ML18041A190: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(10 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18041A190
| number = ML18041A190
| issue date = 04/24/1989
| issue date = 04/24/1989
| title = Special Rept:On 890414,Triaxial Time History Accelerometer Horizontal Trigger Circuits Identified As Inoperable. Caused by Incorrect Calibr Procedure.Surveillance Procedure Immediately Revised to Reflect Correct Setpoint Values
| title = Special Rept:On 890414,triaxial Time History Accelerometer Horizontal Trigger Circuits Identified as Inoperable. Caused by Incorrect Calibr Procedure.Surveillance Procedure Immediately Revised to Reflect Correct Setpoint Values
| author name = NOONAN T P
| author name = Noonan T
| author affiliation = DUQUESNE LIGHT CO.
| author affiliation = DUQUESNE LIGHT CO.
| addressee name =  
| addressee name =  
Line 13: Line 13:
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO,LER), TEXT-SAFETY REPORT
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO,LER), TEXT-SAFETY REPORT
| page count = 8
| page count = 8
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:,  ACCELERATED            D)STPl~U>ON              DEMONSTRA+N              SYSTEM h
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8904280274            DOC.DATE:    89/04/24  NOTARIZED: NO          DOCKET  I FACIL:50-412 Beaver Valley Power          Station, Unit 2,  Duquesne  Light  C 05000412 AUTH. NAME          AUTHOR AFFILIATION NOONAN,T.P.          Duquesne Light Co.
RECIP.NAME          RECIPIENT AFFILIATION Document Control Branch (Document          Control Desk)
==SUBJECT:==
Special rept:on 890414,triaxial time history accelerometer horizontal trigger circuits identified as inoperable.
DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR                ENCL    ( SIZE:
TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.
NOTES:LPDR 2cys Transcripts. LPDR 2cys PDR Documents.                              05000412 8 Application for permit renewal filed.
RECIPIENT          COPIES              RECIPIENT          COPIES ID  CODE/NAME        LTTR ENCL        ID  CODE/NAME      LTTR ENCL PD1-4 LA                  1      1      PD1-4 PD              1    1 TAM,P                    1      1 INTERNAL: ACRS MICHELSON              1      1      ACRS MOELLER          2    2 ACRS WYLIE                1      1      AEOD/DOA              1    1 AEOD/DSP/TPAB            '1      1      AEOD/ROAB/DSP          2    2 DEDR5                    1      1      IRM/DCTS/DAB          1    1 NRR/DEST/ADE 8H          1      1      NRR/DEST/ADS  7E      1    0 NRR/DEST/CEB 8H          1      1      NRR/DEST/ESB  8D      1    1 NRR/DEST/ICSB 7          1      1      NRR/DEST/MEB  9H      1    1 NRR/DEST/MTB 9H          1      1      NRR/DEST/PSB  8D      1    1 NRR/DEST/RSB 8E          1      1      NRR/DEST jSGB  8D      1    1 NRR/DLPQ/HFB 10          1    '1      NRR/DLPQ/QAB  10      1    1 NRR/DOEA/EAB 11          1      1      NRR/DREP/RPB  10      2    2 N~B - IB 9A              1      1      NUDOCS-ABSTRACT        1    1 REG      E      02        1      1      RES/DSIR/EIB          1    1 RES/DSR/PRAB              1      1      RGN1    FILE 01        1    1 EXTERNAL: EGGG WILLIAMS,S              4      4      FORD BLDG HOY,A        1    1 8
L ST LOBBY WARD          1      1      LPDR                  1    1 I
NRC PDR                  1      1      NSIC MAYS,G            1    1 NSIC MURPHYI G A          1      1 D
NOTES:                                  2      2 D
RIDSII RECIPIENIS ~
S PLEASE HELP US  K) REDUCE WMHZ! CXRKACI'%HE DOCUMENI'XWIBDL DESK, ROOM Pl-37 (EXT. 20079) KO ELZHZHATE KKlR NAME FRY DISHGBVZION LXSIS POR DOC%M&IS YOU DGN~T NEZD!
TOTAL NUMBER OF COPIES REQUIRED: LTTR              46  ENCL    45
E' gled~
Duqueem Nuclear Group Lt                                        Telephone (412) 393~
P.O. Box 4 Shippingport. PA 15077~
April 24,          1989 ND3MNO: 1867 Beaver Valley Power Station, Unit No.      2 Docket No. 50-412, License No. NPF-73 S ecial  Re ort United States Nuclear Regulatory Commission Document Control Desk Washington          , DC  20555 Gentleman:
In accordance                with Appendix A, Beaver Valley Technical Specification 3.3.3.3, "Seismic Instrumentation," the following Special Report is submitted....                  This report. is required when the conditions specified in Technical Specification 3.3.3.3.b are not satisfied.
On April            14,  1989,  2ERS-ACS-1 and -3, Triaxial Time History Accelerometer            horizontal    trigger circuits for the Containment Structure and the Switchyard, were identified as being inoperable since        May,        1987, as a result of an incorrect calibration procedure.            On April 1, 1989, a Response Spectrum Analyzer Trouble alarm was observed,                indicating an internal fault. A maintenance work request was generated to correct this condition. During troubleshooting of the central control cabinet, with a vendor representative present, these accelerometer trigger circuits were identified as having incorrect setpoints.                      The accelerometer analog        trigger circuits cause tape recording                  of all three directional sensor inputs and annunciation, when the setpoint value is reached.'he accelerometer trigger circuit cards contain switches which provide annunciation when their respective setpoint is reached.                The setpoints are values measured in g-forces.                It was discovered              that the horizontal trigger    setpoint  value        t0.0lg) for both accelerometer trigger card were set at the 'vertical                        alarm switch setpoint value (0.037g). The                  cause  for this    event      was  due to a deficient surveillance procedure                which  incorrectly      specified the setpoint values.
39042A0274 8904>4  050004i2 PDR        ADOCK PDr.
C April 24,  1989 ND3MNO:1867 Page 2 The  surveillance procedure was immediately revised to reflect the correct setpoint values and the accelerometer trigger circuits were calibrated to the correct values.
There were no safety implications to the public as a result of this event because no seismic activity occurred during the entire period the horizontal          accelerometer    trigger circuits were incorrectly  calibrated. The  trigger  circuits  function to initiate automatic magnetic tape        recording  of  the seismic  event, no other automatic plant    actuations    are  designed  to  occur  from a trigger circuit. In addition,      the  vertical  accelerometer  trigger  circuits were correctly    calibrated    and  operational  throughout  the entire time period.
Very  truly  yours, T. P. N onan General Manager Nuclear Operations JT/c j Attachment
April 24,  1989 ND3MNO:1867 Page  three CC'r. William T. Russell Regional Administrator United States Nuclear Regulatory Commission Region 1 King of Prussia,  PA  19406 C'. A. Roteck, Ohio Edison Mr. Peter Tam,  BVPS Licensing Project Manager United States Nuclear Regulatory Commission Washington,  DC  20555 J. Beall, Nuclear Regulatory Commission, BVPS Senior Resident Inspector Mr. Alex Timme, CAPCO Nuclear Projects Coordinator Toledo Edison INPO Records  Center Suite  1500 1100 Circle  75 Parkway Atlanta, GA    30339 G. E. Muckle, Factory Mutual Engineering, Pittsburgh Mr. J. N. Steinmetz, Operating Plant Projects Manager Mid Atlantic Area    .
Westinghouse Electric Corporation Energy Systems Service Division Box 355 Pittsburgh,  PA  15230 American Nuclear Insurers c/o Dottie Sherman, ANI    Library The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 Mr. Richard Janati Department of Environmental Resources P. O. Box 2063 16th Floor, Fulton Building Harrisburg, PA 17120 Director, Safety Evaluation    & Control Virginia Electric    & Power Co.
P. O. Box 26666 One James River Plaza Richmond, VA 23261
0}}

Latest revision as of 22:37, 21 October 2019

Special Rept:On 890414,triaxial Time History Accelerometer Horizontal Trigger Circuits Identified as Inoperable. Caused by Incorrect Calibr Procedure.Surveillance Procedure Immediately Revised to Reflect Correct Setpoint Values
ML18041A190
Person / Time
Site: Beaver Valley
Issue date: 04/24/1989
From: Noonan T
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ND3MNO:1867, NUDOCS 8904280274
Download: ML18041A190 (8)


Text

, ACCELERATED D)STPl~U>ON DEMONSTRA+N SYSTEM h

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8904280274 DOC.DATE: 89/04/24 NOTARIZED: NO DOCKET I FACIL:50-412 Beaver Valley Power Station, Unit 2, Duquesne Light C 05000412 AUTH. NAME AUTHOR AFFILIATION NOONAN,T.P. Duquesne Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special rept:on 890414,triaxial time history accelerometer horizontal trigger circuits identified as inoperable.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL ( SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:LPDR 2cys Transcripts. LPDR 2cys PDR Documents. 05000412 8 Application for permit renewal filed.

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-4 LA 1 1 PD1-4 PD 1 1 TAM,P 1 1 INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 ACRS WYLIE 1 1 AEOD/DOA 1 1 AEOD/DSP/TPAB '1 1 AEOD/ROAB/DSP 2 2 DEDR5 1 1 IRM/DCTS/DAB 1 1 NRR/DEST/ADE 8H 1 1 NRR/DEST/ADS 7E 1 0 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 7 1 1 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/PSB 8D 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST jSGB 8D 1 1 NRR/DLPQ/HFB 10 1 '1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA/EAB 11 1 1 NRR/DREP/RPB 10 2 2 N~B - IB 9A 1 1 NUDOCS-ABSTRACT 1 1 REG E 02 1 1 RES/DSIR/EIB 1 1 RES/DSR/PRAB 1 1 RGN1 FILE 01 1 1 EXTERNAL: EGGG WILLIAMS,S 4 4 FORD BLDG HOY,A 1 1 8

L ST LOBBY WARD 1 1 LPDR 1 1 I

NRC PDR 1 1 NSIC MAYS,G 1 1 NSIC MURPHYI G A 1 1 D

NOTES: 2 2 D

RIDSII RECIPIENIS ~

S PLEASE HELP US K) REDUCE WMHZ! CXRKACI'%HE DOCUMENI'XWIBDL DESK, ROOM Pl-37 (EXT. 20079) KO ELZHZHATE KKlR NAME FRY DISHGBVZION LXSIS POR DOC%M&IS YOU DGN~T NEZD!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 46 ENCL 45

E' gled~

Duqueem Nuclear Group Lt Telephone (412) 393~

P.O. Box 4 Shippingport. PA 15077~

April 24, 1989 ND3MNO: 1867 Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 S ecial Re ort United States Nuclear Regulatory Commission Document Control Desk Washington , DC 20555 Gentleman:

In accordance with Appendix A, Beaver Valley Technical Specification 3.3.3.3, "Seismic Instrumentation," the following Special Report is submitted.... This report. is required when the conditions specified in Technical Specification 3.3.3.3.b are not satisfied.

On April 14, 1989, 2ERS-ACS-1 and -3, Triaxial Time History Accelerometer horizontal trigger circuits for the Containment Structure and the Switchyard, were identified as being inoperable since May, 1987, as a result of an incorrect calibration procedure. On April 1, 1989, a Response Spectrum Analyzer Trouble alarm was observed, indicating an internal fault. A maintenance work request was generated to correct this condition. During troubleshooting of the central control cabinet, with a vendor representative present, these accelerometer trigger circuits were identified as having incorrect setpoints. The accelerometer analog trigger circuits cause tape recording of all three directional sensor inputs and annunciation, when the setpoint value is reached.'he accelerometer trigger circuit cards contain switches which provide annunciation when their respective setpoint is reached. The setpoints are values measured in g-forces. It was discovered that the horizontal trigger setpoint value t0.0lg) for both accelerometer trigger card were set at the 'vertical alarm switch setpoint value (0.037g). The cause for this event was due to a deficient surveillance procedure which incorrectly specified the setpoint values.

39042A0274 8904>4 050004i2 PDR ADOCK PDr.

C April 24, 1989 ND3MNO:1867 Page 2 The surveillance procedure was immediately revised to reflect the correct setpoint values and the accelerometer trigger circuits were calibrated to the correct values.

There were no safety implications to the public as a result of this event because no seismic activity occurred during the entire period the horizontal accelerometer trigger circuits were incorrectly calibrated. The trigger circuits function to initiate automatic magnetic tape recording of the seismic event, no other automatic plant actuations are designed to occur from a trigger circuit. In addition, the vertical accelerometer trigger circuits were correctly calibrated and operational throughout the entire time period.

Very truly yours, T. P. N onan General Manager Nuclear Operations JT/c j Attachment

April 24, 1989 ND3MNO:1867 Page three CC'r. William T. Russell Regional Administrator United States Nuclear Regulatory Commission Region 1 King of Prussia, PA 19406 C'. A. Roteck, Ohio Edison Mr. Peter Tam, BVPS Licensing Project Manager United States Nuclear Regulatory Commission Washington, DC 20555 J. Beall, Nuclear Regulatory Commission, BVPS Senior Resident Inspector Mr. Alex Timme, CAPCO Nuclear Projects Coordinator Toledo Edison INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, GA 30339 G. E. Muckle, Factory Mutual Engineering, Pittsburgh Mr. J. N. Steinmetz, Operating Plant Projects Manager Mid Atlantic Area .

Westinghouse Electric Corporation Energy Systems Service Division Box 355 Pittsburgh, PA 15230 American Nuclear Insurers c/o Dottie Sherman, ANI Library The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 Mr. Richard Janati Department of Environmental Resources P. O. Box 2063 16th Floor, Fulton Building Harrisburg, PA 17120 Director, Safety Evaluation & Control Virginia Electric & Power Co.

P. O. Box 26666 One James River Plaza Richmond, VA 23261

0