MONTHYEARML20217K4731998-04-29029 April 1998 Summary of 980423 Meeting W/Great Bay Power Corp Re Great Bay Power Corp Response to Request for Addl Re Decommissioning Funding Assurance ML20198L2821998-01-0505 January 1998 Summary of 971219 Meeting W/Util in Rockville,Md Re Decommissioning Funding Assurance.List of Attendees Encl ML20202C7341997-11-17017 November 1997 Summary of 971023 Meeting W/Westinghouse in Rockville,Md Re Axial Offset Anomaly (Aoa) & Seabrook Fuel Failures.Copy of non-proprietary Presentation Matl & List of Participants Encl ML20058A1931993-11-18018 November 1993 Summary of 931110 Meeting W/Util in Rockville,Md to Discuss Operational Problems,Plant Performance,Recent Personnel & Organizational Changes,Response to 10CFR2.206 Petition & Actions Re Employee Concerns.Viewgraphs Encl ML20056F8171993-08-0909 August 1993 Summary of Operating Reactors Events Meeting 93-29 on 930804.List of Attendees & Viewgraphs Encl ML20128K8261993-02-0909 February 1993 Summary of 921123-24 Meeting in King of Prussia,Pa Re Region I Positions on Operator Licensing Issues & Solicit Input from Util Training Staffs ML20128C7481993-01-28028 January 1993 Summary of Operating Reactors Events Meeting 93-03 on 930127.List of Attendees & Elements Discussed Encl ML20125E2221992-12-0404 December 1992 Summary of 921123 Meeting W/Util in Rockville,Md Re Transfer of Emergency Planning Responsibility to Commonwealth of Ma. Meeting Agenda,List of Attendees & to FEMA Encl ML20198C6831991-06-26026 June 1991 Summary of 910621 Public Meeting at Science & Nature Ctr, Seabrook,Nh Re Weld Radiographic Concerns ML20058D5281990-10-30030 October 1990 Summary of 901016 Meeting W/Util Re Removal of Limitations Imposed on Use of Odcm.Util Will Submit Formal Request ML20055H3741990-07-20020 July 1990 Summary of 900727 Presentation by Util Re Facility Cycle 2 Fuel Design & Future Fuel Activities.License Amend Will Be Needed for Plant to Go to Higher Enrichment Fuel for 18-month Cycle.Viewgraphs Encl ML20055F8001990-07-12012 July 1990 Summary of 900611 Meeting W/Utils to Discuss Merger Arrangements on Future Operation of Facility ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246K5011989-07-0707 July 1989 Summary of Operating Reactors Events Meeting 89-25 on 890705 to Discuss Manual Reactor Trip W/Complications ML20245F7221989-04-26026 April 1989 Summary of 890420 Meeting W/Util Re Source of Decommissioning Funding & Supplemental Financial Assurance Arrangements to Deal W/Concern of Time Value of Goods & Svcs in Future.Transcript of Meeting Encl ML20205T4571988-11-0808 November 1988 Summary of 881103 Meeting W/Util in Rockville,Md Re Plant & Applicant Readiness for Low Power Operation.Transcript Encl ML20151G1971988-07-19019 July 1988 Summary of 880709 Meeting W/Util,Bnl & Altran Corp in Boston,Ma Re Cracking in Cooling Tower Concrete Reported as Open Item in Insp Rept 50-443/87-07.Transcript of Meeting & List of Attendees Encl ML20012E1591988-02-0808 February 1988 Trip Rept of 880125-29 Site Visit to Participate in Audit of Emergency Preparedness & Public Affairs Div ML20238D4901987-12-23023 December 1987 Summary of 871222 Meeting W/Util & Plant Joint Owners in Bethesda,Md Re Util Offsite Emergency Plan for Commonwealth of Ma Portion of Epz.Transcript of Meeting & List of Attendees Encl ML20235C0061987-09-17017 September 1987 Summary of 870916 Meeting W/Util to Discuss Util Interim Compensatory Emergency Plan for Commonwealth of Ma Portions of Epz.Transcript,Slides Presented & Attendance Roster Encl ML20236G2871987-07-31031 July 1987 Summary of 870720 Meeting W/Util Re Util Interim Compensatory Emergency Plan for State of Ma Portions of Epz. Meeting Transcript,Slides & Attendance Roster Encl ML20214F6491987-05-15015 May 1987 Summarizes 870507 Meeting W/Util Re Licensing of Unit 1. Transcript of Meeting Encl ML20210C9401987-04-21021 April 1987 Summary of 870409 Meeting W/Util in Bethesda,Md to Discuss Seabrook Tech Specs Issued w/5% License.List of Attendees Encl ML20212R0471987-04-0606 April 1987 Summary of 870114 Meeting W/Util Concerning BNL Final Rept Re Technical Review of Plant Emergency Planning Sensitivity Study.W/Summary of 870325 Meeting ML20212R0721987-04-0606 April 1987 Summary of 870325 Meeting W/Util Concerning BNL Final Rept on Technical Review of Plant Emergency Planning Sensitivity Study.Transcript,Viewgraphs & Attendance Roster Encl ML20205R3411987-03-31031 March 1987 Summary of 870325 Meeting W/Representatives of State of Ma Atty General Re BNL Final Rept on BNL Technical Review of Facility Emergency Planning Sensitivity Study.Attendance List & Meeting Transcript Encl ML20212D8781987-02-20020 February 1987 Summary of 870106 Meeting W/Util Re Actions Necessary to Withdraw OL Application & Cp.Util Must File Motion W/Aslb to Withdraw License.List of Attendees & List of Events Re Midland CP Withdrawal Encl ML20235E0621987-01-28028 January 1987 Summary of 870127 Meeting W/Util to Introduce Feigenbaum to Recipient,Per Derrickson Request ML20235K4951987-01-28028 January 1987 Summarizes 870127 Meeting W/Util Re Feigenbaum Appointment as Util Vice President for Engineering & Util Intent to Submit Emergency Plan for Portion of EPZ in State of Ma ML20207Q0511987-01-15015 January 1987 Summary of 870114 Meeting W/Util & BNL in Bethesda,Md Re Draft Rept on BNL Technical Review of Plant Emergency Planning Sensitivity Study.Nrc Will Review Util Comments on Rept.Transcript of Meeting & List of Attendees Encl ML20215E7661986-12-17017 December 1986 Summary of 861216 Meeting W/Util Re Press Conference to Announce Filing of Petition for Waiver Under 10CFR2.758 of Commission Rules Concerning 10-mile Emergency Planning Zone ML20215E7751986-12-16016 December 1986 Summary of 861216 Meeting Re Organizational Changes Being Made at Plant,Closing of Open Items Prior to Issuance of Low Power License & Possible Filing of Waiver to Regulations Under 10CFR2.758 Re 10-mile Emergency Zone ML20214S0001986-11-26026 November 1986 Summary of 861016-17 Meetings W/Util,Bnl,Pickard,Lowe & Garrick,Inc,Westinghouse & Fauske & Assoc in Brookhaven,Ny Re Emergency Planning Sensitivity Study.List of Attendees & Viewgraphs Encl ML20214R3981986-11-25025 November 1986 Summary of 861112 Meeting W/Util,Pickard,Lowe & Garrick,Inc, Fauske & Assoc,Bnl & Westinghouse in Bethesda,Md Re Emergency Planning Sensitivity Study.Rupture of Steam Generator Tubes During Core Melt Not Included in Study ML20214K0851986-11-21021 November 1986 Summary of 860923 Meeting W/Util,Pickard,Lowe & Garrick,Inc, BNL & Harmon & Weiss in Bethesda,Md Re Emergency Planning Sensitivity Study.Followup Meeting Scheduled for 861016-17 ML20214K0971986-11-21021 November 1986 Summary of 861015 Onsite Meeting W/Util & BNL Re Review of Emergency Planning Sensitivity Study.Training Staff Presented & Discussed Module Designed to Assist Operating Staff in Recognizing LOCA ML20214K1291986-11-17017 November 1986 Summary of 861113 Meeting W/Util & Franklin Research Ctr Re Submittal of Fire Hazards Analysis.Specialized Training for Fire Brigade in Fighting Charcoal Fire in Filter Banks Required.List of Attendees Encl ML20214Q2591986-09-17017 September 1986 Summary of 860904 Meeting W/Util,Plc & Nucon Re Applicant Approach to Charcoal Filter Fire Analyses.Viewgraphs Encl ML20205J8201986-09-11011 September 1986 Summary of 860908 & 09 Site Visit to Allow NRC Staff & Consultants to Visually Examine Plant Features Important to Risk Mgt & Emergency Planning Study.List of Attendees & Related Info Encl ML20214Q5291986-09-0808 September 1986 Summary of 860814 Meeting W/Util,Bnl,United Engineers & Constructors,Structural Mechanics Assoc & Pickard,Lowe & Garrick in Upton,Ny Re Unique Containment Design & Const Features & Inherent Strength Capabilities.Related Info Encl ML20210C9541986-09-0808 September 1986 Summary of 860827 Meeting W/Util & BNL in Bethesda,Md Re Plant Model & Treatment of Event V & Containment Bypass in Risk Mgt & Emergency Planning Study.Viewgraphs Encl ML20210D3541986-09-0808 September 1986 Summary of 860806 Meeting W/Util,Yankee Atomic,Bg&E,Pickard Lowe & Garrick & BNL in Bethesda,Md Re Risk Mgt & Emergency Planning Study.List of Attendees & Viewgraphs Encl ML20209F2471986-08-29029 August 1986 Summary of 860626 & 27 Meetings W/Util in Seabrook,Nh Re Operational Readiness of Facility.Several Work Items, Including Housekeeping & Painting,Incomplete.List of Attendees,Agenda,Viewgraphs & Meeting Notice Encl ML20214K7451986-08-19019 August 1986 Summary of 860815 Meeting W/Sb Comley Re Nuclear Safety & Emergency Planning.Served on 860819 ML20211J8441986-06-21021 June 1986 Summary of 860513-14 Meetings W/Util,Nrc & Eg&G Idaho,Inc in Bethesda,Md Re Questions Resulting from Review of Pump & Valve Inservice Testing Program.Of 113 questions,13 Remain Open.Attendee List & Questions Encl ML20198B3371986-05-13013 May 1986 Summary of 860319 Meeting W/Util,Teledyne Engineering Svcs, United Engineers & Constructors & Bechtel Re Applicant Proposed Cable Tray Qualification Program.Attendance List, Agenda,Viewgraphs & Request for Addl Info Encl ML20244D8391986-05-0707 May 1986 Trip Rept of 860415 Site Visit Re Demonstration for Ultrasonic Exam Procedure of Statically Cast Stainless Steel Primary Loop Welds.Issue of Preservice Ultrasonic Exam of Welds Resolved.Trip Repts by Inel & Bnwl Encl ML20203P3061986-05-0101 May 1986 Summary of 860423 Meeting W/Util Re Scheduling Problems & Proof & Review Version of Tech Spec Section 3/4.6.List of Attendees Encl ML20244D8401986-04-22022 April 1986 Trip Rept of 860415 Site Visit Re Demonstration of Ultrasonic Exams Performed on Cast Stainless Steel Primary Piping Welds.Exam Procedure Appears to Meet or Exceed ASME Code Requirements.Written Procedure Not Available ML20155E2691986-04-11011 April 1986 Summary of 860227 Exit Interview W/Util at Site Re Nrc/Eg&G Idaho Audit of 12 Equipment Qualification Files for Equipment Located in Harsh Environ.Attendance List Encl 1998-04-29
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217K4731998-04-29029 April 1998 Summary of 980423 Meeting W/Great Bay Power Corp Re Great Bay Power Corp Response to Request for Addl Re Decommissioning Funding Assurance ML20198L2821998-01-0505 January 1998 Summary of 971219 Meeting W/Util in Rockville,Md Re Decommissioning Funding Assurance.List of Attendees Encl ML20202C7341997-11-17017 November 1997 Summary of 971023 Meeting W/Westinghouse in Rockville,Md Re Axial Offset Anomaly (Aoa) & Seabrook Fuel Failures.Copy of non-proprietary Presentation Matl & List of Participants Encl ML20058A1931993-11-18018 November 1993 Summary of 931110 Meeting W/Util in Rockville,Md to Discuss Operational Problems,Plant Performance,Recent Personnel & Organizational Changes,Response to 10CFR2.206 Petition & Actions Re Employee Concerns.Viewgraphs Encl ML20056F8171993-08-0909 August 1993 Summary of Operating Reactors Events Meeting 93-29 on 930804.List of Attendees & Viewgraphs Encl ML20128K8261993-02-0909 February 1993 Summary of 921123-24 Meeting in King of Prussia,Pa Re Region I Positions on Operator Licensing Issues & Solicit Input from Util Training Staffs ML20128C7481993-01-28028 January 1993 Summary of Operating Reactors Events Meeting 93-03 on 930127.List of Attendees & Elements Discussed Encl ML20125E2221992-12-0404 December 1992 Summary of 921123 Meeting W/Util in Rockville,Md Re Transfer of Emergency Planning Responsibility to Commonwealth of Ma. Meeting Agenda,List of Attendees & to FEMA Encl ML20198C6831991-06-26026 June 1991 Summary of 910621 Public Meeting at Science & Nature Ctr, Seabrook,Nh Re Weld Radiographic Concerns ML20058D5281990-10-30030 October 1990 Summary of 901016 Meeting W/Util Re Removal of Limitations Imposed on Use of Odcm.Util Will Submit Formal Request ML20055H3741990-07-20020 July 1990 Summary of 900727 Presentation by Util Re Facility Cycle 2 Fuel Design & Future Fuel Activities.License Amend Will Be Needed for Plant to Go to Higher Enrichment Fuel for 18-month Cycle.Viewgraphs Encl ML20055F8001990-07-12012 July 1990 Summary of 900611 Meeting W/Utils to Discuss Merger Arrangements on Future Operation of Facility ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246K5011989-07-0707 July 1989 Summary of Operating Reactors Events Meeting 89-25 on 890705 to Discuss Manual Reactor Trip W/Complications ML20245F7221989-04-26026 April 1989 Summary of 890420 Meeting W/Util Re Source of Decommissioning Funding & Supplemental Financial Assurance Arrangements to Deal W/Concern of Time Value of Goods & Svcs in Future.Transcript of Meeting Encl ML20205T4571988-11-0808 November 1988 Summary of 881103 Meeting W/Util in Rockville,Md Re Plant & Applicant Readiness for Low Power Operation.Transcript Encl ML20151G1971988-07-19019 July 1988 Summary of 880709 Meeting W/Util,Bnl & Altran Corp in Boston,Ma Re Cracking in Cooling Tower Concrete Reported as Open Item in Insp Rept 50-443/87-07.Transcript of Meeting & List of Attendees Encl ML20238D4901987-12-23023 December 1987 Summary of 871222 Meeting W/Util & Plant Joint Owners in Bethesda,Md Re Util Offsite Emergency Plan for Commonwealth of Ma Portion of Epz.Transcript of Meeting & List of Attendees Encl ML20235C0061987-09-17017 September 1987 Summary of 870916 Meeting W/Util to Discuss Util Interim Compensatory Emergency Plan for Commonwealth of Ma Portions of Epz.Transcript,Slides Presented & Attendance Roster Encl ML20236G2871987-07-31031 July 1987 Summary of 870720 Meeting W/Util Re Util Interim Compensatory Emergency Plan for State of Ma Portions of Epz. Meeting Transcript,Slides & Attendance Roster Encl ML20214F6491987-05-15015 May 1987 Summarizes 870507 Meeting W/Util Re Licensing of Unit 1. Transcript of Meeting Encl ML20210C9401987-04-21021 April 1987 Summary of 870409 Meeting W/Util in Bethesda,Md to Discuss Seabrook Tech Specs Issued w/5% License.List of Attendees Encl ML20212R0471987-04-0606 April 1987 Summary of 870114 Meeting W/Util Concerning BNL Final Rept Re Technical Review of Plant Emergency Planning Sensitivity Study.W/Summary of 870325 Meeting ML20212R0721987-04-0606 April 1987 Summary of 870325 Meeting W/Util Concerning BNL Final Rept on Technical Review of Plant Emergency Planning Sensitivity Study.Transcript,Viewgraphs & Attendance Roster Encl ML20205R3411987-03-31031 March 1987 Summary of 870325 Meeting W/Representatives of State of Ma Atty General Re BNL Final Rept on BNL Technical Review of Facility Emergency Planning Sensitivity Study.Attendance List & Meeting Transcript Encl ML20212D8781987-02-20020 February 1987 Summary of 870106 Meeting W/Util Re Actions Necessary to Withdraw OL Application & Cp.Util Must File Motion W/Aslb to Withdraw License.List of Attendees & List of Events Re Midland CP Withdrawal Encl ML20235E0621987-01-28028 January 1987 Summary of 870127 Meeting W/Util to Introduce Feigenbaum to Recipient,Per Derrickson Request ML20235K4951987-01-28028 January 1987 Summarizes 870127 Meeting W/Util Re Feigenbaum Appointment as Util Vice President for Engineering & Util Intent to Submit Emergency Plan for Portion of EPZ in State of Ma ML20207Q0511987-01-15015 January 1987 Summary of 870114 Meeting W/Util & BNL in Bethesda,Md Re Draft Rept on BNL Technical Review of Plant Emergency Planning Sensitivity Study.Nrc Will Review Util Comments on Rept.Transcript of Meeting & List of Attendees Encl ML20215E7661986-12-17017 December 1986 Summary of 861216 Meeting W/Util Re Press Conference to Announce Filing of Petition for Waiver Under 10CFR2.758 of Commission Rules Concerning 10-mile Emergency Planning Zone ML20215E7751986-12-16016 December 1986 Summary of 861216 Meeting Re Organizational Changes Being Made at Plant,Closing of Open Items Prior to Issuance of Low Power License & Possible Filing of Waiver to Regulations Under 10CFR2.758 Re 10-mile Emergency Zone ML20214S0001986-11-26026 November 1986 Summary of 861016-17 Meetings W/Util,Bnl,Pickard,Lowe & Garrick,Inc,Westinghouse & Fauske & Assoc in Brookhaven,Ny Re Emergency Planning Sensitivity Study.List of Attendees & Viewgraphs Encl ML20214R3981986-11-25025 November 1986 Summary of 861112 Meeting W/Util,Pickard,Lowe & Garrick,Inc, Fauske & Assoc,Bnl & Westinghouse in Bethesda,Md Re Emergency Planning Sensitivity Study.Rupture of Steam Generator Tubes During Core Melt Not Included in Study ML20214K0851986-11-21021 November 1986 Summary of 860923 Meeting W/Util,Pickard,Lowe & Garrick,Inc, BNL & Harmon & Weiss in Bethesda,Md Re Emergency Planning Sensitivity Study.Followup Meeting Scheduled for 861016-17 ML20214K0971986-11-21021 November 1986 Summary of 861015 Onsite Meeting W/Util & BNL Re Review of Emergency Planning Sensitivity Study.Training Staff Presented & Discussed Module Designed to Assist Operating Staff in Recognizing LOCA ML20214K1291986-11-17017 November 1986 Summary of 861113 Meeting W/Util & Franklin Research Ctr Re Submittal of Fire Hazards Analysis.Specialized Training for Fire Brigade in Fighting Charcoal Fire in Filter Banks Required.List of Attendees Encl ML20214Q2591986-09-17017 September 1986 Summary of 860904 Meeting W/Util,Plc & Nucon Re Applicant Approach to Charcoal Filter Fire Analyses.Viewgraphs Encl ML20205J8201986-09-11011 September 1986 Summary of 860908 & 09 Site Visit to Allow NRC Staff & Consultants to Visually Examine Plant Features Important to Risk Mgt & Emergency Planning Study.List of Attendees & Related Info Encl ML20210C9541986-09-0808 September 1986 Summary of 860827 Meeting W/Util & BNL in Bethesda,Md Re Plant Model & Treatment of Event V & Containment Bypass in Risk Mgt & Emergency Planning Study.Viewgraphs Encl ML20210D3541986-09-0808 September 1986 Summary of 860806 Meeting W/Util,Yankee Atomic,Bg&E,Pickard Lowe & Garrick & BNL in Bethesda,Md Re Risk Mgt & Emergency Planning Study.List of Attendees & Viewgraphs Encl ML20214Q5291986-09-0808 September 1986 Summary of 860814 Meeting W/Util,Bnl,United Engineers & Constructors,Structural Mechanics Assoc & Pickard,Lowe & Garrick in Upton,Ny Re Unique Containment Design & Const Features & Inherent Strength Capabilities.Related Info Encl ML20209F2471986-08-29029 August 1986 Summary of 860626 & 27 Meetings W/Util in Seabrook,Nh Re Operational Readiness of Facility.Several Work Items, Including Housekeeping & Painting,Incomplete.List of Attendees,Agenda,Viewgraphs & Meeting Notice Encl ML20214K7451986-08-19019 August 1986 Summary of 860815 Meeting W/Sb Comley Re Nuclear Safety & Emergency Planning.Served on 860819 ML20211J8441986-06-21021 June 1986 Summary of 860513-14 Meetings W/Util,Nrc & Eg&G Idaho,Inc in Bethesda,Md Re Questions Resulting from Review of Pump & Valve Inservice Testing Program.Of 113 questions,13 Remain Open.Attendee List & Questions Encl ML20198B3371986-05-13013 May 1986 Summary of 860319 Meeting W/Util,Teledyne Engineering Svcs, United Engineers & Constructors & Bechtel Re Applicant Proposed Cable Tray Qualification Program.Attendance List, Agenda,Viewgraphs & Request for Addl Info Encl ML20203P3061986-05-0101 May 1986 Summary of 860423 Meeting W/Util Re Scheduling Problems & Proof & Review Version of Tech Spec Section 3/4.6.List of Attendees Encl ML20155E2691986-04-11011 April 1986 Summary of 860227 Exit Interview W/Util at Site Re Nrc/Eg&G Idaho Audit of 12 Equipment Qualification Files for Equipment Located in Harsh Environ.Attendance List Encl ML20202H4101986-04-0707 April 1986 Summary of 860227 Meeting W/Util in Bethesda,Md Re Improvements to Proposed Tech Spec 3/4.2, Power Distribution Limits, Transmitted by .List of Meeting Attendees Encl ML20154A2711986-02-24024 February 1986 Summary of 860128-30 Meetings W/Util in Bethesda,Md Re Input for Proof & Review Version of Listed Tech Spec Sections. Unresolved Issues Re Containment Air Temp,Secondary Bypass Leakage & Administrative Controls Discussed ML20214B5251986-02-10010 February 1986 Summary of 860114 Meeting W/Util,Bechtel & New England Coalition on Nuclear Pollution to Discuss Proposed Cable Tray Qualification Program Which Utilizes Dynamic Testing Rather than Traditional Linear Elastic Analysis 1998-04-29
[Table view] |
Text
- f ucuq'o UNITED STATES 8 'n NUCLEAR REGULATORY COMMISSION
, g -r WASHINGTON, D. C. 20655 k...../ $4 SEP N Docket No. 50-443 APPLICANT: Public Service Company of New Hampshire FACILITY: Seabrook Station Unit 1
SUBJECT:
SUMMARY
OF MEETING WITH PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE TO DISCUSS SEABROOK RISK MANAGEMENT AND EMERGENCY PLANNING STUDY A meeting was held with Public Service Company of New Hampshire on August 14, 1986 at Brookhaven National Laboratory in Upton, New York. The NRC staff was represented by members of the Office of Nuclear Reactor Regulation; Division of PWR Licensing-A and members of Brookhaven National Laboratory (BNL) staff.
The applicant was represented by members of Public Service Company of New Hampshire, New Hampshire Yankee Division, Pickard Lowe and Garrick (PL&G),
United Engineers & Constructors (UE&C) and Structural Mechanics Associates (SMA). A list of attendees is included as Enclosure 1.
The purpose of this meeting was to obtain detailed background information regarding Seabrook's unique containment design and construction features and its inherent strength capabilities. An outline of the meeting discussion topics is contained in Enclosure 2.
Mr. Vince Noonan of the NRC staff opened the meeting by stating that it is necessary to identify all additional information needed at the present time in order to complete this review in the projected 3 month time frame.
Mr. Charlie Hofmayer (BNL) continued by stating that BNL intends to review calculations and confirmatory analysis relating to the design, construction and key elements of containment, then examine failure modes and specific details.
Mr. Rich Toland and K. N. Kalawadia began the presentation with a general ,
discussion of the Seabrook containment design. Mr. Toland said that the ,
Seabrook containment was unique for an east coast design in that the design l basis accident pressure is 52 psi with a seismic design of .25 peak ground acceleration. The containment has a liner with T anchors, is reinforced concrete with rebar and behaves as a shell. He said that the liner acts as a barrier, but not a strengthener from the code point of view.
Differences in the Seabrook design and the Indian Point and WNP 1 and 4 designs were discussed with respect to liner and rebar capabilities.
Mr. C. Hofmayer discussed the fact that we are concerned with those features )
of the design that are unique. Mr. Toland pointed out that the main rebar is I continuous; it goes around openings rather than terminating and the dome rebar is continued on the same plain for each of the 4 quadrants.
8609260044 860908 PDR ADOCK 00000443 A PDR I
Don Wesley, of SMA, discussed containment penetrations and said that there are large margins in the hatch design, so that the hatches have a high pressure capacity. He also said that all major penetrations are below grade. .
The staff went on to ask about containment construction. Did anything unique occur? The applicant stated that very minor rebar indentation occurred and cadweld lineup at certain locations may have caused congestion of rebars behind the liner. However, the cadwelds were scattered and therefore no reduction in strength was taken.
The applicant discussed the results of the containment integrated leak rate test. The containment was maintained at 52 psi for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the test was successful.
Mr. Rich Toland discussed the containment ultimate strength evaluation per-formed by UE&C. The behavior to the limit state was analyzed; this was up to a point when the shell would undergo large deformations.
Following the discussion of the ultimate strength evaluation by UE&C, SMA reviewed the ultimate strength evaluation performed by them. Mr. Wesley said
= that SMA considered breach of containment liner to be the containment failure point in their analysis. Two types of failure modes were considered: direct /
actual pressure failure of the structure and indirect / interaction related failure at pipe penetrations.
In his discussion of interaction failures Wesley said that failure to isolate purge valves is one of the most dominant in the PRA.
Mr. Art Tingle (BNL) raised several questions regarding the consequence analysis in the Seabrook submittal. He requested weather information in order to run CRAC 2 or MACCS. It was agreed that a conference call would be arranged with Keith Woodard (PL&G) to get this information. Mr. Tingle stated that NRC must determine whether to use CRAC or MACCS.
The effects of external events and the seismic fragility report were briefly discussed. In response to a question from Mr. Goutam Bagchi it was stated that the effects of relay chatter were not looked at in much detail. Although the fragility report was updated, the information has not been included in the new study and will not be incorporated into the SSPSA until next year.
At the end of the meeting the need for a site visit during the first week of September was discussed.
i Containment design and analysis information presented to the staff during the meeting was listed. This is included as Enclosure 3. It was agreed that a ,
followup meeting would be held with BNL to discuss the V Sequence, Containment '
l Isolation and Containment Bypass. ;
4 The meeting was adjourned at 4:00 p.m.
Elizab h Doolittle, Project Manager PWR Project Directorate #5 i Division of PWR Licensing-A !
Enclosures t
s s
i
_ essuiss j(6tkI " 4 Containment design and analysis information presented to the staff during the meeting was listed. This is included as Enclosure 3. It was agreed that a followup meeting would be held with BNL to discuss the V Sequence, Containment Isolation and Containment Bypass.
The meeting was adjourned at 4:00 p.m.
Elizabeth Doolittle, Project Manager PWR Project Directorate #5 Division of PWR Licensing-A Enclosures fl b0 0FC :PW :p A : : : : : :
_____:__{______:____________:____________:____________:____________:___
NPRE :EDoolittle : : : : : :
DATE :9/ /86 : : : : : :
0FFICIAL RECORD COPY
Meeting Summary Distribution Docket or Central File NRC Participants NRC PDR "
Local PDR E. Doolittle PD#5 Reading File V. Noonan .
J. Partlow G. Bagchi V. Noonan Pro.1ect Manager DGC-Pethesda E. Jordan B. Grimes ACRS (10)
M. Rushbrook 1
cc: I.icensee and Plant Service i
, I.i s t
Mr. Robert J. Farrison
- Public' Service Company of New Hampshire Seabrook Nuclear Power Station I
cc: E. Tupper Kinder, Esq. l Thomas Dignan, Esq. ~ i John A. Ritscher, Esq. G. Dana Bisbee, Esq.
Ropes and Gray Assistant Attorney General Office of Attorney General 225 Franklin Street Boston, Massachusetts 02110 208 State Posue Annex Concord, New Hampshire 03301 Mr. Bruce B. Beckley, Project Manager Public Service Company of New Hampshire Resident Inspector Post Office Box 330 Seabrook Nuclear Power Station Manchester, New Hampshire 03105 c/o US Nuclear, Regulatory Commission Post Office Box 700 Dr. Mauray Tye, President Seabrook, New Hampshire 03874 Sun Valley Association Mr. John DeVincentis, Director 209 Sumer Street Faverhill, Massachusetts 01839 Engineering and licensing Yankee Atomic Electric Company Robert A. Backus, Esq. 1671 Worchester Road O'Neil, Backus and Spielman Framingham, Massachusetts 01701 116 lowell Street Mr. A. M. Ebner, Project Manager i Manchester, New Hampshire 03105
- United Engineers & Constructors William S. Jordan, III 30 South 17th Street Diane Curran Post Office Box 8223 Parmon, Weiss & Jordan Philadelphia, Pennsylvania 19101 20001 S Street, NW Suitt 430 Washington, D.C. 20009 Mr. Philip Ahrens, Esq.
Assistant Attorney General State House, Station #6 Augusta Maine 04333 Jo Ann Shotwell, Esq.
Office of the Assistant Attorney General Environmental Protection Division Mr. Warren Pall One Ashburton Place Public Service Company of Boston, Massachusetts 02108 New Hampshire D. Pierre G. Cameron, Jr., Esq.
Post Office Box 330 Seabrook, New Hampshire 03874 General Counsel Public Service Company of New Fampshire Seacoast Anti-Pollution League Post Office Box 330 ,
Ms. Jane Doughty Manchester, New Fampshire 03105 i l
5 Market Street Portsmouth, New Hampshire 03801 Regional Administrator, Region I U.S. Nuclear Regulatory Comission '
Mr. Diana P. Randall 631 Park Avenue 70 Collins Street King of Prussia, Pennsylvania' 19406 Seabrook, New Fampshire 03874 Richard Pampe Esq.
New Hampshire Civil Defense Agency 107 Pleasant Street Concord, New Hampshire 03301
.Public Service Company of Seabrook Nuclear Power Station
, New Hampshire cc:
Mr. Calvin A. Canney, City Manager Mr. Alfred V. Sargent, City Hall Chairman 126 Daniel Street Board of Selectmen -
Portsmouth, New Hampshire 03801 Town of Salisbury, MA 01950 Ms. Letty Pett Senator Gordon J. Humphrey Town of Brentwood ATTN: Tom Burack RF0 Dalton Road U.S. Senate Brentwcod, New HampsLire 03833 Washington, D.C. 20510 Ms. Roberta C. Pev e r Mr. Owen B. Durgin, Chairman Town of Hampton Falls, New Hampshire Durham Board of Selectmen Drinkwater Road Town of Durham Pampton Falls, New Hampshire 03844 Durham, New Hampshire 03824 Ms. Sandra Gavutis Charles Cross, Esq.
Town of Kensington, New Hampshire Shaines, Mardrigan and RDF 1 McEaschern East Kingston, New Hampshire 03827 25 Maplewood Avenue Post Office Box 366
- Portsmouth, New Hampshire 03801 Chaiman, Board of Selectmen RFD 2 South Pampton, New Hampshire 03827 Mr. Guy Chichester, Chaiman Rye Nuclear Intervention Mr. Angie Machiros, Chairman Comittee Board of Selectmen c/o Rye Town Pall for the Town of Newbury 10 Central Road Newbury, Massachusetts 01950 Rye, New Hampshire 03870 Ms. Cashman, Chairman Jane Spector Board of Selectmen Federal Energy Regulatory Town of Amesbury Comission Town Fall 825 North Capital Street, NE Amesbury, Massachusetts 01913 Room 8105 Washington, D. C. 20426 Ponorable Peter J. Matthews Mayor, City of Newburyport Mr. R. Sweeney Office of the Mayor New Hampshire Yankee Division City Fall Public Service of New Hampshire Newburyport, Massachusetts 01950 Company 7910 Woodmont Avenue Mr. Donald E. Chick, Town Manager Bethesda, Maryland 20814 Town of Exeter 10 Front Street Mr. William B. Derrickson Exeter, New Hampshire 03823 Senior Vice President .
Public Service Company of New Hampshire Post Office Box 700, Route 1 Seabrook, New Hampshire 03874
Enclosure 1 ATTENDANCE 8/14/86 - Seabrook Containment Strength
- 1. E. Doolittle NRC Project Manager
- 2. Vincent S. Noonan NRC/ Director
- 3. Goutam Bagchi NRC/PWR-A/EB
- 4. Robert A. Bari BNL
- 5. Robert E. White NHY-Engineering
- 6. John DeVincentis NHY-Director / Engineering
- 7. Robert E. Sweeney NHY-Bethesda Office
- 8. K. M. Kalawadia SDE NE&C j 9. Fred Torri PLG
- 10. Don Wesley SMA
- 11. Jim Moody NHY
- 12. Paul Bezler BNL
- 13. Kamal K. Bandypadhyay BNL
- 14. Jose Pires BNL
- 15. Charles Hofmayer BNL
- 16. Rich Toland VE&C
= 17. Bruce Miller BNL l
=
1
.i
r Enclosure 2 Meeting to Obtain Information on Seabrook Containment Strength Agenda
- 1. Design of containment: UE&C a) Reinforcement details Membrane Radial Shear Tangential Shear Fatch Openings b) Penetration Reinforcement Details c) Design of Penetration Assemblies d) Details of liner e) Basemat and foundation detail f) Relationship to adjacent structures
- 2. Construction of containment: UE&C a) Material certification b) Strength test results (reinforcing steel, concrete and liner) c) Relevant nonconformance reports (shell and penetration assemblies)
- 3. Structural Integrity and Integrated leak Rate Test Results: PSNP a) Anomalies b) Comparison with analytical predictions
- 4. Ultimate Strength Evaluation: UE&C
- 5. Ultimate Strength Evaluation: SMA
- 6. Containment Failure Modes: SMA Interaction with adjacent structures
- 7. Effects of External Events: SMA
- 8. Action Items: NRC/PSNH
F i .
Enclosure 3 s
DRAWING LIST Stick #1 Containment Building
- 1. Containment Design
' 2. Main Steam and Feedwater Penetration
- 3. Containment Penetration
- 4. Hatch Drawings Stick #2 Adjacent Structure Drawings
, 1. Fuel Building
- 2. Containment Enclosure
- 3. Main Steam & Feedwater Pipe Chase (West)
- 4. Electrical Tunnel
- 5. Pre-action Valve Building
- 6. Main Steam Feedwater Pipe Chase (East)
- 7. Containment Intervals Patick #3 Containment Enclosure D
4 w--_-_-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _
e SBB-86-126
~
- . ATTACHMENT 3 Sh. 1 of 2 i
5 INf0RMATIONONCONTAINMENT i.
4 All Design Drawings (Structure & Penetrations) .
D: sign Specs UE&C Design Report -
UI&C Ultimate Capacity Analysis SMA Reports concerning Containnent Capacity and Seisnic Fragility Construction Reports -
~ uravings Showing Interfaces #iWill AdjaceEt Structuras Structural Integrity Test Report Sunnary of Meteria" Test Reports (Concrete, Rebar, Liner) l l