ML20205A858: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:-
occ      z ma            SUPPLEMENTAL FILE COPY Roger S. Boyd, Assistant Director for Reactor Projects DIRV s D. R. Huller, Chief, Reactor Project Branch fl MEETING VInt ,Py)LIG_1.ERVICE COMPANT OF NEV HAMPSHIRE - NOVEMBER 26, 1968 Messrs. Eliot Priest, Donald Esnett Sinville, and V1111aa Thon.as                                                                    l Nickerson of Public Service of New Hampshire net with D. R. Muller and C. J. Hale to discuss the proposed site of their 2660 avt. PWR.
The Newington site which vaa considered in two previous meetings with this applicant has been abandoned. The applicant felt the close proximity of Pease Air Force Base (SAC) would result in costly and cumbersone design problems. In addition, dye relecse studies in their ultimate heat sink indicated poor thermal dissipation, i
especially if more than one unit were constructed. Therefore, a previously considered site near Seabrook, New Paspehire, approximately 250 acres, has been reevaluated and is now *he proposed location of their first unit.                Mr. Priest, vice president of Public Service Company, will make a news release to this effect in approminately two weeks.
From the information presented we agreed with Public Service that the Secbrook site is more acceptable from at least two vievet the population distribution is lower and there is no involvement with the SAC air base.                                                                                                                    l Mr. Priest expects the PSAR will be submitted in April 1969.
J C. J. Male Project 14ader                                        l
;                                                                                      Reactor Project tranch #1                                        l Division of Reactor Licensing                                    l Distribution:
Suppl.
RL Reading                                          CO (2)
RPB-1 Reading                                      C. Hale D. J. Skovholt                                      N. Blunt S. Levine                                                                                                                    '
R. C. DeYoung                                                                                                            , ,3 D. R. Muller                                                                                                    J' Branch Chiefs. RL:RP                                                                                            y, y, I I,g i
: l. RL;RPBr.1,.
I cmci ,        RL:  E -.1.                                                                                              _.
i l        M                                                                                              !
w.mt ,
Hah
                              '/g            'I Muf$er                                                                                  . . . - . .
eor,        12/2/68                  12/1/68                                                    m. .
_ q.y ._. ..x..
  .wm or,n u
                                                                                                                                                  =
t
                      .t
                                                                                      .,,,,,,,=mm.,.
8810260117 000920 PDR    FOIA MOKRZYC88-443            PDR 3 1J f7                i l
                                                                                                                - _ _ - - _ _ _ -}}

Latest revision as of 07:45, 30 December 2020

Summary of 681126 Meeting W/Util to Discuss Proposed Site of 2,660 Mwt PWR
ML20205A858
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 12/02/1968
From: Hale C
US ATOMIC ENERGY COMMISSION (AEC)
To: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20205A535 List:
References
FOIA-88-443 NUDOCS 8810260117
Download: ML20205A858 (1)


Text

-

occ z ma SUPPLEMENTAL FILE COPY Roger S. Boyd, Assistant Director for Reactor Projects DIRV s D. R. Huller, Chief, Reactor Project Branch fl MEETING VInt ,Py)LIG_1.ERVICE COMPANT OF NEV HAMPSHIRE - NOVEMBER 26, 1968 Messrs. Eliot Priest, Donald Esnett Sinville, and V1111aa Thon.as l Nickerson of Public Service of New Hampshire net with D. R. Muller and C. J. Hale to discuss the proposed site of their 2660 avt. PWR.

The Newington site which vaa considered in two previous meetings with this applicant has been abandoned. The applicant felt the close proximity of Pease Air Force Base (SAC) would result in costly and cumbersone design problems. In addition, dye relecse studies in their ultimate heat sink indicated poor thermal dissipation, i

especially if more than one unit were constructed. Therefore, a previously considered site near Seabrook, New Paspehire, approximately 250 acres, has been reevaluated and is now *he proposed location of their first unit. Mr. Priest, vice president of Public Service Company, will make a news release to this effect in approminately two weeks.

From the information presented we agreed with Public Service that the Secbrook site is more acceptable from at least two vievet the population distribution is lower and there is no involvement with the SAC air base. l Mr. Priest expects the PSAR will be submitted in April 1969.

J C. J. Male Project 14ader l

Reactor Project tranch #1 l Division of Reactor Licensing l Distribution

Suppl.

RL Reading CO (2)

RPB-1 Reading C. Hale D. J. Skovholt N. Blunt S. Levine '

R. C. DeYoung , ,3 D. R. Muller J' Branch Chiefs. RL:RP y, y, I I,g i

l. RL;RPBr.1,.

I cmci , RL: E -.1. _.

i l M  !

w.mt ,

Hah

'/g 'I Muf$er . . . - . .

eor, 12/2/68 12/1/68 m. .

_ q.y ._. ..x..

.wm or,n u

=

t

.t

.,,,,,,,=mm.,.

8810260117 000920 PDR FOIA MOKRZYC88-443 PDR 3 1J f7 i l

- _ _ - - _ _ _ -