ML20205A850

From kanterella
Jump to navigation Jump to search
Advises That H Oslick Informed That Draft Corp of Engineers Rept on Occurrence & Intensity of Hurricanes Cannot Be Released
ML20205A850
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 09/20/1968
From: Muller D
US ATOMIC ENERGY COMMISSION (AEC)
To: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20205A535 List:
References
FOIA-88-443 NUDOCS 8810260114
Download: ML20205A850 (4)


Text

%

e

)

September 20, 1968 R. S. Boyd, Assistant Director for Reactor Projecto PUBLIC SERVICE COMPANY OF 'EW RAMPSHIRZ, N3WINCION NVCLEAR STATIO:1

! In renponse to Mr. Harold Oen \'e letter of September 12, 1968. I inforwd him by telephone on September 19, 1968 that we could not give him a copy of a draf t report by the Corpe of Engineers on occurrence and intensity of hurricanes.

1 I restated our offer to let him ese our copy when he is in Betheede, or to read specific data to him by phone.  ;

D. R. Muller, Qitef Raat *;or Project Branch #1 Division of Reactor Licensing ec: P. A. Morris F. Schroeder P. Howe I. Spickler Distribution:

Suppl.

RL Reading RPB-1 Reading D. R. Muller N. Blunt l

l l

1 di J f

<m k

or nc: , - - - < -.-. - ' ' '~~~""""'

.RL:RPB-)4 * .

sm we ,

MM.r/eb

? ,, , , , .. , _ . , , , ,, . . - .

e tr , 9/20/68 ..]. _ , , , _ , . , , ....,. ....x....._._.=...._.m.=u.:... .

8810260114 000920 PDR FOIA MOKRZYC80-443 PDR

O SUPPLEMENTAL FILE COPY Roger 8. Boyd, Assistant Director for Reactor Frajects 1HRU D. R. Muller, Chief, Reactor Project Branch #1 MEETING WITH PUBLIC SERVICE COMPANY OF NEW RAMFSHIRI RECARDING THE NEWINGTON SITE Hessrs. Eliot Friest and William T. Nickerson representatives of Public Service of New Hampshire met with D. R. Muller and C. J. Hale October 2, 1968, to discuss their progress since the August meeting.

The Public Service Company has contracted several of the long lead-time componente and have initiated a study of the Newington site.

(See attachment for brief site description.)

Aside from the fact that the Newington site is small and the population density is large the applicant feels their greatent problem with the site is the close proximity of the SAC Fease Air Force Base. We '

(y were asked whether DRL has criteria with respect to teattors near j

airports. We advised them that such criteria have not been finalia.4 -

' but that a similar problem had been encountered at Three Mile taland.

' Fublic Service has retained Fickard and Lowe to study the probloc in more detail.

Public Service is looking for a more suitable site with little success.

It appears, although not stated, that they are considering abandoning the Newington site in view of the close proximity of the SV sase.

Mr. Friest stated if Public Service decidea to abandce the Newington site we would be advised before any such statenest was made public.

i 4

J Clif ton J. Male, hoject Leader Reactor Project Branch fl Divisico of Peactor Licensing i

5 J _

2'v4 i

sn I \ 'I

  • R. S. Boyd Distribution:

Suppl.

RL Reading RPB-1 Reading

_1 _- - > .

D. R. Muller C. J. Hale N. Blunt ernce . .. DRL l. .DRL. . , , _ .. , , , , _ , . , , , ,

vi.s.c , . kIle: Is . .. . .M M . :..._.. .

. . . . _ . = - -

om l 10/7/68 .I 10/.2/68_. . . . - . . . . . . . . . _ _ ..

....=..m. _m.=.=

m m . ,t. m .m., m , , , . . . . , , , , . . . , , . . . ,

4 4

NEWIPGTON h't1CI.EAA STATION 5ITE Newington is in the southeast portion of New Hampshire. Tha 157 acre site is situated on the Fiscataqua River approximately one and a half miles northwest of the Fortsmouth city limits. Directly south of the site lies Fease Air Force Base (SAC). The base runvay is lateral to the site and less than two miles from the proposed reactor location. The New Hampshire-Maine border 10 thu Piscatagua River. Population distribution is not available but an estimate of

, 40,000 within a five mile site radius would be conserv.rstive.

.