MONTHYEARML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20076N1401983-07-15015 July 1983 Rept of Overhead Fluid Grouting Test Program ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program. ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage. ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment. ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20023D1331983-05-0505 May 1983 Evaluation of Pressures in Lines of Grouting Equipment - Crack Repair Borated Water Storage Tank Foundations. ML20081J6571983-04-12012 April 1983 Test Program Status & Rev 12 - Test Schedule ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl ML20071D9361983-02-0202 February 1983 Rev 1 to Hydraulic Snubbers ML20071D9271983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Hydrazine Addition Positive Displacement Pump ML20071D9031983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Centrifugal Pump 1985-12-13
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program. ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage. ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment. ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl ML20071D9361983-02-0202 February 1983 Rev 1 to Hydraulic Snubbers ML20071D9271983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Hydrazine Addition Positive Displacement Pump ML20071D9031983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Centrifugal Pump ML20076G1841983-01-28028 January 1983 Rev 1 to ATP-5-Q, Procedure for Providing Project Orientation ML20076G1651983-01-28028 January 1983 Rev 1 to ATP-4-Q, Procedure for Providing Mgjec QA Program ML20069Q4131982-10-25025 October 1982 to QA Dept Procedure B-3M-1, Qualification & Certification of Insp & Test Personnel 1985-12-13
[Table view] |
Text
...
. L.' O O J.0.No. 14509 Date June 16, 1983 Midland Plant Units 1 & 2 Revision i THIRD PARTY CONSTRUCTION IMPLEMENTION OVERVIEW Approval:
/
m l Date: I- /* E3 Manaher Quality Assurance' qp
! \
Date fd-83 Program Manager 1.0 PURPQSE AND SCOPE To estr.blish a program whereby Stone & Webster performs independent evaluations and verifications of the Consumers Power Company (CPCo) Construction Completion Program, (CCP) reports progress, observations, and nonconformances to the program,; specifically, to verify that:
1.1 Management performance is adequate in the following areas:
A. Establishment of the Management Review Comittee B. Duties and responsibilities of the Review Comittee are clearly defined C. Procedures governing the actions of the Review Comittee are in place D. Management reviews are complete, effective, and conducted in ac-cordance with the requirements of the CCP Program 1.2 CCP procedures, instructions, inspection plans, records, and prerequisites for inspections /reinspections have been satisfactorily approved prior to implementation.
1.3 Specific CPCo comitments to the NRC are iden.tified to f acilitate track-ing; dates for compliance (as appropriate) are adequately identified; appropriate action parties are clearly identified; comitted actions have been satisfactorily resolved.
1.4 Procedures, prerequisites, and reinspection attributes in References 2.1, 2.2 and 2.3 have been approved by the Management Review Comittee.
8307260547 830705 PDR ADOCK 05000329 7)'(('*
t A PDR ]f ,
.;. O O J.0. No. 14509 Midland Plant Units 1 s 2 Consumers Power Company ,
1.5 Personnel assigned to implement the CCP Program have been properly trained, qualified and certified in accordance with the requirements of ANSI-N45.2.6; SNT-TC-1A and MPQAD Procedure B-3M-1, Qualification and Certification of Inspection and Test' Personnel. Construction and craft personnel -shall be trained to meet the requirements of the Construction Training Procedure FPG-2.000.
1.6 The effectiveness of the Quality Verification Program based onwitnessing inspections /reinspections of selected component installation, fabrication and review of applicable test / inspection reports and records.
1 1.7 Measures have been developed to ensure that NRC hold points are clearly identified and controls are in evidence to prevent continuance of work pending clearance of the hold points.
2.0 REFERENCES
- 2.1 Quality Verification Program Document, April 16, 1983
, 2.2 Construction Completion Program
- a. Letters J.W. Cook to the IRC: JaNary 10, 1983 April 6, 1983 April 22, 1983 2.3 Nonconformance Identification and Reporting Procedure 3.0 ATTACHMENTS l 3.1 Evaluation Attribute Checklist (Later) 3.2 Verification Attribute Checklist (Later) 3.3 Nonconformance Inspection Report (Later) 4.0 DEFINITIONS 4.1 Construction Completion Program (CCP)
A 'progra:n to provide guidance in planning and management of design and quality activities necessary for completion of construction of the plant and verification nf completed work.
4.2 Quality Verificatfen Program (QVP)
An ' element of the CCP used to confirm the quality status of safety related procurement - and construction activities completed and inspected by the Engineer-Constructor personnel prior to December 2, 1982.
4.3 Evaluation Assessment of quality related activities based upon review of procedures, plans, instructions, inspection . reports, test results and additional conmittments.
~
. O O J.0.No. 14509 Midland Plant Units 1 & 2 Consumers Power Company
~
NOTE Documentation' resulting from resolution of CPCo committments to the NRC and NRC Hold Points shall be 100% reviewed to verify that
- t. proper corrective action has been accom-plished.
. g\
4.4 Verification f Confirming, substantiating or assuring that CCP and QVP requirements have been implemented and are active, verification actions may include docu-mentation, hardware and management systems.
NOTE Activities performed by CPCo under the CCP and QVP Programs will be monitored using random sampling techniques. The sampling will be based on a review of day to day activities in sufficient detail to ensure adequate implementation of the programs.
i' 5.0 GENERAL REQUIREMENTS 5.1 All personnel assigned quality assurance. program evaluation responsibil-ities shall be certified auditors in accordance with ANSI-N45.2.23 and applicable Stone & Webster procedures.
l 5.2 All personnel assigned construction verification responsibilities shall be certified inspectors in accordance with ANSI-N45.2.6 and applicable Stone
& Webster procedures and possess the appropriate combination of education, experience and training. ,_ ,
5.3 The Third Party Construction Implementation Overview (CIO) program will be structured to determine, by evaluation of predetermined procedures and instructions, the quality practices utilized in the construction of the Midland Plant Units 1, 2, and the effectiveness of those practices.
5.4 A site team will be established to monitor the effectiveness of the Con-
-- struction Completion Program. The team will consist of a Program Manager and two functional groups. One group will assess the completeness of compliance with procedures and inspection plans being used to complete the
- -work. The other group will review certain aspects of construction activi-I ties which relate to the performance of the Quality Control Inspection Program. These two gro.ups will use special procedures, checklists, and random sampling techniques to evaluate the following
A. Adequacy and implementation of CPCo procedures regarding construc-tion activities, personnel qualification, training programs, and organizational practices.
'B. Compliance of Construction Completion Program teams to prescribed procedures.
i
.. .d.0.No. 14509 $ D C'
' Midland Plant Units 1 & 7 Consumers Power Company C. Compliance of Midland Project Quality Assurance (MPQAD) personnel to applicable procedures.
D. Compliance of construction activities to applicable procedures.
5.5 The Program Manager shall maintain communications with the NRC and CPCo Site Manager. Weekly progress meetings shall be held with the NRC and CPCo to discuss progress and report on nonconformance and observations.
5.6 Programmatic nonconformances of a serious nature shall be immediately reported to the NRC and CPCo.
6.0 PROCEDURES 6.1 The following procedures shall be prepared to control the activities of the Construction Implementation Overview (CIO) teams.
A. Quality Control Instruction 10.01 Construction Implementation Overview Assessment 6.2 The site teams shall develop attribute checklists for each evaluation and verification activity. Attributes shall be selected from the CCP, PQCI's, CPCo committments to the NRC and other applicable requirements.
6.3 Auditors assigned toconduct evaluations shall, utilizing checklists, itemize those quality practices evident in the performance of each activity.
The results of each evaluation shall be documented on the checklist to ensure repeatability. Summaries of the results shall be tabulated weekly for presentation to the NRC and CPCo.
6.4 Inspectors assigned to conduct verification, shall utilizing the check-list, monitor the activities of CPCo personnel involved in CCP and QVP activities.
6.5 All systems verified shall be identified and documented to assure repeat-ability.
6.6 Nonconformances identified in conjunction with this procedure shall be dccumented on a Nonconformance Inspection Report (NIR)and processed in accordance with Reference 3.3 of this procedure.
7.0 REPORTS 7.1 The following reports will be submitted to NRC and CPCo and S&W by the Program Manager.
A. Weekly Progress Reports
.. [.0.No. 14509
(")
. .' Midland Plant Units 1 &
Consumers Power Company C. Final Reports on Construction Completion 7.2 Weekly Progress Report - Weekly Frogress Reports will be submitted during the weekly meeting with CPCo, and the NRC.
7.3 Final Report - A final report will be submitted 30 days after completion of the program. The report will summarize the SWEC assessment. The final report will be submitted by the Program Manager to the NRC, CPCo and S&W.
1
- O O STONE & WEBSTER MICHIGAN, INC.
P.O. box 2325, BOSTON. M ASSACHUSETTS O2107 SD-3&4 50' N 30 Mr. J. G. Keppler, Administrator, Region III July 14, 1983 Nuclear Regulatory Commission J.0. 14509 799 Roosevelt Road NRC File #83-07-14 Glen Ellyn, IL 60137 '
RE: DOCKET NO. 50-329/330 MIDLAND PLANT - UNITS 1 AND 2 OVERVIEW 0F THE CONSTRUCTION COMPLETION PROGRAM A copy of the Stone & Webster Third Party Implementation Overview Procedure, Rev.1 dated July 5,1983 is enclosed for your review. The Procedure was revised for clarity. As periodic reports have and will be transmitted to your office, requirement for monthly reports has been deleted from the procedure.
Very truly yours, l l l
S. W. Baranow Program Manager Enclosure SWB/ka l cc: JJHarrison, NRC Glen Ellyn i RCook, NRC Midland (site)
DBMiller, CPCo Midland (site)
F8 Kelly, S&W APAmaruso, S&W C0 Richardson, S&W L