WASHINGTON, D. C. 20555 APR 7 1986 Docket Nos.:
50-443 and 50-444 APPLICANT:
Public Service Company of New Hampshire (PSNP)
FACILITY:
Seabrook Station, Unit I and 2
SUBJECT:
MEETING
SUMMARY
A meeting with the New Hampshire Yankee Division (NPY) of PSNP was held on February 27, 1986, in Bethesda, Maryland to discuss improvements to e
the proposed Seabrook Station Technical Specifications.
In their proposed Technical Specifications transmitted by letter of July 26, 1985, the applicant had included significant rearrangement and redrafting of Technical Specification 3/4.2, " Power Distribution limits". As modified during the discussions, some of the proposed changes were included in the Proof and Review version of the Seabrook Technical Specification forwarded to the applicant on March 12, 1986. A list of attendees is enclosed.
The more significant items discussed were as follows:
1.
The applicant withdrew their proposal to change Specification 3/4.2.2 from a heat flux hot channel factor to a planar radial peaking factor.
2.
It was agreed that the limiting reactor coolant system flow rate would be relocated from Specification 3.2.3, "RCS Flow Rate" and
" Nuclear Enthalpy Rise Pot Channel Factor," to Specification 3.25, "DNB Parameters."
3.
It was agreed that the ACTION for Specification 3.2.3 would be H
simplified by replacing prescribed TPERMAl. POWER numerical limits with THERMAI. POWER levels corresponding to out-of-limit nuclear enthalpy rise hot channel factors.
Corresponding simplifications in surveillance of 4.2.3 were implemented.
4.
It was agreed that a major simplification in Specification 3/4.2.4,
" Quadrant Power Tilt Ratio," was acceptable.
8604150258 860407 PDR ADOCK 05000443 A
PDR m
- 5.
It was agreed that Table 3.2.1, "DNB Parameters" could be eliminated.
Surveillance 4.2.5 was modified to refer to the valves now listed under the LC0 instead of in Table 3.2.1.
Victor Nerses, Project Manager PWR Project Directorate No. 5 Division of PWR I.icensing-A
Enclosure:
As stated cc: See next page l
l
t I
Meeting with Seabrook 02/27/86 ATTENDEES Calvin W. Moon..................NRC/PWR-A/F08-A Paul Gurney.....................NPY Jerry Wilson....................NRC/PWR-A/RSB Marvin Dunenfeld................NRC/PWR-A/RSB Warren Pal 1.....................NPY
~.
e 5.
It was agreed that Table 3.2.1, "DNB Parameters" could be eliminated.
Surveillance 4.2.5 was modified to refer to the valves now listed under the LC0 instead of in Table 3.2.1.
Victor Nerses, Project Manager PWR Project Directorate No. 5 Division of PWR licensing-A
Enclosure:
As stated cc: See next page d
PP qPW5 IR:P #5 I./Ekses:js V.
oonan
' 4/ 1 /86 4/
86 0FFICIAL R CORD COPY
Meeting Summary Distribution "Idiid7et Er# Central File NRC Participants NRC PDR I.ocal PDR C. Moon PDf5 Reading File Paul Gurney J. Partlow (Emergency Preparedness only)
Jerry Wilson V. Noonan Marvin Dunenfeld Project Manager V. Nerses Warren Fall 0 ELD E. Jordan B. Grimes ACRS (10)
M. Rushbrook cc: Licensee and Plant Service 1.ist 4
e
~
-me---
,m r
--c-*
c.
,