Text

FLORIDA POWER

& LIGHT COMPANY 700 UNIVERSE BLVD'UNO BEACH, FLORIDA 33408 ST.

LUCIE NUCLEAR PLANT P.O.

BOX 128 FT.

PIERCE, FLORIDA 33454 UNIT 2

'1987 ISI

SUMMARY

REPORT COMMERCIAL SERVICE DATE:

DOCKET No. 50-389 DOCUMENT No. MCI-PSL-200-003 P

PARE ISI SPECIALIST REVIEWED BY:

ISI ENGINEER ATE

- IZ-8 APPROVED BY:

J SU ERVI R

I CODES

& PROGRAMS ATE

/L 8802250306 880210 PDR ADQCK 05000389 8

PDRJ JUNO NUCLEAR ENERGY SERVICES CODES AND PROGRAMS GROUP

Page 1 of 10 FORM NIS-1 OWNER S

REPORT FOR INSERVICE INSPECTIONS As required by the Provisiions of the ASME Code Rules

l. Owner:
2. Plant:

l

(

(

3.Plant Unit.'2.

4.Owner Certificate of Authorization~A 5.Commerical Service Date:

7.

Components Inspected:

6'nit National Board No.~

Component or

'Manufacturer Appurtenance,'r Installer Manufacturer or Installer Serial No.

State or

,'National Province 'Board Number

,'umber I

i'EACTOR VESSEL

,'OMBUSTION

(

ENGINEERING CE 71172 N/A N/A PRESSURIZER COMBUSTION ENG

(

CE 71372'/A'N/A-REACTOR COOLANT

(

BYRON (i

PUMPS 2A1

& 2A1 (i

JACKSON REACTOR COOLANT PIPING EBASCO SAFETY INJECTION(

EBASCO/ FP&L PIPING CLASS 1

CHEMICAL & VOL ~

(

FP&L CONTROL PIPING SAFETY INJECTION(

FP&L PIPING CLASS 2

741-N-001 741-N-002 LINE NOS ON PG.

7 OF 10 LINE NOS ON PG, 7

OF 10 LINE NOS ON

'PG

~

7 OF 10 LINE NOS.

ON PG 7

OF 10 N/A N/A N/A N/A N/A N/A N/A N/A I

N/A N/A N/A N/A MAIN STEAM PIPING FP&L LINE NOS ON PG.

7 OF 10 N/A N/A FEEDWATER PIPING FP&L I

LINE NOS ON

(

N/A PG

~

7 OF 10 N/A CONTAINMENT

((FP&L SPRAY PIPING LINE NOS ON PG.

7 OF 10 N/A

'/A I

I Note:

Supplemental sheets in the form of lists, sketches, or drawings may be used provided (1) 'size is 8 1/2 in.

x 11 in.,(2) information in items 1

through 6 on this data report is included on each sheet,and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Page 2 of 10 NIS-1 REPORT (Continued)

E D

  • 9.Inspection Interval: from ~~ to QgLJ}~

Second Period of the First 10 Year Interval:~~~i. TO The Inservice Examination of selected Class I and II components and piping systems of Florida Power and Light Company s

St.Lucie Plant, Unit 2,

was performed during the refueling outage which began on 03 October 1987.

This constituted the First Outage of the Second 40 Month Period

.The third sched-uled outage for the first 10 year Inspection Interval.

Program B

The components and piping systems examined were selected in accordance with the LONG TERM PLAN, which was prepared per the requirements of Section XI of the ASME Code,1980 Edition and addenda through Hinter of 1980, Manual Ultrasonic, Liquid Penetrant, Magnetic Particle, Radiography and Visual Nondestructive techniques were used in the examination of the selected components, piping systems,and their supports.See attached Summary Tables for complete examination results.

Eddy Current examinations were conducted by Combustion Engineering from October 9,1987 thru October 24,1987 on 2A and 2B Steam Generators.

8211 tubes were examined in Steam Generator 2A, and 8266 tubes were examined in Steam Generator 2B.See the attached NIS-BB report for the summary of examination results.

The augmented Feedwater Nozzle follow up examination program continued this outage.

100% of the area from the nozzle ramp out to a point of one (1) pipe diameter on the elbow side was subjected to an ultrasonic examination.

Snubber functional testing and visual examinations were conducted in'ccordance with PSL-2 Plant Technical Specification 3/4.7.9.

Examination Services supplied by Paul-Munroe Enertech.

System pressure tests were conducted by the plant to applicable Plant Tech.

Specifications and Procedures.

The Instrumented Inspection Technique was used in the testing of some of the systems with the assistance of.H.A.F.A. Inter-national Inc.

Systems tested are listed on Page 6 of 10 of this report.

NIS-1 REPORT (Continued)

J Page 3 of 10

(

R 0 P

fc'LESG~

REACTOR VESSEL A visual (VT-3) examination (8-N-1) was conducted on accessible areas of the vessel interior by Plant Q.C..

No rejectable indications were noted.

PRESSURIZER/SURGE LINE Surface (PT),

and volumetric (UT) examinations were conducted on 'the surge nozzle to head weld and selected surge line welds.

No recordable indica-tions reported.

REACTOR COOLANT PUMPS Surface (PT) and visual (VT-3,4) examinations were conducted as applicable on 2 reactor coolant

pump, supports and pump support integral attachments'o cordable indications were noted.

To meet the commitment made in Relief eguest No,8 for the St. Lucie Plant, Unit 1, an ultrasonic examination was attempted on 2A1 reactor coolant pump casing welds.

A letter (JNS-MCI-88-036) stating the status of this effort has been included with this report.

MAIN REACTOR COOLANT PIPING Surface (MT), and volumetric (UT) examinations were conducted on one four (4) circumferential welds and six (6) longitudinal welds.

No recordable indica-tions were noted'EACTOR COOLANT Visual, surface,and volumetric examinations were conducted on selected piping

welds, valves, and supports.No recordable indications noted.

SAFETY INJECTION/CHARGING PIPING Visual, surface,and volumetric examinations were.conducted on selected piping welds,valves,and supports.

Visual examination revealed a loose jam nut on the pipe clamp of support SI-4200-6340A, and incomplete thread engagement'on valve V-2515,(one stud/nut).

The conditions were reported (NCR-87-004, NCR-

-005) to the Plant and were addressed per Plant procedures.

Page 4 of 10 NIS-1 REPORT (Continued)

CLASS I (Cont.)

CHEMICAL AND VOLUME CONTROL

Visual, and surface examinations were conducted on selected piping welds,
valves, and supports.No recordable indications were noted.

CLASS II MAIN STEAM Visual(VT-3), surface (MT), and volumetric (UT,RT) examinations were conducted

's applicable on selected piping welds, supports and integral attachments.

A 1,4 inch linear indication was identified (NCR-87-003) during the.

surface

'x of weld 79-1-SH-2.

The indication was evaluated as a fabrication

'a and was removed by light surface conditioning.

A followup MT examination revealed no. recordable indication.

n indication resembling a stress crack was identified (NCR-8349M) during the volumetric examination (RT) of weld MS-79-1-SH-3.

Upon proper evaluation, the suspect indication was determined to be due to the surface condition(O.D.) of the weld which was in the"as welded" condition. The weld crown was conditioned by light grinding and the weld was re-examined:

no recordable indications.

MAIN FEEDHATER Surface (MT) and volumetric (UT) examinations were conducted as applicable on three (3) piping welds and on one (1) pipe support integral attachment weld.

Geometric indications were recorded during the volumetric examination of weld 20"-BF-14-SH-P3 and determined to be due to root geometry.

Augmented feedwater nozzle examinations revealed no rejectable indications.

Several geometric indications were recorded and determined to be due to root geometry and nozzle transition.

SAFETY INJECTION/ CONTAINMENT SPRAY Visual, volumetric,and surface examinations were conducted on selected piping welds valves and supports.No recordable indications were. noted.

Page 5 of 10 NIS-1 REPORT (Continued)

SNUBBER EXAMINATION AND TESTING Visual examination was conducted on 100% of the Plants snubber population per the Plant Technical Specifications.

Of the original 10%

sample selected for functional testing one (1) snubber failed.

An additional 10% sample was then tested with one (1) failure reported. As required, 100%

of the same type of snubbers were functional tested.

Complete examination and test results are on file at the Plant.

A summary of the functional test results is included with this report.

SYSTEM LEAKAGE / PRESSURE TESTING The system leakage tests and visual (VT-2) examinations of class I systems were performed by the Plant prior to plant startup.

The system leakage test was conducted during Reactor Coolant (RCS) overpressure.

Documentation packages for all the system leakage tests and pressure tests are on file at he Plant Site

~

All the above conditions were dispositioned in accordance with Plant Procedures.

The Examination Summary Tables included with this Report provide informa-tion and results for the non-destructive examinations which were performed.

An explanation of the Summary Table format is also, included.

NIS-1 REPORT (Continued)

Page 6 of 10 2-IPT-07 2-IPT-08 2-IPT-10 2-IPT-11 2-IPT-12 2-IPT-13 2-IPT-14 2-IPT-15 2-IPT-17 2-IPT-18 2-IPT-19 2-IPT-20 2-IPT-21 2-IPT-22 2-IPT-23 2-IPT-24 2-IPT-26 2-IPT-31 2-IPT-32 2-IPT-35 2-IPT-36 2-IPT-37 2-IPT-38 RCS SYSTEM LEAKAGE 2A 8r, 2B BORIC ACID MAKEUP PUMPS DISCH.

2A COMP. COOLING HATER 2B COMP. COOLING HATER A LPSI PUMP SUCTION B lPSI PUMP SUCTION 2A CTMT.

SPRAY HDR 2B CTMT.

SPRAY HDR A AUX.

FDHTR PUMP DISCH.

B AUX.

FDHTR PUMP DISCH.

C AUX.

FDHTR PUMP DISCH.

LPSI 2A AND 2B DISCH.

A HPSI PUMP SUCTION B HPSI PUMP SUCTION HPSI PUMP DISCH.

HDR 2A HPSI PUMP TO DISCH HDR 2A 5 2B HYDRAZINE PUMP SUCTION 2A INTAKE COOLING HATER 2Bk2C INTAKE COOLING HTR 2A FUEL POOL COOLING PUMP SUCTION 8r. DISCH.

2A AFH SUCTION 8r. RECIRC.

2B AFH SUCTION & RECIRC.

2C AFH SUCTION 84 RECIRC.

SYS.

LEAKAGE IIT SYS.

INSERVICE SYS.

INSERVICE SYS.

FUNCTIONAL SYS.

FUNCTIONAL IIT IIT IIT IIT IIT IIT IIT IIT IIT IIT IIT SAT.

SAT.

SAT.

SAT.

SAT.

SAT.

SAT.

SAT.

S'AT.

SAT.

SAT.

SAT.

SAT.

SAT.

SAT.

SAT.

SAT.

SYS.

INSERVICE SAT.

SYS.

INSERVICE SAT.

IIT SAT.

SYS.

INSERVICE

SAT, SYS.

INSERVICE SAT.

SYS.

INSERVICE SAT.

NIS-1 REPORT (Continued)

Page 7 of 10 Line numbers for piping systems with items selected for nondestructive examination this outage.

I-30-RC-115 I-30-RC-124 I-12-RC-108 I-12-RC-147 I-12-RC-149 I-12-RC-152

', 'I-3-RC-109 I I-2-RC-116 I-2-RC-122 i'-2-RC-142 I-2-RC-150 I-12-SI-149 I-12-SI-150 I-10-SI-130 I-6-SI-515 I-6-SI-517 I-2-CH-145 I-2-CH-146 I-2-CH-148 I-14-SI-512 I-12-SI-460 I-12-SI-458 l-12-SI-414 I-12-SI-412 I-12-SI-410 I-12-SI-406 I-12-SI-164 I-12-SI-103 I-10-SI-556 I-10-SI-472

'I-10-SI-420 I-10-SI-362 I-6-SI-508 I-6-SI-428 I-6-SI-409 I-6-SI-213 I-6-SI-129 I-6-SI-113 I-6-SI-112 I-6-SI-111 I-6-SI-110 I-35.5-MS-1 I-34-MS-29 I-34-MS-28 I-10-MS-79 I-8-MS-79 I-20-BF-19 I-20-BF-14 I-18-BF-52 I-18-BF-51 CONTAINMENT SPRAY I-24-CS-2 I-14-CS-6

Page 8 of 10 NIS-1 REPORT (Continued)

He certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.

Date Signed Certificate of Authorization No.~~~

Expiration Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned.

holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and / or the State or P t~d 1

db of have inspected the components described in this Owner s Data Report during the period C'o and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner s

Data Report in accordance with the require-ments of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective. measures described in this Owner s Data Report.

Further-

more, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a

loss of any kind arising from or connected with this inspection.

Date Commissions I spector's Signature National Board, State, Province 5 No.

1

~

Owner:

2. Plant:

NIS-1 REPORT Page 9 of 10 3.Plant Unit:2.

4.Owner Certificate of Authorization~~

5.Commerical Service Date:

6.Unit National Board No.~

REPORT NUMBER MCI-PSL-87-200-03 MCI-ECT-87-3 2-IPT-07 2-IPT-10 THRU 2-IPT-15 2-IPT-17 THRU 2-IPT-24 2-IPT-26, 2-IPT-31 2-IPT-32, 2-lPT-35 2-IPT-36 THRU 2-IPT-38 ORGANIZATION FPL FPL CE FPL DESCRIPTION OF SERVICES INSERVICE INSPECTION FINAL REPORT EDDY CURRENT EXAMINATION OF STEAM GENERATORS.FINAL REPORT EDDY CURRENT EXAMINATION OF STEAM GENERATORS SNUBBER VISUAL EXAMINATION AND FUNCTIONAL TESTING FINAL REPORT TEST DOCUMENTATION FOR INSERVICE PRESSURE TESTING

Page 10 of 10 FORM NIS-BB OWNERS'DATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As reguired by the provisions of the ASME CODE RULES EDDY CURRENT EXAMINATION RESULTS PLANT: St. Lucie Unit 0 2

EXAMINATION DATES:

9 OCTOBER 1987 thru 24 OCTOBER 1987 STEAM GENERATOR i'UMBER

'i TOTAL TUBES INSPECTED TOTAL INDICATIONS 20%

'20%-39%

'40%-100%

TOTAL TUBES PLUGGED AS PREVENTIVE MAINTENANCE I

iiTOTAL TUBES PLUGGED 8211 337,'9

,'2 6

,'08 I

I I

I I

I 8266

)

186

)

16 8

1 2

I

] 0 I

LOCATION OF INDICATIONS

(

0%

100%

)

STEAM APEX OF U

i EGGCRATES i

PARTIAL EGGCRATESi TOP OF TUBE SHEET GENERATOR i

BENDS DIAG' TO 7

8 TO 9

TO 0

1 EGGCRATE 5, V.S.1-5 'H/L

,'C/L H/L

,'C/L

'HOT LEG 'COLD LEG I

I I

I I

I I

I I

I I

162

,'3

'3 5

I I

I I

I I

I I

I I

I I

I I

CERTIFICATION OF RECORD We certify that the statements in this record are correct inspected were tested in accordance with the reguirements of the ASME Code.

F' I

I I

and the tubes of Section XI I

I I

I

~i DATE BY 10

INTEROFFICE CORRESPONDENCE TO:

FROM:

SUBJECT:

G.

P. Alexander D. C. Nowakowski REACTOR COOLANT PUMP UT LOCATION:

/

DATE February 10, 1988 COPIES TO:

E. L. Anderson JNS-MCI-88-036 In compliance with the commitment made in Relief Request No.

8, (see NRC Safety Evaluation dated May 4, 1987) for the St. Lucie Plant, Unit 1, Florida Power

& Light Company has initiated an effort to determine the feasibility of the use of the ultrasonic technique as the volumetric examination of reactor coolant pump casing welds.

During the St.

Lucie Plant Unit 2 Fall refueling outage, (October 3,

1987 thru November 24, 1987) the upper casing weld of pump 2A1 was subjected to an ultrasonic examination utilizing dual element, 1" diameter, 1.0 Mhz, longitudinal wave transducers focused at different depths as required by the wall thickness variations.

Ultrasonic calibration prior to the examination was performed on calibration block UT-59, a safe end mockup.

Also, at all radiographic stamp marks along the

weld, thickness readings were taken and contours were plotted.

No determination has been made as to the feasibility of the technique employed to have the ability to detect defects in the welds and/or heat affected zone of pump casings.

Additional examinations are scheduled on a spare pump casing of similar design and on one of the St.

Lucie

Plant, Unit 1

reactor coolant

. pumps during the next refueling outage in July of 1988.

The data collected from all of these examinations will be evaluated and compared with the results of the pre-service radiography performed on the St.

Lucie pumps before any conclusions may be drawn.

D. C. Nowakowski

dm an FPL Group company Form 1008 (Stocked) Rev. 8/86

FLORIDA POHER

& LIGHT COMPANY 700 UNIVERSE BLVD.

JUNO BEACH, FLORIDA 33408 ST.

LUCIE NUCLEAR PLANT P.O.

BOX 128 FT.

PIERCE, FLORIDA 33454 UNIT 2 STEAM GENERATOR 2A 5 2B 1987 EDDY CURRENT RESULTS CUMULATIVE REPORT

18/87, ST.

LUCIE STEAM GENERATOR:

A OCATION: ALL RITERIA:

1'A TO 188$

CUMULATIVE REPORT B/G A

4TH REFUELING CYCLEs PAGE:

1 OF 8

DATE:

12/38/87 TINE:

14: 38: 36 I

I I

I IEXTENT I

I I

I ILINIROWIHEATIIILEGIREQITBTIRENIREELIPROBEI I

I I

I I

I I

I I

I LOCATION I

CURRENT IVOLTSINILIDEGI I

I I

I I

/

ICHI I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

221 381999991 221 861888381 231 351999991 261 921999991 I

I I

271 911888111 271 931888311 2711811888111 281 681888381 281 981999991 I

I I

291 811999991 381 961999991 381 981999991 331 1851999991 341 961999991 371 551999991 37 118it999991 481 821999991 411 431999991 421 721999991 4311871888211 441 921999991 471 511999991 471 111188831 I

.I I

I 4811261888381 C

I I,l C 491 271999991 C

491 411888111 581 481999991 5811241888311 I

I I

58 11261888311 511 391888111 51 I 871999991 I

I I

521 781888311 521 841888381 I

I I

I I

I 521 881888111 5311131888211 5311271888381 541188t999991 I

I I

IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/Ll IF/LIF/LI IF/LIF/Li IF/LIF/Lt IF/LIF/LI IF/LIF/LI IF/LIF/Ll IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LtF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/Ll IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI tF/LIF/LI IF/LIF/LI I

I 39FI588SMIVS3+

85FI588BNIVS3+

39FI588SNI86H+

48F1588SNIVS4-48FI588SMI84C+

85FI588SNIDHT+

85FI588SNIVS4+

85F1588SNIDHT+

8SFI588BNI83C+

41FI588SNIVS2+

41FIS88SMIVS4+

41FI588SNIVS3+

42FI588SNIVB2+

42F1588SNIVS2+

44FI588SNIVS2+

44FI588SNIVS2-46FI588BMIVS3+

46FI588SNIVS3+

47FI588SNIVS3-I 48FI588SNIVB3-48FI588SNIVS3+

iSFI588SNIDHB+

26FI588SNI82H+

53FI588BNIVB3-82FI588SMIVS3+

82FI588SMIVS4+

82FI588SMIDHB+

82FI588SNIVS1-54F 1588SM I 81C+

85FI588SNIVS3-54FIS88SMIVS3+

83FI588SNIVS1-83FI588SMIVB2+

83FI588SNIVSi-8SFI588BNIVS3+

54FI588SMIVS2-54F 1588SM I VS4+

8SF1588SNIVS4+

85FI588SNIVS2-8SFI58QSNIVS3+

85FI588SMIVS4+

85FI588SNIVS2-88FI588SNIVS1+

83FI588SNIDHT+

28F1588SNIVS4-I I

1.3

" 8.8 1S. 5 8.9 31.

1 8.8 1.8 8.8

28. 5 8.9 8.7
8. 8 8.9 8.6
8. 2 8.7 8.7 1.5 8.6 1.8 8.5 8.8
22. 9 8.7 8.8 8.8 8.9 1.8 8.7 8.9 8.5 8.7
8. 8 8.8
8. 7 8.8
8. 8 8.8 1.8 8.2 8.5 1.8 1 ~ 8 8.8 1.8 SS SS SS SS SS PC SS SS Pc BS PS SS SS
i. 81 1.'8'I
8. 71
i. 81
8. 71
8. 31
2. 21
8. 31
1. 11
8. 31
8. 91
1. 21
8. 81
8. 61
8. 61
l. 11
1. 71
8. 71
8. 71
8. 41
8. 31
8. 81
8. 51
8. 61
8. 71
8. 61
3. 61
8. 81
8. 11
8. 71
1. 81
8. 61
8. 91
1. 81
8. 91
1. 81
8. 51
2. 81
i. 21
i. 61
8. 91
8. 61
8. 61
8. 51
8. 41 I

11681 11141 11541 11471 11411 11481 I

971 11491 11561 11181 11291 11181 11531 11871 11231 11241 11451 1136t 11221 11871 I

831 11471 11421 11511 11471 I

791 11261 11861 11481 11281 11481 11491 I 1 1 1 I 11141 11471 11381 I

841 11231 11511 11211 11451 1149 I 11391 11551 11931 I

I 1 I Ni I 12INil 41 il 71 il 131 11 171 il 33INil 81 11 1 I 1 I 1 I Ni I 7INil 1 I Ni I 1 I Ml I-1IN1(

311 11 1 I Ni I lil il 161 il 1 I Ml1 1 I Ni I 1 I Nil 131 11 151 11 1 IN1 I 11N11 11Ni t 271 11 1 I Mi I 81 11 1 tNi I 1 I Ni I 1 I Nl I 1 I Nll 1 I Ni I 1 I Nl I 1 I Ni I 1 I Nil 151 Nil 1 I Ni I 361 il 121 11 1 I Ni I 1 I Nl I 21 il iINil I

I FLORIDA POWER AND LIGHT COMPANY

18/87, ST.

LUCIE CUMULATIVE REPORT S/6 A

4TH REFUELING CYCLE, UNIT 2 STEAN GENERATOR:

A OCATION: ALL CRITERIA:

1% TO 188/

PAGE:

2 OF 8

DATE:

12/38/87 TIME:

14: 38: 36 I

I I

I IEXTENT I

I I

I ILINIROWIHEATOILEGIREQITSTIREMIREELIPROBEI I

I I

I I

I I

I I

I LOCATION I

CURRENT IVOLTSINILIDEGI I

I I

I I

ICHI I

I 54 11881999991 541 126188811 I

551 251888381 551 37IQQ832I 551 671888111 I

I I

I I

I 551 1111999991 561 681888111 I

I I

561 941888381 I

I I

561186 I 88838 I 571 9SIQQ8311 I

I I

5711311888381 581. 921888111 581 941888311 I

I I

58 11381888111 581132 I 88838 I I

I I

S91 93I8883lt 591 951888311

,5911271888311 59113il88838I 591133IQQ838I 6811281888111 681138I8883QI 6811321888111 611 831888311 I

I I

611 85IQQQiit 611 1311 888381 621 361999991 631 391999991 6311891888111 631131 I 8881 l I 63 I 133 I 88831 I

641 94I88838I 6411281888311 641 1381888111 64 I 134188838 I

64 ) 1361 88838 I

651 271888581 I

I I

C IF/LIF/Ll I

C IF/LIF/LI I

H IF/LIF/LI I

H IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LIRICI IF/LITSCI I

IF/LIF/LI I

IF/LIF/LIRPII IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI IF/LIF/LI I

I F/L IF/L I I

IF/LIF/LI I

IF/LIF/L!

t IF/LIF/LI I

tF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LIRPII IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI I

H IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI I

IF/LITSCIGNSI IF/LITSCIGNSI IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI I

I.F/I IF/LI I

IF/LIF/LI IF/LIF/LI I

IF/LIF/LI.

I IF/LIF/LI I

IF/LIF/LI I

I I

I I

28F1588SMIVS2-83F1588SMIVSi-85FI588SNIVS3+

85FI588SNIVS3-85FI588SNIVS2+

85FI588SNIVS4-85F1588SN188C-28FI588SMIVS2-13FI588SMI88C+

85FI588SN188C-83FI588SMIVS4+

83FI58QSNIVS4+

83FI58QSNI83C+

83FI588SNIDHT+

83FI588SNIVS2-83FI58QSNIDHB+

83FI58QSMIVS4+

83FI588SNIDHT+

83FI58QSNIVS2+

83FI588SNIDCB+

83FI58QSNIDHB+

83Ft58QSMIDCB+

83FI588SMIVS4-83Ft588SNIVS3-83FI588SNIVSi+

83FI58QSMIDHT+

83FI58QSNIDHB+

84FI58QSNIDHB+

84FI58QSNIDHT+

84FISGQSMIDCT+

85FI588SMIVS2-85FI588SNIVS3+

85FI588SNIVS4+

84FI58QSNIDHT+

55FI588SMIVS3-56F158QSNIVS3-84FI58QSNI87H+

84FIS8QSNIDHB+

84FI58QSMIVSi+

84FI588SNIVS2+

84FI58QSNIVSi+

84F1588SNIVSi+

84FI588SNIDHT+

84FIS8QSMIDHT+

86FI58QSNIDHB+

I I

8.7

8. 9 8.9 1.8 1.8 1.8 8.7 8.7 8.8
8. 78
8. 1 8.9 9.3 8.8 8.8 8.8 8.8 8.9 8.8 8.8 8.8 8.6 8.9 8.9 8.8 8.8 8.8 8.8 8.8 1 ~ 8 8.9 1.8 8.8 1.8 8.9
29. 5 8.8 8.8 1.8 8.8 8.9 8.8 8.8 8.8 SS SS SS SS SS SS SS SS PS PS SS PC SS PC SS I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I

8. 51
l. 41
2. 81
8. 61
8. 61
8. 61
8. 51
8. 41
8. 51
8. 51
1. 51
3. 21
8. 81
8. 61
8. 81
2. 11
i. 81
8. 41
l. 81
8. 31 Q. 41
i. 81
8. 51
1. 11
1. 81
8. 6t
8. 91
8. 41
8. 21
8. 41
i. 81
2. 51
8. 91
8. 61
8. 51
i. 81
8. 41
8. 41
8. 71
1. 31
i. 81
8. 91
i. 51 1 ~ 81
8. 21 I

11681 11441 11671 11451 11461 11SS I 11481 11411 11481 11481 11321 I 95t 11451 11581 I

991 11481 11281 11491 113SI 1158t 11381 11531 I 1 1 1 I 11481 11851 11531 11171 11531 11441 I iS31 11561 11191 11681

'1421 11381 11361 11381 11521 11861 I

991 11241 11421 11351 11411 11491 I

I 1 I Ni I 1 I Mll 1 INi I 1 I Ml I ilMil 1 I Nl I itNil 1 I Mll iINit 1 I Ni I 251 11 48INil 121 11 71 il 32IN11 91 11 1 I Mi I 81 il 1 I Ml I.

71 il 281 11 41 il 18 1 Ml I 1 I Ni I 1 I Ml I 41 il 481 il il il ill ll il il 1 IMi I 28 I Ml I 1 I Ni I 131 11 1 I Mi I 11M11 181 il 21 il 1 IN1 I 29 I Mil 1 I Ni I 1 I Mll 211 il 141 11 181 11 I

I

~

FLORIDA POWER AND LIGHT COMPANY

18/87, ST.

LUCIE STEAN GENERATOR:

A QCATION:

ALL-CRITERIA:

1/

TO 188'A CUNULATIVE REPORT S/G A

4TH REFUELING CYCLE, UNIT 2 PAGE:

3 OF 8

DATE:

12/38/87 TINE:

14:38:36, I

I I LINI I

I I

65 I I 66I I

66 I I

I I

66 I I 67I I

67 I I 67l I

68 I I 69 I I

I I 69I I

78 I I 78l I

78 I I

781 71 I I 71l I

I I 72l I 73l I

I I 73 I I

73 I 73l I

75 I 75I I

75 I i

761 I

I I 761 I 76I I 76I 77I I 77I I

77 I I 77I I

77 I I 77I I

78 I I

I 781 133IQQQ3QI 48188858I 94I8883il I

I 124188831 I

31IQQ858I 37IQQ858I 133I99999I 32I88858I 33IQQ8581 I

I 37IQQ858l 38I88858I 42IQQ858l 44IQQQ58I 136IQQ831I 43I8885QI 45IQQQSQI 38IQQQ58I 481888581 42I8885QI I

I 44I88858I 39iQQQSQI I

I 41 I 88858 I 45IQQQSQI 47188838I 41IQQQ58I 43IQQ858I 55I88858l 42IQQ838I I

I

'44IQQ858I 46IQQ858I 96IQ8838I 43I8885QI 45IQQ858I 47IQQ838I 51IQ88381 53I888581 89IQQ8211 44I88838I I

I 4eiQQQSQi I

I 84FI58QSNIDHT+

C IF/LIF/LI H IF/LIF/LI C IF/LIF/LI C IF/LIF/LI C IF/LIF/LI H IF/LIF/LI H IF/LITSCI C IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/Ll C IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI K IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI C IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI C IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI

.I I

I 86F I 58QSM I DHB+

84FI58QSNIVS4+

84FISGQSNIVS4+

84FI58QSNIVSi+

I 86FI58QBMIDCB+

GNSI QGFI58QSNIDCB+

I 31F I 588SNI VSl+

I 86FISBQSNIDHB+

I 86FI58QSMIDHB+

86FI58QSNIDCB+

86FI58QSNIDCB+

I 86FISGQSNIDHB+

I 86FIS8QSMIDCB+

I 86FI58QSNIDCB+

I 84FI588SNIVS1-I 86FI58QSNIDCB+

I 86FI58QSNIDCB+

I 86FI58QSNIDCB+

I 86FI58QSNIDCT+

I 86FI58QBNIDHB+

86FI58QSMIDCT+

86FIS8QSMIDHB+

87FIS8QBNIDHB+

87FI58QSNIDCT+

87FI58QSMIDHB+

87FISBQSNIDCB+

87FI58QSNIVS3+

87FI58QSNIDCT+

87FI58QSNIDCT+

87FI588SNIVS3+

87FI588SMIDHB+

87FI58QBNIVS3+

87FI58QSNIDHB+

87FI58QSNIDHT+

84FI588SNI82H+

87FI58QSNIDHB+

87FI58QSMIDCT+

87FI58QSNIDCT+

87FISGQSNIDCT+

87FI58QSNIDCT+

15FI588SNI88C+

87FISSQBNIDHB+

87FI58QSMIDCT+

87FISSQSNIDHT+

I I

I I

IEXTENT I

I I

I ROWIHEATNILEGIREQITSTIRENIREELIPROBEI I

I I

I I

I I

I LOCATION 8.8 8.8 8.9

i. 4 8.9 8.8 8.8 8.9 8.8 8.8 8.8 8.8 8.8
8. 8 8.8 8.9 8.8 8.8 8.8 8.8 8.8 8.8 8.9 8.8 8.8 8.8 8.8 8.9 8.8 8.8 8.6
8. 8 8.6

- 8.8 8.8

18. 7
8. 8
8. 8 8.8 Q. 8 8.8
13. 6 8.8 8.8 8.8 PS PS SS SS PS SS PC
2. 81
8. 61
8. 7 I
2. 1I
8. 61
8. 6 I
8. 51
8. el
8. Sl 8.3l
i. 1I Q. 81
8. 7 I
8. 6 I
8. 6 I
8. 8I
8. 5 I
8. 4 I 8.3I
8. 2 I
8. 7l
8. 4 I 8.5l
1. 9 I
8. 8 I 1.3I 8 I
i. 41
i. 8 I
8. 5I
8. 8 I
8. 8 I 8.6l
8. 4 I
8. 2I
8. 6 I
8. 8 I
8. 5 I
8. 8I
8. 9 I
8. 61
8. 4i
i. 2 I
8. 3I
8. 4 I I

I 153 l li68l

'I 148 I I 149 I I 1,45 I li48l I168I I 186 I I 141 I I 148 I I 158 I I 154 I I 158 I I 141 I I 168 I I 1891 I 155 I li47I li58I I 1531 I 157 I I 168 I I 158 I i 143 I I 153 I I 147 I, I 1 54 I I 188 I I 153 I I 157 I li53I I14ei I 181 I

I 1531 I 145 I I 145 I I 154 I I 152 I 1146 I I 154 I I 157 I I 147 I I 142 I i144I li54l I

I I

CURRENT I VOLTS I NILI DEG I I

I I

I I

ICHI I

I 1 I 1 I ll il 16I il 6I il ilNil ill ll il il 1 I Mi I 17I ii ill il 2I il 6I ll 2I 1 I-17I 1.I 1 I i.l 1 I Ni I 51 il 12 I 1 I 2I ii 7I ll 3l 1 I 11 il 2l il 15 I 1 I 5l il 11I il il ll 2SINil 51 il il ll 1INi I 12 I 1 I 1 INl I 5l il 13I 1 I 18 I 1 I 4l il 6l 1 I 121 il 4I il il 1 I 7I 1 I lel ii 14l 1

I il ll I

I FLORIDA POWER AND LIGHT COMPANY

1 8/87, ST.

LUG I E TEAN GENERATOR:

A OCATION: ALL CRITERIA:

1/

TO 188$

CUMULATIVE REPORT S/G A

4TH REFUELING CYCLE, UNIT 2 PAGE:

DATE:

TINE:

4 OF 8

12/38/87 14:38:36 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

'I I

I I

I I

I I

I I

I LIN I ROW I HEAT(( I I

I I

(EXTENT I

LEG(REQITST(R I

I I

H IF/LIF/LI H IF/LIF/LI C IF/LIF/LI H IF/LIF/LI H IF/LIF/Ll H IF/LIF/Ll H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/Lf H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LIR H IF/LIF/LI H IF/LIF/LI H IF/LIF/Lt H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI I

I I

78( 58(88858(

78(

54188858(

78( 72t88821(

78(

96(888311 I

I I

I I

I 79( 49(8883!l 88(

48188838(

I I

I 88(

52(88858(

I I

I 88(

54(88838(

81

( 47(88858(

I I

I ej

( 51(88858(

8jl 53(88858(

8!I 55(88858I Sjl 73I99999(

Sit!35(99999(

8'21 46(88858(

82( 58(88858l 82(

52(QQ858(

82I!38(QQQ!il I

I I

82(j32(88838(

82(148(QQQjjl 83( 47(88858(

83(

53(88838(

84( 46(88838(

84(

~ 58(88838(

84I 54IQQ838(

84(!48(99999(

851.47(88838l I

I I

I I

I 85(

49(88858(

S5( 53(88838(

85(

59(88858(

85( 69(8881!l 85( 97(88811(

I I

I I

I I

86( 58(88858(

86(

52(88838(

86t 68(88838(

I I

I I

I I

EN(REEL(PROBE(

I I

I 87F(588SN(DHB+

87F(58QSNIDHB+

!5F(588SNIVS4+

84F(588SNIVS3-84F(588SNIVS3+

84F(588SNIVS4-87F(588SNIVS3+

87F(58QSNIDHB+

87F(588SNIDCB+

87F(58QSNIDHB+

87F(588SNIDCB+

87F(588SN(DCT+

88F(588SNIVS3+

08F(588SNIDCT+

88F(588SNIDCT+

88F(588SNIDCB+

88F(588SNIVS3-5!F(588SN(VS3-48F(588SNIVS4+

QBF(58QSNIDHB+

88F(588SNIDCB+

QGF(58QSNIDCT+

84F(588SNIVS3-84F(588SNIVS4-84F(58QSN(88H+

84F(588SNIVS5-QBF(588SNIDCT+

QBF(58QSMIDCB+

88F(588SNIDCB+

88F(58QSNIDCT+

88F(58QSNIDCT-63F(588SMIDHB+

88F(588SNIDHB-QSF(588SNIVS3+

88F(588SNIDCB+

8(IF(58QSNIDHB+

88F (518SN ( DCT+

I-88F(588SMIDCB+

I 85F(588SNIVS3-84F(588SNIVS3+

84F(58QSMIVS4-84F(588SMIVS4+

88F(588SNIDCT+

88F(588SNIDCT+

88F(588SNIDHB+

I I

LOCATION 8.8 8.8 8.9

8. 8 1.8 1.8 8.9 8.8 8.8 8.8 8.8 8.8 8.8 8.8 8.8 8.8 8.9 1.8 8.9 8.8 8.8 8.8 1.8 1.8
3. 1 1.8 8.

8'.4 8.9

1. 4 2o i2 8.8 1.8 8.8 8.8 8.8 1.5 8.8 1.8 1.8 1.8 1.8 8.8 8.8
8. 8 SS SS PS SS SS SS SS SS SS SS SS SS SS SS SS SS PS SS SS SS SS SS SS SS 8.-61
8. 51
1. 3 I
1. 1 I
8. 4 I
8. 3 I
1. 2 I
8. 5 I 1.3(

8;31

8. 6(
8. 4 I 1.2l
8. 8 I
8. 6 I
8. 4(

8.5t

8. 61
l. 4 I
8. 7 I 8.5(
8. 5 I
8. 71
8. 7(
8. 8 I
8. 6 I 8.8(

1'. 1l 8.9l

1. 4 I 8.8(

.8.9(

1. 8 I
1. 4 I
1. 91
8. 5(

8.6(

8. 6 I
8. 4 I
8. 9 I
8. 7 I
8. 6 I
8. 8 I I

8.8(

I 8.8(

I I

I 146 I (154(

l!47(

I 138(

114! I (128(

I 89(

1158(

I 158(

(139(

I 145 I (143 I (113(

(158 I I 154(

I 143(

I 115 I I!44I I156I (152(

(149(

l!22(

I 157 I (151(

(153 (

l}48(

(149 I I 151(

I 148 I (152(

I 156 I (141(

l!56(

li431 I 143(

1146(

I!56(

(153(

l!32 I I 153 I l!47(

l!48(

1136(

I 146(

l!48(

I I

I CURRENT IVOLTSINIL(DEGI I

I I

I I

ICHI I

I 12(

1(

4( ll 1 (Nl I 1 I Nl I 1(N11 1(Mll 1(M!l 5(

1(

8( il 17l 1 I 13( il 15 I 1 I 28(N!I 5 I 1'I 1 I 1'I 13(

1 I itM!l 1 I M1 I 1 (Ni I 3( ll 7(

1(

33( jl 1(N! I 1IN1 I 5l 1(

1(Nil 7( il 6(

1(

9( il 5( il 1(

1(

17I

! I 1( ! I 1 I Ml (

14I !I 18 I ! I il 1(

2( i(

1 (N! I

! IN1 I 1 (N! I 1(N1(

191 1 I 111 1(

!7(

1 I I

I FLORIDA POWER AND LIGHT COMPANY

4I

18/87s ST LUCIE TEAN GENERATOR:

A

~

~

~

OCATION: ALL CRITERIA:

1/

TO 188'A CUMULATIVE REPORT S/G A

4TH REFUELING CYCLE, UNIT 2 PAGE:

5 OF 8

DATE:

12/38/87 TINE:

14:38:36 I

I I LINI I

I I

861 I 861 I

I I

861 I

861 I

I I

871 I

I I 87(

I 87(

I I

I 871 I

871 I

871 I

I I

871 I

I I

I 871 871 I

871 I

I I

871 I

881 I

881 I

I I 88(

I 891 I

891 I

981 I 98(

I 98(

I 98(

I I

I 91(

I 911 I

911 I

911 I

921 I

I I

921 I

921 I 921 78(888111 921888311 I

I 188188838(

148(88838(

I I

471888381 I

I 511888381 53(888381 I

I 551888581 69188838(

71(888111 I

I 93(888111 I

I I

I 971999991 I

I 1191888111 121(88838(

I I

139188811(

78(888111 94(99999(

I I

1281999991 931888111 139(888381 92188811(

94188831(

132188811('36188811(

I I

43(88858(

45(888581 47(88858(

189188838(

42188838(

I I

441888581 521888581 58(888581 124(888381 I

I H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/Ll IF/LIF/LI IF/LIF/LI IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LI I

IF/LIF/LIRBDI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LIRBDI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI I F/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/L(F/LI IF/LIF/LI IF/LI87CI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI I

I I

85F1588SNIVS3-84FI588SNIVS2+

84FI58QSNIVS4-84F(588SM(83H+

84F(588SM(VS5-84FI58QBMIDCT+

88F(588SNIDHB+

QSF(588SNIDHT+

88FI588SNIDCB-88F(588SNIVS3-88FI588SNIDCT+

88F1588SMIVS3-88F(588BNIQ5C+

85F(588SMIVS4-QSFI58QSNIVS4+

84F1588SNIVS2-84F(588SNIVS2+

84FIS88BMIVS4+

58F(588SNIVS2-5QFIS8QBNIVS3+

84FI58QSMIVS4-88F(588SNITSC+

88F(58QSNITSC+

84F(588SNIVS5-85F(588SM(88H-5QF(588SNIVS3-5QF(588SNIVS4+

SQF(58QSNIDCB+

84FI58QBNIVS4-84FI588SMIDHT+

84FI588SNIVS2+

84FI588SNIVS3+

84F(588SNIVS2-84F(588SNIVS2-84FIS88BNIVS5+

89F(588SMIDHB+

89F(588SNIDHB+

89F(58QSMIDHB+

83FI588SNITSC+

89FI588SMIDHT+

24F(588SNIDHT+

89FI58QSNIDHT+

89F1588SNIVS3+

12FIS8QBMIDCB+

83F1588SNITSC+

I I

I I

IEXTENT I

I I

I ROWIHEAT((ILEGIREQITSTIRENIREELIPROBEI I

I I

I I

I I

I LOCATION 1.8 1.8 8.7 1.3 1.8 8.8 8.8 8.8 2.2 1 ~ 8 2.2 1 ~ 8 8.9 1.8 1.8 1.8 8.-9

8. 8 8.7 8.8 1.8
11. 5 9.8 1.8 8.8 8.9 8.7 8.8 8.9 8.8 8.9 8.6 1.8 1.8
l. 8 8.8 8.8 8.8 4.8 8.8 8.8 8.8 8.7 8.8 25' SS PS PS SS SS SS SS SS SS SS SS SS SS r

PS PS SS SS SS PS PC PC SS I

I I

I I

I I

I I

I I

II*

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I

8. 4J
8. 81
8. 61
8. 5(
8. 6(
1. 61
8. 7(
i. 61
8. 71
8. 4(
i. 41
8. 4(
8. 41
8. 41
8. 5(
8. 6(
1. 91
8. 8(
8. 71 Q. 51 8.,7(
8. 91
8. 81
8. 71
8. 4(

Q. 61

i. 11
8. 31
8. 91
1. 31
8. 61
l. 11
8. 71
8. 41
8. 5(
8. 41
8. 61
8. 61
8. 81
1. 81
8. 91
8. 71
1. 41
8. 3(
8. 5(

I 1132(

1131(

11421 (149(

11511 11551 11431 1149(

11531 I 42(

I 1581 I

971 11321 (1361 11471 I

841 11561 11611 1138(

11451 (154(

11481 11481 11591 1132(

11421 11471 11551 1149(

11461 11551 11431 11561 (1481 11461 11391 11521 1153(

1125(

1136(

1122(

(1191 11491 1145(

11541 I

I I

CURRENT IVOLTSIMILIDEGI I

I I

I I

ICHI I

I 1 (Ni I ll il 1 (Mi I 9( il 1 (Mi I 3( il 131 1 I 8( il 4( il 1 I Ni I 71 il 1 I Nl I 241 11 1 I Ni I 1(Ni I 1 I Nll 1 I Nl I 1 I Ml I 17( IVIi I 1(Ni I 1 I Ni I 91 11 9( il 1 I Ni I 1 IMi I 12 I Nil 1 INil 21 il 1 (Ni I 12(

1 I i(Nil 151 11 1 I Mi I 1 I Ni I 1 (Nl I 171 1 I 41 il 3( ll 34( il 28(. 11 37(

11 36(

1(

1 (Ni I 131 11 31 ll I

I FLORIDA POWER AND LIGHT COMPANY

18/87, ST.

LUCIE TEAN GENERATOR:

A LOCATION: ALL CRITERIA:

1'A TO 188/

CUMULATIVE REPORT S/G A

4TH REFUELING CYCLE, UNIT 2 PAGE:

DATE:

TINE:

6 OF 8

12/38/87 14:38:36 I

I I

I I LINI ROW I HEATS I I

I I

I I

931 411888581 I 931 451888581 I

931 491888581 I 941 481888381 I

941 521888581 I 951 391888581 I

951 491888581 I

I I

I I" 961 481888311 I

961 421888581 I

961 481888581 I

I I

I I

961 581888311 I 971 37IQQQSQI I

I I

I I 971 451888581 I

971 471888581 I

971 531888381 I

981 381888581 I

I I

I I

I I

I I

I I

I I

98 11381999991 I

991 431888381 I

I I

I I 991 451888581 1 1881 481888581 1 1881 541888581 I 1881 781999991 118111371888381 I 18211341999991 11841 1381888111 I 184113218881 1 f 11851 791888211 I

I I

I 11861 721888211 I 18611261888211 I

I I

11871 531888211 1 1881 341888211 11881 961888211 I

I I

I I 188 11321999991 111811381888111 iiil 691888481 I

I I

I IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/Ll IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/Ll IF/LITSHIGNSI 89FI58QSNIDCT+

89FI58QSMIDCB+

89FI588SNIVS3-89FI58QSMIDHT+

89FI58QSNIVS3+

89FI58QSNIDCB+

13FI588SNIVS3-13FI58QSMIDCT+

89F1588SNIVS3-89FI588SNIVS3+

89FIS88SNIVS3-89FI588SNIVS3+

89FI588SNIVS3-89FI58QSNIDHB+

89FI58QSNIDCB+

12FI58QSMIDCT+

12F1588SNIVS3-12FI58QSNI84C+

89FI588SNIVS3+

12FI588SNIVS3+

89FI588SMIDCB+

12F1588SMIDCB+

4QFI588SNIDHT+

13FI58QSNIDHB+

13FI588SNI84C+

13FI58QSNIDHB+

12FI588SNIVS3+

13FI588SNIVS3+

18FI588SNIVS2+

83FIS8QSNIDHT+

41F1588SNIDCT+

83FI588SNIVSi-83FI588SNIVSS+

87FI588SNIVS3-87FI588SNIVS4+

87FI588SNIVS2+

13FI58QSNIVSi-43FI588SMIVBi-87FI58QSNIVS3+

87FI58QSNIVS3+

H" IF/LIF/LIRBDI 42FI588SNIVS2+

IF/LIF/LI IF/LIF/LI IF/LIF/Ll IF/LIF/LI I

I I

42FI58QSNIVS3+

43F1588SMIDCB+

83FI588SMIVS5+

QGFI58QSNIVS2+

I I

IEXTENT I

I I

I LEGIREQITSTIRENIREELIPROBEI I

I I

I I

I LOCATION 8.8 8.8 1.8

8. 8
8. 8 8.8 8.6
8. 8 8.7, 8.8 8.7 8.7

'8. 8 8.8 8.8

8. 8 8.8
26. 3 8.7 8.7 8.8 8.8

'8.8 8.8

11. 7 8.8 1.8
8. 8 8.8 8.8 8.8 1.8 1.8 1.8 1.8 1.8 8.7
8. 7 1.8
1. 8
8. 7 8.8 8.8 1.8 1.8 SS SB SS SS PC SS PS SC SS SS SS SS SB SS SS SS SS SS SB PS SS SS
8. 8j
8. 21
8. 61 Q. 81
8. 51
8. S I
8. 61
58. 81
1. 31
8. 61
8. 71
1. 81
i. 21
1. 81
8. 81
8. 51
i. 11
8. 71
8. 71
8. 71
8. S I Q. S I
i. 11
8. 31
i. 51 Q. 61
8. 61
l. 81
8. 41
8. 31
i. 81
8. 61
8. 81
8. 31
8. 41
8. 41
8. 41
8. 41
8. 61
8. 31 Q. 91
8. 71
8. 41
8. 51 Q. 41 I

11531 11491 11281 11221 11311 11421 11831 11371 11871 I 1281 I 1511 11481 11841 11491 11481 11531 11461 11451 11221 11221 11211 11211 11431 11581 11431 11581 11171 I

481 11521 11441 11531 11511 11371 11281 I 1241 11281 I

791 I

791 11841 11221 11881 11351 11511 11581 11381 I

I I

CURRENT IVOLTSINILIDEGI I

I I

I I

ICHI I

I 31 il 71 ll 1 I Nl I 341 11 1 I Ni I 151 11 1 INi I 171 11 26 I Ni I 1 I Ml I 1 I Mi I 11M11 38 I Ni I 71 1'I 81 11 il il 1 I Nl I 131 ll 1 I Ni I 1 I Nl I 351 11 3S I 11 221 11 181 11 171 11 41 ll 1 I Nl I 11Nl I 21 11 141 11 1 I 1 I 1 I Nll 1 I Ni I ilM11 11Ni I 1 I Mi I 1 I Nl I 1 I Nl I 11N11 11Mi I 271Mi I 1 I Mi I 31 il 1 I Nil 1 I Nl I I

I FLORIDA POWER AND LIGHT COMPANY

18/87, ST.

STEAN GENERATOR:

A

~

~

OCATION: ALL CRITERIA:

1/

TO aQQA LUCIE CUMULATIVE REPORT S/8 A

4TH REFUELING CYCLE, UNIT 2 PAGE:

DATE:

TIME:

7 OF 8

12/38/87 14:38:36 I

I I

I IEXTENT I

I I

I ILINIROWIHEAT¹ILEGIREQITSTIRENIREELIPROBEI I

I I

I I

I I

I I

LOCATION I

CURRENT IVOLTSINILIDEGI I

I I

I I

ICHI I

I I 1 1 1 I 69 I 88848 I I113l 51I88821I I 114 I 4 I 99999 I l114I 98IQ881il I 115I 4il99999l lal5I 93I99999I I 1 16 I 94 I 99999 I I 117lil3IQ8832I I 118I 92I88811I I 119 I 93 I 88811 I

I I

I I

I128I 78I88821I I128l 74I8882it li28l 94I888111 I

I I

I I

I I

I I

I I

I I 1 28 I 182 I 8881 1 I 121 I 93I88811 I

i 124I 36I 88821 I

I 124l 38I8882al ll24I 42I88821l I 124 I 1 18 I 88821 I I 126I 46I99999I I 127l 53I88821 I

la28I 88I99999l I 129 I 41 I 99999 I I 129l 87I8883at I

I I

I I 1291 91I99999I I 138la88IQQQaal I

I I

I I

I.

I I

I 1381 1 16 I 88811 I

I I

I I

I 131 I 79 I 8881 1 I I 131 I 93188831 I

li32I 36I888481 I 132 I 46 I 88811 t

I 132l 78IQ883QI I 132 t 92l'99999 I li34I 42199999I 1134I 58I99999I li34l 96199999l 138I 92I88838I I

I I

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/Ll IF/LIF/LI IF/LIF/LI I

I I

88FI588SNIVS3+

QBFI588SNIVS3+

61FI588SNIQaH+

83FI588SMIVS2-23FI588SNIVS3+

45FI588SNI83H+

45FI588SNIVS4-84FI588SMI85H+

84FI588SNIVS2-84FI588SMIVS3+

84FI588SNIVS4+

88FI588SNIVS4+

88FI588SMIVS4+

84FI588SNIVS2-84FI588SNIVS2+

84FI588SMIVS3i 84FI588SNIVS4+

84FI588SMIVS3-84FI588SNIVS4+

18FI588BMIDHB+

iQFI588SNIVS3-18FI588SMIVS3+

18FI588BNIVS4+

18FI588BNIQaC+

18FI588SMIVS3+

24FI588SNIVS4-24FI588SNIVS3-81FI588SMIVS2-81FI588BNIVS3+

24FI588SMIVS2-81FI588SNIVSa-81FI588SNIVSi+

81FI588SNIVS2+

81FI588SMITSH+

81FI588BNIVS3-81F I 588SNI VS3-81FI588BNIVS2+

11FI588SMI82C+

81FI588SNIVS3+

81FI588BNIvs2+

26FI588SNIVS2-26FI58QSMI83C+

27FI588SNIDCT+

27FI588SMIVS2+

82FI588SNIVS2-I I

1.8 1.8

24. 1 1.8 8.9 1.7 8.9
29. 7 1.8 1.8 1.8 1.8 1.8 1.2 1 ~ 8 8.8 8.8 8.5 1.8 8.8 8.9 8.8 8.9
18. 6 8.8 8.6 1.8 ao8 8.7 1.8 1.8 1.8 1.8
11. 3 1.8 1.8 8.7
12. 8 1.8 1.8 8.6
8. 8
8. 8 8.8 1.8 SS SS SB SS BS SS SS PS SS SS SS SS SS SS SS SS SS SS SS SS SS I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I 8..6,I

8. 6I
8. 6 I
8. 4 I
8. 5 I
8. 8 I 8.9I
1. 1 I
8. 8I
8. 4 I
8. 4 I
8. 4 I
8. 4 I
8. 7 I 8.5I
8. 9I 8.8I 1.8t
8. 4 I
8. 2 I
8. 5 I 8.8I 8.3I
8. 3 I
1. 8 I Q. 8 I
8. 7I
8. 6 I
l. 2 I Q. 61 8.9I Q. 5 I Q. 4 I
2. 6I
8. 6l Q. 5I
1. 4 I
8. 3 I
8. 6I
8. 7 I
8. 61
8. 5I
8. 3 I
8. 3I
8. 4 I I

I 144 I lii5I li57I 1135I I151I li47I I 153 I I 1351 I 158 I 1136 I la281 I 134 I I 135 I I 159 I I 145 I I 151 I

1144 I I 1 37 I I 131 I I 143 I I 97I I127l I 92I I 147 I I 112 I I 158 I I 131 I I 134 I la88I I114I I 153 I I 145 I t 137 I I 126 I l153I I144l I 84I I 146 I I 139 I I 153 I laa8I I 83I I 137 I I 99I li34I I

I 1 I Nl I alMal 3I il

} I Ni I 1 INa I 18l 1 I 1 IN1 I 22I 1 I 1 IN1 I 1 I Nl I 1 IMi I 1 I Mi I 1 INi I 1 I Mi.l 7 I Ml'I 1 IM1 I ilMil 15INi I ilMiI 13 I 1 I 1 tNi I 1 I Mi I 1 IM1 I 9I it 22 I Ni I 1 I Ml I 1 I Ni I 1 I Mi I 28INal 1 I Ml I 1 IN1 I 1INa I" 1 IN1 I 33l 1 I 1 I Ni I 1 I Ml I 1 IN1 I 18 I 1 I 1 tNi:I 1 IN1 I 1 IM1 I 1 I Ni I 15I il 1 I M1 I 1 INi I I

I FLORIDA POWER AND LIGHT COMPANY

CUMULATIVE REPORT 18/87, ST; LUCIE S/8 A

4TH REFUELING CYCLE, UNIT 2 STEAN GENERATOR:

A OCATION: ALL CRITERIA:

1/

TO 188'A PAGE:

8 OF 8

DATE:

12/38/87 TINE:

14:38:36 I

I I

I IEXTENT I

I I

I ILINIROWIHEATIIILEGIREQITSTIRENIREELIPROBEI I

I I

I I

I I

I I

I I

CURRENT I

LOCATION I VOLTS I NIL I DEG I 5

I CH I I

I I

I I

I 11381 921888381 1 1381 941888111 11391 911888111 1 1431 491888111 11431 511888381 11461 921888111 11491 311888111 11511 531999991 I 1 52 I 58188811 I

I I

I I

I 1531 471888381 1 1551 31999991 11551 471999991 I

I I

I H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H IF/LIF/LI H lj/LIF/LI H IF/LIF/LI H IF/LIF/LI I

I I

I 82FI588SNIVS3-I 82FI588SNIVS4+

I 82F1588SNIVS4-I 82FI588SNIVS3+

I 82FI588SNIVS3-I 82FI588BNIVS4-82FI588SNIVS3-I 34FI588SNIVS3-I 82FI588SNIVS3-I 82FI588SNIVB3+

I 82FI588SNI82H+

I 62FI588SNI86H+

I 36FI588SMIVS3-I I

I 1.8 1.8 1.8 1.8 1.8 1 ~ 8 1.8 8.9 1.8 1.8

16. 3
29. 1 8.7 SS I

BS I

SS I

SS I

SS I

BS I

SS I

I SS I

SS I

I I

I I

8. 51
8. 71
8. 61
8. 41
8. 61
8. 51
8. 61
8. 71
8. 41
8. 51
8. 91
8. 81
1. 11 I

11391 11571 11521 11151 11471 11471 11431 11481 11381 11491 11581 11581 11441 I

I 1 I Ni I 1 I Nil 1 I Ni I 1 I Nl I 1 IN1 I 1 IN11 1 I Nl I 1 I Nil 1 I Mi I 1 I Ni I 81 il 31 il 1 I Nl I I

.I NUMBER OF TUBES SELECTED FROM CURRENT OUTAGE:

263 NO TREND ANALYSIS REQUESTED FLORIDA POWER AND LIGHT CONPANY

'}8/87, ST.'UCIE TEAN GENERATOR:

B OCATION: ALI CRITERIA:

}A TO }88'A CUMULATIVE REPORT S/G B

4TH REFUELING CYCLEr UNIT 2 PAGE:

1 OF 4

DATE:

12/38/87 TINE:

}4:33: 85 I

I I

I IEXTENT I

I I

I ILINIROWIHEATIIILEGIREQITSTIREMIREELIPROBEI I

I I

I I

I I

I I

I LOCATION I

CURRENT IVOLTSIMILIDEGI I

I I

t I

/

I CHI I

I I

241 881888} 1 I C

I 241 941888}i I C

I 241 961999991 C

I I

I I

C I

251 4SI888211 C

I 251 891888311 C

I 261 981999991 C

I 271 7318881}I C

I 271 971888}ll C

I 281}881999991 C

I 291 951888l C I 291 971888}il C I I I I C I 381184t999991 C I 311 771888211 C I 331 431888}il C I 331 471888381 C I 341 961888311 C 351 751888381 C 371 651999991 C I 381 961888381 C I I I I C I 4} I 951999991 C I 4811141999991 C I SQI}}6188838l C I 511 571888381 H I 521 81999991 C I 521 681999991 H I 531 591888381 H I 551 3t888321 C I I I I H I 55 t 1311999991 C I 571125199999f C I 5811321999991 C I 591 491999991 H I 59113}1999991' I 621 681999991 H I 631 53199999t H I 6411361999991 C I 651 391999991 H I I I I H 651}151999991 C I 681 321888381 H I 681 361888581 H 6811341888381 C I I I IF/LIF/Ll I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/I IF/LIRPII IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LtF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/Ll I IF/LIF/LIRPII IF/LIF/I IRPII IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I 189HIF/LI I 189CIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LITSCIGNSI IF/LITSCIGNBI IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I I I I I 83FI588SMIVS2+ 83FI588SNIDHB+ 43FI588SNI88H-43FI588SNIVS4+ 1}FI588SMIVS3-83FI588SNIVS2-42FI588SNIDCB+ 84FI588SNIVS4-84FI588SNIVS4+ 45FI588SNIDCT+ 84F1588SMIDCT+ 84FI588SNIVS2-84FI588SMIVS3+ 46FI588BNIVS3+ 12F1588SNI82C+ 84F1588SNIVS3-QSFI588SMI82C+ 85FI588SNIVS2+ 85FI588SNIQSH+ 49FI588SNIVS3+ 85FI588SNIVS2-85FIS88SNIVS4-5}FI588SMIVS2+ 28FIS88SNITSC+ 82FI588SMI85H+ 89FIS88SNIVS3-54FI588SMI86C+ 52FI588SNIVS2+ 89FI588SNI83H+ 88FI588SNI8}H+ }QFI588SNIQ}H+ 29FI588SNIDCB+ 29FI588SMIVS2-38FI588SNIVS}+ 54FI588SMIVS3-38FI588SNIDCT+ 55FIS88SNIVS4+ 56FI588SNIVS3-8311588SMIDHT+ 57F1588SNIVS3+ 57FI588SMIVB3+ 8311588SNI88H+ 82FI588SMIDHB+ 82FI588SNIVS3+ 83FI588SMI85H+ I 8.8 8.8

i. 8 8.8
8. S 8.9 8.8 1.8 1.8 8.8 8.8 1.8
l. 8 1.4
29. 7 8.8 33s 2 8.5 7.6 1.8 8.8 8.9 8.8 3.3
32. 5 8.8
21. 5 1.8 7.8

}.2 1.2 8.8 8.7 8.8 1.8 8.8 8.8 8.6 8.8 8.8 8.8 9.4 8.8 8.8 4.7 SS PS SS SS SS PC SS PB PB SS PS SB PC SS SS PS I I I I II' ( I I I I I I I I I I I I I I I I I I I I I I I I I 8.,41

8. 41
8. 81
8. 71
8. 61
i. 51
8. 71
8. 51
8. 31
l. 31 Q. 61
8. 91
8. 61
8. 41
8. 61
8. 61
8. 91
8. 61
8. 51
i. 11
2. 51
4. 61
l. 81
8. 61
1. } I
i. } I
8. 71
8. 81
1. 11
8. 61
8. 61
8. 61
1. 31
8. 81
8. 61
8. 81
8. 61
8. 41
8. 31
8. 61
8. 61
8. 31
1. 31
8. 81
8. 51 I

I 731 11431 11871 I }881 'I 771 I 951 11581 11581 l}821 11591 11531 11291 11531 l}3}l I }S31 I 1241 11441 I }351 I }521 I }441 I 961 I 851 l}891 11451 115} I I 851 11571 l}3}l I 1621 l}521 I }S21 I}491 l}531 I 8} I I 781 I }491 ll}41 113} I 11431 I 671 I 671 I }391 I }371 11431 I }581 I I } I Mll 161 11 381M}l } I M} I } I N} I 43 I N} I 31 11 } I N} I 1 I M} I 21 il 21 il } I N} I }IN}l 7 I N}I Sl 1'I }IM}l 161 1 I 261 il 71 il }41 il 5} I N} I 62IN}l } I Mll 161 11 81 11 } I M} I il il } I N} I ll 11 71 ll 71 ll lil il } I M} I } I N} I } I M} I ill il } I N} I }IN}I 141 11 } I M} I } I M} I }91 il 221 il } I N} I 81 il I I FLORIDA POWER AND LIGHT COMPANY

}Q/87, ST. TEAN GENERATOR: B ~ ~ QCATION: ALL CRITERIA: }/ TO }88'5 LUCIE CUMULATIVE REPORT S/8 B 4TH REFUELING CYCLE, UNIT 2 PAGE'ATE: TIME: 2 OF 4 12/38/87 14:33:85 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/LI 82F1588SNIVS3+ 83FI5888MIVSi+ 82F1588SMIVS3+ 82FI588SNIVS3+ 57FI58QSNI83H+ 83FI588SNIDHB+ 83F 1588SM I8}H+ 58FI588SNt85C+ 33FI58QSNIVS2+ 83FIS88SMIVS3-83FI58QSNIVS3-83FI588SNIVS3-83FI588SMIDHB+ 83FI588SNIVS3+ 83FI588SNIVS3+ 34FI588SNI87C+ 83FIS8QSMIDCB+ 47FI588SMI84H+ 42F1588SMI8}H+ 84FI588SMIDHB+ 84FI58QSMIDCB+ 84FI588SMIDCB+ 15FIS88SNIVS2-43FIS88SNIVS}+ 43FI588SNIVS4-84FI588SNIDHT+ 29FI588SMIVS3+ 84FI588SMIDCT+ 84FI588SMIDHB+ 84FI588SMIVS3+ 84FI588SNIDHB+ 84FI588SNIDCT+ 84FI588SMIDHB+ 84FI58QSMIVS3-84FI58QSNIVS3+ 84FI588SNIDCT+ 84F158QSMIDHB+ 84FI588SNIVS3-84FIS8QSMIDHT+ 84FI588SNIDHB+ 45FI588SNIVS3+ 89FI588SNIVS3+ 89FI588SNIVS3-84FI588SNtDCT+ 84FI588SMIDCT+ I I 691 391888581 69113318883}l 781 461888581 781 481888581 781 721999991 711 351888581 7}l 391888581 711 631999991 711 971999991 721 481888581 741 481888581 751 4}1888581 761 421888581 761 521888581 761 56IQQQSQI 7611121999991 771 431888381 771 731999991 771 991999991 78t 461888581 781 481888381 781 581888581 781 881888481 781 961999991 781 1 121 999991 791 471888381 I I I 791 491888581 881 461888381 I RPI I I I I I I I I I I RPI I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I IF/LIF/LI I I I H IF/LIF/LI IF/LIF/LI 881 481888381 H I I I H 881.521888381 I I I IF/LIF/LI IF/LIF/LI IF/LIF/LI IF/LIF/Ll IF/LIF/Ll IF/LIF/LI I I I 881 541888381 881 561888S81 I I I H IF/LIF/LI H IF/LIF/LI 8} I 471888381 821 461888381 821 981999991 831 871888}il IF/LIF/Ll IF/LIF/LI IF/LtF/Ll IF/LIF/LI IF/LIF/LI I I I 831 891888381 841 481888581 841 581888581 I I I ej I I I IEXTENT I I I. I L IN I ROW I HEATIII LEG I REQ I TST I REMI REEL I PROBE I I I I I I I I I LOCATION 8.8 8.8

8. 7 8.7
28. 8 8.8
8. 1
38. 5
8. 8 8.7 8.9 8.9 8.8 8.7 8.7 8.8 8.8
25. 9 9.8 8.8 8.8 8.8 8.7
l. 1 8.8 8.8 8.8 8.8
8. 8 1.8 8.8 8.8
8. 8 1.8 1.8
8. 8 8.8 8.9
8. 8 8.8 8.'8 1 ~ 8 8.7 8.8 8.8 PS PS PS SS PS PS SC SS SS SS SS SS SS SS SS SC SS SS SS I

I I I I I I I I I I I I I I I I' I I I I I I I I I I I I I I I I I I I I I I I I I I I

l. }l
8. 91
l. 31
8. 71
8. 31
8. 51
8. 71
8. 51
8. 81
8. 61 Q. 81
8. 71 Q. 61
1. 81 1.

11'. 81

8. 81
1. 81 Q. 41
8. 51
8. 61
8. 41
8. 81
8. 81
8. 91
2. 81 1 ~ 61
8. 71
i. 31
l. 41
8. 41
2. 11
8. 81
8. 81
8. 91
1. 11
8. S I
i. 81
l. 71
2. 11
i. 81
8. 61
l. 31
8. 81
8. 51 I

11891 I 931 11621 I 991 I }471 I }491 I }3}I I }471 I }341 l}881 l}381 I 9} I 11531 I 951 11311 I }2}I I }541 11581 11491 I }441 l}481 11351 I 881 I 821 I }781 I }351 11221 t }331 I }4}I t}271 I }241 11581 I }471 I 911 I }151 I }58 t I }491 I }271 l}471 I }431 11881 11281 l}881 I}541 l}471 I I I CURRENT IVOLTSINILIDEGI I I I I I I CH t I I } IM11 4S I Ni I } I N} I } I N} I }31 1 I 81 ~ } I 1} IN} I ill il } I Ml I 1 I N} I } I N}1 531M}l 41 11 } I N}' } IM}1 361 11 31 il il 11 }11 } I 181 11 151 11 2} I 1 I } I M} I } IN}I } I Nll 2} I 1 I 18 I M} I 251 il 141 11 1} I M} I 331 }I 31 il 71 il } I N} I } IM11 31 il 81 il 15 I M}I 71 11 121 ll } I Mll }IN} t 351M}I 31 il 181 11 I I FLORIDA POWER AND LIGHT COMPANY

1 8/87$ ST. STEAM GENERATOR: B ~ ~ i OCATION: ALL CRITERIA: 1/ TO jQQ'A LUCIE CUMULATIVE REPORT S/8 B 4TH REFUELING CYCLE, UNIT 2 'AGE: 3 OF 4 DATE: 12/38/87 TIME: 14: 33: 85 I I I I IEXTENT I I I I I LINIROWIHEAT¹ILEGIREQITSTIRENIREELIPROBEI I I I I I I I I I I LOCATION I CURRENT IVOLTStMILIDEGI I I I I I I CH I I I I 841 I 851 I 851 I 861 I 861 I 861 I 861 I 871 I I I 871 I 881 I 881 I 881 I 881 I 881 I 981 I 981 I 911 I 921 I I I 931 I 941 I 951 I 961 I I t 961 I 961 I 971 I 971 I 971 I 971 I 981 I 991 I 991 991 I 1881 11881 t 188I 11881 I I I 1881 11811 881888111 471888381 751999991 521888381 561888581 68IQQQSQI 881888211 491888311 I I 531888581 461888381 48188QSQI 521888311 561888311 621888581 54IQQQSQI 561888581 451888311 1231888211 541888311 I I 871888211 961888211 1371999991 921888321 I I 941888111 961888111 891999991 931999991 951999991 971888381 ,3418883it 35IQQQSQI 371888311 471888581 321888581 34IQQQSQI 36188QS81 92IQ88311 I I 941888111 311QQQSQI 931888111 341888311 I I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/Lt I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LIRPII H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LIRPII H IF/LIF/LI I H IF/LIF/LI H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H 1F/LIF/LI I H IF/LIF/LI I C IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I C IF/LIF/LI I C IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI .I C IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/Lt I H'F/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LIRPII H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I C IF/LITSHIGNSI I t I I 89FI588SNIVS2+ 84F158QSMIDCB+ 48Ft588SNITSC+ 84FIS88SNIDCB+ 84FI588SMtVS3+ 85FI588SMIVS3-15FI588SMIVS3+ QSFI58QSNIVS3-QSFI58QSNIDCT+ QSFI588SNIVS3+ QSFI588SNIVS3+ QSFI588SNIDCB+ 85FI588SNIVS3+ 85FIS88SNIVS3+'5F1588SNIVS3-QSFI58QBNIDCB+ QSFI588SNIDCT+ 85FI588SMIVS3+ 13FI588SM184H+ QSFI58QSNIVB3+ QSFI588SNIDCT+ QSFI588SMIVS3-14FI58QSNIVS4+ 8.9 Q. 8

14. 8 8.8 1.8 1.8 8.9 8.8 8.8 1.8 8.8 Q.Q 8.9 8.8 8.9 8.8 8.8 8.8 3.5 8.7 8.8 8.9 8.9 87FI588SNI81H+

87FI58QSM183H+ 87Ft588SNIVS2-87FI588SMIVS3+ 18FI588SNIVB4+ 37FI588SNIVS2+ 37FI588SNIVS2-87FI588SNITSH+ 85FI588SNIVS3-86FI58QSMIDCB+ QSFI588SNIVS3-86FI588SMIVS3-86FI58QSMIDCT+ 86FI588SNIDHB+ 86FI588SMIDCB+ 87FI588SMIVB2-87FI588SMIVB2+ 87F158QBNIVS2+ 86FI58QSMIDCT+ 87FI588SNIVS2-liFIS88SMIVS3+ I I

15. 5
15. 4 1.8 8.7 8.8 Q. 9 8.6
28. 8 8.6 Q.Q 8.8 1.8 8.8 8.8 8.8 8.9 8.7 8.8 8.8 8.8
l. 1 36FI588SMIQ3H+ 32. 6 SS SB PS SS SS PB SS PS PB SC SS PS PS SS PC SS PS PS PS SS PS SB PC 8.,81
1. 21
i. 21
l. 81
i. 81
8. 61
8. 61
i. 61 Q. 81
8. 51
2. 71
8. 41
1. 31
1. 31
8. 91
8. 41
8. 51
8. 81
8. 51
8. 81
8. 51
8. 41
i. 71 Q. 71
8. 71
8. 71
8. 61
1. 71
8. 41
8. 61
8. 61
8. 51
8. 81
8. 71
i. 41
8. 81
8. 71 Q. 41
8. 41
2. 41
1. 91
1. 31 Q. 41
i. 11 Q. 81 I

I 1181 11411 11581 11511 11351 11841 I 851 I 981 11451 11171 I 981 11431 I 961 11861 I 781 11431 11471 11231 11511 I 671 11561 11381 11491 11571 11441 11421 11291 11371 I 851 11231 I isi I I 1351 11851 11311 I 1281 11811 I 1'461 11411 I 1311 11881 11251 I 441 11551 I 1171 11171 I I 1 tNl I 141 11 21 il 21 ll 1 I Ni I 1 I Ml I 1 I Ni I 47 I Mi I 121 11 1 I Ni I 47 I Nl I 141 11 11Mil 39 I Ni I 1 I Ni'I 121 11 ill il 1 IM11 71 il 1 I Ml I 21 il 1 I Ml I 1 t Nil 21 il 151 it 181 11 1 I Ni I 1 I Nl I 1 INi I 1 I Ml I 181 il 261 11 ifMil 281 11 17INil 1 I Nl1 141 11 181 11 281 1 I 42 I Mi I 1 I Nl I 1 INiI, 41 ll 1 I Ni I 1 I Nl I I I FLORIDA POWER AND LIGHT CONPANY

18/87, ST; LUCIE STEAM GENERATOR: B ~ ~ LOCATION: ALL CRITERIA: 1/ TO 188$ 'UMULATIVEREPORT S/8 8 4TH REFUELING CYCLE, UNIT 2 PAGE: 4 OF 4 DATE: 12/38/87 TIME: 14: 33: 85 I I I I IEXTENT I I I I ILiNIROWIHEAT¹ILEGIREQITSTIRENIREELIPROBEI' I I I I I I I I I LOCATION I CURRENT IVOLTSIMiLIDEGI I I I I I ICHI I I I 1831 89199999I I 184I 24I99999l I 184 I 118 I 99999 I liQSI 89I8882lt I 1861 58I99999I I188I 34199999I I 188I 58IQQ821I tf88l 96I99999l I 118 I 52 I 88821 I Iiiil.89IQQ8311 I 1 1 1 I 93 I 88831 I I 1 1 1 I 119 I 88838 I lfi2t 54(88832I I I I I I 1 14 I 96I 88838 I I I I I I 115 I 87 I QQQi 1 I lii6l 52IQQQ38I I 117I 89IQQ83it l12il 75I99999l I 122 I 94 I 8881 1 I I,123 I 97 I 88831 I I I I I I1251 55199999I I 129 I 75I99999I li29I 85I99999I I 1 31 I 1 1 5 I 99999 I I 1321 56I999991 I 134 1184 I 99999 I li35l 57I999991 I 135 I 89I 99999 I I 136 I 94 I 88821 I lf36ti88IQQ838t 1141 I 77199999 I I 143 I 95188831 I I 1 44 I 96 I 88811 I I 158 I 8 I 99999 I li56I 24I99999I I I I I 19FI588SNIVS2+ 19FI588SNIVS3+ 38FI588SMIVSi+ 86FI588SNIVB2-28FI588BNIVS3-21F I 588SN I VS3-86FI588SNIVS3-48FI588SNIVS2-36FI588BNIVS3+ 82FI58QBNIVS4+ 87FI58QSNIVS2+ 87FI588BMI86H+ 25FIS88SNITSC+ 22FI588SNITSC+ 87FISBQBNIVB2-87FI58QSMIVS4+ 82FI588SNIVS2+ 82FI588BNITBC+ 82FI58QSNIVS2-26FI58QSMI87C+ 88FI588SMIVS2-88FI588SNIVS3+ 88FI588SNIVS4-19FI588BNIVS3-21FI588SNIDHB+ 21FI58QBMIDHB+ 22FI58QSNIVSS+ 23FI588SMIDCT+ 25FI588SNIVSi+ 2SFI588SMI86H+ 25FI588SNIDCB+ ifFI588SNIVS4+ 81FISGQSMIQfC+ 28FI588SMIDCT+ QfFI58QSNIVS2-QiFI58QBMIDCB+ 59FI588BNIQiH+ 33FISBQBMI85C+ IF/LIF/LI I IF/I IF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LITSHIGNBI IF/LIF/LI I IF/LIF/LI I IF/LIF/LI IF/LIF/LI I IF/LIF/LIRPII IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/Lt I IF/LIF/LI I IF/I IF/LI t IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I I 86I PB SS SS PS PB PS SC PC SS SS SS SB SB SS 1.8 1.8 8.5 8.9 8.8

8. 7 8.7
8. 8 8.7
8. 7 8.6 29.

1

22. 8
22. 8 8.9 8.7 8.8
11. 1 8.7
34. 8
1. 1 8.7 8.9 1 ~ 8
8. 8 8.8
i. 88 8.8 8.5
26. 5
8. 8 1.8 3f. 1 8.8 8.9 8.8 22o 5
15. 9 1 I Ni I 1 I Nfl 18I

-1 I 1 IM1 I ilNil 1 I Ni I 1 I Ni I 1 I Ni I 1 I Ml I 1 I Mi I 53IN1 I 13 I 1 I 16I il 16I 1',I 1 I Ni'I 1 I Ni I 1 I Mi I 4I il ilNil 15l 1 I 21 I 1 I 23INll 1 IMi I ilNil 18I il 7I il 3l it 19 I 1 I 28I il 6I 1I 6I il 1 I Ni I 12 I Ml t 18 I 1 I 18 I Ni I 5I il 13I il 18 I 1 I 8..7 I

8. 5 I 8.8I
8. 51
8. 9 I
8. 8 I
8. 81
l. 7 I
1. 1I
1. 8 I
2. 3 I 8.7I
8. 9I
8. 9 I
2. 8 I
8. 9 I
8. 8 I Q. 8 I 8.8I
8. 3 I
8. 9 I
2. 8 I
i. 8 I
1. 1 I

,8. 5l

8. 6 I
8. 6 I 8.4t
8. 8l
8. 9 I 8.6I
8. 7l
1. 8 I
8. 5 I 1.3I
8. 8 I
8. 6 I
8. 5 I I 123 I I 152 I I 71 I I 125 I I 86 I t

191 I 149 I I 141 I I 62I I 91 I I 146I I 1411 I 1411 I 1 if I I 98I I 153 I 1155 I I 72I I 144 I I 139 I I 122 I I 136 I I 95i I 147 I I 153 I I 157 I I 137 I I 139 I I 153 I H IF/LIF/LI I H IF/LIF/LI I H IF/LIF/LI I H 'IF/LIF/LI I 1531 I 187 I I 125 I I148I IF/LIF/LI I IF/LIF/LI I I127I IF/LIF/LI I IF/LIF/LI I IF/LIF/LI I I 153 I I 1'46 I I 152 I I I I I I I I I I I I NUMBER OF TUBES SELECTED FROM CURRENT OUTAGE: 155 NO TREND ANALYSIS REQUESTED FLORIDA POWER AND LIGHT COMPANY

INSERVICE INSPECTION

SUMMARY

TABLES 0 n order to aid in the review of the ISI Summary Tables, which are enclosed with the St. Lucie Unit 2 1987 Inservice Inspection Summary Report, the following explanation of the format used in the tables is provided below: DATE: 1 REVISION: 4 PLANT/UNIT 2 INSERVICE INSPECTION

SUMMARY

OUTAGE 5 ( 6 ), 7 PERIOD, 8 INTERVAL CLASS 9 COMPONENTS PAGE: 3 SYSTEM 10 ZONE NUMBER: 11

SUMMARY

NUMBER 12 ASME SEC ~ XI EXAMINATION AREA CATGY IDENTIFICATION ITEM NO 13, 14 15 16 EXAM METHOD PROCEDURE N I 0 0 N G T R S E H E I 0 E REMARKS C G M R 44CAL BLK 17 18 19 20 21 23 22 -24 1. DATE The date the tables were run off. 2. PLANT/UNIT Self explanatory. 3. PAGE The heading provides the page number of each table. 4. REVISION The current.revision of the computer data base in relation to the ISI Program. 5. OUTAGE Provides the current outage number for the interval. 6. YEAR the outage year applicable to the tables. 7. PERIOD The current period that these tables are applicable to. 8. INTERVAL Identifies the current interval applicable to the tables. 9. CLASS ASME Code class (1,2,or3) applicable to the components listed in each specific table. 10. SYSTEM Identifies the system applicable to the components listed in the 'specific table. 11. ZONE NUMBER Identifies the specific zone covered by the table.

INSERVICE INSPECTION

SUMMARY

TABLES (Format explanation continued) 12.

SUMMARY

NUMBER Identifies the weld, component, or item for the purpose of administrative control and to provide a uniform format identification for accessing multiple data bases. 13. EXAM IDENTIFICATION Lists unimue identification=number for specific component or weld. 14 'SME CODE CATEGORY Applicable category from the ASME Sect. Xl'ables (IHB,IHC,IHD,8cIHF-2500) is listed here. 15. EXAM METHOD Applicable examination method used. 16. PROCEDURE Identifies the applicable NDE procedure used and the examination data sheet number for the exam. 17. NOREC This column is marked when the examination results indicate no recordable indications. 18. INSIG. INSIGNIFICANT: Has applied when (1) the amplitude of any indication observed was equal to or greater than the record-ing

level, but less than 100$ of the DAC curve,and was determined as being not relevant or (2) nonzelevant such as reflection due to standing wave, trapped couplant,etc.

19. GEOM The term geometry was applied when (1) indications which have an amplitude equal to or greater than 100$ of the DAC curve, and have been documented to geometric in nature, or (2) indic-ations that are less than 100% of the DAC curve but were suspected by the level II examiner to be other than geometric in nature,and were determined and documented to be geometric'0. OTHER Includes those indications which have been evaluated to be other than insignificant or geometric'1. REMARKS Used to record any additional examination remarks or comments applicable to the specific item 22. COMPONENT DESCRIPTION gives a brief description of the component or the parts being joined, in the case of welds. 23. CODE ITEM NO. Applicable ASME Code item number 24. CALIBRATION BLOCK Lists ultrasonic calibration block(s) used, as applicable.

DATE: 02/11/88 ISIOH: 1 ST. LUCIS NUCLEAR PLANT UHIT 2 IHSERVICE IHSPECTION SUHlfhRY OUTAGE 1 (1987), SECOND PERIOD, FIRST IHTERVAL CLASS 1 COHPOHEHTS PAGE: 1 ZONK NUHBKR: 001 SUHHARY EXAHINATIOH AREA HUHBER IDEHtIFICATIOH ASHE SiC XI CATGY KXAH ITEN HO HKTHOD PROCEDURE HI 0 OHGT RSEH E I 0 K RKHARKS C G H R 44CALIBRATION BLOCK44 000770 OH-IE-h BH1 VT-3 QI 9-2 REV. 12 C IHTEGRAL EXT. HAT, SURF. 0 Oo B13.10 11-10-87: CO}lPLETED,I}lCfUDES ALL ACCESSIBLE AREAS, PER INB-2500-1,B13.10 (1) 44}l/h!! 000780 OH-IK-B BH1 VT-3 91 9-2 RKV.12 C INTEG. EXT. HAT. SURF. 0 180o B13. 10 11-10-87: COHPf KTED,IHCfUDES ALL ACCESSIBf K AREAS,PER IMB-2500-1.813.10 (1) 4tN/htt

DATE: 02/ll/88 SIOH: 1 ST. t,UCIE NUCLEAR PLANT UNIT 2 'HSERVICE IHSPECTIOH SUHHARY OUTAGE I ( 1987), SECOHD PERIOD, FIRST IHTERVAL CLASS 1 COHPOHEHTS ZONE HUHBER: 005 SUHNARY EXAHIHATIOH AREA HUHBER IDEHTIFICATIOH ASHE SEC. XI CATGY EXAH ITEN HO IfETHOD paocanUaa NI 0 OHGT RSEH E I 0 E REHARXS C G H R ttCALIBRATION BfOCKtt 001650 105-651 B-D UT-O SURGE NOZZ.-TO-LON. BEAD MELD B3.110 UT-45 UT-60 NDE 5.1 - 01 C NDE 5.1 - 02 C HDE 5.1 - 03 C 10-29-87: ColIPLETE ttUT4htt 001660 SRGH-IR B-D UT-45 HDE 5.13 - 01 C SURGE HOZZ., IHH. RADIUS

83. 120 UT-70 HDE 5. 13 - 02 C

10-29-87: COHPLETED 'tUT-6tt

MTE: 02/ll/88 VISION: 1 ST. LUCIK NUCLEhR Pf,hNT OHIT 2 IHSERVICE IHSPECTIOH SOHHhRV OUThGE 1 (1987), SECOHD PERIOD, FIRST IHTKRVhf CfhSS 1 COHPOHEHTS ZONE NUHBER: 008 SOHHhRV EIhHIHhTIOH hRHh HUHBER IDHNtfFIChTIOH hSHE SEC. XI ChTGV EXhH ITKH NO HKTNOD PROCEDURE HI 0 OHGT RSHH H I 0 E RHlfhRKS C G H R 44ChCIBRhTIOH BLOCK44 ,001980 30 -109-742-h ELBOM LOHGITUDINhL SEdH B-J UT-45 HDE 5.3 - 02 C B9.12 OT-60 NDE 5.3 - 03 C HT HDH 2.2 - 19 C 10-26-87: lfT COHPIETH 10-28-87: UT COHPLETE teU[-644 001990 30'-109-742-B Ef BOM LOHGITODIHhC SEhH B-J OT-45 NDE 5.3 - 02 C B9.12 UT-60 NDE 5.3 - 03 C HT NDE 2.2 - 20 C 10-26-8?: HT COHPIHTH 10-28-87: OT COHPLETE eeOT-6e~ 002000 30'-115-2 Ef BOM - TO - PIPE B-J OT-45 NDE 5.3 - 01 C B9.11 QT-60 HDE 5,3 - 04 C HT HDE 2.2 - 18 C 10-26-87: HT COHPI ETE 10-26-87: OT COHPCKTH otOT-Sent 002010 30 -10?-722-h PIPE LONGITODIHhf SEhH B-J OT-45 HDE 5.3 - 02 C B9. 12 UT-60 HDE 5 ' - 03 C HT HDE 2.2 - 15 C 10-26-87: HT COHPLETE 10-28-87: OT COlfPLETE 44OT-64t 002020 30'-107-722-B PIPE LOHGITODIHhf SEhH B-J OT-45 HDE 5.3 - 02 C B9.12 QT-60 NDE 5.3 - 03 C HT HDE 2.2 - 14 C 10-26-87: HT COHPf ETE 10-28-87: OT COHPIHTE NOT-644 002040 30'-103-742-h EfBOM CONGITUDINhL SHhH B-J OT-45 B9,12 QT-60 llT NDK 5.3 - 02 C NDH 5.3 - 03 C HDK 2.2 - 13 C 10-24-87: HT CO!fPLETH 10-28-87: OT COHPfETE'QT-64!

DATE: 02/11/88 SIOH: 1 ST. LUCIE HUCLEAR PLAHT UNIT 2 IHSERVICE INSPECTIOH SUHHART OUTAGE 1'1987), SECOND PERIOD, FIRST INTERVAL Cf ASS 1 COHPOHEHTS PACK: 4 ZOHE HUHBKR: 008 SUHHARY EDHINATIOH AREA HUHBER IDENTIFICATION ASHE SEC. XI CATGT KZAH ITEN HO HKTHOD PROCEDURE NI 0 OHGT RSKH E I 0 K REHARKS C G H R ttCALIBRATIOH BLOCK!t 002050 30'-103-742-B EfBOM IOHGITUDIHAL SEAN B-J UT-45 NDE 5.3 - 02 C B9.12 UT-60 NDE 5.3 - 03 C HT NDE 2.2 - 12 C 10-24-87: HT COHPI ETE 10-28-87: UT COHPLETE ttUT-Stt 002060 30'-115-1 B-J UT-45 NDE 5.3 - 01 C ELBOM-TO-S/G NOZZ. EIT. PIECE B9. 11 UT-60 NDK 5.3 - 04 C HT NDE 2.2 - 17 C 10-24-87: HT COHPf ETE 10-26-87: UT COHPLETE ttUT-6tt 070 30'-401-258-B B-J UT-45 HDE 5.3 - 01 C S/G HOZZ.-TO-HOZZ. EXT. PIECE B9.11 UT-60 NDE 5.3 - 04 C HT NDE 2.2 - 16 C 10-24-87: HT COHPIETE 10-26-87: UT COHPLETK, LIHITED EWH MITN 45

DEGREE, CRV ACHIEVED MITS 60 DEGREE.

ttUT-6tt

DATE: 02/11/88 g ISIOH: 1 ST. LOCIE HGCLEAR PLAHT OBIT 2 IHSERVICE IHSPECTIOH SUHHARY ODTAGE 1 ( 1987), SECOHD PERIOD, FIRST IHTERVAK CLASS 1 COHPOHEHTS PAGE: 5 ZOHE HUHBER: 014 SUHHARY EXAHIHATIOH AREA HOHBER IDEHTIVICATIOH ASHE SEC. XI CATGY EXAH ITEH HO HETHOD PROCEDURE HI 0 0HGT RSEH E I 0 E REHARKS C G H R ttCALIBRATIOH BLOCKtt 002770 30'-401-258-h B-J STEAH GEH. HOZZ.-TO-EXT.PIECE B9.11 DT-45 HDE 5.3 - 05 C UT-60 HDE 5.3 - 06 C HT HDE 2.2 - 29 C 10-30-87: HT COHPLETE 10-31-87: DT COHPLETE,IIHITED SCAH MITH 45 DEGREE,COHPLETE SCAH NITH 60 DEGREE.

DATE: 02/11/88 SION: 1 ST. f,UCIE HUCf,EAR Pl,AHT UHIT 2 IHSERVICE IHSPECTIOH SUHHARY OUTAGE 1 ( 1987), SECOHD PERIOD, fIRST IHTERVAL CLASS 1 COHPOHEHTS PAGE: 6 ZONK HUHBER: 016 SUHHARY EZAHIHATIOH AREA HUHBER IDENTIFICATION ASHE SEC. ZI CATGY EZAH ITEH HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 E RKHARKS C G H R eeCALIBRATIOH BLOCKte 003060 12'-301-771 SURGE HOZZ,-TO-SAVE EHD B-P UT-45 S,E, HDE5.11 - 01 C B5.50 UT-45 lfZL. HDE5.11 - 02 C PT HDE 3.3 - 44 C 10-29-87: PT COHPLETED 10-29-87: UT COHPLETED ~~UT16!e 003070 12 -RC-108-VN-3 HOT LKG HOZZ. S.E.-TO-KfBON B-J UT-45 HDE 5.4 - 08 C 10-29-87: PT COHPlETE

89. 11 PT llDE 3.3 - 45 '

10-30-87: Ut COHPIKTK, GKOHETRY-IlfTERHITTEHT,360 DEGREES eeUT23ee 080 12'-106-751 ELBON - TO - PIPE B-J UT-45 HDE 5.4 - 08 C B9.11 PT HDE 3 ' - 46 C 10-29-87: PT COHPLETED 10-30-87: Ut COHPl ETED eeUT23(e 003100 12 -107-751 PIPE - TO - ELBON B-J UT-54 B9.11 PT HDE 5.4 - 08 C 10-26-87: Pt COHPLETE HDE 3.3 - 32 C 10-30-87: UT CO!fPLETE,GEOHKTRY - 360 DEGREES IHTERHITTEHT. 4!0723~4 003110 12 -RC-108-VN-2 ElBON - TO - PIPE B-J UT-45 B9.11 PT HDE 5.4 - 08 C 10-29-87: PT COHPLETED HDE 3.3 - 43 C 10-30-87: UT COHPLKTED, GEOHETRY-IHTERHITtEHT,360 DEGREES. ~ePZ23~e 003130 12 -101-751 PIPE - TO - EfBON B-J UT-45 B9.11 PT HDE 5.4 - 09 C 10-29-87: PT COHPLETED HDE 3.3 - 49 C 10-29-87: UT COHPIETED, GEOHETRY - 360 DEGREES IHTKRHITTEHT. eeUT23et

DhTK: 02/11/88 ISIOH: 1 ST. LUCIK HUCI EhR PLhHT OBIT 2 IHSERVICE IHSPECTIOH SQHHhRY OOThGE 1 {1987), SKCOHD PERIOD, KIRST IHTERYdf, CLhSS 1 COHPOHEHTS PhGE: 7 ZOHE HUHBER: 016 SUHHhRY EZhHIHhTIOH hREh HUHBER IDEHTIFICdTIOH hSHE SEC. ZI ChTGY EXhH ITEH HO HETHOD PROCKDORH HI 0 OHGT RSEH E I 0 K REHhRKS C G H R 4tChLIBRhTIOI BLOCKe4 003140 12'-102-751 BLBOM - TO - PIPH B-J UT-45 B9.11 PT HDH 5.4 - 09 C 10-27-87: PT COHPIETHD HDH 3.3 - 31 C 10-29-87: QT COHPLETED, GEOHETBY - 360 DHGREBS IHTHRHITTEHT. 4407234! 003160 12 -514-671 SURGE BUZZ{K-TO-ShFK EHD B-E QT-45 S.E. HDH5.11 - Ol C B5.20 UT-45 HZf. HDK5. 11 - 02 C PT HDH 3.3 - 30 C 10-26-87: PT COHPLETED 10-29-87: UT COHPLETED 44071644

DATE: 02/11/88 ISIOH: 1 ST. r,UCIE NUCr,EAR Pr,ANT UNIT 2 IHSKRVICK INSPECTION SUHHART OUTAGE 1 (1987), SECOND PERIOD, FIRST INTERVAL CLASS 1 COHPOHEHTS PAGE: 8 ZONK HUHBER: 018 SUHHARY EXAHIHATIOH AREA HUHBER IDEHTITICATIOH ASHE SEC. XI CATGY EXAH ITEN HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHARKS C G 5 R ttCALIBRATIOH BLOCEtt 003340 02-018-004 SUPPORT LUG $2 BX1 PT B10.20 HDE 3.3 - 26 C 10-21-87: COllPLETED, Ll!IITED EXAH AROUllD SUPPORT NUT AREA SEE DATA. ttN/htt 003350 02-01&-005. SUPPORT LUG $3 BKI PT B10.20 HDE 3.3 - 27 C 10-21-87: CQHPfKTKD, LIHITED KXAH AROUND SUPPORT HUT AREA,SEE DATA. ttN/htt 360 02-018-006 SUPPORT LUG $ 4 BK1 PT B10.20 HDE 3.3 - 28 C 10-21-87: COHPLETED, LIHITED EXAH AROUHD SUPPORT HUT AREA,SEE DATA. ttH/Att 003370 02-018-007 SUPPORT fUG 81 BKi PT B10.20 NDE 3.3 - 29 C 10-21-87: COHPLETED, f IHITED EXAH AROUHD SUPPORT HUT,SEK EXAH DATA. ttN/htt

y I

DATE: 02/11/&8 SION: 1 ST. fUCIE HUCf EAR PLAHT UNIT 2 IHSERVICE IHSPECTIOH SUHHART OUTAGE 1 ( 1987), SECOND PERIOD, FIRST IHTERVhf ClhSS 1 COHPOHEHTS PAGE: 9 ZONE HUHBER: 022 SUHHART EXAHINATIOH AREA 'UHBER IDENTIFICATION ASHE SEC. XI CATGT EXAH ITElf HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHARKS C G H R ttCALIBRATIOH BLOCKtt 004140 V-3217 BOLTIHG BG2 VT-1 NDE 4.1 - 04 C B7 ~ 70 10-27-87: COHPLETED ttN/htt 004260 12 -SI-149-FN-1 B-J UT-45 HDE 5.4 - 06 C 10-22-87: PT COHPlETED PIPE - TO - VALVE (V-3614) B9.11 PT NDE 3.3 - 13 C 10-22-87: UT COHPf,ETED, ROOT GEOHETRT ttUT35!t 80 V-3614 BOI TIHG BG2 VT-1 HDE 4 ~ 1 - 01 C B?.70 10-22-87: COHPLETED ttN/htt 004320 6'-Sl-515-EM-2 B-J UT-45 HDE 5.4 - 03 C PIPE - !0 - VALVE (V-3259) B9.11 PT HDE 3.3 - 12 10-22-87:PT COHPLETED, OHE (1) ROUNDED C INDICATION,0.1 nlh.,6.4 CH e C.r,. OZ THE MEfD CRONE,ACCEPT.10-22-8?: UT COHPLETED ttUT38tt 004340 V-3259 BOfTIHG BG2 VT-1 HDE 4.1 - 01 C B7.70 10-22-87: COHPLETED ttN/htt

DhTE: 02/11/88 ISIOH: 1 ST. LUCIE HUCLKhR Pf,hHT UHIT 2 IHSERVICE IHSPECTIOH SUHHhRY OUThGK 1 ( 1987), SECOND PERIOD, FIRST IHTERVhL CLhSS 1 COHPOHEHTS PhGK: 10 ZONK HUHBER: 022 SUHHdBT EXhHIHhTIOH hREd HUHBER IDEHTIFIChTIOH dSHE SEC. XI CdTQT KXdH ITEN HO HETHOD PROCEDURE j HI 0 OHGT RSEH E I 0 E RE!fhBKS C G H R ttChLIBRhTIOH BLOCKtt 004370 SI-4200-6340h VhR. SPBIHG SUPPORT (2) P-C VT-3 HDE 4.3 - 37 K-123 C 10-27-87: LOOSE JdH HUT ON BOTTOH PIPE CLhHP,HCR-87-004,DISPOSITIOHED PER PfhHT PNO. 11-23-87: NCR CLOSED. ttH/htt 004380 SI-4200-6340h VhR. SPRING SUPPORT'2) F-C VT-4 HDE 4.3 - 37 C F-4 10-2?-87: COHPLETED ttH/dtt 0 SI-4200-6350 VhB. SPRIHG SUPPORT (1) F-C VT-3 NDE 4.3 - 36 C F-123 10-27-87: COHPIETED ttN/htt 004460 SI-4200-6350 VhR. SPRING SUPPORT (1) F-C VT-4 'DE 4.3 - 36 C F-4 10-27-87: COHPf ETED ttH/dtt

DhTE: 02/11/88 ISIOH: 1 0 ST. fUCIE HUCLEhR PfhffT UHIT 2 IHSERVICE INSPECTION SUHHhRY OUThGE 1 (1987), SECOND PERIOD, FIRST IHTERVhL CLhSS 1 COHPOHEHTS PhGE: 11 ZOHE HUHBER: 023 SUHHhRY EXhHIHhTIOH hREh HUHBER IDEHTIVIChTIOH hSHE SEC. XI ChTGY EIhH ITEH HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHhRKS C G H R 44ChLIBRhTIOH BLOCK44 004470 12 -903-771 B-V SVTY IHJ. HOZZ.-TO-ShVE EHD B5.50 QT-45 S.E ~ HDE5.11 - 03 C QT-45 HZl, HDE5.11 - 04 C P! HDE 3.3 - 50 10-30-87: PT COHPLETE, LIGHT IHDIChTIOHS hT TOE OV HELD,IHTERHITTEHT BETNEEH C RhDIOGRhPRY HhRKIHGS 150 DEGREES TO 170

DEGREES, HOH-REI EVhHT.

10-30-87: UT COHPLETED t!UT16!! 004770 6'-517-1-SN-3 EfBON - TO - PIPE B-J UT-45 HDE 5.4 - 04 C 10-22-87: PT COHPLETED '9.11 PT HDE 3.3 - 14 C 10-22-87: QT COHPIETED 4!QT38~~

TE: 02/11/88 SION' P. r,UCIE NUCr,WR PLANT UNIT 2 IHSERVICE IHSPECTIOH SUHHARY OUTAGE 1 (f987), SECOND PERIOD, FIRST IHTERVdf CfhSS 1 COHPOHEHTS ZONE HUHBER: 023 SUHHARY EXAHIHATIOH AREA HUHBER IDEHTIFICATIOH ASHE SEC. XI CATGY EXAH ITEN HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHARKS C G H R 44CALIBRATIOH BLOCK44 004840 SI-4204-153 RIGID STRUT SUPPORT E-C VT-3 HDE 4.3 - 39 C F-123 10-31-87: COHPLETED

TE: 02/11/88 y SIOH: 1 ST. l,UCIE HUCLEhR PLhHT UNIT 2 IHSERVICE IHSPECTIOH SUHHhRT OUThGE 1 (1987), SECOND PERIOD, FIRST IHTERVdL CLhSS 1 COHPOHEHTS ZONE NUHBER: 026 SUHHhRT EXhHINhTIOH hREh HUHBER IDEHTIFIChTIOH hSHE SEC. XI ChTGT EXhH ITEN HO HETHOD PROCEDURE -HI 0 OHGT RSEH E I 0 E REHhRKS C G H R itChLIBRhTIOH BfOCKtt 005850 SPB-327 VdR. SPRIHG SUPPORT (2) F-C VT-3 F-123 HDE 4.3 - 40 C 10-31-87: COHPLETED ttH/htt 005860 SPH-327 VhR. SPRIHG SUPPORT (2) F-C VT-4 HDE 4.3 - 40 C 10-31-87: COHPLETED ttH/htt

DhTE;. 02/11/88 SIOH: 1 ST. I,UCIE HUCf,EhR PLhHT UNIT 2 IHSERVICE IHSPECT ION SUHHhRT OUThGE 1 (1987), SECOND PERIOD, FIRST IHTERVhL CLhSS 1 COHPONEHTS ZONE HUHBKR: 028 SUHHhRY E!hHIHdTIOH hRKh HUHBER IDENTIFIChTIOH hSHK SEC. XI ChTGT EXhH ITEN HO HKTNOD PROCEDURE NI 0 OHGT RSEH E I 0 E REHdRXS C G H R ttChLIBRhTIOH BLOCXtt 006710 HO I,D. BG2 VT-1 HDE 4.1 - 02 C FLhNGE BOLTIHG(8STUDS,16HUTS) B7.50 10-27-87: COHPI ETED ttN/htt 006830 V-3652 BOf TIHG (18 STUDS d HUTS) BG2 VT-1 B?.70 HDE 4.1-02 C 10-27-87: COHPLETED tt}f/htt 10 NO I.D. BG2 VT-1 HDE 4 ~ 1 - 02 C FLhHGK BOLT. (8 STUDS, 16HUTS) B?.50 10-27-87: COHPLETED ttN/dtt 006970 V-3651 BOITIHG BG2 VT-1 }lDE 4.1 - 02 C B7.70 10-27-87: COHPf ETED tt}f/htt 00?170 V-3527 BG2 VT-1 HDE 4.1 - 02 C VhfVE BOITIHG(18STUDS,18HUTS) B?,70 10-27-87: COHPLETED ttH/dtt 007290 V-3526 BG2 VT-1 HDE 4.1 - 02 C VhLVE BO(,TING(16 STUDShHUTS) B?.70 10-27-87: COHPf ETED ttN/dtt

DATE: 02/11/88 SIOH: 1 ST. fUCIE HUCfEAR PI ANT UNIT 2 IHSERVICE IHSPECTIOH SUHHARV OUTAGE 1 (1987), SECOND PERIOD, FIRST IHTERVAL CLASS 1 COHPOHEHTS ZONK HUHBER: 030 SUHHARV REANIMATION AREA HUHBER IDEHTIFICATIOH AS}{E SEC. XI CATGV KIAH ITEN NO HETHOD PROCEDURE NI 0 ONGT RSEH K I 0 E RElfhRKS C G H R ttCALIBRATIOH BLOCKtt 008240 2'-CH-146-FM-12 COUPLIHG - TO - PIPE B-J PT B9.40 HDE 3.3 - 15 C 10-22-8?: COMPLETED ttN/Att 008260 2 -CH-146-FM-11 PIPE - TO - TEK B-J PT B9.40 HDE3 ~3-16 C 10-22-87: COHPfETED ttN/htt 70 2 -CH-146-SM-8 TEE - TO - PIPE B-J PT B9.40 HDE 3.3 - 17 C 10-22-87: COMPLETED tt}l/htt 008280 2 -CH-146-SM-9 PIPE - TO - ELBOM BJ PT B9.40 HDE 3.3 - 18 C 10-22-87: COMPLETED ttN/htt 008290 2 -CH-146-SM-10 ELBOM - TO - REDUCER B-J PT B9.40 HDE3 ~3-19 C 10-22-87: COHPLETED

DATE: 02/11/88 ISIOH: 1 ST. lUCIE HUCf EAR PLANT UNIT 2 IHSERVICE IHSPECTIOH SUHHART OUTAGE 1 (1987), SECOHD PERIOD, fIRST IHTERVAL CLASS 1 COHPOHEHTS PAGE: 16 ZONE HUHBHR: 031 SUHHART EIAHIHATIOH AREA HUHBER IDHHTIFICATIOH ASHE SEC. II CATGT EIAH ITEN HO HHTHOD PROCEDURH NI 0 ONGT RSEH E I 0 E REHARKS C G H R ttCALIBRATIOH BLOCK>>>> 008660 2 -CH-148-SM-7 THE - TO - PIPH B-J PT B9.40 HDH 3 ' - 20 C 10-22-87: COHPLHTHD, LIGHT IHDICATION 0 TOE Of MHLD, 360 DEGREHS,IHTERHITTHHT,GEOHHTRY-ACCEPT. t>>N/h>>>>

DATE: 02/11/88 SIOH: 1 ST. LUCIE HUCl EAR PLANT UHIT 2 'INSERVICE IHSPECTIOH SUHHARY OUTAGE 1'1987j, SECOHD PERIOD, FIRST INTERVAl CLASS 1 COHPOHEHTS ZONE HUNBER: 031 SUHHART EIAHIHATION AREA NUNBER IDEHTIFICATIOH ASHE SEC. XI CATGT EXAH ITEN NO NETNOD PROCEDURE NI 0 OHGT RSEH E I 0 E REHARKS C G H R 44CALIBRATIOH, BLOCK44 008870 CN-108-R2 RIGID U-STRAP SUPPORT F-C VT-3 NDE 4,3 - 41 C F-2,3 10-31-87: COHPIETED !AN/Q4 008910 CH-108-R5 RIGID U-STRAP SUPPORT F-C VT-3 HDE 4.3 - 28 C F-2,3 10-22-8Z: CONPLETED !ON/h!4 0 8930 CH-108-R6 RIGID STRUT SUPPORT F-C VT-3 F-123 NDE 4 ' - 26 C 10-22-87: COHPLETED 4!N/h!4 008940 CH-108-R7 RIGID STRUT SUPPORT F-C VT-3 HDE 4.3 - 27 C F-123 10-22-8Z: COHPLETED 4!N/hti

TE: 02/11/88 SION' ST. l,UCIE NUCLEAR PLANT UHIT 2 IHSERVICE IHSPECTIOH SUHHARY OUTAGE 1 (1987), SECOND PERIOD, FIRST IHTERVhl Cl ASS 1 COHPOHENTS ZOHE NUHBER: 034 SUHHARY EXAHIHATION AR&d NUHBER IDENTIFICATIOH ASHE SEC. XI CATGY EXAH ITEN NO HETHOD PROCEDURE NI 0 OHGT RSEH E I 0 E REHdRKS C G H R ><CALIBRATION BLOCK44 009890 2 -1503-771-A B-F PT DRAIH NOZZLE - TO - SAFE END B5.50 NDE 3.3 - 11 C 10-21-87: COHPLETED

DATE: 02/11/88 ISIOH: 1 ST. LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE IHSPECTIOH SUHHARY OUThGE I (198Z), SECOND PERIOD, FIRST INTERVAL CLASS 1 COHPONENTS ZONE HUHBER: 034 SUHHARY EXAHIHATIOH AREA HUHBER IDEHTITICATIOH ASHE SEC. XI CATGY EXAH ITEN HO HETHOD PROCEDURE NI 0 ONGT RSEH E I 0 E REHARKS C G H R ttCALIBRATION BLOCKtt 0099ZO VRC-i-Rl CLAHP SUPPORT P-B VT-3 NDE 4.3 - 23 C E-123 10-21-87: COHPLETED ttN/htt

DATE: 02/11/88 ISION: 1 ST. r,UCIK HUCr,KAR PLANT UNIT 2 IHSERVICE IHSPECTIOH SUHHARV OUTAGE I (1987), SECOND PERIOD, FIRST INTERVAL CLASS 1 COHPONENTS PAGE: 20 ZONE HUHBKR: 037 SUHHARY EXAHIHATIOH AREA HUHBER IDENTIFICATION ASHE SEC. XI CATGUT EXAH ITEN HO HKTHOD PROCEDURE HI 0 OHGT RSEH E I 0 E RKHARXS C G H R ttCALIBRATIOH BLOCKtt 010260 2'-RC-142-SN-12 PIPE - TO - COUPLING B-J PT B9.40 HDE 3.3 - 3? C 10-28-87: COHPLETE ttH/htt 010270 2'-RC-142-PM-13 COUPLIHG - TO - PIPE B-J PT '9.40 HDE 3.3 - 38 C 10-28-87: COHPLETE ttN/htt 90 2'-RC-142-VN-19 B-J PT REDUCER - TO - VALVE (V-2593) B9.21 NDE 3.3 - 41 C 10-29-87: COHP(ETE, OHE (1) ROUHDED IHDICATIOH,.Q2'IA.,ACCEPT. ttN/Att 010300 V-2593 VALVE BOLTING (16) B-G-2 VT-1 HDE 4.1 - 03 C B7.70 10-29-87: COHPl KTED ttH/htt 010310 2 -RC-142-KM-18 VhfVE - TO - REDUCER B-J PT B9.21 HDK 3.3 - 40 C 10-29-87: COHPI ETE ttN/htt 010330 2"-RC-142-FN-1? B-J PT PIPE - TO - VhfVE (V-2515) B9.21 HDE 3.3 - 39 C 10-29-87: COHPLETE ttN/htt

DATE: 02/ll/88 ISIOH: ST. LUCIE HUCLEAR PLAHT UHIT 2 IHSERVICE IHSPECTIOH SUHlfhRT OUTAGE 1 (1987), SECOND PERIOD, FIRST INTERVAL CLASS 1 CONPOHEHTS PME: 21 ZONE HUHBER: 037 SUNNART EXAHINATION AREA NUHBER IDEHTIFICATIOH ASHE SEC. XI CATGT EXAH ITEN HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 E RENARKS C G H R ttChf IDEATION BfOCKtt 010340 V-2515 VALVE BOfTING (12) B-G-2 VT-1 'NDE 4.1 - 03 B7.70 C 10-29-87: INADEQUATE THREAD EHGAGEllEHT,HCR 87-05,0NE STUD TOUND PLUSH NITS TOP OT HUT. DISPOSITIOHED PER PLANT PROCEDURES.11-23 -87: HCR CLOSED. ttH/htt 010350 2'-CH-145-SH-I VAIVE - TO - PIPE B-J PT B9.21 HDE 3.3 - 42 C 10-29-87: CONPLETE tt}f/htt

DATE: 02/11/88 SIOH: 1 ST, LUCIE HUCfKAR PLANT UNIT 2 IHSERVICE IHSPECTIOH SUHHARY OUTAGE 1 (198?j, SECOND PERIOD, FIRST IHTERVhl CLASS 1 COHPONENTS PAGE: 22 ZONE NUHBER: 037 SUHHARY KXAHIHATIOHAREA HUHBKR IDKHTIFICATIOH ASHE SEC. XI CATGY EXAH ITEH NO HKTNOD PROCEDURE HI 0 OHGT RSEH E I 0 K REHARKS C G H R ttChlIBRATIOH BIOCKtt 010620 RC-2-R3 RIGID U-STRAP SUPPORT F-C VT-3 HDE 4.3 - 47 C F-2,3 10-31-87: COHPIETED ttN/htt 010630 RC-2-R3A RIGID FRANK SUPPORT F-B VT-3 NDE 4.3 - 46 C F-2,3 10-31-87: COHPLETED ttN/htt 40 RC-2-R2 RNID FRANK SUPPORT F-B VT-3 HDE 4.3 - 45 C F-2,3 10-31-87: COHPl ETKD ttN/htt 010650 RC-2-Rlh RNID STRUT SUPPORT F-C VT-3 HDK 4.3 - 43 C F-123 10-31-8?: COHPLETED ttN/Att 010660 RC-2-R1 RIGID U-STRAP SUPPORT 010670 RC-2-R8 VARIABLE SPRING SUPPORT F-C VT-3 HDE 4.3 - 44 C F-2,3 F-C VT-3 NDE 4.3 - 42 C F-123 10-31-87: COHPLETED ttN/htt 10-31-87: COHPLKTKD ttN/htt

DATE: 02/11/88 ISIOH' ST. LUCIE NOCLEAR PIAHT OHIT 2 IHSERVICE IHSPECTION SOHHARV OOTAGE I (1987), SECOHD PERIOD, VIRST IHTERVhft Cl ASS 1 COHPOHEHTS PAG&: 23 ZONK HOHBER: 037 SOHHARV KZAHIHATIOH AREA NOHBER IDEHTIVICATION ASHK SEC. ZI CATGV EXAH ITElf NO HKTHOD PROCEDORE HI 0 OHGT RSEH E I 0 K REHARES C G H R 44CALIBRATIOH BLOCE4! 010680 RC-2-R8 VARIABLE SPRING SUPPORT V-C VT-4 NDK 4,3 - 42 C F-4 10-31-87: COHPLETED

DATE: 02/ll/88 SIOH: 1 ST. LUCIE HUCf,EAR PLAHT OHIT 2 IHSKRVICE IHSPECTIOH SOHHARY OUTAGE I (1987), SECOHD PERIOD, FIRST IHTERVAL CLASS 2 COHPOHEHTS PAGE: 24 ZOHK HUHBHR: 043 SOHHARY EXAHIHATIOH AREA HOHBER IDEHTIVICATIOH ASHE SEC. XI CATGY EXAH ITEH HO lfKTHOD PROCEDURE NI 0 OHGT RSHH H I 0 E REHARKS C G H R 4~CALIBRATIOH BLOCK44 012380 6'-SI-409-IIH-2 C-E PT PIPH - TO - VhfVH (HCV-3615) C5.11 NDH 3.3 - 72 C 11-6-87: COHPIHTH 4!H/AN 012390 6'-SI-409-FN-1 C-F OT-45 HDH 5.4 - 10 C VALVE (HCV-3615) - TO -PIPE C5.21 PT HDH 3.3 - 74 C 11-6-8?: PT COHPLHTED 11-6-8?: OT COHPfKTHD 4!OT38N 400 6'-129-lh-SN-1 PIPE - TO - ELBOM C-E UT-45 HDE 5.4 - 10 C C5.21 PT HDE 3.3 - 73 C 11-6-8?: PT COHPLETED 11-6-87: UT COHPLETHD ~~0?3844

hTE: 02/11/88 ISIOH: 1 ST. LUCIE HUCLEhR PLhHT UHIT 2 IHSERVICE IHSPECTIOH SUHHhRY OUThGE 1 ( 1987), SECOND PERIOD, VIRST IHTERVhL CfhSS 2 COHPOHEHTS PhGE: 25 ZONE NUHBER: 043 SUHHhRY EXhHIHhTIOH hREh HUHBER IDEHTIVIChTIOH hSHE SEC. XI ChTGY EXhH ITEN HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHhRKS C G H R ttChLIBRhTIOH BLOCKtt 013320 SI-2408-56 RIGID ROD SUPPORT P-C VT-3 NDE 4.3 - 20 C E-123 10-22-87: COHPLETE ttH/htt 013350 SI-2408-47 RIGID VRdHE SUPPORT F-B VT-3 HDE 4.3 - 21 C F-123 10-22-87: COHPLETED ttH/htt

DATE: 02/11/88 SION: 1 ST. LUCIE HOCI,EAR PLANT OHIT 2 IHSERVICE IHSPECTIOH SOHHARY OUTAGE 1 (1987), SECOHD PERIOD, FIRST IHTERVAL CLASS 2 COHPOHEHTS ZONE HOHBER: 044 SDHHARY EXAHIHATIOH AREA HOHBER IDENTIFICATION ASHE SEC. ZI CATGY EIAH ITEN HO H&THOD PROCEDORE NI 0 OHGT RSEH E I 0 E REHARKS C G H R 4!CALIBRATION BLOCK4! 013810 12'-164-1-SN-10 PIPE - TO - EIBOM C-f PT C5.11 HDE 3.3 - 75 C 11-6-87: COHPI EYE sCN/h!4 013830 12'-164-1-SM-10A C-E PT EIBOM LONG SEAN AT SX-10 C5.12 HDE 3 ' - 76 C HDE 3.3 11-6-8?: COHPLETE 44N/htt

ATE: 02/ll/88 ISIOH: 1 ST. IUCIE NUCLEAR PfhHT UNIT 2 IHSERVICE IHSPECTION SUHHARY OUTAGE 1 (1987), SECOND PERIOD, FIRST INTERVAL CLASS 2 COHPOllEHTS PAGE: 27 ZONE NUHBER: 044 SUHHARY &XAHIHdTIOH AREA HUHBER IDEHTIFICATION ASHE SEC. XI CATGY ITEN NO EXAH HETHOD PROCEDURE HI 0 ONGT RSEH E I 0 E REHARKS C G H R 44CALIBRATION BLOCK44 013831 12'-164-1-SM-10h C-F PT, ELBON LONG SEAN AT SM-11 C5.12 RAB NDE 3.3 - 77 C 11-6-87: COHPIETE >>N/A44

DATE: 02/11/88 SION: 1 ST. IUCIE HUCfEAR PLAHT UHIT 2 IHSERVICE IHSPECTIOH SQHHART OUTAGE 1'1987), SECOHD PERIOD, FIRST IHTERVAL CLASS 2 COHPOHEHTS PAGE: 28 ZONE HQHBER: 044 ASHE SEC. XI SUHHARY EKAHIHATIOH AREA Ch!GY EIAH. HUHBER IDEHTIFICATIOH ITEH HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHARKS C G H R ttCALIBRATIOf(Bf,OCKtt 013840 12'-164-1-SM-11 KLBOM - TO - PIPE C-F PT C5.11 HDE 3.3 - 78 C 11-6-87: COHPIETE ttH/htt 013850 HO I.D. PIPE LOHG SEAH AT SN-11 C-F PT C5,12 HDK 3.3 - 79 C 11-6-87: COHPLETE ttH/htt 860 12'-SI-164-FN-1 CF PT PIPE - TO - VhfVE (V-3658) C5.11 HDE 3.3 - 80 C 11-6-87: CO!fPLETE ttH/htt 013870 HO I.D. PIPE LOHG SEAH AT FN-1 C-F PT C5.12 HDE 3.3 - 81 C 11-6-87: COHPLETE ttH/hti 014900 6 -110-8-SM-1 PIPE - TO - EfBOM C-F UT-45 C5.21 PT HDE 5.4 - 12 C HDE 3.3 - 93 C 11-9-87: PT COHPf ETED, STRUCTURhf IHTERFEREHCK, 5'F NEID HOT COVERED, SEE DATA SHEET. 11-9-87: UT COHPLETED, STRUCTQRhf, IHTERFEREHCE, 2'ITHER SIDE OF THE 0 ttQT38tt 014910 6 -SI-110-FM-9 ELBON - TO - PIPE C-F UT-45 HDE 5.4 - 12 C C5,21 PT HDE 3.3 - 92 C 11-9-8?: PT COHPLKTED 11-9-87: UT COHPf K?ED ttQT38tt

i

E: 02/11/88 SIOH: 1 ST. f UCIE HUCf EAR PWHT UNIT 2 INSERVICK IHSPECTION SUHlfhRT OUTAGE 1 (1987), SECOHD PERIOD, FIRST IHTKRVhf Cf ASS 2 CONPOHENTS PAGE: 29 ZONK NUHBER: 044 SUHHARY EXAHIHATIOH AREA HUHBER IDENTIFICATION ASHE SKC. XI CATGT EXAH ITEN NO HKTHOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHARKS C G H R ttCAI,IBRATIOH Bf,OCEtt 014920 6'-SI-110-FN-10 PIPE - TO - PEHETRATIOH C-F DT-45 C5.21 PT HDE 5.4 - 12 C HDE 3.3 - 91 C 11-9-87: PT COHPI ETED 11-9-87: UT COHPf ETED ttUT38tt

TE: 02/11/88 SION: ST. fUCIE NUCf EAR PLANT UNIT 2 IHSERVICE INSPECTIOH SUlfHART OUTAGE 1 (1987), SECOND PERIOD, FIRST IHTERVAL CLASS 2 COHPO}lEIITS PAGE: 30 ZONK NUHBKR: 044 SUHHARY EBHIHATION AREA HUHBER IDEHTIFICdTIOH ASHE SEC. XI CATGT Eldg ITEN HO H&THOD PROCEDURE NI 0 OHGT RSEH E I 0 K REHARKS C G H R ttCALIBRATIOH BLOCKtt 015470 SI-2404-17 RIGID STRUT SUPPORT P-C VT-3 NDE 4.3 - 01 F-123 C 10-20-87: COHPLETED, LIGHT BORON CRYSTALS 0}l REAR BRACKET PLATE NOTED. CLEAHED ttg/htt 015480 SI-2404-7 RIGID TRANK SUPPORT P-B VT-3 HDE 4.3 - 03 C E-123 10-20-87: COHPIETED ttg/htt 490 SI-2404-8002 AHCROR F-B VT-3 NDE 4.3 - 02 C F-123 10-20-87: COHPLETED ttg/htt 015750 SI-2410-1401 RIGID PRANK SUPPORT F-B VT-3 NDE 4.3 - 54 C F-2,3 10-23-87: COHPLKTED ttg/htt 015760 SI-2410-10 RIGID TRANK SUPPORT F-B VT-3 HDE 4.3 - 34 C F-123 10-23-87: COHPLETED ttg/htt 015770 SI-2410-6 RIGID STRUT SUPPORT F-C VT-3 HDE 4.3 - 53 C F-123 10-23-87: COHPLETED ttN/htt

TE: 02/11/88 SIOH: 1 ST. I,UCIK NUCLEdR Pr,hNT UNIT 2 ...IHSERVICE IHSPECTIOH SUHHhRV OUThGE 1 (1987), SECOHD PERIOD, FIRST IHTERVdL CfdSS 2 COHPOHKHTS ZONK HUHBER: 045 SUllHhRY EXhHIHhTIOH dREh NUNBER IDEHTIFIChTIOH hSHE SEC ~ XI ChTGT EXdH ITEN HO H&THOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHdRKS C G H R ttChLIBRhTIOH BLOCKtt 015930 SI-4200-6306 RIGID STRUT SUPPORT F-C VT-3 HDE 4.3 - 04 C F-123 10-20-87: COHPLETED ttN/htt 016090 SI-4200-6330 RIGID STRUT SUPPORT F-C VT-3 NDE 4.3 - 05 C F-123 10-20-87: COHPIETED ttN/htt

ATE: 02/11/88 SION: ST.- LUCIE HOCLEAR PLAHT UNIT 2 INSERVICE IHSPECTIOH SQHHARV ODTAGE 1 ( 1987), SECOHD PERIOD, fIRST INTKRVAL CfhSS 2 COHPONEHTS PAGE: 32 ZONK HOlfBKR: 046 SDHHARV EXAHIHATION AREA NOHBER IDKHTIVICATION ASHE SEC. XI CATGV EXAH ITEN HO HETHOD NI 0 OHGT RSEH E I 0 E REHARXS PROCEDORE C G H R 44CALIBRATIOH BLOCK!! 016110 6 -112-7-SN-3 PIPE - TO - ELBOM C-F DT-Q HDE 5.4 - Ql C C5.21 DT-45 HDE 5.4 - 02 C PT NDE 3 ' - 01 C 10-14-87: PT COHPf ETED 10-15-87: QT COHPLE!ED 4!QT38!e

DATE: 02/11/88 SIOH: 1 0 ST. LUCIE NUCLEAR PLAHT UHIT 2 IHSERVICE IHSPECTIOH SUHNART OUTAGE 1'1987), SECOHD PERIOD, FIRST IHTERVAL CfhSS 2 COHPOHEHTS PAGE: 33 ZONE HUHBER: 046 SUNHART EKAHIHATIOH AREA HUHBER IDEHTIFICATION ASHE SEC. XI CATGT EZAH ITEN NO HETHOD PROCEDURE HI 0 ONGT RSEH E I 0 E REHARKS C G H R ttCALIBRATIOH BLOCKtt 016290 SI-4201-702 RIGID STRUT SUPPORT F-C VT;3 HDE 4.3 - 07 C F-123 10-20-87: COHPIETED ttN/Att 016320 SI-4201-711 F-C VT-3 HDE 4.3 - 06 C YARIABlE SPRING BASE SUPPORT F-123 10-20-87: COHPLETED ttN/htt 330 SI-4201-711 F-C VT-4 HDE 4.3 - 06 C VARIABLE SPRIHG BASE SUPPORT F-4 10-20-87: COHPfETED ttH/Att 016370 SI-4201-7201d F-C VT-3 HDE 4 ' - 09 C RIGID FRANK h STRUT SUPPORT F-123 10-20-87: COHPLETED ttN/htt 016500 Sf-4201-7391 F-C VT-3 HDE 4.3 - 08 C RIGID FRANK A STRUT SUPPORT F-123 10-20-87: COHPLETED ttN/htt

TE: 02/11/88 ISIOH: 1 ST. LUCIE HUCLEAR Pf,AHT UHIT 2 IHSERVICE INSPECTION SUHHART OUTAGE 1 (1987), SECOND PERIOD, FIRST IHTERVAL CLASS 2 COkfPOHEHTS PAGE: 34 ZONE NUHBER: 048 SUHffhRY EXAHIHATION AREA NUHBER IDEHTIFICATIOH ASHE SEC. XI CATGY EXAH ITEN HO HETHOD PROCEDURE NI 0 ONGT RSEH E I 0 E REHARKS C G H R ttCAI,IBBATIOH Bf,OCKt>> 016590 6 -110-8A-SH-1 PIPE - TO - EfBON C-F UT-45 C5.21 PT HDE 5.4 - 05 C HDE 3.3 - 21 C 10-22-87: PT C01IPIETED 10-22-87: UT COHPIETED ttUT38tt

DATE: 02/11/88 SIOH: 1 ST. IUCIE NUCLEAR PfhHT UNIT 2 IHSERVICE 'IHSPECTION SUHHARY OUTAGE I'(1987),. SECOND PERIOD, FIRST INTERVAL ClASS 2 COHPONEHTS PAGE: 35 ZONK HUHBER: 048 SUNHARY EXAHIHATIOH AREA HUHBER IDEHTIFICATION ASHE SEC. XI CATGY EXAH ITElf NO HETHOD PROCEDURE NI 0 OHGT RSEH E I 0 E REHARES C G H R ttCALIBRATIOffBLOCXtt 016700 SI-4203-201 VARIABIE SPRIHG SUPPORT F-C VT-3 NDE 4.3 - 10 C F-123 10-20-87: COHPLETKD ttN/htt 016710 SI-4203-201 VARIABfE SPRIHG SUPPORT F-C VT-4 HDE 4.3 - 10 C F4 10-20-87: COHPLKTED ttN/Att 770 SI-4203-24A RIGID STRUT'UPPORT F-C VT-3 NDE 4.3 - 11 C F-123 10-20-87: COHPLETED ttH/htt

DATE: 02/11/88 SION: 1 ST. LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE INSPECTION SUHHARV OUTAGE I'(1987), SECOND PERIOD, FIRST IHTERVAL CLASS 2 COHPONEHTS PAGE: 36 ZONE NUHBER: 049 SUHHARV EXAHINATIOH AREA NIJHBER IDEHTIFICATIOH ASHE SEC. XI CATGV KXAH ITEN NO HKTROD PROCEDURE HI 0 OHGT RSEH E I 0 E RKHARKS C G H R ttCALIBRATIOH.BIOCKtt 017600 10 -424-1-SM-8h ELBOM LONG SEAN AT SM-7 C-F PT C5.12 HDE 3.3 - 66 C HDE 3.3 11-3-87: COHPLETE ttH/htt 017610 10'-424-1-SM-7 ELBOM - TO - PIPE C-F PT C5 F 11 HDE 3 ' - 62 C 11-3-87: COHPLETE ttN/Att 7620 HO I.D. PIPE LONG SEAN AT SM-7 C-F PT C5.12 HDE 3 ' - 63 C 11-3-87: COHPIETE ttN/htt 017630 10 -424-1-SM-6 PIPE - TO - TKE C-F PT C5 ~ 11 HDE 3.3 - 65 C 11-3-87: COHPLETE ttN/Att 017640 HO I.D. PIPE LOHG SEAN AT SM-6 C-F PT C5.12 NDE 3.3 - 64 C 11-3-87: COHPLETE ttN/htt

ATE: 02/11/88 ISION: ST. LUCIE HUCLEAR PLAHT UHIT 2 IHSERVICE IHSPECTIOH SUHHARY OUTAGE 1 (1987), SECOND PERIOD, YIRST IHTERVdL Cf ASS 2 COHPONEHTS PAGE: 37 ZONE NUHBER: 049 SUHHARY EXAHINATIOH AREA NUHBER IDENTIFICATION AS!{E SEC ~ XI CATGY EXAH ITEN NO HETHOD PROCEDURE HI 0 ONGT RSEH E I 0 E REHARKS C G H R ttCALIBRATION BfOCKtt 017690 SI-2412-108 RIGID TRANS SUPPORT E-B VT-3 NDE 4.3 - 35 C E-2,3 10-23-87: COHPLETED ttN/htt 017750 SI-2412-83 RIGID YRAHE SUPPORT F-B VT-3 NDE 4.3 - 22 C P-2,3 10-22-87: COHPLETED ttN/htt

DATE: 02/11/88 ISIOH: 1 ST. LUCIE NUCI,EAR PLAHT UHIT-2 INSERVICE INSPECTION SUHHARY OUTAGE 1 ( 1987), SECOND PERIOD, FIRST IHTKRFAL Cf dSS 2 COHPOHEHTS PdGE: 38 ZONE HUHBER: 052 SUHHARY EXdHINATIOH AREA HUHBER IDEHTIFICATIOH ASHE SEC. XI CATGT

KXAH, ITEN NO HETHOD PROCEDURE HI 0

OHGT RSEH E I 0 E REHARKS C G H R ttChf,IBRATIOH BLOCKtt 019940 10'-362-1-FN-903 ELBON - TO - PIPE C-F PT C5 F 11 HDE 3.3 - 35 C 10-28-87: COHPfETE ttH/dtt 019950 HO r.n, PIPE f OHG SEAN AT FK-903 C-F PT C5.12 HDE 3 ' - 47 C 10-28-87: COHPf ETE ttH/htt 960 ,SI-4205-7425 SHEAR LUGS (2) T=i 1/2'-C PT C3.40 HDE 3.3 - 36 C 10-28-87: COHPf KTED,SHEAR IUGS (2) ttN/dtt 019970 10'-SI-362-FN-2 PIPE - TO - EfBOM C-F PT C5.11 NDE 3 ' - 33 C 10-28-87: COHPIETED ttN/htt 019980 HO I.D. PIPE fOHG SEAN AT FN-2 C-F PT C5.12 HDE 3.3 - 34 C 10-28-87: COHPLETE ttH/htt 019990 10 -362-2-FN-2h ELBON fOHG SEAN AT FN-2 C-F PT C5.12 HDE 3.3 - 48 C 10-28-87: CO!lPLETE ttH/dtt

DATE: 02/11/88 ISIOH: 1 ST. LUCIE NUClEAR PLAHT UHIT 2 IHSERVICE IHSPECTIOH SUHHARV OUTAGE 1 (1987), SECOHD PERIOD, FIRST IHTERVAL CIASS 2 CONPOHEHTS PAGE: 39 ZONE HUHBER: 052 SUHHART EXAHINATIOH AREA NUHBER IDEHTIFICATIOH ASHE SEC. XI CATGT EXAH ITEN HO HETNOD PROCEDURE HI 0 ONGT RSEH E I 0 E REHARKS C G H R 4!CALIBRATION BLOCK!4 020500 SI-4205-4900A RIGID STRUT SUPPORT F-C VT-3 NDE 4.3 - 48 C F-123 10-31-87: CONPLETED 0tH/AN 020510 SI-4205-4900B RIGID STRUT SUPPORT F-C VT-3 HDE 4.3 - 49 C F-123 10-31-87: COHPI ETED

TE: 02/11/88 SIOH: 1 ST. LQCIE NUCLEAR PLANT OMIT 2 IHSKRVICE IHSPECTIOH SOHHART DOTAGE 1 ( 1987), SECOND PERIOD, EIRST IHTERVhf CLASS 2 COHPOHEHTS PAGE: 40 ZONE HOHBKR: 057 SOHHARY EXAHIHATIOH AREA HOHBER IDENTIFICATION ASHE SEC. XI CATGT EXAH ITKH HO HKTHOD PROCKOaRK HI 0 OHGT RSEH E I 0 E REMARKS C G H R ><CALIBRATIOH BLOCK44 020870 12'-SI-458-VM-3 PIPE - TO - VALVE (V-3325) C-T PT C5 ~ 11 HDE 3.3 - 22 C 10-22-87: COHPLETED ftN/Q4 020880 12 -SI-102-PM-I VALVE (V-3325) - TO - PIPE C-F OT-45 HDE 5.4 - 07 C5.12 P! HDE 3.3 - 23 C C 10-22-87: PT COHPLETED 10-22-87: OT CO!fPIKTED,ROOT GEOHETRY ~~073544

DhTE: 02/11/88 VISIOH: 1 ST. I,UCIE HUCf,EdR PLdHT UHIT 2 IHSERVICK IHSPECTIOH SUHHhRV OUThGE I (198?), SKCOHD PERIOD, FIRST IHTERVhL CLhSS 2 COHPOHEHTS ZOHE HUHBER: 059 SUHHhRV EXhHIHhTIOH dREh HUHBER IDEHTIFIChTIOH hSHE SEC. XI ChTGV EXhH ITEH HO HETHOD PROCEDURE HI 0 OHGT RSEH K I 0 E REHhRXS C G H R 44ChLIBRhTIOH BLOCX44 021391 12 -460-1-FM-902h ELBOM IOHG SEhH hT FM-901 RCB C-F PT C5.12 HDE 3.3 - 24 C 10-22-87: COHPLETED NH/dN 021400 12 -SI-460-FM-901 EfBOM - TO - PIPE C-F PT C5.11 HDE 3.3 - 25 C 10-22-87: COHPLKTED t!H/htf

DATE: 02/11/88 ISIOH: 1 ST. I UCIE HUCf EAR PLANT UHIT 2 IHSERVICE IHSPECTIOH SUHHART OUTAGE 1 (1987), SECOND PERIOD, FIRST IHTERVhf CLASS 2 COHPOHENTS PAGE: 42 ZONE HUHBER: 059 SUHHART EXANIHATION AREA NUHBER IDEHTIFICATIOH ASHE SEC ~ XI CATGT EXAN ITEN HO HETROD PROCEDURE NI 0 OHGT RSEH E I 0 E RE!fhRKS C G H R ttCALIBRATIOH BLOCKtt 021510 SI-4204-109 RIGID STRUT SUPPORT F-C VT-3 HDE 4.3 - 51 C P-123 10-31-87: COHPIETED ttN/htt 021520 SI-4204-1100A RIGID STRUT SUPPORT F-C VT-3 F-123 HDE 4.3 - 50 C 10-31-87: COHPLETED ttH/htt

TE: 02/11/88 ISIOH: 1 ST. I UCIE NUCLEhR PLhNT UHIT 2 IHSERVICE IHSPECTIOH SUHHdRY OUThGE 1 (1987), SECOND PERIOD, FIRST IHTERVhL Cf dSS 2 COHPOHEHTS PhGE: 43 ZONE HUHBER: 062 SUHHhRY EXhHIHhIIOH hREh HUNBER IDEHTIFICdTIOH hSHE SEC. XI ChTGY EXhH ITEN HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHhRKS C G H R eeChLIBRhTION BLOCK!! 022090 SI-2415-2141 RIGID FRhNE SUPPORT F-B VT-3 NDE 4.3 - 38 C F-2,3 10-22-81: COHPLETED !AN/Qt

E: 02/11/88 SIOH: 1 ST. LUCIE HOCf HAH PLAHT UNIT 2 IHSERVICE IHSPECTIOH SUHHARV OUTAGE 1 (1887), SECOHD PERIOD, FIRST INTERVAL CLASS 2 COHPOHEHTS PAGH: 44 ZONE HUHBER: 062 SUHHARY EXAHINATIOH ARHA 'U}{BER IDENTIFICATION ASHH SEC. EI CATGT EDH ITEN HO }IETHOD PROCEDURE NI 0 OHGT RSEH E I 0 E REHARKS C G H R eeCALIBRATIOH BLOCK!e 022160 6'-SI-213-2-FN-2 C-F OT-45 HDH 5.4 - 11 C VALVE (V-3654) - TO - PIPH C5,21 PT NDH 3.3 - 71 C 11-3-87: PT COHPLETED 11-6-87: UT COHPLHTED 440754M

TE: 02/11/88 ISIOH: 1 ST. LUCIE NUCl EhR PLdHT UNIT 2 IHSERVICE IHSPECTION SUNHhRV OUThGE 1 (1987), SECOND PERIOD, FIRST IHTERVhf CLdSS 2 COHPOHEHTS PhGE: 45 ZONE HUHBER: 063 SUNNhRV EIhHINdTIOH hREh HUNBER IDEHTIFICdTIOH hSlfE SEC. XI ChTGV EKhH ITEN HO NETHOD PROCEDURE HI 0 ONGT RSEH E I 0 E REHhRKS C G N R 44ChLIBRhTION BLOCK44 022260 HS-4100-6079 CONSThHT SPRING SUPPORT F-C VT-3 HDE 4.3 - 52 C F-123 10-31-87: COHPLETED CON/d44 022270 HS-4100-6079 COHSTdHT SPRIHG SUPPORT F-C VT-4 HDE 4.3 - 52 C F-4 10-31-87: COHPLETED t!H/hff

IE: 02/11/88 SION: 1 f ST. f UCIE NUCLEAR PLAHT UNIT 2 IHSERVICE INSPECTION SQHHARY OOTAGH 1 (1987), SECOND PERIOD, FIRST IHTERVAL CLASS 2 COHPONHHTS PAGE: 46 ZONE HOHBER: 063 SOHHARY EXAHINATIOH AREA HOHBER IDEHTIFICATION

ASHH, SEC. II ChTGY EM ITEN HO HEIHOD HI 0

ONGT RSHH E I 0 E REHARKS PROCEDURH C G H R ttChf,IBRATIOH BLOCKtt 022481 34 1-SM-3d ELBOM LONG SHAH AT PM-1 RCB C-P QT-45 C5.22 DT-60 HT NDE 5.2 - 11 C HDH 5.2 - 12 C NDE 2.2 - 30 C 10-30-87: HT COHPLHTE 10-31-87: DT COHPIHTE ttUI-45tt 022482 34 1-SM-3B E!BOM lOHG SHAH AT PM-1 RCB C-F U!-45 HDE 5.2 - 11 C C5.22 OT-60 HDE 5.2 - 12 C HT HDE 2.2 - 28 C 10-30-87: HT COHPl ETE 10-31-87: OT COHPLEIE ttUT-45tt 490 34'-HS-28-PM-1 HLBOM - TO - PIPH C-P OT-45 C5.21 OT-60 HT HDE 5.2 - 11 C NDH 5.2 - 12 C NDE 2.2 - 26 C 10-30-8?: HT COHPLETH 10-31-87: OT COHPLHTE ttUI45tt 022500 HO I.D. PIPE LONG SHAH AT FM-1 C-F UT-45 NDE 5.2 - 11 C C5.22 OT-60 NDH 5,2 - 12 C HT NDE 2.2 - 27 C 10-30-8?: HT COHPLETE 10-31-87: OT COHPLETE ttDT45tt

0

DATE: 02/11/88 VISIOH: 1 ST. IUCIE HUCLEAR PLANT UNIT 2 IHSERVICE INSPECTIOH SUHHARV OUTAGE

1. (1987),

SECOHD PERIOD, FIRST IHTERVAL CIASS 2 COlfPOHEHTS PAGE: 47 ZONK HUHBER: 064 SUHHARV REANIMATION AREA NUHBER IDEHTIFICATIOH ASHE SEC. XI CATGV EIAH ITEN HO HETNOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHARKS C G H R ttCALIBRATIO!fBLOCKtt 023130 HO I.D. SM-1 PIPE IOHG SEAN C-F UT-45 HDE 5.2 - 09 C C5.22 QT-60 NDE 5.2 - 10 C HT HDE 2.2 - 24 C 10-28-87: llT COHPLETE 10-31-87: QT COHPLETE ttQT45tt 023150 34'-29-3-SM-1 PIPE - TO - ELBOM C-F QT-45 C5.21 UT-60 HT HDE 5.2 - 09 C HDE 5.2 - 10 C HDE 2 ' - 23 C 10-28-87: HT CO!fPLETE 10-31-87: UT COHPLETE ttUT45tt 23160 34'-29-3-SM-1A ElBOM LONG SEAN hi SM-1 C-F QT-45 HDE 5.2 - 09 C C5.22 UT-60 NDE 5.2 - 10 C HT HDE 2.2 - 25 C 10-28-87: HT COHPfETE 10-31-87: UT COHPLETE ttUT45tt

DATE: 02/11/88 SIOH: 1 ST. LUCIK HUCLHAR PfhHT UHIT 2 IHsaaVICH INsPHCTIOH sUHHhar oorhGH 1 (1987), sacoan paafoD, efasr INTHRYAL CfdSS 2 COHPOHEHTS PAGE: 48 ZONK HOHBER: 065 SUHHARY EIAHIHATIOH AREA NOHBER IDENTIPICATIOH ASHK SKC. XI CATGY EIAH ITEN HO HETNOD PROCEDURE NI 0 OHGT RSHH H I 0 H REHARKS C G H R ttCALIBRATIOffBf,OCKtt 023700 io 1-SM-3 TEK - TO - REDUCER STH.TRSL STH.rasf, C-P HT C5.21 Rr RT NDB 2.2 - 02 C H87-3233 lf87-3300 C 10-16-87: Hr COHPLETE C 11-10-87 RT: INDICATIONS DUB TO SURPACE CONDITIONS, MBLD CROXH COHDITIOHED BY GRIHDIHG 11-13-87 RT: RE -EXhlfIHHD HO RECORDABIE IHDICATIONS. tta/htt 023Z10 8'-79-1-SM-2 RKDUCHR - TO - PIPE C-P OT-45 HDE 5.2 - 01 C C5,21 OT-60 NDE 5.2 - 03 C Hr HDH 2.2 - 01 HT HDE 2.2 - OZ C 87 - LIHEAR IHDICATIOH, 1.4'H

LENGTH, AREA RK-Cf EARED,RE-EXAHINED INDICATIOH C

POOHD TO BE h PABRICATIOH HARK,ACCEPT AS IS,HCR 03.10-21-87: Hr COHPfHTH 10-16-87: UT COHPLETE ttOT48tt 023720 8 -HS-120-PM-1 PIPE - TO - VhfVE C-P OT-45 C5.21 OT-60 Hr NDE 5.2 - 01 C 10-16-87: H'r COHPfETE NDE 5.2 - 03 C 10-16-87: OT COlfPf ETE, ROOT GEOHETRY NDE 2.2 - 06 C ttOT48tt 023770 8 -HS-124-PM-1 PIPE - TO - VALVE C-P OT-45 NDE 5.2 - 02 C 10-16-87: HT COHPfETE C5.21 OT-60 NDH 5.2 - 04 C 10-19-87: UT COHPLKTE,ROOT GEOHHTRY HT HDE 2.2 - 05 C ttUT46tt 023880 34'-HS-32-PM-1 HSIV - TO - PIPE C-P OT-45 HDH 5.2 - 05 C 10-24-87: Hr COHPLETE CS.21 UT-60 NDH 5.2 - 06 C 10-26-87: UT COHPI,KTK,ROOT GEOHETRY HT HDE 2.2 - ll C ttUT44tt

TK: 02/11/88 SION: ST. LUCIK HUCIEAR PIAHT UHIT 2 IHSERVICE IHSPECTIOH SUHHARY OUTAGE 1 (1987), SECOHD PERIOD, FIRST IHTERVAI CIASS 2 COHPOHKHTS PAGE: '9 ZONE NUHBER: 065 SUHNARY EXAHIHATIOH AREA HUHBER IDEHTIFICATIOH ASHE SEC. XI CATGY EXAH ITEN HO HETHOD PROCEDURE HI 0 ONGT RSEN E I 0 REHARKS C G H R eeCALIBRATION BLOCK!e 023900 HS-4102-2705 CC HT NS ATTACH TRUNNIOHS (4)7=1.4 C3.40 NDK 2.2 - 10 C 10-24-87: (4) FOUR TRUNNIOHS EXAHIHED,COHPLETE. !4H/hf!

i

DATE: 02/11/88 KVISIOH: 1 ST. LOCIK HUCI,EAR PLANT OHI! 2 IHSERVICK IHSPHCTIOH SUHHART OUTAGE 1 (1987), SECOND PERIOD, fIRST IHTERVAL CLASS 2 COHPOHEHTS PAGE: 50 ZONK NUHBER: 067 SOHHARY EXAHIHATIOH ARHA HOHBER IDEHTIPICATION ASHK SEC. XI CATGT EXAH ITEN HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 H REHARKS C G H R 44CALIBRATION BLOCK44 024680 18 2-SM-'1 CC HT HANGER LOG BP-4007-6081 T=1 C3.40 NDE 2.2 - 22 C 10-27-87: COHPLETE 44N/htt 024690 18 -BP-51-PM-3 C-P ELBOH-TO-S/G 2A1 NOZZ EXT PCH C5.21 OT-O NDE 5.18 - 01 C 10-27-87: AUGHEHTED KXAHS,(IAE 79 UT-45 NDH 5.16 - 02 C -13),I.D. GKOHKTRT-360 DEGREE OT-60 NDH 5.16 - 03 C IHTERHITTEHT AT VARVING AHPLITUDES. kiUT4344 024700 18 -201-228 NOZZLE KXT PIECE-TO-HOZZLH C-P OT-0 C5.21 OT-45 OT-60 HT HT HDE 5.18 - 01 HDE 5. 16 - 02 HDE 5.16 - 03 HDE 2.2 - 09 HDE 2.2 - 21 10-24-87: HT COHPLETE 10-27-87: UT COHPLETK, AOGHEHTKD HXAH IHCMDED(REP. I.A E. BULLETIN 79-13) ttUT434!

DATE: 02/11/88 ISIOH: 1 ST. LUCIE NUCfEAR PLAHT UNIT 2 IHSERVICE IHSPECTIOH SUHHARY OUTAGE 1 (1987), SECOND PERIOD, FIRST IHTERVAL CLASS 2 COHPONEHTS PAGE: 51 ZONE NUHBER: 068 SUHHARY EXAHIlfd'TI0!fAREA HUHBER IDENTIFICATION ASHE SEC. XI CATGY EXAH ITEN HO HETHOD PROCEDURE HI 0 OHGT RSEN E I 0 E REHARXS C G H R 44CALIBRATIOH BLOCK!4 025030 18'-BF-52-FN-3 C-P ELBON-TO-S/G 2B1 NOZZ EXT PCE C3.21 UT-45 HDE 5,16 - 02 C UT-60 HDE 5.16 - 03 HT HDE 2.2 - 08 C 10-23-87: HT COlfPLEYE C 10-24-87: UT CO!fPIETE,INCLUDING AUGHENTED EXAHS(IAE 79-13),I.D. GEOHETRY -360 DEGREES IHTERHITTEHT AT VARYING AHPLITUDES. $!UT43tt 025040 18 -201-228 C-F UT-45 HDE 5. 16 - 02 C HOZZfE EXT PIECE-TO-NOZZLE UT-60 HDE 5.16 - 03 C 10-24-87: COHPLETED, AUGHEHTED EXAHS(IAE 79-13) 4!UT4344

i i

DATE: 02/11/88 ISIOH: 1 0 ST. r,UCIE NUCLEAR PLANT UNIT 2 IHSERVICE IHSPECTIOH SUHlfhRY OUTAGE 1 (198?j, SECOND PERIOD, FIRST I}ITERVAL CIASS 2 COHPOHEHTS PAGE: 52 ZONE HUHBER: 070 SUHHARY EXAHINATION AREA HUHBER IDENTIEICATIOH ASHE SEC. XI CATGY EXAH ITE}f HO HETHOD PROCEDURE NI 0 ONGT RSEN E I 0 E REHARKS C G H R ttChf,IBRATION BLOCKtt 025050 SI-2412-6002 E-C VT-3 NDE 4.3 - 30 C VARIABLE SPRING BASE SUPPORT F-123 10-22-87: COHPLETED ttN/htt 025060 SI-2412-6002 F-C VT-4 HDE 4.3 - 30 C VARIABLE SPRING BASE SUPPORT F-4 10-22-8?: COHPLETED ttH/htt 50 SI-2407-17 RIGID STRUT SUPPORT F-C VT-3 HDE 4.3 - 29 F-123 C 10-22-87: COHPLETED, RUST OH EHBEDHEHT PLATE,CLEANED PER PI AHT XORK REQUESTS XA873060831. ttN/htt 025260 SI-2407-19 SLIDING BASE SUPPORT F-C VT-3 HDE 4.3 - 31 F-123 C 10-22-87: COHPLETED,RUST ON BASE P}ATE,CIEANED PER MURK REQUEST 8 XA873060839. tt}l/htt

DATE: 02/11/88 VISIOH: 1 0 ST. LUCIE HUCf,EAR PLAHT UHIT 2 IHSERVICE IHSPECTIOH SUHHARV OUTAGE 1 (1987), SECOND PERIOD, FIRST INTERVAL Cl ASS 2 COHPOHEHTS PAGE: 53 .ZONE HUllBER: 070 SUHHARV KXAHIHATIOHAREA HUHBER IDEHTIFICATIOH ASHE SEC. XI CATGV EXAH ITKH HO HKTHOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHARKS C G H R ttChfIBRATIOH BLOCKii 025690 24 -CS-2-FN-5 PIPE - TO - ELBON C-F PT C5.11 HDE 3 ' - 02 C 10-19-87: COHPLETED ttH/htt 025700 HO I.D. PIPE LONG SKAH AT FN-5 C-F PT C5.12 HDK 3.3 - 03 C 10-19-87: COHPLETKD ttH/hti 025710 24 -CS-2-FN-5h ElBON LONG SHAH AT FN-5 C-F PT C5.12 HDE 3.3 - 04 C 10-19-87: COHPfETKD ttH/Att 025720 24 -CS-2-FN-5B ELBON lOHG SKAH AT FN-5 C-F PT C5.12 HDE 3.3 - 05 C 10-19-87: COHPLKTED tiH/hii 025770 SI-2407-17 NELDED LUGS (8) T=i 1/4'-C PT C3.40 HDK 3.3 - 06 C 10-19-87: COllPLETED - EXAHIHED All EIGHT (8) LUGS ttH/Att 025780 24 -CS-2-FN-3 PIPE - TQ - Ef BOW C-F PT HDE 3.3 - 07 C C5.11 10-19-87: COHPLKTED ttH/Att

DATE: 02/11/88 ISIOH: 1 ST. f,UCIE HUCLEAR PLANT UNIT 2 IHSERVICE IHSPECTION SUHHARY OUTAGE 1 ( 1987), SECOHD PERIOD, FIRST IHTERVAL CfhSS 2 COHPOHKHTS PAGE: 54 ZONE NUHBER: 070 SUNHARY EKANINATIOH AREA HUHBER IDENTIFICATIOH ASHK SEC. XI CATGY EIAH ITEN E0 HKTNOD PROCEDURE NI 0 OHGT RSEH E I 0 E REHARES C G H R e!CALIBRATIOH BLOCK!t 025790 NO I.D. PIPE LOHG SEAN AT FN-3 C-F PT C5.12 NDE 3.3 - 08 C 10-19-87: COHPLETED ffH/Aft 025800 24 -CS-2-FN-3h ELBON LONG SEAN AT FN-3 C-e PT C5. 12 NDE 3.3 - 09 C 10-19-87: COHPLETED 4!N/A44 810 24 -CS-2-FM-3B EfBOM IONG SEAN AT FM-3 C-F PT C5.12 NDE 3.3 - 10 C 10-19-87: COHPLETED CAN/h!4

DhTK: 02/l,i/88 VISIOH: 1 ST. LUCIK HUCl,EhR Pf,dHT UNIT 2 IHSKRVICE IHSPECTIOH SUHHhRV OUThGE 1 (1987), SECOHD PERIOD, VIRST IHTERVhL CldSS 2 COHPONEHTS PhGK: 55 XONE HUHBER: 071 SUHHhRY EXhHINhTIOH hREh HUHBER IDKHTIVIChTIOH hSHE SEC. XI ChTGV EXdH ITEN HO HKTHOD HI 0 OHGT =-RSEH E I 0 E REHhRXS PROCEDURE C G H R ttCdI,IBRETIOH BLOCXtt 027040 20 -BF-14-VN-2 PIPE-TO-PEHE l3 EXT, PIPE C-P UT-45 HDE 5.2 - 07 C C5.21 Of-60 HM 5.2 - 08 C H! HDE 2,2 - 04 C 10-16-87: HT COHPLETE 10-21-87: UT COHPLKTK ttUT41tt 027050 20 -BV-14-SM-P-3 C-E UT-45 HDK 5.2 - 07 C 10-16-87: HT COHPLKTE KXT. PIPE-'TO-PEEK 13 hSSEHBLV C5.21 UT-60 HDK 5.2 - 08 C 10-21-87: UT COHPfETE,ROOT GEOHETRV STH TRSL. HT HDE 2.2 - 03 C ttgf41tt

DATE: 02/11/88 ISION: 1 ST. LUCIE NUCLEAR Pf,AHT UNIT 2 IHSERVICE IHSPECTIOH SUHHARY OUTAGE I (IS8?), SECOHD PERIOD, VIRST INTERVAL CfhSS 2 COHPOHEHTS PAGE: 56 ZONE HUHBER: 073 SUHHARY EIAHIHATION AREA HUHBER IDEHTIVICATIOH ASHE SEC. ZI CATGY EXAH ITEN HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHARKS C G H R ttCALIBRATION BLOCKtt 028760 6'-SI-508-VN-3 VAIVE - TO - PIPE C-E PT C5 ~ 11 HDE 3.3 - 67 C 11-3-87: COHPLETED ttH/Att 028770 6'-28-508-VM-4 PIPE - !0 - VALVE (V-3470) C-E PT C5.11 NDE 3.3 - 68 C 11-3-87: COHPLETE ttH/htt

MTE: 02/11/88 ISIOH: 1 0 ST. IUCIH HUCf HdR PLdHT UNIT 2 IHSERVICE INSPECTION SUHlfdRT OUThGE 1 (1987), SECOHD PERIOD, FIRST IHTERVhf CLhSS 2 COHPOHEHTS PhGE: 57 ZONE NOHBER: 074 SOHHhRT'IdNINhTIOH hREh HUNBER IDEHTIFIChTIOH hSNH SEC ~ II ChTGT HIdH ITEN HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHhRKS C G H R e4ChLIBRhTIOH BLOCKte 029020 SI-2407-76 F-C VT-3 HDH 4.3 - 12 C RIGID STRUT h SLID. BhSE

SUPP, F-123 10-20-87:

COHPLHTED NN/hat 029060 Sl-2403-540 F-C VT-3 HDE 4.3 - 16 C VhR. SPRING BhSE SUPPORT F-123 10-20-87: CONPLETHD 44N/hat 70 SI-2403-540 F-C VT-4 NDE 4.3 - 16 C VhR. SPRING BhSE SUPPORT F-4 10-20-87: COHPLETHD NN/hN 029110 SI-2403-43h F-C VT-3 NDE 4.3 - 15 C VhR. SPRING BdSE h RIG. STRUT F-123 10-20-87: COHPf HTED 029120 SI-2403-43h F-C VT-4 HDE 4.3 - 15 C VhR. SPRING BhSH h RIG. STRUT F-4 10-20-87: COHPf HTED c!H/h!! 029150 SI-2403-51 RIGID STRUT SUPPORT F-C VT-3 HDE 4.3 - 14 C F-123 10-20-87: COHPfETED tfN/Q4

i

DhTK: 02/11/88 ISIOH: 1 ST. LUCIK HUCfEhR PLhHT UHIT 2 IHSERVICE INSPECTIOH SUHHhRT OUThQE 1 (1987), SECOHD PERIOD, FIRSt IHTERYhL CfhSS 2 COHPONEHTS PhGE: 58 ZONE NUHBER: 074 SUNHhRT EXhHIHhTION hREh NUHBER IDEHTIFIChTIOH hSHE SKC. XI ChTQT EXhH ITEN HO NKTHOD PROCEDURE HI 0 OHGT RSEN K I 0 E RKHhRKS C G H R ttChf,IBRhTIOH BLOCXtt 029160 SI-2407-101 RIGID BhSK SUPPORT F-B VT-3 HDK 4.3 - 13 C F-123 10-20-87: COHPLETED ttN/htt

DATE: 02/11/88 VISIOH: 1 ST. r,UCIH NUCr,HAR PLANT UNIT 2 'IHSHRVICE IHSPHCTIOH SUHHARY OUTAGH 1 (198?), SECOHD PERIOD, FIRST IHTERVAL CLASS 2 COHPOHEHTS PAGE: 59 ZONE NUHBER: 074 SUHHARY REANIMATION AREA NUHBER IDEHTIFICATIOH ASHE SEC. XI CATGY H}fhH ITHH HO HKTHOD PROCEDURE NI 0 OHGT RSEH H I 0 E REHARKS C G H R ttCALIBRATIOH BLOCKtt 030050 14 -Sl-512-FM-1 REDUCHR - TO - PIPE C-F PT C5 F 11 HM33-53 C 11-3-87: COHPIHTE ttH/htt 030060 14 3-SM-lh REDUCER LONG SHAH AT FM-1 C-F PT C5 F 11 HDK 3.3 - 54 C 11-3-87: CO}fPLETE ttN/htt 00?0 . NO I.n. PIPE L0NG SHAH AT FM-1 C-F PT C5.12 HDK 3.3 - 55 C 11-3-8?: CONf ETE ttN/Att 030080 14'-512-1-SM-4 PIPH - TO - EIBOM C-F PT C5,11 HDH 3 ' - 69 C 11-3-8?: CONLHTE ttH/Att 030090 NO I.D. PIPH fOHG SHAH AT SM-4 C-F PT C5.12 HDE 3.3 - 59 C 11-3-87: COHPLETED ttN/htt 030100 14 -512-1-SM-4h ELBOM fONG SHAH AT SM-4 C-F PT C5 ~ 12 NDE 3.3 - 60 C 11-3-87: COMPLETE ttN/htt

DATE: 02/11/88 VISION: 1 ST. f,UCIK HUCf,KAR PLAHT UHIT 2 IHSERVICE IHSPECTIOH SUHHART OUTAGE 1 (1987), SECOHD PERIOD, FIRST IHTERVAL CLASS 2 COHPQHEHTS PAGE: 60 ZONE HUHBER: 074 SUHHARY KXAHIHATIOHAREA HUHBKR IDEHTIFICATIOH ASHE SEC ~ XI CATGT EXAH ITKH HO METHOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHARXS C G H R ttCALIBRATIOH BfOCXtt 030110 14 -512-1-SM-4B EIBON LOHG SEAM AT SN-4 C-P PT C5.12 HDE 3 ' - 61 C 11-3-87: COHPLETE ttH/htt 030120 14 -512-1-SM-4A KfBON GONG SHAH AT SM-3 C-E PT C5.12 HDK 3.3 - 57 C 11-3-87: COHPf ETED ttH/htt 030130 14 -512-1-SN-4B ELBON GONG SKAH AT SM-3 C-F PT C5,12 HDE 3 ' - 58 C 11-3-87: COHPLKTE ttH/htt 030140 14 -512-1-SN-3 ELBON - TO - PIPE C-e PT C5.11 HDK 3.3 - 70 C 11-3-87: COHPLETE ttH/htt 030150 HO I.D. PIPE LOHG SHAH AT SN-3 C-E PT C5.12 HDK 3.3 - 56 C 11-3-87: COHPfETE ttH/htt 031390 6 -428-3-SM-2 C-F PT PIPE - TO - REDUCER (6'x4') C5.11 HDE 3.3 - 51 C 11-3-8?: COHPLKTE ttH/htt

ATE: 02/11/88 ISIOH: 1 ST. LUCIE HUCI,EAR PLAHT UNIT 2 IHSERVICE IHSPECTIOH SUHHARY OUTAGE 1 (1987), SECOND PERIOD, FIRST INTERYAL ClhSS 2 COHPOHEHTS ZONE NUHBER: 074 SUHHARY EXAHIHATIQH AREA HUHBER IDEHTIFICATIOH ASHE SEC. XI CATGY EXAH ITEN HO HETHOD PROCEDURE NI 0 ONGT RSEH E I 0 E REHARKS C G H R a!CALIBRATIOH BLOCKee 031400 6 -428-3-SH-1 C-F PT REDUCER-TO-FLANGE 0 BPSI-2B C5,11 HDE 3.3 - 52 C 11-3-87: COHPI EYE

DATE: 02/11/88 VISION: 1 ZONE HUHBER: 076 SUHHARY EKAHINATIOH AREA HUHBER IDENTIFICATION ST. LUCIE NUCLEAR PLANT UNIT 2 IHSERVICE IHSPECTIOH SUHHARY OUTAGE 1 (1987), SECOND PERIOD, FIRST IHTERVAL CLASS 2 COHPOHEHTS HI 0 ASHE 0 H G T SEC. XI R S E H CATGT K!AH E I 0 E REHARKS ITEN NO HETHOD PROCEDURE C G H R ttCALIBRATIOH BLOCKtt PAGE: 62 032350 SI-2406-24 VARIABLE SPRING SUPPORT F-C VT-3 F-123" NDE 4.3 - 24 C 10-21-87: COHPLETED ttH/htt 032360 SI-2406-24 VARIABLE SPRIHG SUPPORT F-C YT-4 HDE 4.3 - 24 C 10-21-87: COHPLETED ttH/htt

DATE: 02/11/88 VISIOH: 1 ST. r,UCIK NUCLEAR Pr,AHT UNIT 2 IHSERVICE IHSPECTIOH SUHHART OUTAGE 1 (1987), SECOHD PERIOD, KIRST IHTERYAL CLASS 2 COHPOHEHTS PAGE: 63 ZONE NUHBKR: 076 SUHHART EXAHIHATION AREll HUHBER IDKHTIVICATIOH ASHE SEC. XI CATGT EXAH ITEN HO HKTNOD PROCEDURE HI 0 ONGT RSEH E I 0 E REHARKS C G H R ttCALIBRATION BLOCKtt 032700 12 -412-2-SM-3 PIPE - TO - TKK C-T PT C5 ~ 11 HDE 3.3 - 90 C 11-9-87: COHPIETE ttN/Att 032710 HO I.D. PIPE LONG SEAN AT SM-3 C-F PT C5.12 HDE 3 ' - 89 C 11-9-87: COHPLETE ttN/Att 032720 12 -412-2-SM-3A TEK LONG SEAN AT SM-3 C-F PT C5.12 HDE 3.3 - 88 C 11-9-87: COHPIETE ttN/htt 032721 12'-412-2-SM-3d TEE LONG SEAN AT SM-2 RAB C-F PT C5.12 HDE 3.3 - 87 C 11-9-87: COHPLETE ttN/htt 032730 12 -412-2-SM-2 TEE - TO - PIPE C-E PT C5.11 HDE 3.3 - 86 C 11-9-87: COHPl ETED ttH/htt 032740 NO I.D. PIPE fOHG SEAN AT SM-2 C-F PT C5,12 NDE 3.3 - 85 C 11-9-87: COHPLETE ttN/htt

DATE: 02/11/88 ISIOH: 1 ST. LUCIE NUCLEAR PLANT UHIT 2 IHSERVICE INSPECTION SUHHARV OUTAGE 1 (1987), SECOND PERIOD, FIRST IHTERVAI CI ASS 2 COHPOHEHTS PAGE: 64 ZONE NUHBER: 076 SUHHARY EXAHINATION AREA NUHBER IDEHTIFICATIOH ASHE SEC. XI CATGY EXAH ITEN HO HETHOD PROCEDURE NI 0 OHGT RSEH E I 0 E REHARXS C G H R ttCALIBRATIOH BLOCKtt 033050 12'-SI-410-FN-3 TEE - TO - PIPE C-F PT C5.11 NDE 3.3 - 83 C 11-9-87: COHPIETED ttH/htt 033060 HO I.D. PIPE LONG SEAN AT FN-3 C-F PT C5.12 HDE 3.3 - 84 C 11-9-87: COHPLETED ttH/htt

DATE: 02/11/88 VISIOH: 1 ST. lUCIK HOCf EAR PlhNT OHIT 2 IHSERVICE IHSPKCTIOH SUHHART OUTAGE 1 (1987), SECOHD PERIOD, FIRST IHTERVAL CLASS 2 COHPOHEHTS PAGE: 65 ZONE HUHBER: 077 SUHHARY EXAHIHATIOH AREA NOHBKR IDKHTIVICATIOH ASHE SEC. EI CATGY EZAH ITEN HO HETHOD HI 0 OHGT RSEH E I 0 E RKHARKS PROCEDURE C G H R ttCht,IBRATIOH BLOCKtt 033220 SI-2401-42 P-C VT-3 HDE 4,3 - 17 C VARIABLE SPRING SUPPORT (2) E-123 10-21-87: COHPLETED ttN/Att 033230 SI-2401-42 E-C VT-4 HDE 4.3 - 17 C VARIABLE SPRING SUPPORT (2) F-4 10-21-87: COHPLKTED ttH/htt 033310 SI-2401-70 RIGID BASE SUPPORT F-C VT-3 F-123 HDE 4.3 - 18 C 10-21-87: COHPLETED ttN/htt

DATE: 02/ll/88 ISIOH: 1 0 ST. LUCIE HUCLEAR PLAHT UHIT 2 IHSERYICE IHSPECTIOH SUHHARV OUTAGE 1 (1987), SECOHD PERIOD, FIRST IHTERVAL CLASS 2 COHPOHEHTS PAGE: 66 ZOHE HUHBER: 077 SUHHARV EXAHIHATIOH AREA HUHBER IDEHTIFICATIOH ASHE SEC. XI CATGT EXAH ITEH HO HETHOD PROCEDURE HI 0 OHGT RSEB E I 0 E REHARKS C G H R ttCALIBRATIOH BLOCKtt 033780 10 -SI-472-FM-4 PIPE - TO - VALVE (V-3156) C-F PT C5.11 HDE 3.3 - 82 C 11-6-87: COHPIETE ttH/Att

DATE: 02/11/88 VISION: 1 ST. LUCIE NUCf,EAR PLANT UNIT 2 IHSERVICE IHSPECTION SUHHART OUTAGE 1 (1987), SECOND PERIOD, FIRST IHTERVAL CfhSS 2 COHPOHENTS PAGE: 67 ZOHE HUHBER: 078 SUHHARY EIAHIHATIOH AREA NUHBER IDEHTIFICATIOH ASHE SEC. XI CATGT EKdlf ITElf HO HETHOD PROCEDURE HI 0 OHGT RSEH E I 0 E RE!fhRKS C G H R ttCALIBRATIOH Bf,OCKtt 034060 SI-2404-64 RIGID FRANK SUPPORT F-B VT-3 NDE 4.3 - 19 C F-2,3 10-21-87: COHPLETED itH/htt 034090 SI-2404-74 F-C VT-3 HDE 4.3 - 25 C SPRING SUPPORT W/HORIZ. STRUTS F-123 10-21-87: CO}IPLETED ttH/htt 1 SI-2404-74 F-C VT-4 HDE 4.3 - 25 C SPRING SUPPORT M/HORIZ. STRUTS F-4 RAB 10-21-87: COHPLETED ttH/htt

DdTE: 02/11/88 VISION: 1 ST. LUCIE HUCfEhR PLdNT UNIT 2 IHSERVICE INSPECTIO!f SUHHhRT OUTdGE 1 (1987), SECOHD PERIOD, FIRST IHTERVhL CfhSS 2 CO!fPOHEHTS PhGE: 68 ZONE HUHBER: 080 SUHHdRT EXhHIHhTION hREh HUHBER IDEHTIFIChTION hSHE SEC. XI ChTGT EXhH ITEN HO HETNOD PROCEDURE HI 0 OHGT RSEH E I 0 E REHhRKS C G N R 44ChLIBRhTIOH BLOCK44 035700 SI-2401-32 RIGID FRhHE SUPPORT F-B VT-3 HDE 4.3 - 33 C F-123 10-22-87: COlfPfETED 44N/Q4 035730 SI-2401-29 RIGID FRdHE SUPPORT F-B VT-3 HDE 4.3 - 32 C F-123 10-22-87: COHPfETED

0

DATE: 02/11/88 VISION: ST. LUCIE HUCf EAR PWHT UHIT 2 ,IHSERVICE INSPECTION SUHHARV OUTAGE f, (1987), SECOND PERIOD, FIRST IHTERVAL CLASS 3 COHPOHEHTS ZONE NUHBER: 106 SUNHARY EXAHIHATIOH AREA HUHBER IDENTIFICATIOH ASH& SEC. XI CATGUT EXAH ITEN NO HETBOD PROCEDURE NI 0 OHGT RSEB E I 0 E REHARKS C G H R ttChf IBRATIOH BLOCKtt 037600 CC-2063-7425 RIGID FRANK SUPPORT F-B VT-3 HDE 4.3 - 55 C F-2,3 11-3-87: COHPIETED ttN/htt 037790 CC-2063-6488 VARIABfE SPRING SUPPORT F-C VT-3 HDE 4.3 - 56 C F-123 11-5-87: COHPLETED ttN/htt 037800 CC-2063-6488 YARIABfE SPRING SUPPORT F-C VT-4 NDE 4.3 - 56 C 11-5-87: COHPLETED ttN/htt

FLORIDA POHER & LIGHT COMPANY 700 UNIVERSE BLVD. JUNO BEACH, FLORIDA 33408 ST. LUCIE NUCLEAR PLANT P.O. BOX 128 FT. PIERCE, FLORIDA 33454 UNIT 2 1987 SNUBBER FUNCTIONAL TEST RESULTS

Tag ¹: 2-005 Mfg.-Cap.: Taylor-400 Serial ¹: 5 Mark¹: SS-5-2A 109.0% Breakaway: Initial Drag: Activation: Test Load: 109.0% Final Drag: The snubber exceeded the lockup criteria of 1-2 ipm by 3 96 ipm in tension and by 0 67ipm in compression. Tag ¹: 2-006 Mfg.-Cap.: Taylor-400 Serial ¹: 6 Mark¹: SS-6-2A Breakaway: Initial Drag: Activation: Test Load'095% Final Drag: The snubber exceeded the lockup criteria of 1-2 lpm by 0.23 lpm in compression. 109.0% Tag ¹: 2-021 Mfg.-Cap.: PSA-1/4 Serial ¹: 11856 Mark¹: RC-58-22 Breakaway: 0,2%, PASS. 0.1%, PASS. Initial Drag: 2.5%, PASS. 2.6/o, PASS., Activation: PASS PASS Test Load: 89.9% 95.3% Final Drag: 3.4%, PASS. 53%, 09¹ over, FAILI The snubber exceeds the acceptance standard by 0.9ifs (5.3%) in Final Compression Drag, indicating that while the snubber has FAILED, andmust be repaired or replaced, no engineering analysis of the system components is required. Tag ¹: 2-022 Mfg.-Cap.: PSA-1/4 Serial ¹: 11896 Mark¹: RC-48-R8 Breakaway: Initial Drag: Activation; Test Load: Final Drag: 0.2%, PASS. 3.0%, PASS. PASS 86.5% 2.9%, PASS. 0.3%, PASS. 2.9%, PASS. PASS 91 9% 1.7%, PASS.

Tag ¹: 2-023 Mfg.-Cap.: PSA-1/4 Serial¹: 25939 Mark¹: RCPORT Breakaway: 0.3%, PASS. 0.3%, PASS. initial Drag: 2.7%, PASS. 3.1%, PASS. Activation: 0.001 g over, FAILI PASS Test Load: 80.3% 79.5% Final Drag: 4.1%, PASS. 65%, 5.2¹ over, FAILI The snubber exceeded the acceptance standard of 0.02g by 0.001 g in the Tens! on Load Test, requiring that the snubber be repaired of replaced. The snubber exceeds the acceptance standardby 5.2¹s (6.5%) fn Final Compression Drag.. Snubber 2423, when combined with the drag values of companion snubber 2424, exceeds the acceptance standards by 03¹s (0.1%) in Initial Tension Drag,3.7¹s (1.1%) in Initial Compression Drag,22.0¹s (63%) in Final Tension Drag,14.2¹s (4.1%) in Final Compression Drag, which requires evaluation of the companion snubbers and, possibly,'n engineering analysis of stress input to the system components. Since the initial drag values were acceptable, no engineering evaluation is required. Replace with SPARE. Disassemble snubber and inspect for damage/cause. Provide report. Tag ¹: 2-024 Breakaway: 03'/o, PASS 0.3%, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 2.4'/o, PASS 2.9/o, PASS. Serial ¹:. 11432 Activatfon: PASS PASS Mark¹: RC~R7 Test Load: 86.0% 86.7% Final Drag: 7.2/, 7.7¹ over, FAILI 2.6%, PASS. The snubber exceeds the acceptance standard by 7.7¹s (7.2%) in Final Tension Drag, indicating that whife the snubber has FAILED,and must be repaired or replaced, no engineering analysis of the system components is required. Snubber 2424, when combined with the drag values of companion snubber 2423, exceeds the acceptance standards by 03¹s (0.1%) in initial Tension Drag,3.7¹s (1.1%) in Initial Compression Drag,22.0¹s (6.3%) in Final Tension Drag,14.2¹s (4.1 /.) In Rnal Compression Drag, which requires evaluation of the companion snubbers and, possibly, an engineering analysis of stress input to the system components. Tag ¹: 2-025 Mfg.-Cap.: PSA-1/4 Serial¹: 20284 Mark¹: RC-35-R11 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 2.7%, PASS. PASS 870% 3.1%, PASS. 0.1%, PASS. 3.7%, PASS. PASS 94.0% 3.9%, PASS. Tag ¹: 2-026 Mfg.-Cap.: PSA-1/4 Serial ¹: 29191 Mark¹: RC-37-R14 Breakaway: 0.6%, PASS. 0.4%, PASS. Initial Drag; 3.1%, PASS. 7.4%, 8.4¹ over, FAILI Activation: PASS PASS Test Load: 49.6% 81.8% Final Drag: 2.8%, PASS. 52%, 1.2¹ over, FAILI Snubber exceeded 5% drag criteria by 8.4¹s in initial drag compression and by 1.2¹s fn final drag compression. Replace viith SPARE. Disassemble and inspect fordamage/cause. Since the snubber at the 2426 location v "s analyzed as a rigid restraint in 1984 (Ref.: NCR¹110) and the stress inputs were found to be acceptable, there is no need for additional engineering analysis to address the current drag values.

Tag ¹: 2-02? Mfg.-Cap.: PSA-1/4 Serial ¹: 11855 Mark¹: RC-2-R5 Breakaway: 0.3%, PASS. 0.3%, PASS. Initial Drag: 2.7%, PASS. 2.7/o, PASS. Activation: PASS PASS Test Load: 96.1% 98 4% Final Drag: 3.0%, PASS. 2.7/o PASS. Snubber 2427, when combined with the drag values ot companion snubber 2428, exceeds the acceptance standards by 3.7¹s (1.1%) in Initial Tension Drag,6.6¹s (1.9%) in Initial Compression Drag,4.4¹s (1.3%) in Final Tension Drag,45¹s (1.3%) in Final Compression Drag, whch requires evaluation ot the companion snubbers and, possibly, an engineering anaiyis of stress input to the system components. Tag ¹: 2-028 Breakaway: 0.4%, PASS. 0.5%, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 3.4%, PASS. 4.2%, PASS. Serial¹: 19089 Activation: PASS PASS Mark¹: RC-2-R5 Test Load: '90 7'/o 98 4o/o Final Drag: 3,2%, PASS. 3.6'/o, PASS. Snubber 2428, when combined viiththe drag values ot companion snubber 2427, exceeds the acceptance standards by 3.7¹s (1.1%) in Initial Tension Drag,6.6¹s (1.9%) in Initial Compression Drag,4A¹s (1.3%) in Final Tension Drag,45¹s (1.3%) in Final Compression Drag, which requires evaluation of the companion snubbers and, possibly, an engineering analysis of stress input to the system components. Tag ¹: 2-029 Mfg.-Cap.: PSA-1/4 Serial ¹: 20174 Mark¹: RC-5-R4 Breakaway: Initial Drag: Activation: Test Load: Final Drag: Although acceptable, the larger of the final drag values, overhaul and/or replacement. 0.2/o, PASS. 0.4%, PASS. 3.2%, PASS. 3.4%, PASS. PASS PASS 84.9% 91.7o/o 3.5'/o, PASS. 4.4%, PASS. 155¹s (4.4%), is nearing the allowable limitand should be considered for Tag ¹: 2-030 Mfg.-Cap.: PSA-1/4 Serial ¹: 11853 Mark¹: RC-59-R2 Breakaway: 0 2'/o, PASS. O.P/o, PASS. Initial Drag: 9.2o/o, 14.6¹ over, FAILI 11.8'/o, 23.7¹ over, FAILI Activation: PASS PASS Test Load: 89 9% 89.6% Rnal Drag: 5.5%, 1.8¹ over, FAILI 5.0%, PASS. The snubber exceeds the acceptance standard by 14.6¹s (9.2/o) in Initial Tension Drag,23.7¹s (11.8%) In Initial Compression Drag, which may require an engineering evaluation ot stress input to the system components. The snubber exceeds the acceptance standard by 1.8¹s (55%) in Final Tension Drag.

Tag ¹: 2.031 Mfg.-Cap.: PS A-1/4 Serial¹: 26328 Mark¹: RC-39-R7 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 3.2%, PASS. PASS 82 9% 3.3%, PASS. 0.4%, PASS. 3.9%, PASS. PASS 84.7% 2.6%, PASS. Tag ¹: 2-032 Mfg.-Cap.: PSA-1/4 Serial ¹: 26321 Mark¹: RC-9-R12 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 2.4%, PASS, PASS 88.6% 3.1%, PASS. 0.4%, PASS. 2.4%, PASS. PASS 97.6% 3,9%, PASS. Tag ¹: 2-033 Breakaway: 0.4%, PASS. 0.3%, PASS. Mfg.-Cap.: PS@-1/4 initial Drag: 6.6%, 5.5¹ over, FAIL} 52%%d, 0.8¹ over, FAILI Serial¹: 20205 Activation: PASS PASS Mark¹: RC-18-R9 Test Load: 84.1% 89.3% Final Drag: 3.5%, PASS. 3.3%, PASS. The snubber exceeded the 5% drag criteria as indicated above. Upon further examination of the snubber, itwas noted that the high drag forces were due to tape residue between the dust cover and the inner tube. Upon retest following removal of the tape residue, the snubber was found to have acceptable drag results. SPECIAL DISPOSITION: Tag the snubber (S/N 20205) as a SPARE. Acceptable for use in another location. Tag ¹: 2-034 Mfg.-Cap.: PSA-1/4 Serial ¹: 20198 Matc ¹: RC-26-R10A Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 1.9%, PASS. PASS 771o/ 2.3%, PASS. 0.6%, PASS. 2.3%, PASS. PASS 83.9% 2.3%, PASS.

Tag ¹: 2-035 Breakaway: 2.8%, PASS. 3.1%, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 7.8%, 9.7¹ over, FAILI 11.1% 21.4¹ over FAILI . Serial ¹; 26330 Activation: PASS PASS Maik¹: Sl-73-R4 Test Load: 76 6'/o 81.6% Final Drag: 6.6%, 5.6¹ over, FAILI 9.9%, 17.3¹ over, FAILI The snubber exceeds the acceptance standard by 9.7¹s (7.8%) in'nitial Tension Drag,21.4¹s (11.1%) In Initial Compression Drag, which may require an engineering evaluation of stress input to the system components. The snubber exceeds the acceptance standard by 5.6¹s (6.6%) in Final Tension Drag,172¹s (9.9%) in Final Compression Drag. Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹: 2-037 PSA-10 12504 SI-4205-4080 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 1.2/o, PASS. PASS 90.4% 1.2/o, PASS. 0.3%, PASS. 13%, PASS. PASS 90 6o/o 1.1%, PASS. Tag ¹: 2-039 Breakaway: 1 2'/o PASS. 1.6/o, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag; 4.1%, PASS. 5.4%, 1.4¹ over, FAILI Serial¹: 26316 Activation 0.001g over FAILI PASS Maik¹: SI-83-R3 Test Load: 30 7% 86.5% Final Drag: 15.7/., 37.5¹ over, FAILI 8.9%, 13.5¹ over, FAILI The snubber exceeds the acceptance standard by 1.4¹s (54%) in Initial Compression Drag, whichmay require an engineenng evaluation of stress input to the system components. The snubber exceeded the acceptance standard of 0.02g by 0.001g in the Tension Load Test, requiring that the snubber be repaired of replaced. The snubber exceeds the acceptance standard by 375¹s (15.7%) ln Final Tension Drag,135¹s (8.9%) in Final Compression Drag. Since the drag force was only marginally over the acceptance standard and the high drag spike occurred outside the range of thermal movement, engineering analysis is not required. Tag ¹: 2-040 Mfg.-Cap.: PSA-1/4 Serial ¹: 29179 Mark¹: MS-19-RSB Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.5%, PASS. 2.9%, PASS. PASS 81.0% 3.1%, PASS. 0.3%, PASS, 2.1%, PASS. PASS 81.0% 3.1%, PASS.

Breakaway: Initial Drag: Activation: Test Load: Final Drag: The snubber exceeds the acceptance standard by 6.5ffs of stress input to the system components. The snubber Tag ¹: 2-041 Mfg.-Cap.: PSA-1/4 Serial¹: 29335 Mark¹: B-23-R1A 0.5% PASS 0.3%, PASS. 3.2%, PASS. 69%, 65¹ over, FAILI PASS PASS 89.3% 93.3% 3.1 /o, PASS. 65%, 5.2¹ over, FAILI (6,9%) in Initial Compression Drag, which may require an engineering evaluation exceeds the acceptance standard by 5.2¹s (65%) in Final Compression Drag. Tag ¹: 2-042 Breakaway: 03'/o, PASS. 0.5%, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 2.1%, PASS. 2.2o/o, PASS. Serial¹: 26317 Activation: 0.002g over, FAILI PASS Mark¹: CH-105-R2 Test Load: 90.7% 99.2% Final Drag: 3.0%, PASS. 3.4'Yo, PASS. The snubber exceeded the acceptance standard of 0.02g by 0.002g in the Tension Load Test, requiring that the snubber be repailed of replaced. Replace the snubber with a SPARE. Disassemble failed snubber and inspect fordamage/cause. The failure of this snubber requires the 'election of functional test sample ¹3, consisting of 9 PSA-1/4 and PSA-1/2 snubbers. Tag ¹: 2-043 Mfg.-Cap.: PSA-1/4 Serial¹: 26320 Malk¹: CH-106-R7 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 2.7/o, PASS. PASS 94.5% 3.1%, PASS. 0.2/o, PASS. 2.6o/o, PASS. PASS 97.4% 3.0%, PASS. Tag ¹: 2-044 Breakaway 0 3% PASS 0.6/o, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 3.4%, PASS. 6.2%, 4.2¹ over, FAILI Serial¹: 26322 Activation: PASS PASS Mes¹: CH-109-R7 Test Load: 89.9% 99.0% Rnal Drag: 5.5%, 1.9¹ over, FAILt 5.7/o, 2.4¹ over, FAILI The snubber exceeds the acceptance standard by 4.2¹s (6.2%) in initial Compression Drag, which may require an engineering evaluation of stress input to the system components. The snubber exceeds the acceptance standard by 1.9¹s (5.5%) in Final Tension Drag, 2.4¹s (5.7%) In Final Compression Drag.

Tag ¹: 2-045 Mfg.-Cap.: PSA-1/4 Serial ¹: 20175 Mark¹: CH-108-R4 Breakaway: fnitial Drag: Activation: Test Load: Final Drag: 0.6%, PASS. 2.7%, PASS. PASS 89.6% 2.7%, PASS. 0.5%, PASS. 3.4%, PASS. PASS 94.0% 2.7/o, PASS. Tag ¹: 2-046 Mfg.-Cap.: PSA-1/4 Serial ¹: 11829 Mark¹: CH-108-R8 Breakaway: Initial Drag: Activation: Test Load: Final Drag: Snubber exceeded 25% of rated load in breakaway compression. Snubber exceeded 25% of rated load during stroke test. NOTE: Functional test was not completed. 2-048 PSA-1/4 19064 MSI-10-R7B Tag ¹: Breakaway: 1.1%, PASS. 0.4%, PASS. Mfg.-Cap,: Initial Drag: 2.7%, PASS. 3.0%, PASS. Serial ¹: Activation: PASS PASS Mark¹: Test Load: 78.4% 84.1% Final Drag: 3.2%, PASS. 4.6%, PASS. Although acceptable, the larger of the final drag values, 16.1¹s (4.6%), is nearing the allowable limitand should be considered for overhaul and/or replacement. Tag ¹: 2-049 Mfg.-Cap.: PSA-1/4 Serial¹: 29334 Mark¹: B-15-R10 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.5%, PASS. 2.7%, PASS. PASS 82.6% 2.9%, PASS. 0.3%, PASS. 1.6/o, PASS. PASS 81.8% 1.1%, PASS.

Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹: 2-050 PSA-10 10185 SI-4201-7741 B Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.1%, PASS. 1.4%, PASS. PASS 91 1% 1.2/o, PASS. 0.1%, PASS. 1.1%, PASS. PASS 89.7% 1.4%, PASS. Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹: 2-051 PSA-1/4 19022 SI-4201-736B Breakaway: initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 2.9%, PASS. PASS 89.6% 2.0%, PASS. O.P/o, PASS. 3.2'/o, PASS. PASS 94.3% 2.6%, PASS. Tag ¹: 2-052 Breakaway: 0.4%, PASS. 0.5/o, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 2.8%, PASS. 52%, 0.6¹ over, FAIL} Serial ¹: 12897 Activation: PASS PASS Mark¹r Sl-4201-730B Test Load: 77./% 79.7% Final Drag:, 2.3%, PASS. 52%, 06¹ over, FAILI The snubber exceeds the acceptance standard by 0.6¹s (5.2/) in Initial Compression Drag, whichmay require an engineering evaluation of stress input to the system components. The snubber exceeds the acceptance standard by 0.6¹s (5.2%) in Final Compression Drag. Since the maximum drag force in the area of thermal movement is only164¹s, engineering analysis is not required. Replace the snubber with a SPARE. Disassemble filed snubber and inspect for damage/cause. Provide report. Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹: 2-057 PSA-3 16753 SI-4200-326B Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.1%, PASS. 0.6%, PASS. PASS 87.8% 0.7%, PASS. 0.2'/o, PASS. 0.9%, PASS. PASS 88.6% 0.8%, PASS.

Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹: 2-059 PSA-1/4 11848 SI-4200-322B Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 2.6%, PASS. PASS 91.7o/o 2.4%, PASS. 0.3%, PASS. 2.4%, PASS. PASS 94 8% 2.9%, PASS. Tag ¹: 2-061 Mfg.-Cap.: PSA-1/4 Serial¹: 20285 Mark¹: SI-4200-6307 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.4%, PASS. 2.7%, PASS. PASS 76.9% 3.5%, PASS. 0.5%, PASS. 2.5%, PASS. PASS 810% 2.6o/o, PASS. Tag ¹: 2-062 Mfg.-Cap.: PSA-1/4 Serial¹: 19070 Mark¹: Sl-4200-6307 Breakaway: Initial Drag: Activation: Test Load: Final Drag: Although acceptable, the larger of the final drag values, overhaul and/or replacement 0.3%, PASS. 0.3%, PASS. 1.0%, PASS. 3.5%, PASS. PASS PASS 79.7% 84 7% 2.9%, PASS. 4.1%, PASS. 14.4¹s (4.1%), is nearing the allowable limitand should be considered for Tag ¹: 2-063 Breakaway: 0.4%, PASS. 0.3% PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 2.6%, PASS. 3.2'/o, PASS. Serial ¹: 29361 Activation: . PASS PASS Mark¹: Sl-4208-210B Test Load: 80.8 82.6% Final Drag: 3.1%, PASS. 4.6%, PASS. Although acceptable, the larger of the final drag values, 16.0¹s (4.6%), Is nearing the allowable limitand should be considered for overhaul and/or replacement.

Tag ¹: 2-064 Mfg.-Cap.: PSA-1/4 Serial¹: 29363 Mark¹: Sl-2408-210C Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2% PASS. 1.6/o, PASS. PASS 79 2% 0.8%, PASS. 0.4/o, PASS. 4.0%, PASS. PASS 82.1% 3.1/o, PASS. Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹r 2-069 PSA-1/4 12903 SI-4208-264B Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 2.1%, PASS. PASS 86.2% 3.2%, PASS. 0.2/o, PASS. 3.7'/o, PASS. PASS 92 7o/ 2.7o/o, PASS. Tag ¹: 2-071 Breakaway. 0.5/o, PASS. '.T/o, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 3.1%, PASS. 4.1%, PASS. Serial¹: 20250 Activation: PASS PASS Mark¹: Sl-4208-266B Test Load 93.8% 95.9 Final Drag: 4.0%, PASS. 269.9%, 927.1¹ over, FAILI The snubber exceeds the acceptance standard by 927.1¹s (269.9%) in Final Compression Drag, indicating that while the snubber has FAILED,and must be repaired or replaced, no engineering analysts of the system components is required. Tag ¹: 2-073 Breakaway: 0.3%, PASS. 0.4%, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 1.9%, PASS. 5.4%, 1.4¹ over, FAILI Serial ¹: 19096 Activation. PASS PASS Mark¹: CH-103-R7B Test Load: 82.9% Flrlal Drag: 3.9%, PASS. 4.9'/o, PASS. The snubber exceeds the acceptance standard by1A¹s (5.4%) in Initial Compression Drag, which may require an engineering evaluation of stress input to the system components. Although acceptable, the larger of the final drag values, 17.2¹s (4.9%), is nearing the allowable limitand should be considered foroverhaul and/or replacement. The high value represents aninstantaneous peak which is only marginally over the acceptance standard and thus does not warrant engineering analysis. Reptace the snubber with a SPARE. Disassemble failed snubber and inspect fordamage/cause. Provide report.

Tag ¹: 2-0? 5 Mfg.-Cap.: PSA-3 'erial¹: 16769 Mark¹: Sl-4205-6713B Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.1%, PASS. 0.5%, PASS. PASS 88 Oo/o 0.8%, PASS. 0.2'/o, PASS. 0.7/o, PASS. PASS 87.4% 0.9%, PASS. Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹: 2-084 PSA-3 16768 SI-4205-1100B Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0,1%, PASS. 0.7%, PASS. PASS 8 0.5%, PASS. 0.1%, PASS. 0.6/o, PASS. PASS 87 9'/ 0.7%, PASS. Breakaway: 0.6%, PASS. 0.8%, PASS. Initial Drag: 1.9%, PASS. 3.5'/o, PASS. Activation: PASS PASS Test Load: 76.4% 77.1% Final Drag: 3.2%, PASS. 4.0%, PASS. Snubber 2485, when combined with the drag values of companion snubber 2486, exceeds the acceptance standards by 6.3¹s (1.8%) In Initial Compression Drag,65¹s (1.9%) in Final Tension Drag,11.0¹s (3.1%) in Final Compression Drag, which requires evaluation of the companion snubbers and, possibly, an engineering anaiyis of stress input to the system components. SPECIAL DISPOSITION: Although acceptable, the drag values on this snubber indicate an advancing state of degradation. Additionally, when combined with the drag values of the companion snubber, marginally exceed the acceptance standard. Replace with SPARE. Tag and save the snubber for future overhaul. Breakaway 0.2%, PASS. 0.4%, PASS. Initial Drag: 2.3%, PASS. 3.3%, PASS. Activation: PASS PASS ,Test Load: 83.9% 79.7% Final Drag: 3.7%, PASS. 4.1%, PASS. Although acceptable, the larger of the final drag values, 145¹s (4.1%), is nearing the allowable limitand should be considered for overhaul and/or replacement.Snubber 2486, when combined with the drag values of companion snubber 2485, exceeds the acceptance standards by 6.3¹s (1.8%) In Initial Compression Drag,65¹s (1.9/.) In Final Tension Drag,11.0¹s (3.1%) in Final Compression Drag, which requ':nis evaluation of the companion snubbers and, possibly, an engineering analysis of stress input to the system components. SPECIAL DISPOSITION: Although acceptable, the drag values on this snubber indicate an advandng state of degradation. Replace with SPARE. Tag and save the snubber for future overhaul.

i

Tag ¹: 2-087 Mfg.-Cap.: PSA-1/4 Serial¹: 12906 Mark¹: Sl-4206-61 6B Breakaway: initial Drag: Activation: Test Load: Final Drag; 0.4%, PASS. 1.9%, PASS. PASS 76.6% 3.0%, PASS. 0.3%, PASS. 2.6/o, PASS. PASS 81.6o/o 3.9'Yo, PASS. Tag ¹: 2-089 Mfg;Cap.: PSA-1 Serial ¹: 16142 Matk¹: Sl-4204-1270B Breakaway: 0.3/o, PASS. Initial Drag: Activation: Test Load: Final Drag: Snubber failed to stroke fullyduring functional test. Snubber exceeded 25% of rated load during initial drag tension. Functional testing of this snubber was not completed. Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹: 2-091 PSA-10 16440 BF-4007-7012 Breakaway: InNal Drag: Activation: Test Load: Rnal Drag: 0.2%, PASS. 1.1%, PASS. PASS 98.9% 1.2o/o, PASS. 0.2/o, PASS. 1.4%, PASS. PASS 99 6% 0.9%, PASS. Tag ¹: 2-094 Mfg.-Cap.: PSA-35 Serial¹: 8291 Mark¹: MS-41 00-1 6A Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 0.6'Yo, PASS. PASS 851% 0.5%, PASS. 0.2'/o, PASS. 0.7Yo, PASS. PASS 85 0% 0.6'/o, PASS.

Tag ¹: 2-101 Mfg.-Cap.: PSA-1/4 Serial¹: 26325 Mark¹: Sl-4201-7201B Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.4%, PASS. 3.0%, PASS. PASS 77.7% 2.4%, PASS. 0.3%, PASS. 3.6%, PASS. PASS 79.5% 3.5%, PASS. Tag ¹: 2-1 03 Mfg.-Cap.: PSA-1 Serial¹: 14872 Mark¹: Sl<203-24B Breakaway: Initial Drag: Activation; Test Load: Final Drag: 0.2%, PASS. 2.5%, PASS. PASS 89.9% 2.7%, PASS. 0.2/o, PASS. 2.5%, PASS. PASS 87.3% 12', PASS. Tag ¹: Mfg.-Cap.: Serial ¹: Mark ¹'-114 PSA-10 8930 BF-4006-7416 Breakaway: initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 1.1%, PASS. PASS 88.2% 0.9%, PASS. 0.3%, PASS. 13%, PASS. PASS 88.5% 0.9%, PASS. Tag ¹: 2-116 Mfg.-Cap.: PSA-1/4 Serial ¹: 12911 Mark¹: Sl-4206-6254 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.5%, PASS. 2.8%, PASS. PASS 74.3% 2.5%, PASS. 0.3%, PASS. 3.1%, PASS. PASS 84 4% 2.4%, PASS.

Tag ¹: 2-117 Breakaway: 0 3'/o, PASS. 0.3%, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 2.4%, PASS. 4.9%, PASS. Serial ¹: 11837 Activation: PASS PASS Mark¹: SI-4206-6271 B Test Load: 89.3% 89.3% Final Drag: 4.7/o, PASS. 2.1%, PASS. Although acceptable, the larger of the final drag values, 18.3¹s (4.7/o), is nearing the allowable limitand should be considered for overhaul and/or replacement. Tag ¹: Mfg;Cap.: Serfal ¹: Mark¹: 2-1'1 8 PSA-1/2 14140 SI-4208-2801 B Breakaway: Initial Drag: Activatfon: Test Load: Final Drag: '.2%, PASS. 0.3%, PASS. PASS 85 3% 1.0%, PASS. 0.2'/o, PASS. 1.6%, PASS. PASS 90 8% 0.8'/o, PASS. Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹: 2-119 PSA-1/4 24082 SI-4208-2705B Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 2.9'Yo, PASS. PASS 78.2o/ 3.0%, PASS. 0.3/o, PASS. 2.7%, PASS. PASS 84.1% 2.8%, PASS. Tag ¹: 2-1 24 Mfg.-Cap.: PSA-1/4 Serial¹: 29366 Mark¹: RC-98-R12 Breakaway: Initial Drag: Activatfon: Test Load: Final Drag: 0.3%, PASS. 3.0%, PASS. PASS 82.9% 1.3'Yo, PASS. 0.4%, PASS. 3.4%, PASS. PASS 85 5% 2.1%, PASS. /

Tag ¹: 2-125 Mfg.-Cap.: PSA-1/4 Serial¹: 29332 Mark¹: RC-98-R4B Breakaway: . Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 2.9%, PASS. PASS 90 1o/ 2.7%, PASS. 0.4%, PASS. 2.3%, PASS. PASS 94.3% 3.4%, PASS. Tag ¹: 2-1 26 Mfg.-Cap.: PSA-1 Serial¹: 19222 Mark¹: CH-107-R10 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 2.3%, PASS. PASS 95 9% 2.0%, PASS. 0.3% PASS. 2.4%, PASS. PASS 98.7% 2.0%, PASS. Tag ¹: Mfg.-Cap.: Serial ¹: Max¹: 2~1 27 PSA-1/4 19068 MSI-13-R1 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.5/o, PASS. 2.6%, PASS. PASS 76 9% 2.5%, PASS. 0.5%, PASS. 3.9%, PASS. PASS 84 4% 3.3%, PASS. Tag ¹: 2-1 28 Mfg,-Cap.: PSA-1/4 'erial¹: 19098 Mark¹: MSI-13-R4 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 2.9%, PASS. PASS 74 5% 2.9%, PASS. 0.3%, PASS. 3.2'/o, PASS. PASS 84 9% 2.3%, PASS.

Tag ¹: 2-1 32 Mfg.-Cap.: PSA-1/4 Serial¹: 12908 Mark¹: MS-33-R3B Breakaway: 0.4%, PASS. 0.3%, PASS. Initial Drag: 2.7%, PASS. 65%, 52¹ over, FAILI Activation: 0.001 g over, FAILI PASS Test Load: 77.9% 84.9% Final Drag: 3.5%, PASS. 4.9%, PASS. The snubber exceeds the acceptance standard by 5.2¹s (6.5%) In Initial Compression Drag, which may require an engineering evaluation of stress input to the system components. The snubber exceeded the acceptance standard of 0.02g by 0.001g in the Tension Load Test, requiring that the snubber be repaired of replaced. Although acceptable, the larger of the final drag values, 17.2¹s (4.9%), is nearing the allowable limitand should be considered for overhaul and/or replacement. Tag ¹: 2-133 Breakaway: 0.3%, PASS. 0.3%, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 4.6/o, PASS. 5.9%, 3M over FAILI Serial¹: 12909 Activation: PASS PASS Maik¹: MS-33-R3B Test Load: 80.3% 84.4% FInal Drag: 4.7/o, PASS. 6.7%, 6.0¹ over, FAILI The snubber exceeds the acceptance standard by 3.3¹s (5.9%) in Initial Compression Drag, which may require an engineering evaluation of stress input to the system components. The snubber exceeds the acceptance standard by 6.0¹s (6.7/.) in Final Compression Drag. Tag ¹: 2-134 Mfg.-Cap.: PSA-1/4 Serial¹: 29369 Mark¹: RC-101-R5B Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 3.0%, PASS. PASS 79.2% 1.7%, PASS. 0.3%, PASS. 3.1/o, PASS. PASS 83.4% 2.9%, PASS. Tag ¹: 2-136 Breakaway: 1.3%, PASS. 0.4/o, PASS. Mfg:Cap.: PSA-1/4 Initial Drag: 1.8%, PASS. 4.7'/o, PASS. Serial ¹: 12051 Activation: PASS PASS Mark¹: MS-32-R3B Test Load: 79.2% 82.6% Final Drag: 3.3%, PASS. 5.0/o, 0.1¹ over, FAILt The snubber exceeds the acceptance standard by 0.1¹s (5.0%) in Final Compression Drag, indicating that while the snubber has FAILED, andmust be repaired or replaced, no engineering analysis of the system components is required.

Tag ¹: 2.1 3? Mfg.-Cap.: PSA-1/4 Serial¹: 12049 Mark¹: MS-32-R4B Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.4%, PASS. 3.5%, PASS. PASS 79.2% 3.1%, PASS. 0.3%, PASS. 3.6'/o, PASS. PASS 82.6% 2.3%, PASS. Tag ¹: 2-138 Breakaway: 0.6%, PASS. 0.6/o, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 3.1%, PASS. 3.4%, PASS. Serial¹: 19087 Activation: PASS PASS Mark¹: MSI-12-R4 Test Load: 82 3'/o 87.8% Final Drag: 2.3%, PASS. 4.7% PASS Although acceptable, the larger of the Anal drag values, 16.3Ns (4.7/o), Is nearing the allowable limitand should be considered for overhaul and/or replacement. Tag ¹: 2-139 Mfg.-Cap.: PSA-1/4 Serial ¹: 19091 Mark¹: MSI-12-R5 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 2.2%, PASS. PASS 76.6% 2,9%, PASS. 0.3%, PASS. 4.1%, PASS. PASS 78.7o/ 2.9%, PASS. Tag ¹: 2-140 Mfg.-Cap.: PSA-1/4 Serial ¹: 12612 Mark¹: RC-99-R5 Breakaway: initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 1.0%, PASS. PASS 78 4o/ 2,9%, PASS. 0.5%, PASS. 2.6%, PASS. PASS 83.4% 2.6o/o, PASS.

Tag ¹: 2-1 41 Mfg.-Cap.: PSA-1/4 Serial¹: 29364 Mark¹: RC-99-R2 Breakaway: ~Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 2.4%, PASS. PASS 77 9% 3.0%, PASS. 0.3%, PASS. 2.3%, PASS. PASS 82.1% 0.8%, PASS. Tag ¹: 2-142 Mfg.-Cap.: PSA-1/4 Serial ¹: 12610 Mark¹: RC-99-R8B Breakaway: 03'/o, PASS Initial Drag: 2.6'/o, PASS. Activation: PASS Test Load: 80.3% Final Drag: 2.3%, PASS. 0.4%, PASS. 3.1%, PASS. PASS 87.8'/o 1.2/o, PASS. Tag ¹: 2-143 Breakaway: 0.5%, PASS. 0.3%, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 2.0%, PASS. 4.4%, PASS. Serial ¹: 12902 Activation:, 0.004g over, FAILI PASS Mark¹: RC-97-R6 Test Load: 81 3'/o 81.0% Final Drag: 2.6%, PASS. 4.1%, PASS. The snubber exceeded the acceptance standard of 0.02g by 0.004g in the Tension Load Test, requiring that the snubber be repaired of replaced. Final compresion drag exceeded the acceptance standard by 14.2¹s (4.1%). Tag ¹: 2-150 Mfg.-Cap.: PSA-1 Serial¹: 14880 Mark¹: RC<300-125 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 1.8%, PASS. PASS 86.6% 2.1%, PASS. 0.2%, PASS. 2.3%, PASS. PASS 86.8% 2.0/o, PASS.

Tag ¹: 2.1 53 Mfg.-Cap.: PSA-3 Serial¹: 16568 Mark¹: RC<300-26B Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 1.8%, PASS. PASS 88.1% 0.7%, PASS. 0.3%, PASS. 1.2/o, PASS. PASS 87.8% 0.7/o, PASS. Tag ¹: 2-155 Mfg.-Cap.: PSA-1 0 Serial ¹: 10177 Mark¹: RC<300-126 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 1.0/o, PASS. PASS 86.7% 0.9%, PASS. 0.1%, PASS. 0.9%, PASS. PASS 68 1% 1.1%, PASS. Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹: 2-164 PSA-10 8943 RC-4300-157 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 1.0%,PASS. PASS 81.4% 1.1%, PASS. 0.2o/o, PASS. 0.9%, PASS. PASS 84.5o/o 1.0%, PASS. Tag ¹: 2-166 Mfg.-Cap.: PSA-1/4 Serial¹: 26324 Mark¹: RC-97-R9 Breakaway: initial Drag: Activation: Test Load: Final Drag: 0.4%, PASS. 2.7%; PASS. PASS 79.5o/o 2.3%, PASS. 0.4% PASS 2.7o/o, PASS. PASS 50.1o/o 2.9%, PASS.

. Tag ¹ 2-169 Mfg.-Cap.: PSA-3 Serial¹: 16762 Mark¹: RC<300-139 Breakaway: 'Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 0.6%, PASS. PASS 74 So/ 0.5%, PASS. 0.2/o, PASS. 0.8%, PASS. PASS 73 7% 0.8%, PASS. Tag ¹: 2-171 Mfg.-Cap.: PSA-1/4 Serial¹: 29368 Mark¹: RC-101-R7B Breakaway: initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 1.1%, PASS. PASS 78.4% 3.3%, PASS. 0.3%, PASS. 2.3%, PASS. PASS 81.6'/o 3.6'/o, PASS. Breakaway: 0.3%, PASS. 0.2/o, PASS. Initial Drag: 2.6%, PASS. 15% PASS Activation: PASS PASS Test Load: 77.4% 83.4% Final Drag: 2.4%, PASS. 2.9%, PASS, Snubber 2-177, when combined with the drag values of companion snubber 2-178, exceeds the acceptance standards by 2.4¹s (0.7/) ln InitialTension Drag,4.8¹s (1.4%) in Final Compression Drag, which requires evaluation of the companion snubbers and, possibly, an engineering analysis of stress input to the system components. Tag ¹: 2-179 Breakaway: 0.4%) PASS. 0.6%, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 1.9%, PASS. 3.7'/o, PASS. Serial ¹: 12904 Activation: PASS PASS Mark¹: RC-97-R1C Test Load: 77 7'/o 80.8% Final Drag: 4.1%, PASS. 2.7/o, PASS. Although acceptable, the larger of the final drag values, 14.3¹s (4.1%), ls nearing the allowable limitand should be considered for overhaul and/or replacement.

Tag ¹: 2.1 81 Mfg.-Cap.: PSA-1/2 Serial¹: 10722 Mark¹: SPS-467 Breakaway: initial Drag: Activation; Test Load: Final Drag: 0.3%, PASS. 1.0%, PASS. PASS 81.3% 1.9%, PASS. 0.4%, PASS. 2.5%, PASS. PASS 80.1% 2.1%, PASS. Tag ¹: 2-182 Mfg.-Cap.: PSA-1/2 Serial ¹: 11260 Mark¹: SPS-467 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 1.4%, PASS. PASS 81.3% 1.2/o, PASS. 0.2%%d, PASS. .0.8/o, PASS. PASS 82.9% 1.3%, PASS. Tag ¹: 2-189 Mfg.-Cap.: PSA-1/4 Serial¹: 12611 Mark¹: CH-107-R8 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 1.5/o, PASS. PASS 78.7% 1.9%, PASS. 0.4%, PASS. '.4%, PASS. PASS 77.9% 3.3%, PASS. Breakaway: 0 4% PASS. 0.4%, PASS. Initial Drag: 0.9%, PASS. 0.9%, PASS. Activation: 0.001 g over, FAILI PASS Test Load: 44.0% 86.4% Final Drag: 0.9%, PASS. 0.8%, PASS. The snubber exceeded the acceptance standard af 0.02g by 0.001 g in the Tension Load Test, requiring that the snubber be repaired of replaced.

Tag ¹: 2.1 91 Mfg.-Cap.: PSA-1/4 Serial¹: 23958 Mark¹: MSI-5-R8 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 1.0%, PASS. PASS 80.0% 2.7%, PASS. 0.3%, PASS. 3.T/o, PASS. PASS 79.2% 2.7/o, PASS. Tag ¹: 2-192 Mfg.-Cap.: PSA-1/4 Serial¹: 23959 Mark¹: MSI-6-R7 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 1.6/o, PASS. PASS 75.9% 3.2%, PASS. 0.4%, PASS. 4.1%, PASS. PASS 83.9o/o 2.6/o, PASS. Tag ¹: 2-193 Mfg.-Cap.: PSA-1/4 Serial¹: 19067 Mark¹: MSI-7-R7 Breakaway: 0.3%, PASS. 0.3%, PASS. Initial Drag: 2.1%, PASS. 3.6%, PASS. Activation: PASS PASS Test Load: 77.4% 84% Final Drag: 1.5%, PASS. 4.1%, PASS. Although acceptable, the larger of the final drag values, 145¹s (4.1%i, is nearing the allowable limitand should be considered for overhaul and/or replacement. Tag ¹: 2-194 Mfg.-Cap.: PSA-1/4 Serial ¹: 19097 Mark¹: MSI4-R6 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.5%, PASS. 2.5%, PASS. PASS 813% 2.4%, PASS. 0.4%, PASS. 4.2%, PASS. PASS 813% 2.8%, PASS.

Tag ¹: Mfg.-Cap.: Serial ¹: Marks 2-200 PSA-1 21579 SI40-R5 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 1.0%, PASS. PASS 88.2% 1.6/o, PASS. 0.2'/o, PASS. 2.4%, PASS. PASS 86.3% 2.2'/o, PASS. Tag ¹: Mfg;Cap.: Serial ¹: Mark¹. 2-201 PSA-1/4 12899 SI-80-R7A Breakaway: initial Drag: Activation: Test Load: Final Drag: 04% PASS. 2.4%, PASS. PASS 80.8% 3.1%, PASS. 0.3%, PASS. 3.5%, PASS. PASS 83.4% 2.6/o, PASS. Tag ¹: 2-202 Mfg:Cap,: PSA-1/4 Serial¹: 12900 Mark¹: SI40-R7B Breakaway: Initial Drag: Activation: Test Load: . HnalDrag: 0.3%, PASS. 2.9%, PASS. PASS 80 3o/o 2.4%, PASS. 0.4%, PASS. 3.8%, PASS. PASS 83.6% 2 7'/o, PASS. Tag ¹: 2-206 Mfg.-Cap.: PSA-1/4 Serial¹: 19077 Matk¹: MS-14-R6 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 1.7/o, PASS. PASS 771% 2.7%, PASS. 0.4%, PASS. 3.1%, PASS. PASS 80 9o/o 3.2'/o, PASS.

Tag ¹: 2-207 Mfg.-Cap.: PSA-1/4 Serial¹: 19093 Mark¹: MS-13-R6 Breakaway: Initial Drag: Activatfon: Test Load: Final Drag: Although acceptable, the larger of the final drag values, overhaul andtor replacement. 0.3%, PASS. 0.4%, PASS. 3.1%, PASS. 3.6%, PASS. PASS PASS 83 4% 83 9% 3.1%, PASS. 4.4%, PASS. 153¹s (4.4%), is nearing the allowable limitand should be considered for Tag ¹: 2-208 Mfg.-Cap.: PSA-1/4 Serial¹: 19084 Mark¹: MS-12-R6 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.6%, PASS. 2.9%, PASS. PASS 77.9% 3.2%, PASS. 0.6%, PASS. 4.1/o, PASS; PASS 78.2% 3.1%, PASS. Tag ¹: 2-209 Mfg.-Cap.: PSA-1/4 Serial¹: 12907 Matk¹: MS-11-R6 Breakaway: Initfal Drag: Activation: Test Load: Final Drag: 0.3% PASS. 1.3%, PASS. PASS 79.2% 2.9%, PASS. 0.8%, PASS. 2.8%, PASS. PASS 83.9o/ 3.1%, PASS. Breakaway: 1.1%, PASS. 1.0%, PASS. Initial Drag: 6.2%, 4.3¹ over, FAILI 7.0%, 7.0¹ over, FAILI Activation: PASS PASS Test Load: 81.6'/o 84.1% Final Drag: 4.1%, PASS. 6.1%, 3.7¹ over, FAILI The snubber exceeds the acceptance standard by 4.3¹s (6.2%) fn InitialTension Drag,7.0¹s (7.0%) fn Initial Compression Drag, which may require an engineering evaluation of stress input to the system components. The snubber exceeds the acceptance standard by 3.7¹s (6.1%) in Final Compression Drag.

Tag¹: 2 213 Mfg.-Cap.: PSA;1 0 Serial¹: 12094 Mark¹: Sl-2407-143A Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.0%, PASS. 1.P/o, PASS. PASS 88.4% 1.1%, PASS. 0.2/o, PASS. 2.4%, PASS. PASS 89.6o/o 1.3%, PASS. Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹: 2-214 PSA-1/2 10723 CH-2081-147A Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.5%, PASS. 4.2'/o, PASS. ,PASS 87 Oo%%d 1.7/o, PASS. 0.2o/o, PASS. 2.8%, PASS." PASS 90 8% 2.0%, PASS. Tag ¹: 2-215 Breakaway: 1.0%, PASS. Mfg.-Cap.: PSA-1/2 Initial Drag: 4.0%, PASS. Serial¹: 16088 Activation: PASS Mark¹: CH-2081-1 00A Test Load: 91Z/o Final Drag: 3.8%, PASS. Snubber failed to reach full stroke by.187'n compression. 0.3%, PASS. 1$%, PASS. PASS 93.4% 3.9%, PASS. Tag ¹: Mfg.-Cap.: Serial ¹: Mark ¹'~223 PSA-1/2 14136 CH-2081-1085 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.4%, PASS. 0.9%, PASS. PASS 81.4% 1.2/o, PASS. 0.3%, PASS. 2.4%, PASS. PASS 79,9% 2.2/o, PASS.

Tag ¹: 2-224 Mfg.-Cap.: PSA-1/2 Serial ¹: 10719 Mark¹: CH-2081-685B Breakaway: Initial Drag: Activation: Test Load: Final Drag; 0.2%, PASS. 1.0%, PASS. PASS 78.7% 0.8%, PASS. 0.2/o, PASS. 0.7/o, PASS. PASS 80.8% 13%, PASS. Tag ¹: Mfg.-Cap.: Serial ¹: 2-229 PSA-3 16758 BF-3020-119B Breakaway: initial Drag: Activation: Test Load: Final Drag: 0.2%, PASS. 0.6%, PASS. PASS 88.4% 0.7%, PASS. 0.2/o, PASS. 1.0%, PASS. PASS 89.0% 0.8%, PASS. Tag ¹; 2>>230 Breakaway: 0.5%, PASS. 0.8/o, PASS. Mfg.-Cap.: PSA-1/4 Initial Drag: 13.0%, 27.9¹ over, FAILI 14.1%, 32.0¹ over, FAILI Serial¹: 20252 Activation: PASS PASS Mark¹: CH-1-R5 Test Load: 88.1% 919% Final Drag: 133%, 28.9¹ over, FAILI 15.4%, 36.5¹ over, FAILI The snubber exceeds the acceptance standard by 278¹s (13.0/o) ln Initial Tension Drag,32.0¹s (14.1 /o) In Initial Compression Drag, whichmay require an engineering evaluation of stress input to the system components. The snubber exceeds the acceptance standard by 28.9¹s (13.3%) in Final Tension Drag,36.5¹s (15.4%) in Rnal Compression Drag,. Tag ¹: 2-231 Mfg.-Cap.: PSA-1/4 Serial¹: 19072 Mark¹: CH-1-R2 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 2.1%, PASS. PASS 84 4% 2.7%, PASS. 0.4%, PASS. 3.1%, PASS. PASS 84.4% 3.3% PASS

0.4%, PASS. 7.3%, 7.9¹ over, FAILI Tag ¹: 2.232 , Mfg.-Cap,: PSA-1/4 Serial¹: 20245 Mark¹: CH-1-R3 Breakaway: 0.7%, PASS. Initial Drag: 4.4%, PASS. Activation: Test Load: 86.0% 88.6% Final Drag: 4.7/., PASS., 8.3%,11.5¹ over, FAIL} The snubber exceeds the acceptance standard by 7.9¹s (7.3%) in initial Compression Drag, which may require an engineering evaluation of stress input to the system components. The snubber exceeds the acceptance standard by 11.5¹s (8.3%) in Final Compression Drag,. Tag ¹: 2-234 Breakaway: 0.3%, PASS. 1.0% PASS. Mfg.-Cap.: PSA-1/4 Initial Drag; 1.6/o, PASS. 4.3%, PASS. Serial ¹: 19110 Activation: PASS PASS Mark¹: CH-1-R8 Test Load: 79.2'/o 83.1% Final Drag: 3.7%, PASS. 5.1%, 0.3¹ over, FAIL} The snubber exceeds the acceptance standard by 0.3¹s (5.1%) in Final Compression Drag, indicating that while the snubber has FAILED, and must be repaired or replaced, no engineering analysis of the system components is required. Tag ¹: 2-235 Mfg.-Cap.: PSA-1/2 Serial ¹: 14135 Mark¹: B-2501-11 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 1.3%, PASS. PASS 85.0% 1.6%, PASS. 0.2/o, PASS. 1.7%, PASS. PASS 88.5% 1.8%, PASS. Tag ¹: 2-236 Mfg.-Cap.: PSA-1/4 Serial¹: 23635 Mark¹: B-2501-6B Snu Inib Breakaway: 0.9%, PASS. '.9%, PASS. Initial Drag 2.8%, PASS. 3.0%, PASS. Activation: PASS PASS Test Load; 83.4% 83.9% Final Drag: 2.7%, PASS. 2.4%, PASS. bber 2-236, when combined with the drag values of companion snubber 2-237, exceeds the acceptance standards by 4.4¹s (1.3%) in 'al Tension Drag,6.7¹s (1.9%) in Initial Compression Drag,5.7¹s (1.6/o) in Final Tension Drag,1.7¹s (05%) in Final Compression g, which requires evaluation of the companion snubbers and, possibly, an engineering analysis of stress input to the system components.

Tag ¹: 2-23? Breakaway: 0.5%, PASS. 0.3%, PASS. Mfg,-Cap.: PSA-1/4 Initial Drag: 3.5%, PASS. 3.9%, PASS. Serial¹: 23634 Activation: PASS PASS Mark¹: B-2501-6B Test Load: 77.1'/o 83.9'/o Final Drag: 3.9%, PASS. 3.1%, PASS. Snubber 2-237, when combined with the drag values of companion snubber 2-236, exceeds the acceptance standards by 4.4¹s (1.3%) in InitialTension Drag,6.7¹s (1.9%) In Initial Compression Drag/.7¹s (1.6o/o) in Final Tension Drag,1.7¹s (05%) in Final Compression Drag, whch requires evaluation of the companion snubbers and, possibly, an engineering analysis of stress input to the system components. Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹: 2-246 PSA-35 7814 MS-4102-287A Breakaway: Initial Drag: Activation: Test Load: Rnal Drag: 0.2%, PASS. 0.5%, PASS. PASS 89.0o/o 0.4%, PASS. 0.2'/o, PASS. 1.0%, PASS.

PASS, 91'/o 0.9%, PASS.

2-316 PSA-3 21264 BF-4004-38 Breakaway: 0.2%, PASS. 0.3%, PASS. Initial Drag: 3.9%, PASS. 2.2o/o, PASS. Activation: PASS PASS Mark¹: Test Load: 879'/o 88.6% Final Drag: 2.2%, PASS. 4.3% PASS Although acceptable, the larger of the final drag values, 259.1¹s (4.3%), Is nearing the allowable limitand should be considered for overhaul and/or replacement. Tag ¹: 2-32 1 Mfg.-Cap.: PSA-1/4 Serial ¹: 20136 Mark¹: MS-50-R4 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3'/o, PASS. 2.1%, PASS. PASS 8 6'/o 2.6/o, PASS. 1.4/o, PASS. 4.9% PASS. PASS 90 9% 3.9%, PASS.

Tag ¹: 2-322 Breakaway: 0.3%, PASS. 0.3% PASS Mfg.-Cap.: PSA-1/4 Initial Drag: 2.9%, PASS. 6.2%%d, 4.3¹ over, FAILI Serial ¹: 1261 8 Activation; PASS PASS Mad< ¹: MS-7-R2B Test Load: 8t~% 84 9% Final Drag: 4.2'/o, PASS. 6.1%, 3.7¹ over, FAILI The snubber exceeds the acceptance standardby 43Ns (62/o) in Initial Compression Drag, whichmay require an engineering evaluation of stress input to the system components. The snubber exceeds the acceptance standard by 3.7¹s (6.1%) in Final Compression Drag,. Tag ¹: Mfg.-Cap.: Serial ¹: Mark¹: 2~323 PSA-1 26064 MS-3023-1 1 B Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.6%, PASS. 3.5%, PASS. PASS 92.3% 3.0%, PASS. 0.6'/o, PASS. 2.2/o, PASS. PASS 95 0% 3.2'/o, PASS. Tag ¹: 2-327 Mfg.-Cap.: PSA-1/4 Serial ¹: 23636 Mark¹: RC-55-R7 Breakaway: Initial Drag: Activation: Test Load: Final Drag: 0.3%, PASS. 2.9%, PASS. PASS 90.7% 2.9%, PASS. 0.5/o, PASS. 2.0%, PASS. PASS 99.2% 2.3%, PASS.

i}}