL SHEET 1; OWNER! FLORIDA POWER 8t LIGHT CO. DATEi Qe>~6l l P,E;f/. ~, /~"

f P.O. Box 29100 Qiam4 Florida 331f2

2. PLANT: ST. LUCIS PLANT UNIT II UNITt P. O. Box 1200 Jensen Beach, Florida 34957
3. WORK JOB NO. PC/M Pfg Z~j PERFORMED BY: FPL PLANT CONSTRUCTION/BACKFIT P. Q. Box 1400 Juno Beach, Florida 33408 CWO NO.! ggQZ
0. IDENTIFICATION OF SYSTEM: (B+Q7Dfc'0.0 LANAI,i PROCESS SHEET NO.:
f. DESCRIPTION OF WORK:

O gag fg,7 /O g,go.z.9o- II39 4~

QW.BMBB I AE'-r=DOJV D'D/ D 66'i f lA6 /-'DR 5'8W4 A cQ- IQ 6 Wf6 0. 0 iNeiiBS (NKR 0- 984) ( ~II Nflgi hl(JMBEIZ 8 98 AB)

ROC //=/Qe l IO hJS WC/~ WAiDE'd 8DddS l 785 L E'hlATH dF ill 8 X l8 A'5IChl 5( RO I 8&SENBL/ 0 D 8 Qddi47/47 DDT E 8 ~O l- D 68 l I lh/6 88 / W88h/ I 0 8'A'D /.'5 SNOBBY E 04-l'~q (BI/? f0RPv. NI0IMeBR- "fBa'o- 7020)

/gag/gg D ~/'X) //= /CR 7 /OR / D AQh'/EV<

A wee 8ASe PlHVG 7d /// PAVDCC PSSS~a~V a~O 8 5PAeea SLOG,K WRS FAef.'Ical/=-D. /H/5, pA-DDM Movlr-leal low R<QUI I? e3 ~ 06(R/4 & VC &lke'i> COLD >El l /H6.

Nm-2 SUPPLEMENThL SHEET I OWNER! FLORIDA POSER dt LIGHT CO. DATEt DEQErl88R 4. l'(~~

F.O. Box $ 29100 Miami, Florida 331f2 UNIT! ll

'. PLANT: ST. LUCIS PLANT UNlT II P, 0. Box 1200 3OB NO. FC/M 5gy-Z 90 Jensen Beach, Florida 34957 CWO NO.! $ Q4Z

3. WORK PERFORMED BY: F PL PLANT CONSTRUCTION/BACKPIT P. 0. Box 1400 PROCESS SHEET NO.:

Juno Beach, Florida 33408 390- 290- //g7 /o 8+U- z~D- //99 ~/D

0. IDENTIFICATION RGAeioR ODOLAV(

~ ADDITIONALMATERIAL

~ ~

(Excluding Welding Material)

Heat/Lot No.

or CFC or Manufacturer Specification TYpe dc Description RIR/Report DU 805F- ~/5 Pg+IEl'}c.K 6(~6(- A-VARI

<I5 1~I sam ~/8" 98/6 22aa

PSL-2, NIS-2 TRACKING NO. S L-2-05-~05 2 F FORM NIS-2 OWNERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provlsloas of the ASME Code Section XI

l. Owner. Florida Power & Light Co. Date: 0143-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of P'< g1<

jal

2. Plant. St. Lucie Plant Unit ¹: 2 6501 South Hwy. AlA Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: 374-290M 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3607/62 XA ¹'00626200008 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Reactor Coolant
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of Name of National Replaced ASME Manufacturer Other Year Repaired Code Component Manufacturer Serial No. Identification Built r or Stamped Replacement (Y or N) 1 1/4" DIA. - 8 NOVA MACHINE N/A N/A HEAT ¹ N/A Replacement HVY HEX NUT 8094962 NEW PLUG Garrett Corp N96008-31-0 N/A N/A N/A Replacement

.~

001 Old Plug Garrett Corp N/A N/A N/A N/A Replaced N/A

7. Description of Work: Power Operated Relief Valve (PORV) V1474 was removed, disassembled and inspected. During this inspection and subsequent re-assembly, four (4) flange

~~

nuts were replaced, because of incorrect material. Also the above listed

g. Tests Conducted: 'ydrostatic

~X

~

internal parts were replaced.

P Pneumatic re~

~ psig Nominal Operating Pressure Test Temp. 'P

I g 7

~t ~

PSL-2, NIS-2 TRACKING NO. S L-2-05-~05 2 FORM NIS-2 (Back) Sheet 2 of g'2 I'+(I~I

~l~

9. Remarks: An acceptable system leakage test was conducted.

APPLCABLE MANUFACTURE'S DATA AEPOATS TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this /Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Au rizatio No.: N/A Signed wner or 0 ner's 0 Ignee, Tile Date ~tt te~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Sign ture National Board, State, Providence and Endorsements Date

PSL-2, NIS-2 TRACKING NO. S L-2-05-~05 3 FORM NIS-2 OXVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASiME Code Section XI

1. Owner. Florida Power & Light Co. Date: 02-11-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: 374-290M 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3609/62 XA ¹: 900626201520 CWO ¹: N/A Process Sheet: N/A Repair Orttanization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Reactor Coolant
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of Name of National Replaced ASME Manufacturer Other Year Component Manufacturer Board Repaired Code Serial No. Identification Built or Stamped Replacement (Y or N) 1 1/4" DIA. - 8 NOVA MACHINE N/A N/A HEAT ¹ N/A Replacement HVY HEX NUT CORP. 8094962

7. Description of Work: Power Operated Relief Valve (PORV) V1475 was removed, disassembled and inspected. During this inspection and subsequent re-assembly, four (4) flange

~~

nuts were replaced, because of incorrect material.

8. Tests Conducted: Hydrostatic Other~X

~ Pneumatic Pressure~

~ psig Nominal Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~05 3 FORM NIS-2 (Back) Sheet 2 of P'Q

9. Remarks: An acceptable system leakage test was conducted.

APPLICABLE MANUFACTURE'S CATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Au rizati n No.: N/A Signed Own o Owner's D Ignee, Title Date ~Ma ta~i CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or

, implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's S gnature National Board, State, Providence and Endorsements Date

PSL 2, NIS 2 TRACKING NO. S L-2-05-~05 8 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

l. Owner. Florida Power k Light Co. Date: 0143-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. AlA Jensen Beach, FL 34957 P.O. ¹: N/A

'. Work Performed By: Florida Power 4 Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 1089/62 XA ¹: 900907064911 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Main Steam
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs Code Cases and Replacement Components 1980 Edition, thru the

6. Identification of Components Repaired or Replaced and Replacement Components:

National Replaced ASME Name of Name of Manufacturer Other Year Code Boardd B Repaired Component Manufacturer Serial No. Identification Built N or Stamped Replacement (Y or N)

NEW CONIROL S/N 2 N/A Dwg ¹ 1984 Replacement STEM/PLUG COMPONENTS 320601 61 2

7. Description of Work: Motor Operated Atmospheric Dump Valve MV-08-18B was removed and

~~

disassembled for an overhaul. During the inspection and subsequent overhaul the stem/plug was replaced, due to a damaged assembly. s

8. Tests Conducted: Hydrostatic Other~X

~ Pneumatic Pressure~

~ psig Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~05 4 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLCABLE MANUFACTURES CATA REPORTS TO BE ATTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Q Repair QX Replacement Type Code Symbol Stamp: N/A Certificate of Authorization No.:

Signed 0 er r Owner's N/A eslgne, Title Date ~~ 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or toss of any kind arising from or connected with this inspection.

s Commissions Inspector's Signature National Board, State, Providence and Endorsements Date

PSL 2, NIS 2 TRACKING NO. S L-2-05-~056 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

l. Owner: Florida Power A Light Co. Date: 2-11-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: 'St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: k Florida Power Light Co. PCM ¹: N/A 6501 South Hwy. AIA Jensen Beach, FL 34957 PWO ¹: 1049 XA ¹: 900809031501 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Auxiallary Feedwater
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

ASME Name of Name of Manufacturer National Other Year Replaced B d Repaired Code Component Manufacturer Serial No. Identification Built N or Stamped Replacement (Y or N)

All Thread Rod Hub Inc N/A QSC Heat¹: N/A Replacement N 1 1/2" SA193 -332 8098719 Stud Ingersoll Rand N/A N/A Part¹: N/A Replaced 61A3

7. Description of Work: 2C AUX. FEED WATER PP

~~

Damaged threads on one bolt removed from pump as a result of pump disassembly for maintenance was identified and required replacement.

6. Tests Conducted: Hydrostatic Other~x

~ Pneumatic Pressure psig Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~05 6 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: A satisfactory Inservice Leak Test was performed APPLCABLE MANuFACTURE'8 DATA AEPOATB To BE AlTACHEO Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of A orizatio No.: N/A Signed Cate a -rI Is~I

/ Owner or wne Desi ee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle SOS starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer m'akes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsements Date 19 P/

PSL-2, NIS-2 TRACKING NO. S L ~ 2 ~ 0 5.~59 FORM NISs2 OVFNERsS REPORT FOR REPhIRS OR REPLACEMENTS hs Required by the Provisions of the hSME Code Section XI

1. Owner. Florida Power 8i, Light Co. r>atm slfT dffyf Ry'ts, f9' P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 4
2. Plant St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: 4/8
3. Work Performed By: Florida Power 4, Light Co. PCM ¹'J/P 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: A//g cwo s: 860/ Pmosss dhesu Br'sDI-lfIBI Pil Repair Orgauzauon P.O. Nots Sob No., ect.

Type Code Symbol Stamp N/A Authorization No, N/A Expiration Date N/A

4. IdentiTicsiton of dysmm: gfghr I crytrtrrtf
5. (a) Applicable Construction Code ASME Section IH, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thu the Code Cases I

6. Identification of Components Repaired or Replaced and Replacement Components:

National Replaced Name of of Manufacturer Other Year Repaired Component Manufacturer Serial No. Identification Built Stamped or Replacement (Y or N)

COMBED I Jo>J 5-]7 9'-A A8 /917 MRn/M'A'ame RePW

//88 I 6lhinlEEArn'6 8

rhr, rudra'ominal

y. Desorfptlon of work: Ardrdotyret df Lrny&yfR fr'dotcA rrortl rtrtf yffd rttfr nloQM d/ ~i Sdofaowd QDDL/a(~ HGn 8'xerRedaL PI/Rd/tJEL 8.

Ham Tests Conduoted:

A/P Other ..

Hydrostado ~ Pneumatto Pressure sl Test Tem Operating Pressure

. 'F

PSL 2, NIS 2 TRACKING NO. S I. ~ 2-0 S.~dt 9 FORM NIS-2 (Back) Sheet 2 of

9. Remarks: jtrrjg APPLIcABLE MANIXAcluAFSOATA BEPOATB To BE ATTACHEO Certificate of Compliance We certify that the statements made in the report are ccrrect and this conforms to the rules of the ASME Code,Section XI.

g Repair + Reptacsment Type Code Symbol Stamp: N/A Certificate of Authorization No.:

Signed Date 19 9/

Owner or Owner'a Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florkla and employed by Arkwright insurance of Norwood Mass.

have inspected the components described in this Owner's Report during the period 4/89 To 1 t/go, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Ignaturo National Board, State, Provtdonce and Endorsernanta Date

PSL 2, NIS 2 TRACKING NO. S L-2-0 5-~06 0 FORM NIS-2 OXVNERsS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Scctlon XI

1. Owner. Florida Power & Light Co. Date: 2-12-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power &, Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 5708 XA ¹: 901112202441 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp Authorization No.

Expiration Date

'/AN/A N/A

4. IdentiTication of System: Component Cooling
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

National Replaced AS ME Name of Name of Manufacturer Other Year Code Board Repaired Component Manufacturer Serial No.

Nor Identification Built or Stamped Replacement (Y or N)

FW-1 Yuba Heat N/A N/A Tubesheet- N/A Repair NCR 2-428 Shell FW- 1A Yuba Heat N/A N/A Tubesheet- N/A Repair NCR 2-428 Shell FW-2 Yuba Heat N/A N/A Tubesheet- N/A Repair NCR 2-428 Shell FW-3 Yuba Heat N/A N/A Tubesheet- N/A Repair NCR 2-428 Shell FW -4 Yuba Heat N/A N/A Tubesheet- N/A Repair NCR 2-428 Shell

7. Description of Work: 2B CCWHEX (West End)

~~

Repair indications found by excavation and rewelding in accordance with Nonconformance Report 2-435 & 2-428.

6. Tests Conducted: Hydrostatic ~x. Pneumatic Nominal Operating Pressure Other~ Pressure psig Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-06-~060 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: Pressure test was performed by the Construction Services organization and documented on IR¹ M90-4402 (CWO 8740-1148 ).

APPLCABLE MANUFAOTURE'S DATA REPORTB TO BE ATTACHEQ Certificate of Compliance We certify that the statements made in the report are "correct and this QX Repair+ Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Aut ation No.: N/A Signed Date a~a<a, t 9~I ner or Owner's esl nee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner,.for any personal

. injury or property'damage or loss of any kind arising from or connected with this inspection.

Commissions nspector's Slgnatu e National Board, State, Providence and Endorsements Date 19

PSL 2, NIS 2 TRACKING NO. S L-2-05-~061 r

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

l. Owner: Florida Power & Light Co. Date: 0143-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2 2., Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. AlA Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. AlA Jensen Beach, FL 34957 PWO ¹: 0278 / 62 XA ¹: 901114150458 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A "Authorization No. N/A Expiration Date N/A

4. Identification of System: Intake Cooling Water
5. (a) Applicable Construction Code ASME Section III, 1977 Edition,-Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of National Replaced AS ME Name of Manufacturer Other Year Board Repaired Cede Component Manufacturer Serial No. Identification Built or Stamped Replacement (Y or N) 1" DIA. - 8 NOVA MACHINE N/A N/A HEAT ¹ Replacement N3 HVY HEX NUT 17155

7. Description of Work: The discharge head to sole plate holdown nuts were replaced, due to incorrect material.
6. Tests Conducted: Hydrostattc Other~

~ Pneumattc Pressure~

~ pstg ~~

Nomtnat Operattng Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~06 1 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: N/A APPLICABLE MANUFACTUAE'BDATA REPOATB TO BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

/ Repair+X Replacement Type Code Symbol Stamp:

Signed Owner or Owner'B N/A Certificate of Authorization No.: N/A eslgnee, Title Date ~ $ 9 f/

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

e By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions I Inspector's Signature National Board, State, Providence and Endorsements Date

0 PSL.2, NIS-2 TRACKING NO. S I. ~ 2 ~ 0 0-~ry FORM NISe2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS Aa Required by the Prov!stone of the ASME Code Section XI

l. Owner: Florida Power &, Light Co.'.O.

Date: I- I(c -9l Box 529100 Miami, FL 33152 Sheet: 1 of g

2. Plant: St. Lucic Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O.>>: g/p
3. Work Performed By: Florida Power & Light Co. PCM¹: ggg,. +~A 6501 South Hwy. AlA Jensen Beach, FL 34957 PWO¹: Q/P XA¹: h//p CWO ¹: 8@OI Process Sheet:899-AO-/W/N 46 Repair Organizaaon P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No, N/A Expiration Date N/A

4. Identification of System:

QgyuIPqrJE~ CDCylyd6 IAJNEZ

5. (a) AppHcablc Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda ~ Code Cases (b) Applicable Edition Winter 1980 addenda.

of

~

Section XI Utilized Code Cases for Repairs and Replacement Components 1980 Edition, thru the

6. Identification of Components Repaired or Replaced and Rephcement Components:

National Replaced ASME Name of Name of Manufacturer Other Year Code Board Repaired Component Manufacturer Serial No. identification Built or Stamped Replacement (Y or N) 5l) D I AIO ~

P-Z075-12 kPCIIRBD

7. Description of Nolly: lAE ld5iR~i(Owl Ok 58IN5 YV6Ã8'd@UfkGD Od 5dePD~i iD 8850RE fHRr ac.e'RRPvQd'lr7ed5vnJ fd/ERRQ&s Qddm BE lE- PLR1E elaS Bc.bo R~Pt.RQeo R85IRR/PJf

~

I DPJ 1

8. Tests Conduoted: Hydrostatlo Pneumatto Nominal Operating Pressure Other Pressure si Test Temp. 'F

PSL.2 NIS.2 TRACKING NO. S L. 2 05 ~O FORM NIS-2 (Back) Sheet 2 of A

9. Remarks: g jp APPLCASLR MiNJFlclURE'S OATA AElaoRTS Cl $ 6 ATTACHED Certificate of Compliance We certify that the atatsmenta made In the report are ccrrsct and thfa HRspafr Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization, No.: N/A Signed Date /-/I:- I2 9 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during the period 4/a9 To 11/90,

'nd state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector S nat re Nathnal Board, State, Providence and Endorsamenta Date ts~F

0 PSL-2, NIS-2 TRACKING NO. S L-2-05-~066 F FORM NIS-2 OWNEReS REPORT FOR REPAIRS OR REPLACEMENTS, As Requtred by the Provisions of the ASME Code Section XI

1. Owner. Florida Power 8c Light Co. Date: 2-13-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A n
3. Work Performed By: Florida Power &, Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3956 XA ¹: 901119225512 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Componant Cooling
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases (b) Applicable Edition Winter 1980 addenda.

of

~

Section XI Utilized Code Cases for Repairs and Replacement Components 1980 Edition, thru the

6. IdentiTication of Components Repaired or Replaced and Replacement Components:

National Replaced ASME Name of Name of Manufacturer Other Year Board Repaired Code Component Manufacturer Serial No.

No Identification Built or Stamped Replacement (Y or N)

FW1 Yuba Heat N/A N/A Tubesheet- N/A Repaired NCR 2-434 Shell Weld FW2 Yuba Heat N/A N/A Tubesheet- N/A Repaired NCR 2-434 Shell Weld x

7. Description of Work: 2BCCWHEATEXCHANGEREASTEND

~~

Repair indications found by excavation and rewelding in accordance with Nonconformance Report 2-434 & 2-435.

S. Tests Conducted: Hydrostatic Other~

~x ~

pneumatic Pressure~

~ psig Nominal Operating pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~063 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: Pressure test was performed by the Construction Services organization and documented on IR¹ M90-4427 (CWO 8740-1148 ).

APPLtCABLE MANUFACTURE'S DATA REPORTS TO BE ATfACHEO Certificate of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

QX Repair + Replacement Type Code Symbol Stamp: N/A Certificate of Aut ization No.: N/A Signed Ow r or Owner's sl nee, Tit Date 4 ~,

19~9'ERTIFICATE OF INSERVlCE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions inspector'B Signature National Board, State, Providence and Endorsements Date 19

PSL 2, NiS2 TRACKtNG NO. S L-2-05-~064 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner. Florida Power 8t Light Co. Date: 2-15-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: 273-290D 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 0290 XA ¹: 901 tf073243 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Intake Cooling Water
5. (a) Applicable Construction Code ASME Section Dl, 1977 Edition, Summer 1977 Addenda. ~ Code Cases (b) Applicable Edition of Winter 1980 addenda. ~

Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of Name of National Replaced ASME Manufacturer Other Year Component Manufacturer Board Repaired Code Serial No. Identification Built 0 Stamped I'eplacement (Y or N) 3" Strainer Zurn 5376-2 N/A Heat¹ 1974 Replacement 85589 5/8" Nuts Nova Lot ¹ N/A Heat¹ 1983/ Replacement Y Heav Hex 33224006 31695 84 All Thread Rod Nova Lot¹ N/A Heat¹ 1 983/ Replacement 5/8" 33090006 60895 84

7. Description of Work: REPLACE 3" DIA. ZURN STRAINER SS-214B1 AND ASSOCIATED FASTENERS AS DESCRIBED ABOVE STRAINER WAS REPLACED DUE TO LEAKAGEFROM HOLE

~~

IN STRAINER BODY.

8. Tests Oonductsd: Hydrostatic ~ Pneumatic re~

~ psig Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~064 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: A satisfactory Inservice Leak Test and a VT 3 of boltin was performed.

APPLICABLE MANUFACTURE'S DATA REPORTS To BE ATTACHED Certificate of Compliance We cenity that the atatsmsnta made In the report are correct and this conforms to the rules of the ASME Code,Section XI.

Q Repair QX Replacement Type Code Symbol Stamp: N/A Certificate of Au 'zatlon No.: N/A Signed ITBr or Owner's esi nee, Tl e Date 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described In this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions In pector's Slgnatu e National Board, State, Providence and Endorsements Date Cf~ 19 dt I

PSL-2, NIS-2 TRACKING NO. S L-2-05-~06 6 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provlslons of the ASME Code Section XI

1. Owner. Florida Power & Light Co. Date: 0143-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3416/62 XA ¹: 901126052503 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Safety Injection
5. (a) Applicable Construction Code ASME Section HI, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

National Replaced ASMF Name of Name of Manufacturer Other Year B d Repaired Component Manufacturer Serial No. N Identification Built or Stamped Replacement (Y or N)

OLD RELIEF N591 94-00-0 N/A N/A 1974 Replacement VALVE 003 NEW REUEF N591 94-00-0 N/A N/A 1988 REPLACED VALVE 006

7. Description of Work: Relief valve V3221 was removed and bench tested, due to valve leaking by.

~~

The valve was tested, which confirmed severe seat leakage. This valve was replaced with a new valve.

6. Tests Conducted: Hydrostatic h ~X

~ pneumatic e psig Nominal Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-06-~06 6 FORM N IS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted>bq opE'Moi~s p-~<4) y,q.~)

APPLCABLE MANUFACTURE'S DATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed wner or Ow r's Designee, Title Date ~w, 19~

CERTIFICATE OF INSERVICE INSPECTION-I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle II05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or .

implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions inspector's Signature National Board, State, Providence and Endorsements Date 5 19~

PSL-2, NIS-2 TRACKING NO. S L-2-05-~067 FORM NIS-Z OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provlstons of the ASME Code Section XI

l. Owner.- Florida Power 8. Light Co. Date: 01-03-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power 8t, Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 0314/62 XA ¹: 901126221237 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Main Steam
5. (a) ApplicableConstructionCodeASMESectionIII,1977Edition,Summer1977Addenda. ~ CodeCases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of National Replaced ASME Name of Manufacturer Other Year B rd Repaired Code Component Manufacturer Serial No. Identification Built 0 Stamped i'eplacement (Y or N) 1/2 " DIA. PIN TIOGA PIPE N/A N/A Neat¹ 1988 Replacement PIPE PLUG SUPPLY DF61

7. Description of Work: Check valve V08163 was identified as having a steam leak under the insulation

~~

lagging. The valve was inspected externally and was found with a steam leak at the pipe plug for the check valve pin. The pipe plug was replaced with a

8. Tests Conducted:

0 new plug.

Hydrostatic h ~X

~ P Pneumatic secre~

~ pstg Nominal Operating Pressure Test Temp. 'p

PSL-2, NIS-2 TRACKING NO. S L-2-05-~067 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLCABLE MANUPACTUAE'BDATAREPDATB TO BE ATTACHED

. Certificate of Compliance We certify that the statements made in the report are correct and this Repair X Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Date ~A' te~<

wner o wner's Oeslgnee, itle CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI ~

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions inspector's g nature National Board, State, Providence and Endorsements Date Z., 1 9~~

PSL-2, NIS-2 TRACKING NO. S L-2-05-~066 FORM NIS-2 OWNEReS REPORT FOR REPAIRS OR REPLACEMENTS As Requtred by the Provisions of the ASME Code Section XI

1. Owner. Florida Power &, Light Co. Date: 01-02-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: 3638/62 XA ¹: 900529140112 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Main Steam
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of National Replaced ASME Name of Manufacturer Other Year B d Repaired Code Component Manufacturer Serial No. Identification Built or Stamped Replacement (Y or N)

Stud NOVA MACHINE N/A N/A HEAT ¹ N/A Replacement 3/4" x 6" 8094962

7. Description of Work: Check valve V08163 was disassembly per a check valve inspection (SOER

~~

86-3, FYP¹0315), which identified that a body to bonnet stud was heavily corroded. This stud was replaced as identified above.

6. Tests Conducted: Hydrostatic th ~X

~ P Pneumatic s ore~

~ psig Nominal Operating Pressure Test Temp. 'F

IeSL-2, NIS-2 TRACKING NO. S L-2-05-~066 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks: An acceptable system leakage test was conducted.

APPLCABLE MANUFACTURE'S DATA REPORTS To BE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repairs Replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of A rizatio No.: N/

Signed Owner or wner's D gnee, Tit Date ~~7, 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore,= neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Ign ture National Board, State, Providence and Endorsements Date

PSL 2, NIS 2 TRACKING NO. S L-2-05-~06 9 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

l. Owner: Florida Power 4 Light Co. Date: 2-11-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 2
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: N/A
3. Work Performed By: Florida Power A Light Co. PCM ¹; N/A 6501 South Hwy. AlA Jensen Beach, FL 34957 PWO ¹: 3418 XA ¹t 901127123948 CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Safety Injection
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XIUtilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

Name of of Manufacturer National Year Replaced ASME Component'ame Manufacturer Serial No.

Board Identification Built Repaired Code 0 Stamped I'eplacement (Y or N)

Valve Disc Crosby Valve K55460-37-0 N/A P/N¹ 1 973 Replaced 010 K55460 Valve Disc Crosby Valve K55460-46-0 N/A P/N¹ 1985 Replacement 0042 K55460

7. Description of Work: Disc replaced on relief valve V3221 due to seat leakage.
6. Tests Conducted: Hydrostatic Other ~x

~ Pneumatic Pressure~

~ psig ~~

Nominal Operating Pressure Test Temp. 'P

PSL-2, NIS-2 TRACKING NO. S L-2-05-~069 FORM NIS-2 (Back) Sheet 2 of 2

9. Remarks:

APPLCABLE MANUFACTURE'S DATA REPORTS TO BE ATTACHED Certificate. of Compliance We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Q Repair +X Replacement Type Code Symbol Stamp: N/A Certificate of Au izati No.: N/

Signed Own r or Owner's Desi nee, Titf Date A-/< 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel

'Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Providence and Endorsements Date

PSL 2, NIS 2 TRACKING NO. S L-2-0 5-~07 1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner: Florida Power & Light Co. Date: 2-21-91 P.O. Box 529100 Miami, FL 33152 Sheet: 1 of 3
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: B90681-90003
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: N/A XA ¹: N/A CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., ect.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Safety Injection, Main Steam, Feedwater, Charging & Reactor Coolant
5. (a) Applicable Construction Code ASME Section III, 1977 Edition, Summer 1977 Addenda. ~ Code Cases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs and Replacement Components 1980 Edition, thru the Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components:

National Replaced ASME Name of Name of Manufacturer Other Year Code Board Repaired Component Manufacturer Serial No. No Identification Built 0 Stamped I'eplacement (Y or N)

S I-4201-736B Pacific 38537 N/A PSA 1/4 N/A Replacement Scientific S I-4201-730B Pacific 38534 N/A PSA 1/4 N/A Replacement Scientific S I-4204-1270B Pacific 26002 N/A PSA 1 N/A Replacement Scientific S I-4204-1270B Pacific 26062 N/A PSA 1 N/A Replacement Scientific S I-4200-322B Lisega 61 21 1/84 N/A 675 N/A Replacement

7. Description of Work: Replace miscellaneous mechanical or hydraulic snubbers due to functional test

~~

failures or change out. Work performed by Qualtec Testing Services in accordance with P.O. B90681-90003

8. Tests Conducted: Hydrostatic Other ~x

~ Pneumatic Pressure~

~ pslg Nominal Operating Pressure Test Temp. 'F

PSL-2, NIS-2 TRACKING NO. S L-2-05-~071 FORM NIS-2 (Back) Sheet 2 of 3

9. Remarks: All snubbers were functionally tested prior to installation and a final. as left visual examination was performed.

APPLCABLE MANUFACTURE'SDATA REPDRTs To SE ATTACHED Certificate of Compliance We certify that the statements made in the report are correct and this Repair x Replacement conforms to the rules of the ASME Code,Section XI.

b Type Code Symbol Stamp: N/A Certificate of Authorization No.: N/A Signed Owner or Owner's esl nee, Title Date ~r~-, 19~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Providence of Florida and employed by Arkwright Insurance of Norwood Mass.

have inspected the components described in this Owner's Report during operating cycle ¹05 starting on 4/89, and state that to the best of my knowledge and belief, the Owner has performed examinations and and taken corrective measures described ln this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descibed in the Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions inspector's Signature National Board, State, Providence and Endorsements Date

0

PSL-2, NIS-2 TRACKING NO. S L-2-0 5-~071 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

l. Owner: Florida Power 4 Light Co. Date: 2-21-91 P.O. Box 529100 Miami, FL 33152 Sheet: 3 of 3
2. Plant: St. Lucie Plant Unit ¹: 2 6501 South Hwy. A1A Jensen Beach, FL 34957 P.O. ¹: B90681-90003
3. Work Performed By: Florida Power & Light Co. PCM ¹: N/A 6501 South Hwy. A1A Jensen Beach, FL 34957 PWO ¹: N/A XA ¹: N/A CWO ¹: N/A Process Sheet: N/A Repair Organization P.O. No., Job No., cct.

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System: Safety Injection, Main Steam, Feedwater, Charging & Reactor Coolant
5. (a) ApplicableConstructionCodeASMESectionlII,1977Edition,Summerl977Addenda. ~ CodeCases Winter 1980 addenda. ~

(b) Applicable Edition of Section XI Utilized for Repairs Code Cases and Replacement Components 1980 Edition, thru the

6. IdentiTication of Components Repaired or Replaced and Replacement Components:

National Replaced AS ME Name of Name of Manufacturer Other Year Code Board B d Repaired Component Manufacturer Serial No. Identification Built or Stamped Replacement (Y or N)

MS I-10-R7B Pacific 38516 N/A PSA 1/4 N/A Replacement N Scientific MS-7-R2B ~

Pacific 38531 N/A PSA 10 N/A Replacement N Scientific CH-2081-1 085B Pacific 20434 N/A PSA 1/2 N/A Replacement Scientific RC-4300-139 Pacific 17850 N/A PSA 3 N/A Replacement N Scientific B-15-R10 Pacific 37657 N/A PSA 1/4 N/A Replacement N Scientific BF-4007-7012A Pacific 17850 N/A PSA 10 N/A Replacement N Scientific BF-4007-7012A Pacific 17851 N/A PSA 10 N/A Replacement N Scientific

J